Lecture Notes For Cost Estimating PDF
Lecture Notes For Cost Estimating PDF
Building Economy
Today’s Lecture
What is an Estimate?
What is an Estimate?
What is an Estimate?
1. Materials costs.
2. Labor costs.
3. Equipment costs.
4. Overhead (general and job) costs.
5. Profit.
If costs are too high, his jobs will be few and far
between.
١٠
١١
١٢
١٣
١٤
١٥
١٧
9. Omission of profit.
١٩
Types of Estimates
Today’s Lecture
Types of Estimates.
Conceptual Phase Estimate.
Procurement Estimate.
٢١
Types of Estimates
When beginning to prepare an estimate, it is important to
understand its intended use.
Conceptual phase.
Schematic phase.
Design development phase.
Procurement phase.
٢٢
٢٤
٢٥
This estimate will take one to two weeks and will carry a
10% contingency for unknown design and engineering
details that will be developed during the next design stage.
٢٦
٢٧
٢٨
٢٩
٣٠
The contractors bidding for the project will break the project
down into work packages.
٣١
٣٢
Estimate Considerations
Today’s Lecture
Estimate Considerations.
Project Size.
Project Quality.
Project Location.
Time.
Market Conditions.
٣٥
Estimate Considerations
Every estimate, whether it is generated in the conceptual
phase of a project or at bidding time, must consider a
number of issues.
٣٦
Project Size
As a general rule in construction, as a project gets bigger,
the cost of the project increases.
٣٧
Project Size
As the project becomes a little better understood, the
project’s size will begin to be quantified more accurately.
٣٨
Project Size
The principle of economy of scale must be considered when
addressing project size
٣٩
Project Size
On large commercial buildings and heavy engineering
projects, worker productivities are plotted into what are
called Learning curves.
Time
Learning curves show
Required that as the number of
Per Unit repetitions or units a
Learning Curve worker needs to
accomplish increases, the
time required to perform
that repetition decreases.
Number of Units
٤٠
Project Quality
As the quality and complexity of a project increases, so does
the project’s cost.
٤١
Project Location
The location of the project is a major consideration in the
preparation of an estimate.
Project Location
Time
The time at which a project is built can have a major impact
on the cost of the project.
Time
Historical indices can be used to adjust the cost of a past
project to one today.
٤٥
Project size.
Project quality.
Project location.
Time.
٤٦
٤٧
2. Determine quantities.
٤٨
4. Price labor.
5. Price equipment.
٥١
Pre-Construction Estimates
Today’s Lecture
Assemblies Estimate.
٥٣
Pre-Construction Estimates
Pre-construction estimates are prepared during the pre-
construction stage of a project.
٥٤
Pre-Construction Estimates
All pre-construction estimates start with a database of past
projects.
٥٥
Pre-Construction Estimates
In working with historical data, it is important to understand
what costs are included and not included in each item.
٥٦
Conceptual estimate.
Square foot estimate.
Assemblies estimate.
٥٧
٥٨
٥٩
٦٠
To adjust for quality, the unit costs are divided into three
columns, ¼, median, and ¾. This allows the estimator to
adjust for quality quickly.
Size
In the project size modifier table (figure 5-3), the typical motel
equals 27,000 sq. ft. Therefore the cost multiplier for the size
adjustment can be calculated as follows:
Using a size factor of 1.148 (round off to 1.1), read from the
graph on figure 5-3 a cost multiplier of 0.99.
Therefore for the motel project, the price adjusted to size is:
٦٥
Figure 5-4 shows example tables for a few of the over 200
cities throughout the US and Canada for which Means has
complied the cost of construction.
٦٦
٦٧
Columbia:
2,014,650/100 = Adjusted Columbia Cost/77.9
Columbia Cost = $1,569,412
Spokane:
2,014,650 = Adjusted Spokane Cost/99.9
Spokane Cost = $2,012,635
٦٨
٦٩
Time
٧٠
٧١
Construction cost.
Building cost.
Common labor.
Skilled labor.
Materials.
٧٣
٧٤
1. The reported costs are derived from actual projects that have
been built around the country.
٧٧
٧٨
٨٠
٨١
٨٢
Example:
٨٣
٨٤
٨٥
Study carrels.
Emergency lights.
Furnishings (bookshelves, reading tables).
٨٨
٨٩
Cost.
Durability.
Owner requirements for quality.
٩٠
Woven wool carpet (42 oz) with padding = $6.68/sq. ft. $66,680
Nylon carpet (26 oz) = $3.06/sq. ft. $30,600
Resilient asphalt tile = $1.57/sq. ft. $15,700
Example:
٩٢
٩٣
Example:
٩٥
٩٦
٩٧
٩٩
١٠٢
The earlier and more accurate the estimate, the greater the
opportunity for such decisions to be made.
١٠٣
Detailed Estimating
١٠٦
To this total, the costs required to manage the job in the filed
and at the home office must be added.
Quantity Takeoff
Today’s Lecture
Organization.
Measuring Quantities.
١١٠
١١١
١١٢
١١٤
١١٧
١١٨
١١٩
١٢٣
Unit Pricing
Today’s Lecture
Pricing Sources.
Material Costs.
Equipment Costs.
١٢٥
Unit Pricing
With the quantity takeoff complete, the estimator has
determined all the typical components that go into the
project and how many of each type are necessary.
Unit Pricing
The equipment unit price covers the cost of the
equipment necessary to install the material.
١٢٧
١٣٠
١٣١
١٣٢
١٣٣
١٣٤
١٣٥
١٣٦
Estimate Setup
Today’s Lecture
Format.
Overhead.
Profit.
١٣٨
Estimate Setup
Most estimates are complied by a number of people
and organizations.
١٣٩
١٤٠
١٤١
١٤٣
١٤٤
١٤٥