0 Design of Substructure
2.1 Design of Pier
Section of Pier
A B C A' 1.475 A
0.50 TPL 83.10
1.00
2.500 2.500 2.00
4.50
3 SBL 78.40
1.60 1.60
0.2 76.80
8.40 10.80 FBL
75.15
MSL
4 rows of piles @2.4 m c/c 5 rows of piles @2.4 m c/c
0.8
PBL
54.80
8.40 2.4
10.80
= 230.40
= 144.00
Distance of the edge pile from the axis along longitudinal axis xc= 2.4 m
Distance of the edge pile from the axis along transverse axis yc= 3.6 m
Summary of Load
Non-seismic cases Vmax (KN) Vmin (KN) Hmax (KN)
Dry (comb. I), Full LL 813.59 656.21 9.77
Flooded (comb. IV),NoLL 659.08 614.01 9.77
Seismic cases
Dry (comb. V), Full LL 927.56 515.22 86.86
Flooded (comb. VIII),NoLL 850.37 729.86 86.86
Provide 12 mm circular rings @ 100 mm c/c upto height of 3 m from top of pile.
(PPL 2)
Provide 12 mm circular rings @ 150 mm c/c in rest portion of pile.
Summary of reinforcement of Pier Pile Cap and Pile
M 30