EVAPORATION NEW BODY ERRECTION AND COMMISSIONG REQUIRED MATERIALS

1] Level transmitter [double diaphragm] with accessories -2 nos.

2] RTD with accessories -2 nos.

3] Vacuum gauges and pressure gauges with 1 inch ball valve – 2 nos each

4] SCADA modification in PLC.

5] ½ inch PU connecter -15 nos.

6] ¼ inch PU connecter -6 nos.

7] PU pipe 8/6 – 4 mtr.

8] Ball valve ½ inch with internal threading -6 nos.

9] Cable for control valves.