You are on page 1of 76

वितरण सच

ू ी
Distribution List

1 सचचि, के.वि.नि.आ. तीसरा एिं चौथा तल, चंद्रलोक भिि, 36, जिपथ, िई दिल्ली – 110001
Secretary, CERC, 3rd & 4th Floor, Chanderlok Building,36,Janpath,New Delhi-110001

2 मुख्य अभभयंता (जी एम), के.वि.प्रा., सेिा भिि, आर. के. पुरम, िई दिल्ली – 110066
Chief Engineer (GM), CEA,Sewa Bhavan, R.K.Puram , New Delhi-110066

3 सिस्य सचचि, उ. क्षे. वि. स., 18/ए, शहीि जीत भसंह सिसििाल मार्ग, िई दिल्ली – 110016
Member Secretary, NRPC,18/A,SJSS Marg, Katwaria Sarai, New Delhi-110016

4 सिस्य सचचि, प. क्षे. वि. स., एफ-3, एम आई डी सी क्षेत्र, अंधेरी(पूि)ग , मुंबई – 400093
Member Secretary, WRPC, F-3,MIDC Area, Andheri (East),Mumbai-400093

5 सिस्य सचचि, ि. क्षे. वि. स., 29, रे स कोसग क्रॉस रोड, बंर्लूरु – 560009
Member Secretary, SRPC, 29,Race Course Cross Road,Bangalore-560009

6 सिस्य सचचि, प.ू क्षे. वि. स., 14, र्ोल्फ क्लब रोड, कोलकाता – 700033
Member Secretary, ERPC, 14,Golf Club Road , Kolkata-700033

सिस्य सचचि,उ. पू. क्षे. वि. स.,मेघालय राज्य आिासीय वित्त सहकारी सभमनत भलभमटे ड भिि, िोंचिम
7 दहल्स, भशलोंर् – 793003
Member Secretary, NERPC, Meghalaya State Housing Finance Cooperative Society Ltd.
Building, Nongrim Hills , Shillong -793003

मुख्य अभभयंता, राष्ट्रीय विद्युत सभमनत, एिआरपीसी भिि, तत


ृ ीय तल, 18/ए, शहीि जीत भसंह
8 सिसििाल मार्ग, िई दिल्ली – 110016
Chief Engineer, National Power Committee, NRPC Building, 3rd floor, 18/A,SJSS Marg,
Katwaria Sarai, New Delhi-110016

9 कायगपालक नििे शक, प.ू क्षे. भा. प्रे. के., 14, र्ोल्फ क्लब रोड, कोलकाता – 700033
Executive Director, ERLDC,14, Golf Club Road , Kolkata-700033

10 कायगपालक नििे शक, प. क्षे. भा. प्रे. के., एफ-3, एम आई डी सी क्षेत्र, अंधेरी(पूि)ग , मुंबई – 400093
Executive Director, WRLDC,F-3,MIDC Area, Andheri (East),Mumbai-400093

11 महाप्रबंधक, उ.क्षे.भा.प्रे.के, 18/ए, शहीि जीत भसंह सिसििाल मार्ग, िई दिल्ली – 110016
General Manager, NRLDC,18/A,SJSS Marg, Katwaria Sarai, New Delhi-110016

12 महाप्रबंधक, ि. क्षे. भा. प्रे. के, 29, रे स कोसग क्रॉस रोड, बंर्लरु
ू – 560009
General Manager, SRLDC, 29,Race Course Cross Road,Bangalore-560009

13 कायगपालक नििे शक, प.ू क्षे. भा. प्रे. के., डोंर्नतएह, लोअर िोंिह, लापलंर्, भशलोंर्- 793006
Executive Director, NERLDC, Dongtieh, Lower Nongrah, Laplang, Shillong-793006
POWER SYSTEM OPERATION CORPORATION LIMITED
पॉवर सिस्टम ऑपरे शन कारपोरे शन सिसमटे ड

NATIONAL LOAD DESPATCH CENTRE –राष्ट्रीय भार प्रेषण केन्द्र

Monthly
मासिक ऑपरे शन ररपोटट Operation Report

जुलाई
2020
पावर सिस्टम ऑपरे शन कापोरे शन सिसमटे ड
राष्ट्रीय भार प्रेषण केंद्र, नई सिल्ली

POWER SYSTEM OPERATION CORPORATION LTD


NATIONAL LOAD DESPATCH CENTRE, NEW DELHI

माह जु िाई-2020 के सिए प्रचािन सनष्पािन ररपोटट


OPERATIONAL PERFORMANCE REPORT FOR THE
MONTH OF JULY-2020
पृ ष्ठसूची CONTENTS

1 माह जुलाई-2020 की साराां श ररपोर्ट 1-5

Summary of report for the month of JULY-2020


2 क्षे त्रवार स्थापपत पवद् यु त क्षमता 6
Region wise Installed Capacity
3 राष्ट्रीय स्तर पर साांध्यकालीन पशखर माां गपूपतट 7-8
Peak demand met at National level

4 राष्ट्रीय स्तर पर पवद् यु त ऊजाट खपत 9-10


Energy consumption at National level

5 पिक्वेंसी रूपरे खा 11-12


Frequency profile

6 राष्ट्रीय स्तर पर जल पवद् यु त ऊजाट उत्पादन 13-14


Hydro generation at National level

7 राष्ट्रीय स्तर पर पवन ऊजाट उत्पादन 15


Wind generation at National level

8 राष्ट्रीय स्तर पर सौर ऊजाट उत्पादन 16


Solar generation at National level

9 राष्ट्रीय स्तर पर दै पनक अपिकतम पवद् यु त माांग पूपतट 17


Daily maximum demand met at National level

10 02 जुलाई के मााँ ग एवां उत्पादन प्लॉर् (अपिकतम माां ग पूपतट ) व मााँग का डार्ा (15 पमनर् अां तराल)
Demand and generation plots for 02- JULY (Max Demand Met) and Demand data 18-22
(15-minute)

11 ऊजाट आपूपतट की वास्तपवक स्स्थपत 23


Actual power supply position

12 ऊजाट आवश्यकता एवां आपू पतट की पपछले वर्ट माह जुलाई -2019 से तुलना 24
Energy requirement and met comparison with JULY -2019

13 पशखर माां ग आवश्यकता एवां आपू पतट की पपछले वर्ट माह जुलाई -2019 से तुलना 25
Peak demand requirement and met comparison with JULY -2019

14 क्षेत्रीय स्तर पर पशड्यूल एवां डर ावल 26


Schedule & drawal at regional level
15 अां तर क्षेत्रीय पवपनमय 27-34
Inter-regional exchanges

16 अां तर राष्ट्रीय पवद् यु त पवपनमय 35-37


Inter-national exchanges

17 एसर्ीओए (पिपक्षीय एवां सामूपहक)एवां यू आइ का ब्यौरा 38


Bilateral and collective short-term open access & UI details

18 पावर माकेर् की सूचना 39-42


Power market information

19 अक्षय ऊजाट प्रमाण पत्र प्रपिया 43-45


Renewable energy certificate mechanism

20 मुख्य घर्नाएाँ एवां पडस्टर्बें स 46-54


Important events/disturbances

21 नए कमीशांड पारे र्ण तत्व 55


New elements commissioned

22 पवभव रूपरे खा 56
Voltage profile

23 जुलाई -2020 के दौरान रा.भा.प्रे .के.िारा पनगरानी में तत्वोां के आउर्े ज की सूची 57-67
List of outage of elements monitored by NLDC for the month of JULY -2020

24
24 अर्ब तक उच्चतम (माां ग व ऊजाट ) आाँ कड़े : माह जुलाई -2020 तक 68
All Time Highest (Demand & Energy) figures : Till JULY-2020

25 जुलाई-2020 के पलए पसस्टम ररलाइपर्बपलर्ी सूचकाां क 69


System Reliability Indices for JULY -2020
1. SUMMARY OF REPORT FOR THE MONTH OF JULY 2020

1
2
3
4
5
2. ALL INDIA REGIONWISE INSTALLED CAPACITY

As on 31.07.2020
(All figures are in MW)

THERMAL RES @ GRAND


S No Region NUCLEAR HYDRO
COAL LIGNITE GAS DIESEL TOTAL MNRE TOTAL
1 NR 53440 1580 5781 0 60801 1620 20086 17148 99655
2 WR 73735 1540 10806 0 86082 1840 7623 26411 121956
3 SR 44365 3240 6492 434 54530 3320 11775 42589 112214
4 ER 27285 0 100 0 27385 0 4639 1507 33531
5 NER 770 0 1812 36 2618 0 1577 367 4562
6 ISLANDS 0 0 0 40 40 0 0 18 58
ALL INDIA 199595 6360 24992 510 231456 6780 45699 88042 371977
Remarks: Data from CEA website

6
3. र ष्ट्रीय स्तर पर सांध्य क लीन दिखर दर्वि् युत म ां ग पू दति
EVENING PEAK HOUR DEMAND MET AT NATIONAL LEVEL
म ह: जुल ई 2020 MONTH:- JULY 2020
सभी आां कड़े मेग र्व ट मे All figures in MW
दिन ांक ऊत्तरी क्षे. पदिमी क्षे. िदक्षणी क्षे. पू र्वी क्षे. पू र्वोत्तर क्षे. कुल
Date NR WR SR ER NER TOTAL
1-Jul-20 60826 41432 35942 21193 2724 162117
2-Jul-20 63328 42765 35398 21879 2624 165994
3-Jul-20 61135 41932 33378 21513 2687 160645
4-Jul-20 60198 41860 34904 21630 2665 161257
5-Jul-20 53319 37901 31961 21026 2604 146811
6-Jul-20 54780 39444 35423 19801 2745 152193
7-Jul-20 53050 39722 36888 20780 2713 153153
8-Jul-20 54375 41238 36068 21085 2610 155376
9-Jul-20 57880 40963 36070 20873 2662 158448
10-Jul-20 57678 41124 35569 19810 2561 156742
11-Jul-20 57634 41442 35125 20099 2560 156860
12-Jul-20 48437 39388 32179 19787 2427 142218
13-Jul-20 54375 41238 36068 21085 2610 155376
14-Jul-20 59265 42528 35654 21306 2658 161411
15-Jul-20 59882 41115 34238 21526 2730 159491
16-Jul-20 59817 41470 34391 21665 2739 160082
17-Jul-20 60376 42577 34986 22053 2732 162724
18-Jul-20 60087 43360 35796 22345 2695 164283
19-Jul-20 56496 41806 33033 19433 2518 153286
20-Jul-20 55876 42542 34935 21080 2491 156924
21-Jul-20 47566 43935 36528 20154 2575 150758
22-Jul-20 50285 43962 37571 21598 2691 156107
23-Jul-20 55154 43822 36798 20398 2627 158799
24-Jul-20 55560 43470 36320 21236 2675 159261
25-Jul-20 56621 42512 35176 21652 2729 158690
26-Jul-20 58060 42632 33098 21945 2627 158362
27-Jul-20 59884 45341 37479 21692 2607 167003
28-Jul-20 61544 45004 36811 20986 2692 167037
29-Jul-20 58369 45148 36164 21427 2679 163787
30-Jul-20 56176 45160 37223 22249 2671 163479
31-Jul-20 58778 44942 36513 22670 2680 165583
उच्चतम MAXIMUM 63328 45341 37571 22670 2745 167037

दनम्नतम MINIMUM 47566 37901 31961 19433 2427 142218

औसत AVERAGE 56994 42315 35409 21161 2645 158524


अब तक क
उच्चतम All Time 63328 54589 50436 23016 2944 176381
Max.
दिन ांक Date 02.07.20 15.10.18 24.02.20 31.08.19 29.08.19 29.05.19
नोट : सभी आां कड़े 2000 बजे की म ांगपू दति पर आध ररत है ।
Note: The above figures correspond to value at 2000 Hrs
7
EVENING PEAK HOUR DEMAND MET DURING THE MONTH OF JULY 2020
NR WR SR ER NER INDIA
180

160

140
EVENING PEAK HOUR DMD (GW) -->

120

100
NR - Max: 63328 MW Min: 47566 MW Avg : 56994 MW WR - Max: 45341 MW Min: 37901 MW Avg : 42315 MW
SR - Max: 37571 MW Min: 31961 MW Avg : 35409 MW ER - Max: 22670 MW Min: 19433 MW Avg : 21161 MW
80
ALL INDIA - Max: 167037 MW Min: 142218 MW Avg : 158524 MW NER - Max: 2745 MW Min: 2427 MW Avg : 2645 MW

60

40

20

0
10-Jul-20

11-Jul-20

12-Jul-20

13-Jul-20

14-Jul-20

15-Jul-20

16-Jul-20

17-Jul-20

18-Jul-20

19-Jul-20

20-Jul-20

21-Jul-20

22-Jul-20

23-Jul-20

24-Jul-20

25-Jul-20

26-Jul-20

27-Jul-20

28-Jul-20

29-Jul-20

30-Jul-20

31-Jul-20
1-Jul-20

2-Jul-20

3-Jul-20

4-Jul-20

5-Jul-20

6-Jul-20

7-Jul-20

8-Jul-20

9-Jul-20

DATE -->

8
4. र ष्ट्रीय स्तर पर दर्वि् युत ऊर् ा आपूदता ENERGY MET AT NATIONAL LEVEL
म ह: र्ुल ई 2020 MONTH:- JULY 2020
सभी आां कड़े दमदलयन यूदनट मे All figures in MU
दिन ांक ऊत्तरी क्षे. पदिमी क्षे. िदक्षणी क्षे. पूर्वी क्षे. पूर्वोत्तर क्षे. कुल
Date NR WR SR ER NER TOTAL
01-Jul-20 1460 1004 855 467 50 3835
02-Jul-20 1512 1021 847 471 48 3900
03-Jul-20 1520 1029 825 466 50 3889
04-Jul-20 1436 1003 796 450 51 3735
05-Jul-20 1137 937 744 437 49 3304
06-Jul-20 1281 931 809 428 49 3498
07-Jul-20 1278 943 854 437 51 3564
08-Jul-20 1257 967 868 453 51 3596
09-Jul-20 1324 983 837 440 50 3635
10-Jul-20 1378 981 810 436 47 3652
11-Jul-20 1274 990 813 428 45 3550
12-Jul-20 1112 958 775 430 44 3318
13-Jul-20 1257 967 868 453 51 3596
14-Jul-20 1374 1012 844 440 49 3718
15-Jul-20 1398 998 807 447 48 3698
16-Jul-20 1420 974 780 458 51 3683
17-Jul-20 1419 997 807 473 51 3748
18-Jul-20 1418 1022 824 480 49 3793
19-Jul-20 1317 1015 792 447 46 3617
20-Jul-20 1236 1025 816 436 44 3557
21-Jul-20 1090 1047 836 435 46 3453
22-Jul-20 1112 1059 885 432 48 3537
23-Jul-20 1219 1055 861 411 49 3595
24-Jul-20 1270 1045 851 428 49 3643
25-Jul-20 1296 1023 831 437 50 3638
26-Jul-20 1325 1008 776 461 49 3620
27-Jul-20 1428 1066 872 468 49 3883
28-Jul-20 1450 1089 897 445 51 3931
29-Jul-20 1390 1072 860 436 51 3810
30-Jul-20 1274 1083 870 450 49 3725
31-Jul-20 1301 1083 891 460 50 3785
कुल TOTAL 40958 31387 25803 13843 1517 113508
उच्चतम MAXIMUM 1520 1089 897 480 51 3931
दनम्नतम MINIMUM 1090 931 744 411 44 3304
औसत AVERAGE 1321 1012 832 447 49 3662
सांचयी 2020-21
130388 120273 105008 47182 5142 407994
Cumulative 2020-21
अब तक क उच्चतम
1520 1293 1157 496 58 4145
All Time Max.
दिन ांक Date 03.07.20 16.10.18 18.03.20 25.06.19 22.08.19 30.05.19

9
ENERGY MET DURING THE MONTH OF JULY' 2020
NR WR SR ER NER ALL INDIA
4500

4000

3500

3000
ENERGY (MU) -->

NR - Max: 1520 MU Min: 1090 MU Avg : 1321 MU WR - Max: 1089 MU Min: 931 MU Avg : 1012 MU
2500
SR - Max: 897 MU Min: 744 MU Avg : 832 MU ER - Max: 480 MU Min: 411 MU Avg : 447 MU
ALL INDIA - Max: 3931 MU Min: 3304 MU Avg : 3662 MU NER - Max: 51 MU Min: 44 MU Avg : 49 MU
2000

1500

1000

500

0
10-Jul-20

11-Jul-20

12-Jul-20

13-Jul-20

14-Jul-20

15-Jul-20

16-Jul-20

17-Jul-20

18-Jul-20

19-Jul-20

20-Jul-20

21-Jul-20

22-Jul-20

23-Jul-20

24-Jul-20

25-Jul-20

26-Jul-20

27-Jul-20

28-Jul-20

29-Jul-20

30-Jul-20

31-Jul-20
1-Jul-20

2-Jul-20

3-Jul-20

4-Jul-20

5-Jul-20

6-Jul-20

7-Jul-20

8-Jul-20

9-Jul-20

DATE -->

10
5. वर्ष 2020-21 के फ्रिए आवृफ्रत रूपरे खा FREQUENCY PROFILE FOR YEAR 2020-21

राष्ट्रीय फ्रिड NATIONAL GRID


उच्चतम फ्रिम्नतम औसत
फ्रिक्वेंसी रूपरे खा (Hz) <49.9 49.9-50.05 >50.05
फ्रिक्वेंसी फ्रिक्वेंसी फ्रिक्वेंसी

Apr-20 All India Grid 5.10 75.13 19.77 50.30 49.61 50.01

May-20 All India Grid 4.23 76.68 19.10 50.29 49.57 50.01

Jun-20 All India Grid 4.51 76.91 18.58 50.31 49.63 50.01
% समय

Jul-20 All India Grid 6.71 78.15 15.14 50.39 49.62 50.00

2020-21
All India Grid 5.13 76.72 18.15 50.39 49.57 50.00
(upto July)

11
5.1 जुलाई 2020 के फ्रलए आवृफ्रत रूपरे खा FREQUENCY PROFILE FOR JULY 2020

उच्चतम फ्रिम्नतम औसत


फ्रिक्वेंसी रूपरे खा (Hz) <49.9 49.9-50.05 >50.05 एफ़.वी.आई.
फ्रिक्वेंसी फ्रिक्वेंसी फ्रिक्वेंसी

01-Jul-20 8.33 79.81 11.85 50.14 49.79 49.99 0.04


02-Jul-20 6.34 83.50 10.16 50.13 49.77 49.99 0.03
03-Jul-20 7.33 81.76 10.91 50.14 49.78 49.99 0.03
04-Jul-20 3.39 71.50 25.10 50.15 49.80 50.01 0.03
05-Jul-20 2.57 46.94 50.49 50.39 49.81 50.06 0.11
06-Jul-20 5.05 73.30 21.66 50.13 49.82 50.00 0.03
07-Jul-20 4.98 80.81 14.21 50.21 49.80 50.00 0.03
08-Jul-20 9.71 76.89 13.40 50.16 49.76 49.99 0.04
09-Jul-20 3.30 81.16 15.54 50.14 49.77 50.00 0.02
10-Jul-20 1.66 78.66 19.69 50.17 49.83 50.01 0.02
11-Jul-20 2.93 70.49 26.59 50.20 49.84 50.02 0.03
12-Jul-20 4.20 61.96 33.84 50.31 49.79 50.03 0.08
13-Jul-20 18.62 75.86 5.52 50.15 49.69 49.96 0.07
14-Jul-20 25.65 70.65 3.70 50.12 49.62 49.94 0.08
15-Jul-20 15.16 76.52 8.32 50.17 49.69 49.97 0.06
% 16-Jul-20 10.52 76.61 12.87 50.17 49.73 49.99 0.04
समय
17-Jul-20 7.22 80.51 12.27 50.19 49.69 49.99 0.04
18-Jul-20 8.59 84.07 7.34 50.11 49.78 49.98 0.03
19-Jul-20 0.47 77.62 21.91 50.16 49.88 50.02 0.02
20-Jul-20 3.70 74.53 21.77 50.16 49.80 50.01 0.03
21-Jul-20 5.58 81.18 13.24 50.19 49.75 50.00 0.03
22-Jul-20 1.44 87.84 10.73 50.14 49.85 50.00 0.02
23-Jul-20 4.59 84.41 11.00 50.12 49.83 50.00 0.02
24-Jul-20 3.19 84.57 12.23 50.17 49.84 50.00 0.02
25-Jul-20 6.28 85.19 8.53 50.13 49.77 49.99 0.03
26-Jul-20 6.03 80.63 13.34 50.23 49.81 50.00 0.03
27-Jul-20 6.93 84.25 8.82 50.17 49.78 49.98 0.03
28-Jul-20 9.39 81.78 8.83 50.13 49.74 49.98 0.04
29-Jul-20 2.15 83.13 14.72 50.14 49.84 50.00 0.02
30-Jul-20 5.14 79.07 15.79 50.18 49.70 50.00 0.03
31-Jul-20 7.56 87.62 4.83 50.13 49.76 49.98 0.03

12
6.र ष्ट्रीय स्तर पर जल दर्वि् युत उत्प िन
HYDRO GENERATION AT NATIONAL LEVEL
म ह: जुल ई 2020 MONTH:- JULY 2020

सभी आां कड़े दमदलयन यूदनट मे All figures in MU


दिन ांक ऊत्तरी क्षे . पदिमी क्षे . िदक्षणी क्षे . पूर्वी क्षे . पूर्वोत्तर क्षे . कुल
Date NR WR SR ER NER TOTAL
01-Jul-20 364 57 65 150 29 665
02-Jul-20 366 47 57 132 29 632
03-Jul-20 364 46 56 151 31 647
04-Jul-20 360 45 59 142 27 633
05-Jul-20 351 30 51 137 28 597
06-Jul-20 361 37 62 144 27 631
07-Jul-20 360 32 66 145 27 631
08-Jul-20 368 34 86 149 27 664
09-Jul-20 363 34 80 149 29 656
10-Jul-20 365 28 69 129 31 622
11-Jul-20 363 26 67 116 31 603
12-Jul-20 351 21 56 135 31 593
13-Jul-20 368 34 86 149 27 664
14-Jul-20 358 46 83 150 31 668
15-Jul-20 355 33 77 149 29 643
16-Jul-20 346 29 70 152 29 626
17-Jul-20 349 27 69 149 28 623
18-Jul-20 354 33 88 152 30 657
19-Jul-20 344 22 80 147 28 621
20-Jul-20 346 25 102 132 31 636
21-Jul-20 344 23 111 137 30 645
22-Jul-20 339 22 116 127 31 634
23-Jul-20 336 21 122 132 30 642
24-Jul-20 331 22 105 137 29 626
25-Jul-20 342 25 98 139 29 632
26-Jul-20 348 23 72 143 27 612
27-Jul-20 355 25 95 141 28 644
28-Jul-20 352 28 102 131 31 643
29-Jul-20 348 23 87 139 31 628
30-Jul-20 345 25 90 143 31 635
31-Jul-20 348 14 90 146 30 628
कुल TOTAL 10945 937 2519 4371 906 19678
उच्चतम MAXIMUM 368 57 122 152 31 668
दनम्नतम MINIMUM 331 14 51 116 27 593
औसत AVERAGE 353 30 81 141 29 635
सांचयी 2020-21
34498 5212 9365 12531 2049 63656
Cumulative 2020-21
अब तक क उच्चतम All
389 167 208 152 37 816
Time Max.
दिन ांक Date 18.08.15 18.12.14 31.08.18 16.07.20 03.07.19 09.09.19
13
HYDRO ENERGY DURING THE MONTH OF JULY' 2020
NR WR SR ER NER INDIA
800
NR - Max: 368 MU Min: 331 MU Avg : 353 MU
SR - Max: 122 MU Min: 51 MU Avg : 81 MU
700 ALL INDIA - Max: 668 MU Min: 593 MU Avg : 635 MU

600

WR - Max: 57 MU Min: 14 MU Avg : 30 MU


HYDRO ENERGY (MU) -->

ER - Max: 152 MU Min: 116 MU Avg : 141 MU


500
NER - Max: 31 MU Min: 27 MU Avg : 29 MU
ER - Max: 152 MU Min: 116 MU Avg : 141 MU
400

300

200

100

0
1-Jul-20

2-Jul-20

3-Jul-20

4-Jul-20

5-Jul-20

6-Jul-20

7-Jul-20

8-Jul-20

9-Jul-20

10-Jul-20

11-Jul-20

12-Jul-20

13-Jul-20

14-Jul-20

15-Jul-20

16-Jul-20

17-Jul-20

18-Jul-20

19-Jul-20

20-Jul-20

21-Jul-20

22-Jul-20

23-Jul-20

24-Jul-20

25-Jul-20

26-Jul-20

27-Jul-20

28-Jul-20

29-Jul-20

30-Jul-20

31-Jul-20
DATE -->

14
7. र ष्ट्रीय स्तर पर पर्वन ऊर् ा उत्प िन
WIND GENERATION AT NATIONAL LEVEL
म ह: र्ुल ई 2020 MONTH:- JULY 2020
सभी आां कड़े दमदलयन यूदनट मे All figures in MU
दिन ांक ऊत्तरी क्षे . पदिमी क्षे . िदक्षणी क्षे . पूर्वी क्षे . पूर्वोत्तर क्षे . कुल
Date NR WR SR ER NER TOTAL
01-Jul-20 12.9 58.7 159.8 ---------- ---------- 231
02-Jul-20 41.5 79.6 173.2 ---------- ---------- 294
03-Jul-20 39.4 80.0 202.3 ---------- ---------- 322
04-Jul-20 39.5 71.5 195.1 ---------- ---------- 306
05-Jul-20 13.7 82.9 166.7 ---------- ---------- 263
06-Jul-20 10.2 114.6 198.1 ---------- ---------- 323
07-Jul-20 7.0 114.9 179.4 ---------- ---------- 301
08-Jul-20 11.8 112.3 113.4 ---------- ---------- 238
09-Jul-20 16.8 94.0 72.3 ---------- ---------- 183
10-Jul-20 38.7 129.7 84.7 ---------- ---------- 253
11-Jul-20 51.6 117.7 89.2 ---------- ---------- 258
12-Jul-20 50.3 128.7 113.5 ---------- ---------- 292
13-Jul-20 11.8 103.0 116.0 ---------- ---------- 231
14-Jul-20 14.9 43.9 103.9 ---------- ---------- 163
15-Jul-20 10.8 53.0 133.7 ---------- ---------- 197
16-Jul-20 13.4 50.5 156.3 ---------- ---------- 220
17-Jul-20 11.6 57.4 151.7 ---------- ---------- 221
18-Jul-20 5.3 61.5 66.8 ---------- ---------- 134
19-Jul-20 33.3 94.7 37.9 ---------- ---------- 166
20-Jul-20 53.6 114.9 40.1 ---------- ---------- 209
21-Jul-20 53.9 93.3 27.2 ---------- ---------- 174
22-Jul-20 22.6 58.4 21.0 ---------- ---------- 102
23-Jul-20 37.4 65.0 26.6 ---------- ---------- 129
24-Jul-20 21.1 45.1 47.7 ---------- ---------- 114
25-Jul-20 10.4 19.6 81.9 ---------- ---------- 112
26-Jul-20 8.3 38.2 101.8 ---------- ---------- 148
27-Jul-20 22.5 63.9 123.8 ---------- ---------- 210
28-Jul-20 47.8 92.1 94.4 ---------- ---------- 234
29-Jul-20 45.4 74.3 103.5 ---------- ---------- 223
30-Jul-20 15.3 26.1 113.6 ---------- ---------- 155
31-Jul-20 17.0 23.7 124.7 ---------- ---------- 165
कुल TOTAL 789.7 2363.4 3420.6 ---------- ---------- 6574
उच्चतम MAXIMUM 53.9 129.7 202.3 ---------- ---------- 323
दनम्नतम MINIMUM 5.3 19.6 21.0 ---------- ---------- 102
औसत AVERAGE 25.5 76.2 110.3 ---------- ---------- 212
सांचयी 2020-201
2837.6 8550.7 10352.1 ---------- ---------- 21740
Cumulative 2020-21
अब तक क उच्चतम
71.3 199.3 245.5 … … 467
All Time Max.
दिन ांक Date 14.07.19 27.07.19 20.07.18 … … 12.06.18
*Source: As reported by SLDCs. Limited visibility of embedded wind generator data.
15
8. र ष्ट्रीय स्तर पर सौर ऊर् ा उत्प िन
SOLAR GENERATION AT NATIONAL LEVEL
म ह: र्ुल ई 2020 MONTH:- JULY 2020
सभी आां कड़े दमदलयन यू दनट मे All figures in MU
दिन ांक ऊत्तरी क्षे. पदिमी क्षे. िदक्षणी क्षे. पूर्वी क्षे. पूर्वोत्तर क्षे. कुल
Date NR WR SR ER NER TOTAL
01-Jul-20 39 28 90 4.8 0.0 161
02-Jul-20 41 30 84 4.8 0.0 160
03-Jul-20 40 27 84 4.6 0.0 156
04-Jul-20 41 24 71 4.9 0.0 141
05-Jul-20 33 17 62 4.8 0.0 117
06-Jul-20 33 16 70 4.6 0.0 123
07-Jul-20 34 20 88 4.5 0.0 147
08-Jul-20 34 25 87 4.8 0.0 151
09-Jul-20 39 26 71 4.5 0.0 141
10-Jul-20 38 22 67 4.6 0.0 132
11-Jul-20 38 25 89 4.5 0.0 156
12-Jul-20 35 25 90 4.8 0.0 155
13-Jul-20 34 25 87 4.8 0.0 151
14-Jul-20 35 20 68 4.7 0.0 128
15-Jul-20 40 19 54 4.6 0.0 118
16-Jul-20 37 22 63 4.6 0.0 126
17-Jul-20 38 27 83 4.4 0.0 152
18-Jul-20 34 30 89 4.3 0.0 158
19-Jul-20 34 27 90 4.1 0.0 155
20-Jul-20 36 24 86 4.0 0.0 150
21-Jul-20 25 24 99 4.2 0.0 153
22-Jul-20 32 28 90 4.6 0.0 154
23-Jul-20 42 26 64 4.3 0.0 137
24-Jul-20 38 24 81 4.3 0.0 147
25-Jul-20 35 22 78 4.4 0.0 139
26-Jul-20 37 29 90 4.4 0.0 160
27-Jul-20 40 30 103 4.3 0.0 178
28-Jul-20 45 26 79 4.3 0.0 155
29-Jul-20 39 22 73 4.4 0.0 138
30-Jul-20 38 22 91 4.3 0.0 154
31-Jul-20 29 25 88 4.5 0.0 147
कुल TOTAL 1132 760 2510 139 0.8 4542
उच्चतम MAXIMUM 45 30 103 5 0.04 178
दनम्नतम MINIMUM 25 16 54 4 0.02 117
औसत AVERAGE 37 25 81 4 0.03 147
सांचयी 2020-21
4667 3117 9771 568 3.6 18127
Cumulative 2020-21
अब तक क उच्चतम
47 32 104 5 0.24 178
All Time Max.
दिन ांक Date 03.04.20 13.03.20 17.02.20 25.06.20 22.11.19 28.03.20

*Source: RLDCs for solar connected to ISTS; SLDCs for embedded solar. Limited visibility of embedded solar data.

16
9. र ष्ट्रीय स्तर पर िै दनक अदिकतम दर्वि् यु त म ांग पूदता
DAILY MAXIMUM DEMAND MET AT NATIONAL LEVEL
म ह: र्ुल ई 2020 MONTH:- JULY 2020
सभी आां कड़े मेग र्व ट मे All figures in MW

दिन ांक ऊत्तरी क्षे. पदिमी क्षे. िदक्षणी क्षे. पूर्वी क्षे. पूर्वोत्तर क्षे. कुल दर्वदभन्नत फ़ैक्टर
Date NR WR SR ER NER TOTAL Diversity Factor*
01-Jul-20 66463 44130 39300 22252 2718 166781 1.048
02-Jul-20 68605 44539 39417 22546 2679 170545 1.042
03-Jul-20 67114 44579 37625 22255 2701 168346 1.035
04-Jul-20 66282 43407 35781 21450 2702 160830 1.055
05-Jul-20 58713 40082 34107 21041 2638 148872 1.052
06-Jul-20 59986 39468 39033 20384 2703 154489 1.046
07-Jul-20 57955 41413 39785 21007 2769 155230 1.050
08-Jul-20 58570 41328 40557 21493 2753 156394 1.053
09-Jul-20 63242 41495 38294 21402 2693 162367 1.029
10-Jul-20 61509 41733 36802 20839 2583 157751 1.036
11-Jul-20 63084 41815 36978 20463 2606 159578 1.034
12-Jul-20 59116 39887 35689 19966 2525 152201 1.033
13-Jul-20 58570 43692 40557 21493 2753 156394 1.068
14-Jul-20 63982 43763 39811 20822 2703 161761 1.058
15-Jul-20 65470 43593 38117 21535 2827 160654 1.068
16-Jul-20 65318 41756 35382 21825 2698 161136 1.036
17-Jul-20 65616 42492 37617 22339 2735 163719 1.043
18-Jul-20 64373 43821 38048 22902 2754 165723 1.037
19-Jul-20 63274 42911 36432 22606 2556 160144 1.048
20-Jul-20 57386 44972 39131 20827 2508 157059 1.049
21-Jul-20 52090 45439 38819 20541 2634 150357 1.061
22-Jul-20 53305 46232 41541 21204 2672 156246 1.056
23-Jul-20 58685 45951 39146 20455 2646 159652 1.045
24-Jul-20 59111 45259 39671 20783 2699 160247 1.045
25-Jul-20 60856 45113 38935 21243 2763 159897 1.056
26-Jul-20 63307 42607 35349 22269 2624 161787 1.027
27-Jul-20 64881 46313 41365 21778 2648 168905 1.048
28-Jul-20 65510 47244 42503 20919 2774 169216 1.058
29-Jul-20 63677 46294 41307 21536 2691 166224 1.056
30-Jul-20 59568 47407 41220 22051 2687 164359 1.052
31-Jul-20 62438 47519 43190 22709 2696 167512 1.066
उच्चतम MAXIMUM 68605 47519 43190 22902 2827 170545 1.068

दनम्नतम MINIMUM 52090 39468 34107 19966 2508 148872 1.027

औसत AVERAGE 61873 43750 38758 21449 2682 160786 1.048

अब तक क उच्चतम
68605 59385 53465 23783 3145 182610
All Time Max.

दिन ांक Date 02.07.20 21.02.20 18.03.20 14.06.19 07.09.19 30.05.19


* Diversity factor = (Sum of regional max demands) / All India max demand
नोट : यह आां कड़े एनएलडीसी स्क ड प्रण ली में िर्ा िै दनक अदिकतम म ांगपू दता िर् ा ते हैं ।
Note: The above figures denote daily maximum demand met recorded in NLDC SCADA.

17
10. DEMAND AND GENERATION PLOTS FOR 02 JULY (MAXIMUM DEMAND MET)

18
19
20
21
02 जुलाई 2020 (अधिकतम मााँग) की आल इं धिया मााँग आपूधति
ALL INDIA DEMAND MET FOR 02 JULY 2020 (MAXIMUM DEMAND*)

Time (hrs) All India Demand (MW) Time (hrs) All India Demand (MW)
00:05 161817 12:05 164928
00:20 161763 12:20 166535
00:35 160845 12:35 166109
00:50 160181 12:50 166977
01:05 159067 13:05 165678
01:20 158447 13:20 165827
01:35 157535 13:35 165281
01:50 156930 13:50 166705
02:05 155704 14:05 167052
02:20 155489 14:20 167608
02:35 154625 14:35 167977
02:50 154094 14:50 167906
03:05 152891 15:05 168769
03:20 152588 15:20 168261
03:35 151932 15:35 168290
03:50 151632 15:50 167436
04:05 151087 16:05 165199
04:20 151460 16:20 164088
04:35 151259 16:35 162986
04:50 151747 16:50 161088
05:05 152470 17:05 160379
05:20 152834 17:20 159369
05:35 151926 17:35 158918
05:50 151817 17:50 157587
06:05 149628 18:05 156157
06:20 151803 18:20 156199
06:35 152580 18:35 157718
06:50 153273 18:50 159901
07:05 153428 19:05 161248
07:20 155130 19:20 163109
07:35 155612 19:35 165752
07:50 156407 19:50 167670
08:05 157183 20:05 167935
08:20 158336 20:20 168654
08:35 158594 20:35 168478
08:50 159738 20:50 168355
09:05 160339 21:05 169161
09:20 162237 21:20 168690
09:35 162555 21:35 168879
09:50 163132 21:50 168864
10:05 162928 22:05 169130
10:20 163562 22:20 170223
10:35 163700 22:35 169943
10:50 163741 22:50 169231
11:05 163392 23:05 168358
11:20 163674 23:20 167594
11:35 164108 23:35 166288
11:50 164813 23:50 165288
Maximum Demand of 170545MW met @ 22:10hrs (from 1 min. interval SCADA DATA)
* 15 minute interval SCADA DATA of instanteneous demand

22
11. ACTUAL POWER SUPPLY POSITION - JULY 2020

Requirement/Availability in MU/DAY Requirement/Availability in MU Peak Demand/Peak Met in MW


REGION STATE Peak
Energy Surplus(+)/ Requirem Energy Surplus(+)/ % Surplus(+)/ %
Requirement Requirement Demand
met Deficit(-) ent met Deficit(-) Shortage Deficit(-) Shortage
Met
Chandigarh 6 6 0.0 182 182 0 0.0 384 384 0 0.0
Delhi 107 107 0.0 3314 3313 -1 0.0 6310 6310 0 0.0
Haryana 189 189 0.0 5870 5870 0 0.0 10982 10982 0 0.0
Himachal Pradesh 28 28 0.0 867 867 0 0.0 1479 1479 0 0.0
J&K(UT) and Ladakh(UT) 45 45 0.0 1399 1399 0 0.0 2427 2427 0 0.0
Punjab 239 239 0.0 7402 7402 0 0.0 13148 13148 0 0.0
NR
Rajasthan 251 251 0.0 7793 7793 0 0.0 13079 13079 0 0.0
Uttar Pradesh 416 415 -0.3 12884 12875 -8 -0.1 23419 23419 0 0.0
Uttarakhand 40 40 0.0 1229 1229 0 0.0 2030 2030 0 0.0
NFF/Railway 1 1 0.0 44 44 0 0.0 92 92 0 0.0
TOTAL 1322 1322 -0.3 40982 40973 -9 0.0 68288 67578 -710 -1.0
Gujarat 294 294 0.0 9118 9118 0 0.0 15741 15741 0 0.0
Madhya Pradesh 215 215 -0.1 6668 6665 -3 0.0 10318 10290 -28 -0.3
Chhattisgarh 95 95 0.0 2934 2934 0 0.0 4577 4569 -8 -0.2
Maharashtra 371 371 0.0 11486 11486 0 0.0 17792 17792 0 0.0
Goa 9 9 0.0 264 264 0 0.0 451 450 -1 -0.2
WR
D&D 5 5 0.0 160 160 0 0.0 259 259 0 0.0
DNH 14 14 0.0 427 427 0 0.0 649 649 0 0.0
AMNSIL* 17 17 0.0 537 537 0 0.0 852 852 0 0.0

TOTAL 1019 1019 -0.1 31594 31591 -3 0.0 47910 47860 -50 -0.1

Andhra Pradesh 154 154 0.0 4764 4764 -1 0.0 8500 8500 0 0.0
Telangana 181 181 0.0 5616 5615 -1 0.0 11193 11177 -16 -0.1
Karnataka 157 157 0.0 4876 4875 -1 0.0 9400 9400 0 0.0
Kerala 63 62 0.0 1938 1937 0 0.0 3199 3199 0 0.0
SR
Tamil Nadu 270 269 0.0 8355 8354 -1 0.0 13589 13589 0 0.0
Puducherry 7 7 0.0 228 228 0 0.0 374 374 0 0.0
TOTAL 832 831 -0.1 25778 25773 -5 0.0 43176 43176 0 0.0
Bihar 107 106 -0.6 3314 3294 -20 -0.6 5948 5845 -103 -1.7
Jharkhand 28 27 -0.1 854 851 -3 -0.3 1552 1453 -99 -6.4
DVC 68 68 0.0 2104 2104 0 0.0 2884 2884 0 0.0
ER Odisha 88 88 0.0 2723 2723 0 0.0 4551 4551 0 0.0
West Bengal 170 170 -0.1 5282 5279 -3 -0.1 8430 8417 -13 -0.2
Sikkim 1 1 0.0 38 38 0 0.0 100 100 0 0.0
TOTAL 462 461 -0.8 14315 14289 -26 -0.2 22914 22914 0 0.0
Arunachal Pradesh 2 2 0.0 53 52 0 -0.7 155 127 -28 -17.9
Assam 32 31 -1.5 996 951 -45 -4.5 1839 1758 -81 -4.4
Manipur 2 2 0.0 77 77 0 -0.6 225 197 -28 -12.4
Meghalaya 5 5 0.0 163 163 0 0.0 321 321 0 0.0
NER Mizoram 2 2 0.0 51 51 0 -0.6 102 102 0 0.0
Nagaland 2 2 0.0 77 76 0 -0.4 147 147 0 0.0
Tripura 8 8 0.0 241 241 0 0.0 288 288 0 0.0
TOTAL 53 52 -1.5 1657 1610 -47 -2.8 3076 2939 -137 -4.4

ALL INDIA 3688 3685 -2.9 114326 114236 -89 -0.1 185363 184467 -897 -0.5
* ArcelorMittal Nippon Steel India Ltd. Previously it was ESIL (Essar Steel India Ltd.)

23
12. ENERGY COMPARISON OF JULY 2020 vs JULY 2019
Energy Requirement (MU) Energy Met (MU)
REGION STATE Average Average
Jul-19 Jul-20 Difference % Change MU/day for Jul-19 Jul-20 Difference % Change MU/day for
July-20 July-20
Chandigarh 175 182 6 4 6 175 182 6 4 6
Delhi 3750 3314 -436 -12 107 3749 3313 -436 -12 107
Haryana 5986 5870 -116 -2 189 5978 5870 -108 -2 189
Himachal Pradesh 905 867 -38 -4 28 901 867 -34 -4 28
J&K(UT) and Ladakh(UT) 1603 1399 -205 -13 45 1295 1399 104 8 45
NR Punjab 7272 7402 130 2 239 7272 7402 130 2 239
Rajasthan 7162 7793 631 9 251 7162 7793 631 9 251
Uttar Pradesh 11999 12884 884 7 416 11943 12875 932 8 415
Uttarakhand 1298 1229 -69 -5 40 1292 1229 -63 -5 40
NFF/Railway 77 44 -33 -43 1 77 44 -33 -43 1
TOTAL 40227 40982 755 2 1322 39845 40973 1128 3 1322
Gujarat 10551 9118 -1432 -14 294 10547 9118 -1429 -14 294
Madhya Pradesh 6022 6668 646 11 215 6020 6665 646 11 215
Chhattisgarh 2882 2934 52 2 95 2881 2934 53 2 95
Maharashtra 12591 11486 -1105 -9 371 12591 11486 -1105 -9 371
WR Goa 344 264 -80 -23 9 344 264 -80 -23 9
D&D 229 160 -69 -30 5 229 160 -69 -30 5
DNH 577 427 -150 -26 14 577 427 -150 -26 14
AMNSIL* 179 537 358 200 17 179 537 358 200 17
TOTAL 33376 31594 -1781 -5 1019 33369 31591 -1778 -5 1019
Andhra Pradesh 5352 4764 -588 -11 154 5350 4764 -586 -11 154
Telangana 5206 5616 410 8 181 5204 5615 411 8 181
Karnataka 5702 4876 -826 -14 157 5700 4875 -825 -14 157
SR Kerala 2102 1938 -164 -8 63 2099 1937 -162 -8 62
Tamil Nadu 9841 8355 -1486 -15 270 9838 8354 -1484 -15 269
Puducherry 254 228 -26 -10 7 254 228 -26 -10 7
TOTAL 28457 25778 -2679 -9 832 28445 25773 -2672 -9 831
Bihar 2884 3314 430 15 107 2872 3294 423 15 106
Jharkhand 773 854 81 11 28 767 851 84 11 27
DVC 2198 2104 -94 -4 68 2198 2104 -94 -4 68
ER Odisha 2745 2723 -23 -1 88 2745 2723 -23 -1 88
West Bengal 5440 5282 -158 -3 170 5430 5279 -151 -3 170
Sikkim 37 38 1 2 1 37 38 1 2 1
TOTAL 14077 14315 237 2 462 14049 14289 239 2 461
Arunachal Pradesh 69 53 -16 -24 2 69 52 -16 -24 2
Assam 955 996 42 4 32 899 951 52 6 31
Manipur 75 77 2 3 2 74 77 2 3 2
Meghalaya 171 163 -9 -5 5 171 163 -9 -5 5
NER
Mizoram 56 51 -5 -9 2 56 51 -5 -9 2
Nagaland 70 77 7 9 2 70 76 7 9 2
Tripura 145 241 96 66 8 144 241 97 68 8
TOTAL 1540 1657 117 8 53 1482 1610 128 9 52
ALL INDIA 117677 114326 -3351 -3 3688 117190 114236 -2954 -3 3685
* ArcelorMittal Nippon Steel India Ltd. Previously it was ESIL (Essar Steel India Ltd.)

24
13. DEMAND COMPARISON OF JULY 2020 vs JULY 2019

Peak Requirement (MW) Peak Met (MW)


REGION STATE
Jul-19 Jul-20 Difference % Change Jul-19 Jul-20 Difference % Change
Chandigarh 380 384 4 1.1 380 384 4 1.1
Delhi 7409 6310 -1099 -14.8 7409 6310 -1099 -14.8
Haryana 11001 10982 -19 -0.2 11001 10982 -19 -0.2
Himachal Pradesh 1527 1479 -48 -3.1 1527 1479 -48 -3.1
J&K(UT) and Ladakh(UT) 2904 2427 -477 -16.4 2323 2427 104 4.5
NR
Punjab 13633 13148 -485 -3.6 13633 13148 -485 -3.6
Rajasthan 12351 13079 728 5.9 12351 13079 728 5.9
Uttar Pradesh 21254 23419 2165 10.2 21254 23419 2165 10.2
Uttarakhand 2158 2030 -128 -5.9 2158 2030 -128 -5.9
NFF/Railway 125 92 -33 -26.3 125 92 -33 -26.3
Gujarat 17577 15741 -1836 -10 17577 15741 -1836 -10.4
Madhya Pradesh 10097 10318 221 2 10097 10290 193 1.9
Chhattisgarh 4746 4577 -169 -4 4736 4569 -167 -3.5
Maharashtra 20604 17792 -2812 -14 20583 17792 -2791 -13.6
WR
Goa 566 451 -115 -20 566 450 -116 -20.5
D&D 350 259 -91 -26.0 350 259 -91 -26.0
DNH 826 649 -177 -21.4 826 649 -177 -21.4
AMNSIL* 868 852 -16 -1.8 868 852 -16 -1.8
Andhra Pradesh 7036 8500 1464 20.8 7035 8500 1465 20.8
Telangana 7334 11193 3859 52.6 7333 11177 3844 52.4
Karnataka 7861 9400 1539 19.6 7861 9400 1539 19.6
SR
Kerala 3387 3199 -188 -5.5 3367 3199 -168 -5.0
Tamil Nadu 14104 13589 -515 -3.7 14103 13589 -514 -3.6
Puducherry 376 374 -2 -0.5 376 374 -2 -0.5
Bihar 5437 5948 511 9.4 5388 5845 457 8.5
Jharkhand 1445 1552 107 7.4 1350 1453 103 7.6
DVC 3067 2884 -183 -6.0 3067 2884 -183 -6.0
ER
Odisha 4907 4551 -356 -7.2 4907 4551 -356 -7.2
West Bengal 9138 8430 -708 -7.7 9129 8417 -712 -7.8
Sikkim 104 100 -4 -4.2 104 100 -4 -4.2
Arunachal Pradesh 137 155 18 12.9 134 127 -7 -5.4
Assam 1840 1839 -1 0.0 1793 1758 -35 -2.0
Manipur 182 225 43 23.7 175 197 22 12.6
NER Meghalaya 333 321 -12 -3.6 332 321 -11 -3.4
Mizoram 102 102 -1 -0.5 100 102 2 1.6
Nagaland 169 147 -22 -12.8 151 147 -4 -2.8
Tripura 298 288 -10 -3.4 297 288 -9 -3.0
* ArcelorMittal Nippon Steel India Ltd. Previously it was ESIL (Essar Steel India Ltd.)

25
14. SCHEDULE AND DRAWAL OF CONSTITUENTS - JULY 2020

ACTUAL Over drawal(+)/ ACTUAL Over drawal(+)/


SCHEDULE SCHEDULE
REGION STATE DRAWAL Under Drawal(-) % OD/UD DRAWAL Under Drawal(-)
(MU) (MU/DAY)
(MU) (MU) (MU/DAY) (MU/DAY)

Chandigarh 185.62 185.08 -0.53 -0.29 5.99 5.97 -0.02


Delhi 2866.36 2831.58 -34.78 -1.21 92.46 91.34 -1.12
Haryana 4571.29 4600.92 29.64 0.65 147.46 148.42 0.96
Himachal Pradesh -101.32 -93.77 7.55 -7.45 -3.27 -3.02 0.24
J&K(UT) and Ladakh(UT) 576.58 535.41 -41.17 -7.14 18.60 17.27 -1.33
NR
Punjab 4431.16 4331.04 -100.13 -2.26 142.94 139.71 -3.23
Rajasthan 2903.96 2948.40 44.44 1.53 93.68 95.11 1.43
Uttar Pradesh 6148.42 6158.90 10.49 0.17 198.34 198.67 0.34
Uttarakhand 578.80 587.00 8.20 1.42 18.67 18.94 0.26
NFF/Railway 41.39 43.93 2.53 6.12 1.34 1.42 0.08
Gujarat 2702.89 2777.41 74.52 2.76 87.19 89.59 2.40
Madhya Pradesh 3697.43 3660.24 -37.19 -1.01 119.27 118.07 -1.20
Chhattisgarh 1061.41 1066.17 4.76 0.45 34.24 34.39 0.15
Maharashtra 4316.29 4273.93 -42.36 -0.98 139.24 137.87 -1.37
WR
Goa 256.38 250.74 -5.64 -2.20 8.27 8.09 -0.18
D&D 157.81 159.62 1.81 1.14 5.09 5.15 0.06
DNH 426.02 426.79 0.77 0.18 13.74 13.77 0.02
AMNSIL* 197.65 198.20 0.55 0.28 6.38 6.39 0.02
Andhra Pradesh 1755.32 1780.37 25.05 1.43 56.62 57.43 0.81
Telangana 2687.47 2696.81 9.34 0.35 86.69 86.99 0.30
Karnataka 1671.78 1663.65 -8.13 -0.49 53.93 53.67 -0.26
SR Kerala 1450.24 1469.42 19.18 1.32 46.78 47.40 0.62
Tamil Nadu 3592.40 3508.33 -84.07 -2.34 115.88 113.17 -2.71
Puducherry 236.92 228.23 -8.69 -3.67 7.64 7.36 -0.28
Goa (SR) 45.85 45.24 -0.61 -1.32 1.48 1.46 -0.02
Bihar 3148.37 3139.77 -8.60 -0.27 101.56 101.28 -0.28
Jharkhand 615.15 599.36 -15.79 -2.57 19.84 19.33 -0.51
DVC -1185.99 -1177.21 8.77 -0.74 -38.26 -37.97 0.28
ER
Odisha 193.37 173.49 -19.88 -10.28 6.24 5.60 -0.64
West Bengal 1526.76 1585.02 58.26 3.82 49.25 51.13 1.88
Sikkim 37.67 37.91 0.23 0.62 1.22 1.22 0.01
Arunachal Pradesh 51.13 52.49 1.37 2.67 1.65 1.69 0.04
Assam 811.42 830.36 18.95 2.34 26.17 26.79 0.61
Manipur 75.77 76.63 0.86 1.14 2.44 2.47 0.03
NER Meghalaya -16.39 -23.06 -6.68 40.74 -0.53 -0.74 -0.22
Mizoram 38.45 37.02 -1.43 -3.72 1.24 1.19 -0.05
Nagaland 72.38 69.40 -2.98 -4.11 2.33 2.24 -0.10
Tripura 175.30 173.64 -1.66 -0.95 5.65 5.60 -0.05
* ArcelorMittal Nippon Steel India Ltd. Previously it was ESIL (Essar Steel India Ltd.)

26
15. INTER REGIONAL EXCHANGES 2020-21
(All figures in MU)

Apr'20 May'20 June'20 July'20 Fin. Year 2020-21

Name of Line
Import of NR from WR (WR-NR)
WR - NR 765 kV Gwalior - Agra 2xS/C 1065.60 1216.52 1243.66 1294.07 4819.85
WR-NR 765 kV Gwalior - Phagi 2xS/C 505.05 640.47 614.28 668.29 2428.09
WR-NR 765 kV Jabalpur-Orai D/C 627.01 791.13 921.28 1061.51 3400.93
WR-NR 765 kV Satna-Orai 740.12 847.26 865.05 895.24 3347.67
WR-NR 765 kV Gwalior-Orai 0.00 0.00 0.00 0.00 0.00
WR - NR HVDC Champa - Kurukshetra 227.60 880.36 1195.53 1290.29 3593.78
WR - NR HVDC Vindhyachal 7.01 36.91 77.22 56.54 177.68
WR - NR 400 kV Zerda Kankroli 0.00 2.21 4.06 24.41 30.68
WR - NR 400 kV Zerda Bhinmal 0.00 2.53 5.49 34.24 42.26
WR - NR 400 kV RAPP C - Shujalpur D/C 3.27 24.69 94.41 128.34 250.71
WR - NR 220 kV Bhanpura - Ranpur 17.04 26.66 40.97 43.31 127.98
WR - NR 220 kV Bhanpura - Modak 35.46 36.32 46.94 51.37 170.09
WR - NR 220 kV Auraiya - Malanpur/Mehgaon 0.00 0.00 0.00 0.72 0.72
WR - NR 400 kV Vindhyachal-Rihand D/C 0.00 0.00 0.00 0.00 0.00
WR - NR HVDC Mundra - Mohindergarh 627.43 1013.72 969.13 1057.31 3667.59
WR-NR 765 kV Banaskata-Chittorgarh D/C 70.14 175.09 271.26 388.41 904.90
Total WR - NR 3925.73 5693.87 6349.28 6994.05 22962.93
Export of NR to WR (NR-WR)
NR - WR 765 kV Gwalior - Agra 2xS/C 0.00 0.00 0.00 0.00 0.00
NR - WR 765 kV Gwalior - Phagi 2xS/C 0.00 0.00 0.00 0.00 0.00
NR - WR 765 kV Jabalpur-Orai D/C 0.00 0.00 0.00 0.00 0.00
NR - WR 765 kV Satna-Orai 0.00 0.00 0.00 0.00 0.00
NR - WR 765 kV Gwalior-Orai 297.33 302.13 221.33 244.48 1065.27
NR - WR HVDC Champa- Kurukshetra 0.00 0.00 0.00 0.00 0.00
NR - WR HVDC Vindhyachal 258.29 61.96 57.17 116.55 493.97
NR - WR 400 kV Zerda Kankroli 60.84 56.98 18.14 4.37 140.33
NR - WR 400 kV Zerda Bhinmal 86.61 74.20 60.47 27.99 249.27
NR - WR 400 kV RAPP C - Shujalpur D/C 27.71 37.62 8.88 3.94 78.15
NR - WR 220 kV Bhanpura - Ranpur 0.00 1.87 0.00 0.00 1.87
NR - WR 220 kV Bhanpura - Modak 0.00 0.00 0.00 0.00 0.00
NR - WR 220 kV Auraiya - Malanpur/Mehgaon 55.54 39.06 76.07 40.22 210.89
NR-WR 400 kV Rihand-Vindhyachal D/C 654.81 676.77 672.55 687.08 2691.21
NR - WR HVDC Mundra - Mohindergarh 0.00 0.00 0.00 0.00 0.00
NR - WR 765 kV Banaskata-Chittorgarh D/C 25.63 22.48 4.67 0.00 52.78
Total NR - WR 1466.76 1273.07 1119.28 1124.63 4983.74
Import of NR from ER (ER-NR)
ER - NR 765 kV Sasaram - Fatehpur 14.25 51.47 5.34 3.68 74.74
ER - NR 765 kV Gaya - Varanasi 2*S/C 153.62 216.96 172.81 304.91 848.30
ER - NR 765 kV Gaya - Balia 134.25 188.23 190.45 188.96 701.89
ER - NR HVDC Alipurduar - Agra 0.00 112.75 514.69 857.38 1484.82
ER-NR 400 kV Patna - Balia 2xD/C 295.70 355.51 451.36 452.90 1555.47
ER - NR 400 kV Muzaffarpur - Gorakhpur D/C 226.29 365.87 358.37 402.11 1352.64
ER - NR 400 kV Biharshariff - Balia D/C 114.58 138.51 146.45 192.91 592.45
ER - NR 400 kV Motihari - Gorakhpur D/C 110.76 137.33 148.91 156.96 553.96
ER - NR 400 kV Biharshariff - Varanasi D/C 17.49 50.34 20.50 42.44 130.77
ER - NR 400 kV Sasaram -Varanasi 149.59 157.19 200.48 198.99 706.25
ER - NR 400 kV Sasaram -Allahabad 49.12 54.01 74.36 103.62 281.11
ER - NR 220 kV Pusauli - Sahupuri 88.20 91.85 64.81 59.25 304.11
ER - NR 132 kV Sahupuri - Karamnasa 11.04 15.44 13.44 18.24 58.16
ER - NR 132 kV Rihand - Son Nagar 0.71 1.42 0.00 0.36 2.49
ER - NR 132 kV Rihand - Garhwa 0.00 0.00 0.00 0.88 0.88
Total ER-NR 1365.60 1936.88 2361.97 2983.59 8648.04
Import of NR from NER (NER-NR)
NER-NR HVDC Biswanath Chariali - Agra 11.83 195.04 467.34 464.65 1138.86
Total NER - NR 11.83 195.04 467.34 464.65 1138.86
Export of NR to ER (NR-ER)
NR - ER 765 kV Sasaram - Fatehpur 9.02 7.14 37.82 47.36 101.34
NR - ER 765 kV Gaya - Varanasi 2*S/C 0.00 4.50 0.00 0.00 4.50
NR - ER 765 kV Gaya - Balia 0.00 0.00 0.00 0.00 0.00
NR - ER HVDC Alipurduar - Agra 0.00 0.00 0.00 0.00 0.00
NR - ER 400 kV Patna - Balia 2xD/C 0.00 0.00 0.00 0.00 0.00
NR - ER 400 kV Muzaffarpur - Gorakhpur D/C 0.00 0.00 0.00 0.00 0.00
NR - ER 400 kV Biharshariff - Balia D/C 0.00 0.00 0.00 0.00 0.00
ER - NR 400 kV Motihari - Gorakhpur D/C 0.00 0.00 0.00 0.00 0.00
NR - ER 400 kV Biharshariff - Varanasi D/C 14.15 7.93 10.97 2.50 35.55
NR - ER 400 kV Sasaram -Varanasi 0.00 0.00 0.00 0.00 0.00
NR - ER 400 kV Sasaram -Allahabad 0.00 0.00 0.70 0.00 0.70
NR - ER 220 kV Pusauli - Sahupuri 0.00 0.00 0.00 0.00 0.00
NR - ER 132 kV Sahupuri - Karamnasa 7.20 8.64 5.28 9.58 30.70
NR - ER 132 kV Rihand - Son Nagar 7.66 7.59 4.25 5.29 24.79
ER - NR 132 kV Rihand - Garhwa 7.89 8.67 7.33 6.11 30.00
Total NR - ER 45.92 44.47 66.35 70.84 227.58
Export of NR to NER (NER-NR)
NR-NER HVDC Biswanath Chariali - Agra 236.01 134.73 0.00 0.00 370.74
Total NR - NER 236.01 134.73 0.00 0.00 370.74

27
Apr'20 May'20 June'20 July'20 Fin. Year 2020-21

Name of Line
Export of WR to ER (WR-ER)
WR - ER 765 kV Ranchi - Dharamjaygarh 2xS/C 123.48 234.93 411.24 447.45 1217.11
WR - ER 765 kV Dharamjaygarh - Jharsuguda 2xD/C 567.02 669.41 567.35 467.04 2270.82
WR - ER 765 kV Durg - Jharsuguda D/C 2.45 11.99 28.02 27.81 70.27
WR - ER 400 kV Sipat - Ranchi D/C 54.26 112.15 175.99 155.37 497.77
WR - ER 400 kV Raigarh - Jharsuguda 2xD/C 2.64 24.85 61.71 12.03 101.23
WR - ER 220 kV Korba - Budhipadar D/C 61.68 70.37 88.70 63.49 284.25
WR - ER 220 kV Raigarh - Budhipadar 0.00 0.01 0.63 0.01 0.65
Total WR - ER 811.54 1123.72 1333.65 1173.19 4442.10
Import of WR from ER (ER - WR)
ER - WR 765 kV Ranchi - Dharamjaygarh 2xS/C 36.29 16.56 1.23 1.12 55.20
ER - WR 765 kV Dharamjaygarh - Jharsuguda 2XD/C 4.18 0.13 0.10 4.18 8.60
ER - WR 765 kV Durg - Jharsuguda D/C 81.45 80.11 23.63 27.38 212.56
ER - WR 400 kV Sipat - Ranchi D/C 14.28 3.72 0.14 0.40 18.54
ER - WR 400 kV Raigarh - Jharsuguda 2xD/C 90.49 28.51 16.33 58.51 193.83
ER - WR 220 kV Korba - Budhipadar D/C 0.01 0.11 0.01 0.10 0.24
ER - WR 220 kV Raigarh - Budhipadar 65.45 44.92 27.62 47.37 185.36
Total ER - WR 292.14 174.07 69.07 139.05 674.33
Export of ER to NER (ER - NER)
ER - NER 400 kV Binaguri - Bongaigaon D/C 0.21 36.70 120.97 103.72 261.60
ER - NER 400 kV Alipurduar - Bongaigaon D/C 0.19 85.79 151.92 69.39 307.30
ER - NER 220 kV Birpara - Salakati D/C 0.14 17.12 42.92 38.13 98.30
Total ER - NER 0.53 139.61 315.81 211.25 667.20
Import of ER from NER ( NER - ER)
NER - ER 400 kV Binaguri - Bongaigaon D/C 179.31 61.16 1.02 2.94 244.43
NER - ER 400 kV Alipurduar - Bongaigaon D/C 217.91 64.39 6.59 32.03 320.93
NER - ER 220 kV Birpara - Salakati D/C 44.02 9.92 0.06 0.20 54.20
Total NER - ER 441.24 135.47 7.67 35.18 619.55
Export of ER to SR (ER - SR)
ER - SR HVDC Gazuwaka 237.04 258.00 247.19 325.58 1067.82
ER - SR HVDC Talchar - Kolar 1269.79 1349.18 1173.80 1236.41 5029.17
ER - SR 765 kV Angul- Srikakulam D/C 1714.96 1844.12 1385.97 1290.91 6235.95
Total ER - SR 3221.78 3451.30 2806.96 2852.90 12332.94
Import of ER from SR (SR - ER)
SR - ER HVDC Gazuwaka 0.00 0.00 0.00 0.00 0.00
SR - ER HVDC Talchar - Kolar 0.00 0.00 0.00 0.00 0.00
SR - ER 765 kV Angul- Srikakulam D/C 0.00 0.00 0.00 0.00 0.00
Total SR - ER 0.00 0.00 0.00 0.00 0.00
Export of WR to SR (WR-SR)
WR - SR HVDC Bhadrawati 542.30 594.23 467.53 425.17 2029.23
WR - SR 765 kV Sholapur - Raichur 2xS/C 1001.48 846.15 625.27 669.23 3142.13
WR - SR 765 kV Wardha - Nizamabad D/C 1346.36 671.01 1017.01 1016.54 4050.92
WR - SR 400KV Kolhapur-Kudgi D/C 83.82 26.69 2.24 0.56 113.30
Total WR - SR 2973.96 2138.07 2112.05 2111.50 9335.59
Import of WR from SR (SR - WR)
SR - WR HVDC Bhadrawati 0.00 0.00 2.77 0.00 2.77
SR - WR 765 kV Raichur - Sholapur 2xS/C 1.59 6.71 30.49 27.76 66.56
SR - WR 765 kV Wardha - Nizamabad D/C 0.00 0.00 0.00 0.00 0.00
SR - WR 400KV Kolhapur-Kudgi D/C 34.06 92.45 268.09 284.55 679.16
Total SR - WR 35.66 99.17 301.35 312.31 748.49
TOTAL ALL INDIA 14829 16539 17311 18473 67152

28
15.1 Import-Export of NR with WR during July 2020

Import of NR from WR (WR-NR)

Date
NR - WR
WR-NR WR-NR WR - NR WR-NR WR - NR 220 WR - NR 220 WR-NR WR - NR
WR - NR 765 kV WR-NR WR-NR WR - NR WR - NR WR - NR 400 WR - NR 220 765 kV
765 kV 765 kV HVDC 400 kV RAPP kV kV Auraiya - 400 KV Rihand HVDC Total
Gwalior - Agra 765 kV 765 kV HVDC 400 kV Zerda- kV Zerda- kV Bhanpura Banaskata -
Gwalior-Phagi Jabalpur- Champa- C - Shujalpur Bhanpura - Malanpur / Vindhyachal Mundra - WR - NR
2xS/C Satna- Orai Gwalior-Orai Vindhyachal Kankroli Bhinmal - Ranpur Chittorgarh
2xS/C Orai D/C Kurukshetra D/C Modak Mehgaon D/C M'garh
D/C

1-Jul-20 41.82 26.93 35.97 31.96 0.00 70.80 4.24 0.51 0.94 6.25 1.38 1.58 0.00 0.00 40.77 10.63 273.78
2-Jul-20 51.00 23.98 30.55 34.50 0.00 62.55 3.74 0.64 1.13 6.01 1.85 2.03 0.30 0.00 44.70 13.25 276.23
3-Jul-20 50.80 25.74 39.68 30.73 0.00 69.10 3.36 0.82 0.00 3.09 1.97 2.11 0.29 0.00 43.88 14.59 286.16
4-Jul-20 46.38 23.03 35.73 29.46 0.00 56.42 4.66 0.15 0.00 6.26 1.32 1.50 0.13 0.00 40.94 11.49 257.47
5-Jul-20 29.23 14.86 26.48 23.58 0.00 27.29 1.04 0.00 0.00 2.37 0.80 1.12 0.00 0.00 30.68 1.53 158.98
6-Jul-20 46.24 21.63 37.63 29.25 0.00 49.68 1.31 1.17 1.62 5.24 1.43 1.63 0.00 0.00 44.77 13.44 255.04
7-Jul-20 38.10 17.01 29.03 27.14 0.00 64.03 2.43 0.81 1.57 2.23 1.07 1.41 0.00 0.00 49.57 7.76 242.16
8-Jul-20 40.51 18.99 31.49 28.70 0.00 34.48 2.44 1.46 2.37 2.62 1.22 1.53 0.00 0.00 29.87 16.16 211.84
9-Jul-20 38.34 21.15 32.06 27.07 0.00 31.66 2.41 0.81 0.82 2.43 1.64 1.97 0.00 0.00 33.70 13.02 207.08
10-Jul-20 41.98 20.84 41.34 11.10 0.00 49.38 0.94 0.38 0.00 2.83 2.60 1.45 0.00 0.00 41.12 15.14 229.10
11-Jul-20 37.64 16.96 31.51 28.72 0.00 25.81 0.00 0.00 0.00 1.53 2.01 2.14 0.00 0.00 30.85 11.22 188.39
12-Jul-20 23.44 6.24 18.09 22.76 0.00 16.94 0.00 0.00 0.00 0.00 1.27 1.49 0.00 0.00 24.69 6.98 121.90
13-Jul-20 39.46 21.05 30.46 29.38 0.00 29.57 0.00 0.74 0.61 4.25 1.65 1.74 0.00 0.00 24.97 8.02 191.90
14-Jul-20 45.23 22.88 35.31 31.71 0.00 56.97 0.00 1.53 2.11 5.79 1.39 1.73 0.00 0.00 40.23 14.73 259.61
15-Jul-20 42.80 26.03 36.39 31.17 0.00 69.81 1.79 0.74 1.96 6.05 1.27 1.93 0.00 0.00 48.37 10.67 278.98
16-Jul-20 45.51 26.01 38.32 32.03 0.00 69.71 5.70 1.12 1.19 5.77 1.55 1.72 0.00 0.00 48.37 11.84 288.84
17-Jul-20 47.74 25.79 41.03 31.35 0.00 69.51 4.88 1.17 1.82 6.59 1.44 1.58 0.00 0.00 53.17 11.33 297.40
18-Jul-20 47.42 27.98 41.63 31.10 0.00 44.73 4.88 3.30 5.71 7.90 1.54 1.76 0.00 0.00 35.90 19.77 273.62
19-Jul-20 38.56 20.29 32.96 28.73 0.00 42.82 0.68 2.13 1.74 3.29 1.23 1.59 0.00 0.00 22.73 18.96 215.71
20-Jul-20 35.17 16.40 27.14 27.25 0.00 28.97 0.00 0.52 0.00 0.18 1.01 1.37 0.00 0.00 19.42 16.08 173.51
21-Jul-20 24.41 11.63 19.85 24.36 0.00 16.50 0.00 0.00 0.00 0.00 0.71 1.13 0.00 0.00 16.59 6.99 122.17
22-Jul-20 29.21 18.56 25.03 25.09 0.00 16.02 0.00 0.00 0.00 1.43 1.21 1.58 0.00 0.00 14.60 7.85 140.58
23-Jul-20 37.87 20.92 28.94 29.95 0.00 16.03 0.00 0.05 0.00 2.57 1.37 1.69 0.00 0.00 20.49 12.32 172.20
24-Jul-20 46.22 24.56 35.53 31.99 0.00 16.53 0.00 1.03 1.64 5.19 1.36 1.68 0.00 0.00 24.24 14.99 204.96
25-Jul-20 45.01 24.78 39.23 29.93 0.00 30.19 2.21 0.48 1.12 5.73 1.11 1.43 0.00 0.00 31.47 10.94 223.63
26-Jul-20 47.59 23.76 39.26 30.57 0.00 35.76 0.60 1.06 2.37 5.88 1.36 1.70 0.00 0.00 32.93 13.43 236.27
27-Jul-20 50.11 22.49 44.08 32.09 0.00 61.90 0.00 0.30 0.60 5.00 1.57 1.90 0.00 0.00 45.32 13.40 278.76
28-Jul-20 51.49 22.33 41.01 31.91 0.00 47.61 0.40 0.75 0.00 4.49 0.92 2.52 0.00 0.00 42.80 17.83 264.06
29-Jul-20 47.71 25.77 39.26 32.44 0.00 36.29 3.66 0.94 0.00 4.08 1.52 1.53 0.00 0.00 31.76 18.16 243.12
30-Jul-20 42.30 24.56 37.09 29.97 0.00 19.04 2.11 0.90 2.82 6.36 1.27 1.29 0.00 0.00 23.04 12.42 203.17
31-Jul-20 44.78 25.14 39.43 29.25 0.00 24.19 3.06 0.90 2.10 6.93 1.27 1.54 0.00 0.00 25.37 13.47 217.43
Total 1294.07 668.29 1061.51 895.24 0.00 1290.29 56.54 24.41 34.24 128.34 43.31 51.37 0.72 0.00 1057.31 388.41 6994.05

29
15.1 Import-Export of NR with WR during July 2020

Export of NR to WR (NR- WR)

Date
NR-WR NR - WR
NR - WR NR-WR NR-WR NR - WR 220 NR - WR
NR-WR NR-WR NR - WR HVDC NR - WR NR - WR NR - WR NR-WR WR - NR 220 WR - NR 220 400 kV 765 kV
765 kV 765 kV 765 kV kV Auraiya - HVDC Total
765 kV 765 kV Champa- HVDC 400 kV Zerda- 400 kV Zerda- 400 kV RAPP C kV Bhanpura - kV Bhanpura - Rihand- Banaskata -
Gwalior - Agra Gwalior-Phagi Jabalpur- Orai Malanpur / Mundra - NR - WR
Satna- Orai Gwalior-Orai Kurukshetra Vindhyachal Kankroli Bhinmal - Shujalpur D/C Ranpur Modak Vindhyachal Chittorgarh
2xS/C 2xS/C D/C Mehgaon M'garh
D/C D/C

1-Jul-20 0.00 0.00 0.00 0.00 7.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.36 22.61 0.00 0.00 30.47
2-Jul-20 0.00 0.00 0.00 0.00 4.97 0.00 1.71 0.00 0.00 0.00 0.00 0.00 0.00 22.56 0.00 0.00 29.24
3-Jul-20 0.00 0.00 0.00 0.00 8.90 0.00 0.00 0.00 1.20 0.00 0.00 0.00 0.00 17.63 0.00 0.00 27.73
4-Jul-20 0.00 0.00 0.00 0.00 8.92 0.00 1.87 0.00 2.04 0.00 0.00 0.00 0.00 15.79 0.00 0.00 28.62
5-Jul-20 0.00 0.00 0.00 0.00 3.68 0.00 4.67 1.16 1.02 0.00 0.00 0.00 0.89 18.72 0.00 0.00 30.14
6-Jul-20 0.00 0.00 0.00 0.00 7.35 0.00 2.80 0.00 0.00 0.00 0.00 0.00 0.37 22.54 0.00 0.00 33.06
7-Jul-20 0.00 0.00 0.00 0.00 7.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.05 22.83 0.00 0.00 31.72
8-Jul-20 0.00 0.00 0.00 0.00 8.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.93 22.57 0.00 0.00 31.76
9-Jul-20 0.00 0.00 0.00 0.00 8.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.38 22.61 0.00 0.00 32.59
10-Jul-20 0.00 0.00 0.00 0.00 1.89 0.00 3.00 0.00 1.76 0.00 0.00 0.00 0.67 22.62 0.00 0.00 29.94
11-Jul-20 0.00 0.00 0.00 0.00 8.88 0.00 4.92 0.37 4.28 0.00 0.00 0.00 2.13 22.60 0.00 0.00 43.18
12-Jul-20 0.00 0.00 0.00 0.00 5.46 0.00 10.58 1.06 4.94 2.44 0.00 0.00 2.46 20.03 0.00 0.00 46.97
13-Jul-20 0.00 0.00 0.00 0.00 9.02 0.00 12.15 0.00 0.00 0.00 0.00 0.00 2.55 22.95 0.00 0.00 46.67
14-Jul-20 0.00 0.00 0.00 0.00 8.60 0.00 12.14 0.00 0.00 0.00 0.00 0.00 2.91 22.99 0.00 0.00 46.64
15-Jul-20 0.00 0.00 0.00 0.00 9.28 0.00 4.98 0.00 0.00 0.00 0.00 0.00 1.75 23.07 0.00 0.00 39.08
16-Jul-20 0.00 0.00 0.00 0.00 9.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.25 22.78 0.00 0.00 33.56
17-Jul-20 0.00 0.00 0.00 0.00 9.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.97 22.85 0.00 0.00 33.42
18-Jul-20 0.00 0.00 0.00 0.00 10.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.11 22.82 0.00 0.00 34.35
19-Jul-20 0.00 0.00 0.00 0.00 8.24 0.00 8.14 0.00 0.00 0.00 0.00 0.00 1.66 22.58 0.00 0.00 40.62
20-Jul-20 0.00 0.00 0.00 0.00 6.72 0.00 9.69 0.00 2.52 0.00 0.00 0.00 0.98 22.74 0.00 0.00 42.65
21-Jul-20 0.00 0.00 0.00 0.00 6.58 0.00 10.59 1.35 4.66 1.50 0.00 0.00 1.50 22.85 0.00 0.00 49.03
22-Jul-20 0.00 0.00 0.00 0.00 8.10 0.00 8.22 0.43 1.17 0.00 0.00 0.00 1.80 22.86 0.00 0.00 42.58
23-Jul-20 0.00 0.00 0.00 0.00 7.87 0.00 5.00 0.00 1.77 0.00 0.00 0.00 1.31 22.93 0.00 0.00 38.88
24-Jul-20 0.00 0.00 0.00 0.00 8.14 0.00 1.27 0.00 0.00 0.00 0.00 0.00 1.10 22.75 0.00 0.00 33.26
25-Jul-20 0.00 0.00 0.00 0.00 9.21 0.00 0.52 0.00 0.00 0.00 0.00 0.00 1.09 22.82 0.00 0.00 33.64
26-Jul-20 0.00 0.00 0.00 0.00 8.61 0.00 5.12 0.00 0.00 0.00 0.00 0.00 0.62 22.83 0.00 0.00 37.18
27-Jul-20 0.00 0.00 0.00 0.00 8.84 0.00 6.13 0.00 0.00 0.00 0.00 0.00 0.84 22.91 0.00 0.00 38.72
28-Jul-20 0.00 0.00 0.00 0.00 8.22 0.00 2.92 0.00 1.89 0.00 0.00 0.00 1.76 22.92 0.00 0.00 37.71
29-Jul-20 0.00 0.00 0.00 0.00 8.47 0.00 0.00 0.00 0.74 0.00 0.00 0.00 1.88 22.87 0.00 0.00 33.96
30-Jul-20 0.00 0.00 0.00 0.00 7.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.26 22.63 0.00 0.00 32.83
31-Jul-20 0.00 0.00 0.00 0.00 8.84 0.00 0.13 0.00 0.00 0.00 0.00 0.00 2.64 22.82 0.00 0.00 34.43
Total 0.00 0.00 0.00 0.00 244.48 0.00 116.55 4.37 27.99 3.94 0.00 0.00 40.22 687.08 0.00 0.00 1124.63

30
15.2 Import-Export of NR with ER & NER during July 2020
Import of NR from NER
Import of NR from ER (ER-NR)
(NER-NR)

Date
ER - NR 400 ER - NR
ER - NR 765 ER - NR ER - NR ER - NR ER-NR ER - NR ER - NR 132 ER - NR NR - ER
ER - NR 765 ER-NR 400 kV kV 400 kV ER-NR 400 NER-NR
kV Gaya - ER - NR 765 HVDC 400 kV 400 kV 400 kV 220 kV kV 132 kV 132 kV Total Total
kV Sasaram - Patna - Balia Muzaffarpur - Motihari - kV Sasaram - HVDC Biswanath
Varanasi kV Gaya Balia Alipurduar - Biharshariff - Biharshariff - Sasaram - Pusauli - Sahupuri - Rihand - Rihand - ER -NR NER-NR
Fatehpur 2xD/C Gorakhpur Gorakhpur Varanasi Chariali - Agra
2*S/C Agra Balia D/C Varanasi D/C Allahabad Sahupuri Karamnasa Son Nagar Garhwa
D/C D/C

1-Jul-20 0.00 11.75 8.42 22.60 17.31 13.12 5.83 5.45 1.68 6.06 3.53 1.74 0.96 0.00 98.45 11.47 11.47
2-Jul-20 0.00 11.00 9.86 19.15 17.57 3.60 7.10 5.24 1.27 6.30 3.30 2.29 0.96 0.00 87.64 14.05 14.05
3-Jul-20 0.00 15.41 6.05 24.11 18.90 17.00 8.75 5.01 3.20 5.60 3.79 2.12 0.00 0.00 109.94 14.67 14.67
4-Jul-20 0.00 14.49 5.80 20.23 19.19 17.34 8.26 5.26 3.56 5.70 4.17 2.06 0.00 106.06 13.19 13.19
5-Jul-20 0.00 8.17 3.81 15.20 14.33 12.54 5.10 4.25 1.18 8.93 3.55 1.79 0.00 0.00 78.85 11.98 11.98
6-Jul-20 0.00 10.88 4.20 24.37 13.38 14.36 6.83 4.65 1.95 6.11 3.37 1.49 0.96 0.00 92.55 14.31 14.31
7-Jul-20 0.00 7.59 3.74 33.58 5.87 12.40 6.03 2.94 1.88 6.05 3.18 1.62 0.48 0.00 0.48 85.84 14.61 14.61
8-Jul-20 0.00 7.88 3.25 34.30 9.18 11.47 4.69 4.09 0.00 6.40 3.66 1.94 0.96 0.00 87.82 12.84 12.84
9-Jul-20 0.44 9.84 3.73 32.02 15.09 15.36 6.61 5.32 2.53 8.91 3.65 1.91 0.00 105.41 13.77 13.77
10-Jul-20 0.00 11.99 4.88 14.58 14.70 12.88 6.00 4.94 1.91 5.80 3.66 1.88 0.00 83.22 32.87 32.87
11-Jul-20 0.00 7.31 3.41 18.50 12.27 8.94 4.03 4.12 0.00 6.50 3.25 1.53 0.00 69.86 18.51 18.51
12-Jul-20 0.00 1.86 2.31 28.74 8.68 9.40 3.67 3.70 0.00 6.75 2.61 1.70 0.96 0.00 70.38 14.39 14.39
13-Jul-20 0.00 10.87 3.62 28.74 16.29 16.90 7.55 5.01 2.93 8.92 3.43 2.05 1.44 0.00 107.75 14.38 14.38
14-Jul-20 1.50 14.01 4.60 27.36 19.73 16.59 7.55 6.15 2.23 5.69 3.53 1.83 0.96 0.00 111.73 21.98 21.98
15-Jul-20 0.72 13.24 4.52 24.39 17.53 15.54 7.36 5.80 2.26 6.25 3.46 1.93 0.00 0.00 103.00 18.55 18.55
16-Jul-20 0.00 12.48 4.66 24.06 17.80 14.97 6.78 5.56 1.15 6.39 3.21 1.88 0.00 0.00 98.94 14.50 14.50
17-Jul-20 0.00 10.74 4.82 24.10 17.36 15.23 6.92 5.45 1.23 5.88 3.19 2.05 0.00 0.00 96.97 14.32 14.32
18-Jul-20 0.01 13.32 9.36 26.22 19.07 16.22 7.35 6.43 1.94 5.98 3.48 2.03 1.44 0.00 112.85 19.79 19.79
19-Jul-20 0.00 8.85 7.26 28.67 14.19 14.88 6.62 5.01 2.11 5.73 3.24 1.88 1.44 0.00 0.40 100.28 13.45 13.45
20-Jul-20 0.00 4.63 6.26 28.67 11.42 8.64 4.78 4.60 0.00 6.36 2.87 1.59 1.44 0.01 81.27 16.75 16.75
21-Jul-20 0.00 2.06 4.71 29.13 9.10 9.83 3.84 3.69 0.00 6.78 2.94 1.97 0.00 74.05 12.30 12.30
22-Jul-20 0.00 6.58 6.19 27.17 12.65 11.64 7.02 4.79 0.00 6.68 3.13 2.02 0.00 87.87 10.72 10.72
23-Jul-20 0.00 6.35 7.68 29.28 15.89 16.22 7.20 4.93 2.14 5.94 3.33 2.30 0.00 101.26 12.45 12.45
24-Jul-20 0.74 15.10 9.11 27.54 14.94 16.69 7.79 5.49 1.87 6.14 3.43 2.32 0.96 0.00 112.12 11.14 11.14
25-Jul-20 0.00 11.99 8.25 29.14 12.73 15.44 6.92 5.10 1.56 6.07 3.36 2.23 1.44 0.00 104.23 10.25 10.25
26-Jul-20 0.00 9.81 8.72 27.75 14.22 13.62 5.89 5.63 0.72 6.36 3.11 2.11 1.44 0.35 99.73 12.15 12.15
27-Jul-20 0.00 10.61 8.92 29.09 14.14 13.58 6.29 5.61 1.12 5.86 3.40 2.10 0.00 0.00 100.72 12.11 12.11
28-Jul-20 0.27 11.92 8.68 34.34 16.32 11.37 6.36 5.63 1.34 5.87 3.40 2.16 0.00 0.00 107.66 14.27 14.27
29-Jul-20 0.00 9.08 7.64 37.60 14.96 9.58 5.08 5.65 0.56 6.24 3.16 2.20 0.00 0.00 101.75 16.81 16.81
30-Jul-20 0.00 6.80 6.93 42.32 12.28 8.53 4.33 5.06 0.00 6.54 3.06 0.00 1.44 0.00 97.29 15.08 15.08
31-Jul-20 0.00 8.30 7.57 44.43 15.81 8.23 4.38 6.40 0.12 6.20 3.17 2.53 0.96 0.00 108.10 16.99 16.99
Total 3.68 304.91 188.96 857.38 452.90 402.11 192.91 156.96 42.44 198.99 103.62 59.25 18.24 0.36 0.88 2983.59 464.65 464.65

31
15.2 Import-Export of NR with ER & NER during July 2020
Export of NR to NER
Export of NR to ER (NR- ER)
(NR-NER)

Date
NR - ER NR - ER 400 NR - ER
NR - ER NR - ER NR-ER NR - ER NR-ER NR-ER NR - ER NR - ER NR - ER NR-NER
NR - ER 765 NR - ER 765 NR - ER 400 kV 400 kV kV 132 kV
765 kV Gaya HVDC 400 kV 400 kV 400 kV 400 kV 220 kV 132 kV 132 kV Total HVDC Total
kV Sasaram - kV Gaya Muzaffarpur - Motihari - Biharshariff - Rihand -
- Varanasi Alipurduar - Patna - Biharshariff - Sasaram - Sasaram - Pusauli - Sahupuri - Rihand - NR -ER Biswanath NR-NER
Fatehpur Balia Gorakhpur D/C Gorakhpur Varanasi Son
2*S/C Agra Balia 2xD/C Balia D/C Varanasi Allahabad Sahupuri Karamnasa Garhwa Chariali - Agra
D/C D/C Nagar

1-Jul-20 2.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.38 3.25 0.00 0.00
2-Jul-20 3.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.45 4.05 0.00 0.00
3-Jul-20 2.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.96 0.33 3.76 0.00 0.00
4-Jul-20 1.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.30 1.47 0.00 0.00
5-Jul-20 2.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.48 0.48 3.84 0.00 0.00
6-Jul-20 1.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.25 1.68 0.00 0.00
7-Jul-20 1.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.56 0.00 0.00
8-Jul-20 3.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.14 0.00 0.00 0.00 0.00 0.34 4.35 0.00 0.00
9-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.30 0.30 0.00 0.00
10-Jul-20 0.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.24 0.33 0.00 0.00
11-Jul-20 2.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.14 0.00 0.00 0.00 0.25 2.88 0.00 0.00
12-Jul-20 4.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.75 0.00 0.00 0.00 0.00 0.36 5.91 0.00 0.00
13-Jul-20 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.33 0.34 0.00 0.00
14-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.44 0.44 0.00 0.00
15-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.92 0.37 2.29 0.00 0.00
16-Jul-20 1.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.44 0.39 2.89 0.00 0.00
17-Jul-20 1.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.44 0.42 3.00 0.00 0.00
18-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.42 0.42 0.00 0.00
19-Jul-20 1.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.36 0.00 1.44 0.00 0.00
20-Jul-20 3.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.09 0.00 0.00 0.00 0.00 0.35 3.66 0.00 0.00
21-Jul-20 3.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.57 0.00 0.00 0.00 0.43 4.62 0.00 0.00
22-Jul-20 1.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.60 0.00 0.00 0.00 0.36 2.46 0.00 0.00
23-Jul-20 0.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.27 0.53 0.00 0.00
24-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.36 0.36 0.00 0.00
25-Jul-20 0.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.42 0.74 0.00 0.00
26-Jul-20 1.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.99 0.00 0.00
27-Jul-20 0.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.44 0.45 2.56 0.00 0.00
28-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.46 0.96 1.42 0.00 0.00
29-Jul-20 1.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.44 0.55 3.38 0.00 0.00
30-Jul-20 2.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.21 0.00 0.00 0.00 0.00 0.37 3.20 0.00 0.00
31-Jul-20 1.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.47 1.72 0.00 0.00
Total 47.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 9.58 5.29 6.11 70.84 0.00 0.00

32
15.3 Import and Export of ER with WR & NER during July 2020
Export of WR to ER (WR-ER) Import of WR from ER (ER - WR) Export of ER to NER (ER-NER) Import of ER from NER (NER-ER)

Date WR - ER 765 ER-WR


WR - ER WR - ER ER - WR ER-WR ER - WR ER - WR ER - NER ER - NER 400 ER - NER NER - ER NER - ER 400 NER - ER
kV WR - ER 765 WR - ER WR - ER 220 765 kV ER - WR 400 ER - WR
765 kV 400 kV WR - ER 220 765 kV 765 kV 400 kV 220 kV 400 kV kV 220 kV 400 kV kV 220 kV
Dharamjayga kV Durg - 400 kV kV Korba - Total WR - Dharamjayg kV Raigarh - 220 kV Total ER - Total ER - Total NER -
Dharamjayg Raigarh - kV Raigarh - Dharamjayg Durg - Sipat - Korba - Binaguri - Alipurduar - Birpara - Binaguri - Alipurduar - Birpara -
rh - Jharsuguda Sipat - Budhipadar ER arh - Jharsuguda- Raigarh - WR NER ER
arh - Ranchi Jharsuguda- Budhipadar arh - Ranchi Jharsuguda Ranchi Budhipada Bongaigaon Bongaigaon Salakati Bongaigaon Bongaigaon Salakati
Jharsuguda D/C Ranchi D/C D/C Jharsuguda 2xD/C Budhipadar
2xS/C 2xD/C 2xS/C D/C D/C r D/C D/C D/C D/C D/C 2xD/C D/C
Q/C D/C

1-Jul-20 14.3 4.4 0.4 5.4 0.1 1.9 0.0 26.33 0.0 1.0 0.8 0.0 1.3 0.0 1.8 4.89 4.62 5.31 1.61 11.54 0.00 0.00 0.00 0.00
2-Jul-20 20.0 12.3 1.0 7.2 1.4 3.3 0.0 45.37 0.0 0.0 0.0 0.0 0.1 0.0 1.4 1.55 3.37 4.98 1.57 9.92 0.00 0.02 0.00 0.02
3-Jul-20 17.6 7.3 1.3 6.0 0.2 1.7 0.0 34.08 0.0 0.0 0.2 0.0 2.0 0.0 2.0 4.26 3.32 3.59 1.33 8.24 0.02 0.41 0.00 0.44
4-Jul-20 17.2 10.1 2.4 5.6 0.1 1.1 0.0 36.48 0.0 0.0 0.2 0.0 3.0 0.1 1.9 5.12 3.37 4.46 1.52 9.35 0.00 0.00 0.00 0.00
5-Jul-20 15.0 22.4 2.2 5.8 0.5 2.3 0.0 48.24 0.0 0.0 0.0 0.0 1.1 0.0 1.2 2.34 0.97 1.85 0.78 3.60 0.82 0.70 0.00 1.52
6-Jul-20 13.7 17.8 1.6 6.3 1.9 3.2 0.0 44.50 0.0 0.0 0.0 0.0 0.1 0.0 0.9 1.01 2.29 1.17 1.04 4.50 0.43 0.81 0.00 1.24
7-Jul-20 10.3 16.9 1.5 5.1 1.3 3.2 0.0 38.37 0.1 0.0 0.3 0.0 0.4 0.0 1.0 1.83 3.82 1.68 1.29 6.79 0.00 0.76 0.00 0.76
8-Jul-20 14.6 22.4 1.1 4.7 0.0 3.0 0.0 45.88 0.0 0.0 0.1 0.0 1.5 0.0 1.3 2.85 4.52 2.43 1.43 8.38 0.00 0.42 0.00 0.42
9-Jul-20 9.2 20.4 0.4 2.4 0.0 2.5 0.0 34.97 0.0 0.0 0.8 0.1 2.7 0.0 1.5 5.03 2.85 1.05 0.87 4.77 0.00 1.60 0.00 1.60
10-Jul-20 11.6 12.3 0.3 3.8 0.0 2.7 0.0 30.76 0.0 0.0 0.9 0.0 1.8 0.0 1.4 4.17 1.91 0.93 0.63 3.47 0.09 2.81 0.06 2.96
11-Jul-20 15.4 23.3 1.3 5.2 0.2 2.9 0.0 48.26 0.0 0.0 0.3 0.0 1.1 0.0 1.0 2.38 1.17 1.18 0.63 2.98 0.57 2.10 0.04 2.71
12-Jul-20 15.7 31.8 2.4 5.4 1.9 3.1 0.0 60.29 0.0 0.0 0.0 0.0 0.0 0.0 1.0 1.03 1.24 0.57 0.54 2.35 0.33 2.87 0.05 3.24
13-Jul-20 7.9 14.6 0.1 3.0 0.4 1.5 0.0 27.62 0.0 0.0 1.6 0.0 1.2 0.0 2.1 4.95 1.19 0.72 0.63 2.55 0.46 3.06 0.03 3.55
14-Jul-20 6.4 4.4 0.0 2.5 0.0 1.8 0.0 15.14 0.4 0.4 3.4 0.2 2.3 0.0 1.5 8.19 4.74 5.24 1.77 11.75 0.00 0.64 0.00 0.64
15-Jul-20 8.4 2.9 0.0 3.2 0.0 1.3 0.0 15.89 0.4 1.0 4.4 0.1 3.1 0.0 1.4 10.39 5.32 6.06 2.04 13.41 0.00 0.00 0.00 0.00
16-Jul-20 13.9 7.1 0.3 4.7 0.0 1.1 0.0 27.16 0.0 0.5 1.6 0.0 3.2 0.0 1.3 6.54 3.43 3.41 1.58 8.42 0.00 0.01 0.00 0.01
17-Jul-20 16.0 10.1 1.3 5.8 0.6 2.4 0.0 36.20 0.0 0.0 0.4 0.0 0.5 0.0 1.2 2.05 3.88 3.89 1.71 9.49 0.00 0.00 0.00 0.00
18-Jul-20 14.5 16.0 1.2 4.9 0.2 1.6 0.0 38.40 0.0 0.0 0.4 0.0 0.9 0.0 2.0 3.41 3.39 2.50 1.33 7.23 0.00 0.19 0.00 0.19
19-Jul-20 14.2 18.5 0.7 5.3 0.9 2.3 0.0 41.95 0.0 0.0 0.4 0.0 0.4 0.0 2.0 2.73 3.43 2.50 1.32 7.25 0.00 0.18 0.00 0.18
20-Jul-20 14.3 26.9 1.2 5.2 0.7 2.2 0.0 50.52 0.0 0.0 0.2 0.0 0.9 0.0 2.1 3.25 3.53 1.36 1.18 6.08 0.00 0.71 0.00 0.71
21-Jul-20 13.6 34.2 1.7 5.1 0.9 1.9 0.0 57.35 0.0 0.0 0.0 0.0 0.7 0.0 1.8 2.49 2.60 1.18 0.96 4.74 0.00 0.62 0.00 0.62
22-Jul-20 9.5 26.5 0.9 3.3 0.0 0.7 0.0 40.90 0.1 0.0 0.3 0.0 2.8 0.0 2.0 5.27 2.37 1.28 0.67 4.33 0.09 2.16 0.02 2.28
23-Jul-20 9.3 26.0 0.6 3.3 0.0 1.3 0.0 40.54 0.0 0.0 0.7 0.0 1.4 0.0 1.6 3.69 2.20 1.25 0.90 4.35 0.02 1.45 0.00 1.47
24-Jul-20 12.9 21.4 0.5 4.5 0.2 2.0 0.0 41.46 0.0 0.0 0.6 0.0 0.8 0.0 1.9 3.34 2.46 1.01 0.86 4.32 0.06 1.67 0.00 1.72
25-Jul-20 15.8 12.3 0.5 5.7 0.2 2.4 0.0 36.80 0.0 0.0 0.4 0.0 0.9 0.0 1.4 2.75 3.10 1.17 1.13 5.41 0.01 1.21 0.00 1.22
26-Jul-20 21.3 8.3 0.7 7.3 0.1 2.1 0.0 39.89 0.0 0.2 0.3 0.0 1.2 0.0 0.9 2.67 3.42 1.53 1.26 6.21 0.01 1.07 0.00 1.08
27-Jul-20 19.8 2.0 0.1 6.4 0.1 1.5 0.0 29.71 0.0 1.0 1.5 0.0 4.6 0.0 1.5 8.58 2.66 0.94 1.18 4.78 0.00 1.59 0.00 1.59
28-Jul-20 17.3 7.5 0.0 5.0 0.0 1.3 0.0 31.03 0.0 0.0 1.9 0.0 4.6 0.0 1.5 8.02 3.73 1.56 1.38 6.67 0.02 1.99 0.00 2.01
29-Jul-20 17.4 8.8 0.5 5.2 0.0 1.7 0.0 33.69 0.0 0.0 2.3 0.0 4.7 0.0 1.5 8.46 5.90 1.75 1.81 9.46 0.00 0.48 0.00 0.48
30-Jul-20 20.6 10.5 0.6 6.2 0.0 1.8 0.0 39.71 0.0 0.0 1.3 0.0 4.5 0.0 1.6 7.38 6.09 1.30 1.61 9.00 0.00 1.42 0.00 1.42
31-Jul-20 20.0 7.6 0.7 5.9 0.0 1.6 0.0 35.72 0.0 0.1 2.0 0.0 4.8 0.0 1.6 8.43 6.80 1.53 1.59 9.92 0.00 1.08 0.00 1.08
Total 447.45 467.04 27.81 155.37 12.03 63.49 0.01 1173.19 1.12 4.18 27.38 0.40 58.51 0.10 47.37 139.05 103.72 69.39 38.13 211.25 2.94 32.03 0.20 35.18

33
15.4 Import and Export of SR with ER & WR during July 2020

Export of ER to SR (ER - SR) Import of ER from SR (SR - ER) Export of WR to SR (WR-SR) Import of WR from SR (SR - WR)
Date
SR-ER WR-SR SR - WR SR-WR
ER-SR SR - ER WR - SR WR-SR SR-WR 400KV
ER - SR HVDC ER - SR HVDC Total SR - ER 765 kV Angul- Total WR - SR 400KV Total SR - WR HVDC 765 kV Raichur 765 kV Total
765 kV Angul- HVDC 765 kV Sholapur 765 kV Wardha - Kolhapur-Kudgi
Gazuwaka Talchar -Kolar ER - SR HVDC Talchar - Srikakulam SR - ER HVDC Bhadrawati Kolhapur-Kudgi WR - SR Bhadrawati - Sholapur Wardha - SR - WR
Srikakulam D/C Gazuwaka - Raichur 2xS/C Nizamabad D/C D/C
D/C D/C 2xS/C Nizamabad D/C

1-Jul-20 7.33 29.65 38.56 75.54 0.00 0.00 0.00 0.00 12.19 13.88 23.34 0.00 49.41 0.00 1.50 0.00 13.46 14.96

2-Jul-20 7.19 42.31 32.24 81.75 0.00 0.00 0.00 0.00 12.15 10.98 21.32 0.00 44.45 0.00 3.50 0.00 13.23 16.73

3-Jul-20 7.22 26.14 30.14 63.49 0.00 0.00 0.00 0.00 12.17 5.76 19.40 0.00 37.33 0.00 4.46 0.00 16.08 20.54

4-Jul-20 7.19 24.15 31.35 62.69 0.00 0.00 0.00 0.00 12.17 10.21 23.55 0.00 45.93 0.00 2.14 0.00 13.20 15.33

5-Jul-20 7.26 24.18 38.24 69.68 0.00 0.00 0.00 0.00 10.51 21.86 33.19 0.02 65.57 0.00 0.25 0.00 9.20 9.45

6-Jul-20 7.44 36.56 36.13 80.14 0.00 0.00 0.00 0.00 10.88 17.75 30.95 0.00 59.58 0.00 0.20 0.00 9.65 9.86

7-Jul-20 10.61 41.48 40.11 92.20 0.00 0.00 0.00 0.00 8.08 23.17 31.49 0.02 62.76 0.00 0.31 0.00 7.72 8.03

8-Jul-20 12.23 38.06 47.04 97.33 0.00 0.00 0.00 0.00 14.09 33.19 36.36 0.31 83.95 0.00 0.00 0.00 5.72 5.72

9-Jul-20 12.07 45.31 49.42 106.80 0.00 0.00 0.00 0.00 23.64 35.50 30.86 0.07 90.07 0.00 0.00 0.00 5.24 5.24

10-Jul-20 12.06 33.97 42.88 88.91 0.00 0.00 0.00 0.00 19.07 23.73 34.28 0.00 77.08 0.00 0.00 0.00 6.09 6.09

11-Jul-20 12.26 33.97 44.72 90.95 0.00 0.00 0.00 0.00 18.47 30.80 38.53 0.00 87.80 0.00 0.00 0.00 6.77 6.77

12-Jul-20 12.42 41.76 40.34 94.52 0.00 0.00 0.00 0.00 16.58 23.80 41.04 0.00 81.41 0.00 0.32 0.00 8.75 9.07

13-Jul-20 12.42 42.15 42.85 97.43 0.00 0.00 0.00 0.00 17.39 26.91 38.09 0.02 82.41 0.00 0.00 0.00 6.11 6.11

14-Jul-20 12.42 41.46 39.04 92.92 0.00 0.00 0.00 0.00 17.90 25.25 31.44 0.00 74.59 0.00 0.01 0.00 6.80 6.81

15-Jul-20 12.29 35.46 34.49 82.24 0.00 0.00 0.00 0.00 7.38 21.89 29.41 0.00 58.68 0.00 0.00 0.00 10.28 10.28

16-Jul-20 8.47 28.51 34.41 71.39 0.00 0.00 0.00 0.00 7.35 16.60 20.72 0.00 44.67 0.00 2.63 0.00 8.72 11.35

17-Jul-20 8.46 36.13 34.58 79.16 0.00 0.00 0.00 0.00 7.33 14.49 24.66 0.00 46.48 0.00 3.32 0.00 10.31 13.62

18-Jul-20 8.46 45.49 42.95 96.90 0.00 0.00 0.00 0.00 10.37 24.30 33.64 0.01 68.32 0.00 0.48 0.00 6.62 7.10

19-Jul-20 8.47 39.65 45.60 93.72 0.00 0.00 0.00 0.00 10.39 24.65 39.20 0.00 74.24 0.00 0.05 0.00 6.11 6.16

20-Jul-20 8.47 45.05 49.18 102.70 0.00 0.00 0.00 0.00 14.05 28.97 43.73 0.00 86.75 0.00 0.00 0.00 4.06 4.06

21-Jul-20 8.46 48.03 47.17 103.67 0.00 0.00 0.00 0.00 20.57 25.60 40.50 0.00 86.67 0.00 0.24 0.00 5.24 5.48

22-Jul-20 8.48 48.05 54.11 110.64 0.00 0.00 0.00 0.00 21.00 31.23 43.14 0.00 95.37 0.00 0.00 0.00 4.32 4.32

23-Jul-20 14.36 48.04 53.63 116.04 0.00 0.00 0.00 0.00 23.69 33.48 40.56 0.10 97.82 0.00 0.00 0.00 2.96 2.96

24-Jul-20 12.61 48.07 49.54 110.22 0.00 0.00 0.00 0.00 11.00 28.21 40.28 0.02 79.51 0.00 0.00 0.00 3.29 3.29

25-Jul-20 12.42 47.75 39.62 99.79 0.00 0.00 0.00 0.00 9.75 16.43 31.85 0.00 58.02 0.00 1.23 0.00 13.08 14.31

26-Jul-20 12.42 45.88 34.21 92.51 0.00 0.00 0.00 0.00 9.76 11.77 25.52 0.00 47.05 0.00 3.47 0.00 17.67 21.14

27-Jul-20 12.43 35.97 40.12 88.52 0.00 0.00 0.00 0.00 8.51 15.09 32.45 0.00 56.05 0.00 1.59 0.00 16.14 17.73

28-Jul-20 12.44 45.41 45.92 103.77 0.00 0.00 0.00 0.00 17.68 24.88 39.47 0.00 82.03 0.00 0.00 0.00 12.02 12.02

29-Jul-20 12.41 46.99 46.21 105.61 0.00 0.00 0.00 0.00 14.81 19.68 34.90 0.00 69.40 0.00 0.00 0.00 10.01 10.01

30-Jul-20 12.40 44.99 44.64 102.02 0.00 0.00 0.00 0.00 9.75 15.78 34.48 0.00 60.02 0.00 0.08 0.00 12.31 12.39

31-Jul-20 12.40 45.79 41.46 99.65 0.00 0.00 0.00 0.00 16.48 13.39 28.20 0.00 58.07 0.00 1.98 0.00 13.39 15.37

TOTAL 325.58 1236.41 1290.91 2852.90 0.00 0.00 0.00 0.00 425.17 669.23 1016.54 0.56 2111.50 0.00 27.76 0.00 284.55 312.31

34
16. भूटान , नेपाल, बाांग्लादे श एवां म्यान्मार के साथ अांतरराष्ट्रीय ववद् युत वववनमय
INTERNATIONAL EXCHANGE WITH BHUTAN, NEPAL BANGLADESH AND MYANMAR

अप्रैल 2020 से मार्च 2021 April 2020 to March 2021


अांतरराष्ट्रीय विद् यु त विवनमय [भारत से दू सरे दे श को आयात (+) / वनयाात (-) ]
Transnational Exchange (Import=(+ve) /Export =(-ve))

भूटान BHUTAN नेपाल NEPAL बाां ग्लादे श BANGLADESH म्यान्मार MYANMAR


Energy Energy Energy Energy
माह MONTH
Exchange Exchange Exchange Exchange
(In MU) (In MU) (In MU) (In MU)
अप्रैल 2020 APR'20 260.07 -61.15 -408.56 -0.72
मई 2020 MAY'20 838.57 -20.95 -585.83 -0.77
जून 2020 JUN'20 1302.09 -44.41 -748.92 -0.81
जुलाई 2020 JUL'20 1625.18 -48.89 -778.40 -0.89
कुल Total 4025.91 -175.40 -2521.71 -3.19
* Based on daily operational data

35
16.1 Import from neighbouring countries during July 2020
(All figures in MU)
Import from
Date Import from Bhutan Import from Bangladesh Import from Nepal
Myanmar
400 kV 400 kV
400 kV Tala- 400 kV 220 kV 220 kV 132 kV 132 kV 132 kV 132 kV 220 kV
Jigmeling- Behrampur- From BIHAR 11 kV Moreh-
Binaguri I,II Binaguri- Birpara- Birpara- Rangia- Salakati- Surjyamaninagar- Tanakpur- Muzaffarpur-
Alipurdwar Bheramara Source Tamu
& IV Malbase Chuka D/C Malbase Motanga Gelephu Comilla D/C Mahendranagar Dhalkebar
D/C D/C
1-Jul-20 19.14 5.87 4.48 1.38 17.76 1.11 0.84 0.00 0.00 0.00 0.00 0.00 0.00
2-Jul-20 19.36 6.03 4.55 1.36 18.02 0.92 0.82 0.00 0.00 0.00 0.00 0.00 0.00
3-Jul-20 19.24 5.95 4.82 1.40 18.33 1.19 0.96 0.00 0.00 0.00 0.00 0.00 0.00
4-Jul-20 19.42 6.04 5.21 1.47 18.33 1.19 0.95 0.00 0.00 0.00 0.00 0.00 0.00
5-Jul-20 19.63 6.16 5.59 1.54 18.55 1.29 0.16 0.00 0.00 0.00 0.00 0.00 0.00
6-Jul-20 19.60 6.14 5.55 1.55 18.70 1.39 1.17 0.00 0.00 0.00 0.00 0.00 0.00
7-Jul-20 19.56 6.12 5.89 1.84 18.71 1.41 1.19 0.00 0.00 0.00 0.00 0.00 0.00
8-Jul-20 19.49 6.09 6.06 1.81 18.70 1.40 1.22 0.00 0.00 0.00 0.00 0.00 0.00
9-Jul-20 19.53 6.11 5.95 1.83 18.69 1.29 1.13 0.00 0.00 0.00 0.00 0.00 0.00
10-Jul-20 19.41 6.08 5.92 1.74 18.59 1.24 1.15 0.00 0.00 0.00 0.00 0.00 0.00
11-Jul-20 19.57 6.19 5.86 1.64 18.44 1.28 1.18 0.00 0.00 0.00 0.00 0.00 0.00
12-Jul-20 19.46 6.11 5.96 1.75 17.79 1.22 1.15 0.00 0.00 0.00 0.00 0.00 0.00
13-Jul-20 18.91 5.96 5.93 1.74 18.54 1.32 1.23 0.00 0.00 0.00 0.00 0.00 0.00
14-Jul-20 18.94 5.92 5.91 1.86 18.72 1.27 1.25 0.00 0.00 0.00 0.00 0.00 0.00
15-Jul-20 19.51 6.10 6.00 2.00 18.71 1.32 1.15 0.00 0.00 0.00 0.00 0.00 0.00
16-Jul-20 19.51 6.11 5.95 1.89 18.69 1.30 1.17 0.00 0.00 0.00 0.00 0.00 0.00
17-Jul-20 18.89 6.56 5.99 1.97 18.69 1.30 1.17 0.00 0.00 0.00 0.00 0.00 0.00
18-Jul-20 19.47 6.08 5.96 1.85 18.72 1.30 1.30 0.00 0.00 0.00 0.00 0.03 0.00
19-Jul-20 19.64 6.18 5.91 1.68 18.16 1.29 1.25 0.00 0.00 0.00 0.00 0.16 0.00
20-Jul-20 19.22 6.03 5.86 1.71 14.44 1.32 1.24 0.00 0.00 0.00 0.00 0.00 0.00
21-Jul-20 19.49 6.12 6.03 1.88 17.84 1.29 1.16 0.00 0.00 0.00 0.00 0.00 0.00
22-Jul-20 17.85 5.56 6.06 1.90 15.22 1.20 1.37 0.00 0.00 0.00 0.00 0.00 0.00
23-Jul-20 17.91 5.42 7.32 1.17 18.48 1.16 1.15 0.00 0.00 0.00 0.00 0.00 0.00
24-Jul-20 19.49 6.09 6.11 2.01 16.20 1.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00
25-Jul-20 19.55 6.12 6.00 1.87 14.33 1.37 1.24 0.00 0.00 0.00 0.00 0.00 0.00
26-Jul-20 19.48 6.19 5.96 1.79 14.05 1.38 1.25 0.00 0.00 0.00 0.00 0.00 0.00
27-Jul-20 17.91 7.54 5.99 1.89 13.97 1.38 1.27 0.00 0.00 0.00 0.00 0.00 0.00
28-Jul-20 19.54 6.13 5.91 1.76 14.03 0.99 1.53 0.00 0.00 0.00 0.00 0.00 0.00
29-Jul-20 19.42 6.05 6.01 1.82 14.01 1.25 1.37 0.00 0.00 0.00 0.00 0.00 0.00
30-Jul-20 19.41 6.04 5.99 1.88 13.98 1.46 1.28 0.00 0.00 0.00 0.00 0.00 0.00
31-Jul-20 19.29 5.97 5.94 1.90 13.99 1.46 0.55 0.00 0.00 0.00 0.00 0.00 0.00
Total 596.86 189.06 180.67 53.90 531.37 39.64 33.85 0.00 0.00 0.00 0.00 0.19 0.00
*Based on SEM/Energy meter data for links where available

36
16.2 Export to neighbouring countries during July 2020
(All figures in MU)
Export to
Date Export to Bhutan Export to Bangladesh Export to Nepal
Myanmar
400 kV 400 kV
400 kV Tala- 400 kV 220 kV 220 kV 132 kV 132 kV 132 kV 220 kV
Jigmeling- Behrampur- 132 kV Tanakpur- From BIHAR 11 kV Moreh-
Binaguri I,II Binaguri- Birpara- Birpara- Rangia- Salakati- Surjyamaninagar- Muzaffarpur-
Alipurdwar Bheramara Mahendranagar Source Tamu
& IV Malbase Chuka D/C Malbase Motanga Gelephu Comilla D/C Dhalkebar
D/C D/C
1-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.22 3.00 0.33 0.58 0.74 0.03
2-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.66 3.16 0.31 0.68 0.54 0.03
3-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.35 3.21 0.29 0.63 0.46 0.03
4-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.93 3.42 0.12 0.49 0.01 0.03
5-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.42 3.42 0.24 0.74 0.31 0.03
6-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.80 3.30 0.29 0.86 0.49 0.03
7-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.80 3.42 0.28 0.82 0.61 0.03
8-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.74 3.26 0.30 0.87 0.40 0.03
9-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.74 3.43 0.38 1.52 0.24 0.03
10-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.80 3.18 0.69 2.32 1.63 0.03
11-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.10 3.19 0.00 1.46 0.26 0.02
12-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.09 3.04 0.59 1.33 0.45 0.02
13-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.07 3.28 0.60 1.48 0.11 0.01
14-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.86 3.29 0.58 1.65 0.46 0.05
15-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.58 3.43 0.63 0.57 0.34 0.03
16-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.17 3.48 0.70 0.31 0.28 0.03
17-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.46 3.35 0.73 0.30 0.43 0.03
18-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.48 3.34 0.56 0.08 0.00 0.03
19-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.82 3.40 0.61 0.01 0.00 0.03
20-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.79 3.08 0.67 0.18 0.90 0.03
21-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.66 2.57 0.75 0.14 0.38 0.03
22-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.75 2.28 0.49 0.30 1.47 0.03
23-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.49 3.02 0.58 0.17 0.11 0.02
24-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.95 20.80 2.69 0.43 0.25 0.11 0.03
25-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.50 2.96 0.45 0.11 0.11 0.03
26-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.59 3.31 0.63 0.30 0.61 0.03
27-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.56 3.54 0.77 0.39 0.41 0.03
28-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.48 3.36 0.77 0.24 1.29 0.03
29-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.73 2.94 0.00 0.32 0.13 0.03
30-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.57 3.21 0.47 0.29 0.11 0.03
31-Jul-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.61 3.05 0.76 0.20 0.71 0.03
Total 0.00 0.00 0.00 0.00 0.00 0.00 0.95 681.64 98.59 15.00 19.59 14.06 0.89
*Based on SEM/Energy meter data for links where available

37
17. एसटीओए (दिपक्षीय एर्वों सामूदहक) एर्वों डी एस एम दिदलोंग का ब्य रा – र्ुलाई 2020
STOA (BILATERAL AND COLLECTIVE) & DSM BILLING DETAILS - JULY 2020

दिपक्षीय एसटीओए BILATERAL SHORT TERM OPEN ACCESS

र्ुलाई 2020 JULY' 2020 Apr-Mar'21

लेन – दे न ों की सोंख्या अनुम ददत ऊर्ाा लेन – दे न ों की सोंख्या अनुम ददत ऊर्ाा
क्षे.भा.प्रे .के. का नाम
No. of (दम.यु .) Energy No. of (दम.यु .) Energy
Name of RLDC
Transactions Approved(MU) Transactions Approved (MU)

ऊ. क्षे. NR 543 3219 2096 7617


प.क्षे. WR 64 203 319 1334
द.क्षे. SR 92 364 739 2824
पू .क्षे. ER 62 601 532 3520
पूर्वोत्तर क्षे. NER 4 64 86 292
कुल TOTAL 765 4451 3772 15587

एसटीओए SHORT TERM OPEN ACCESS

सामूदहक एसटीओए Collective STOA दिपक्षीय एसटीओए Bilateral STOA

क्रेताओों / दर्वक्रेताओों की अनुम ददत ऊर्ाा क्रेताओों / दर्वक्रेताओों की अनुम ददत ऊर्ाा
माह MONTH स. NO. of (दम.यु .) Approved स. NO. of (दम.यु .) Approved
Buyers/Sellers Energy (MU) Buyers/Sellers Energy (MU)

अप्रैल 2020 Apr'20 2458 3692 705 3056


मई 2020 May'20 2922 5596 1282 3546
र्ून 2020 Jun'20 * 2846 4707 1020 4534
र्ुलाई 2020 Jul'20** 4700 5272 765 4451
कुल TOTAL 12926 19267 3772 15587
* Approved Energy (MU) includes the Real Time Market (RTM) transactions (started from 1st Jun-20) as well, while No. of Buyers/Sellers are excluding RTM transactions.
** Approved Energy (MU) includes the Real Time Market (RTM) transactions (started from 1st Jun-20) as well, while No. of Buyers/Sellers are excluding RTM transactions

अनोंदतम आँ कड़े
मादसक डी एस एम दिदलोंग का ब्य रा 2020-21
Provisional data
MONTHLY DSM BILLING DETAILS 2020-21
subject to change
कर ड़ रु. मे (RS. IN CRORES)
पूर्वोत्तर क्षेत्र NORTH
क्षेत्र REGION उत्तरी क्षेत्र NORTH पदिमी क्षेत्र WEST ददक्षणी क्षेत्र SOUTH पूर्वी क्षेत्र EAST
EAST
29.06.20 to 05.07.20 74.60 94.90 40.32 75.86 31.57
06.07.20 to 12.07.20 82.34 73.29 9.13 60.04 24.77
13.07.20 to 19.07.20 104.11 87.98 14.01 81.95 45.20
20.07.20 to 26.07.20 100.97 98.25 14.72 80.93 26.32
27.07.20 to 02.08.20 251.86 112.57 40.74 106.66 ---

38
18. पािि माकेट की िूचना ( स्रोत : आई.ई.एक्स. एिं पी.एक्स.आई.एल.)
POWER MARKET INFORMATION ( Source IEX & PXIL)
पािि एक्स्चेंज के माध्यम िे विवनमय – माह जुलाई 2020
EXCHANGES THROUGH POWER EXCHANGES - JULY 2020
पािि एक्स्चेंज के माध्यम िे ( वम.यु . मे) Through Power Exchange in MU
क्र. ि. S.
क्षेत्रीय इकाई Regional Entity क्षेत्र Region Day Ahead Market (DAM) Real Time Market (RTM) Total (DAM+RTM)
No.
विक्रय Sale क्रय Purchase विक्रय Sale क्रय Purchase विक्रय Sale क्रय Purchase
1 पंजाब Punjab 2.70 86.09 0.01 2.01 2.70 88.10
2 हरियाणा Haryana 7.80 298.51 1.18 49.88 8.98 348.39
3 िाजस्थान Rajasthan 13.06 222.28 3.63 154.18 16.68 376.46
4 विल्ली Delhi 36.54 131.32 27.49 40.11 64.03 171.42
5 उत्ति प्रिे श Uttar Pradesh 120.80 262.33 56.03 34.59 176.83 296.91
6 उत्तिाखंड Uttarakhand 0.00 198.77 0.00 1.34 0.00 200.10
7 वहमाचल प्रिे श Himachal Pradesh 431.31 23.34 6.17 0.08 437.49 23.43
8 जम्मू औि कश्मीि J & K 277.70 0.00 180.75 0.00 458.45 0.00
9 केंद्र शावित चंडीगढ़ UT Chandigarh 22.26 1.27 0.46 0.00 22.72 1.27
10 ए डी हाइडरो AD Hydro 106.90 0.00 0.61 0.00 107.51 0.00
11 किचम िांगतू Karcham Wangtoo 94.99 0.00 0.03 0.00 95.02 0.00
12 श्री िीमेंट Shree Cement 0.00 0.00 0.00 0.00 0.00 0.00
13 नाथ्पा झाकिी Nathpa Jhakri 1.15 0.00 0.00 0.00 1.15 0.00
14 बैिािूल Baira Siul HEP(BS0) 0.00 0.00 0.00 0.00 0.00 0.00
15 चमेिा -1 Chamera-I HEP(CM1) 0.00 0.00 0.00 0.00 0.00 0.00
16 चमेिा -2 Chamera-II HEP(CM2) 0.00 0.00 0.00 0.00 0.00 0.00
17 धौलीगंगा Dhauliganga HEP(DG0) 0.00 0.00 0.00 0.00 0.00 0.00
18 िु लहस्ती Dulahasti HEP(DU0) 0.00 0.00 0.00 0.00 0.00 0.00
19 िलाल Salal HEP(SL0) 0.00 0.00 0.00 0.00 0.00 0.00
20 िेिा -2 Sewa-II NHPC(SW2) 0.00 0.00 0.00 0.00 0.00 0.00
21 टनकपुि Tanakpur HEP(TP0) 0.00 0.00 0.00 0.00 0.00 0.00
22 उिी Uri HEP(UR0) 0.00 0.00 0.00 0.00 0.00 0.00
23 लांको बुवधल LANCO Budhil 6.50 0.00 0.00 0.00 6.50 0.00
24 चमेिा-3 chamera 3 0.00 0.00 0.00 0.00 0.00 0.00
25 अिानी एचिीडीिी ADANI HVDC(N0RGU0) 0.00 0.00 0.00 0.00 0.00 0.00
26 मलाना MALANA 0.00 0.00 0.00 0.00 0.00 0.00
27 उिी-II Uri-II HEP(UR2) 0.00 0.00 0.00 0.00 0.00 0.00
28 पाबबवत-III Parbati-III 0.00 0.00 0.00 0.00 0.00 0.00
29 विंगिौली Singrauli 0.00 0.00 0.00 0.00 0.00 0.00
30 िाििी-I Dadri stage-I 0.00 0.00 0.00 0.00 0.00 0.00
31 िाििी-II Dadri stage-II 0.00 0.00 0.00 0.00 0.00 0.00
32 ऊंचाहाि-I Unchahar-I TPS उत्तिी क्षेत्र NR
0.00 0.00 0.00 0.00 0.00 0.00
33 ऊंचाहाि-II Unchahar-II TPS 0.00 0.00 0.00 0.00 0.00 0.00
34 ऊंचाहाि-III Unchahar-III TPS 0.00 0.00 0.00 0.00 0.00 0.00
35 रिहंि-I Rihand STPS-I 0.00 0.00 0.00 0.00 0.00 0.00
36 रिहंि-II Rihand STPS-II 0.00 0.00 0.00 0.00 0.00 0.00
37 रिहंि-III Rihand STPS-III 0.00 0.00 0.00 0.00 0.00 0.00
38 एपीिीपीएल झज्जि APCPL Jhajjar 0.00 0.00 0.00 0.00 0.00 0.00
39 िेंज Sainj HEP 63.80 0.00 0.00 0.00 63.80 0.00
40 िाििी गैि Dadri GPP 0.00 0.00 0.20 0.00 0.20 0.00
41 औिै या गैि NTPC Auraiya 0.00 0.00 0.00 0.00 0.00 0.00
42 वकशनगंगा Kishanganga HEP 0.00 0.00 0.00 0.00 0.00 0.00
43 अंता गैि NTPC Anta 0.00 0.00 0.22 0.00 0.22 0.00
44 िामपुि एचईपी RAMPUR HEP 0.58 0.00 0.00 0.00 0.58 0.00
45 ऊंचाहाि-IV UNCHAHAR-IV 0.00 0.00 0.00 0.00 0.00 0.00
46 एनटीपीिी कोलडाम NTPC KOLDAM 0.00 0.00 0.00 0.00 0.00 0.00
47 कोटे श्वि Koteshwar 0.00 0.00 0.00 0.00 0.00 0.00
48 वकलाज िोलि Kilaj Solar 7.92 0.00 0.00 0.00 7.92 0.00
49 अंता(आि॰एल॰एन॰जी॰) Anta_RLNG Fuel 0.00 0.00 0.00 0.00 0.00 0.00
50 अंता(िंयुक्त ईंधन) Anta_Comb. RLNG Fuel 0.00 0.00 0.00 0.00 0.00 0.00
51 अंता(द्रि ईंधन) Anta_Liquid Fuel 0.00 0.00 0.00 0.00 0.00 0.00
52 औिै या(आि॰एल॰एन॰जी॰) Auraiya_RLNG Fuel 0.00 0.00 0.00 0.00 0.00 0.00
53 औिै या(िंयुक्त ईंधन) Auraiya_Comb. RLNG Fuel 0.00 0.00 0.00 0.00 0.00 0.00
39
18. पािि माकेट की िूचना ( स्रोत : आई.ई.एक्स. एिं पी.एक्स.आई.एल.)
POWER MARKET INFORMATION ( Source IEX & PXIL)
पािि एक्स्चेंज के माध्यम िे विवनमय – माह जुलाई 2020
EXCHANGES THROUGH POWER EXCHANGES - JULY 2020
पािि एक्स्चेंज के माध्यम िे ( वम.यु . मे) Through Power Exchange in MU
क्र. ि. S.
क्षेत्रीय इकाई Regional Entity क्षेत्र Region Day Ahead Market (DAM) Real Time Market (RTM) Total (DAM+RTM)
No.
विक्रय Sale क्रय Purchase विक्रय Sale क्रय Purchase विक्रय Sale क्रय Purchase
54 औिै या(द्रि ईंधन) Auraiya_Liquid Fuel 0.00 0.00 0.00 0.00 0.00 0.00
55 िाििी(आि॰एल॰एन॰जी॰) Dadri_RLNG Fuel 0.00 0.00 0.00 0.00 0.00 0.00
56 िाििी(ियुंक्त ईंधन) Dadri_Comb. RLNG Fuel 0.00 0.00 0.00 0.00 0.00 0.00
57 िाििी(द्रि ईंधन) Dadri_Liquid Fuel 0.00 0.00 0.00 0.00 0.00 0.00
58 टांडा स्टे ज-२ Tanda Stg-2 0.00 0.00 0.00 0.00 0.00 0.00
59 अिानी ग्रीन एनवजब Adani Green Energy 2.75 0.00 0.00 0.00 2.75 0.00
60 नेप NAPP 0.00 0.00 0.00 0.00 0.00 0.00
61 िै प-बी RAPP-B 0.00 0.00 0.00 0.00 0.00 0.00
62 िे लिे Railways 0.00 0.00 0.00 0.00 0.00 0.00
63 वटहिी Tehri 0.00 0.00 0.00 0.00 0.00 0.00
64 मध्य प्रिे श MP 24.24 34.06 5.45 0.38 29.69 34.44
65 महािाष्ट्र Maharashtra 20.72 785.03 26.98 47.29 47.71 832.32
66 गुजिात Gujarat 24.72 420.89 6.73 13.75 31.45 434.64
67 छत्तीिगढ़ Chhattisgarh 6.83 42.32 2.66 29.09 9.49 71.40
68 गोिा Goa 57.15 0.04 0.00 0.00 57.15 0.04
69 िमन औि िीि Daman and Diu 0.00 0.88 0.00 0.00 0.00 0.88
70 िाििा औि नगि हिेली Dadra & Nagar Haveli 3.16 20.76 0.00 1.91 3.16 22.67
71 वजंिल Jindal Power 82.70 0.00 3.35 0.48 86.05 0.48
72 लांको अमिकंटक LANCO AMK 0.00 0.00 0.00 0.00 0.00 0.00
73 आयबन कोल ACB India Limited 18.92 0.00 0.82 0.00 19.75 0.00
74 वजंिल स्टील एं ड पािि Jindal Steel and Power Ltd 0.00 0.00 0.00 0.00 0.00 0.00
75 बालको -2 Balco-II 9.82 0.00 5.12 0.00 14.93 0.00
76 स्टिलाइट Sterlite 0.00 0.00 0.00 0.00 0.00 0.00
77 एमको EMCO 40.48 0.00 11.06 0.00 51.54 0.00
78 िन्दना विि् युत VANDANA VIDYUT 0.00 0.00 0.00 0.00 0.00 0.00
79 एस्साि पािि ESSAR POWER 50.48 0.00 4.90 8.82 55.38 8.82
80 एस्साि स्टील ESSAR STEEL 0.00 0.00 0.00 0.00 0.00 0.00
81 के एि के महानिी KSK Mahanadi 0.00 0.00 0.00 0.00 0.00 0.00
82 वजंिल स्टे ज -II Jindal Stg-II 38.58 0.00 4.74 0.88 43.31 0.88
83 कोिबा (प.) Korba(W) Comp. Ltd. / Raigarh EL 0.00 0.00 0.00 0.00 0.00 0.00
84 डी बी पािि D B Power 59.75 0.00 10.15 0.00 69.90 0.00
85 धािीिाल Dhariwal उत्तिी क्षेत्र NR 0.21 0.00 0.09 0.00 0.30 0.00
86 जे पी वनग्री Jaypee Nigire 255.71 0.00 0.00 0.00 255.71 0.00
87 जी एम आि छत्तीिगढ़ GMR Chhattisgarh / REL 0.00 0.00 0.00 0.00 0.00 0.00
88 डी जीईएन मेगा पािि DGEN Mega Power 101.22 0.00 14.58 0.00 115.80 0.00
89 एम बी मेगा पािि MB Power 50.90 0.00 0.46 0.00 51.35 0.00
90 एपीएल मुंद्रा स्टे ज-I APL Mundra Stg-I 0.00 0.00 0.00 0.00 0.00 0.00
91 एपीएल मुंद्रा स्टे ज-II APL Mundra Stg-II 8.64 0.00 0.27 0.00 8.91 0.00
92 एपीएल मुंद्रा स्टे ज-III APL Mundra Stg-III 33.44 0.00 24.10 0.00 57.53 0.00
93 टोिें ट िुगेन Torrent Sugen 27.43 0.00 14.74 0.00 42.16 0.00
94 मारुवत कोल Maruti Coal 30.02 0.00 2.99 0.08 33.01 0.08
95 स्पेक्ट्रम Spectrum 26.60 0.00 0.29 0.00 26.89 0.00
96 झाबुआ पािि Jhabua Power 15.43 0.00 8.52 0.00 23.95 0.00
97 विंध्याचल-I Vindhyachal Stg-I 0.00 0.00 0.00 0.00 0.00 0.00
98 विंध्याचल-II Vindhyachal Stg-II पविमी क्षेत्र 0.00 0.00 0.00 0.00 0.00 0.00
99 विंध्याचल-III Vindhyachal Stg-III WR 0.00 0.00 0.00 0.00 0.00 0.00
100 विंध्याचल-IV Vindhyachal Stg-IV 0.00 0.00 0.00 0.00 0.00 0.00
101 विंध्याचल-V Vindhyachal Stg-V 0.00 0.00 0.00 0.00 0.00 0.00
102 मौिा-I Mouda STPS Stg-I 0.00 0.00 0.94 0.00 0.94 0.00
103 िीपत-I Sipat Stg-I 0.00 0.00 0.00 0.00 0.00 0.00
104 िीपत-II Sipat Stg-II 0.00 0.00 0.00 0.00 0.00 0.00
105 िािन Sasan UMPP 0.00 0.00 18.01 0.00 18.01 0.00
106 एनएिपीिीएल NSPCL 0.00 0.00 2.19 0.00 2.19 0.00
40
पविमी क्षेत्र
WR

18. पािि माकेट की िूचना ( स्रोत : आई.ई.एक्स. एिं पी.एक्स.आई.एल.)


POWER MARKET INFORMATION ( Source IEX & PXIL)
पािि एक्स्चेंज के माध्यम िे विवनमय – माह जुलाई 2020
EXCHANGES THROUGH POWER EXCHANGES - JULY 2020
पािि एक्स्चेंज के माध्यम िे ( वम.यु . मे) Through Power Exchange in MU
क्र. ि. S.
क्षेत्रीय इकाई Regional Entity क्षेत्र Region Day Ahead Market (DAM) Real Time Market (RTM) Total (DAM+RTM)
No.
विक्रय Sale क्रय Purchase विक्रय Sale क्रय Purchase विक्रय Sale क्रय Purchase
107 कोिबा-III Korba-III 16.32 0.00 0.00 0.00 16.32 0.00
108 टीआिएन इनजी TRN Energy 0.00 0.00 0.00 0.00 0.00 0.00
109 गंधाि Gandhar 0.00 0.00 0.01 0.00 0.01 0.00
110 कोिबा I &II Korba Stage I & II 0.00 0.00 0.00 0.00 0.00 0.00
111 आिकेएम पाििजेन RKM Power Gen 0.00 0.00 0.00 0.00 0.00 0.00
112 किाि Kawas 0.00 0.00 0.18 0.00 0.18 0.00
113 मौिा-II Mouda STPS Stg-II 0.00 0.00 0.00 0.00 0.00 0.00
114 एिकेएि पाििजेन SKS Powergen 2.77 0.00 0.37 0.00 3.14 0.00
115 शोलापुि एिटीपीपी Sholapur STPP 0.00 0.00 0.14 0.00 0.14 0.00
116 ित्नावगिी गैि पािि प्राइिेट वलवमटे ड RGPPL 0.00 0.00 1.38 0.00 1.38 0.00
117 गिििाड़ा Gadarwara 0.00 0.00 1.07 0.00 1.07 0.00
118 लािा-II LARA-II 0.00 0.00 0.00 0.00 0.00 0.00
119 िायपुि इनिजेन Raipur Energen 72.42 0.00 15.22 0.00 87.65 0.00
120 आिेलि वमत्तल Arcellor Mittal 0.00 198.05 0.00 0.55 0.00 198.60
121 गंधाि(एन॰ए॰पी॰एम॰) Gandhar_NAPM 0.00 0.00 0.00 0.00 0.00 0.00
122 गंधाि(आि॰एल॰एन॰जी॰) Gandhar_RLNG Fuel 0.00 0.00 0.00 0.00 0.00 0.00
123 गंधाि(ियुंक्त ईंधन) Gandhar_Comb. RLNG Fuel 0.00 0.00 0.02 0.00 0.02 0.00
124 किाि(एन॰ए॰पी॰एम॰) Kawas_NAPM 0.00 0.00 0.00 0.00 0.00 0.00
125 किाि(आि॰एल॰एन॰जी॰) Kawas_RLNG Fuel 0.00 0.00 0.00 0.00 0.00 0.00
126 किाि(ियुंक्त ईंधन) Kawas_Comb. RLNG Fuel 0.00 0.00 0.25 0.00 0.25 0.00
127 किाि(द्रि ईंधन) Kawas_Liquid Fuel 0.00 0.00 0.00 0.00 0.00 0.00
128 खािगोन Khargone STPP 0.00 0.00 1.35 0.00 1.35 0.00
129 आि जी पी पी एल(आई आि) RGPPL_IR 0.00 0.00 0.17 0.00 0.17 0.00
130 आि जी पी पी एल RGPPL_Others 0.00 0.00 0.03 0.00 0.03 0.00
131 ककिापि Kakrapar 0.00 0.00 0.00 0.00 0.00 0.00
132 कोिबा पच्शशम Korba West 0.00 0.00 0.00 0.00 0.00 0.00
133 तािापुि Tarapur 0.00 0.00 0.00 0.00 0.00 0.00
134 आं ध्र प्रिे श Andhra Pradesh 7.03 421.85 0.00 80.38 7.03 502.22
135 कनाबटक Karnataka 79.24 73.57 57.87 4.65 137.11 78.21
136 केिल Kerala 3.37 54.52 0.10 6.04 3.47 60.56
137 तवमलनाडु Tamilnadu 10.10 265.00 0.05 18.02 10.15 283.02
138 पॉच्िचेिी Pondicherry उत्तिी क्षेत्र NR 0.00 0.00 0.00 0.00 0.00 0.00
139 गोिा Goa 0.00 0.00 0.00 0.00 0.00 0.00
140 लांको कोंडापल्ली LANCO_KONDPLY 0.00 0.00 0.00 0.00 0.00 0.00
141 विमापुिी SIMHAPURI 0.00 0.00 0.00 0.00 0.00 0.00
142 मीनाक्षी MINAXI 0.00 0.00 0.00 0.00 0.00 0.00
143 तेलंगाना TELANGANA 11.88 673.12 7.62 185.39 19.50 858.50
144 थमबल पॉिि टे क Thermal Power Tech 0.00 0.00 0.00 0.00 0.00 0.00
145 कोस्टल इनिजेन Coastal Energen 0.00 0.00 0.00 0.00 0.00 0.00
146 आइ एल & एफ़ एि IL&FS 2.65 0.00 0.01 0.00 2.66 0.00
147 विम्हाद्री -II Simhadri Stg-II 0.00 0.00 0.00 0.00 0.00 0.00
148 एनएलिी-I विस्ताि NLC TPS-I (Exp) 0.71 0.00 32.10 0.00 32.81 0.00
149 एनएलिी-II स्टे ज-I NLC TPS-II Stg-I िवक्षणी क्षेत्र 0.64 0.00 7.40 0.00 8.04 0.00
150 एनएलिी-II स्टे ज-II NLC TPS-II Stg-II SR 0.22 0.00 0.78 0.00 1.00 0.00
151 लांको कोंडापल्ली स्टे ज-III LANCO_KONDPLY STG III 0.00 0.00 0.00 0.00 0.00 0.00
152 िामागुिम-I Ramagundam Stg-I 0.00 0.00 7.35 0.00 7.35 0.00
153 तालचि-II Talcher Stg-II 0.00 0.00 5.08 0.00 5.08 0.00
154 िामागुिम-IIII Ramagundam Stg-III 0.00 0.00 1.37 0.00 1.37 0.00
155 एिजीपीएल Sembcorp Gayatri Pvt. Ltd. 197.32 0.00 29.59 0.00 226.91 0.00
156 एनटीईिीएल िल्लूि NTECL Vallur 0.00 0.00 0.00 0.00 0.00 0.00
157 कुडगी Kudgi 0.00 0.00 0.00 0.00 0.00 0.00
158 विम्हाद्री -I Simhadri Stg-I 0.00 0.00 0.00 0.00 0.00 0.00
159 एनएलिी टीपीएि-II एक्स्प NLC TPS-II EXP 0.05 0.00 3.19 0.00 3.24 0.00
160 एन टी पी एल NTPL 0.00 0.00 0.00 0.00 0.00 0.00
161 एि बी जी क्लीनटे क SBG Cleantech 0.00 0.00 0.00 0.00 0.00 0.00
162 न्यू॰ नैिेली थमबल पािि प्रोजेक्ट् NNTPP 0.00 0.00 15.84 0.00 15.84 0.00
163 कैगा Kaiga 0.00 0.00 0.00 0.00 0.00 0.00
41
िवक्षणी क्षेत्र
SR

18. पािि माकेट की िूचना ( स्रोत : आई.ई.एक्स. एिं पी.एक्स.आई.एल.)


POWER MARKET INFORMATION ( Source IEX & PXIL)
पािि एक्स्चेंज के माध्यम िे विवनमय – माह जुलाई 2020
EXCHANGES THROUGH POWER EXCHANGES - JULY 2020
पािि एक्स्चेंज के माध्यम िे ( वम.यु . मे) Through Power Exchange in MU
क्र. ि. S.
क्षेत्रीय इकाई Regional Entity क्षेत्र Region Day Ahead Market (DAM) Real Time Market (RTM) Total (DAM+RTM)
No.
विक्रय Sale क्रय Purchase विक्रय Sale क्रय Purchase विक्रय Sale क्रय Purchase
164 कैगा-2 Kaiga-2 0.00 0.00 0.00 0.00 0.00 0.00
165 एमएपीएि MAPS 0.00 0.00 0.00 0.00 0.00 0.00
166 पविम बंगाल West Bengal 12.34 35.46 24.87 25.70 37.22 61.16
167 ओवड़शा Odisha 348.92 49.21 72.85 5.43 421.77 54.64
168 वबहाि Bihar 34.93 124.98 2.71 17.39 37.63 142.37
169 झािखंड Jharkhand 47.14 0.53 6.87 1.81 54.01 2.34
170 विच्िम Sikkim 43.46 0.00 6.30 0.50 49.76 0.50
171 िामोिि घाटी परियोजना DVC 5.77 0.00 0.14 2.11 5.92 2.11
172 स्टिलाइट STERLITE 0.00 0.00 0.00 0.00 0.00 0.00
173 मैथन पािि वलवमटे ड Maithon P. Ltd 0.00 0.00 0.00 0.00 0.00 0.00
174 आधुवनक पा. वलवमटे ड Adhunik P.Ltd 0.48 0.00 0.00 0.00 0.48 0.00
175 चुजाचेन Chuzachen HEP 24.02 0.00 0.00 0.00 24.02 0.00
176 िं वगत Rangit HEP 0.00 0.00 0.00 0.00 0.00 0.00
177 तीस्ता Teesta HEP 0.00 0.00 0.00 0.00 0.00 0.00
178 जीएमआि कमलंगा GMR Kamalanga 18.58 0.00 1.91 0.00 20.49 0.00
179 वजंिल आई पी टी एल JIPTL 21.07 0.00 0.00 0.00 21.07 0.00
180 जोिथांग Jorethang 75.25 0.00 0.71 3.92 75.96 3.92
पूिी क्षेत्र ER
181 फििा-III Farakka-III 1.89 0.00 2.18 0.00 4.06 0.00
182 बाढ़-II Barh Stage-II 0.00 0.00 0.55 0.00 0.55 0.00
183 कहलगााँि -II Kahalgaon Stage-II 0.00 0.00 0.71 0.00 0.71 0.00
184 फििा Farakka 0.06 0.00 0.00 0.00 0.06 0.00
185 कहलगााँि Kahalgaon 0.07 0.00 0.25 0.00 0.33 0.00
186 तालचि Talcher 0.11 0.00 4.75 0.00 4.87 0.00
187 तीस्ता-III Teesta-III 712.87 0.00 7.40 12.63 720.27 12.63
188 विक्चु Dikchu HEP 76.41 0.00 0.00 0.00 76.41 0.00
189 तावशविं ग Tashiding HEP 77.00 0.00 0.59 0.06 77.59 0.06
190 बीआिबीिीएल BRBCL 0.00 0.00 0.43 0.00 0.43 0.00
191 केबीयूएनएल KBUNL 0.00 0.00 0.00 0.00 0.00 0.00
192 ओपीजीिी यूवनट-IV OPGC UNIT-IV 0.00 0.00 0.00 0.00 0.00 0.00
193 िलीपल्ली Darlipalli 0.00 0.00 0.00 0.00 0.00 0.00
194 एम॰ टी॰ पी॰ एि॰ (स्टे ज-२) MTPS Stg-2 0.00 0.00 0.00 0.00 0.00 0.00
195 नबीनगि NPGC Nabinagar 0.00 0.00 0.65 0.00 0.65 0.00
196 अरुणाचल प्रिे श Arunachal Pradesh 34.73 0.00 0.00 0.00 34.73 0.00
197 अिम Assam 127.69 46.90 7.20 22.31 134.90 69.21
198 मवणपुि Manipur 14.19 2.56 0.00 0.65 14.19 3.21
199 मेघालय Meghalaya 62.39 6.17 1.19 2.32 63.58 8.49
200 वमज़ोिम Mizoram 2.85 0.00 0.00 0.00 2.85 0.00
उत्तिी क्षेत्र NR
201 नागालैंड Nagaland 0.00 6.90 0.00 8.56 0.00 15.46
202 वत्रपुिा Tripura 0.00 0.00 1.02 2.12 1.02 2.12
203 अगितला जीटीपीपी Agartala GTPP_AG0 0.00 0.00 0.00 0.00 0.00 0.00
204 कोवपली KOPILI_KP1 0.00 0.00 0.00 0.00 0.00 0.00
पूिोत्ति क्षेत्र
205 अिम जीबीपीपी Assam GBPP_KT0 0.00 0.00 0.00 0.00 0.00 0.00
NER
206 लोकटक LOKTAK 0.00 0.00 0.00 0.00 0.00 0.00
207 िं गानिी Ranganadi 0.00 0.00 0.00 0.00 0.00 0.00
208 िोयांग Doyang 0.00 0.00 0.00 0.00 0.00 0.00
209 पलाताना Palatana 31.11 0.00 5.07 0.00 36.18 0.00
210 कोवपली-II Kopili-II 0.00 0.00 0.00 0.00 0.00 0.00
211 खंडोंग Khandong 0.00 0.00 0.00 0.00 0.00 0.00
212 बोंगाईगााँि Bongaigaon TPP 1.73 0.00 0.38 0.00 2.11 0.00
213 पािे PARE 0.00 0.00 0.00 0.00 0.00 0.00
214 कामेंग Kameng HEP 123.01 0.00 2.18 0.00 125.20 0.00
4487 4487 785 785 5272 5272

42
19. RENEWABLE ENERGY CERTIFICATE MECHANISM
MONTH : JULY 2020

RE Source & Unit wise break up (01.07.2020-31.07.2020)

Accreditation Registration
Sr.No Source Wise Capacity Capacity
Unit Unit
(MW) (MW)
1 Wind 4 3 9 10
Urban or Municipal
2 0 0 0 0
Waste
3 Solar Thermal 0 0 0 0

4 Solar PV 9 6 53 3

5 Small Hydro 0 0 0 0

6 Others 0 0 0 0

7 Geothermal 0 0 0 0

8 Biomass 0 0 0 0

9 Bio-fuel cogeneration 5 1 12 2

Total 18 10 74 15

RECs Issued (01.07.2020-31.07.2020)

Sr.No. Non Solar Solar Total

1 441041 89894 530935

Redemption of REC (01.07.2020-31.07.2020)

Sr.No. Non Solar Solar Total

1 98084 2387 100471

43
19. RENEWABLE ENERGY CERTIFICATE MECHANISM
MONTH : JULY 2020

RE Source & Unit wise break up (Apr-Mar'21)

Accreditation Registration
Sr.No Source Wise Capacity Capacity
Unit Unit
(MW) (MW)
1 Wind 24 19 31 25
Urban or Municipal
2 0 0 0 0
Waste
3 Solar Thermal 0 0 0 0

4 Solar PV 87 15 80 11

5 Small Hydro 0 0 0 0

6 Others 0 0 0 0

7 Geothermal 0 0 0 0

8 Biomass 0 0 0 0

9 Bio-fuel cogeneration 12 2 22 3

Total 123 36 133 39

RECs Issued (Apr-Mar'21)

Sr.No. Non Solar Solar Total


1 1323718 311999 1635717

Redemption of REC (Apr- Mar'21)


Sr.No. Non Solar Solar Total
1 885658 143882 1029540

44
19. RENEWABLE ENERGY CERTIFICATE MECHANISM
MONTH : JULY 2020

RE Source & Unit wise break up Since Inception to July'20


Accreditation Registration
Sr.No Source Wise Capacity Capacity
Unit Unit
(MW) (MW)
1 Wind 2634 503 2636 501
Urban or Municipal
2 0 0 0 0
Waste
3 Solar Thermal 0 0 0 0
4 Solar PV 939 387 916 378
5 Small Hydro 274 38 250 37
6 Others 4 2 3 1
7 Geothermal 0 0 0 0
8 Biomass 477 43 420 40

9 Bio-fuel cogeneration 819 90 378 54

Total 5147 1063 4603 1011

RECs Issued since Inception to July'20


Sr.No. Non Solar Solar Total
1 58354822 9895792 68250614

Redemption of REC since Inception to July'20


Sr.No. Non Solar Solar Total
1 52231008 9680470 61911478

REC Closing balance as on 31.07.2020


Sr.No. Non Solar Solar Total
1 6123814 215322 6339136

45
20. IMPORTANT GRID EVENTS / DISTURBANCES
Northern Region-Grid Event Report for July 2020

Outage Revival Category as


Generation Load Energy
Name of Elements Affected Event per CEA
S.No. Region Owner/ Agency Duration Loss Loss Unserved
(Tripped/Manually opened) Area (As reported) Grid
Date Time Date Time (MW) (MW) (in MU)
Standards

1) 35 MW Budhil HPS (IPP) - UNIT 1 HIMACHAL


1 NR HP 1-Jul-20 11:35 7-Jul-20 16:40 149:05 DC supply failure resulted in tripping of both units at Budhil HEP. 70 0 GD-1 0
2) 35 MW Budhil HPS (IPP) - UNIT 2 PRADESH

1) 220 KV Bhiwani-Charkhi Dadri (BB) Ckt-2


2) 220 KV Bhiwani-Hissar (BB) Ckt-1
3) 220 KV Bhiwani(HV)-Bhiwani(BB) (HVPNL) Ckt-2
4) 220 KV Bhiwani(HV)-Bhiwani(BB) (HVPNL) Ckt-1
5) 220 KV Bhiwani-Charkhi Dadri (BB) Ckt-3
Both 220kV buses at 400/220kV Bhiwani(BBMB) tripped on bus bar protection operation which
2 NR 6) 400/220 kV 500 MVA ICT 1 at Bhiwani(BB) HARYANA BBMB, HVPNL 1-Jul-20 12:45 1-Jul-20 13:20 0:35 0 150 GD-1 0.09
resulted in tripping of all 220kV elements at Bhiwani(BBMB).
7) 220KV Bus 2 at Bhiwani(BB)
8) 220KV Bus 1 at Bhiwani(BB)
9) 220 KV Bhiwani-Charkhi Dadri (BB) Ckt-1
10) 220 KV Bhiwani-Charkhi Dadri (BB) Ckt-4
11) 220 KV Bhiwani-Hissar (BB) Ckt-2

1) 800 KV HVDC Kurukshetra(PG) Pole-3


3 NR HARYANA POWERGRID 2-Jul-20 10:41 2-Jul-20 11:55 1:14 DC supply failure resulted in blocking of 800 KV HVDC Kurukshetra(PG) Pole-3&4. 0 0 GI-2 0
2) 800 KV HVDC Kurukshetra(PG) Pole-4

1) 220 KV Saharanpur(UP)-Khodri(UK) (UP) Ckt-1 UTTRAKHAN


At Khodri, B-Phase Bus Isolator jumper damaged resulted in Bus bar protection operation.
4 NR 2) 220 KV Sarsawan(UP)-Khodri(UK) (UP) Ckt-1 D, UTTAR PTCUL, UPPTCL 4-Jul-20 7:01 4-Jul-20 10:46 3:45 75 0 GD-1 0
Multiple lines and units.
3) 220 KV Khodri(UK)-Majri(HP) (UK) Ckt-1 PRADESH,
HIMACHAL

1) 220 KV RAPS_C(NP)-RAPS_B(NP) (NPCIL) Ckt-1 POWERGRID, B-N fault occurred resulted in tripping of 220 KV RAPS_C(NP)-RAPS_B(NP) (NPCIL) Ckt-1 and 220
5 NR RAJASTHAN 4-Jul-20 13:24 4-Jul-20 14:43 1:19 0 0 GI-2 0
2) 220 KV RAPS_B(NP)-Sakatpura(RS) (RS) Ckt-1 RRVPNL KV RAPS_B(NP)-Sakatpura(RS) (RS) Ckt-1 (Z-1 from RAPS-B end, fault at 17km from RAPS-B end).

1) 220 KV Amargarh(NRSS XXIX)-Ziankote(JK) (PDD JK) Ckt-1


2) 220 KV Amargarh(NRSS XXIX)-Ziankote(JK) (PDD JK) Ckt-2
3) 220 KV Wagoora(PG)-Ziankote(JK) (PDD JK) Ckt-1 At 20:19hrs, 220kV Amargarh-Ziankote D/C and 220kV Wagoora-Zianakote D/C tripped on over
6 NR J&K PDD JK 5-Jul-20 20:18 5-Jul-20 22:00 1:42 0 400 GD-1 0.46
4) 220 KV Wagoora(PG)-Ziankote(JK) (PDD JK) Ckt-2 current. Further, at 20:59hrs, 220kV Wagoora-Pampore D/C tripped on over current.
5) 220 KV Wagoora(PG)-Pampore(PDD) (PDD JK) Ckt-2
6) 220 KV Wagoora(PG)-Pampore(PDD) (PDD JK) Ckt-1

1) 765 KV Bara-Mainpuri (UP) Ckt-2 At Bara TPS(UP), B-N fault (Y-N as per PMU) occurred on 765kV Bara-Mainpuri line. Line A/R from
UTTAR
7 NR 2) 765/21 kV 825 MVA GT 2 at Bara(UP) UPPTCL 6-Jul-20 3:15 6-Jul-20 5:36 2:21 Mainpuri end but failed to A/R from Bara end resulted in tripping of above line and running unit 600 0 GD-1 0
PRADESH
3) 660 MW Bara PPGCL TPS - UNIT 2 #2 due to loss of evacuation.

Due to maloperation of relay during testing of SPS at Chamera-3 HEP, 220kV Chamera_3-
1) 220 KV Chamera_3(NH)-Chamba(PG) (PG) Ckt-1 HIMACHAL Lanco Budhil,
8 NR 6-Jul-20 17:21 6-Jul-20 17:43 0:22 Chamba(PG) ckt-1, 220kV Chamera_3-Budhil, running units at Chamera-3 and Budhil HEPs 225 0 GD-1 0
2) 220 KV Chamera_3(NH)-Budhil(LB) (LB) Ckt-1 PRADESH POWERGRID
tripped.

At 220kV Ferozabad(UP), R phase isolator clamp of 220kV main-bus of 220kV Ferozabad(UP)-


1) 220 KV Mainpuri(PG)-Ferozabad(UP) (UP) Ckt-1 UTTAR
9 NR UPPTCL 10-Jul-20 11:20 10-Jul-20 13:55 2:35 Mainpuri(PG) melted resulted in tripping of both 220kV ckts viz. 220kV Ferozabad(UP)- 0 0 GI-1 0
2) 220 KV Agra(PG)-Firozabad(UP) (UP) Ckt-2 PRADESH
Mainpuri(PG) and 220kV Ferozabad(UP)-Agra(PG).

1) 400/220 kV 315 MVA ICT 3 at Bareilly(UP) LBB of 400kV Bareilly - Unnao ckt-1 operated which tripped 400kv Bus coupler and tripped 400kv
2) 400 KV Bareilly(UP)-Bareilly(PG) (PG) Ckt-1 UTTAR POWERGRID, PG-1 line and 315MVA ICT-3 connected to main bus-II. As per PMU, No fault is observed in the
10 NR 11-Jul-20 14:19 11-Jul-20 15:20 1:01 0 0 GI-2 0
3) 400KV Bus 2 at Bareilly(UP) PRADESH UPPTCL system. In antecedent conditions, 400 KV Bareilly(UP)-Bareilly(PG) (PG) Ckt-1 & 400KV
4) 400KV Lucknow_1(PG)-Unnao(UP) (PG) Ckt-1 Lucknow_1(PG)-Unnao(UP) (PG) Ckt-1 carrying 76MW & 255MW respectively.

1) 800 KV HVDC Kurukshetra(PG) Pole-4 At 1135Hrs, Control got wrong status of HVHS breaker and generated CAT-B fault. Due to CAT-B
11 NR HARYANA POWERGRID 13-Jul-20 11:35 13-Jul-20 12:44 1:09 0 0 GI-2 0
2) 800 KV HVDC Kurukshetra(PG) Pole-2 fault Pole-2 & Pole-4 blocked. As per PMU, No fault is observed in the system.

Bus-Bar Protection operated at 220 kV Sub-Station Sarojini Nagar Lucknow due to which 400/220
1) 400/220 kV 500 MVA ICT 2 at Lucknow(UP) UTTAR kV 500 MVA ICT 1 & ICT 2 tripped at Lucknow(UP). As per PMU, R-N fault with delayed clearance
12 NR UPPTCL 14-Jul-20 2:31 14-Jul-20 3:22 0:51 0 200 GD-1 0.17
2) 400/220 kV 500 MVA ICT 1 at Lucknow(UP) PRADESH is observed in the system. In antecedent conditions, 400/220 kV 500 MVA ICT 1 & ICT 2 at
Lucknow(UP) carrying 168MW & 170MW respectively.

220 KV Bhiwadi(PG)-Bhiwadi(RS) (RS) Ckt-1 tripped on B-N fault, 1.42 Km from Bhiwadi(PG) end.
220 KV Bhiwadi(PG)-Bhiwadi(RS) (RS) Ckt-2 tripped on Z2, R-N fault, 7.26 Km from Bhiwadi(PG)
1) 220 KV Bhiwadi(PG)-Bhiwadi(RS) (RS) Ckt-1
13 NR RAJASTHAN RRVPNL 16-Jul-20 15:22 16-Jul-20 16:37 1:15 end. As per PMU, R-B fault followed by R-N fault is observed in the system. In antecedent 0 275 GD-1 0.34
2) 220 KV Bhiwadi(PG)-Bhiwadi(RS) (RS) Ckt-2
conditions, 220 KV Bhiwadi(PG)-Bhiwadi(RS) (RS) Ckt-1 & 2 carrying 137MW & 129MW
respectively.

1) 110 MW Vishnuparyag HPS - UNIT 4 All the four nos. unit at 4X100 kV Vishunuprayag (Hydro generating Station) tripped due to butter
2) 110 MW Vishnuparyag HPS - UNIT 2 UTTAR fly valve closed. Generation loss 400 MW (approx.). As per PMU, No fault is observed in the
14 NR UPPTCL 17-Jul-20 3:22 17-Jul-20 5:08 1:46 400 0 GD-1 0
3) 110 MW Vishnuparyag HPS - UNIT 1 PRADESH system. In antecedent conditions, 400kV Vishnuprayag-Alaknanda & 400kV Vishnuprayag-
4) 110 MW Vishnuparyag HPS - UNIT 3 Muzaffarnagar carrying 121MW & 390MW respectively.
46
Northern Region-Grid Event Report for July 2020

Outage Revival Category as


Generation Load Energy
Name of Elements Affected Event per CEA
S.No. Region Owner/ Agency Duration Loss Loss Unserved
(Tripped/Manually opened) Area (As reported) Grid
Date Time Date Time (MW) (MW) (in MU)
Standards

1) 400/220 kV 500 MVA ICT 1 at Bhiwani(BB) 220 Bus Bar protection operated on Bus I and II at Bhiwani(BBMB) s/s. All 220kV lines tripped
15 NR 2) 220KV Bus 1 at Bhiwani(BB) HARYANA BBMB 18-Jul-20 11:45 18-Jul-20 12:08 0:23 along with ICT-1 (500MVA). As per PMU, Y-N fault with delayed clearance is observed in the 0 250 GD-1 0.09
3) 220KV Bus 2 at Bhiwani(BB) system. In antecedent conditions, 400/220 kV 500 MVA ICT 1 at Bhiwani(BB) carrying 262MW.

1) 220 KV Meerut(PG)-Nara(UP) (PG) Ckt-1


2) 220KV Bus 1 at Meerut(PG) At 13:35 Hrs, R-N phase fault detected in 220 kV Meerut-Nara but fault could not be cleared by
3) 400/220 kV 315 MVA ICT 1 at Meerut(PG) its 220 kV CB and resulted in operation of LBB which tripped 220 kV BUS-I at Meerut and tripping
UTTAR POWERGRID,
16 NR 4) 220 KV Meerut(PG)-Modipuram(UP) (PG) Ckt-1 18-Jul-20 13:34 18-Jul-20 14:55 1:21 of all associated elements. As per PMU, R-N fault with delayed clearance is observed in the 0 0 GI-2 0
PRADESH UPPTCL
5) 220 KV Meerut(PG)-Charla(UP) (UP) Ckt-1 system. In antecedent conditions, 400/220 kV 315 MVA ICT 1 at Meerut(PG) & 400/220 kV 315
6) 220 KV Meerut(PG)-Jagriti Vihar (UP) (UP) Ckt-1 MVA ICT 3 at Meerut(PG) carrying 117MW & 118MW respectively.
7) 400/220 kV 315 MVA ICT 3 at Meerut(PG)
400 KV Gorakhpur(PG)-Muzaffarpur(PG) (POWERLINK) Ckt-1 tripped on B-N fault, F/C-2.279KA,
F/D-287 km from Gorakhpur end. At the same time, 400 KV Gorakhpur(PG)-Muzaffarpur(PG)
1) 400 KV Gorakhpur(PG)-Muzaffarpur(PG) (POWERLINK) Ckt-1 UTTAR
17 NR POWERLINK 20-Jul-20 7:06 20-Jul-20 8:25 1:19 (POWERLINK) Ckt-2 also tripped. As per PMU, B-N fault with delayed clearance is observed in the 0 0 GI-2 0
2) 400 KV Gorakhpur(PG)-Muzaffarpur(PG) (POWERLINK) Ckt-2 PRADESH
system. In antecedent conditions, 400 KV Gorakhpur(PG)-Muzaffarpur(PG) (POWERLINK) Ckt-1 &
2 carrying 309MW & 313MW respectively.
As reported by SLDC Rajasthan, 220kV Amarsagar-Dechu, 220kV Amarsagar-Mada and 220kV
1) 220 KV Akal-Amarsagar
Amarsagar-Akal tripped at 20.50 Hrs due to snapping of Main bus jumper at 220kV Amarsagar.
18 NR 2) 220 KV Amarsagar-Mada RAJASTHAN RRVPNL 20-Jul-20 20:50 20-Jul-20 23:05 2:15 1200 0 GD-1 0
As per PMU, R-B fault is observed in the system. Wind generation loss of approx. 1200 MW
3) 220 KV Amarsagar-Dechu
observed as per SCADA. No load loss reported.
400/220 kV 500 MVA ICT 1 at Bhadla(RS) & 400/220 kV 500 MVA ICT 3 at Bhadla(RS) tripped due
1) 400/220 kV 500 MVA ICT 1 at Bhadla(RS) to operation of over current protection. As per PMU, fluctuations in voltage is observed in the
19 NR RAJASTHAN RRVPNL 22-Jul-20 12:50 22-Jul-20 13:21 0:31 1400 0 GD-1 0
2) 400/220 kV 500 MVA ICT 3 at Bhadla(RS) system. In antecedent conditions, 400/220 kV 500 MVA ICT 1 at Bhadla(RS) & 400/220 kV 500
MVA ICT 3 at Bhadla(RS) carrying 541MW & 535MW respectively.

Load loss of around 300 MW Occurred due to tripping of all the emanating 220 kV lines at
Nanauta (UP). As observed from SCADA, tripping of 220 kV Shamli- Nanauta line occurred initially
1) 220 KV Saharanpur(PG)-Sarsawan(UP) (UP) Ckt-1 UTTAR
20 NR UPPTCL 24-Jul-20 11:24 24-Jul-20 14:47 3:23 which lead to tripping of 220kV Nanauta-Saharanpur(PG) due to overloading. As per PMU, Y-B 0 300 GD-1 1
2) 220 KV Khara(UP)-Saharanpur(PG) (UP) Ckt-1 PRADESH
fault followed by three phase fault is observed in the system. In antecedent conditions, 220kV
Nanauta-Saharanpur(PG) & 220 kV Shamli- Nanauta carrying 194MW & 43MW respectively.

The incident occurred due to the closing of line CB of 220 kV BKN-GJNR-1 feeder with the EB
switch closed at 17:49:05 hrs. Due to this the 220 kV side Bus Bar protection operated resulting
1) 400/220 kV 315 MVA ICT 1 at Bikaner(RS)
21 NR RAJASTHAN RRVPNL 24-Jul-20 17:49 24-Jul-20 19:19 1:30 in the opening of CB’s of 220 kV side of ICT1, ICT2 and other 220 kV feeders connected to the 0 200 GD-1 0.3
2) 400/220 kV 315 MVA ICT 2 at Bikaner(RS)
Bus. As per PMU, Y-B fault is observed in the system. In antecedent conditions, 400/220 kV 315
MVA ICT 1 & ICT 2 at Bikaner(RS) carrying 157MW & 162MW respectively.

1) 220 KV Tanakpur(NH)-CBGanj(UP) (PG) Ckt-1


2) 220 KV Sitarganj(PG)-CBGanj(UP) (PG) Ckt-1 220 kV CBganj-Badaun tripped resulting in operation of Bus bar protection at CBganj causing
3) 220KV Bus 1 at CBGanj(UP) tripping of both bus along with all 220kv line from substation.90 MW Unit 1, Unit 2 and unit 3 of
4) 220KV Bus 2 at CBGanj(UP) UTTAR NHPC TANAKPUR tripped at 12:09 Hrs along with tripping of 220kV Bus 1 and 2 at Cbganj, 220 kV
5) 31.42 MW Tanakpur HPS - UNIT 1 PRADESH ; NHPC, CBGANJ-SITARGANJ line, and CBGANJ-TANAKPUR line tripped on Zone-4 protection. 210MW Unit
22 NR 26-Jul-20 12:09 26-Jul-20 12:56 0:47 300 500 GD-1 0.39
6) 31.4 MW Tanakpur HPS - UNIT 2 UTTRAKHAN POWERGRID 1,2 and Unit 3 of NHPC DHAULIGANGA also tripped. 220KV BAREILLY(UP)- PANTNAGAR(UK), and
7) 31.4 MW Tanakpur HPS - UNIT 3 D 132KV SITARGANJ(PG)- SITARGANJ(UK) tripped resulting in load loss of 200MW in Uttarakhand
8) 70 MW Dhauliganga HPS - UNIT 1 control area. As per PMU, R-B fault with delayed clearance is observed in the system. Load loss of
9) 70 MW Dhauliganga HPS - UNIT 2 around 300MW also observed in UP control area.
10) 70 MW Dhauliganga HPS - UNIT 3

1) 400 KV Singrauli(NT)-Lucknow(UP) (PG) Ckt-1


2) 400/220 kV 500 MVA ICT 1 at Lucknow(UP)
3) 400 KV Unnao-Lucknow (UP) Ckt-1 400kv bus bar protection operated at 400/220kV Lucknow(UP) due to falling of kite wire on
4) 400KV Bus 1 at Lucknow(UP) 400kv bus-coupler which caused operation of 400kv bus bar protection and tripped the
UTTAR POWERGRID,
23 NR 5) 400/220 kV 500 MVA ICT 2 at Lucknow(UP) 28-Jul-20 17:38 28-Jul-20 18:58 1:20 associated elements. As per PMU, R-B fault is observed in the system. In antecedent conditions, 0 0 GI-2 0
PRADESH UPPTCL
6) 400KV Bus 2 at Lucknow(UP) 400/220 kV 500 MVA ICT 1 & 500 MVA ICT 2 at Lucknow(UP) carrying 226MW & 231MW
7) 400 KV Lucknow_1(PG)-Lucknow(UP) (PG) Ckt-1 respectively.
8) 400 KV Lucknow(UP)-Bareilly(PG) (PG) Ckt-1
9) 50 MVAR Bus Reactor No 1 at 400KV Lucknow(UP)
1) 220 kV Bhadla-Baap tripping of 220kV Bhadla(RS)-Badsid, 220kV Bhadla(RS)-Saurya Urja (Ckt 1&2) and 220kV Bhadla-
2) 220 kV Bhadla-Badisid Baap transmission lines lead to a generation loss of approximately 500MW. Supply failed due to
24 NR RAJASTHAN RRVPNL 29-Jul-20 16:01 29-Jul-20 16:35 0:34 500 0 GD-1 0
3) 220 kV Bhadla-Saurya Urja Ckt-1 snapping of jumper between Main Bus-I and Main Bus-I isolator at 220kV Bhadla. As per PMU, B-
4) 220 kV Bhadla-Saurya Urja Ckt-2 N fault is observed in the system.

47
Northern Region-Grid Event Report for July 2020

Outage Revival Category as


Generation Load Energy
Name of Elements Affected Event per CEA
S.No. Region Owner/ Agency Duration Loss Loss Unserved
(Tripped/Manually opened) Area (As reported) Grid
Date Time Date Time (MW) (MW) (in MU)
Standards
1) 130 MW Parbati III HEP - UNIT 3
2) 130 MW Parbati III HEP - UNIT 2
3) 400 KV Parbati_2(NH)-Parbati Pooling Banala(PG) (PKTCL) Ckt-
Fire Incident occurred at Bus Duct at Parbati II station leading to tripping of 400 KV Parbati_2(NH)-
1
Parbati Pooling Banala(PG) (PKTCL) Ckt-1 and units at 400kV Parbati II, 400kV Parbati III & 400kV
4) 130 MW Parbati III HEP - UNIT 4
HIMACHAL Sainj. Hydro generation loss of 700 MW(approx.) occurred at Parbati III(520MW), Parbati
25 NR 5) 130 MW Parbati III HEP - UNIT 1 HP, NHPC, PSTCL 29-Jul-20 23:11 30-Jul-20 0:54 1:43 700 0 GD-1 0
PRADESH II(72MW) and Sainj(108MW). As per PMU, R-N fault with delayed clearance is observed in the
6) 400 KV Parbati_2(NH)-Sainj(HP) (UNDEF) Ckt-1
system. In antecedent conditions, 400 KV Parbati_2(NH)-Parbati Pooling Banala(PG) (PKTCL) is
7) Parbati II HEP - UNIT 2
carrying 212MW.
8) 200 MW Parbati II HEP - UNIT 4
9) 50 MW Sainj HEP - UNIT 1
10) 50 MW Sainj HEP - UNIT 2
R-Phase jumper of 220KV Amar Sagar-Akal line broken leading to tripping of 220KV Amar Sagar-
1) 220 KV Akal-Amarsagar Akal, 220KV Akal-Mada & 220KV Amar Sagar-Mada. As per PMU, R-N fault is observed in the
26 NR 2) 220KV Akal-Mada RAJASTHAN RRVPNL 31-Jul-20 19:47 31-Jul-20 19:52 0:05 system. 220KV Amar Sagar-Akal, 220KV Akal-Mada & 220KV Amar Sagar-Mada carrying 198MW, 700 0 GD-1 0
3) 220KV Amar Sagar-Mada 215MW & 180MW respectively. Wind generation loss of around 700MW is observed(as per
SCADA data).

48
Western Region-Event Report for July 2020
Outage Revival Outage Duration
Category as per CEA Energy Unserved
S.No Region Name of Elements Owner/Agency Event Generation Loss (MW) Load Loss (MW)
standards (MU)
Date Time Date Time Time

Tripping of
1.220 kV Gandhar-Haldarwa 1&3 At 400/220 kV Gandhar Power station, 220 kV Bus 1 and all connected elements tripped on busbar protection operation for
2.400/220 kV 500 MVA Gandhar ICT 1 external fault (Y-E fault) on 220 kV Haldarwa-Jhambua line. Busbar protection operation for through fault was due to the
1 WR NTPC 12-Jul-20 20:18 12-Jul-20 21:46 1:28 117 Nil GI-1 Nil
3.144.3 MW Gandhar GT 1 wiring defect in Y phase of Bus 1 Transformer Measurement Differential (Tmd) unit in busbar relay and the same was
4.224.5 MW Gandhar ST-4 rectified during joint testing done by NTPC& GETCO on 27-07-20.

At 400kV Koyna Stage IV Hydro power station, short circuit in DC distribution box resulted in the failure of control DC of
2 WR Tripping of Koyna Stage IV Units 1,2,3&4(250MW each) MSPGCL 14-Jul-20 14:10 14-Jul-20 18:54 4:44 975 Nil GI-2 Nil
butterfly valves. Hence, the valves closed and resulted in the tripping of all Units 1,2,3&4 of 250MW each.

400kV Jejuri-Lonikhand line tripped on B-E fault due to conductor snapping at location 28 at 17:01 Hrs. 400 kV Jejuri-New
Tripping of
Koyna stage IV tripped on B-E fault due to conductor snapping at location 11 at 20:28 Hrs. At the same time, 220kV Jejuri-
1.400 kV Jejuri-Lonikhand
Phursungi 1&2 tripped at Phursungi end on reverse power flow protection.With the tripping of these lines, 400 kV Jejuri Bus
3 WR 2.400kV Jejuri- New Koyna Stage IV MSETCL 23-Jul-20 20:28 24-Jul-20 6:19 9:51 Nil Nil GI-2 Nil
Voltage increased to 448 kV and 400/220 kV ICTs 1,2&3 were H/T to control high voltage at Jejuri substation at 20:33 Hrs.
3. 220 kV Jejuri-Phursungi 1&2
Load trimming scheme operated at 220/132kV Walchandnagar due to overloading of 220 kV Lonand-Kandalgaon line and 42
MW load was curtailed.

pp g
1.400 kV Kalwa-Padghe 1&2
2.400 kV Kalwa-Kharghar At 400/220 kV Kalwa substation, Y phase CT of 400 kV Bus coupler blasted and resulted in tripping of all the elements on
4 WR MSETCL 26-Jul-20 10:04 26-Jul-20 10:48 0:44 Nil Nil GI-2 Nil
3.400 kV Kalwa-Pune busbar protection operation.
4.400/220 kV Kalwa ICTs 1,2,3&4

Tripping of At 220/66 kV Kharadpada substation, 66 kV Kharadpada-Athal tripped on B-E fault. At the same time, 220/66 kV Kharadpada
5 WR 1.220/66 kV 100MVA Kharadpada ICTs 2&3 DNH 28-Jul-20 13:13 28-Jul-20 13:22 0:09 ICTs 2&3 tripped on Directional Earth fault protection operation. Due to the tripping of the ICTs, 142 MW load at 66 kV side Nil 142 GI-1 0.0213
2.66 kV Kharadpada-Athal got affected.

Tripping of
At 400 kV Mapusa substation, 400 kV Mapusa Bus 1 tripped on LBB operation of 400 kV Kolhapur 1 Main bay during the B-E
6 WR 1.400 kV Mapusa Bus 1 PGCIL 28-Jul-20 18:47 28-Jul-20 19:26 0:39 Nil Nil GI-2 Nil
fault on 400 kV Kolhapur-Mapusa 1. LBB timer was found faulty during testing and the same was replaced.
2.400 kV Kolhapur-Mapusa 1

49
Southern Region-Grid Event Report for July 2020

Outage Revival Outage


Category as per Energy
Sl. Name of Elements Duration Event Generation Load Loss
Region Owner / Agency CEA Grid Unserved
No. (Tripped/Manually opened) (As reported) Loss (MW) (MW)
Standards (MU)
Date Time (Hrs) Date Time (Hrs) Time

Complete outage of 220kV Kadakola substation of KPTCL :In the antecedent all elements were connected to
i. 220kV Kadakola - Kaniyampeta ii.
220kV Bus A at Kadakola station since 220kV Bus-B was under maintenence. As reported bus bar
1 SR 220kV Kadakola - Mysore 1&2 iii. KPTCL 5-Jul-20 4:31 5-Jul-20 8:54 4 Hrs 23 mins
protection of 220kV Bus A operated due to suspected DC ground resulting in tripping of all connected
---- 50 MW GD-1 ----
220kV Kadakola - Chamrajnagar 1 & 2
elements at 220kV Kadakola. Details awaited.

Complete Outage of 400kV/220kV Kolar SS of SR-2, 400kV/220kV Hoody SS of KPTCL and Tripping of HVDC
i. 400kV Kolar – Thiruvalum ii.
Talchar Kolar Pole-1 and 2 : In the antecedent, 400kV Kolar – NP Kunta line was open under voltage
400kV Kolar - Hosur 1&2
regulation. As reported, all connected lines at 400kV Kolar tripped on operation of overvoltage protection.
iii.400kV Kolar - Somanahalli
Due to loss of voltage in AC side HVDC Talcher – Kolar Pole-1 and Pole-2 tripped on pole control reference
2 SR iv. 400/220kV Kolar ICT-1&2 v. KPTCL, PGCIL 16-Jul-20 1:58 16-Jul-20 2:42 44 mins
voltage protection. There was complete loss of supply at 400/220kV Hoody substation since the station was
---- 870 MW GD-1 0.6380
400kV Kolar - Hoody 1&2 vi.
radially fed from Kolar. In the antecedent conditions, 400kV Hoody-Yelahanka and 400kV Hoody –
400/220kV Hoody ICT-1,2&3
Nelamangala were under planned shutdown due to construction works of 400kV Pavagada – Devenahalli
vii. HVDC Talcher- Kolar Pole-1&2
line by PGCIL.

 i. 220kV Narnoor - AP Carbides


Tripping of 220kV Bus-2 at 400/220kV Narnoor station of APTRANSCO : Triggering incident was fault in Y-
ii. 220kV Narnoor - Somrajpally
3 SR APTRANSCO 15-Jul-20 2:16 15-Jul-20 4:33 2 hrs 17 mins phase isolator of 220kV Bus-2. This resulted in operation of bus bar protection of 220kV Bus-2 at Narnoor ---- ---- GI-1 ----
iii. 220kV Narnoor - Brahmakotkur
station. All elements connected to 220kV Bus-2 tripped.
iv. 400/220kV ICT-2 at Narnoor 

i. 220kV Kadakola - Mysore Line-2 Tripping of 220kV Bus-2 at Kadakola station of KPTCL: 220kV Bus-2 at Kadakola station tripped due to mal
4 SR ii. 220kV Kadakola - Chamrajnagar Line-2 KPTCL 17-Jul-20 5:02 17-Jul-20 6:40 1 hr 38 mins operation of Y-phase bus bar differential relay resulting in tripping of all elements connected to Bus-2 at ---- ---- GI-1 ----
iii. 100MVA ICT-2 at Kadakola Kadakola station.

50
Eastern Region-Grid Event Report for July 2020

Outage Revival Outage Duration Category as per


Sl. Owner / Generation Loss Load Loss Loss of
Region Name of major elements tripped Event CEA Grid
No. Agency (MW) (MW) Energy(in MU)
Date Time Date Time Time Standards

BRBCL, a 4 x 250 MW thermal power plant is connected to rest of the grid via 400 kV BRBCL – Sasaram D/C. 400 kV BRBCL – Sasaram
400 kV BRBCL – Sasaram – 1 – 2 was under break down due to rectification of tower bending. Unit 1 and 2 were in running condition at BRBCL. At 05:50 hrs.,
1 ER ISTS 1-Jul-20 5:50 1-Jul-20 10:05 4:15 410 0 GD-1 0.0000
Unit 1 and 2 at BRBCL 400kV Sasaram-BRBCL #1 tripped on R and Y phase fault. Both the units got tripped due to loss of evacuation path. Heavy rain,
thundering and lightning was reported at the time of the event.

At 12:47 hrs 220 kV Joda – TTPS - 1 tripped on Y and B phase to earth fault. At 13:00 hrs it was charged from Joda end successfully.
220 kV Joda – TTPS D/C But while charging this circuit from TTPS end at 13:01 hrs, it tripped on B phase to earth fault from TTPS end. At 13:06 hrs 220 kV
2 ER 220 kV Ramchandrapur – Joda S/C OPTCL 4-Jul-20 13:19 4-Jul-20 14:02 0:43 Joda – TTPS – 2 tripped from both ends on R phase to earth fault. At 13:19 hrs 220 kV Joda – Ramchandrapur end tripped from both 0 110 GD-1 0.1003
220 kV Joda – JSPL - Jamshedpur S/C ends on Y phase to earth fault. At same time, 220 kV Jamshedpur – JSPL – Joda feeder tripped from Jamshedpur end in overcurrent
protection. Weather condition was normal at the time of the event.

400 kV Rangpo – Kishangunj S/C At 14:24 hrs 400 kV Rangpo – Kishangunj S/C tripped from both ends. Directional Earth fault protection operated at Rangpo and DT
220 kV Jorethang – New Melli D/C was received at Kishangunj. At same time, 220 kV JLHEP – New Melli D/C and 220 kV Tashiding Rangpo S/C tripped on earth fault
3 ER ISTS 4-Jul-20 14:24 4-Jul-20 14:28 0:04 104 0 GD-1 0.0000
220 kV Tashiding – Rangpo S/C protection at Jorethang and Tashiding end respectively. As a result both the running units at Jorethang tripped due to loss of
Unit 1 and 2 at JLHEP evacuation path

400 kV BRBCL – Sasaram – 2 BRBCL, a 4 x 250 MW thermal power plant is connected to rest of the grid via 400 kV BRBCL – Sasaram D/C. 400 kV BRBCL – Sasaram
765/400 kV ICT at Sasaram – 1 was charged from Sasaram end. During synchronizing this line from BRBCL end, 400 kV bus 1 at Sasaram got tripped resulting in
4 ER ISTS 7-Jul-20 23:58 8-Jul-20 3:56 3:58 425 0 GD-1 0.0000
400 kV bus 1 at Sasaram tripping of 400 kV BRBCL – Sasaram – 2, 765/400 kV ICT at Sasaram. Unit 2 and 3 were in running condition at BRBCL prior to the
Unit 2 and 3 at BRBCL event. Both the units tripped due to loss of evacuation path.

400/132 kV Motihari substation is connected to rest of the grid via 400 kV Barh – Motihari – 2 (Others lines are under breakdown due
to tower-collapse) and its radial load of 132 KV Betiya, 132 KV Motihari (Bihar) and 132 KV Raxaul are being supplied through
400/132 kV ICT – 2 at Motihari.
5 ER 400 kV Barh – Motihari – 2 ISTS 8-Jul-20 2:19 8-Jul-20 2:50 0:31 0 248 GD-1 0.1281
At 02:19 hrs 400 kV Barh – Motihari – 2 tripped due to B phase to earth fault. The tripping has led to loss of supply to
Betiah/Raxaul/Motihari as being the single source of supply causing Grid Disturbance 1 (GD-1) category event.

400 kV Arambag – New Chanditala S/C


400 kV Arambag – Bakreswar S/C
400 kV Arambag Kolaghat S/C
400/220 kV ICT – 1, 2, 3 and 4 at Arambag
220 kV Arambag – Midnapore D/C
At 08:45 hrs, 400 kV Arambag – New Chanditala S/C, 400 kV Arambag – Bakreswar S/C, 400 kV Arambag Kolaghat S/C and 400/220 kV
220 kV Arambag – New Bishnupur D/C
6 ER WBSETCL 10-Jul-20 8:45 10-Jul-20 9:11 0:26 ICT – 1, 2, 3 and 4 at Arambag tripped. At same time, all 220 KV lines connected to Arambag s/s and some 132 kV lines also tripped 0 61 GI-2 0.0264
220 kV Arambag – Domjur – 1
during this event. Flash over was reported at B phase pole of 220 kV side breaker of 315 MVA 400/220 kV ICT – 4 at Arambag.
220 kV Arambag Howrah S/C
220 kV Arambag – Rishra S/C
132 kV Arambag Tarakeswar D/C
132 kV Arambag – Raina D/C
132 kV Arambag – Brisingha - 2

At 01:58hrs. both poles of Talcher-Kolar HVDC tripped due to un-availability of 400kV bus voltage at Kolar end. Before tripping flow
7 ER HVDC Talcher Kolar pole 1 and 2 ISTS 16-Jul-20 1:58 16-Jul-20 3:36 1:38 was 500MW. SPS acted and generation reduction happened at JITPL(150MW) and GMR (269MW). No generaton reduction in Talcher 419 0 GI-2 0.0000
Stg-2.

400 KV Teesta III Kishanganj S/C was taken under shutdown on emergency basis at 15:49 hrs for gas density monitor replacement
400 KV Teesta III – Dikchu S/C
work at Kishangunj end. To ensure maximum power evacuation, 400 kV buses at Rangpo were split. Teesta III and Dikchu were
400 KV Rangpo-Dikchu S/C
connected to 400 kV bus 1 at Rangpo through 400 kV Dikchu – Rangpo S/C. their generation was evacuated through 400 kV Rangpo
8 ER 400 KV Rangpo-Kishanganj S/C ISTS 16-Jul-20 16:27 16-Jul-20 17:13 0:46 1390 0 GD-1 0.0000
Kishangunj S/C. All other elements at Rangpo S/S were connected to 400 kV bus 2. Generation at Teesta V, Jorethang, Tashiding,
Units 1, 2, 3, 4, 5 and 6 at Teesta III HEP
Chujachen HEP was being evacuated through 400 kV Rangpo – Binaguri D/C. At 16:27 hrs, 400 KV Teesta III – Dikchu S/C, 400 KV
Both units 1 and 2 at Dikchu HEP
Rangpo-Dikchu S/C, 400 KV Rangpo-Kishanganj S/C tripped resulting total power failure at Teesta III and Dikchu HEP.

At 23:18 Hrs, 400 KV Alipurduar-Jigmelling D/c tripped on spurious DT receive at Alipurduar end resulting in tripping of Mangdechu
9 ER 400 kV Alipurduar - Jigmelling D/C ISTS 19-Jul-20 23:18 19-Jul-20 23:58 0:40 units #1 and #2 due to loss of evacuation path. Generation loss at Mangdechu was 777 MW. No generation or load loss was reported 0 0 GI-2 0.0000
in Indian grid during this event.

400 kV Muzaffarpur-Gorakhpur D/C


400 kV Muzaffarpur-New Purnea-D/C At 07:06 hrs. B phase to earth fault occurred at 400 kV Muzaffarpur-Gorakhpur – 2. B pole of tie breaker at Muzaffarpur end got did
400 kV Muzaffarpur-Biharshariff D/C not open. Due to delay in LBB operation, fault was getting fed and to clear the fault, 400 kV Muzaffarpur-Gorakhpur – 1, 400 kV
220 kV Muzaffarpur – Hajipur D/C Muzaffarpur-New Purnea-2, 400 kV Muzaffarpur-Biharshariff D/C and 220 kV Muzaffarpur – Hajipur D/C tripped. Fault clearing time
10 ER 220 kV Muzaffarpur – MTPS - 1 ISTS 20-Jul-20 7:06 20-Jul-20 7:49 0:43 was around 500 ms. Tripping of 220 kV Muzaffarpur – Hajipur D/C resulted total power failure at Hajipur and chapra. At 07:08 hrs, 0 300 GD-1 0.2150
220 kV Darbhanga (DMTCL) – Darbhanga D/C, 220 kV 220 kV Darbhanga (DMTCL) – Darbhanga D/C, 220 kV Darbhanga (DMTCL) – Motipur D/C, 220 kV Darbhanga (DMTCL) – Laukahi - 1,
Darbhanga (DMTCL) – Motipur D/C 220 kV Darbhanga (DMTCL) – Samastipur S/C tripped due to overvoltage problem resulting total power failure at Darbhanga and its
220 kV Darbhanga (DMTCL) – Laukahi - 1 nearby areas.
220 kV Darbhanga (DMTCL) – Samastipur – S/C

At 01:32 hrs 400 kV Alipurduar Jigmelling D/C tripped due to R & B phase fault. Prior to the tripping, schedule to Mangdechu
11 ER 400 kV Alipurduar - Jigmelling D/C ISTS 22-Jul-20 1:32 22-Jul-20 4:10 2:38 0 0 GI-2 0.0000
generating units were 762 MW. There was no load or generation loss reported in Indian grid at the time of the event.

220 kV Darbhanga (BSPTCL) to Mushahari – 2 was idle charged from Mushahari end. At 12:15 hrs 220 kV Darbhanga (DMTCL) –
220 kV Darbhanga (DMTCL)-Darbhanga (Bihar) D/C Darbhanga (BSPTCL) D/C tripped from DMTCL end only. At same time 220 kV Darbhanga (BSPTCL) to Mushahari – 1 also tripped.
12 ER BSPTCL 22-Jul-20 12:15 22-Jul-20 12:50 0:35 0 250 GD-1 0.1458
220 kV Dharbanga-Mushahari-1 Later it was reported that Y – Phase Bushing to Gantry tower conductor of 220 kV Darbhanga (DMTCL) – Darbhanga (BSPTCL) – 2
melted and fault occurred.
51
North Eastern Region-Grid Disturbances Report for July 2020
Generati Load Category as
Sl. Date and Time of Date and Time of Outage Generation Load Loss
Region Name of Element Owner / Agency Event on Loss Loss in per CEA Grid
No. Tripping Revival Duration Loss (MW) (MW)
in MU MU Standards
Yiangangpokpi Area of Manipur Power System was connected with the rest of NER Grid through 132 kV Imphal (MSPCL) -
Yiangangpokpi D/C. 132 kV Thoubal - Kakching kept opened to avoid over-loading of 132 kV Loktak- Ningthoukhong line.
1 NER 132 kV Imphal (MSPCL) - Yiangangpokpi D/C MSPCL 01-Jul-20 04:25 01-Jul-20 04:32 0:07:00 0 17 0 0.0019 GD 1
At 04:25 Hrs on 01.07.2020,132 kV Imphal (MSPCL) - Yiangangpokpi D/C tripped. Due to tripping of these element, Yiangangpokpi
Area of Manipur Power System was separated from rest of NER Grid and subsequently collapsed due to no source in this area.

Pasighat area of Arunachal Pradesh Power System was connected with the rest of NER Grid through 132 kV Along - Pasighat line.
DoP, Arunachal
2 NER 132 kV Along - Pasighat line 01-Jul-20 04:25 01-Jul-20 05:00 0:35:00 At 04:25 Hrs on 01.07.2020, 132 kV Along - Pasighat line tripped. Due to tripping of this element, Pasighat area of Arunachal Pradesh 0 14 0 0.0081 GD 1
Pradesh
Power System was separated from rest of NER Grid and subsequently collapsed due to no source in this area.

Ningthoukhong area of Manipur Power System was connected with the rest of NER Grid through 132 kV Loktak - Ningthoukhong line
and 132 kV Imphal(PG) - Ningthoukhong line. 132 kV Kongba - Kakching line was kept opened to avoid over-loading of 132 kV Loktak-
132 kV Loktak - Ningthoukhong line and 132 Ningthoukhong line.
3 NER MSPCL 04-Jul-20 12:00 04-Jul-20 12:18 0:18:00 0 21 0 0.0060 GD 1
kV Imphal (PG) - Ningthoukhong line At 12:00 Hrs on 04.07.2020,132 kV Loktak - Ningthoukhong line and 132 kV Imphal (PG) - Ningthoukhong line tripped. Due to
tripping of these elements, Ningthoukhong Area of Manipur Power System was separated from rest of NER Grid and subsequently
collapsed due to no source in this area.
Melriat (PG) Substation and Zuangtui Area of Mizoram Power System were connected with rest of NER Grid through 132 kV Aizawl -
Melriat(PG) line and 132 kV Silchar - Melriat (PG) 1 &2 lines.
132 kV Aizawl - Melriat(PG) line and 132 kV POWERGRID &
4 NER 05-Jul-20 12:36 05-Jul-20 13:06 0:30:00 At 12:36 Hrs on 05.07.20,132 kV Aizawl - Melriat(PG) line and 132 kV Silchar - Melriat (PG) 1 &2 lines tripped. Due to tripping of 0 32 0 0.0160 GD 1
Silchar - Melriat (PG) 1 & 2 lines P&ED, Mizoram
these elements, Melriat (PG) and Zuangtui Area were separated from rest of NER Grid and subsequently collapsed due to no source
in this area.
Khupi Area of Arunachal Pradesh Power System and 220 kV and 132 kV Buses of Balipara (PG) Substation were connected with rest
of NER Grid through 400/220 kV, 315 MVA ICT-1 & 2 and 220 kV Balipara-Sonabil T/L.
220 kV and 132kV Buses of Balipara (PG) At 12:53 hrs of 09.07.2020, 400/220kV ICT-1 & ICT-2 at Balipara and 220 kV Balipara-Sonabil line tripped while availing planned
5 NER POWERGRID 09-Jul-20 12:53 09-Jul-20 14:55 2:02:00 0 5 0 0.0100 GD 1
Substation shutdown of 220 kV Balipara-Sonabil T/L causing bus dead of 220 kV & 132 kV Bus at Balipara. Due to tripping of these elements,
Khupi area of Arunachal Pradesh Power System was separated from the rest of NER Grid and subsequently collapsed due to no
source in this area.

Lumshnong Area of Meghalaya Power System was connected to the rest of NER grid through 132 kV Lumshnong - Panchgram line.
132 kV Khliehriat - Lumshnong line tripped on Earth Fault at 08:00 Hrs of 12.07.2020.
6 NER 132 kV Lumshnong - Panchgram line AEGCL, MEPTCL 12-Jul-20 08:01 12-Jul-20 08:18 0:17:00 0 25 0 0.0070 GD 1
At 08:01 hrs of 12.07.2020, 132 kV Lumshnong - Panchgram line tripped. Due to tripping of this element, Lumshnong Area of
Meghalaya Power System was separated from the rest of NER Grid and subsequently collapsed due to no source in this area.

Lumshnong Area of Meghalaya Power System was connected to the rest of NER grid through 132 kV Lumshnong - Panchgram line.
132 kV Khliehriat - Lumshnong line tripped on Earth Fault at 08:01 Hrs of 12.07.2020.
7 NER 132 kV Lumshnong - Panchgram line AEGCL, MEPTCL 12-Jul-20 19:53 12-Jul-20 20:02 0:09:00 0 27 0 0.0040 GD 1
At 19:53 hrs of 12.07.2020, 132 kV Lumshnong - Panchgram line tripped. Due to tripping of this element, Lumshnong Area of
Meghalaya Power System was separated from the rest of NER Grid and subsequently collapsed due to no source in this area.

Along area of Arunachal Pradesh Power System was connected with the rest of NER Grid through 132 kV Along - Daporjio line.
DOP , Arunachal
8 NER 132 kV Along - Daporjio line 16-Jul-20 18:51 16-Jul-20 19:05 0:14:00 At 18:51 Hrs on 16.07.2020,132 kV Along - Daporjio line tripped. Due to tripping of this element, Along area of Arunachal Pradesh 0 24 0 0.0056 GD 1
Pradesh
Power System was separated from rest of NER Grid and subsequently collapsed due to no source in this area.

Karong area of Manipur Power System was connected with the rest of NER Grid through 132 kV Imphal (MSPCL) - Karong Line and
132 kV Karong - Kohima Line.
132 kV Imphal (MSPCL) - Karong Line and 132 MSPCL & DoP
9 NER 17-Jul-20 15:53 17-Jul-20 16:24 0:31:00 At 15:53 Hrs on 17.07.2020, 132 kV Imphal (MSPCL) - Karong Line and 132 kV Karong - Kohima Line tripped. Due to tripping of these 0 11 0 0.0060 GD 1
kV Karong - Kohima Line Nagaland
elements, Karong area of Manipur Power System was separated from rest of NER Grid and subsequently collapsed due to no source
in this area.
Yiangangpokpi area of Manipur Power System was connected with the rest of NER Grid through 132 kV Yiangangpokpi-
132 kV Yiangangpokpi-Imphal(Yurembam) Imphal(Yurembam) D/C.
10 NER MSPCL 19-Jul-20 10:37 19-Jul-20 10:42 0:05:00 0 24 0 0.0020 GD 1
D/C At 10:37 Hrs on 19.07.2020,132 kV Yaingangpokpi-Imphal(Yurembam) D/C tripped. Due to tripping of these elements, Yiangangpokpi
area of Manipur Power System was separated from rest of NER Grid and subsequently collapsed due to no source in this area.

Umtru and New Umtru Power Station of Meghalaya Power System were connected with the rest of NER Grid through 132 kV Umiam
st-III -Umtru I & II lines, 132 kV Umiam st-IV - Umtru I & II lines, 132 kV EPIP II - Umtru I & II lines and 132 kV EPIP II -New Umtru
132 kV Umiam st-III -Umtru I & II lines
line.[132 kV Umtru- Sarusajai DC was idle charged from Sarusajai end since 20-06-2020 & 132 kV Umtru- Kahilipara DC was idle
132 kV Umiam st-IV - Umtru I & II lines
charged from Kahelipara end since 09-04-2020]. Umiam area of Meghalaya Power System was connected with the rest of NER Grid
132 kV EPIP II - Umtru I & II lines
MePTCL & through 132 kV Umiam - Umiam st-I line and Umiam-NEHU line. Umiam Stage-II Power Station was connected with the rest of NER
11 NER 132 kV EPIP II -New Umtru line 20-Jul-20 11:50 20-Jul-20 11:58 0:08:00 126 30 0.0168 0.0040 GD 1
MePGCL Grid through 132 kV Umiam st-II - Umiam st-I line.
132 kV Umiam st-II - Umiam st-I line
At 11:50 Hrs on 20.07.2020, 132 kV Umiam st-III -Umtru I & II lines, 132 kV Umiam st-IV - Umtru I & II lines, 132 kV EPIP II - Umtru I &
132 kV Umiam - Umiam st-I line and Umiam-
II lines, 132 kV EPIP II -New Umtru line, 132 kV Umiam st-II - Umiam st-I line, 132 kV Umiam - Umiam st-I line and Umiam-NEHU line
NEHU line
tripped. Due to tripping of these elements, Umiam area, Umtru and New Umtru Power Station of Meghalaya Power System were
separated from rest of NER Grid and subsequently collapsed due load generation mismatch.
Kongba area of Manipur Power System was connected with the rest of NER Grid through 132 kV Yiangangpokpi- Kongba line. 132 kV
Kakching - Kongba line kept open for system requirement.
12 NER 132 kV Yiangangpokpi- Kongba line MSPCL 23-Jul-20 11:03 23-Jul-20 11:18 0:15:00 0 20 0 0.0050 GD 1
At 11:03 Hrs on 23.07.2020, 132 kV Yiangangpokpi- Kongba line tripped. Due to tripping of this element, Kongba area of Manipur
Power System was separated from rest of NER Grid and subsequently collapsed due to no source in this area.
Rangia and Kamalpur areas of Assam Power System were connected with the rest of NER Grid through 220 kV BTPS - Rangia 1&2
lines and 132 kV Rangia - Motonga line. 132 kV Kamalpur - Kahilipara line and 132 kV Kamalpur - Sisugram line kept open for system
requirement. 132 kV Rangia - Sipajhar line was radial due to bus split at Sipajhar. 132 kV Dhaligaon - Bornagar line was kept idle
220 kV BTPS - Rangia 1&2 lines and 132 kV AEGCL &
13 NER 23-Jul-20 11:45 23-Jul-20 11:48 0:03:00 charged from Dhaligaon end and 132 kV Rangia - Nalbari line was idle charged from Rangia end. 0 150 0 0.0080 GD 1
Rangia - Motonga line POWERGRID
At 11:45 Hrs on 23.07.2020, 220 kV BTPS - Rangia 1&2 lines and 132 kV Rangia - Motonga line tripped. Due to tripping of these
elements, Rangia and Kamalpur areas of Assam Power System were separated from rest of NER Grid and subsequently collapsed
due to no source in these areas.

52
North Eastern Region-Grid Disturbances Report for July 2020
Generati Load Category as
Sl. Date and Time of Date and Time of Outage Generation Load Loss
Region Name of Element Owner / Agency Event on Loss Loss in per CEA Grid
No. Tripping Revival Duration Loss (MW) (MW)
in MU MU Standards
Rangia and Kamalpur areas of Assam Power System were connected with the rest of NER Grid through 220 kV BTPS - Rangia 1&2
lines and 132 kV Rangia - Motonga line. 132 kV Kamalpur - Kahilipara line and 132 kV Kamalpur - Sisugram line kept open for system
requirement. 132 kV Rangia - Sipajhar line was radial due to bus split at Sipajhar. 132 kV Dhaligaon - Bornagar line was kept idle
220 kV BTPS - Rangia 1&2 lines AEGCL &
14 NER 23-Jul-20 12:48 23-Jul-20 12:58 0:10:00 charged from Dhaligaon end and 132 kV Rangia - Nalbari line was idle charged from Rangia end. 0 150 0 0.0250 GD 1
132 kV Rangia - Motonga line POWERGRID
At 12:48 Hrs on 23.07.2020, 220 kV BTPS - Rangia 1&2 lines and 132 kV Rangia - Motonga line tripped. Due to tripping of these
elements, Rangia and Kamalpur areas of Assam Power System were separated from rest of NER Grid and subsequently collapsed
due to no source in these areas.
Kongba area of Manipur Power System was connected with the rest of NER Grid through 132 kV Yiangangpokpi- Kongba line. 132 kV
Kakching - Kongba line kept open for system requirement.
15 NER Kongba area of Manipur Power System MSPCL 29-Jul-20 10:58 29-Jul-20 11:18 0:20:00 0 23 0 0.0080 GD 1
At 10:58 Hrs on 29.07.2020, 132 kV Yiangangpokpi- Kongba line tripped. Due to tripping of this element, Kongba area of Manipur
Power System was separated from rest of NER Grid and subsequently collapsed due to no source in this area.

Churachandpur Area of Manipur Power System was connected with the rest of NER Grid through 132 kV Ningthoukhong -
Churachandpur D/C. 132 kV Kakching - Kongba line kept open for system requirement.
16 NER 132 kV Ningthoukhong - Churachandpur D/C MSPCL 31-Jul-20 09:46 31-Jul-20 10:02 0:16:00 0 24 0 0.0060 GD 1
At 09:46 Hrs on 31.07.2020, 132 kV Ningthoukhong - Churachandpur D/C tripped. Due to tripping of these elements, Churachandpur
Area of Manipur Power System was separated from rest of NER Grid and subsequently collapsed due to no source in this area.

New Umtru Area of Meghalaya Power System was connected with the rest of NER Grid through 132 kV New Umtru - Umtru line and
132 kV New Umtru - Umtru line 132 kV New Umtru - EPIP II line.
132 kV New Umtru - EPIP II line At 18:36 Hrs on 31.07.2020, 132 kV New Umtru - Umtru line and 132 kV New Umtru - EPIP II line tripped. Due to tripping of these
132 kV Umium III-Umium IV ckt I elements, New Umtru Area of Meghalaya Power System consisting of New Umtru HEP U-I and New Umtru HEP U-II was separated
17 NER 132 kV Umium III-Umium IV ckt II MePTCL 31-Jul-20 18:36 31-Jul-20 18:45 0:09:00 from rest of NER Grid and subsequently collapsed due to load-generation mismatch.At the same time, the following transmission 96 0 0.0144 0.0000 GD 1
132 kV Umium IV- Umtru ckt I lines tripped: 132 kV Umium III-Umium IV ckt I, 132 kV Umium III-Umium IV ckt II, 132 kV Umium IV- Umtru ckt I, 132 kV Epip II-Epip I
132 kV Epip II-Epip I ckt I ckt I, 132 kV Epip II-Epip I ckt II.At the same time, the following generations tripped: Umiam Stage 1 U-I, Umiam Stage 1 U-II, Umiam
132 kV Epip II-Epip I ckt II. Stage 1 U-III, Umiam Stage 1 U-IV, Umiam Stage 2 U-I, Umiam Stage 2 U-II, thus giving a total of 96 MW (including New Umtru HEP
U-I and New Umtru HEP U-II) generation loss in Meghalaya Power System

53
North Eastern Region-Grid Incidences Report for July 2020
Category as
Sl. Owner / Date and Time of Date and Time of Generation Load Loss Generation Loss Load Loss
Region Name of Element Outage Duration Event per CEA Grid
No. Agency Tripping Revival Loss (MW) (MW) in MU in MU
Standards
Kameng HEP - Unit 1 & 2 tripped due to Differential Protection Operated in GT HV
1 NER Kameng HEP - Unit 1 & 2 NEEPCO 05-Jul-20 09:00 05-Jul-20 10:30 1:30:00
side at 09:00 Hrs on 05-07-20. Revision done from Block No.43 on 05-07-20.
300 0 0.450 0 GI 2

AGBPP Units 2, 4 & 8 tripped at 20:37 Hrs on 13-07-20 due to tripping of GBC-3.
2 NER AGBPP Units 2, 4 & 8 NEEPCO 13-Jul-20 20:37 13-Jul-20 22:30 1:53:00 85 0 0.160 0 GI 2
Revision done from Block No.91 on 13-07-20.
Kameng HEP - Unit 1 & 2 tripped due to operation of Differential Protection at 05:05
3 NER Kameng HEP - Unit 1 & 2 NEEPCO 17-Jul-20 05:05 17-Jul-20 07:00 1:55:00 304 0 0.582 0 GI 2
Hrs on 17-07-20. Revision done from Block No.29 on 17-07-20.
Kameng HEP - Unit 1 tripped at 21:59 Hrs on 23-07-20 due to Governor pressure
4 NER Kameng HEP - Unit 1 NEEPCO 23-Jul-20 21:59 23-Jul-20 23:30 1:31:00 150 0 0.228 0 GI 2
imbalance. Revision done from Block No.95 on 23-07-20.

54
21. NEW ELEMENTS COMMISSIONED* IN JULY 2020
COMMISSIONING OF NEW GENERATING UNITS

REGION S.NO. CONSTITUENT UNIT NAME / LOCATION UNIT NO CAPACITY (MW) DATE
NR 1 ADANI GREEN ENERGY LTD. Adani(Solar)/Rajasthan -- 25* 07-07-2020
WR 1 AEPL Alfanar (Wind) 1 88 29-07-2020
SR 1 TS BTPS ( Manuguru ) 2 270 03-07-2020
*Out of 50 MW COD.
COMMISSIONING OF NEW ICTs
CAPACITY
REGION S.NO. CONSTITUENT VOLTAGE LEVEL (KVA) SUB-STATION ICT NO DATE
(MVA)
1 GTPL 400/220 Sohna I & II 500 Each 21-07-2020
NR
2 PGCIL 765/400 Koteshwar I 801 30-07-2020
ER 1 PGCIL 400/220 Maithon III 500 29-07-2020
1 AEGCL 132/33 Kahilipara GSS I 50 18-07-2020
2 AEGCL 132/33 Nazira GSS I 40 28-07-2020

COMMISSIONING OF NEW TRANSMISSION LINES

LINE NAME VOLTAGE


REGION S.NO. CONSTITUENT CKT NO DATE
(kV)
1 PGCIL 400kV Rajarhat -Gokrana I 400 12-07-2020
ER
2 PGCIL 400 kV Rajarhat -FSTPP I 400 12-07-2020

LILO OF TRANSMISSION LINES


SL. LINE NAME VOLTAGE
REGION CONSTITUENT LILO AT DATE
NO. (kV)

COMMISSIONING OF BUS/LINE REACTORS


SL. SUB-STATION/ LINE (@SUB-STATION)
REGION CONSTITUENT VOLTAGE LEVEL CAPACITY (MVAR) DATE
NO.
1 RRVUNL Suratgarh 400 125 09-07-2020
NR
2 NTPC RIHAND 400 80 24-07-2020
SR 1 PGCIL Nelemangala 400 50 11-07-2020

COMMISSIONING OF FACTS DEVICE/SYSTEM


SL. SUB-STATION/CONSTITUENT VOLTAGE
REGION NAME RATINGS DATE
NO. (kV)
NIL

*Includes first time charging (FTC) as well

55
22. Voltage Profile
कवद् युत कविव रूपरे खा माह - जुलाई 2020 VOLTAGE PROFILE - July 2020
Date of reporting: 05-Aug-20
Number of hours
Voltage Deviation Index
क्र.स. Sl. VOLTAGE < V(lower)* V(lower) < VOLTAGE < VOLTAGE > V(upper)* voltage was outside उच्चतम (कक.वो.) किम्नतम(कक.वो.) औसत (कक.वो.)
क्षेत्र REGION उपकेंद्र SUBSTATION (%age of time voltage is
No. (V=380,728 kV) V(upper)* (V=420,800 kV) IEGC band during Maximum(kV) Minimum(kV) Average(kV)
outside range)
month
1 अंगुल ANGUL 0% 100% 0% 0% 0 801 760 779
2 पूवी क्षेत्र गया GAYA 0% 100% 0% 0% 0 794 749 772
3 झारसुगुड़ा JHARSUGUDA 0% 93% 7% 7% 50 806 778 793
ER
4 रांची RANCHI 0% 100% 0% 0% 0 794 764 781
5 सासाराम SASARAM 0% 100% 0% 0% 1 799 719 764
1 आगरा AGRA 0% 100% 0% 0% 0 804 749 777
2 आगरा (फ़तेहाबाद) AGRA (FATEHABAD) 0% 94% 6% 6% 44 807 762 786
3 अिपरा सी ANPARA-C 0% 100% 0% 0% 0 778 755 766
4 अिपरा डी ANPARA-D 0% 100% 0% 0% 0 779 754 766
5 अंता ANTA 0% 100% 0% 0% 0 798 760 779
6 बकलया BALLIA 0% 100% 0% 0% 0 793 743 770
7 किवािी BHIWANI 0% 99% 1% 1% 7 806 750 779
8 बरे ली BAREILLY 0% 98% 2% 2% 11 805 743 776
9 उत्तरी क्षेत्र फ़तेहपुर FATEHPUR 0% 100% 0% 0% 0 796 735 766
10 NR ग्रेटर िोएडा GREATER NOIDA 0% 97% 3% 3% 19 809 750 779
11 झकटकरा JHATIKARA 0% 100% 0% 0% 1 803 743 776
12 कािपुर जीआईएस KANPUR GIS 0% 100% 0% 0% 0 800 746 773
13 लखिऊ LUCKNOW 0% 100% 0% 0% 2 803 745 775
14 लकलतपुर LALITPUR 0% 100% 0% 0% 0 790 761 777
15 मेरठ MEERUT 0% 98% 2% 2% 15 811 740 776
16 मोगा MOGA 0% 100% 0% 0% 1 802 742 774
17 फागी PHAGI 0% 100% 0% 0% 0 799 748 777
18 वाराणसी VARANASI 0% 100% 0% 0% 0 796 750 776
19 उन्नाव UNNAO 0% 100% 0% 0% 0 790 735 765
1 अकोला AKOLA 0% 99% 1% 1% 11 804 764 788
2 औरं गाबाद AURANGABAD 0% 100% 0% 0% 0 799 752 779
3 िोपाल (बीडीटीसीएल ) BHOPAL (BDTCL) 0% 100% 0% 0% 0 788 752 771
4 कबलासपुर BILASPUR 0% 100% 0% 0% 0 788 763 775
5 बीिा BINA 0% 100% 0% 0% 0 800 759 780
6 चांपा CHAMPA 0% 100% 0% 0% 4 803 774 788
7 धममजयगढ़ DHARAMJAIGARH 0% 100% 0% 0% 0 789 766 777
8 धुले (बीडीटीसीएल ) DHULE (BDTCL) 0% 100% 0% 0% 0 793 750 776
9 एकतुिी EKTUNI 0% 96% 4% 4% 33 806 763 788
10 ग्वाकलयर GWALIOR 0% 100% 0% 0% 2 805 749 780
11 इं दौर INDORE 0% 100% 0% 0% 0 786 749 770
12 जबलपुर JABALPUR 0% 99% 1% 1% 4 806 765 783
13 पकिमी क्षेत्र कोरडी KORADI 0% 100% 0% 0% 0 788 757 774
14 WR पुणे PUNE 0% 100% 0% 0% 0 800 752 784
15 रायगढ़ पूकलंग RAIGARH POOLING 0% 100% 0% 0% 0 798 774 786
16 रायपुर पूकलंग RAIPUR POOLING 0% 100% 0% 0% 0 789 765 778
17 सासि SASAN 0% 100% 0% 0% 0 785 760 772
18 सतिा SATNA 0% 100% 0% 0% 0 793 756 775
19 कसविी SEONI 0% 100% 0% 0% 0 796 762 782
20 सीपत SIPAT 0% 100% 0% 0% 0 787 766 776
21 सोलापुर SOLAPUR 0% 97% 3% 3% 23 806 757 788
22 तामिार TAMNAR 0% 100% 0% 0% 0 798 776 786
23 कतरोड़ा TIRORA 0% 100% 0% 0% 0 784 753 770
24 वड़ोदरा VADODARA 0% 100% 0% 0% 0 798 764 783
25 कवंध्याचल पूकलंग VINDHYACHAL PS 0% 100% 0% 0% 0 786 760 773
26 वधाम WARDHA 0% 100% 0% 0% 0 799 748 780
1 किूमल KURNOOL 0% 100% 0% 0% 2 803 746 778
2 िेल्लूर पूकलंग NELLORE PS 0% 100% 0% 0% 2 803 750 778
3 दकक्षणी क्षेत्र रायचूर RAICHUR 0% 99% 1% 1% 7 804 748 781
4 SR किज़ामाबाद NIZAMABAD 0% 96% 4% 4% 27 808 739 783
5 श्रीकाकुलम SRIKAKULAM 0% 95% 5% 5% 34 810 738 784
6 कतरुवलम THIRUVALEM 0% 100% 0% 0% 2 803 739 776
1 अज़ारा AZARA (400 kV) 0% 100% 0% 0% 0 413 401 407
2 बाकलपारा BALIPARA (400 kV) 0% 100% 0% 0% 0 413 402 406
3 कबस्विाथ चररआकल BISWANATH CHARIALI (400 kV) 0% 100% 0% 0% 0 418 393 407
4 बोंगाईगांव BONGAIGAON (400 kV) 0% 100% 0% 0% 0 418 396 407
5 पूवोत्तर क्षेत्र बोंगाईगांव टीपीएस BONGAIGAON TPS (400 kV) 0% 100% 0% 0% 0 420 399 410
6 NER बकिमहाट BYRNIHAT (400 kV) 0% 100% 0% 0% 0 413 401 407
7 पालाटािा PALATANA (400 kV) 0% 100% 0% 0% 0 420 386 411
8 रं गािदी RANGANADI (400 kV) 0% 96% 4% 4% 26 425 399 413
9 मीसा MISA (400 kV) 0% 100% 0% 0% 2 420 392 407
10 कसलचर SILCHAR (400 kV) 2% 98% 0% 2% 14 417 350 404
All listed stations are 765 kV stations unless otherwise mentioned
*Percentage is calculated w.r.t. Time of one month.

56
23. List of Outages of Elements monitored by NLDC for the month of July-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month

Inter Regional Elements


1 Bhadrawati Pole-I HVDC WR/SR TS 08-07-2020 08:43 IDMT Earth Fault Relay operated 08-07-2020 15:34 6:51:00 1
2 Bhadrawati Pole-II HVDC WR/SR TS 18-07-2020 08:33 Pressure Relief Device (PRD) OF CWT22 (Pole-2 West Y-Ph) operated 18-07-2020 15:55 7:22:00 1
tripped due DC fault in line-2 as OPGW snapped at tower no 499( section between APD and
3 Biswanath Chariali-Agra Line-II HVDC NER/NR TL 02-07-2020 10:41 02-07-2020 17:06 1
BNC). 6:25:00
tripped due to tripping of HVDC Agra BNC Line 2 on DC line Fault. Fault Distance from Agra end
4 Biswanath Chariali-Agra Line-II HVDC NER/NR TL 21-07-2020 21:01 22-07-2020 04:51 2
209.1 KM 7:50:00
5 Champa-Kurushetra pole-I HVDC WR/NR MO 12-07-2020 08:07 Manually opened due to High Voltage. 13-07-2020 12:11 28:04:00 0
6 Champa-Kurushetra pole-II HVDC WR/NR TS 13-07-2020 11:35 Cat-B protection operation. 13-07-2020 12:44 1:09:00 1
7 Champa-Kurushetra pole-II HVDC WR/NR MO 20-07-2020 06:39 Manually opened due to High Voltage. 26-07-2020 20:56 158:17:00 1
8 Champa-Kurushetra pole-III HVDC WR/NR TS 02-07-2020 10:41 Due to transient disturbance in Pole-3, Pole-4 station DC Supply failure at Kurukshetra end. 02-07-2020 11:55 1
1:14:00
9 Champa-Kurushetra pole-III HVDC WR/NR MO 05-07-2020 04:02 Manually opened due to High Voltage. 06-07-2020 05:25 25:23:00 1
10 Champa-Kurushetra pole-IV HVDC WR/NR TS 02-07-2020 10:41 Due to transient disturbance in Pole-3, Pole-4 station DC Supply failure at Kurukshetra end. 02-07-2020 12:11 1
1:30:00
11 Champa-Kurushetra pole-IV HVDC WR/NR MO 05-07-2020 04:08 Manually opened due to High Voltage. 06-07-2020 05:27 25:19:00 1
12 Champa-Kurushetra pole-IV HVDC WR/NR TS 13-07-2020 11:35 Cat-B protection operation. 13-07-2020 13:01 1:26:00 2
13 Gazuwaka Pole-I HVDC ER/SR TS 01-07-2020 10:02 Due to loss of minimum AC Filter Banks on East side. 01-07-2020 21:14 11:12:00 1
14 Mundra-Mahendragarh-Pole-I HVDC WR/NR TS 01-07-2020 06:04 problem in Valve Based Electronics (VBE) system 01-07-2020 07:53 1:49:00 1
Pole-1&2 tripped due to tripping of Filter banks.Filter banks had got tripped due to over
15 Talcher-Kolar Pole-I HVDC ER/SR TS 16-07-2020 01:58 16-07-2020 04:49 1
voltage.non availability of 400 kV bus voltage reported. 2:51:00
Pole-1&2 tripped due to tripping of Filter banks.Filter banks had got tripped due to over
16 Talcher-Kolar Pole-II HVDC ER/SR TS 16-07-2020 01:58 16-07-2020 03:36 1
voltage.non availability of 400 kV bus voltage reported. 1:38:00
17 Vindhyachal Pole-I HVDC WR/NR TS 16-07-2020 09:29 For replacement of faulty thyristors, snubber circuit components and CFC tuning works 16-07-2020 18:38 9:09:00 1
18 132 kV Bina-Morwa Line NR/WR MO 01-07-2020 00:00 Power not required by Bina(UP) 01-08-2020 00:00 744:00:00 0
19 132 kV Bina-Morwa Line NR/WR MO 20-07-2020 12:29 Due to shutdown of 132KV main bus at Morwa SS(MP) 20-07-2020 16:56 4:27:00 0
20 132 kV Bina-Morwa Line NR/WR SE 29-07-2020 11:48 CT oil leakage at Morwa 29-07-2020 14:58 3:10:00 0
21 132 kV Rihand-Garwah 1 Line ER/NR TP 06-07-2020 12:30 Tripped due to tripping of UP internal Obra Th and Obra Hy lines from Rihand. 06-07-2020 14:22 1:52:00 1
22 132 kV Rihand-Garwah 1 Line ER/NR TL 20-07-2020 13:25 Phase to earth fault (Yph-E) ZONE 1, 86 Y - 1, 38 KM. AT RIHAND END 20-07-2020 15:21 1:56:00 2
23 132 kV Rihand-Garwah 1 Line ER/NR TL 27-07-2020 09:39 Y_N Fault,Z1, 0.36 kA, 26.6 KM (Garwah)/Y_N Fault,Z1,76 KM (Rihand) 27-07-2020 11:02 1:23:00 3
24 132 kV Rihand-Sone nagar 1 Line ER/NR TL 01-07-2020 00:00 R-B fault 29-07-2020 13:50 685:50:00 1
25 132 kV Sahupuri-Karmanasa 1 Line ER/NR TL 14-07-2020 07:18 B-N fault 14-07-2020 12:56 5:38:00 1
26 132kV Anpara-Morwa Line NR/WR MO 20-07-2020 12:29 Due to shutdown of 132KV main bus at Morwa SS(MP) 20-07-2020 16:58 4:29:00 0
27 132kV Lalitpur - Rajghat Line WR/NR MO 01-07-2020 00:00 Line hand tripped from Rajghat as requested from UPPTCL. 01-08-2020 00:00 744:00:00 0
For Jumper work at location No. 118B under the project for LILO of 132 KV RAPP-GandhiSagar
28 132kV Ranapratap Sagar-Gandhi Sagar 1 Line WR/NR SC 25-07-2020 11:06 01-08-2020 00:00 0
for new 132 KV GSS KuaKhera 156:54:00
29 220 kV Bhanpura-Modak Line WR/NR SO 10-07-2020 11:12 QUARTERLY Bay MAINTENANCE & testing WORK 10-07-2020 18:36 7:24:00 0
30 220 KV Bhanpura - Ranpur line Line WR/NR SO 28-07-2020 11:06 For line maintenance work 28-07-2020 19:57 8:51:00 0
31 220 kV Budhipadar-Korba-II Line ER/WR TS 16-07-2020 12:07 Master Trip of Bus Bar Protection Operated at Budipadar end 16-07-2020 14:15 2:08:00 1
32 220 kV Budhipadar-Korba-II Line ER/WR TS 18-07-2020 11:58 Tripped on B-phase E/F, 3.5KA, 41.17KM@Korba end. 18-07-2020 12:40 0:42:00 2
33 220 kV Budhipadar-Korba-II Line ER/WR SO 18-07-2020 13:28 To attend breaker compressor shaft 18-07-2020 18:07 4:39:00 2
34 220 kV Budhipadar-Korba-II Line ER/WR SO 26-07-2020 09:22 Stringing of conductor. 26-07-2020 16:44 7:22:00 2
35 220 kV Budhipadar-Korba-II Line ER/WR SO 31-07-2020 14:08 B-N,3.5KA,41km from Korba 31-07-2020 15:31 1:23:00 2
36 220 kV Budhipadar-Raigarh Line ER/WR TS 16-07-2020 12:07 Master Trip of Bus Bar Protection Operated at Budipadara end 16-07-2020 14:18 2:11:00 1
37 220 kV Budhipadar-Raigarh Line ER/WR SO 26-07-2020 09:43 for complete replacement of insulator string with insulator. 26-07-2020 16:26 6:43:00 1
38 220 kV Budhipadar-Raigarh Line ER/WR TL 27-07-2020 12:31 B-E fault,Raigarh end:2.0kA,65Km 27-07-2020 14:21 1:50:00 2
39 220 kV Malanpur-Auraiya Line WR/NR TL 15-07-2020 04:42 R_N fault 15-07-2020 06:28 1:46:00 1
line tripped on R ph fault. From Mudshingi end, Z1, 10.64 kA, 6.6 km.Idle charged (Mudshingi
40 220 kV Mudasangi (Kolhapur)-Chikkodi Line WR/SR TL 02-07-2020 06:24 02-07-2020 13:26 1
end) 7:02:00
41 220kV Ponda-Ambewadi Line WR/SR SO 01-07-2020 00:00 Debunching of 220 kV Ambewadi-Ponda 01-08-2020 00:00 744:00:00 0
42 220kV Xeldom-Ambewadi Line WR/SR TL 23-07-2020 11:38 B-N Fault 23-07-2020 12:32 0:54:00 1
43 220kV Xeldom-Ambewadi Line WR/SR TL 24-07-2020 13:01 B ph to Earth fault 24-07-2020 15:08 2:07:00 2
44 400 kV Alipurduar-Bongaigaon-II Line ER/NER TL 06-07-2020 10:27 B-N fault 06-07-2020 11:40 1:13:00 1
45 400 kV Alipurduar-Bongaigaon-II Line ER/NER SO 06-07-2020 18:19 Tree cutting 06-07-2020 20:07 1:48:00 1
46 400 kV Jeypore-Gazuwaka-II Line ER/SR SE 22-07-2020 11:47 Strand cut of conductor (Dropper from Line to Line isolator) towards Gazuwaka-II line side in FSC 22-07-2020 15:03 0
3:16:00
47 400 kV Jharsuguda-Raigarh-I Line ER/WR TS 22-07-2020 20:27 Tripped on Y-phase E/F, 7.76KA, 25.7KM@Raigarh 23-07-2020 07:08 10:41:00 1
48 400 kV Jharsuguda-Raigarh-I Line ER/WR SE 23-07-2020 07:09 E/S/D line tripped at 20:27 hrs on 22/07/2020 23-07-2020 20:18 13:09:00 1
49 400 kV Jharsuguda-Raigarh-I Line ER/WR TS 23-07-2020 21:37 Y-ph LA failed at Jharsuguda end. 24-07-2020 01:51 4:14:00 2
57
List of Outages of Elements monitored by NLDC for the month of July-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month
50 400 kV Muzaffarpur-Gorakhpur-I Line ER/NR TL 20-07-2020 07:06 B-N fault, F/C-2.279KA, F/D-287 km from Gorakhpur end 20-07-2020 09:00 1:54:00 1
51 400 kV Muzaffarpur-Gorakhpur-II Line ER/NR TL 20-07-2020 07:06 Phase to earth fault B-N FD=275 KM & FC= 2.03 KA FROM Gorkhpur end 20-07-2020 08:25 1:19:00 1
52 400 kV Muzaffarpur-Gorakhpur-II Line ER/NR TL 31-07-2020 11:10 Tripped on B- N fault 31-07-2020 11:43 0:33:00 2
53 400 kV Patna-Balia-I Line ER/NR SE 24-07-2020 09:38 Emergency S/D for restoration of snapped earth wire at loc 54 24-07-2020 15:10 5:32:00 0
54 400 kV Patna-Balia-II Line ER/NR TL 07-07-2020 20:48 Tripped only from Ballia-end B-N fault, FD from Balia-126.02 km, fault current 3.89 kA 07-07-2020 21:39 0:51:00 1
55 400 kV Shujalpur-RAPP-I Line WR/NR TS 28-07-2020 23:22 Buchholz trip signal of reactor NGR 29-07-2020 06:43 7:21:00 1
56 400 kV Varanasi-Biharshariff-II Line ER/NR TS 04-07-2020 15:12 Due to tripping of line reactor on REF causing tripping of line 04-07-2020 18:17 3:05:00 1
57 400 kV Varanasi-Biharshariff-II Line ER/NR SO 05-07-2020 17:33 Opened to take L/R at Varanasi end. 05-07-2020 17:47 0:14:00 1
58 400kV Barh-Gorakhpur Ckt-II Line ER/NR SC 01-07-2020 00:00 for the stringing at Gandak river of the LILO section on ERS towers . 01-08-2020 00:00 744:00:00 0
59 765 kV Gaya-Balia Line ER/NR SO 03-07-2020 09:30 Tower Strengthening work 03-07-2020 19:54 10:24:00 0
60 765 kV Gaya-Balia Line ER/NR SO 04-07-2020 09:48 Tower Strengthening work 04-07-2020 19:57 10:09:00 0
61 765 kV Gaya-Balia Line ER/NR SO 05-07-2020 08:50 Tower Strengthening work 05-07-2020 19:51 11:01:00 0
62 765 kV Gaya-Balia Line ER/NR SO 06-07-2020 07:49 Tower Strengthening work 06-07-2020 20:08 12:19:00 0
63 765 kV Gaya-Balia Line ER/NR SO 07-07-2020 08:16 Tower Strengthening work 07-07-2020 20:07 11:51:00 0
64 765 kV Gaya-Balia Line ER/NR SO 08-07-2020 08:12 Tower Strengthening work 08-07-2020 20:12 12:00:00 0
65 765 kV Gaya-Balia Line ER/NR SO 09-07-2020 09:11 Tower Strengthening work 09-07-2020 20:23 11:12:00 0
66 765 kV Gaya-Balia Line ER/NR SO 10-07-2020 09:29 Tower Strengthening work 10-07-2020 19:11 9:42:00 0
67 765 kV Gaya-Balia Line ER/NR SO 11-07-2020 08:04 Tower Strengthening work 11-07-2020 19:56 11:52:00 0
68 765 kV Gaya-Balia Line ER/NR SO 12-07-2020 08:14 Tower Strengthening work 12-07-2020 20:12 11:58:00 0
69 765 kV Gaya-Balia Line ER/NR SO 13-07-2020 08:14 Tower Strengthening work 13-07-2020 19:58 11:44:00 0
70 765 kV Gaya-Balia Line ER/NR SO 14-07-2020 08:04 Tower Strengthening work 14-07-2020 20:11 12:07:00 0
71 765 kV Gaya-Balia Line ER/NR SO 15-07-2020 07:59 Tower Strengthening work 15-07-2020 19:53 11:54:00 0
72 765 kV Gaya-Balia Line ER/NR SO 16-07-2020 08:35 Tower Strengthening work 16-07-2020 20:11 11:36:00 0
73 765 kV Gaya-Balia Line ER/NR SO 17-07-2020 08:43 Tower Strengthening work 17-07-2020 20:26 11:43:00 0
74 765 kV Gwalior-Agra-II Line WR/NR SO 01-07-2020 09:10 For enabling M2 LBB function 01-07-2020 17:55 8:45:00 0
75 765 kV Jharsuguda-Dharmjaygarh-I Line ER/WR SC 21-07-2020 09:59 Tamnar Bay extension work 21-07-2020 20:27 10:28:00 0
76 765 kV Jharsuguda-Dharmjaygarh-I Line ER/WR SC 22-07-2020 09:24 Tamnar Bay Extension Construction Works - Feeder Gantry Erection 22-07-2020 21:47 12:23:00 0
77 765 kV Jharsuguda-Dharmjaygarh-I Line ER/WR SO 30-07-2020 10:33 For SS and Line AMP works in ckt-2. 30-07-2020 19:51 9:18:00 0
78 765 kV Jharsuguda-Dharmjaygarh-II Line ER/WR SO 30-07-2020 09:12 For SS and Line AMP works. 30-07-2020 20:02 10:50:00 0
79 765 kV New Ranchi-Dharamjaygarh-II Line ER/WR SC 05-07-2020 08:43 Power line crossing 05-07-2020 19:26 10:43:00 0
80 765 kV New Ranchi-Dharamjaygarh-II Line ER/WR SC 06-07-2020 07:30 Power line crossing 06-07-2020 20:20 12:50:00 0
81 765 kV New Ranchi-Dharamjaygarh-II Line ER/WR SC 07-07-2020 08:04 Power line crossing 07-07-2020 20:21 12:17:00 0
82 765 kV Solapur-Raichur-I Line WR/SR SE 03-07-2020 09:28 E/S/D for rectification of missing split pin & nut of insulator hardware at loc 222. 03-07-2020 19:28 10:00:00 0
83 765 kV Solapur-Raichur-II Line WR/SR SE 10-07-2020 09:02 Replacement of the Broken suspension Insulator at Location no 418. (E/S/D) 10-07-2020 20:06 11:04:00 0
84 765kV Chittorgarh-Banaskanta-I Line NR/WR SO 13-07-2020 08:36 OPGW rectification 14-07-2020 13:58 29:22:00 0
85 765kV Durg-Jharsuguda Ckt-I Line WR/ER SO 01-07-2020 09:30 Jumper rectification work 01-07-2020 20:47 11:17:00 0
86 765kV Durg-Jharsuguda Ckt-I Line WR/ER SO 02-07-2020 07:33 Jumper rectification work 02-07-2020 20:50 13:17:00 0
87 765kV Durg-Jharsuguda Ckt-I Line WR/ER SO 03-07-2020 09:54 Jumper rectification work 03-07-2020 20:46 10:52:00 0
88 765kV Durg-Jharsuguda Ckt-I Line WR/ER MO 05-07-2020 15:43 Manually opened due to High Voltage. 14-07-2020 11:11 211:28:00 0
89 765kV Durg-Jharsuguda Ckt-II Line WR/ER SO 01-07-2020 09:29 Jumper rectification work 01-07-2020 20:48 11:19:00 0
90 765kV Durg-Jharsuguda Ckt-II Line WR/ER SO 02-07-2020 07:34 Jumper rectification work 02-07-2020 21:00 13:26:00 0
91 765kV Durg-Jharsuguda Ckt-II Line WR/ER SO 03-07-2020 09:55 Jumper rectification work 03-07-2020 20:44 10:49:00 0
92 765kV Durg-Jharsuguda Ckt-II Line WR/ER MO 19-07-2020 16:09 Manually opened due to High Voltage. 27-07-2020 21:33 197:24:00 0
93 765kV Gwalior-Orai Line NR/WR SO 05-07-2020 08:43 Installation of counter weight pilot insulator 05-07-2020 19:26 10:43:00 0
94 765kV Satna-Orai Line WR/NR SO 10-07-2020 08:06 Installation of counter weight in pilot insulators of gantry tower 10-07-2020 22:46 14:40:00 0
95 765kV Wardha-Nizamabad-1 Line WR/SR SO 09-07-2020 07:59 AMP works. 09-07-2020 20:11 12:12:00 0

58
List of Outages of Elements monitored by NLDC for the month of July-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month

Transnational Elements
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month
1 HVDC Behramara Pole-I HVDC Bangladesh TS 02-07-2020 18:55 Fire reported 02-07-2020 21:33 2:38:00 1
2 HVDC Behramara Pole-I HVDC Bangladesh TS 09-07-2020 10:49 Tripped due to through fault in 220KV side at Bheramera end 09-07-2020 14:00 3:11:00 2
To resolve overloading problem in transformer at Kishanganj New GSS (2x160MVA). 132kV
3 132 kV Kataiya-Kusaha Line Nepal MO 10-07-2020 00:24 10-07-2020 00:51 0
Mainbus at Kataiya GSS split to feed power of Lahan(Nepal) through Supaul GSS 0:27:00
4 132 kV Ramnagar - Valmikinagar (surajpur) Line ER/Nepal TS 27-07-2020 12:10 Tripped from Nepal end only. Charged at 12:06 Hrs, again tripped from Nepal at 12:10 Hrs . 27-07-2020 19:15 1
7:05:00
5 132 kV Ramnagar - Valmikinagar (surajpur) Line ER/Nepal MO 08-07-2020 18:35 Opened on no requirement power 08-07-2020 19:33 0:58:00 1
6 132 kV Ramnagar - Valmikinagar (surajpur) Line ER/Nepal SE 09-07-2020 15:15 E/S/D CT ratio changed at Ramnagar and Power assistance to BSEB 09-07-2020 18:09 2:54:00 1
7 132 kV Ramnagar - Valmikinagar (surajpur) Line ER/Nepal MO 19-07-2020 06:04 Power assitance from Nepal 19-07-2020 19:50 13:46:00 1
LOW SYSTEM DEMAND AMD HIGH VOLTAGE AT RAXUAL AREA POWER ASSISTANCE FROM
8 132 kV Ramnagar - Valmikinagar (surajpur) Line ER/Nepal MO 20-07-2020 03:05 20-07-2020 19:14 1
NEPAL WITHDRAWN 16:09:00
9 132 kV Ramnagar - Valmikinagar (surajpur) Line ER/Nepal MO 21-07-2020 07:41 Power Assistance to Nepal 21-07-2020 09:50 2:09:00 1
10 132 kV Ramnagar - Valmikinagar (surajpur) Line ER/Nepal MO 22-07-2020 06:15 Opened on no requirement of power 26-07-2020 11:27 101:12:00 1
11 132 kV Ramnagar - Valmikinagar (surajpur) Line ER/Nepal SO 26-07-2020 11:28 isolator replacement at Surjpura end 26-07-2020 17:11 5:43:00 1
12 132 kV Ramnagar - Valmikinagar (surajpur) Line ER/Nepal TS 27-07-2020 11:54 Tripped from Nepal end only. Charged at 12:06 Hrs, again tripped from Nepal at 12:10 Hrs . 27-07-2020 12:06 2
0:12:00
13 132 kV Ramnagar - Valmikinagar (surajpur) Line ER/Nepal SE 30-07-2020 03:10 Sparking in Isolator at Nepal end 31-07-2020 17:48 38:38:00 2
14 132 kV Ramnagar - Valmikinagar (surajpur) Line ER/Nepal TS 31-07-2020 23:40 Tripping of upstream line feeding Gandak S/S due to broken jumper 01-08-2020 03:55 4:15:00 3
15 132 kV Salakati-Gelephu Line Bhutan TL 10-07-2020 12:29 R ph fault, Z1, 24.1 km from Gelephu, A/R successful at Salakati end 10-07-2020 12:48 0:19:00 1
16 132 kV Salakati-Gelephu Line Bhutan TL 30-07-2020 01:28 Tripped at Gelphu end 30-07-2020 01:38 0:10:00 2
17 132 kV Surajmani Nagar - Comilla - 1 Line Bangladesh TL 08-07-2020 10:47 tripped due on R- phase fault 08-07-2020 10:55 0:08:00 1
18 132 kV Surajmani Nagar - Comilla - 1 Line Bangladesh TS 31-07-2020 14:05 due to SPS-4 testing at SM Nagar 31-07-2020 14:35 0:30:00 2
19 132 kV Surajmani Nagar - Comilla - 2 Line Bangladesh TL 08-07-2020 10:47 tripped due on R- phase fault 08-07-2020 10:55 0:08:00 1
20 132 kV Surajmani Nagar - Comilla - 2 Line Bangladesh TS 21-07-2020 14:00 due to pole discrepancy. 21-07-2020 14:26 0:26:00 2
21 132 kV Surajmani Nagar - Comilla - 2 Line Bangladesh TS 21-07-2020 14:27 due to pole discrepancy. 21-07-2020 16:48 2:21:00 3
22 132kV Rangia-Motanga S/C Line ER/BHUTAN TS 06-07-2020 22:06 Over current protection optd. 06-07-2020 22:40 0:34:00 1
23 132kV Rangia-Motanga S/C Line ER/BHUTAN TL 23-07-2020 11:44 line tripped on B- N fault 23-07-2020 12:18 0:34:00 2
24 132kV Rangia-Motanga S/C Line ER/BHUTAN TL 23-07-2020 12:48 B-N fault 23-07-2020 13:30 0:42:00 3
25 132kV Raxaul - Parwanipur Line ER/Nepal MO 01-07-2020 00:00 LINE ANTITHEFT CHARGED FROM RAXAUL END 01-07-2020 20:55 20:55:00 0
26 132kV Raxaul - Parwanipur Line ER/Nepal MO 08-07-2020 18:30 Opened on no requirement power 08-07-2020 19:06 0:36:00 0
27 132kV Raxaul - Parwanipur Line ER/Nepal MO 09-07-2020 05:45 Bihar Power assistance not required 09-07-2020 18:43 12:58:00 0
28 132kV Raxaul - Parwanipur Line ER/Nepal MO 19-07-2020 06:30 Power assitance from Nepal 19-07-2020 19:50 13:20:00 0
LOW SYSTEM DEMAND AMD HIGH VOLTAGE AT RAXUAL AREA POWER ASSISTANCE FROM
29 132kV Raxaul - Parwanipur Line ER/Nepal MO 20-07-2020 02:55 20-07-2020 22:02 0
NEPAL WITHDRAWN 19:07:00
30 132kV Raxaul - Parwanipur Line ER/Nepal MO 21-07-2020 07:41 Opened on no requirement power 21-07-2020 09:50 2:09:00 0
31 132kV Raxaul - Parwanipur Line ER/Nepal MO 22-07-2020 06:15 Opened on no requirement power 26-07-2020 19:41 109:26:00 0
32 132kV Raxaul - Parwanipur Line ER/Nepal TS 27-07-2020 11:54 Tripped from Nepal end only 27-07-2020 19:22 7:28:00 1
33 132kV Raxaul - Parwanipur Line ER/Nepal MO 31-07-2020 08:05 LINE CLOSED FOR POWER ASSISTANCE FROM NEPAL ON A/C OF OUTAGE OF MOTIHARI (DMTCL) 31-07-2020 17:50 1
9:45:00
34 220 kV Malbase - Birpara Line Bhutan TL 04-07-2020 14:51 B-N Fault 04-07-2020 15:25 0:34:00 1
35 220 kV Malbase - Birpara Line Bhutan SE 08-07-2020 19:16 Severe Hot spot has been observed at 220KV BRP-MALBASE Y-Ph CT connector(line side) 08-07-2020 21:06 1
1:50:00
36 220 kV Malbase - Birpara Line Bhutan SE 23-07-2020 09:30 for attending hot spot in line isolator at Malbase. 23-07-2020 18:57 9:27:00 1
37 220 Kv Muzaffarpur-Dhalkebar-I Line Nepal SE 25-07-2020 08:40 for maintenance of sparking jumper on Dhalkebar S/S side 25-07-2020 19:37 10:57:00 0
38 220 Kv Muzaffarpur-Dhalkebar-II Line Nepal SE 25-07-2020 08:40 for maintenance of sparking jumper on Dhalkebar S/S side 25-07-2020 19:35 10:55:00 0
39 400 kV Behramara-Behrampore-I Line Bangladesh SO 02-07-2020 20:28 Rectification of Isolator 02-07-2020 20:51 0:23:00 0
40 400 kV Behramara-Behrampore-II Line Bangladesh SE 03-07-2020 10:17 Emergency Shutdown availed for rectification of jumper. 04-07-2020 16:21 30:04:00 0
41 400 kV Tala - Binaguri - I Line Bhutan SO 17-07-2020 09:45 Testing of Busbar protection Main-I 17-07-2020 15:32 5:47:00 0
42 400 kV Tala - Binaguri - II Line Bhutan TL 26-07-2020 23:15 Binaguri end. Z2,Y-N,FD-130km,FC-2.7KA 27-07-2020 09:24 10:09:00 1
43 400 kV Tala - Binaguri - II Line Bhutan SO 27-07-2020 09:25 To work permit for S/D 27-07-2020 17:00 7:35:00 1
44 400kV Alipurdaur-Jingmeling-I Line ER/BHUTAN TS 19-07-2020 23:17 DT receipt at APD end due to R-N fault at Jigmeling 20-07-2020 23:58 24:41:00 1
45 400kV Alipurdaur-Jingmeling-I Line ER/BHUTAN TS 22-07-2020 01:32 R-B fault. 22-07-2020 09:51 8:19:00 2
46 400kV Alipurdaur-Jingmeling-II Line ER/BHUTAN TS 01-07-2020 23:15 DT received at Bhutan end 01-07-2020 23:52 0:37:00 1
47 400kV Alipurdaur-Jingmeling-II Line ER/BHUTAN TL 19-07-2020 23:17 DT receipt at APD end due to R-N fault at Jigmeling 20-07-2020 01:09 1:52:00 2
59
List of Outages of Elements monitored by NLDC for the month of July-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month
48 400kV Alipurdaur-Jingmeling-II Line ER/BHUTAN TS 22-07-2020 01:32 R-B fault. 22-07-2020 04:10 2:38:00 3

60
List of Outages of Elements monitored by NLDC for the month of July-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month

Northern Region Elements


Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month
1 B/R-I at Meerut Bus Reactor NR SO 31-07-2020 09:41 AMP Works 31-07-2020 19:44 10:03:00 0
2 Balia-Bhiwadi Pole-I HVDC NR TS 26-07-2020 07:43 tripped on DC filter 1 60/61 unbalance malfunction 26-07-2020 09:24 1:41:00 1
3 HVDC Agra Pole-1 HVDC NR TL 21-07-2020 21:42 tripped due to tripping of HVDC Agra BNC Line 2 on DC line Fault. Fault Distance from Agra end 21-07-2020 22:58 1:16:00 1
4 HVDC Agra Pole-2 HVDC NR TL 02-07-2020 10:41 tripped due DC fault in line-2 as OPGW snapped at tower no 499( section between APD and 02-07-2020 13:03 2:22:00 1
5 HVDC Agra Pole-2 HVDC NR TL 21-07-2020 21:01 tripped due to tripping of HVDC Agra BNC Line 2 on DC line Fault. Fault Distance from Agra end 22-07-2020 04:51 7:50:00 2
6 HVDC Agra Pole-4 HVDC NR TL 02-07-2020 10:41 tripped due DC fault in line-2 as OPGW snapped at tower no 499( section between APD and 02-07-2020 13:03 2:22:00 1
7 HVDC Agra Pole-4 HVDC NR TL 21-07-2020 21:01 tripped due to tripping of HVDC Agra BNC Line 2 on DC line Fault. Fault Distance from Agra end 22-07-2020 04:57 7:56:00 2
8 765/400 kV ICT-I at Bara ICT NR SO 03-07-2020 12:46 To attend the hot spot problem of B phase isolator of GT-1. 06-07-2020 18:33 77:47:00 0
9 765/400kV ICT- II at Hapur ICT NR SO 06-07-2020 10:43 For Normalization of ICT-2. B phase was charged with spare ICT on 25-06- 2020 06-07-2020 12:21 1:38:00 0
10 765/400kV ICT-II at Bikaner ICT NR SE 22-07-2020 10:43 Due to oil leakage from turret of HV(765 KV) bushing 22-07-2020 12:29 1:46:00 0
11 765/400kV ICT-III at Bhadla ICT NR SE 22-07-2020 06:30 Hand tripped due to sparking found in T-1 isolator of R phase 22-07-2020 18:10 11:40:00 0
12 765 kV Moga-Meerut Line NR TL 04-07-2020 21:18 Phase to earth fault Y-N FD= 11.2Km, FC= 11.9KA from Moga end . Line tripped due to heavy 05-07-2020 00:20 3:02:00 1
13 765 kV Moga-Meerut Line NR MO 05-07-2020 03:36 Manually opened due to High Voltage. 06-07-2020 21:50 42:14:00 1
14 765 kV Moga-Meerut Line NR MO 08-07-2020 04:09 Manually opened due to High Voltage. 10-07-2020 11:29 55:20:00 1
15 765 kV Moga-Meerut Line NR TL 10-07-2020 22:37 Phase to earth fault R-N Line tripped on RN fault. FLR Moga: 168.265Km, 3.53KA 11-07-2020 00:12 1:35:00 2
16 765 kV Moga-Meerut Line NR MO 11-07-2020 01:40 Manually opened due to High Voltage. 11-07-2020 11:08 9:28:00 2
17 765 kV Moga-Meerut Line NR MO 12-07-2020 02:15 Manually opened due to High Voltage. 12-07-2020 10:53 8:38:00 2
18 765 kV Moga-Meerut Line NR MO 12-07-2020 18:14 Manually opened due to High Voltage. 13-07-2020 07:26 13:12:00 2
19 765 kV Moga-Meerut Line NR MO 19-07-2020 07:34 Manually opened due to High Voltage. 22-07-2020 10:19 74:45:00 2
20 765 kV Moga-Meerut Line NR MO 23-07-2020 04:41 Manually opened due to High Voltage. 23-07-2020 09:56 5:15:00 2
21 765 kV Moga-Meerut Line NR MO 24-07-2020 08:15 Manually opened due to High Voltage 26-07-2020 21:26 61:11:00 2
22 765kV Ajmer-Bikaner Ckt-I Line NR SE 31-07-2020 11:46 to attend hot spot in top phase jumper of tower no. 345 31-07-2020 18:25 6:39:00 0
23 765kV Ajmer-Chittorgarh Ckt-I Line NR MO 01-07-2020 00:00 Manually opened due to High Voltage. 08-07-2020 23:54 191:54:00 0
24 765kV Ajmer-Chittorgarh Ckt-I Line NR MO 15-07-2020 02:40 Manually opened due to High Voltage. 25-07-2020 21:47 259:07:00 0
25 765kV Ajmer-Chittorgarh Ckt-II Line NR MO 09-07-2020 00:28 Manually opened due to High Voltage. 14-07-2020 12:58 132:30:00 0
26 765kV Ajmer-Chittorgarh Ckt-II Line NR MO 26-07-2020 02:59 Manually opened due to High Voltage. 26-07-2020 09:38 6:39:00 0
27 765kV Aligarh-G.Noida Line NR SO 03-07-2020 09:04 Tower strengthening work 03-07-2020 19:35 10:31:00 0
28 765kV Aligarh-G.Noida Line NR SO 04-07-2020 08:07 Tower strengthening work 04-07-2020 20:03 11:56:00 0
29 765kV Antah-Phagi-I Line NR TL 01-07-2020 00:00 Y-N Fault, conductor broken at loc:347,349(Tower collapsed) 01-08-2020 00:00 744:00:00 1
30 765kV Bara-Mainpuri-II Line NR TL 06-07-2020 03:15 Line tripped from Bara end. Z-1, Y-N fault. 06-07-2020 05:36 2:21:00 1
31 765kV Fatehabad-Lalitpur-I Line NR TL 16-07-2020 12:35 R-N fault ,main -1 Relay no flag Main -2 zone-none location- none Va-311. 2kv Vb-487.4kv Vc- 16-07-2020 15:16 2:41:00 1
32 765kV Fatehpur-Agra-I Line NR MO 01-07-2020 00:00 Manually opened due to High Voltage. 05-07-2020 14:58 110:58:00 0
33 765kV Fatehpur-Agra-I Line NR MO 12-07-2020 02:17 Manually opened due to High Voltage. 12-07-2020 18:56 16:39:00 0
34 765kV Fatehpur-Agra-I Line NR MO 19-07-2020 06:08 Manually opened due to High Voltage. 20-07-2020 17:13 35:05:00 0
35 765kV Fatehpur-Agra-I Line NR MO 27-07-2020 16:19 Manually opened due to High Voltage. 27-07-2020 16:51 0:32:00 0
36 765kV Fatehpur-Agra-I Line NR MO 29-07-2020 03:03 Manually opened due to High Voltage. 01-08-2020 20:30 89:27:00 0
37 765kV Fatehpur-Agra-II Line NR MO 05-07-2020 03:37 Manually opened due to High Voltage. 11-07-2020 21:49 162:12:00 0
38 765kV Fatehpur-Agra-II Line NR MO 12-07-2020 11:16 Manually opened due to High Voltage. 19-07-2020 19:48 176:32:00 0
39 765kV Fatehpur-Agra-II Line NR MO 20-07-2020 04:04 Manually opened due to High Voltage. 25-07-2020 22:45 138:41:00 0
40 765kV Fatehpur-Agra-II Line NR MO 27-07-2020 18:15 Manually opened due to High Voltage. 27-07-2020 21:27 3:12:00 0
41 765kV G'Noida-Meerut Line NR SO 10-07-2020 12:11 A Type Tower Strengthening Work 10-07-2020 18:46 6:35:00 0
42 765kV G'Noida-Meerut Line NR SO 11-07-2020 10:20 A Type Tower Strengthening Work 11-07-2020 19:06 8:46:00 0
43 765kV G'Noida-Meerut Line NR SO 12-07-2020 09:52 A Type Tower Strengthening Work 12-07-2020 17:33 7:41:00 0
44 765kV Jabalpur-Orai Ckt-1 Line NR SO 02-07-2020 09:16 Installation of Counter weight In pilot insulator of gantry tower. 02-07-2020 22:01 12:45:00 0
45 765kV Jhatikara-Bhiwani(PG) Line NR SO 05-07-2020 09:29 Tower strengthening work 05-07-2020 20:36 11:07:00 0
46 765kV Jhatikara-Bhiwani(PG) Line NR SO 06-07-2020 09:59 Tower strengthening work 06-07-2020 20:09 10:10:00 0
47 765kV Jhatikara-Bhiwani(PG) Line NR SO 07-07-2020 07:55 Tower strengthening work 07-07-2020 20:31 12:36:00 0
48 765kV Jhatikara-Bhiwani(PG) Line NR SO 08-07-2020 07:48 Tower strengthening work 08-07-2020 19:31 11:43:00 0
49 765kV Jhatikara-Bhiwani(PG) Line NR SO 09-07-2020 08:30 Tower strengthening work 09-07-2020 20:12 11:42:00 0
50 765kV Kanpur-Aligarh Line NR MO 05-07-2020 03:22 Manually opened due to High Voltage. 05-07-2020 19:46 16:24:00 0
51 765kV Kanpur-Aligarh Line NR MO 08-07-2020 07:10 Manually opened due to High Voltage. 09-07-2020 13:05 29:55:00 0
52 765kV Kanpur-Aligarh Line NR MO 11-07-2020 04:06 Manually opened due to High Voltage. 11-07-2020 21:42 17:36:00 0
53 765kV Kanpur-Aligarh Line NR MO 12-07-2020 05:17 Manually opened due to High Voltage. 14-07-2020 12:23 55:06:00 0
54 765kV Kanpur-Aligarh Line NR MO 20-07-2020 03:40 Manually opened due to High Voltage. 23-07-2020 21:38 89:58:00 0
55 765kV Kanpur-Aligarh Line NR TL 24-07-2020 17:52 During hotline Stringing of 765kv s/c Agra Greater noida T/L over 765kv S/C Kanpur Aligarh T/L 24-07-2020 20:07 2:15:00 1
56 765kV Kanpur-Aligarh Line NR MO 30-07-2020 06:54 Manually opened due to High Voltage. 02-08-2020 21:44 86:50:00 1
57 765kV Meerut-Bhiwani(PG) Line NR SC 14-07-2020 09:12 for diversion due to DFCC project work 01-08-2020 19:02 441:50:00 0
58 765kV Meerut-Koteshwar CKt-I Line NR MO 04-07-2020 06:24 Manually opened due to High Voltage. 04-07-2020 11:48 5:24:00 0
61
List of Outages of Elements monitored by NLDC for the month of July-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month
59 765kV Meerut-Koteshwar CKt-I Line NR MO 05-07-2020 03:24 Manually opened due to High Voltage. 05-07-2020 15:29 12:05:00 0
60 765kV Meerut-Koteshwar CKt-I Line NR TV 07-07-2020 18:16 Tripped on O/V 07-07-2020 19:15 0:59:00 1
61 765kV Meerut-Koteshwar CKt-II Line NR SE 07-07-2020 13:18 To attend heavy spark at tower location no. 71 07-07-2020 19:09 5:51:00 0
62 765kV Meerut-Koteshwar CKt-II Line NR MO 07-07-2020 19:10 Manually opened due to High Voltage. 07-07-2020 21:43 2:33:00 0
63 765kV Moga-Bhiwani(PG) Line NR SO 01-07-2020 08:58 Tower Strengthening works 01-07-2020 21:01 12:03:00 0
64 765kV Moga-Bikaner Ckt-I Line NR MO 12-07-2020 00:25 Manually opened due to High Voltage. 13-07-2020 08:44 32:19:00 0
65 765kV Moga-Bikaner Ckt-I Line NR MO 22-07-2020 13:31 Manually opened due to High Voltage. 23-07-2020 10:07 20:36:00 0
66 765kV Moga-Bikaner Ckt-II Line NR TL 04-07-2020 19:57 Line A/R on Y-N Fault and then tripped on 3 phase fault. FLR: Bikaner-125.8Km, Ir-6.2Ka, Iy- 05-07-2020 13:27 17:30:00 1
67 765kV Phagi-Bhiwani-II Line NR MO 12-07-2020 11:42 Manually opened due to High Voltage. 12-07-2020 20:39 8:57:00 0

62
List of Outages of Elements monitored by NLDC for the month of July-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month

Western Region Elements


1 330 MVAR Bus Reactor-1 at Warora Bus Reactor WR SO 07-07-2020 09:39 AMP Works 07-07-2020 15:52 0
6:13:00
2 B/R-I at Sasan Bus Reactor WR SE 17-07-2020 12:11 Rectification of hotspot in B-ph jumper 17-07-2020 14:25 0
2:14:00
3 B/R-I at Vadodara Bus Reactor WR SO 29-07-2020 11:35 AMP works 29-07-2020 13:26 0
1:51:00
4 765/400 kV ICT - I at Parli ICT WR SO 20-07-2020 09:29 For AMP works 20-07-2020 18:59 9:30:00 0
5 765/400 kV ICT - II at Parli ICT WR SO 22-07-2020 12:05 For AMP works 22-07-2020 14:53 2:48:00 0
6 765/400 kV ICT-II at Vadodara ICT WR SO 20-07-2020 13:14 for attending CB Low Oil Pressure in 400 kV Side CB 20-07-2020 15:16 2:02:00 0
7 765/400 kV ICT-II at Vindhyachal PS ICT WR SO 01-07-2020 11:25 AMP works 01-07-2020 13:47 2:22:00 0
8 765/400kV ICT-I at Bhuj ICT WR SC 28-07-2020 10:27 Erection of 220 KV TBC BUS 28-07-2020 19:21 8:54:00 0
9 765/400kV ICT-I at Khandwa(PS) ICT WR TS 21-07-2020 11:13 Differential relay replacement 21-07-2020 15:42 4:29:00 1
10 765/400kV ICT-II at Khandwa(PS) ICT WR SE 07-07-2020 17:09 To attend oil leakage on 33kV Bushing 07-07-2020 20:54 3:45:00 0
11 765kV Aurangabad-Phadge Ckt-I Line WR SO 23-07-2020 16:47 Gas top up Compartment of B-Ph 23-07-2020 18:32 1:45:00 0
12 765kV Aurangabad-Sholapur-I Line WR MO 10-07-2020 11:53 Manually opened due to High Voltage. 29-07-2020 09:56 454:03:00 0
13 765kV Aurangabad-Sholapur-II Line WR MO 01-07-2020 00:00 Manually opened due to High Voltage. 10-07-2020 07:37 223:37:00 0
14 765kV Aurangabad-Sholapur-II Line WR MO 29-07-2020 16:48 Manually opened due to High Voltage. 01-08-2020 00:00 55:12:00 0
15 765kV Bilaspur-Rajnandgaon-I Line WR SO 21-07-2020 09:32 AMP Works 21-07-2020 20:03 10:31:00 0
16 765kV Bilaspur-Rajnandgaon-II Line WR SO 23-07-2020 09:39 AMP Works 23-07-2020 19:48 10:09:00 0
17 765kV Bilaspur-Rajnandgaon-II Line WR SO 24-07-2020 09:27 For Reactor AMP works 24-07-2020 20:50 11:23:00 0
18 765kV Bina-Gwalior-III Line WR SO 11-07-2020 10:08 For AMP of terminal equipments at Bina 11-07-2020 19:59 9:51:00 0
19 765kV Bina-Indore Line WR SO 09-07-2020 09:41 For Line AMP Works 09-07-2020 20:14 10:33:00 0
20 765kV Bina-Jabalpur-I Line WR SE 10-07-2020 15:11 To attend the conductor of jumper at location 40 hanging 10-07-2020 19:00 3:49:00 0
21 765kV Bina-Jabalpur-II Line WR SE 19-07-2020 10:08 Tower span between 34-35, strand cut found in middle conductor (Y-ph) 19-07-2020 16:17 6:09:00 0
22 765kV Bina-Jabalpur-III Line WR MO 05-07-2020 03:24 Manually opened due to High Voltage. 06-07-2020 09:47 30:23:00 0
23 765kV Durg-Wardha-I Line WR MO 13-07-2020 18:13 Manually opened due to High Voltage. 01-08-2020 00:00 437:47:00 0
24 765kV Durg-Wardha-II Line WR MO 01-07-2020 00:00 Manually opened due to High Voltage. 13-07-2020 11:17 299:17:00 0
25 765kV Durg-Wardha-III Line WR MO 01-07-2020 00:00 Manually opened due to High Voltage. 06-07-2020 10:12 130:12:00 0
26 765kV Durg-Wardha-III Line WR MO 21-07-2020 17:07 Manually opened due to High Voltage. 01-08-2020 00:00 246:53:00 0
27 765kV Durg-Wardha-IV Line WR MO 06-07-2020 17:28 Manually opened due to High Voltage. 21-07-2020 09:54 352:26:00 0
28 765kV Indore-Bhopal Line WR TL 23-07-2020 18:06 Tripped on B-E fault 23-07-2020 18:51 0:45:00 1
29 765kV Indore-Khandwa Ckt-I Line WR TS 17-07-2020 14:24 Tripped from Indore end only. DT receive at Indore end. 17-07-2020 16:01 1:37:00 1
30 765kV Jabalpur-Bhopal Line WR SO 03-07-2020 10:55 To verify CSD setting of L/R as bus reactor. 03-07-2020 22:23 11:28:00 0
31 765kV Jabalpur-Dharamjaigarh-I Line WR MO 01-07-2020 00:00 Manually opened due to High Voltage. 08-07-2020 11:16 179:16:00 0
32 765kV Jabalpur-Dharamjaigarh-II Line WR TL 09-07-2020 16:26 B- phase fault 09-07-2020 18:14 1:48:00 1
33 765kV Jabalpur-Dharamjaigarh-II Line WR MO 12-07-2020 11:17 Manually opened due to High Voltage. 30-07-2020 20:02 440:45:00 1
34 765kV Jabalpur-Dharamjaigarh-IV Line WR MO 01-07-2020 00:00 Manually opened due to High Voltage. 01-08-2020 00:00 744:00:00 0
35 765kV New Parli - Solapur Ckt-I Line WR MO 05-07-2020 17:52 Manually opened due to High Voltage. 06-07-2020 07:05 13:13:00 0
36 765kV New Parli - Solapur Ckt-I Line WR MO 16-07-2020 02:06 Manually opened due to High Voltage. 16-07-2020 06:31 4:25:00 0
37 765kV New Parli - Solapur Ckt-II Line WR MO 10-07-2020 00:57 Manually opened due to High Voltage. 10-07-2020 06:07 5:10:00 0
38 765kV New Parli - Solapur Ckt-II Line WR MO 16-07-2020 23:32 Manually opened due to High Voltage. 17-07-2020 06:04 6:32:00 0
39 765kV Pune-Phadge Line WR MO 01-07-2020 00:00 Manually opened due to High Voltage. 21-07-2020 10:46 490:46:00 0
40 765kV Pune-Sholapur Line WR MO 01-07-2020 00:00 Manually opened due to High Voltage. 22-07-2020 09:35 513:35:00 0
41 765kV Pune-Sholapur Line WR MO 22-07-2020 17:30 Manually opened due to High Voltage. 23-07-2020 16:37 23:07:00 0
42 765kV Pune-Sholapur Line WR MO 23-07-2020 19:11 Manually opened due to High Voltage. 01-08-2020 00:00 196:49:00 0
43 765kV Raigarh-PS(Kotra)-Raipur-PS(Durg)-II Line WR TS 09-07-2020 09:25 tripped due to Y-N fault 09-07-2020 17:59 8:34:00 1
44 765kV Raigarh-PS(Kotra)-Tamnar-I Line WR SO 14-07-2020 09:25 For Station and Line AMP Works. 14-07-2020 19:43 10:18:00 0
45 765kV Raigarh-PS(Kotra)-Tamnar-II Line WR SO 13-07-2020 10:31 For Station and Line AMP Works. 13-07-2020 19:50 9:19:00 0
46 765kV Seoni-Bilaspur-I Line WR SO 27-07-2020 10:03 For Reactor AMP works 27-07-2020 20:39 10:36:00 0
47 765kV Seoni-Bina-I Line WR SO 06-07-2020 09:56 AMP Works 06-07-2020 20:28 10:32:00 0
48 765kV Tirora-Koradi-I Line WR SE 29-07-2020 11:06 to attend hotspot in Line Metering B phase CT 29-07-2020 13:22 2:16:00 0
49 765kV Vindhyachal(PS)- Jabalpur- II Line WR TL 23-07-2020 10:15 R-Y Fault (Conductor snapped b/w location 58-59) 24-07-2020 15:15 29:00:00 1
Line tripped from Vindhyachal end only. No fault indication. As informed by RTAMC, the breaker
50 765kV Vindhyachal(PS)- Jabalpur- II Line WR TS 25-07-2020 20:14 25-07-2020 20:53 2
might have tripped due to DC Earth fault and rain ingress in CB MB 0:39:00
51 765kV Vindhyachal-Satna-I Line WR SO 15-07-2020 09:58 Reactor AMP work & Line Terminal Equipment tightening at Vindhychal(P). 15-07-2020 19:47 9:49:00 0
52 765kV Vindhyachal-Satna-II Line WR SE 28-07-2020 09:10 To Fix Hanging jumper 28-07-2020 13:31 4:21:00 0
53 765kV Wardha-Aurangabad-I Line WR MO 09-07-2020 19:40 Manually opened due to High Voltage. 30-07-2020 11:03 495:23:00 0
54 765kV Wardha-Aurangabad-I Line WR MO 30-07-2020 17:23 Manually opened due to High Voltage. 01-08-2020 00:00 30:37:00 0
63
List of Outages of Elements monitored by NLDC for the month of July-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month
55 765kV Wardha-Aurangabad-II Line WR MO 01-07-2020 00:00 Manually opened due to High Voltage. 08-07-2020 09:49 177:49:00 0
56 765kV Wardha-Aurangabad-III Line WR MO 01-07-2020 00:00 Manually opened due to High Voltage. 09-07-2020 11:25 203:25:00 0
57 765kV Wardha-Aurangabad-III Line WR MO 12-07-2020 01:23 Manually opened due to High Voltage. 01-08-2020 00:00 478:37:00 0
58 765kV Wardha-Aurangabad-IV Line WR SE 09-07-2020 12:11 for rectifying the two broken jumpers at loc no.809. 09-07-2020 18:51 6:40:00 0
59 765kV Warora-Rajnandgaon-I Line WR SO 17-07-2020 09:21 IPS replacement works at Warora SS 17-07-2020 18:08 8:47:00 0

64
List of Outages of Elements monitored by NLDC for the month of July-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month

Eastern Region Elements


Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month
tripped due DC fault in line-2 as OPGW snapped at tower no 499( section between APD and
1 HVDC Alipurdaur Pole-4 HVDC ER TL 02-07-2020 10:41 02-07-2020 13:44 1
BNC). 3:03:00
tripped due to tripping of HVDC Agra BNC Line 2 on DC line Fault. Fault Distance from Agra end
2 HVDC Alipurdaur Pole-4 HVDC ER TL 21-07-2020 21:01 22-07-2020 04:57 2
209.1 KM 7:56:00
3 765/400 kV ICT-I at Sasaram ICT ER TS 07-07-2020 23:58 Tripped from LV side only 08-07-2020 02:09 2:11:00 1
4 765/400 kV ICT-III at Jharsuguda ICT ER SO 24-07-2020 10:12 To remove spare from the ICT-3 and taking R-ph into service 24-07-2020 13:53 3:41:00 0
5 765/400 kV ICT-IV at Angul ICT ER SO 17-07-2020 09:28 OLTC OIL REPLACEMENT AT ANGUL. 17-07-2020 17:40 8:12:00 0
6 765/400 kV ICT-IV at Jharsuguda ICT ER SO 31-07-2020 09:22 Spare changeover and stool arrangement for LA arrester. 31-07-2020 19:06 9:44:00 0
7 765kV Angul-Jharsuguda-III Line ER MO 01-07-2020 00:00 Manually opened due to High Voltage. 13-07-2020 07:42 295:42:00 0
8 765kV Angul-Jharsuguda-III Line ER MO 24-07-2020 13:24 Manually opened due to High Voltage. 01-08-2020 00:00 178:36:00 0
9 765kV Angul-Jharsuguda-IV Line ER MO 13-07-2020 18:24 Manually opened due to High Voltage. 23-07-2020 10:36 0
232:12:00

Southern Region Elements


Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month
1 240Mvar Bus Reactor-II at Kurnool Bus Reactor SR SE 25-07-2020 12:37 For attending heavy oil leak in R-phase (Change of spare reactor R-ph) 25-07-2020 14:36 0
1:59:00
2 B/R -II Chilkuripetha Bus Reactor SR SO 11-07-2020 11:47 AMP works. 11-07-2020 17:07 0
5:20:00
3 765/400kV ICT-I at Maheshwaram ICT SR SO 01-07-2020 09:37 AMP Works 01-07-2020 18:42 9:05:00 0
4 765/400kV ICT-II at Chilkuripetha ICT SR SO 06-07-2020 10:05 For AMP work 06-07-2020 18:07 8:02:00 0
5 765kV Cuddapah- Chilkuripetha Ckt-I Line SR MO 21-07-2020 17:44 Manually opened due to High Voltage. 22-07-2020 07:25 13:41:00 0
6 765kV Cuddapah- Chilkuripetha Ckt-I Line SR MO 23-07-2020 21:35 Manually opened due to High Voltage. 24-07-2020 06:32 8:57:00 0
7 765kV Cuddapah- Chilkuripetha Ckt-I Line SR MO 24-07-2020 20:58 Manually opened due to High Voltage. 25-07-2020 06:32 9:34:00 0
8 765kV Cuddapah- Chilkuripetha Ckt-II Line SR MO 01-07-2020 00:00 Manually opened due to High Voltage. 04-07-2020 08:47 80:47:00 0
9 765kV Cuddapah- Chilkuripetha Ckt-II Line SR SO 04-07-2020 08:38 AMP works. 04-07-2020 19:24 10:46:00 0
10 765kV Cuddapah- Chilkuripetha Ckt-II Line SR MO 04-07-2020 19:31 Manually opened due to High Voltage. 21-07-2020 10:10 398:39:00 0
11 765kV Cuddapah- Chilkuripetha Ckt-II Line SR MO 22-07-2020 21:46 Manually opened due to High Voltage. 23-07-2020 06:25 8:39:00 0
12 765kV Cuddapah- Chilkuripetha Ckt-II Line SR MO 27-07-2020 17:50 Manually opened due to High Voltage. 03-08-2020 09:27 159:37:00 0
13 765kV Cuddapah-Thiruvalam Ckt-I Line SR MO 01-07-2020 02:36 Manually opened due to High Voltage. 01-07-2020 06:26 3:50:00 0
14 765kV Cuddapah-Thiruvalam Ckt-II Line SR MO 01-07-2020 00:00 Manually opened due to High Voltage. 08-07-2020 09:18 177:18:00 0
15 765kV Cuddapah-Thiruvalam Ckt-II Line SR MO 09-07-2020 23:10 Manually opened due to High Voltage. 10-07-2020 07:02 7:52:00 0
16 765kV Cuddapah-Thiruvalam Ckt-II Line SR MO 10-07-2020 23:49 Manually opened due to High Voltage. 11-07-2020 07:48 7:59:00 0
17 765kV Cuddapah-Thiruvalam Ckt-II Line SR MO 12-07-2020 00:30 Manually opened due to High Voltage. 13-07-2020 08:00 31:30:00 0
18 765kV Cuddapah-Thiruvalam Ckt-II Line SR MO 13-07-2020 20:40 Manually opened due to High Voltage. 14-07-2020 07:06 10:26:00 0
19 765kV Cuddapah-Thiruvalam Ckt-II Line SR MO 14-07-2020 22:45 Manually opened due to High Voltage. 18-07-2020 07:02 80:17:00 0
20 765kV Cuddapah-Thiruvalam Ckt-II Line SR MO 18-07-2020 21:20 Manually opened due to High Voltage. 22-07-2020 08:50 83:30:00 0
21 765kV Cuddapah-Thiruvalam Ckt-II Line SR MO 24-07-2020 01:09 Manually opened due to High Voltage. 24-07-2020 07:34 6:25:00 0
22 765kV Cuddapah-Thiruvalam Ckt-II Line SR MO 25-07-2020 01:47 Manually opened due to High Voltage. 27-07-2020 06:57 53:10:00 0
23 765kV Cuddapah-Thiruvalam Ckt-II Line SR MO 28-07-2020 21:51 Manually opened due to High Voltage. 29-07-2020 07:17 9:26:00 0
24 765kV Cuddapah-Thiruvalam Ckt-II Line SR MO 29-07-2020 17:46 Manually opened due to High Voltage. 30-07-2020 09:16 15:30:00 0
25 765kV Cuddapah-Thiruvalam Ckt-II Line SR MO 30-07-2020 21:18 Manually opened due to High Voltage. 01-08-2020 00:00 26:42:00 0
26 765kV Kurnool-Cuddapah Ckt-I Line SR MO 18-07-2020 17:58 Manually opened due to High Voltage. 28-07-2020 07:01 229:03:00 0
27 765kV Kurnool-Cuddapah Ckt-I Line SR MO 29-07-2020 02:15 Manually opened due to High Voltage. 01-08-2020 00:00 69:45:00 0
28 765kV Kurnool-Cuddapah Ckt-II Line SR MO 02-07-2020 00:22 Manually opened due to High Voltage. 03-07-2020 08:04 31:42:00 0
29 765kV Kurnool-Cuddapah Ckt-II Line SR MO 04-07-2020 00:04 Manually opened due to High Voltage. 04-07-2020 07:41 7:37:00 0
30 765kV Kurnool-Cuddapah Ckt-II Line SR MO 10-07-2020 00:55 Manually opened due to High Voltage. 10-07-2020 12:05 11:10:00 0
31 765kV Kurnool-Cuddapah Ckt-II Line SR MO 10-07-2020 17:18 Manually opened due to High Voltage. 13-07-2020 06:43 61:25:00 0
32 765kV Kurnool-Cuddapah Ckt-II Line SR MO 16-07-2020 23:42 Manually opened due to High Voltage. 17-07-2020 06:57 7:15:00 0
33 765kV Kurnool-Cuddapah Ckt-II Line SR MO 17-07-2020 23:11 Manually opened due to High Voltage. 18-07-2020 09:05 9:54:00 0
65
List of Outages of Elements monitored by NLDC for the month of July-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month
34 765kV Nizamabad- Maheswaram-I Line SR MO 01-07-2020 02:13 Manually opened due to High Voltage. 04-07-2020 07:22 77:09:00 0
35 765kV Nizamabad- Maheswaram-I Line SR MO 06-07-2020 22:18 Manually opened due to High Voltage. 07-07-2020 07:34 9:16:00 0
36 765kV Nizamabad- Maheswaram-I Line SR SO 07-07-2020 07:35 AMP Works 07-07-2020 21:55 14:20:00 0
37 765kV Nizamabad- Maheswaram-I Line SR MO 10-07-2020 22:46 Manually opened due to High Voltage. 11-07-2020 06:43 7:57:00 0
38 765kV Nizamabad- Maheswaram-I Line SR MO 11-07-2020 21:10 Manually opened due to High Voltage. 12-07-2020 07:04 9:54:00 0
39 765kV Nizamabad- Maheswaram-I Line SR MO 18-07-2020 21:47 Manually opened due to High Voltage. 19-07-2020 06:31 8:44:00 0
40 765kV Nizamabad- Maheswaram-I Line SR MO 20-07-2020 22:12 Manually opened due to High Voltage. 21-07-2020 05:54 7:42:00 0
41 765kV Nizamabad- Maheswaram-II Line SR MO 04-07-2020 18:43 Manually opened due to High Voltage. 06-07-2020 06:17 35:34:00 0
42 765kV Nizamabad- Maheswaram-II Line SR MO 08-07-2020 00:47 Manually opened due to High Voltage. 08-07-2020 08:00 7:13:00 0
43 765kV Nizamabad- Maheswaram-II Line SR SO 08-07-2020 08:01 AMP Works 08-07-2020 20:38 12:37:00 0
44 765kV Nizamabad- Maheswaram-II Line SR MO 08-07-2020 20:40 Manually opened due to High Voltage. 10-07-2020 06:53 34:13:00 0
45 765kV Nizamabad- Maheswaram-II Line SR MO 12-07-2020 17:35 Manually opened due to High Voltage. 13-07-2020 06:42 13:07:00 0
46 765kV Nizamabad- Maheswaram-II Line SR MO 13-07-2020 23:10 Manually opened due to High Voltage. 14-07-2020 05:39 6:29:00 0
47 765kV Nizamabad- Maheswaram-II Line SR MO 15-07-2020 20:01 Manually opened due to High Voltage. 17-07-2020 06:31 34:30:00 0
48 765kV Nizamabad- Maheswaram-II Line SR MO 17-07-2020 20:51 Manually opened due to High Voltage. 18-07-2020 06:25 9:34:00 0
49 765kV Nizamabad- Maheswaram-II Line SR MO 19-07-2020 22:17 Manually opened due to High Voltage. 20-07-2020 06:38 8:21:00 0
50 765kV Nizamabad- Maheswaram-II Line SR MO 24-07-2020 20:21 Manually opened due to High Voltage. 27-07-2020 06:32 58:11:00 0
51 765kV Nizamabad- Maheswaram-II Line SR MO 28-07-2020 21:02 Manually opened due to High Voltage. 29-07-2020 06:42 9:40:00 0
52 765kV Nizamabad- Maheswaram-II Line SR MO 29-07-2020 18:45 Manually opened due to High Voltage. 30-07-2020 09:02 14:17:00 0
53 765kV Vemagiri-Chilkuripeta Ckt-I Line SR MO 04-07-2020 14:56 Manually opened due to High Voltage. 05-07-2020 09:29 18:33:00 0
54 765kV Vemagiri-Chilkuripeta Ckt-I Line SR MO 31-07-2020 22:58 Manually opened due to High Voltage. 01-08-2020 06:32 7:34:00 0
55 765kV Vemagiri-Chilkuripeta Ckt-II Line SR MO 24-07-2020 14:31 Manually opened due to High Voltage. 24-07-2020 20:09 5:38:00 0
56 765kV Vemagiri-Chilkuripeta Ckt-II Line SR MO 26-07-2020 01:35 Manually opened due to High Voltage. 28-07-2020 10:23 56:48:00 0

66
List of Outages of Elements monitored by NLDC for the month of July-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month

North Eastern Region Elements


Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month

tripped due DC fault in line-2 as OPGW snapped at tower no 499( section between APD and
1 HVDC Biswanath Chariali Pole-2 HVDC NER TL 02-07-2020 10:41 02-07-2020 13:03 2:22:00 1
BNC).
2 HVDC Biswanath Chariali Pole-2 HVDC NER SO 15-07-2020 12:20 P2 Earth Over current Protection alarm checking 18-07-2020 11:26 71:06:00 1
tripped due to tripping of HVDC Agra BNC Line 2 on DC line Fault. Fault Distance from Agra end
3 HVDC Biswanath Chariali Pole-2 HVDC NER TL 21-07-2020 21:01 22-07-2020 04:51 7:50:00 2
209.1 KM

TL= Tripping due to Line Fault


TS= Tripping due to S/S Fault
MO= Opened due to system constraints
TV= Tripped on Overvoltage
SC= Planned Shutdown for
construction activities
SO= Planned Shutdown for O&M activities
SE= Emergency Shutdown
TP= Protection Maloperation
ME= Miscellanous outage

67
24. ALL TIME HIGHEST
As on 31-07-2020
Maximum Demand Demand Met during
Energy Met Hydro Gen. Wind Gen. Solar Gen.
Regions Met during the day Evening Peak
(MU) (MU) (MU) (MU)
(MW) hrs(MW)
68605 63328 1520 389 71 46.6
NR 02-07-2020 02-07-2020 03-07-2020 12-08-2017 14-07-2019 03-04-2020
59385 54589 1293 167 199 31.5
WR 21-02-2020 15-10-2018 16-10-2018 18-12-2014 27-07-2019 13-03-2020
53465 50436 1157 208 245 103.6
SR 18-03-2020 24-02-2020 18-03-2020 31-08-2018 20-07-2018 17-02-2020
23783 23016 496 152 - 5.5
ER 14-06-2019 31-08-2019 25-06-2019 18-07-2020 25-06-2020
3145 2944 58 37 - 0.2
NER 07-09-2019 29-08-2019 22-08-2019 03-07-2019 22-11-2019
182610 176381 4145 816 467 178.1
All India 30-05-2019 29-05-2019 30-05-2019 09-09-2019 12-06-2018 28-03-2020

Max. Demand Met Energy Consumption


Regions States during the day (MW) (MU)
As on date As on date
Punjab 13087 02-07-2020 301.8 02-07-2020
Haryana 10877 03-07-2020 240.7 03-07-2020
Rajasthan 14209 06-02-2020 280.3 19-06-2020
Delhi 7254 02-07-2019 147.1 02-07-2019
NR UP 23419 17-07-2020 471.8 05-06-2019
Uttarakhand 2753 08-06-2018 53.2 14-06-2019
HP 1786 31-01-2020 34.0 18-08-2019
J&K 2934 04-01-2020 56.5 18-12-2018
Chandigarh 380 02-07-2019 7.4 03-07-2019
Chhattisgarh 4736 21-07-2019 111.6 23-07-2019
Gujarat 18305 07-06-2019 403.2 21-09-2018
MP 14785 03-02-2020 278.5 12-11-2017
Maharashtra 24962 22-10-2018 522.1 23-05-2019
WR
Goa 613 13-12-2019 14.4 07-09-2018
DD 662 05-07-2018 9.5 14-07-2018
DNH 861 06-07-2020 19.5 05-03-2020
Essar Steel 880 17-06-2020 19.4 29-06-2020
Andhra Pradesh* 10207 18-03-2020 205.1 17-03-2020
Telangana* 13168 28-02-2020 256.2 18-03-2020
Karnataka 13258 16-03-2020 273.3 26-03-2019
SR
Kerala 4316 13-04-2019 89.4 23-05-2019
Tamil Nadu 16386 03-04-2019 365.4 12-04-2019
Pondy 480 18-04-2019 9.7 21-06-2019
Bihar 5972 03-09-2019 121.4 02-09-2019
DVC 5422 13-02-2019 77.3 20-03-2017
Jharkhand 4308 30-06-2018 31.6 24-01-2016
ER
Odisha 5679 23-08-2018 123.5 02-10-2018
West Bengal 9989 14-06-2019 198.5 10-05-2019
Sikkim 193 24-01-2020 2.8 25-01-2020
Arunachal Pradesh 165 26-04-2019 3.0 29-07-2020
Assam 1968 29-08-2019 38.0 21-08-2019
Manipur 220 25-01-2020 3.2 16-01-2020
NER Meghalaya 394 13-01-2020 6.9 06-02-2020
Mizoram 126 28-01-2020 2.2 24-11-2018
Nagaland 170 05-09-2019 2.8 05-05-2017
Tripura 344 26-03-2016 6.6 27-06-2019
Andhra Pradesh
*SR 13162 23-03-2014 284.8 22-03-2014
(Undivided)

68
25.System Reliability Indices Report for the month of July 2020

Percentage (%) of times ATC was violated

Number of Blocks Number of Hours


S.No. Corridor %Violation
Violated Violated
1 WR-NR 1 0.25 0.03

2 ER-NR 151 37.75 5.07

3 Import of NR 1 0.25 0.03

4 NEW-SR 0 0.00 0.00

5 NER Import 0 0.00 0.00

Percentage(%) of times (N-1) Criteria was violated

Number of Blocks Number of Hours


S.No. Corridor %Violation
Violated Violated
1 WR-NR 0 0.00 0.00

2 ER-NR 68 17.00 2.28

3 Import of NR 1 0.25 0.03

4 NEW-SR 0 0.00 0.00

4 NER Import 0 0.00 0.00

Remarks: Flows crossing Total Transfer Capability (TTC) on interregional corridors has been worked out as a
proxy for (N-1) violation.

69
POWER SYSTEM OPERATION CORPORATION LIMITED
पॉवर सिस्टम ऑपरे शन कारपोरे शन सिसमटे ड
NATIONAL LOAD DESPATCH CENTRE – राष्ट्रीय भार प्रेषण केन्द्र
First floor, B-9, Qutab Institutional Area,
Katwaria Sarai, New Delhi-110016.

70