वितरण सच

ू ी
Distribution List

1 सचचि, के.वि.नि.आ. तीसरा एिं चौथा तल, चंद्रलोक भिि, 36, जिपथ, िई दिल्ली – 110001
Secretary, CERC, 3rd & 4th Floor, Chanderlok Building,36,Janpath,New Delhi-110001

2 मुख्य अभभयंता (जी एम), के.वि.प्रा., सेिा भिि, आर. के. पुरम, िई दिल्ली – 110066
Chief Engineer (GM), CEA,Sewa Bhavan, R.K.Puram , New Delhi-110066

3 सिस्य सचचि, उ. क्षे. वि. स., 18/ए, शहीि जीत भसंह सिसििाल मार्ग, िई दिल्ली – 110016
Member Secretary, NRPC,18/A,SJSS Marg, Katwaria Sarai, New Delhi-110016

4 सिस्य सचचि, प. क्षे. वि. स., एफ-3, एम आई डी सी क्षेत्र, अंधेरी(पूि)ग , मुंबई – 400093
Member Secretary, WRPC, F-3,MIDC Area, Andheri (East),Mumbai-400093

5 सिस्य सचचि, ि. क्षे. वि. स., 29, रे स कोसग क्रॉस रोड, बंर्लूरु – 560009
Member Secretary, SRPC, 29,Race Course Cross Road,Bangalore-560009

6 सिस्य सचचि, प.ू क्षे. वि. स., 14, र्ोल्फ क्लब रोड, कोलकाता – 700033
Member Secretary, ERPC, 14,Golf Club Road , Kolkata-700033

सिस्य सचचि,उ. पू. क्षे. वि. स.,मेघालय राज्य आिासीय वित्त सहकारी सभमनत भलभमटे ड भिि, िोंचिम
7 दहल्स, भशलोंर् – 793003
Member Secretary, NERPC, Meghalaya State Housing Finance Cooperative Society Ltd.
Building, Nongrim Hills , Shillong -793003

मुख्य अभभयंता, राष्ट्रीय विद्युत सभमनत, एिआरपीसी भिि, तत


ृ ीय तल, 18/ए, शहीि जीत भसंह
8 सिसििाल मार्ग, िई दिल्ली – 110016
Chief Engineer, National Power Committee, NRPC Building, 3rd floor, 18/A,SJSS Marg,
Katwaria Sarai, New Delhi-110016

9 कायगपालक नििे शक, प.ू क्षे. भा. प्रे. के., 14, र्ोल्फ क्लब रोड, कोलकाता – 700033
Executive Director, ERLDC,14, Golf Club Road , Kolkata-700033

10 कायगपालक नििे शक, प. क्षे. भा. प्रे. के., एफ-3, एम आई डी सी क्षेत्र, अंधेरी(पूि)ग , मुंबई – 400093
Executive Director, WRLDC,F-3,MIDC Area, Andheri (East),Mumbai-400093

11 महाप्रबंधक, उ.क्षे.भा.प्रे.के, 18/ए, शहीि जीत भसंह सिसििाल मार्ग, िई दिल्ली – 110016
General Manager, NRLDC,18/A,SJSS Marg, Katwaria Sarai, New Delhi-110016

12 महाप्रबंधक, ि. क्षे. भा. प्रे. के, 29, रे स कोसग क्रॉस रोड, बंर्लरु
ू – 560009
General Manager, SRLDC, 29,Race Course Cross Road,Bangalore-560009

13 कायगपालक नििे शक, प.ू क्षे. भा. प्रे. के., डोंर्नतएह, लोअर िोंिह, लापलंर्, भशलोंर्- 793006
Executive Director, NERLDC, Dongtieh, Lower Nongrah, Laplang, Shillong-793006
POWER SYSTEM OPERATION CORPORATION LIMITED
पॉवर सिस्टम ऑपरे शन कारपोरे शन सिसमटे ड

NATIONAL LOAD DESPATCH CENTRE –राष्ट्रीय भार प्रेषण केन्द्र

Monthly
मासिक ऑपरे शन ररपोटट Operation Report

मई
2020
पावर सिस्टम ऑपरे शन कापोरे शन सिसमटे ड
राष्ट्रीय भार प्रेषण केंद्र, नई सिल्ली

POWER SYSTEM OPERATION CORPORATION LTD


NATIONAL LOAD DESPATCH CENTRE, NEW DELHI

माह मई-2020 के सिए प्रचािन सनष्पािन ररपोटट


OPERATIONAL PERFORMANCE REPORT FOR THE
MONTH OF MAY-2020
पृष्ठसूची CONTENTS

1 माह मई-2020 की साराां श ररपोर्ट 1-5

Summary of report for the month of MAY-2020


2 क्षेत्रवार स्थापपत पवद् युत क्षमता 6
Region wise Installed Capacity
3 राष्ट्रीय स्तर पर साां ध्यकालीन पशखर माां गपूपतट 7-8
Peak demand met at National level

4 राष्ट्रीय स्तर पर पवद् युत ऊर्ाट खपत 9-10


Energy consumption at National level

5 पिक्वेंसी रूपरे खा 11-12


Frequency profile

6 राष्ट्रीय स्तर पर र्ल पवद् युत ऊर्ाट उत्पादन 13-14


Hydro generation at National level

7 राष्ट्रीय स्तर पर पवन ऊर्ाट उत्पादन 15


Wind generation at National level

8 राष्ट्रीय स्तर पर सौर ऊर्ाट उत्पादन 16


Solar generation at National level

9 राष्ट्रीय स्तर पर दै पनक अपिकतम पवद् युत माां ग पूपतट 17


Daily maximum demand met at National level

10 26 मई के मााँ ग एवां उत्पादन प्लॉर् (अपिकतम माां ग पूपतट) व मााँ ग का डार्ा (15 पमनर् अांतराल)
Demand and generation plots for 26- MAY (Max Demand Met) and Demand data 18-22
(15-minute)

11 ऊर्ाट आपूपतट की वास्तपवक स्स्थपत 23


Actual power supply position

12 ऊर्ाट आवश्यकता एवां आपूपतट की पपछले वर्ट माह मई -2019 से तुलना 24


Energy requirement and met comparison with MAY -2019

13 पशखर माां ग आवश्यकता एवां आपूपतट की पपछले वर्ट माह मई -2019 से तुलना 25
Peak demand requirement and met comparison with MAY -2019

14 क्षेत्रीय स्तर पर पशड्यूल एवां डरावल 26


Schedule & drawal at regional level
15 अांतर क्षेत्रीय पवपनमय 27-34
Inter-regional exchanges

16 अांतर राष्ट्रीय पवद् युत पवपनमय 35-37


Inter-national exchanges

17 एसर्ीओए (पिपक्षीय एवां सामू पहक)एवां यू आइ का ब्यौरा 38


Bilateral and collective short-term open access & UI details

18 पावर माकेर् की सूचना 39-41


Power market information

19 अक्षय ऊर्ाट प्रमाण पत्र प्रपिया 42-44


Renewable energy certificate mechanism

20 मुख्य घर्नाएाँ एवां पडस्टर्बेंस 45-51


Important events/disturbances

21 नए कमीशांड पारे र्ण तत्व 52


New elements commissioned

22 पवभव रूपरे खा 53
Voltage profile

23 मई -2020 के दौरान रा.भा.प्रे.के.िारा पनगरानी में तत्वोां के आउर्े र् की सूची 54-63


List of outage of elements monitored by NLDC for the month of MAY-2020

24 मई-2020 के पलए पसस्टम ररलाइपर्बपलर्ी सूचकाां क 64


System Reliability Indices for MAY-2020
1. SUMMARY OF REPORT FOR THE MONTH OF MAY 2020

1
2
3
4
5
2. ALL INDIA REGIONWISE INSTALLED CAPACITY

As on 31.05.2020
(All figures are in MW)

THERMAL RES @ GRAND


S No Region NUCLEAR HYDRO
COAL LIGNITE GAS DIESEL TOTAL MNRE TOTAL
1 NR 53440 1580 5781 0 60801 1620 20086 16933 99440
2 WR 72935 1540 10806 0 85282 1840 7623 26080 120824
3 SR 44095 3490 6492 434 54510 3320 11775 42488 112093
4 ER 27285 0 100 0 27385 0 4639 1499 33523
5 NER 770 0 1812 36 2618 0 1577 365 4560
6 ISLANDS 0 0 0 40 40 0 0 18 58
ALL INDIA 198525 6610 24992 510 230636 6780 45699 87384 370498
Remarks: Data from CEA website

6
3. र ष्ट्रीय स्तर पर सांध्य क लीन दिखर दर्वि् युत म ां ग पू दति
EVENING PEAK HOUR DEMAND MET AT NATIONAL LEVEL
म ह: मई 2020 MONTH:- MAY 2020
सभी आां कड़े मेग र्व ट मे All figures in MW
दिन ांक ऊत्तरी क्षे. पदिमी क्षे. िदक्षणी क्षे. पू र्वी क्षे. पू र्वोत्तर क्षे. कुल
Date NR WR SR ER NER TOTAL
1-May-20 39939 38408 31886 13668 2264 126165
2-May-20 40679 39218 32676 16007 1935 130515
3-May-20 30890 38529 32724 17470 2159 121772
4-May-20 37536 38654 34676 17338 2367 130571
5-May-20 35230 39223 34680 16710 1754 127597
6-May-20 38308 39060 34588 16996 2284 131236
7-May-20 39776 40192 34575 15197 2321 132061
8-May-20 41155 39285 35805 17044 2344 135633
9-May-20 41865 40148 35936 18589 2500 139038
10-May-20 31228 36018 35290 15310 2535 120381
11-May-20 38373 40647 36314 18684 2566 136584
12-May-20 40666 40993 36456 18507 2494 139116
13-May-20 41215 39066 37180 18614 2185 138260
14-May-20 37734 39963 36998 18543 2332 135570
15-May-20 43103 40297 37132 18927 2416 141875
16-May-20 43861 40948 36537 18516 2317 142179
17-May-20 43674 40093 32707 19517 2433 138424
18-May-20 44884 40443 34074 20377 2642 142420
19-May-20 46112 41215 35589 17414 2612 142942
20-May-20 46619 41649 37137 11487 2435 139327
21-May-20 47040 42048 37884 14007 1939 142918
22-May-20 48994 42771 37842 16481 2256 148344
23-May-20 49858 43471 39016 18368 2376 153089
24-May-20 50592 42833 36510 18487 2173 150595
25-May-20 51419 43471 37714 18322 2054 152980
26-May-20 49385 44074 38044 18597 1640 151740
27-May-20 48159 43718 37898 16112 2060 147947
28-May-20 42830 42469 36896 16181 2307 140683
29-May-20 43544 42672 37268 18138 2454 144076
30-May-20 38313 43829 37211 17068 2472 138893
31-May-20 38313 39834 33526 18278 2433 132384
उच्चतम MAXIMUM 51419 44074 39016 20377 2642 153089

दनम्नतम MINIMUM 30890 36018 31886 11487 1640 120381

औसत AVERAGE 42300 40814 35896 17257 2292 138559


अब तक क
उच्चतम All Time 62627 54589 50436 23016 2944 176381
Max.
दिन ांक Date 03.07.19 15.10.18 24.02.20 31.08.19 29.08.19 29.05.19
नोट : सभी आां कड़े 2000 बजे की म ांगपू दति पर आध ररत है ।
Note: The above figures correspond to value at 2000 Hrs
7
EVENING PEAK HOUR DEMAND MET DURING THE MONTH OF MAY 2020
NR WR SR ER NER INDIA
180

160

140
EVENING PEAK HOUR DMD (GW) -->

120

100
NR - Max: 51419 MW Min: 30890 MW Avg : 42300 MW WR - Max: 44074 MW Min: 36018 MW Avg : 40814 MW
SR - Max: 39016 MW Min: 31886 MW Avg : 35896 MW ER - Max: 20377 MW Min: 11487 MW Avg : 17257 MW
80
ALL INDIA - Max: 153089 MW Min: 120381 MW Avg : 138559 MW NER - Max: 2642 MW Min: 1640 MW Avg : 2292 MW

60

40

20

0
1-May-20

2-May-20

3-May-20

4-May-20

5-May-20

6-May-20

7-May-20

8-May-20

9-May-20

10-May-20

11-May-20

12-May-20

13-May-20

14-May-20

15-May-20

16-May-20

17-May-20

18-May-20

19-May-20

20-May-20

21-May-20

22-May-20

23-May-20

24-May-20

25-May-20

26-May-20

27-May-20

28-May-20

29-May-20

30-May-20

31-May-20
DATE -->

8
4. र ष्ट्रीय स्तर पर दर्वि् युत ऊर् ा आपूदता ENERGY MET AT NATIONAL LEVEL
म ह:मई 2020 MONTH:- MAY 2020
सभी आां कड़े दमदलयन यूदनट मे All figures in MU
दिन ांक ऊत्तरी क्षे. पदिमी क्षे. िदक्षणी क्षे. पूर्वी क्षे. पूर्वोत्तर क्षे. कुल
Date NR WR SR ER NER TOTAL
01-May-20 842 972 783 294 37 2928
02-May-20 865 996 805 295 37 2997
03-May-20 791 995 814 325 37 2961
04-May-20 776 986 852 346 40 3000
05-May-20 808 987 872 344 38 3050
06-May-20 817 1009 877 310 37 3049
07-May-20 823 1007 877 326 36 3068
08-May-20 915 1022 886 331 38 3193
09-May-20 956 1024 903 362 42 3287
10-May-20 815 981 873 359 44 3071
11-May-20 803 980 907 331 44 3065
12-May-20 876 1034 911 382 45 3248
13-May-20 931 1030 922 392 39 3313
14-May-20 929 1030 927 395 39 3320
15-May-20 971 1030 931 401 39 3373
16-May-20 1008 1031 917 415 39 3409
17-May-20 1016 1021 862 411 39 3349
18-May-20 1049 1040 834 428 46 3397
19-May-20 1065 1050 837 405 48 3405
20-May-20 1087 1052 898 294 45 3375
21-May-20 1109 1076 932 269 37 3423
22-May-20 1164 1087 954 325 39 3569
23-May-20 1192 1095 959 369 41 3656
24-May-20 1201 1100 938 396 39 3675
25-May-20 1229 1125 960 390 37 3740
26-May-20 1250 1133 962 401 29 3775
27-May-20 1225 1129 969 351 30 3705
28-May-20 1101 1121 957 323 39 3541
29-May-20 1026 1115 945 361 41 3487
30-May-20 859 1111 919 375 43 3306
31-May-20 859 1080 858 354 43 3193
कुल TOTAL 30357 32447 27840 11060 1227 102930
उच्चतम MAXIMUM 1250 1133 969 428 48 3775
दनम्नतम MINIMUM 776 972 783 269 29 2928
औसत AVERAGE 979 1047 898 357 40 3320
सांचयी 2020-21
52113 59955 53039 20678 2202 187987
Cumulative 2020-21
अब तक क उच्चतम
1493 1293 1157 496 58 4145
All Time Max.
दिन ांक Date 01.07.19 16.10.18 18.03.20 25.06.19 22.08.19 30.05.19

9
ENERGY MET DURING THE MONTH OF MAY' 2020
NR WR SR ER NER ALL INDIA
4000

3500

3000

2500
ENERGY (MU) -->

NR - Max: 1250 MU Min: 776 MU Avg : 979 MU WR - Max: 1133 MU Min: 972 MU Avg : 1047 MU
SR - Max: 969 MU Min: 783 MU Avg : 898 MU ER - Max: 428 MU Min: 269 MU Avg : 357 MU
2000
ALL INDIA - Max: 3775 MU Min: 2928 MU Avg : 3320 MU NER - Max: 48 MU Min: 29 MU Avg : 40 MU

1500

1000

500

0
1-May-20

2-May-20

3-May-20

4-May-20

5-May-20

6-May-20

7-May-20

8-May-20

9-May-20

10-May-20

11-May-20

12-May-20

13-May-20

14-May-20

15-May-20

16-May-20

17-May-20

18-May-20

19-May-20

20-May-20

21-May-20

22-May-20

23-May-20

24-May-20

25-May-20

26-May-20

27-May-20

28-May-20

29-May-20

30-May-20

31-May-20
DATE -->

10
5. वर्ष 2020-21 के फ्रिए आवृफ्रत रूपरे खा FREQUENCY PROFILE FOR YEAR 2020-21

राष्ट्रीय फ्रिड NATIONAL GRID


उच्चतम फ्रिम्नतम औसत
फ्रिक्वेंसी रूपरे खा (Hz) <49.9 49.9-50.05 >50.05
फ्रिक्वेंसी फ्रिक्वेंसी फ्रिक्वेंसी

Apr-20 All India Grid 5.10 75.13 19.77 50.30 49.61 50.01

% समय May-20 All India Grid 4.23 76.68 19.10 50.29 49.57 50.01

2020-21
All India Grid 4.66 75.90 19.44 50.30 49.57 50.01
(upto May)

11
5.1 मई 2020 के फ्रिए आवृफ्रत रूपरे खा FREQUENCY PROFILE FOR MAY 2020

उच्चतम फ्रिम्नतम औसत


फ्रिक्वेंसी रूपरे खा (Hz) <49.9 49.9-50.05 >50.05 एफ़.वी.आई.
फ्रिक्वेंसी फ्रिक्वेंसी फ्रिक्वेंसी

01-May-20 2.20 73.17 24.63 50.22 49.84 50.01 0.03


02-May-20 0.65 78.74 20.61 50.14 49.83 50.01 0.02
03-May-20 6.35 76.56 17.08 50.25 49.78 50.00 0.04
04-May-20 9.63 75.45 14.92 50.19 49.65 49.99 0.06
05-May-20 7.11 77.87 15.02 50.21 49.70 50.00 0.04
06-May-20 1.82 74.61 23.58 50.23 49.82 50.02 0.03
07-May-20 3.82 79.80 16.38 50.23 49.81 50.01 0.03
08-May-20 5.63 84.92 9.46 50.16 49.74 49.99 0.03
09-May-20 11.45 79.62 8.94 50.20 49.72 49.98 0.04
10-May-20 2.66 65.75 31.59 50.28 49.77 50.03 0.05
11-May-20 3.30 72.35 24.35 50.18 49.82 50.01 0.03
12-May-20 6.83 75.42 17.75 50.20 49.75 50.00 0.04
13-May-20 1.49 80.06 18.45 50.21 49.83 50.01 0.02
14-May-20 1.62 74.84 23.54 50.27 49.84 50.02 0.03
15-May-20 4.61 77.71 17.69 50.22 49.76 50.00 0.03
% 16-May-20 1.50 82.49 16.01 50.17 49.85 50.01 0.02
समय
17-May-20 2.04 75.53 22.43 50.27 49.77 50.02 0.03
18-May-20 4.36 80.37 15.27 50.19 49.78 50.00 0.03
19-May-20 1.83 75.54 22.63 50.16 49.82 50.01 0.03
20-May-20 3.59 84.68 11.74 50.23 49.80 50.00 0.02
21-May-20 1.09 62.66 36.25 50.21 49.84 50.03 0.03
22-May-20 8.66 77.99 13.36 50.19 49.73 49.99 0.04
23-May-20 5.10 85.57 9.33 50.20 49.74 49.99 0.03
24-May-20 1.74 86.83 11.44 50.20 49.83 50.00 0.02
25-May-20 6.49 81.57 11.93 50.19 49.66 49.99 0.04
26-May-20 6.08 72.85 21.08 50.29 49.78 50.01 0.04
27-May-20 1.64 66.57 31.78 50.23 49.82 50.03 0.04
28-May-20 1.10 64.98 33.92 50.29 49.57 50.04 0.05
29-May-20 7.19 73.48 19.33 50.24 49.77 50.00 0.04
30-May-20 6.26 83.72 10.02 50.20 49.74 49.99 0.03
31-May-20 3.18 75.31 21.50 50.18 49.80 50.01 0.03

12
6.र ष्ट्रीय स्तर पर जल दर्वि् युत उत्प िन
HYDRO GENERATION AT NATIONAL LEVEL
म ह: मई 2020 MONTH:- MAY 2020

सभी आां कड़े दमदलयन यू दनट मे All figures in MU


दिन ांक ऊत्तरी क्षे. पदिमी क्षे. िदक्षणी क्षे. पूर्वी क्षे. पूर्वोत्तर क्षे. कुल
Date NR WR SR ER NER TOTAL
01-May-20 237 34 69 65 7 412
02-May-20 246 50 75 72 7 450
03-May-20 247 42 81 74 6 452
04-May-20 250 37 87 74 6 454
05-May-20 234 42 87 81 6 449
06-May-20 230 55 81 80 7 453
07-May-20 236 41 84 75 6 442
08-May-20 236 42 87 74 5 445
09-May-20 243 54 89 77 6 469
10-May-20 240 45 73 66 5 428
11-May-20 245 38 79 66 5 432
12-May-20 251 58 81 67 5 462
13-May-20 256 49 82 67 6 461
14-May-20 263 42 85 63 11 465
15-May-20 273 33 68 68 7 449
16-May-20 277 35 80 79 10 482
17-May-20 276 40 71 83 12 482
18-May-20 274 47 51 89 8 470
19-May-20 269 34 61 95 8 466
20-May-20 245 38 75 79 10 447
21-May-20 246 44 86 121 13 509
22-May-20 280 41 97 130 19 567
23-May-20 295 44 99 136 19 593
24-May-20 305 49 74 132 17 576
25-May-20 296 52 86 132 18 585
26-May-20 302 36 77 124 18 557
27-May-20 296 26 70 114 19 526
28-May-20 289 21 72 99 23 503
29-May-20 284 22 74 95 21 497
30-May-20 287 34 81 97 17 515
31-May-20 287 37 70 96 19 508
कुल TOTAL 8196 1261 2433 2770 345 15005
उच्चतम MAXIMUM 305 58 99 136 23 593
दनम्नतम MINIMUM 230 21 51 63 5 412
औसत AVERAGE 264 41 78 89 11 484
सांचयी 2020-21
13336 2685 4671 4393 491 25577
Cumulative 2020-21
अब तक क उच्चतम All
389 167 208 145 37 816
Time Max.
दिन ांक Date 18.08.15 18.12.14 31.08.18 15.09.19 03.07.19 09.09.19

13
HYDRO ENERGY DURING THE MONTH OF MAY' 2020
NR WR SR ER NER INDIA
700

600

500
HYDRO ENERGY (MU) -->

NR - Max: 305 MU Min: 230 MU Avg : 264 MU WR - Max: 58 MU Min: 21 MU Avg : 41 MU


400 ER - Max: 136 MU Min: 63 MU Avg : 89 MU
SR - Max: 99 MU Min: 51 MU Avg : 78 MU
ALL INDIA - Max: 593 MU Min: 5 MU Avg : 166 MU NER - Max: 23 MU Min: 5 MU Avg : 11 MU
ER - Max: 136 MU Min: 63 MU Avg : 89 MU
300

200

100

0
1-May-20

2-May-20

3-May-20

4-May-20

5-May-20

6-May-20

7-May-20

8-May-20

9-May-20

10-May-20

11-May-20

12-May-20

13-May-20

14-May-20

15-May-20

16-May-20

17-May-20

18-May-20

19-May-20

20-May-20

21-May-20

22-May-20

23-May-20

24-May-20

25-May-20

26-May-20

27-May-20

28-May-20

29-May-20

30-May-20

31-May-20
DATE -->

14
7. र ष्ट्रीय स्तर पर पर्वन ऊर् ा उत्प िन
WIND GENERATION AT NATIONAL LEVEL
म ह: मई 2020 MONTH:- MAY 2020
सभी आां कड़े दमदलयन यूदनट मे All figures in MU
दिन ांक ऊत्तरी क्षे . पदिमी क्षे . िदक्षणी क्षे . पूर्वी क्षे . पूर्वोत्तर क्षे . कुल
Date NR WR SR ER NER TOTAL
01-May-20 35.5 69.3 35.8 ---------- ---------- 141
02-May-20 29.0 86.0 31.8 ---------- ---------- 147
03-May-20 23.3 88.4 32.2 ---------- ---------- 144
04-May-20 14.7 85.1 31.0 ---------- ---------- 131
05-May-20 4.9 57.0 31.4 ---------- ---------- 93
06-May-20 10.1 68.1 42.7 ---------- ---------- 121
07-May-20 9.2 63.9 35.3 ---------- ---------- 108
08-May-20 13.7 63.9 22.0 ---------- ---------- 100
09-May-20 24.5 59.6 20.1 ---------- ---------- 104
10-May-20 24.3 65.0 28.2 ---------- ---------- 118
11-May-20 21.6 58.6 28.3 ---------- ---------- 108
12-May-20 19.6 39.4 22.7 ---------- ---------- 82
13-May-20 25.1 50.3 20.5 ---------- ---------- 96
14-May-20 13.2 36.7 25.9 ---------- ---------- 76
15-May-20 14.3 46.7 42.8 ---------- ---------- 104
16-May-20 5.8 62.5 49.5 ---------- ---------- 118
17-May-20 13.8 80.3 54.3 ---------- ---------- 148
18-May-20 8.2 80.8 104.9 ---------- ---------- 194
19-May-20 13.9 73.9 160.6 ---------- ---------- 248
20-May-20 11.6 83.4 172.7 ---------- ---------- 268
21-May-20 21.0 94.2 135.4 ---------- ---------- 251
22-May-20 27.0 117.7 123.0 ---------- ---------- 268
23-May-20 19.3 107.9 101.3 ---------- ---------- 229
24-May-20 16.2 98.5 116.0 ---------- ---------- 231
25-May-20 27.3 110.4 87.6 ---------- ---------- 225
26-May-20 42.9 129.4 90.7 ---------- ---------- 263
27-May-20 45.2 153.8 102.4 ---------- ---------- 301
28-May-20 55.6 174.4 93.7 ---------- ---------- 324
29-May-20 55.3 155.7 85.8 ---------- ---------- 297
30-May-20 19.0 111.3 56.1 ---------- ---------- 186
31-May-20 19.0 64.9 47.1 ---------- ---------- 131
कुल TOTAL 684.1 2637.1 2031.9 ---------- ---------- 5353.2
उच्चतम MAXIMUM 55.6 174.4 172.7 ---------- ---------- 324
दनम्नतम MINIMUM 4.9 36.7 20.1 ---------- ---------- 76
औसत AVERAGE 22.1 85.1 65.5 ---------- ---------- 173
सांचयी 2020-201
1160.8 4208.4 3004.3 ---------- ---------- 8374
Cumulative 2020-21
अब तक क उच्चतम
71.3 199.3 245.5 … … 467
All Time Max.
दिन ांक Date 14.07.19 27.07.19 20.07.18 … … 12.06.18
*Source: As reported by SLDCs. Limited visibility of embedded wind generator data.
15
8. र ष्ट्रीय स्तर पर सौर ऊर् ा उत्प िन
SOLAR GENERATION AT NATIONAL LEVEL
म ह: मई 2020 MONTH:- MAY 2020
सभी आां कड़े दमदलयन यू दनट मे All figures in MU
दिन ांक ऊत्तरी क्षे. पदिमी क्षे. िदक्षणी क्षे. पूर्वी क्षे. पूर्वोत्तर क्षे. कुल
Date NR WR SR ER NER TOTAL
01-May-20 43 27 87 5 0.0 162
02-May-20 43 29 95 5 0.0 171
03-May-20 35 28 93 5 0.0 161
04-May-20 29 28 96 5 0.1 157
05-May-20 42 29 93 5 0.0 168
06-May-20 37 27 84 5 0.0 153
07-May-20 44 30 83 5 0.0 161
08-May-20 45 29 83 5 0.1 162
09-May-20 43 28 84 5 0.1 160
10-May-20 36 26 84 5 0.1 151
11-May-20 37 28 86 5 0.0 155
12-May-20 37 27 95 5 0.1 163
13-May-20 39 26 77 5 0.0 148
14-May-20 40 27 80 5 0.0 152
15-May-20 42 27 83 5 0.0 156
16-May-20 41 26 74 5 0.0 146
17-May-20 41 27 73 5 0.0 146
18-May-20 43 27 67 5 0.0 141
19-May-20 43 28 68 4 0.0 143
20-May-20 43 29 82 4 0.0 158
21-May-20 45 30 87 4 0.0 166
22-May-20 44 29 85 5 0.0 161
23-May-20 37 29 85 4 0.0 156
24-May-20 38 30 83 5 0.0 155
25-May-20 43 28 79 5 0.0 155
26-May-20 44 28 80 5 0.0 156
27-May-20 43 28 80 5 0.0 156
28-May-20 41 28 82 5 0.1 156
29-May-20 38 28 80 5 0.0 152
30-May-20 40 27 73 5 0.0 144
31-May-20 40 26 70 5 0.0 141
कुल TOTAL 1252 862 2549 147 1.1 4810
उच्चतम MAXIMUM 45 30 96 5 0.06 171
दनम्नतम MINIMUM 29 26 67 4 0.01 141
औसत AVERAGE 40 28 82 5 0.03 155
सांचयी 2020-21
2397 1692 5205 286 2.0 9582
Cumulative 2020-21
अब तक क उच्चतम
47 32 104 5 0.24 178
All Time Max.
दिन ांक Date 03.04.20 13.03.20 17.02.20 17.03.20 22.11.19 28.03.20

*Source: RLDCs for solar connected to ISTS; SLDCs for embedded solar. Limited visibility of embedded solar data.

16
9. र ष्ट्रीय स्तर पर िै दनक अदिकतम दर्वि् यु त म ांग पूदता
DAILY MAXIMUM DEMAND MET AT NATIONAL LEVEL
म ह: मई 2020 MONTH:- MAY 2020
सभी आां कड़े मेग र्व ट मे All figures in MW

दिन ांक ऊत्तरी क्षे. पदिमी क्षे. िदक्षणी क्षे. पूर्वी क्षे. पूर्वोत्तर क्षे. कुल दर्वदभन्नत फ़ैक्टर
Date NR WR SR ER NER TOTAL Diversity Factor*
01-May-20 42163 42259 35119 14868 2297 131140 1.042
02-May-20 41596 43404 36770 15537 2106 134700 1.035
03-May-20 39550 43237 36678 17170 2182 130605 1.063
04-May-20 40126 43876 38976 17270 2416 135074 1.056
05-May-20 38122 44856 40288 16886 1917 134899 1.053
06-May-20 39939 44251 41208 17048 2307 137223 1.055
07-May-20 41587 45126 41083 16055 2433 138608 1.055
08-May-20 43844 45378 41208 17018 2346 143333 1.045
09-May-20 44880 45899 41600 18448 2526 146028 1.050
10-May-20 42919 44315 39278 17752 2533 142522 1.030
11-May-20 40693 45209 42223 18697 2561 143192 1.043
12-May-20 43606 45758 41016 18564 2516 145600 1.040
13-May-20 43775 45917 42833 19009 2219 146543 1.049
14-May-20 42867 46939 43033 18728 2336 145663 1.057
15-May-20 45879 46343 44112 19496 2435 150343 1.053
16-May-20 47336 46085 41792 19081 2389 149008 1.052
17-May-20 47328 45185 38347 20316 2461 146252 1.051
18-May-20 48870 46018 38396 20611 2636 150332 1.041
19-May-20 50084 45911 36754 20236 2683 149919 1.038
20-May-20 50338 45347 39623 17288 2492 144709 1.072
21-May-20 51350 47699 41770 14243 2090 151572 1.037
22-May-20 53815 48114 43044 16934 2289 155374 1.057
23-May-20 54945 48540 42252 18679 2399 160096 1.042
24-May-20 55699 48164 40354 18387 2159 159881 1.031
25-May-20 56870 49702 43706 18602 2071 163796 1.044
26-May-20 56244 49371 44951 18894 1703 166424 1.028
27-May-20 54808 49680 45168 18724 1946 164009 1.039
28-May-20 50822 49676 45643 16092 2395 160311 1.027
29-May-20 44949 49866 44632 18870 2541 156567 1.027
30-May-20 43251 50283 42324 18133 2518 153472 1.020
31-May-20 40569 47495 39357 18045 2443 140047 1.056
उच्चतम MAXIMUM 56870 50283 45643 20611 2683 166424 1.072

दनम्नतम MINIMUM 38122 42259 35119 14243 1703 130605 1.020

औसत AVERAGE 46414 46448 41082 17925 2334 147653 1.045

अब तक क उच्चतम
66687 59385 53465 23783 3145 182610
All Time Max.

दिन ांक Date 03.07.19 21.02.20 18.03.20 14.06.19 07.09.19 30.05.19


* Diversity factor = (Sum of regional max demands) / All India max demand
नोट : यह आां कड़े एनएलडीसी स्क ड प्रण ली में िर्ा िै दनक अदिकतम म ांगपू दता िर् ा ते हैं ।
Note: The above figures denote daily maximum demand met recorded in NLDC SCADA.

17
10. DEMAND AND GENERATION PLOTS FOR 26 MAY (MAXIMUM DEMAND MET)

18
19
20
21
26 मई 2020 (अधिकतम म ाँग) की आल इं धिय म ाँग आपूधति ALL
INDIA DEMAND MET FOR 26 MAY-2020 (MAXIMUM DEMAND*)

Time Block All India Demand (MW) Time Block All India Demand (MW)
1 159601 49 156342
2 159683 50 157714
3 159432 51 158442
4 158672 52 158272
5 157632 53 157601
6 156814 54 157991
7 156175 55 159431
8 155157 56 160956
9 153973 57 162256
10 153331 58 163185
11 152484 59 164419
12 151865 60 165372
13 150835 61 165682
14 150471 62 165935
15 149480 63 166150
16 149146 64 165400
17 148667 65 164038
18 149126 66 163543
19 148731 67 163217
20 148714 68 161025
21 148217 69 156912
22 149049 70 154176
23 148639 71 151713
24 148332 72 146973
25 147858 73 143604
26 148899 74 141877
27 148630 75 143046
28 148818 76 144590
29 148550 77 146406
30 149011 78 147648
31 148562 79 150801
32 148938 80 152239
33 149206 81 152362
34 150353 82 152594
35 151202 83 153098
36 150992 84 154329
37 151643 85 155967
38 152252 86 157420
39 153491 87 158566
40 154438 88 159968
41 154184 89 160486
42 155416 90 163256
43 155724 91 163914
44 156309 92 163368
45 156389 93 163127
46 156708 94 160875
47 157254 95 160695
48 157216 96 160035
* 15 minute interval SCADA DATA

22
11. ACTUAL POWER SUPPLY POSITION - MAY 2020

Requirement/Availability in MU/DAY Requirement/Availability in MU Peak Demand/Peak Met in MW


REGION STATE Peak
Energy Surplus(+)/ Requirem Energy Surplus(+)/ % Surplus(+)/ %
Requirement Requirement Demand
met Deficit(-) ent met Deficit(-) Shortage Deficit(-) Shortage
Met
Chandigarh 4 4 0.0 117 117 0 0.0 297 297 0 0.0
Delhi 80 80 0.0 2467 2465 -1 0.0 5464 5464 0 0.0
Haryana 126 126 -0.1 3903 3899 -3 -0.1 8011 8011 0 0.0
Himachal Pradesh 21 21 0.0 658 658 0 0.0 1312 1312 0 0.0
J&K 52 42 -10.0 1620 1309 -311 -19.2 3072 2458 -614 -20.0
Punjab 133 133 0.0 4130 4130 0 0.0 8180 8180 0 0.0
NR
Rajasthan 217 217 0.0 6738 6738 0 0.0 12050 12050 0 0.0
Uttar Pradesh 331 330 -0.5 10249 10233 -16 -0.2 21331 21331 0 0.0
Uttarakhand 29 29 0.0 905 905 0 0.0 1762 1762 0 0.0
NFF/Railway 1 1 0.0 36 36 0 0.0 85 85 0 0.0
TOTAL 994 984 -10.7 30822 30490 -331 -1.1 57116 56620 -496 -0.9
Gujarat 308 308 0.0 9543 9543 0 0.0 15589 15578 -11 -0.1
Madhya Pradesh 205 205 -0.1 6365 6363 -2 0.0 10173 10173 0 0.0
Chhattisgarh 76 76 0.0 2371 2371 0 0.0 3736 3736 0 0.0
Maharashtra 429 429 0.0 13293 13293 0 0.0 21501 21463 -38 -0.2
Goa 10 10 0.0 316 316 0 -0.1 513 512 -1 -0.2
WR
D&D 4 4 0.0 128 128 0 0.0 225 225 0 0.0
DNH 8 8 0.0 245 245 0 0.0 415 415 0 0.0
AMNSIL 12 12 0.0 367 367 0 0.0 804 804 0 0.0

TOTAL 1053 1052 -0.1 32628 32626 -2 0.0 51148 51148 0 0.0

Andhra Pradesh 180 180 0.0 5565 5565 0 0.0 10125 10101 -24 -0.2
Telangana 155 155 0.1 4817 4819 2 0.0 9130 9114 -16 -0.2
Karnataka 195 195 0.1 6044 6046 2 0.0 10999 10999 0 0.0
Kerala 71 71 0.0 2196 2197 1 0.0 3713 3713 0 0.0
SR
Tamil Nadu 290 290 0.1 8985 8988 3 0.0 14343 14343 0 0.0
Pondicherry 7 7 0.0 226 226 0 0.0 410 410 0 0.0
TOTAL 898 898 0.2 27832 27840 7 0.0 45646 45646 0 0.0
Bihar 89 89 -0.2 2770 2763 -7 -0.3 5415 5415 0 0.0
Jharkhand 25 25 -0.8 785 761 -24 -3.1 1512 1400 -112 -7.4
DVC 51 51 0.0 1578 1578 0 0.0 2348 2348 0 0.0
ER Odisha 77 77 0.0 2399 2399 0 0.0 4094 4094 0 0.0
West Bengal 118 118 -0.1 3670 3666 -4 -0.1 7856 7856 0 0.0
Sikkim 1 1 0.0 40 40 0 0.0 105 105 0 0.0
TOTAL 363 362 -1.1 11242 11207 -35 -0.3 20596 20596 0 0.0

Arunachal Pradesh 0 0 0.0 15 15 0 -1.4 108 108 0 0.0

Assam 10 8 -1.6 296 246 -50 -17.0 1720 1663 -57 -3.3
Manipur 1 1 0.0 18 18 0 -1.5 208 189 -19 -9.1
NER Meghalaya 3 3 -0.1 103 100 -3 -3.1 322 322 0 0.0
Mizoram 1 1 0.0 18 18 0 -1.3 106 106 0 0.0
Nagaland 1 1 0.0 20 20 0 -1.2 136 133 -3 -2.1
Tripura 4 4 0.0 123 122 -1 -0.6 284 284 0 0.0
TOTAL 19 17 -1.8 593 538 -55 -9.3 2884 2804 -79 -2.7

ALL INDIA 3326 3313 -13.4 103117 102700 -416 -0.4 177390 176814 -575 -0.3

23
12. ENERGY COMPARISON OF MAY 2020 vs MAY 2019
Energy Requirement (MU) Energy Met (MU)
REGION STATE Average Average
May-19 May-20 Difference % Change MU/day for May-19 May-20 Difference % Change MU/day for
May-20 May-20
Chandigarh 154 117 -37 -24 4 154 117 -37 -24 4
Delhi 3371 2467 -904 -27 80 3370 2465 -905 -27 80
Haryana 4916 3903 -1013 -21 126 4911 3899 -1012 -21 126
Himachal Pradesh 867 658 -209 -24 21 866 658 -208 -24 21
J&K 1795 1620 -175 -10 52 1459 1309 -150 -10 42
NR Punjab 4769 4130 -639 -13 133 4769 4130 -639 -13 133
Rajasthan 7116 6738 -378 -5 217 7116 6738 -378 -5 217
Uttar Pradesh 12687 10249 -2438 -19 331 12667 10233 -2433 -19 330
Uttarakhand 1336 905 -430 -32 29 1335 905 -430 -32 29
NFF/Railway 81 36 -46 -56 1 81 36 -46 -56 1
TOTAL 37089 30822 -6268 -17 994 36726 30490 -6236 -17 984
Gujarat 11758 9543 -2215 -19 308 11758 9543 -2215 -19 308
Madhya Pradesh 7022 6365 -656 -9 205 7018 6363 -655 -9 205
Chhattisgarh 2582 2371 -211 -8 76 2582 2371 -211 -8 76
Maharashtra 15426 13293 -2133 -14 429 15426 13293 -2133 -14 429
WR Goa 366 316 -50 -14 10 366 316 -50 -14 10
D&D 220 128 -91 -42 4 220 128 -91 -42 4
DNH 552 245 -307 -56 8 552 245 -307 -56 8
ESIL 174 367 193 111 12 174 367 193 111 12
TOTAL 38099 32628 -5471 -14 1053 38095 32626 -5470 -14 1052
Andhra Pradesh 6056 5565 -491 -8 180 6048 5565 -484 -8 180
Telangana 5318 4817 -501 -9 155 5318 4819 -499 -9 155
Karnataka 6700 6044 -656 -10 195 6700 6046 -654 -10 195
SR Kerala 2582 2196 -386 -15 71 2573 2197 -376 -15 71
Tamil Nadu 10612 8985 -1627 -15 290 10611 8988 -1623 -15 290
Pondicherry 271 226 -46 -17 7 271 226 -45 -17 7
TOTAL 31540 27832 -3707 -12 898 31521 27840 -3681 -12 898
Bihar 3088 2770 -317 -10 89 3085 2763 -322 -10 89
Jharkhand 846 785 -62 -7 25 839 761 -78 -9 25
DVC 2253 1578 -675 -30 51 2253 1578 -675 -30 51
ER Odisha 2630 2399 -231 -9 77 2630 2399 -231 -9 77
West Bengal 5669 3670 -1999 -35 118 5648 3666 -1982 -35 118
Sikkim 40 40 0 0 1 40 40 0 0 1
TOTAL 14526 11242 -3284 -23 363 14495 11207 -3288 -23 362
Arunachal Pradesh 64 15 -49 -77 0 64 15 -49 -77 0
Assam 819 296 -523 -64 10 738 246 -493 -67 8
Manipur 73 18 -55 -75 1 72 18 -55 -76 1
Meghalaya 167 103 -65 -39 3 159 100 -59 -37 3
NER
Mizoram 55 18 -37 -67 1 55 18 -37 -67 1
Nagaland 65 20 -45 -69 1 64 20 -45 -69 1
Tripura 173 123 -50 -29 4 170 122 -48 -28 4
TOTAL 1416 593 -824 -58 19 1323 538 -785 -59 17
ALL INDIA 122670 103117 -19554 -16 3326 122160 102700 -19460 -16 3313

24
13. DEMAND COMPARISON OF MAY 2020 vs MAY 2019

Peak Requirement (MW) Peak Met (MW)


REGION STATE
May-19 May-20 Difference % Change May-19 May-20 Difference % Change
Chandigarh 380 297 -83 -21.8 380 297 -83 -21.8
Delhi 6461 5464 -997 -15.4 6461 5464 -997 -15.4
Haryana 8874 8011 -863 -9.7 8874 8011 -863 -9.7
Himachal Pradesh 1480 1312 -168 -11.4 1480 1312 -168 -11.4
J&K 3033 3072 39 1.3 2426 2458 32 1.3
NR
Punjab 8641 8180 -461 -5.3 8641 8180 -461 -5.3
Rajasthan 11791 12050 259 2.2 11791 12050 259 2.2
Uttar Pradesh 21493 21331 -162 -0.8 21493 21331 -162 -0.8
Uttarakhand 2155 1762 -393 -18.2 2155 1762 -393 -18.2
NFF/Railway 133 85 -48 -36.1 133 85 -48 -36.1
Gujarat 18094 15589 -2505 -14 18094 15578 -2516 -13.9
Madhya Pradesh 10143 10173 30 0 10131 10173 42 0.4
Chhattisgarh 4504 3736 -768 -17 4504 3736 -768 -17.1
Maharashtra 23621 21501 -2120 -9 23613 21463 -2150 -9.1
WR
Goa 554 513 -41 -7 554 512 -42 -7.5
D&D 344 225 -119 -34.6 344 225 -119 -34.6
DNH 799 415 -384 -48.1 799 415 -384 -48.1
ESIL 897 804 -93 -10.3 897 804 -93 -10.3
Andhra Pradesh 9854 10125 271 2.8 9854 10101 247 2.5
Telangana 8700 9130 430 4.9 8684 9114 430 5.0
Karnataka 12158 10999 -1160 -9.5 12158 10999 -1160 -9.5
SR
Kerala 4219 3713 -506 -12.0 4219 3713 -506 -12.0
Tamil Nadu 16014 14343 -1671 -10.4 15952 14343 -1608 -10.1
Pondicherry 444 410 -34 -7.6 442 410 -32 -7.2
Bihar 5545 5415 -130 -2.3 5366 5415 49 0.9
Jharkhand 1437 1512 75 5.3 1348 1400 52 3.9
DVC 3200 2348 -852 -26.6 3200 2348 -852 -26.6
ER
Odisha 4655 4094 -562 -12.1 4655 4094 -562 -12.1
West Bengal 9432 7856 -1576 -16.7 9353 7856 -1497 -16.0
Sikkim 97 105 8 8.2 97 105 8 8.2
Arunachal Pradesh 140 108 -33 -23.2 138 108 -31 -22.1
Assam 1756 1720 -35 -2.0 1673 1663 -10 -0.6
Manipur 183 208 25 13.6 181 189 8 4.3
NER Meghalaya 329 322 -8 -2.3 325 322 -4 -1.1
Mizoram 102 106 5 4.5 100 106 7 6.6
Nagaland 130 136 6 4.3 128 133 5 3.7
Tripura 297 284 -13 -4.4 295 284 -11 -3.8

25
14. SCHEDULE AND DRAWAL OF CONSTITUENTS - MAY 2020

ACTUAL Over drawal(+)/ ACTUAL Over drawal(+)/


SCHEDULE SCHEDULE
REGION STATE DRAWAL Under Drawal(-) % OD/UD DRAWAL Under Drawal(-)
(MU) (MU/DAY)
(MU) (MU) (MU/DAY) (MU/DAY)

Chandigarh 124.06 120.07 -3.99 -3.21 4.00 3.87 -0.13


Delhi 2061.33 2036.94 -24.39 -1.18 66.49 65.71 -0.79
Haryana 3420.51 3428.35 7.84 0.23 110.34 110.59 0.25
Himachal Pradesh 15.79 -13.02 -28.81 -182.44 0.51 -0.42 -0.93
J&K 758.04 693.60 -64.43 -8.50 24.45 22.37 -2.08
NR
Punjab 3205.93 3190.22 -15.71 -0.49 103.42 102.91 -0.51
Rajasthan 2286.71 2303.98 17.28 0.76 73.76 74.32 0.56
Uttar Pradesh 5012.38 5039.48 27.10 0.54 161.69 162.56 0.87
Uttarakhand 370.35 371.74 1.39 0.38 11.95 11.99 0.04
NFF/Railway 33.71 35.56 1.85 5.49 1.09 1.15 0.06
Gujarat 2541.80 2647.25 105.44 4.15 81.99 85.40 3.40
Madhya Pradesh 3338.88 3280.54 -58.34 -1.75 107.71 105.82 -1.88
Maharashtra 759.38 738.35 -21.03 -2.77 24.50 23.82 -0.68
Chhattisgarh 4961.31 4945.63 -15.68 -0.32 160.04 159.54 -0.51
WR
Goa 305.81 300.36 -5.45 -1.78 9.86 9.69 -0.18
D&D 123.09 128.13 5.04 4.10 3.97 4.13 0.16
D&NH 243.68 244.54 0.86 0.35 7.86 7.89 0.03
AMNSIL 93.67 102.97 9.30 9.93 3.02 3.32 0.30
Andhra Pradesh 3004.66 3018.42 13.76 0.46 96.92 97.37 0.44
Telangana 1935.41 1945.68 10.27 0.53 62.43 62.76 0.33
Karnataka 1841.14 1860.06 18.92 1.03 59.39 60.00 0.61
SR Kerala 1479.79 1492.49 12.70 0.86 47.74 48.14 0.41
Tamil Nadu 4981.69 4951.48 -30.21 -0.61 160.70 159.73 -0.97
Pondicherry 235.03 225.87 -9.16 -3.90 7.58 7.29 -0.30
Goa (SR) 56.11 57.39 1.28 2.28 1.81 1.85 0.04
Bihar 2599.14 2578.88 -20.25 -0.78 83.84 83.19 -0.65
Jharkhand 537.54 526.50 -11.04 -2.05 17.34 16.98 -0.36
DVC -862.23 -838.98 23.24 -2.70 -27.81 -27.06 0.75
ER
Odisha 31.80 27.44 -4.36 -13.70 1.03 0.89 -0.14
West Bengal 1174.18 1194.61 20.42 1.74 37.88 38.54 0.66
Sikkim 43.42 39.90 -3.52 -8.10 1.40 1.29 -0.11
Arunachal Pradesh 11.53 10.90 -0.63 -5.49 0.37 0.35 -0.02
Assam 145.63 148.41 2.78 1.91 4.70 4.79 0.09
Manipur 17.79 17.65 -0.14 -0.81 0.57 0.57 0.00
NER Meghalaya 16.01 14.48 -1.52 -9.52 0.52 0.47 -0.05
Mizoram 10.83 10.48 -0.35 -3.24 0.35 0.34 -0.01
Nagaland 15.42 14.86 -0.56 -3.62 0.50 0.48 -0.02
Tripura 33.13 29.90 -3.23 -9.75 1.07 0.96 -0.10

26
15. INTER REGIONAL EXCHANGES 2020-21
(All figures in MU)

Apr'20 May'20 Fin. Year 2020-21

Name of Line
Import of NR from WR (WR-NR)
WR - NR 765 kV Gwalior - Agra 2xS/C 1065.60 1216.52 2282.12
WR-NR 765 kV Gwalior - Phagi 2xS/C 505.05 640.47 1145.52
WR-NR 765 kV Jabalpur-Orai D/C 627.01 791.13 1418.14
WR-NR 765 kV Satna-Orai 740.12 847.26 1587.38
WR-NR 765 kV Gwalior-Orai 0.00 0.00 0.00
WR - NR HVDC Champa - Kurukshetra 227.60 880.36 1107.96
WR - NR HVDC Vindhyachal 7.01 36.91 43.92
WR - NR 400 kV Zerda Kankroli 0.00 2.21 2.21
WR - NR 400 kV Zerda Bhinmal 0.00 2.53 2.53
WR - NR 400 kV RAPP C - Shujalpur D/C 3.27 24.69 27.96
WR - NR 220 kV Bhanpura - Ranpur 17.04 26.66 43.70
WR - NR 220 kV Bhanpura - Modak 35.46 36.32 71.78
WR - NR 220 kV Auraiya - Malanpur/Mehgaon 0.00 0.00 0.00
WR - NR 400 kV Vindhyachal-Rihand D/C 0.00 0.00 0.00
WR - NR HVDC Mundra - Mohindergarh 627.43 1013.72 1641.15
WR-NR 765 kV Banaskata-Chittorgarh D/C 70.14 175.09 245.23
Total WR - NR 3925.73 5693.87 9619.60
Export of NR to WR (NR-WR)
NR - WR 765 kV Gwalior - Agra 2xS/C 0.00 0.00 0.00
NR - WR 765 kV Gwalior - Phagi 2xS/C 0.00 0.00 0.00
NR - WR 765 kV Jabalpur-Orai D/C 0.00 0.00 0.00
NR - WR 765 kV Satna-Orai 0.00 0.00 0.00
NR - WR 765 kV Gwalior-Orai 297.33 302.13 599.46
NR - WR HVDC Champa- Kurukshetra 0.00 0.00 0.00
NR - WR HVDC Vindhyachal 258.29 61.96 320.25
NR - WR 400 kV Zerda Kankroli 60.84 56.98 117.82
NR - WR 400 kV Zerda Bhinmal 86.61 74.20 160.81
NR - WR 400 kV RAPP C - Shujalpur D/C 27.71 37.62 65.33
NR - WR 220 kV Bhanpura - Ranpur 0.00 1.87 1.87
NR - WR 220 kV Bhanpura - Modak 0.00 0.00 0.00
NR - WR 220 kV Auraiya - Malanpur/Mehgaon 55.54 39.06 94.60
NR-WR 400 kV Rihand-Vindhyachal D/C 654.81 676.77 1331.58
NR - WR HVDC Mundra - Mohindergarh 0.00 0.00 0.00
NR - WR 765 kV Banaskata-Chittorgarh D/C 25.63 22.48 48.11
Total NR - WR 1466.76 1273.07 2739.83
Import of NR from ER (ER-NR)
ER - NR 765 kV Sasaram - Fatehpur 14.25 51.47 65.72
ER - NR 765 kV Gaya - Varanasi 2*S/C 153.62 216.96 370.58
ER - NR 765 kV Gaya - Balia 134.25 188.23 322.48
ER - NR HVDC Alipurduar - Agra 0.00 112.75 112.75
ER-NR 400 kV Patna - Balia 2xD/C 295.70 355.51 651.21
ER - NR 400 kV Muzaffarpur - Gorakhpur D/C 226.29 365.87 592.16
ER - NR 400 kV Biharshariff - Balia D/C 114.58 138.51 253.09
ER - NR 400 kV Motihari - Gorakhpur D/C 110.76 137.33 248.09
ER - NR 400 kV Biharshariff - Varanasi D/C 17.49 50.34 67.83
ER - NR 400 kV Sasaram -Varanasi 149.59 157.19 306.78
ER - NR 400 kV Sasaram -Allahabad 49.12 54.01 103.13
ER - NR 220 kV Pusauli - Sahupuri 88.20 91.85 180.05
ER - NR 132 kV Sahupuri - Karamnasa 11.04 15.44 26.48
ER - NR 132 kV Rihand - Son Nagar 0.71 1.42 2.13
ER - NR 132 kV Rihand - Garhwa 0.00 0.00 0.00
Total ER-NR 1365.60 1936.88 3302.48
Import of NR from NER (NER-NR)
NER-NR HVDC Biswanath Chariali - Agra 11.83 195.04 206.87
Total NER - NR 11.83 195.04 206.87
Export of NR to ER (NR-ER)
NR - ER 765 kV Sasaram - Fatehpur 9.02 7.14 16.16
NR - ER 765 kV Gaya - Varanasi 2*S/C 0.00 4.50 4.50
NR - ER 765 kV Gaya - Balia 0.00 0.00 0.00
NR - ER HVDC Alipurduar - Agra 0.00 0.00 0.00
NR - ER 400 kV Patna - Balia 2xD/C 0.00 0.00 0.00
NR - ER 400 kV Muzaffarpur - Gorakhpur D/C 0.00 0.00 0.00
NR - ER 400 kV Biharshariff - Balia D/C 0.00 0.00 0.00
ER - NR 400 kV Motihari - Gorakhpur D/C 0.00 0.00 0.00
NR - ER 400 kV Biharshariff - Varanasi D/C 14.15 7.93 22.08
NR - ER 400 kV Sasaram -Varanasi 0.00 0.00 0.00
NR - ER 400 kV Sasaram -Allahabad 0.00 0.00 0.00
NR - ER 220 kV Pusauli - Sahupuri 0.00 0.00 0.00
NR - ER 132 kV Sahupuri - Karamnasa 7.20 8.64 15.84
NR - ER 132 kV Rihand - Son Nagar 7.66 7.59 15.25
ER - NR 132 kV Rihand - Garhwa 7.89 8.67 16.56
Total NR - ER 45.92 44.47 90.39
Export of NR to NER (NER-NR)
NR-NER HVDC Biswanath Chariali - Agra 236.01 134.73 370.74
Total NR - NER 236.01 134.73 370.74

27
Apr'20 May'20 Fin. Year 2020-21

Name of Line
Export of WR to ER (WR-ER)
WR - ER 765 kV Ranchi - Dharamjaygarh 2xS/C 123.48 234.93 358.42
WR - ER 765 kV Dharamjaygarh - Jharsuguda 2xD/C 567.02 669.41 1236.44
WR - ER 765 kV Durg - Jharsuguda D/C 2.45 11.99 14.44
WR - ER 400 kV Sipat - Ranchi D/C 54.26 112.15 166.41
WR - ER 400 kV Raigarh - Jharsuguda 2xD/C 2.64 24.85 27.50
WR - ER 220 kV Korba - Budhipadar D/C 61.68 70.37 132.05
WR - ER 220 kV Raigarh - Budhipadar 0.00 0.01 0.01
Total WR - ER 811.54 1123.72 1935.26
Import of WR from ER (ER - WR)
ER - WR 765 kV Ranchi - Dharamjaygarh 2xS/C 36.29 16.56 52.85
ER - WR 765 kV Dharamjaygarh - Jharsuguda 2XD/C 4.18 0.13 4.31
ER - WR 765 kV Durg - Jharsuguda D/C 81.45 80.11 161.55
ER - WR 400 kV Sipat - Ranchi D/C 14.28 3.72 18.00
ER - WR 400 kV Raigarh - Jharsuguda 2xD/C 90.49 28.51 119.00
ER - WR 220 kV Korba - Budhipadar D/C 0.01 0.11 0.13
ER - WR 220 kV Raigarh - Budhipadar 65.45 44.92 110.37
Total ER - WR 292.14 174.07 466.21
Export of ER to NER (ER - NER)
ER - NER 400 kV Binaguri - Bongaigaon D/C 0.21 36.70 36.90
ER - NER 400 kV Alipurduar - Bongaigaon D/C 0.19 85.79 85.98
ER - NER 220 kV Birpara - Salakati D/C 0.14 17.12 17.26
Total ER - NER 0.53 139.61 140.14
Import of ER from NER ( NER - ER)
NER - ER 400 kV Binaguri - Bongaigaon D/C 179.31 61.16 240.47
NER - ER 400 kV Alipurduar - Bongaigaon D/C 217.91 64.39 282.30
NER - ER 220 kV Birpara - Salakati D/C 44.02 9.92 53.94
Total NER - ER 441.24 135.47 576.71
Export of ER to SR (ER - SR)
ER - SR HVDC Gazuwaka 237.04 258.00 495.04
ER - SR HVDC Talchar - Kolar 1269.79 1349.18 2618.97
ER - SR 765 kV Angul- Srikakulam D/C 1714.96 1844.12 3559.08
Total ER - SR 3221.78 3451.30 6673.08
Import of ER from SR (SR - ER)
SR - ER HVDC Gazuwaka 0.00 0.00 0.00
SR - ER HVDC Talchar - Kolar 0.00 0.00 0.00
SR - ER 765 kV Angul- Srikakulam D/C 0.00 0.00 0.00
Total SR - ER 0.00 0.00 0.00
Export of WR to SR (WR-SR)
WR - SR HVDC Bhadrawati 542.30 594.23 1136.54
WR - SR 765 kV Sholapur - Raichur 2xS/C 1001.48 846.15 1847.62
WR - SR 765 kV Wardha - Nizamabad D/C 1346.36 671.01 2017.36
WR - SR 400KV Kolhapur-Kudgi D/C 83.82 26.69 110.51
Total WR - SR 2973.96 2138.07 5112.03
Import of WR from SR (SR - WR)
SR - WR HVDC Bhadrawati 0.00 0.00 0.00
SR - WR 765 kV Raichur - Sholapur 2xS/C 1.59 6.71 8.31
SR - WR 765 kV Wardha - Nizamabad D/C 0.00 0.00 0.00
SR - WR 400KV Kolhapur-Kudgi D/C 34.06 92.45 126.51
Total SR - WR 35.66 99.17 134.82
TOTAL ALL INDIA 14829 16539 31368

28
15.1 Import-Export of NR with WR during May 2020

Import of NR from WR (WR-NR)

Date
NR - WR
WR-NR WR-NR WR - NR WR-NR WR - NR 220 WR - NR 220 WR-NR WR - NR
WR - NR 765 kV WR-NR WR-NR WR - NR WR - NR WR - NR 400 WR - NR 220 765 kV
765 kV 765 kV HVDC 400 kV RAPP kV kV Auraiya - 400 KV Rihand HVDC Total
Gwalior - Agra 765 kV 765 kV HVDC 400 kV Zerda- kV Zerda- kV Bhanpura Banaskata -
Gwalior-Phagi Jabalpur- Champa- C - Shujalpur Bhanpura - Malanpur / Vindhyachal Mundra - WR - NR
2xS/C Satna- Orai Gwalior-Orai Vindhyachal Kankroli Bhinmal - Ranpur Chittorgarh
2xS/C Orai D/C Kurukshetra D/C Modak Mehgaon D/C M'garh
D/C

1-May-20 37.49 16.64 19.83 25.32 0.00 3.62 0.00 0.00 0.00 0.00 1.03 1.65 0.00 0.00 27.86 0.00 133.44
2-May-20 35.97 14.05 18.76 26.53 0.00 6.87 0.00 0.00 0.00 0.00 1.29 1.96 0.00 0.00 27.86 0.00 133.29
3-May-20 25.00 9.17 11.22 23.19 0.00 10.86 0.28 0.00 0.00 0.00 1.16 1.57 0.00 0.00 27.86 0.00 110.31
4-May-20 40.19 16.59 15.29 25.95 0.00 6.79 1.21 0.00 0.00 0.00 0.65 1.32 0.00 0.00 27.86 0.35 136.20
5-May-20 32.18 28.52 20.09 26.94 0.00 15.07 0.53 0.00 0.00 0.00 0.79 1.56 0.00 0.00 27.86 2.07 155.61
6-May-20 37.12 26.02 22.43 28.74 0.00 12.83 0.00 0.00 0.00 0.00 0.42 0.55 0.00 0.00 27.86 0.78 156.75
7-May-20 38.55 27.50 23.62 28.82 0.00 5.82 0.74 0.00 0.00 0.00 0.55 0.81 0.00 0.00 27.86 1.24 155.51
8-May-20 44.59 32.09 29.19 29.85 0.00 11.84 1.42 0.00 0.00 0.00 0.22 0.86 0.00 0.00 27.86 5.60 183.52
9-May-20 48.46 33.85 28.94 31.47 0.00 18.09 0.52 0.00 0.00 0.00 0.53 0.82 0.00 0.00 27.86 8.68 199.22
10-May-20 38.47 24.64 21.77 25.88 0.00 13.56 0.07 0.00 0.00 0.00 0.05 0.03 0.00 0.00 25.56 0.93 150.96
11-May-20 40.90 27.36 26.66 29.83 0.00 11.75 0.00 0.00 0.00 0.00 0.15 0.61 0.00 0.00 23.78 4.79 165.83
12-May-20 48.44 29.02 31.65 32.82 0.00 19.95 0.00 0.00 0.00 0.00 0.00 0.28 0.00 0.00 34.77 0.00 196.93
13-May-20 47.11 24.06 31.42 33.66 0.00 15.39 0.00 0.00 0.00 0.24 0.17 0.64 0.00 0.00 38.71 0.00 191.40
14-May-20 41.90 19.34 25.31 27.93 0.00 25.65 0.00 0.00 0.00 0.00 0.69 1.09 0.00 0.00 32.75 0.00 174.66
15-May-20 46.79 21.64 28.81 30.35 0.00 20.45 0.00 0.00 0.00 1.29 1.12 1.72 0.00 0.00 29.01 0.93 182.11
16-May-20 46.67 21.88 29.63 30.97 0.00 27.46 0.00 0.00 0.73 1.96 1.43 1.77 0.00 0.00 29.06 4.86 196.42
17-May-20 44.68 19.35 28.61 28.97 0.00 39.11 0.00 0.00 0.00 1.07 1.49 1.74 0.00 0.00 30.41 7.27 202.70
18-May-20 48.66 20.92 31.76 30.38 0.00 55.50 1.28 0.00 0.70 1.97 1.55 1.81 0.00 0.00 38.71 5.04 238.28
19-May-20 49.02 22.17 34.74 30.01 0.00 55.83 2.43 0.00 0.06 0.96 1.32 1.69 0.00 0.00 39.29 3.79 241.31
20-May-20 50.48 23.74 30.90 30.59 0.00 62.51 2.44 0.00 0.09 3.08 0.00 1.94 0.00 0.00 42.82 4.69 253.28
21-May-20 46.78 22.82 25.78 28.65 0.00 64.57 1.12 0.00 0.00 1.66 0.80 0.26 0.00 0.00 42.65 10.96 246.05
22-May-20 44.20 19.05 26.18 27.08 0.00 64.31 0.00 0.00 0.00 1.00 1.10 0.30 0.00 0.00 48.36 10.16 241.74
23-May-20 41.33 19.76 29.86 28.34 0.00 53.67 0.82 0.00 0.00 1.71 0.74 1.91 0.00 0.00 40.63 10.93 229.70
24-May-20 40.56 18.35 26.93 26.87 0.00 50.37 0.94 0.00 0.68 2.37 1.55 0.36 0.00 0.00 37.44 11.02 217.44
25-May-20 43.26 22.38 32.16 30.52 0.00 40.70 0.00 0.39 0.05 1.91 1.46 1.80 0.00 0.00 33.89 14.20 222.72
26-May-20 48.50 21.57 34.72 30.26 0.00 32.85 0.00 0.96 0.00 2.96 1.43 1.76 0.00 0.00 33.89 19.43 228.33
27-May-20 43.72 21.47 32.36 28.17 0.00 29.20 0.00 0.86 0.22 2.51 1.38 1.80 0.00 0.00 34.49 20.53 216.71
28-May-20 16.99 14.94 29.01 17.98 0.00 25.77 1.62 0.00 0.00 0.00 1.34 1.58 0.00 0.00 32.17 15.68 157.08
29-May-20 13.94 8.09 16.83 14.87 0.00 21.71 11.84 0.00 0.00 0.00 1.00 0.97 0.00 0.00 36.93 5.82 132.00
30-May-20 19.60 8.25 14.30 20.44 0.00 29.46 9.65 0.00 0.00 0.00 0.86 0.80 0.00 0.00 33.41 5.34 142.11
31-May-20 14.97 5.24 12.37 15.88 0.00 28.80 0.00 0.00 0.00 0.00 0.39 0.36 0.00 0.00 24.25 0.00 102.26
Total 1216.52 640.47 791.13 847.26 0.00 880.36 36.91 2.21 2.53 24.69 26.66 36.32 0.00 0.00 1013.72 175.09 5693.87

29
15.1 Import-Export of NR with WR during May 2020

Export of NR to WR (NR- WR)

Date
NR-WR NR - WR
NR - WR NR-WR NR-WR NR - WR 220 NR - WR
NR-WR NR-WR NR - WR HVDC NR - WR NR - WR NR - WR NR-WR WR - NR 220 WR - NR 220 400 kV 765 kV
765 kV 765 kV 765 kV kV Auraiya - HVDC Total
765 kV 765 kV Champa- HVDC 400 kV Zerda- 400 kV Zerda- 400 kV RAPP C kV Bhanpura - kV Bhanpura - Rihand- Banaskata -
Gwalior - Agra Gwalior-Phagi Jabalpur- Orai Malanpur / Mundra - NR - WR
Satna- Orai Gwalior-Orai Kurukshetra Vindhyachal Kankroli Bhinmal - Shujalpur D/C Ranpur Modak Vindhyachal Chittorgarh
2xS/C 2xS/C D/C Mehgaon M'garh
D/C D/C

1-May-20 0.00 0.00 0.00 0.00 10.30 0.00 2.22 3.73 7.56 1.69 0.00 0.00 1.86 22.15 0.00 3.16 52.67
2-May-20 0.00 0.00 0.00 0.00 8.66 0.00 1.24 3.12 5.57 1.63 0.00 0.00 2.06 22.39 0.00 0.82 45.49
3-May-20 0.00 0.00 0.00 0.00 11.70 0.00 0.00 3.96 6.02 1.97 0.00 0.00 1.63 22.44 0.00 5.63 53.35
4-May-20 0.00 0.00 0.00 0.00 6.63 0.00 0.00 2.65 3.67 2.01 0.00 0.00 0.43 23.03 0.00 0.00 38.42
5-May-20 0.00 0.00 0.00 0.00 9.74 0.00 0.00 2.24 2.13 2.40 0.00 0.00 2.03 22.24 0.00 0.00 40.78
6-May-20 0.00 0.00 0.00 0.00 9.80 0.00 2.31 3.24 2.81 4.92 0.00 0.00 1.22 22.28 0.00 0.00 46.58
7-May-20 0.00 0.00 0.00 0.00 10.53 0.00 2.32 2.92 2.20 3.87 0.00 0.00 1.43 22.35 0.00 0.00 45.62
8-May-20 0.00 0.00 0.00 0.00 11.72 0.00 0.00 2.17 1.95 3.07 0.00 0.00 1.49 22.50 0.00 0.00 42.90
9-May-20 0.00 0.00 0.00 0.00 12.61 0.00 0.74 1.35 1.86 1.72 0.00 0.00 0.97 22.31 0.00 0.00 41.56
10-May-20 0.00 0.00 0.00 0.00 10.18 0.00 3.08 2.80 3.87 1.99 0.00 0.00 1.14 22.80 0.00 0.00 45.86
11-May-20 0.00 0.00 0.00 0.00 11.02 0.00 7.82 2.21 3.02 1.53 0.00 0.00 1.00 21.90 0.00 0.00 48.50
12-May-20 0.00 0.00 0.00 0.00 11.33 0.00 1.27 3.33 4.42 0.89 0.25 0.00 0.47 22.61 0.00 0.73 45.30
13-May-20 0.00 0.00 0.00 0.00 11.04 0.00 1.26 3.95 5.92 0.00 0.00 0.00 0.85 22.94 0.00 2.04 48.00
14-May-20 0.00 0.00 0.00 0.00 10.57 0.00 1.27 3.24 3.29 0.31 0.00 0.00 1.12 22.32 0.00 4.46 46.58
15-May-20 0.00 0.00 0.00 0.00 10.78 0.00 2.52 2.08 1.80 0.00 0.00 0.00 0.65 22.31 0.00 0.00 40.14
16-May-20 0.00 0.00 0.00 0.00 11.56 0.00 4.03 1.10 0.00 0.00 0.00 0.00 0.85 22.87 0.00 0.00 40.41
17-May-20 0.00 0.00 0.00 0.00 10.14 0.00 7.33 0.89 0.11 0.00 0.00 0.00 0.97 22.96 0.00 0.00 42.40
18-May-20 0.00 0.00 0.00 0.00 10.67 0.00 3.47 1.05 0.00 0.00 0.00 0.00 0.53 22.97 0.00 0.00 38.69
19-May-20 0.00 0.00 0.00 0.00 11.71 0.00 0.00 0.89 0.00 0.00 0.00 0.00 0.49 22.92 0.00 0.00 36.01
20-May-20 0.00 0.00 0.00 0.00 12.63 0.00 0.00 1.06 0.00 0.00 1.62 0.00 0.68 22.43 0.00 0.00 38.42
21-May-20 0.00 0.00 0.00 0.00 14.44 0.00 0.00 0.40 0.27 0.00 0.00 0.00 1.10 20.52 0.00 0.00 36.73
22-May-20 0.00 0.00 0.00 0.00 10.69 0.00 0.70 0.74 1.57 0.00 0.00 0.00 1.19 22.94 0.00 0.00 37.83
23-May-20 0.00 0.00 0.00 0.00 10.41 0.00 1.98 0.33 0.17 0.00 0.00 0.00 1.21 22.80 0.00 0.00 36.90
24-May-20 0.00 0.00 0.00 0.00 9.31 0.00 0.56 0.10 0.00 0.00 0.00 0.00 1.38 22.63 0.00 0.00 33.98
25-May-20 0.00 0.00 0.00 0.00 9.60 0.00 2.47 0.00 0.00 0.00 0.00 0.00 1.39 22.79 0.00 0.00 36.25
26-May-20 0.00 0.00 0.00 0.00 9.10 0.00 3.21 0.00 0.27 0.00 0.00 0.00 0.95 22.62 0.00 0.00 36.15
27-May-20 0.00 0.00 0.00 0.00 7.60 0.00 6.03 0.00 0.00 0.00 0.00 0.00 1.27 22.51 0.00 0.00 37.41
28-May-20 0.00 0.00 0.00 0.00 5.59 0.00 4.42 0.29 3.65 0.16 0.00 0.00 1.99 16.20 0.00 0.00 32.30
29-May-20 0.00 0.00 0.00 0.00 2.36 0.00 0.00 1.31 4.21 2.71 0.00 0.00 1.85 14.73 0.00 0.00 27.17
30-May-20 0.00 0.00 0.00 0.00 3.95 0.00 0.00 2.02 2.98 2.71 0.00 0.00 2.16 20.81 0.00 0.00 34.63
31-May-20 0.00 0.00 0.00 0.00 5.76 0.00 1.71 3.81 4.88 4.04 0.00 0.00 2.70 17.50 0.00 5.64 46.04
Total 0.00 0.00 0.00 0.00 302.13 0.00 61.96 56.98 74.20 37.62 1.87 0.00 39.06 676.77 0.00 22.48 1273.07

30
15.2 Import-Export of NR with ER & NER during May 2020
Import of NR from NER
Import of NR from ER (ER-NR)
(NER-NR)

Date
ER - NR 400 ER - NR
ER - NR 765 ER - NR ER - NR ER - NR ER-NR ER - NR ER - NR 132 ER - NR NR - ER
ER - NR 765 ER-NR 400 kV kV 400 kV ER-NR 400 NER-NR
kV Gaya - ER - NR 765 HVDC 400 kV 400 kV 400 kV 220 kV kV 132 kV 132 kV Total Total
kV Sasaram - Patna - Balia Muzaffarpur - Motihari - kV Sasaram - HVDC Biswanath
Varanasi kV Gaya Balia Alipurduar - Biharshariff - Biharshariff - Sasaram - Pusauli - Sahupuri - Rihand - Rihand - ER -NR NER-NR
Fatehpur 2xD/C Gorakhpur Gorakhpur Varanasi Chariali - Agra
2*S/C Agra Balia D/C Varanasi D/C Allahabad Sahupuri Karamnasa Son Nagar Garhwa
D/C D/C

1-May-20 2.30 9.27 5.58 12.09 11.59 5.04 3.63 2.63 5.53 2.16 2.89 0.48 0.00 0.00 63.19 0.00 0.00
2-May-20 2.02 9.29 4.69 10.51 11.20 4.07 3.37 2.29 4.05 2.06 2.94 0.96 0.00 0.00 57.45 0.00 0.00
3-May-20 1.30 2.07 2.85 5.90 9.19 2.16 3.14 0.00 4.42 1.35 3.27 0.48 0.00 0.00 36.13 0.00 0.00
4-May-20 0.00 2.38 3.57 5.79 7.08 2.17 3.06 0.00 4.97 1.00 3.50 0.00 0.00 0.00 33.52 0.00 0.00
5-May-20 3.21 8.47 4.82 11.70 12.05 4.71 3.41 2.44 3.95 1.86 2.62 0.00 0.00 0.00 59.24 0.00 0.00
6-May-20 2.26 8.57 5.39 10.03 11.77 4.70 3.34 2.16 5.48 2.26 2.80 0.00 0.00 0.00 58.76 0.00 0.00
7-May-20 2.19 7.86 4.99 8.72 9.58 4.62 2.89 2.32 3.95 2.00 2.96 2.00 0.00 0.00 54.08 0.00 0.00
8-May-20 4.12 10.90 7.39 11.32 13.93 6.47 3.78 3.55 3.77 2.23 3.18 0.00 0.00 0.00 70.64 0.00 0.00
9-May-20 3.57 11.04 8.27 13.16 11.59 6.17 4.35 3.42 4.01 1.89 3.33 0.48 0.00 0.00 71.28 0.00 0.00
10-May-20 0.00 0.00 4.31 5.70 4.95 2.52 2.81 0.00 6.96 1.33 3.12 0.00 0.00 0.00 31.70 0.00 0.00
11-May-20 2.00 5.62 5.93 7.38 6.30 3.06 3.50 0.07 6.31 1.74 0.01 0.00 0.00 0.00 41.92 0.00 0.00
12-May-20 1.57 7.55 8.15 6.86 7.24 3.53 3.93 0.12 3.93 1.75 2.41 0.00 0.00 0.00 47.04 0.00 0.00
13-May-20 1.01 7.04 6.15 7.02 7.27 3.07 4.04 0.00 6.12 1.30 2.31 0.96 0.71 0.00 47.00 8.14 8.14
14-May-20 0.36 5.03 5.96 0.85 6.73 7.26 2.32 3.58 0.00 6.71 1.36 3.13 0.96 0.00 0.00 44.25 6.53 6.53
15-May-20 0.21 4.96 5.75 7.25 7.61 1.73 4.93 0.00 4.67 1.34 3.51 1.44 0.71 0.00 44.11 9.50 9.50
16-May-20 0.83 6.07 5.71 10.22 9.38 2.16 5.30 0.36 4.41 1.51 3.15 0.00 0.00 0.00 49.10 9.02 9.02
17-May-20 0.00 5.96 5.85 9.41 10.01 2.36 5.36 0.18 7.01 1.16 4.11 0.00 0.00 0.00 51.41 10.83 10.83
18-May-20 0.00 5.78 6.66 9.72 10.84 2.71 5.48 0.00 7.15 1.02 4.26 0.00 0.00 0.00 53.62 7.85 7.85
19-May-20 1.02 7.48 7.87 12.94 11.52 4.28 5.25 0.67 4.55 1.39 3.56 0.96 0.00 0.00 61.49 5.66 5.66
20-May-20 2.95 10.77 7.47 13.51 15.73 5.51 5.73 2.66 3.80 1.70 2.48 0.96 0.00 0.00 73.27 5.68 5.68
21-May-20 5.24 11.79 7.82 3.41 17.57 20.01 8.40 5.77 5.59 5.13 2.55 3.02 1.44 0.00 0.00 97.74 7.84 7.84
22-May-20 3.10 8.73 6.80 6.04 16.68 19.69 7.79 5.48 4.02 5.79 1.86 3.11 0.00 0.00 0.00 89.09 8.13 8.13
23-May-20 3.46 8.06 6.61 9.07 16.71 20.19 7.44 5.82 3.33 3.86 2.02 2.36 0.00 0.00 0.00 88.93 7.32 7.32
24-May-20 0.37 5.11 6.68 17.08 14.76 15.22 6.77 4.93 0.64 6.63 1.49 3.34 0.00 0.00 0.00 83.02 11.51 11.51
25-May-20 2.30 8.22 6.87 14.24 15.65 17.10 7.40 5.30 3.08 4.02 1.95 3.48 1.44 0.00 0.00 91.05 14.32 14.32
26-May-20 2.59 10.28 7.83 11.98 18.47 17.83 5.58 5.72 3.67 3.63 2.31 3.17 0.96 0.00 0.00 94.02 16.76 16.76
27-May-20 2.39 10.53 8.85 14.43 19.51 20.23 6.26 5.51 4.29 3.50 2.41 2.79 0.96 0.00 0.00 101.66 15.51 15.51
28-May-20 1.10 8.09 6.41 7.26 15.39 12.65 5.17 4.63 2.82 5.63 2.12 2.60 0.00 0.00 0.00 73.87 17.89 17.89
29-May-20 0.00 3.83 4.93 9.94 10.95 9.52 3.57 4.74 0.00 6.72 1.50 2.94 0.00 0.00 0.00 58.64 11.85 11.85
30-May-20 0.00 3.22 4.70 9.37 12.82 9.39 3.80 4.57 0.00 6.36 1.61 3.11 0.00 0.00 0.00 58.95 9.97 9.97
31-May-20 0.00 2.99 3.37 9.08 11.04 7.95 2.97 3.98 0.03 4.17 1.78 2.39 0.96 0.00 0.00 50.71 10.73 10.73
Total 51.47 216.96 188.23 112.75 355.51 365.87 138.51 137.33 50.34 157.19 54.01 91.85 15.44 1.42 0.00 1936.88 195.04 195.04

31
15.2 Import-Export of NR with ER & NER during May 2020
Export of NR to NER
Export of NR to ER (NR- ER)
(NR-NER)

Date
NR - ER NR - ER 400 NR - ER
NR - ER NR - ER NR-ER NR - ER NR-ER NR-ER NR - ER NR - ER NR - ER NR-NER
NR - ER 765 NR - ER 765 NR - ER 400 kV 400 kV kV 132 kV
765 kV Gaya HVDC 400 kV 400 kV 400 kV 400 kV 220 kV 132 kV 132 kV Total HVDC Total
kV Sasaram - kV Gaya Muzaffarpur - Motihari - Biharshariff - Rihand -
- Varanasi Alipurduar - Patna - Biharshariff - Sasaram - Sasaram - Pusauli - Sahupuri - Rihand - NR -ER Biswanath NR-NER
Fatehpur Balia Gorakhpur D/C Gorakhpur Varanasi Son
2*S/C Agra Balia 2xD/C Balia D/C Varanasi Allahabad Sahupuri Karamnasa Garhwa Chariali - Agra
D/C D/C Nagar

1-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.58 0.58 1.16 12.05 12.05
2-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.59 0.59 11.96 11.96
3-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.09 0.00 0.00 0.00 0.00 0.57 1.66 11.67 11.67
4-May-20 1.65 0.00 0.00 0.00 0.00 0.00 0.00 1.85 0.00 0.00 0.00 0.96 0.59 0.58 5.63 12.34 12.34
5-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.48 0.42 0.00 0.90 12.07 12.07
6-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.48 0.03 0.00 0.51 11.91 11.91
7-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.19 0.00 0.19 11.95 11.95
8-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.39 0.00 0.39 12.02 12.02
9-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.48 0.00 0.48 12.10 12.10
10-May-20 1.66 4.50 0.00 0.00 0.00 0.00 0.00 1.11 0.00 0.00 0.00 0.00 0.00 0.29 7.56 12.00 12.00
11-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.40 0.40 11.84 11.84
12-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.37 0.37 2.82 2.82
13-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.24 0.00 0.00 0.00 0.00 0.00 0.00 0.24 0.00 0.00
14-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.01 0.00 0.00 0.00 0.00 0.00 0.49 1.50 0.00 0.00
15-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.87 0.00 0.00 0.00 0.00 0.00 0.48 1.35 0.00 0.00
16-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.96 0.54 1.50 0.00 0.00
17-May-20 0.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.44 0.55 2.24 0.00 0.00
18-May-20 0.42 0.00 0.00 0.00 0.00 0.00 0.00 0.36 0.00 0.00 0.00 0.96 0.54 2.28 0.00 0.00
19-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.57 0.55 1.12 0.00 0.00
20-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.56 0.55 1.11 0.00 0.00
21-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.56 0.56 0.00 0.00
22-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.50 0.50 0.00 0.00
23-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.55 0.55 0.00 0.00
24-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.54 0.54 0.00 0.00
25-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.61 0.61 0.00 0.00
26-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.57 0.57 0.00 0.00
27-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.45 0.45 0.00 0.00
28-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.44 0.42 0.00 1.86 0.00 0.00
29-May-20 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.70 0.00 0.00 0.00 0.96 0.43 0.00 3.54 0.00 0.00
30-May-20 1.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.70 0.00 0.00 0.00 0.96 0.55 0.00 3.32 0.00 0.00
31-May-20 0.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.19 0.00 0.79 0.00 0.00
Total 7.14 4.50 0.00 0.00 0.00 0.00 0.00 0.00 7.93 0.00 0.00 0.00 8.64 7.59 8.67 44.47 134.73 134.73

32
15.3 Import and Export of ER with WR & NER during April 2020
Export of WR to ER (WR-ER) Import of WR from ER (ER - WR) Export of ER to NER (ER-NER) Import of ER from NER (NER-ER)

Date WR - ER 765 ER-WR


WR - ER WR - ER ER - WR ER-WR ER - WR ER - WR ER - NER ER - NER 400 ER - NER NER - ER NER - ER 400 NER - ER
kV WR - ER 765 WR - ER WR - ER 220 765 kV ER - WR 400 ER - WR
765 kV 400 kV WR - ER 220 765 kV 765 kV 400 kV 220 kV 400 kV kV 220 kV 400 kV kV 220 kV
Dharamjayga kV Durg - 400 kV kV Korba - Total WR - Dharamjayg kV Raigarh - 220 kV Total ER - Total ER - Total NER -
Dharamjayg Raigarh - kV Raigarh - Dharamjayg Durg - Sipat - Korba - Binaguri - Alipurduar - Birpara - Binaguri - Alipurduar - Birpara -
rh - Jharsuguda Sipat - Budhipadar ER arh - Jharsuguda- Raigarh - WR NER ER
arh - Ranchi Jharsuguda- Budhipadar arh - Ranchi Jharsuguda Ranchi Budhipada Bongaigaon Bongaigaon Salakati Bongaigaon Bongaigaon Salakati
Jharsuguda D/C Ranchi D/C D/C Jharsuguda 2xD/C Budhipadar
2xS/C 2xD/C 2xS/C D/C D/C r D/C D/C D/C D/C D/C 2xD/C D/C
Q/C D/C

1-May-20 2.0 13.8 0.0 1.2 0.0 1.5 0.0 18.61 0.5 0.0 7.0 0.2 3.7 0.0 2.1 13.51 0.00 0.00 0.00 0.00 5.91 6.88 1.19 13.97
2-May-20 1.6 17.6 0.0 1.2 0.0 2.2 0.0 22.59 0.9 0.0 6.0 0.4 3.4 0.0 1.9 12.68 0.00 0.00 0.00 0.00 5.96 6.31 1.03 13.31
3-May-20 3.1 24.4 0.0 2.5 0.4 2.2 0.0 32.58 0.9 0.0 5.5 0.3 1.7 0.0 2.1 10.60 0.00 0.00 0.00 0.00 5.21 6.70 1.06 12.97
4-May-20 6.1 22.3 0.0 4.1 0.7 2.3 0.0 35.65 0.1 0.0 4.6 0.0 0.5 0.0 2.0 7.19 0.00 0.00 0.02 0.02 4.17 4.59 0.65 9.42
5-May-20 1.8 12.9 0.0 1.2 0.0 1.4 0.0 17.32 1.4 0.1 6.7 0.7 2.1 0.0 2.5 13.43 0.00 0.13 0.14 0.27 4.49 4.39 0.65 9.54
6-May-20 3.0 13.3 0.0 2.4 0.0 1.1 0.0 19.78 1.0 0.0 6.1 0.4 2.4 0.1 2.3 12.42 0.00 0.00 0.01 0.01 4.82 5.37 0.89 11.08
7-May-20 4.7 19.1 0.0 2.8 0.1 1.8 0.0 28.50 0.5 0.0 6.3 0.2 1.6 0.0 1.5 10.13 0.00 0.00 0.06 0.06 3.34 3.68 0.50 7.53
8-May-20 3.3 13.0 0.0 2.1 0.1 2.0 0.0 20.49 0.9 0.0 7.8 0.3 1.9 0.0 1.9 12.81 0.00 0.00 0.00 0.00 5.08 5.76 0.89 11.73
9-May-20 4.9 15.0 0.0 3.1 0.4 2.1 0.0 25.54 0.1 0.0 6.4 0.0 0.9 0.0 1.6 9.12 0.00 0.00 0.00 0.00 4.27 5.66 0.91 10.84
10-May-20 9.6 25.2 0.3 5.9 1.9 3.5 0.0 46.34 0.0 0.0 3.4 0.0 0.2 0.0 0.8 4.44 0.00 0.03 0.03 0.07 2.90 3.48 0.57 6.95
11-May-20 8.2 29.5 0.4 5.1 2.2 3.9 0.0 49.38 0.0 0.0 0.5 0.0 0.1 0.0 0.8 1.38 0.00 0.01 0.03 0.04 3.12 3.14 0.49 6.76
12-May-20 16.3 19.0 0.3 5.9 1.8 3.2 0.0 46.49 0.0 0.0 1.3 0.0 0.2 0.0 1.1 2.59 2.58 3.97 0.67 7.22 1.63 1.88 0.33 3.84
13-May-20 15.0 21.4 0.2 5.6 1.6 3.1 0.0 46.75 0.0 0.0 1.2 0.0 0.2 0.0 1.3 2.67 2.43 4.91 0.77 8.12 0.03 0.01 0.03 0.07
14-May-20 13.5 22.9 0.3 5.1 0.8 2.9 0.0 45.51 0.0 0.0 1.7 0.0 0.4 0.0 1.2 3.25 1.98 3.71 0.60 6.29 0.21 0.08 0.04 0.34
15-May-20 15.5 28.8 0.8 6.1 1.9 2.5 0.0 55.55 0.0 0.0 0.3 0.0 0.1 0.0 1.0 1.38 3.18 6.81 1.06 11.05 0.00 0.00 0.00 0.00
16-May-20 15.2 21.0 0.8 5.9 1.7 2.5 0.0 47.15 0.0 0.0 0.5 0.0 0.2 0.0 0.8 1.60 1.29 5.24 0.83 7.36 0.19 0.00 0.00 0.19
17-May-20 13.3 17.5 0.5 5.7 1.6 2.3 0.0 40.93 0.0 0.0 1.3 0.0 0.1 0.0 1.0 2.48 2.77 6.03 1.12 9.91 0.54 0.09 0.04 0.67
18-May-20 14.2 13.6 0.2 6.0 1.4 2.8 0.0 38.15 0.0 0.0 0.7 0.0 0.2 0.0 1.0 2.02 3.44 8.15 1.56 13.15 0.00 0.00 0.00 0.00
19-May-20 10.2 7.3 0.0 4.9 0.3 2.2 0.0 24.88 0.0 0.0 2.0 0.0 0.6 0.0 1.4 4.02 2.80 8.91 1.71 13.42 0.00 0.00 0.00 0.00
20-May-20 3.6 14.9 0.0 2.5 1.2 1.0 0.0 23.19 0.6 0.0 1.9 0.0 0.3 0.0 2.4 5.32 1.55 5.43 1.04 8.01 0.17 0.00 0.00 0.17
21-May-20 1.3 23.9 0.1 1.1 1.0 1.5 0.0 28.89 4.2 0.0 1.4 0.3 0.4 0.0 2.0 8.42 0.22 4.66 0.73 5.62 1.05 0.00 0.00 1.05
22-May-20 4.5 25.5 0.6 2.9 1.2 2.5 0.0 37.15 0.7 0.0 0.7 0.0 0.3 0.0 1.2 2.89 0.52 3.19 0.66 4.37 1.67 0.37 0.09 2.13
23-May-20 6.3 24.6 0.7 3.2 0.6 2.5 0.0 37.81 0.1 0.0 0.5 0.0 0.3 0.0 1.3 2.20 0.73 1.55 0.43 2.71 2.26 0.41 0.07 2.74
24-May-20 10.2 21.7 0.6 4.1 0.3 2.0 0.0 38.95 0.0 0.0 0.8 0.0 0.7 0.0 1.5 3.14 2.63 3.52 0.86 7.01 0.76 1.17 0.10 2.02
25-May-20 7.7 26.4 0.6 3.5 0.5 2.4 0.0 41.15 0.1 0.0 0.6 0.0 0.5 0.0 1.3 2.47 1.50 2.99 0.88 5.36 0.04 0.00 0.00 0.04
26-May-20 10.2 30.4 1.3 3.8 0.6 2.4 0.0 48.78 0.0 0.0 0.3 0.0 0.4 0.0 1.1 1.73 1.18 2.55 0.60 4.34 0.43 0.27 0.02 0.72
27-May-20 6.4 30.5 1.3 2.8 0.2 2.0 0.0 43.21 0.5 0.0 0.2 0.1 1.0 0.0 1.1 2.97 1.82 2.84 0.58 5.23 0.61 0.34 0.10 1.05
28-May-20 6.5 31.8 2.0 3.2 0.2 2.0 0.0 45.78 0.0 0.0 0.0 0.0 0.8 0.0 1.0 1.80 2.10 5.28 1.04 8.43 0.19 0.53 0.01 0.72
29-May-20 7.6 31.3 0.7 3.4 1.0 2.2 0.0 46.06 0.2 0.0 0.5 0.0 0.7 0.0 1.1 2.48 1.81 2.39 0.65 4.85 1.14 2.00 0.19 3.33
30-May-20 4.6 25.0 0.1 2.4 0.7 2.4 0.0 35.29 1.0 0.0 1.9 0.1 0.8 0.0 1.3 5.01 1.44 2.21 0.62 4.28 0.33 0.28 0.00 0.62
31-May-20 4.6 25.7 0.2 2.2 0.5 2.2 0.0 35.29 2.7 0.0 1.7 0.6 1.7 0.0 1.3 7.89 0.71 1.26 0.43 2.40 0.63 0.97 0.06 1.66
Total 234.93 669.41 11.99 112.15 24.85 70.37 0.01 1123.72 16.56 0.13 80.11 3.72 28.51 0.11 44.92 174.07 36.70 85.79 17.12 139.61 61.16 64.39 9.92 135.47

33
15.4 Import and Export of SR with ER & WR during MAY 2020

Export of ER to SR (ER - SR) Import of ER from SR (SR - ER) Export of WR to SR (WR-SR) Import of WR from SR (SR - WR)
Date
SR-ER WR-SR SR - WR SR-WR
ER-SR SR - ER WR - SR WR-SR SR-WR 400KV
ER - SR HVDC ER - SR HVDC Total SR - ER 765 kV Angul- Total WR - SR 400KV Total SR - WR HVDC 765 kV Raichur 765 kV Total
765 kV Angul- HVDC 765 kV Sholapur 765 kV Wardha - Kolhapur-Kudgi
Gazuwaka Talchar -Kolar ER - SR HVDC Talchar - Srikakulam SR - ER HVDC Bhadrawati Kolhapur-Kudgi WR - SR Bhadrawati - Sholapur Wardha - SR - WR
Srikakulam D/C Gazuwaka - Raichur 2xS/C Nizamabad D/C D/C
D/C D/C 2xS/C Nizamabad D/C

1-May-20 7.46 38.49 57.70 103.65 0.00 0.00 0.00 0.00 19.28 28.00 20.52 2.01 69.82 0.00 0.13 0.00 1.21 1.33

2-May-20 6.65 41.61 62.36 110.61 0.00 0.00 0.00 0.00 20.57 33.40 23.34 2.74 80.06 0.00 0.00 0.00 0.82 0.82

3-May-20 6.20 41.26 61.81 109.28 0.00 0.00 0.00 0.00 18.37 34.21 25.17 1.52 79.28 0.00 0.00 0.00 1.03 1.03

4-May-20 6.19 49.44 61.53 117.15 0.00 0.00 0.00 0.00 23.11 30.59 22.87 1.49 78.06 0.00 0.00 0.00 1.58 1.58

5-May-20 6.18 48.05 62.60 116.83 0.00 0.00 0.00 0.00 23.33 31.48 22.12 1.37 78.30 0.00 0.00 0.00 0.97 0.97

6-May-20 6.19 48.05 65.68 119.92 0.00 0.00 0.00 0.00 23.34 33.69 24.16 2.23 83.43 0.00 0.00 0.00 0.94 0.94

7-May-20 6.18 50.12 69.18 125.49 0.00 0.00 0.00 0.00 23.33 35.91 24.78 0.76 84.78 0.00 0.00 0.00 1.16 1.16

8-May-20 6.18 48.04 68.10 122.32 0.00 0.00 0.00 0.00 23.30 34.52 22.89 0.89 81.60 0.00 0.00 0.00 1.53 1.53

9-May-20 6.18 49.20 66.75 122.13 0.00 0.00 0.00 0.00 18.54 35.63 23.32 1.83 79.31 0.00 0.00 0.00 1.24 1.24

10-May-20 7.92 49.60 63.05 120.57 0.00 0.00 0.00 0.00 23.56 35.53 22.98 1.87 83.93 0.00 0.00 0.00 1.66 1.66

11-May-20 8.63 52.46 66.23 127.32 0.00 0.00 0.00 0.00 23.57 34.08 23.44 1.44 82.52 0.00 0.00 0.00 1.59 1.59

12-May-20 8.62 48.71 63.89 121.22 0.00 0.00 0.00 0.00 23.47 24.05 19.22 2.01 68.75 0.00 0.07 0.00 1.71 1.78

13-May-20 8.63 49.38 67.39 125.40 0.00 0.00 0.00 0.00 23.63 28.39 21.45 0.89 74.36 0.00 0.00 0.00 1.23 1.23

14-May-20 7.76 48.03 66.52 122.31 0.00 0.00 0.00 0.00 22.72 29.14 22.52 1.32 75.70 0.00 0.00 0.00 1.50 1.50

15-May-20 7.30 48.77 64.86 120.94 0.00 0.00 0.00 0.00 19.37 30.59 23.85 1.02 74.83 0.00 0.00 0.00 1.33 1.33

16-May-20 7.99 48.82 62.43 119.24 0.00 0.00 0.00 0.00 19.08 30.73 22.42 0.48 72.71 0.00 0.00 0.00 1.25 1.25

17-May-20 8.65 33.81 53.85 96.31 0.00 0.00 0.00 0.00 19.89 24.76 18.88 1.23 64.76 0.00 0.00 0.00 1.61 1.61

18-May-20 8.65 24.14 52.79 85.59 0.00 0.00 0.00 0.00 12.03 15.78 18.46 0.67 46.93 0.00 0.15 0.00 3.42 3.57

19-May-20 8.59 24.15 48.71 81.46 0.00 0.00 0.00 0.00 12.36 9.90 16.08 0.00 38.33 0.00 2.92 0.00 8.96 11.88

20-May-20 8.86 28.56 51.54 88.97 0.00 0.00 0.00 0.00 15.73 18.22 19.36 0.03 53.34 0.00 0.75 0.00 6.83 7.58

21-May-20 9.98 48.05 59.28 117.30 0.00 0.00 0.00 0.00 14.29 32.84 23.39 0.25 70.77 0.00 0.00 0.00 2.83 2.83

22-May-20 9.98 48.01 58.08 116.06 0.00 0.00 0.00 0.00 14.07 30.14 22.72 0.12 67.05 0.00 0.00 0.00 3.75 3.75

23-May-20 9.98 48.02 57.51 115.51 0.00 0.00 0.00 0.00 21.03 30.58 21.89 0.19 73.68 0.00 0.00 0.00 3.24 3.24

24-May-20 9.99 31.43 54.72 96.14 0.00 0.00 0.00 0.00 23.49 24.45 19.84 0.02 67.80 0.00 0.00 0.00 3.30 3.30

25-May-20 9.99 37.71 55.92 103.62 0.00 0.00 0.00 0.00 23.50 26.31 20.18 0.23 70.23 0.00 0.00 0.00 3.18 3.18

26-May-20 9.98 38.48 54.15 102.61 0.00 0.00 0.00 0.00 21.12 21.27 19.56 0.01 61.96 0.00 0.00 0.00 5.39 5.39

27-May-20 9.98 42.15 56.51 108.64 0.00 0.00 0.00 0.00 19.33 22.23 21.72 0.02 63.30 0.00 0.06 0.00 6.49 6.55

28-May-20 9.99 48.05 52.57 110.61 0.00 0.00 0.00 0.00 12.86 18.96 21.65 0.00 53.47 0.00 0.98 0.00 6.78 7.75

29-May-20 10.00 48.06 52.54 110.60 0.00 0.00 0.00 0.00 12.16 18.35 21.45 0.01 51.96 0.00 0.00 0.00 6.17 6.17

30-May-20 9.98 48.06 54.20 112.23 0.00 0.00 0.00 0.00 12.16 22.37 21.89 0.06 56.48 0.00 0.53 0.00 3.86 4.39

31-May-20 9.15 40.46 51.65 101.27 0.00 0.00 0.00 0.00 11.66 20.05 18.89 0.00 50.60 0.00 1.13 0.00 5.90 7.03

TOTAL 258.00 1349.18 1844.12 3451.30 0.00 0.00 0.00 0.00 594.23 846.15 671.01 26.69 2138.07 0.00 6.71 0.00 92.45 99.17

34
16. भूटान , नेपाल, बाांग्लादे श एवां म्यान्मार के साथ अांतरराष्ट्रीय ववद् युत वववनमय
INTERNATIONAL EXCHANGE WITH BHUTAN, NEPAL BANGLADESH AND MYANMAR

अप्रैल 2020 से मार्च 2021 April 2020 to March 2021


अांतरराष्ट्रीय विद् यु त विवनमय [भारत से दू सरे दे श को आयात (+) / वनयाात (-) ]
Transnational Exchange (Import=(+ve) /Export =(-ve))

भूटान BHUTAN नेपाल NEPAL बाां ग्लादे श BANGLADESH म्यान्मार MYANMAR


Energy Energy Energy Energy
माह MONTH
Exchange Exchange Exchange Exchange
(In MU) (In MU) (In MU) (In MU)
अप्रैल 2020 APR'20 260.07 -61.15 -408.56 -0.72
मई 2020 MAY'20 838.57 -20.95 -585.83 -0.77
कुल Total 1098.64 -82.10 -994.39 -1.49
* Based on daily operational data

35
16.1 Import from neighbouring countries during May 2020
(All figures in MU)
Import from
Date Import from Bhutan Import from Bangladesh Import from Nepal
Myanmar
400 kV 400 kV
400 kV Tala- 400 kV 220 kV 220 kV 132 kV 132 kV 132 kV 132 kV 220 kV
Jigmeling- Behrampur- From BIHAR 11 kV Moreh-
Binaguri I,II Binaguri- Birpara- Birpara- Rangia- Salakati- Surjyamaninagar- Tanakpur- Muzaffarpur-
Alipurdwar Bheramara Source Tamu
& IV Malbase Chuka D/C Malbase Motanga Gelephu Comilla D/C Mahendranagar Dhalkebar
D/C D/C
1-May-20 4.52 1.92 3.73 0.00 5.50 0.67 0.25 0.00 0.00 0.00 0.00 0.00 0.00
2-May-20 5.68 2.49 4.40 0.00 5.79 0.46 0.36 0.00 0.00 0.00 0.00 0.00 0.00
3-May-20 5.82 2.53 4.71 0.00 6.12 0.80 0.23 0.00 0.00 0.00 0.00 0.00 0.00
4-May-20 6.35 2.73 4.65 0.00 7.11 0.82 0.28 0.00 0.00 0.00 0.00 0.00 0.00
5-May-20 6.67 2.96 4.94 0.00 9.53 0.75 0.18 0.00 0.00 0.00 0.00 0.00 0.00
6-May-20 5.92 2.58 4.39 0.00 8.08 0.67 0.13 0.00 0.00 0.00 0.00 0.00 0.00
7-May-20 4.93 2.11 3.54 0.00 6.21 0.57 0.31 0.00 0.00 0.00 0.00 0.00 0.00
8-May-20 4.86 2.09 3.96 0.00 8.29 0.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9-May-20 4.10 1.69 2.57 0.00 5.64 0.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10-May-20 4.18 1.77 1.42 0.00 5.76 0.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11-May-20 4.21 1.80 1.27 0.00 5.81 0.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12-May-20 5.82 0.00 1.12 0.00 4.74 0.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13-May-20 6.84 0.00 0.98 0.00 5.47 0.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14-May-20 7.17 0.00 1.04 0.00 5.53 0.59 0.03 0.00 0.00 0.00 0.00 0.00 0.00
15-May-20 7.67 0.00 1.39 0.00 7.98 0.86 0.12 0.00 0.00 0.00 0.00 0.00 0.00
16-May-20 6.87 3.07 2.27 0.11 10.76 0.88 0.13 0.00 0.00 0.00 0.00 0.00 0.00
17-May-20 6.66 2.97 2.44 0.12 8.37 1.05 0.22 0.00 0.00 0.00 0.00 0.00 0.00
18-May-20 6.71 2.98 2.54 0.25 10.02 1.08 0.17 0.00 0.00 0.00 0.00 0.00 0.00
19-May-20 6.70 2.88 2.39 0.20 10.03 0.97 0.19 0.00 0.00 0.00 0.00 0.00 0.00
20-May-20 6.19 2.75 2.19 0.00 10.59 1.08 1.00 0.00 0.00 0.00 0.00 0.00 0.00
21-May-20 17.41 6.11 4.21 0.75 17.82 1.13 1.13 0.00 0.00 0.00 0.00 0.00 0.00
22-May-20 19.52 6.12 4.37 0.81 17.28 1.05 1.04 0.00 0.00 0.00 0.00 0.00 0.00
23-May-20 19.56 6.12 4.47 0.90 18.09 1.08 0.89 0.00 0.00 0.00 0.00 0.00 0.00
24-May-20 19.27 5.96 4.13 0.95 17.24 1.00 0.62 0.00 0.00 0.00 0.00 0.00 0.00
25-May-20 19.30 6.05 3.76 0.82 16.26 0.92 0.59 0.00 0.00 0.00 0.00 0.00 0.00
26-May-20 18.39 5.45 3.49 0.58 14.72 1.05 0.65 0.00 0.00 0.00 0.00 0.00 0.00
27-May-20 15.05 4.64 3.57 0.66 16.56 1.11 0.63 0.00 0.00 0.00 0.00 0.00 0.00
28-May-20 14.62 1.58 3.51 0.74 11.58 1.04 0.52 0.00 0.00 0.00 0.00 0.00 0.00
29-May-20 13.52 0.91 3.41 0.66 9.70 1.07 0.52 0.00 0.00 0.00 0.00 0.00 0.00
30-May-20 11.19 3.44 3.52 0.15 10.49 1.02 0.54 0.00 0.00 0.00 0.00 0.00 0.00
31-May-20 10.05 3.14 3.75 0.00 10.22 1.11 0.60 0.00 0.00 0.00 1.00 0.00 0.00
Total 295.75 88.83 98.13 7.70 307.28 25.45 11.33 0.00 0.00 0.00 1.00 0.00 0.00
*Based on SEM/Energy meter data for links where available

36
16.2 Export to neighbouring countries during May 2020
(All figures in MU)
Export to
Date Export to Bhutan Export to Bangladesh Export to Nepal
Myanmar
400 kV 400 kV
400 kV Tala- 400 kV 220 kV 220 kV 132 kV 132 kV 132 kV 220 kV
Jigmeling- Behrampur- 132 kV Tanakpur- From BIHAR 11 kV Moreh-
Binaguri I,II Binaguri- Birpara- Birpara- Rangia- Salakati- Surjyamaninagar- Muzaffarpur-
Alipurdwar Bheramara Mahendranagar Source Tamu
& IV Malbase Chuka D/C Malbase Motanga Gelephu Comilla D/C Dhalkebar
D/C D/C
1-May-20 0.00 0.00 0.00 1.74 0.00 0.00 0.00 9.18 2.23 0.00 0.16 0.14 0.02
2-May-20 0.00 0.00 0.00 1.83 0.00 0.00 0.00 10.83 2.30 0.00 0.12 0.05 0.02
3-May-20 0.00 0.00 0.00 1.75 0.00 0.00 0.00 10.91 2.37 0.00 0.40 0.08 0.02
4-May-20 0.00 0.00 0.00 1.51 0.00 0.00 0.00 10.98 2.65 0.00 0.47 0.07 0.02
5-May-20 0.00 0.00 0.00 1.72 0.00 0.00 0.00 10.81 2.92 0.00 0.18 0.06 0.03
6-May-20 0.00 0.00 0.00 1.70 0.00 0.00 0.00 10.69 2.12 0.00 0.20 0.05 0.02
7-May-20 0.00 0.00 0.00 1.46 0.00 0.00 0.00 10.45 1.61 0.04 0.14 0.13 0.02
8-May-20 0.00 0.00 0.00 1.67 0.00 0.00 0.05 17.53 2.20 0.00 0.24 0.06 0.03
9-May-20 0.00 0.00 0.00 1.22 0.00 0.00 0.11 16.54 2.28 0.00 0.28 0.18 0.03
10-May-20 0.00 0.00 0.00 0.22 0.00 0.00 0.13 17.70 3.08 0.00 0.33 0.31 0.02
11-May-20 0.00 0.00 0.00 0.22 0.00 0.00 0.11 17.61 3.61 0.00 0.51 0.60 0.03
12-May-20 0.00 0.18 0.00 0.42 0.00 0.00 0.03 18.68 3.67 0.00 0.41 2.70 0.03
13-May-20 0.00 1.09 0.00 0.58 0.00 0.00 0.04 18.66 3.54 0.00 0.41 1.40 0.02
14-May-20 0.00 0.94 0.00 0.56 0.00 0.00 0.00 18.89 3.40 0.17 0.30 0.94 0.02
15-May-20 0.00 0.36 0.00 0.49 0.00 0.00 0.00 22.08 2.90 0.00 0.32 0.30 0.00
16-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.34 3.42 0.00 0.22 0.15 0.02
17-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.30 3.87 0.17 0.32 0.07 0.03
18-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.30 3.83 0.18 0.31 0.25 0.03
19-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.19 3.61 0.18 0.26 0.20 0.03
20-May-20 0.00 0.00 0.00 0.02 0.00 0.00 0.00 8.16 2.48 0.00 0.24 0.43 0.03
21-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.16 2.33 0.19 0.23 0.12 0.03
22-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.31 3.30 0.15 0.18 0.13 0.03
23-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.68 3.48 0.06 0.20 0.17 0.03
24-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.36 3.29 0.24 0.07 0.60 0.03
25-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.64 3.12 0.24 0.12 0.14 0.03
26-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21.95 2.91 0.24 0.38 0.37 0.03
27-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.61 1.87 0.21 0.26 0.17 0.02
28-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.27 2.27 0.00 0.24 0.08 0.02
29-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.77 2.53 0.29 0.22 0.16 0.02
30-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.06 2.66 0.12 0.05 0.10 0.02
31-May-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.14 3.01 0.09 0.19 0.06 0.02
Total 0.00 2.57 0.00 17.11 0.00 0.00 0.47 494.78 88.84 2.57 7.95 10.27 0.77
*Based on SEM/Energy meter data for links where available

37
17. एसटीओए (दिपक्षीय एर्वों सामूदहक) एर्वों डी एस एम दिदलोंग का ब्य रा – माह मई 2020
STOA (BILATERAL AND COLLECTIVE) & DSM BILLING DETAILS - MAY 2020

दिपक्षीय एसटीओए BILATERAL SHORT TERM OPEN ACCESS

मई 2020 MAY'2020 Apr-Mar'21

अनुम ददत ऊर्ाा


लेन – दे न ों की सोंख्या लेन – दे न ों की सोंख्या अनुम ददत ऊर्ाा
क्षे.भा.प्रे .के. का नाम (दम.यु .) Energy
No. of No. of (दम.यु .) Energy
Name of RLDC Units
Transactions Transactions Approved (MU)
Approved(MU)

ऊ. क्षे. NR 593 1123 908 1320


प.क्षे. WR 83 409 179 905
द.क्षे. SR 350 1454 462 1864
पू .क्षे. ER 205 495 367 2345
पूर्वोत्तर क्षे. NER 51 65 71 168
कुल TOTAL 1282 3546 1987 6602

एसटीओए SHORT TERM OPEN ACCESS

सामूदहक एसटीओए Collective STOA दिपक्षीय एसटीओए Bilateral STOA

क्रेताओों / दर्वक्रेताओों की अनुम ददत ऊर्ाा क्रेताओों / दर्वक्रेताओों की अनुम ददत ऊर्ाा
माह MONTH स. NO. of (दम.यु .) Approved स. NO. of (दम.यु .) Approved
Buyers/Sellers Energy (MU) Buyers/Sellers Energy (MU)

अप्रैल 2020 Apr'20 2458 3692 705 3056


मई 2020 May'20 2922 5596 1282 3546
कुल TOTAL 5380 9288 1987 6602

अनोंदतम आँ कड़े
मादसक डी एस एम दिदलोंग का ब्य रा 2020-21
Provisional data
MONTHLY DSM BILLING DETAILS 2020-21
subject to change

कर ड़ रु. मे (RS. IN CRORES)


पूर्वोत्तर क्षेत्र NORTH
क्षेत्र REGION उत्तरी क्षेत्र NORTH पदिमी क्षेत्र WEST ददक्षणी क्षेत्र SOUTH पूर्वी क्षेत्र EAST
EAST
20.04.20 to 26.04.20 57.06 27.83 11.90 53.24 ---
27.04.20 to 03.05.20 65.03 45.11 13.37 59.86 ---
04.05.20 to 10.05.20 77.71 46.30 20.66 57.71 ---
11.05.20 to 17.05.20 55.82 49.66 10.78 35.17 ---
18.05.20 to 24.05.20 37.72 32.64 12.58 21.70 ---

38
18. पािि माकेट की िूचना ( स्रोत : आई.ई.एक्स. एिं पी.एक्स.आई.एल.)
POWER MARKET INFORMATION ( Source IEX & PXIL)
पािि एक्स्चेंज के माध्यम िे विवनमय – माह मई 2020
EXCHANGES THROUGH POWER EXCHANGES - MAY 2020
पािि एक्स्चेंज के माध्यम िे ( वम.यु. मे )
क्र. ि. S. No. क्षेत्रीय इकाई Regional Entity क्षेत्र Region Through Power Exchange in MU
विक्रय Sale क्रय Purchase
1 पंजाब Punjab 0.00 788.69
2 हरियाणा Haryana 12.03 136.88
3 िाजस्थान Rajasthan 17.21 117.00
4 विल्ली Delhi 92.78 73.24
5 उत्ति प्रिे श Uttar Pradesh 238.16 134.26
6 उत्तिाखंड Uttarakhand 95.50 23.51
7 वहमाचल प्रिे श Himachal Pradesh 382.29 19.37
8 जम्मू औि कश्मीि J & K 386.05 2.20
9 केंद्र शावित चंडीगढ़ UT Chandigarh 38.28 0.53
10 ए डी हाइडरो AD Hydro 43.09 0.00
11 किचम िांगतू KW 45.65 0.00
12 श्री िीमेंट Shree Cement 0.00 0.00
13 नाथ्पा झाकिी Nathpa Jhakri 0.69 0.00
14 बैिािूल Baira Siul HEP(BS0) 0.00 0.00
15 चमेिा -1 Chamera-I HEP(CM1) 0.00 0.00
16 चमेिा -2 Chamera-II HEP(CM2) 0.00 0.00
17 धौलीगंगा Dhauliganga HEP(DG0) 0.00 0.00
18 िु लहस्ती Dulahasti HEP(DU0) 0.00 0.00
19 िलाल Salal HEP(SL0) 0.00 0.00
20 िेिा -2 Sewa-II NHPC(SW2) 0.00 0.00
21 टनकपुि Tanakpur HEP(TP0) 0.00 0.00
22 उिी Uri HEP(UR0) 0.00 0.00
23 लांको बुवधल LANCO Budhil 3.51 0.00
24 चमेिा-3 chamera 3 0.00 0.00
उत्तिी क्षेत्र NR
25 अिानी एचिीडीिी ADANI HVDC(N0RGU0) 0.00 0.00
26 मलाना MALANA 0.00 0.00
27 उिी-II Uri-II HEP(UR2) 0.00 0.00
28 पाबबवत-III Parbati-III 0.00 0.00
29 विंगिौली Singrauli 0.00 0.00
30 िाििी-I Dadri stage-I 0.00 0.00
31 िाििी-II Dadri stage-II 0.00 0.00
32 ऊंचाहाि-I Unchahar-I TPS 0.00 0.00
33 ऊंचाहाि-II Unchahar-II TPS 0.00 0.00
34 ऊंचाहाि-III Unchahar-III TPS 0.00 0.00
35 रिहंि-I Rihand STPS-I 0.00 0.00
36 रिहंि-II Rihand STPS-II 0.00 0.00
37 रिहंि-III Rihand STPS-III 0.00 0.00
38 एपीिीपीएल झज्जि APCPL Jhajjar 0.00 0.00
39 िेंज Sainj HEP 36.37 0.00
40 िाििी गैि Dadri GPP 0.00 0.00
41 औिै या गैि NTPC Auraiya 0.00 0.00
42 वकशनगंगा Kishanganga HEP 0.00 0.00
43 अंता गैि NTPC Anta 0.00 0.00
44 िामपुि एचईपी RAMPUR HEP 0.44 0.00
45 ऊंचाहाि-IV UNCHAHAR-IV 0.00 0.00
46 एनटीपीिी कोलडाम NTPC KOLDAM 0.00 0.00
47 कोटे श्वि Koteshwar 0.00 0.00
48 वकलाज िोलि Kilaj Solar 10.03 0.00

39
18. पािि माकेट की िूचना ( स्रोत : आई.ई.एक्स. एिं पी.एक्स.आई.एल.)
POWER MARKET INFORMATION ( Source IEX & PXIL)
पािि एक्स्चेंज के माध्यम िे विवनमय – माह मई 2020
EXCHANGES THROUGH POWER EXCHANGES - MAY 2020
पािि एक्स्चेंज के माध्यम िे ( वम.यु. मे )
क्र. ि. S. No. क्षेत्रीय इकाई Regional Entity क्षेत्र Region Through Power Exchange in MU
विक्रय Sale क्रय Purchase
49 मध्य प्रिे श MP 41.80 25.47
50 महािाष्ट्र Maharashtra 1.21 1366.23
51 गुजिात Gujarat 14.45 818.80
52 छत्तीिगढ़ Chhattisgarh 243.13 3.00
53 गोिा Goa 19.84 5.78
54 िमन औि िीि Daman and Diu 0.00 0.06
55 िाििा औि नगि हिेली Dadra & Nagar Haveli 6.29 0.97
56 वजंिल Jindal 65.60 0.00
57 लांको अमिकंटक LANCO AMK 0.00 0.00
58 आयबन कोल ACB India Limited 50.01 0.00
59 वजंिल स्टील एं ड पािि Jindal Steel and Power Ltd 0.00 0.00
60 बालको -2 Balco-II 1.10 0.00
61 स्टिलाइट Sterlite(w3rse0) 0.00 0.00
62 एमको EMCO 0.00 0.00
63 िन्दना विि् युत VANDANA VIDYUT 0.00 0.00
64 एस्साि पािि ESSAR POWER 140.06 0.00
65 एस्साि स्टील ESSAR STEEL 0.00 0.00
66 के एि के महानिी KSK Mahanadi 0.00 0.00
67 वजंिल स्टे ज -II Jindal Stg-II 71.23 0.00
68 कोिबा (प.) Korba(W) Comp. Ltd. 105.86 0.00
69 डी बी पािि D B Power 99.83 0.00
70 धािीिाल Dhariwal 0.10 0.00
71 जे पी वनग्री Jaypee Nigire 249.53 0.00
72 जी एम आि छत्तीिगढ़ GMR Chhattisgarh 0.00 0.00
उत्तिी क्षेत्र NR
73 डी जीईएन मेगा पािि DGEN Mega Power 116.95 0.00
74 एम बी मेगा पािि MB Power 66.66 0.00
75 एपीएल मुंद्रा स्टे ज-I APL Mundra Stg-I 0.00 0.00
76 एपीएल मुंद्रा स्टे ज-II APL Mundra Stg-II 104.29 0.00
77 एपीएल मुंद्रा स्टे ज-III APL Mundra Stg-III पविमी क्षेत्र WR 93.66 0.00
78 टोिें ट िुगेन Torrent Sugen 38.82 0.00
79 मारुवत कोल Maruti Coal 34.61 0.00
80 स्पेक्ट्रम Spectrum 51.83 0.00
81 झाबुआ पािि Jhabua Power 51.11 0.00
82 विंध्याचल-I Vindhyachal Stg-I 0.00 0.00
83 विंध्याचल-II Vindhyachal Stg-II 0.00 0.00
84 विंध्याचल-III Vindhyachal Stg-III 0.00 0.00
85 विंध्याचल-IV Vindhyachal Stg-IV 0.00 0.00
86 विंध्याचल-V Vindhyachal Stg-V 0.00 0.00
87 मौिा-I Mouda STPS Stg-I 0.00 0.00
88 िीपत-I Sipat Stg-I 0.00 0.00
89 िीपत-II Sipat Stg-II 0.00 0.00
90 िािन Sasan UMPP 0.00 0.00
91 एनएिपीिीएल NSPCL 0.00 0.00
92 कोिबा-III Korba-III 16.85 0.00
93 टीआिएन इनजी TRN Energy 0.00 0.00
94 गंधाि Gandhar 0.00 0.00
95 कोिबा I &II Korba Stage I & II 0.00 0.00
96 आिकेएम पाििजेन RKM Power Gen 0.00 0.00
97 किाि Kawas 0.09 0.00
98 मौिा-II Mouda STPS Stg-II 0.00 0.00
99 एिकेएि पाििजेन SKS Powergen 24.86 0.00
100 शोलापुि एिटीपीपी Sholapur STPP 0.00 0.00
101 ित्नावगिी गैि पािि प्राइिेट वलवमटे ड RGPPL 0.00 0.00
102 गिििाड़ा Gadarwara 0.00 0.00
103 लािा-II LARA-II 0.00 0.00
104 िायपुि इनिजेन Raipur Energen 235.58 0.00
105 आिेलि वमत्तल Arcellor Mittal 0.00 89.32

40
18. पािि माकेट की िूचना ( स्रोत : आई.ई.एक्स. एिं पी.एक्स.आई.एल.)
POWER MARKET INFORMATION ( Source IEX & PXIL)
पािि एक्स्चेंज के माध्यम िे विवनमय – माह मई 2020
EXCHANGES THROUGH POWER EXCHANGES - MAY 2020
पािि एक्स्चेंज के माध्यम िे ( वम.यु. मे )
क्र. ि. S. No. क्षेत्रीय इकाई Regional Entity क्षेत्र Region Through Power Exchange in MU
विक्रय Sale क्रय Purchase
106 आं ध्र प्रिे श Andhra Pradesh 9.73 1118.53
107 कनाबटक Karnataka 41.04 68.32
108 केिल Kerala 4.51 33.84
109 तवमलनाडु Tamilnadu 10.43 197.93
110 पॉण्डिचेिी Pondicherry 0.00 0.00
111 गोिा Goa 0.00 0.00
112 लांको कोंडापल्ली LANCO_KONDPLY 0.00 0.00
113 विमापुिी SIMHAPURI 0.00 0.00
114 मीनाक्षी MINAXI 0.00 0.00
115 तेलंगाना TELANGANA 33.24 294.50
116 थमबल पॉिि टे क Thermal Power Tech 56.68 0.00
117 कोस्टल इनिजेन Coastal Energen 0.00 0.00
118 आइ एल & एफ़ एि IL&FS 3.16 0.00
119 विम्हाद्री-II Simhadri Stg-II 0.00 0.00
िवक्षणी क्षेत्र SR
120 एनएलिी-I विस्ताि NLC TPS-I (Exp) 8.96 0.00
121 एनएलिी-II स्टे ज-I NLC TPS-II Stg-I 28.92 0.00
122 एनएलिी-II स्टे ज-II NLC TPS-II Stg-II 15.10 0.00
123 लांको कोंडापल्ली स्टे ज-III LANCO_KONDPLY STG III 0.00 0.00
124 िामागुिम-I Ramagundam Stg-I 0.99 0.00
125 तालचि-II Talcher Stg-II 0.18 0.00
126 िामागुिम-IIII Ramagundam Stg-III 0.00 0.00
127 एिजीपीएल Sembcorp Gayatri Pvt. Ltd. 159.17 0.00
128 एनटीईिीएल िल्लूि NTECL Vallur 0.00 0.00
129 कुडगी Kudgi 0.00 0.00
130 विम्हाद्री-I Simhadri Stg-I 0.00 0.00
131 एनएलिी टीपीएि-II एक्स्प NLC TPS-II EXP 3.50 0.00
132 एन टी पी एल NTPL 0.00 0.00
133 एि बी जी क्लीनटे क SBG Cleantech 0.00 0.00
134 पविम बंगाल West Bengal उत्तिी क्षेत्र NR 45.32 35.43
135 उवड़शा Odisha 651.27 24.45
136 वबहाि Bihar 39.42 154.64
137 झािखंड Jharkhand 54.71 2.46
138 विण्डिम Sikkim 39.81 0.00
139 िामोिि घाटी परियोजना DVC 7.11 0.00
140 स्टिलाइट STERLITE 0.00 0.00
141 मैथन पािि वलवमटे ड Maithon P. Ltd 0.00 0.00
142 आधुवनक पा. वलवमटे ड Adhunik P.Ltd 1.49 0.00
143 चुजाचेन Chuzachen HEP 5.44 0.00
144 िं वगत Rangit HEP 0.00 0.00
145 तीस्ता Teesta HEP 0.00 0.00
146 जीएमआि कमलंगा GMR Kamalanga 0.00 0.00
147 वजंिल आई पी टी एल JIPTL पूिी क्षेत्र ER 234.18 0.00
148 जोिथांग Jorethang 29.07 0.00
149 फििा-III Farakka-III 1.23 0.00
150 बाढ़-II Barh Stage-II 0.00 0.00
151 कहलगााँि -II Kahalgaon Stage-II 0.00 0.00
152 फििा Farakka 0.05 0.00
153 कहलगााँि Kahalgaon 0.16 0.00
154 तालचि Talcher 0.27 0.00
155 तीस्ता-III Teesta-III 469.01 0.00
156 विक्चु Dikchu HEP 32.60 0.00
157 तावशविं ग Tashiding HEP 25.57 0.00
158 बीआिबीिीएल BRBCL 0.00 0.00
159 केबीयूएनएल KBUNL 0.00 0.00
160 ओपीजीिी यूवनट-IV OPGC UNIT-IV 0.00 0.00
161 अरुणाचल प्रिे श Arunachal Pradesh 17.39 0.00
162 अिम Assam 158.81 36.07
163 मवणपुि Manipur 2.06 12.56
164 मेघालय Meghalaya 33.24 11.91
165 वमज़ोिम Mizoram 3.21 0.00
166 नागालैंड Nagaland 0.63 0.00
167 वत्रपुिा Tripura 16.12 0.00
168 अगितला जीटीपीपी Agartala GTPP_AG0 0.00 0.00
169 कोवपली KOPILI_KP1 0.00 0.00
पूिोत्ति क्षेत्र NER
170 अिम जीबीपीपी Assam GBPP_KT0 0.00 0.00
171 लोकटक LOKTAK 0.00 0.00
172 िं गानिी Ranganadi 0.00 0.00
173 िोयांग Doyang 0.00 0.00
174 पलाताना Palatana 4.36 0.00
175 कोवपली-II Kopili-II 0.00 0.00
176 खंडोंग Khandong 0.00 0.00
177 बोंगाईगााँि Bongaigaon TPP 0.41 0.00
178 पािे PARE 0.00 0.00
कुल Total 5596 5596

41
19. RENEWABLE ENERGY CERTIFICATE MECHANISM
MONTH : MAY 2020

RE Source & Unit wise break up (01.05.2020-31.05.2020)

Accreditation Registration
Sr.No Source Wise Capacity Capacity
Unit Unit
(MW) (MW)
1 Wind 0 0 5 3
Urban or Municipal
2 0 0 0 0
Waste
3 Solar Thermal 0 0 0 0

4 Solar PV 9 5 3 2

5 Small Hydro 0 0 0 0

6 Others 0 0 0 0

7 Geothermal 0 0 0 0

8 Biomass 0 0 0 0

9 Bio-fuel cogeneration 0 0 0 0

Total 9 5 8 5

RECs Issued (01.05.2020-31.05.2020)

Sr.No. Non Solar Solar Total

1 441471 93192 534663

Redemption of REC (01.05.2020-31.05.2020)

Sr.No. Non Solar Solar Total

1 307508 31155 338663

42
19. RENEWABLE ENERGY CERTIFICATE MECHANISM
MONTH : MAY 2020

RE Source & Unit wise break up (Apr-Mar'21)

Accreditation Registration
Sr.No Source Wise Capacity Capacity
Unit Unit
(MW) (MW)
1 Wind 4 6 16 8
Urban or Municipal
2 0 0 0 0
Waste
3 Solar Thermal 0 0 0 0

4 Solar PV 9 5 7 5

5 Small Hydro 0 0 0 0

6 Others 0 0 0 0

7 Geothermal 0 0 0 0

8 Biomass 0 0 0 0

9 Bio-fuel cogeneration 0 0 10 1

Total 13 11 33 14

RECs Issued (Apr-Mar'21)

Sr.No. Non Solar Solar Total


1 594634 113883 708517

Redemption of REC (Apr- Mar'21)


Sr.No. Non Solar Solar Total
1 524601 51997 576598

43
19. RENEWABLE ENERGY CERTIFICATE MECHANISM
MONTH : MAY 2020

RE Source & Unit wise break up Since Inception to May'20


Accreditation Registration
Sr.No Source Wise Capacity Capacity
Unit Unit
(MW) (MW)
1 Wind 2702 501 2647 489
Urban or Municipal
2 0 0 0 0
Waste
3 Solar Thermal 0 0 0 0
4 Solar PV 868 384 853 377
5 Small Hydro 274 38 250 37
6 Others 4 2 3 1
7 Geothermal 0 0 0 0
8 Biomass 477 43 420 40

9 Bio-fuel cogeneration 819 90 378 54

Total 5144 1058 4551 998

RECs Issued since Inception to May'20


Sr.No. Non Solar Solar Total
1 57625738 9697676 67323414

Redemption of REC since Inception to May'20


Sr.No. Non Solar Solar Total
1 51869951 9588585 61458536

REC Closing balance as on 30.05.2020


Sr.No. Non Solar Solar Total
1 5755787 109091 5864878

44
20. IMPORTANT GRID EVENTS / DISTURBANCES
Northern Region-Grid Event Report for May 2020

Outage Revival Category


Generation Load Energy
Name of Elements Affected Event as per CEA
S.No. Region Owner/ Agency Duration Loss Loss Unserved
(Tripped/Manually opened) Area (As reported) Grid
Date Time Date Time (MW) (MW) (in MU)
Standards

1) 400 KV Bareilly-Unnao (UP) Ckt-1 400 KV Bareilly-Unnao (UP) Ckt-1 tripped due to R-B fault, FC-IR-2.29KA. At the same time, 400 KV Bareilly-Unnao (UP) Ckt-2 also tripped. As per PMU, multiple R-B
1 NR UTTAR PRADESH UPPTCL 2-May-20 14:00 2-May-20 16:38 2:38 0 0 GI-2 0
2) 400 KV Bareilly-Unnao (UP) Ckt-2 faults are observed in the system. In antecedent conditions, 400 KV Bareilly-Unnao (UP) Ckt-1 & 2 carrying 128MW & 77MW respectively.

400 KV Patran(PATR)-Kaithal(PG) (PATRAN) Ckt-2 tripped on R-N fault, 26 km from Kaithal(PG) end. At the same time, 400KV Bus 1 at Patran(PATR) & 400/220 kV 500
1) 400/220 kV 500 MVA ICT 1 at Patran(PATR)
MVA ICT 1 at Patran(PATR) also tripped due to Breaker failure protection operated in 408 Tie Circuit Breaker. As per PMU, R-N fault with delayed clearance is observed
2 NR 2) 400KV Bus 1 at Patran(PATR) HARYANA POWERGRID, PSTCL 2-May-20 19:55 2-May-20 23:06 3:11 0 0 GI-2 0
in the system. In antecedent conditions, 400 KV Patran(PATR)-Kaithal(PG) (PATRAN) Ckt-2 & 400/220 kV 500 MVA ICT 1 at Patran(PATR) carrying 159MW & 66MW
3) 400 KV Patran(PATR)-Kaithal(PG) (PATRAN) Ckt-2
respectively.

1) 765 KV Anta-Phagi (RS) Ckt-2 765 KV Anta-Phagi (RS) Ckt-2 tripped on Y-B fault, 74Km from Phagi end. At 1716Hrs, 765 KV Anta-Phagi (RS) Ckt-1 tripped on Y-N fault, 71Km from phagi end. 660
2) 660 MW Kawai TPS - UNIT 2 MW Chhabra SCTPS - UNIT 5 & 660 MW Kawai TPS - UNIT 2 also tripped due to operation of SPS. After patrolling, tower damage was found on both 765 KV Anta-Phagi
3 NR RAJASTHAN RRVPNL 4-May-20 17:15 5-May-20 17:00 23:45 850 580 GD-1 0
3) 765 KV Anta-Phagi (RS) Ckt-1 (RS) Ckt-1 & 2. As per PMU, three phase fault is observed in the system. In antecedent conditions, 765 KV Anta-Phagi (RS) Ckt-1 & 2 carrying 588MW & 598MW
4) 660 MW Chhabra SCTPS - UNIT 5 respectively.

1) 400 KV Meja TPS(MUN)-Rewa Road(UP) (UP) Ckt-1


2) 400 KV Obra_B-Rewa Road (UP) Ckt-1
At 0207Hrs 400 KV Meja TPS(MUN)-Rewa Road(UP) (UP) Ckt-1 tripped on B-N fault. At 0220Hrs, 400 KV Meja TPS(MUN)-Masoli(UP) (UP) tripped on Y-N fault. At the
3) 400 KV Meja TPS(MUN)-Masoli(UP) (UP) Ckt-1
same time, 400 KV Obra_B-Rewa Road (UP) Ckt-1 & 400 KV Banda-Rewa Road (UP) Ckt-2 also tripped on overvoltage. Then at 0243Hrs, 400/132 kV 200 MVA ICT 1 &
4) 400 KV Banda-Rewa Road (UP) Ckt-2
4 NR UTTAR PRADESH UPPTCL 5-May-20 2:07 5-May-20 4:44 2:37 ICT 2 at Masoli(UP) also tripped due to ingress of water in junction box of control cable. As per PMU, B-N fault, Y-N fault and no fault observed at 0207Hrs, 0220Hrs & 0 0 GI-2 0
5) 400 KV Banda-Orai (UP) Ckt-2
0243Hrs respectively. In antecedent conditions, 400 KV Meja TPS(MUN)-Rewa Road(UP) (UP) ckt-1 carrying 402MW. 400 KV Obra_B-Rewa Road (UP) Ckt-1 & 400 KV
6) 400/132 kV 200 MVA ICT 2 at Meja TPS(MUN)
Banda-Rewa Road (UP) Ckt-2 carrying 156MW & 121MW respectively.
7) 400/132 kV 200 MVA ICT 1 at Masoli(UP)
8) 400/132 kV 200 MVA ICT 2 at Masoli(UP)

1) 220 KV Kishenpur(PG)-Salal(NH) (PG) Ckt-1 220 KV Kishenpur(PG)-Salal(NH) (PG) Ckt-1 & 2 tripped on Y-B fault. As per PMU, Y-B fault is observed in the system. In antecedent conditions, 220 KV Kishenpur(PG)-
5 NR
2) 220 KV Kishenpur(PG)-Salal(NH) (PG) Ckt-2
J&K POWERGRID 6-May-20 17:08 6-May-20 17:19 0:11
Salal(NH) (PG) Ckt-1 & 2 carrying 49MW & 50MW respectively.
90 0 GD-1 0

1) 400 KV Ataur-Muradnagar_1 (UP) Ckt-1


2) 400/220 kV 500 MVA ICT 2 at Muradnagar_1(UP) 400 KV Aligarh-Muradnagar_1 (UP) Ckt-1, 400 KV Ataur-Muradnagar_1 (UP) Ckt-1, 400/220 kV 500 MVA ICT 2 at Muradnagar_1(UP) & 400/220 kV 315 MVA ICT 3 at
6 NR
3) 400/220 kV 315 MVA ICT 3 at Muradnagar_1(UP)
UTTAR PRADESH UPPTCL 10-May-20 11:32 10-May-20 13:19 1:47
Muradnagar_1(UP) tripped due to bad weather. As per PMU, multiple Y-N faults are observed in the system. No load loss is reported by UP.
0 0 GI-2 0
4) 400 KV Aligarh-Muradnagar_1 (UP) Ckt-1

400 KV Deepalpur(JHKT)-Bawana(DV) (PG) Ckt-1 & 400 KV Deepalpur(JHKT)-Kabulpur(HV) (HVPNL) Ckt-2 tripped due to over voltage at Deepalpur end. As per PMU, B-
1) 400 KV Deepalpur(JHKT)-Bawana(DV) (PG) Ckt-1
7 NR
2) 400 KV Deepalpur(JHKT)-Kabulpur(HV) (HVPNL) Ckt-2
HARYANA HVPNL, POWERGRID 10-May-20 12:00 10-May-20 13:57 1:57 N fault is observed in the system. In antecedent conditions, 400 KV Deepalpur(JHKT)-Bawana(DV) (PG) Ckt-1 & 400 KV Deepalpur(JHKT)-Kabulpur(HV) (HVPNL) Ckt-2 0 0 GI-2 0
carrying 124MW & 87MW respectively.

1) 400/132 kV 200 MVA ICT 1 at Masoli(UP) 400 KV Meja TPS(MUN)-Masoli(UP) (UP) Ckt-1 tripped on B-N fault. At the same time, 400/132 kV 200 MVA ICT 1 & ICT 3 at Masoli(UP) also tripped due to bad
8 NR 2) 400 KV Meja TPS(MUN)-Masoli(UP) (UP) Ckt-1 UTTAR PRADESH UPPTCL 10-May-20 20:04 10-May-20 22:20 2:16 weather. As per PMU, Y-N fault with unsuccessful autoreclosing is observed in the system. In antecedent conditions, 400 KV Meja TPS(MUN)-Masoli(UP) (UP) Ckt-1 0 0 GI-2 0
3) 400/132 kV 200 MVA ICT 3 at Masoli(UP) carrying 77MW.

400KV Mandola-Bawana ckt-I tripped due to Phase to phase fault(Y-B fault), F/D-0.16km, F/C-17.44kA (LA Blast of B-phase at Mandola end) and 400KV Mandola-
1) 220 KV Mandola(PG)-South Wazirabad(DV) (DTL) Ckt-4
Bawana ckt-II tripped on phase to phase fault (R-B phase) Zone 1, Fault Distance: 706.1m, Fault current: 9.6KA. At the same time, 220 KV Mandola(PG)-South
9 NR 2) 400 KV Mandola(PG)-Bawana(DV) (DV) Ckt-2 NEW DELHI DTL 14-May-20 17:49 14-May-20 22:28 4:39
Wazirabad(DV) (DTL) Ckt-4 tripped on R-N fault. As per PMU, R-B fault is observed in the system. In antecedent conditions, 400KV Mandola-Bawana ckt-I & II carrying
0 0 GI-2 0
3) 400 KV Mandola(PG)-Bawana(DV) (DV) Ckt-1
89MW & 94MW respectively.

1) 400/220 kV 315 MVA ICT 1 at Rewa Road(UP)


Due to Earth fault in 400 KV Banda-Rewa Road (UP) Ckt-1,the line breaker of same not operated in time so LBB operated on BUS-1.Then all connected line breakers and
2) 125 MVAR Bus Reactor No 1 at 400KV Rewa Road(UP)
Bus coupler with BUS-1 at 400/220kV Rewa Road(UP) got tripped. As per PMU, Y-N fault with delayed clearance is observed in the system. In antecedent conditions,
10 NR 3) 400 KV Rewa Road-Panki (UP) Ckt-1 UTTAR PRADESH UPPTCL 15-May-20 18:31 15-May-20 21:06 2:35 0 0 GI-2 0
315 MVA ICT 1 at Rewa Road(UP) carrying 109MW. 400 KV Rewa Road-Panki (UP) Ckt-1, 400 KV Meja TPS(MUN)-Rewa Road(UP) (UP) Ckt-1 & 400 KV Banda-Rewa
4) 400 KV Meja TPS(MUN)-Rewa Road(UP) (UP) Ckt-1
Road (UP) Ckt-1 carrying 182MW, 296MW & 77MW respectively.
5) 400 KV Banda-Rewa Road (UP) Ckt-1

1) 400 KV Obra_B-Rewa Road (UP) Ckt-1


400 KV Obra_B-Rewa Road (UP) Ckt-1 & 400/220 kV 315 MVA ICT 2 at Obra_B(UP) along with Bus-II tripped at 21:34Hrs due to fire of C.T. of unit no. 12 with reverse
2) 400/220 kV 315 MVA ICT 2 at Obra_B(UP)
11 NR UTTAR PRADESH UPPTCL 16-May-20 21:34 17-May-20 0:23 2:49 zone protection. As per PMU, R-N fault is observed in the system. In antecedent conditions, 400 KV Obra_B-Rewa Road (UP) Ckt-1 & 400/220 kV 315 MVA ICT 2 at 100 0 GD-1 0
3) 200 MW Obra TPS - UNIT 12
Obra_B(UP) carrying 59MW & 152MW respectively.
4) 400KV Bus 2 at Obra_B(UP)

1) 400 KV Bikaner-Bhadla (RS) Ckt-1 400 kV Bhadla(RS) – Bikaner(RS) tripped R-B fault, Zone 1,31.6 km from Bikaner end,Ia = 10.5 kA, Ic = 10.03 kA. At the same time, 220kV Bhadla – Saurya Urja ckt 1 & 2
12 NR 2) 220 KV Bhadla(PG)-Saurya Urja(SU) (UNDEF) Ckt-1 RAJASTHAN RRVPNL 17-May-20 12:20 17-May-20 13:25 1:05 also tripped due to low voltage(as reported by Saurya Urja). As per PMU, R-Y fault is observed in the system. As per SCADA data, 300 MW (approx.) generation loss in 900 0 GD-1 0
3) 220 KV Bhadla(PG)-Saurya Urja(SU) (UNDEF) Ckt-2 Rajasthan Solar system and 600 MW (approx.) in Bhadla PG associated solar generation is observed.

1) 63 MVAR Bus Reactor No 1 at 400KV Banda(UP)


B phase CT of Bus Reactor Main bay at 400/220kV Banda(UP) damaged resulting in tripping of 400kV Bus-1 and 400 KV Banda-Rewa Road (UP) Ckt-1. As per PMU, B-N
13 NR 2) 400 KV Banda-Rewa Road (UP) Ckt-1 UTTAR PRADESH UPPTCL 18-May-20 18:02 18-May-20 20:01 1:59
fault is observed in the system. In antecedent conditions, 400 KV Banda-Rewa Road (UP) Ckt-1 carrying 157MW.
0 0 GI-2 0
3) 400KV Bus 1 at Banda(UP)

400 KV Azamgarh-Mau (UP) Ckt-1 tripped on B-N fault. At the same time, 400 KV Mau(UP)-Balia(PG) (PG) Ckt-1 tripped on DT received from Mau end and Z2. As per
1) 400 KV Azamgarh-Mau (UP) Ckt-1
14 NR
2) 400 KV Mau(UP)-Balia(PG) (PG) Ckt-1
UTTAR PRADESH POWERGRID, UPPTCL 20-May-20 15:53 20-May-20 17:49 1:56 PMU, B-N fault with delayed clearance is observed in the system. In antecedent conditions, 400 KV Azamgarh-Mau (UP) Ckt-1 & 400 KV Mau(UP)-Balia(PG) (PG) Ckt-1 0 0 GI-2 0
carrying 302MW & 78MW respectively.

1) 500 MW Anpara TPS - UNIT 5


2) 400/132 kV 100 MVA ICT 3 at Anpara(UP)
3) 400/132 kV 100 MVA ICT 1 at Anpara(UP)
B phase CT of 10MVA, 132/11kV ICT II at 400/132kV Anpara(UP) blasted due to which Bus Bar protection operated at 132kV side but bus coupler did not open which
4) 210 MW Anpara TPS - UNIT 1
15 NR UTTAR PRADESH UPPTCL 22-May-20 8:12 22-May-20 9:38 1:26 resulted into tripping of all elements associated with 132kV buses along with station transformers which are the source of auxiliary supply for generating units 1600 0 GD-1 0
5) 210 MW Anpara TPS - UNIT 2
resulting into tripping of all units at Anpara TPS. As per PMU, Voltage dip in B phase is observed in the system. Generation loss was about 1600MW.
6) 210 MW Anpara TPS - UNIT 3
7) 500 MW Anpara TPS - UNIT 4
8) 400/132 kV 100 MVA ICT 2 at Anpara(UP)

1) 400 KV Alaknanda GVK(UPC)-Srinagar(UK) (UK) Ckt-2 400 KV Alaknanda GVK(UPC)-Srinagar(UK) (UK) Ckt-1 & 2 tripped during charging of 220 KV Agastmuni to PTCUL. As per PMU, Y-B fault is observed in the system. In
16 NR
2) 400 KV Alaknanda GVK(UPC)-Srinagar(UK) (UK) Ckt-1
UTTRAKHAND PTCUL 22-May-20 13:24 22-May-20 15:46 2:22
antecedent conditions, 400 KV Alaknanda GVK(UPC)-Srinagar(UK) (UK) Ckt-1 & 2 carrying 35MW each.
0 20 GD-1 0.05

1) 220 KV Gurgaon(PG)-GurgaonSec72(HV) (HVPNL) Ckt-4


As reported by HVPNL, R-Phase CT of Rangla Ckt-1 blast at 220KV Gurgaon Sec72(HVPNL), due to this Bus bar protection operated at Gurgaon Sec72(HVPNL) resulting
2) 220 KV Gurgaon(PG)-GurgaonSec72(HV) (HVPNL) Ckt-3
17 NR
3) 220 KV Gurgaon(PG)-GurgaonSec72(HV) (HVPNL) Ckt-2
HARYANA HVPNL 24-May-20 13:46 24-May-20 14:36 0:50 in tripping of 220 KV Gurgaon(PG)-GurgaonSec72(HV) (HVPNL) Ckt-1, 2, 3 & 4. As per PMU, R-N fault followed by B-N fault is observed in the system. In antecedent 0 400 GD-1 0.33
conditions, 220 KV Gurgaon(PG)-GurgaonSec72(HV) (HVPNL) Ckt-1, 2, 3 & 4 carrying 67MW, 81MW, 72MW & 55MW respectively.
4) 220 KV Gurgaon(PG)-GurgaonSec72(HV) (HVPNL) Ckt-1

1) 400/220 kV 250 MVA ICT 2 at Moga(PG) 400/220 kV 500 MVA ICT 1 & 400/220 kV 250 MVA ICT 2 at Moga(PG) tripped due to relay maloperation. As per PMU, No fault is observed in the system. In
18 NR PUNJAB POWERGRID 26-May-20 16:36 26-May-20 18:20 1:44 0 0 GI-2 0
2) 400/220 kV 500 MVA ICT 1 at Moga(PG) antecedent conditions, 500 MVA ICT 1 & 250 MVA ICT 2 carrying 272MW & 146MW respectively.

1) 400/220 kV 315 MVA ICT 3 at Mundka(DV) 400/220 kV 315 MVA ICT 3 & 315 MVA ICT 4 at Mundka(DV) tripped on over current.As per PMU, R-N fault with delayed clearance is observed in the system. In
19 NR
2) 400/220 kV 315 MVA ICT 4 at Mundka(DV)
NEW DELHI DTL 27-May-20 14:12 27-May-20 15:35 1:23
antecedent conditions, 15 MVA ICT 3 & 315 MVA ICT 4 at Mundka(DV) carrying 98MW & 96MW respectively.
0 0 GI-2 0

220 KV Chamera_3(NH)-Chamba(PG) (PG) Ckt-1 tripped on R-N fault leading to Generation loss of around 280MW (230MW from Chamera 3 & 50MW from Budhil) due
HIMACHAL
20 NR 1) 220 KV Chamera_3(NH)-Chamba(PG) (PG) Ckt-1
PRADESH
POWERGRID 27-May-20 15:28 27-May-20 16:21
45 0:53 to loss of evacuation path. As per PMU, B-N fault is observed in the system. In antecedent conditions, 220kV Chamera 3(NHPC) & 220kV Budhil(HP) generating 230MW
& 50MW respectively.
280 0 GD-1 0
Northern Region-Grid Event Report for May 2020

Outage Revival Category


Generation Load Energy
Name of Elements Affected Event as per CEA
S.No. Region Owner/ Agency Duration Loss Loss Unserved
(Tripped/Manually opened) Area (As reported) Grid
Date Time Date Time (MW) (MW) (in MU)
Standards

1) 400 KV Banda-Rewa Road (UP) Ckt-1 400 KV Meja TPS(MUN)-Rewa Road(UP) (UP) Ckt-1 tripped on B-N fault. At the same time, 400 KV Obra_B-Rewa Road (UP) Ckt-1 & 400 KV Banda-Rewa Road (UP) Ckt-
2) 400 KV Meja TPS(MUN)-Rewa Road(UP) (UP) Ckt-1 2 tripped on overvoltage. Also 400 KV Banda-Rewa Road (UP) Ckt-1 tripped on overvoltage from Banda end. As per PMU, B-N fault is observed in the system. In
21 NR UTTAR PRADESH UPPTCL 27-May-20 16:35 27-May-20 17:34 0:59 0 0 GI-2 0
3) 400 KV Banda-Rewa Road (UP) Ckt-2 antecedent conditions, 400 KV Meja TPS(MUN)-Rewa Road(UP), 400 KV Obra_B-Rewa Road (UP) Ckt-1 & 400 KV Banda-Rewa Road (UP) Ckt-2 is 259MW, 238MW &
4) 400 KV Obra_B-Rewa Road (UP) Ckt-1 126MW respectively.

400 KV Chamba-Jalandhar (PG) Ckt-1 tripped on B-N fault,142.7km from Jalandhar end. At the same time, 400 KV Chamba-Jalandhar (PG) Ckt-2 tripped on BR-N
1) 400 KV Chamba-Jalandhar (PG) Ckt-2
22 NR
2) 400 KV Chamba-Jalandhar (PG) Ckt-1
PUNJAB POWERGRID 28-May-20 10:37 28-May-20 10:52 0:15 fault,142.7km from Jalandhar end. As per PMU, R-B fault is observed in the system. In antecedent conditions, 400 KV Chamba-Jalandhar (PG) Ckt-1 & 2 carrying 0 0 GI-2 0
175MW & 181MW respectively.

1) 800 KV HVDC Kurukshetra(PG) Pole-1 800 KV HVDC Champa(PG)-Kurukshetra(PG) pole-1, 2, 3 & 4 tripped due to DC line fault. As per PMU, No fault is observed in the system. In antecedent conditions, 800
23 NR
2) 800 KV HVDC Kurukshetra(PG) Pole-2
HARYANA POWERGRID 28-May-20 14:58 28-May-20 16:22 1:24
KV HVDC Champa(PG)-Kurukshetra(PG) pole-1, 2, 3 & 4 carrying total 1600MW.
0 0 GI-2 0

1) 765 KV Agra-Fatehpur (PG) Ckt-1 765 KV Agra-Fatehpur (PG) Ckt-1 tripped on overvoltage. At the same time, 765 KV Agra-Aligarh (PG) also tripped on overvoltage. As per PMU, No fault is observed in
24 NR
2) 765 KV Agra-Aligarh (PG) Ckt-1
UTTAR PRADESH POWERGRID 28-May-20 18:02 28-May-20 19:43 1:41
the system. In antecedent conditions, 765 KV Agra-Fatehpur (PG) Ckt-1 & 765 KV Agra-Aligarh (PG) carrying 157MW & 336MW respectively.
0 0 GI-2 0

1) 500 KV HVDC Balia-Bhiwadi (PG) Ckt-2 500 KV HVDC Balia-Bhiwadi (PG) Ckt-1 & 2 tripped on DC line fault. As per PMU, Fluctuations observed in the phase voltages. In antecedent conditions, 500 KV HVDC
25 NR RAJASTHAN POWERGRID 29-May-20 17:45 29-May-20 19:11 1:26 0 0 GI-2 0
2) 500 KV HVDC Balia-Bhiwadi (PG) Ckt-1 Balia-Bhiwadi (PG) Ckt-1 & 2 carrying 500MW total.

765 KV Agra-Gwalior (PG) Ckt-1 tripped on B-N fault, 92.3km from Agra end. At the same time, 765 KV Agra-Gwalior (PG) Ckt-2 also tripped on B-N fault,86.4km from
1) 765 KV Agra-Gwalior (PG) Ckt-1
26 NR
2) 765 KV Agra-Gwalior (PG) Ckt-2
UTTAR PRADESH POWERGRID 29-May-20 19:10 29-May-20 22:12 3:02 Agra end. As per PMU, B-N fault with unsuccessful autoreclosing is observed in the system. In antecedent conditions, 765 KV Agra-Gwalior (PG) Ckt-1 & 2 carrying 0 0 GI-2 0
508MW & 507MW respectively.

765 KV Moga-Meerut (PG) Ckt tripped on B-N fault, 20.7km from Meerut S/S end. At the same time, 765 KV Gr.Noida_2(UPC)-Meerut(PG) (PG) Ckt tripped due to B-N
1) 765 KV Gr.Noida_2(UPC)-Meerut(PG) (PG) Ckt-1
27 NR UTTAR PRADESH POWERGRID 29-May-20 21:23 29-May-20 22:09 0:46 fault, 75.7km from Gr. Noida end. As per PMU, B-N fault with unsuccessful autoreclosing is observed in the system. In antecedent conditions, 765 KV Moga-Meerut 0 0 GI-2 0
2) 765 KV Moga-Meerut (PG) Ckt-1
(PG) & 765 KV Gr.Noida_2(UPC)-Meerut(PG) (PG) carrying 56MW & 64MW respectively.

1) 400 KV Aligarh-Muradnagar_1 (UP) Ckt-1 400 KV Aligarh-Muradnagar_1 (UP) Ckt-1 & 400/220 kV 500 MVA ICT 2 at Muradnagar_1(UP) tripped on operation of Bus Bar protection. As per PMU, B-N fault with
28 NR
2) 400/220 kV 500 MVA ICT 2 at Muradnagar_1(UP)
UTTAR PRADESH UPPTCL 31-May-20 7:07 31-May-20 16:34 9:27
delayed clearance is observed in the system.
0 120 GD-1 1.08

1) 400 KV Gurgaon(PG)-Daulatabad(HV) (HV) Ckt-1 400 KV Gurgaon(PG)-Daulatabad(HV) (HV) Ckt-2 tripped on B-N fault. At the same time, 400 KV Gurgaon(PG)-Daulatabad(HV) (HV) Ckt-1 also tripped on B-N fault. As
29 NR
2) 400 KV Gurgaon(PG)-Daulatabad(HV) (HV) Ckt-2
HARYANA HVPNL 31-May-20 15:30 31-May-20 18:27 2:57
per PMU, multiple B-N faults are observed in the system. In antecedent conditions, 400 KV Gurgaon(PG)-Daulatabad(HV) (HV) Ckt-1 & 2 carrying 16MW each.
0 0 GI-2 0

1) 400 KV Bhinmal(PG)-Barmer(RS) (RS) Ckt-2


2) 400KV Bus 1 at Bhinmal(PG) 400 KV Bhinmal(PG)-Barmer(RS) (RS) Ckt-1 tripped due to Y-Phase insulator broken at loc. no. 87. At the same time, 400KV Bus 1, Bus-2 & 400 KV Bhinmal(PG)-
30 NR RAJASTHAN RRVPNL 31-May-20 18:52 31-May-20 21:39 2:47 0 0 GI-2 0
3) 400 KV Bhinmal(PG)-Barmer(RS) (RS) Ckt-1 Barmer(RS) (RS) Ckt-2 also tripped on operation of Bus Bar protection. As per PMU, multiple Y-N fault is observed in the system.
4) 400KV Bus 2 at Bhinmal(PG)

46
Western Region-Event Report for May 2020
Outage Revival Outage Duration
Category as per CEA Energy Unserved
S.No Region Name of Elements Owner/Agency Event Generation Loss (MW) Load Loss (MW)
standards (MU)
Date Time Date Time Time

Tripping of
1.765 kV Gwalior Bus 1 765 kV Gwalior-Jaipur 1 tripped on Y-E fault at Jaipur end. Main bay at Gwalior did not open which resulted in
1 WR PGCIL 3-May-20 17:29 3-May-20 18:25 0:56 Nil Nil GI-2 Nil
2.765 kV Gwalior-Jaipur 1 LBB operation and 765 kV Gwalior Bus 1 and its associated main bays tripped.

Tripping of
400 kV MB Power-Jabalpur 2 tripped on Y-E fault from both ends and 400 kV MB Power-Jabalpur 1 tripped on
2 WR 1.400 kV MB Power-Jabalpur 1&2 MB Power 4-May-20 20:36 4-May-20 20:59 0:23 791 Nil GD-1 Nil
B-E fault only at MB Power end. Due to loss of evacuation path, 660 MW MB Power Units 1&2 tripped.
2.600 MW MB Power Units 1&2
Tripping of
1.400 kV Nagothane-Padghe 1
2.400 kV Nagothane-RGPPL 2 At 400/220kV Nagothane S/S, 400/220 kV 500 MVA ICT 3 was under outage for testing activity. During testing
3 WR MSETCL 5-May-20 12:14 5-May-20 12:41 0:27 Nil Nil GI-2 Nil
3.400/220 kV 315 MVA Nagothane ICT 1 , LBB trip signal got extended and resulted in tripping of 400 kV Bus 1 and all connected elements.
4.400 kV 80 MVAR Nagothane BR

Tripping of
1. 400 kV REL - Durg 1
At 00:02 Hrs, 400 kV REL- Durg 1 tripped on R-E fault and 400 kV REL-Durg 2 tripped on directional over
4 WR 2.400 kV REL - Durg 2 REL 17-May-20 0:02 17-May-20 0:52 0:50 1120 Nil GD-1 Nil
current protection operation. Due to the loss of evacuation path, 685MW REL Units 1&2 tripped.
3.685 MW REL Units 1&2

Tripping of
1.220 kV Chhuri- Korba(E) 1&2 During test charging of 220 kV Chhuri-Kotmikala 2, R phase CB pole got stuck at Churri end and resulted in
2220 kV Chhuri-Korba-(W) 1&2 tripping of all the 220 kV and 132 kV lines at Chhuri S/S. Loads connected to 220/132 kV Chhuri, Bishrampur
5 WR CSPTCL 23-May-20 12:08 23-May-20 12:16 0:08 Nil 365 GD-1 0.4086
3.220 kV Chhuri-Mopka 1&2 and 132/33kV Ambikapur, Baikunthpur, Manendragarh, Wandrafnagar, Pratapur, Rajpur, Balrampur
4.220 kV Chhuri-Bishrampur 1&2 &Pathalgaon, Kansabel,Lodhma,Jashpur ,Batoli & Darri substations were affected due to the event.
5.220 kV Chhuri-Kotmikala 1&2
Tripping of
1.132 kV Jabalpur-Madhotal
2.220/132 kV Jabalpur ICTs 1,2&3
3.132kV Jabalpur-Bargi 1&2
4.132 kV Jabalpur-Tejghat At 220/132 kV Jabalpur substation,132 kV Jabalpur bus along with all connected feeders tripped due to
6 WR MPPTCL 24-May-20 2:40 24-May-20 3:30 0:50 Nil 200 GI-1 0.1667
5.132 kV Jabalpur-Srinagar blasting of Y phase CT of 132 kV Jabalpur-Madhotal feeder.
6.132 kV Jabalpur-Panagar
7.132 kV Jabalpur-VFJ 1&2
8.132 kV Jabalpur-Maneri

Tripping of 800kV HVDC Champa-Kurukshetra Poles 2&4 blocked due to DC line fault. Fault distance from Champa end
7 WR PGCIL 26-May-20 14:37 26-May-20 16:10 1:33 Nil Nil GI-2 Nil
1. +800kV HVDC Champa-Kurukshetra Poles 2&4 was 804.17km. Prior to the event, each pole was carrying 400 MW.

Tripping of 400 kV Seoni-Kirnapur tripped from Seoni end on R-E fault and the line was holding from Kirnapur end. At the
1.400 kV Seoni-Kirnapur same time, sparking occurred in R phase isolator of 132 kV Balaghat-Wara seoni line at Balaghat end. 132kV
8 WR 2.132 kV Kirnapur- Dongargarh MPPTCL 26-May-20 15:32 26-May-20 16:54 1:22 Lalbarra-Balaghat tripped on Zone 3 protection operation from Lalbarra end and 132kV Kirnapur-Dongargarh Nil 80 GD-1 0.1093
3.132kV Lalbarra-Balaghat tripped without any relay indication. With these trippings, 400 kV Kirnapur & 132 kV Balaghat station went
blackout. 400 kV Bhilai-Kirnapur was under outage on Voltage regulation prior to the event.
Tripping of
1.220 kV Kasor-Gavasad 1 At 400/220 kV Kasor S/S, Y-E fault occured on 220 kV Bus 1 and resulted in tripping of all the elements
2.220 kV Kasor- Heranj 1 connected to 220 kV Bus 1 on Busbar protection operation. As reported from site, burnt aluminium wires
9 WR GETCO 27-May-20 9:22 27-May-20 10:37 1:15 Nil Nil GI-1 Nil
3.220 kV Kasor- Karamsad 1 were found in 220/66 kV ICT 1 bay which were suspected to be carried and dropped inside the substation by
4.400/220 kV Kasor ICT 1 some bird.

Tripping of
1.765 kV Satna- Sasan 1&2
2.765 kV Satna-Vindhyachal PS 1&2
3.765 kV Satna-Orai
4.765 kV Satna-Gwalior
5.765 kV Satna-Bina 2
6.765 kV Satna BR 1&2
Multiple trippings
7.765/400 kV Satna ICT 2
occurred at MP
8.765 kV Sasan-Vindhyachal PS 1&2 Due to Extreme weather conditions, multiple trippings occurred at Satna,Sasan and Vindhyachal Pooling
due to heavy
9.765kV Vindhyachal PS-Jabalpur 1&2 PGCIL/SASAN/N station. 765 kV Satna Bus 1 & Bus 2 tripped on R-E fault.This resulted in islanding of Sasan, Vindhyachal
10 WR 28-May-20 16:58 28-May-20 19:08 2:10 5246 950 GD-1 storm. Energy
10.400 kV Satna-JP Nigirie 2 TPC Pooling, VSTPS stage 4&5 and Rihand. After isolation from the grid all the generators/lines connected tripped
unserved in MUs
11.400 kV VIndhyachal PS-Sasan 1&2 on Over speed/Over Voltage respectively
not submitted by
12.400 kV VSTPS 4- Vindhyachal PS 1,2,3&4
MP SLDC
13.400 kV VSTPS 4- VSTPS 5 1&2
14.660MW Sasan Units 2,3,4,5&6
15.500 MW VSTPS Units 11,12&13
16.500 MW Rihand Stage 3 Units 1&2
17.400 kV Sasan-Rewa
18.400/38.5 kV Satna STATCOM coupling transformer
19.765 kV Satna Bus 1&2

800 kV HVDC Champa-Kurukshetra Pole 1 blocked due to Valve Based Electronics (VBE) Control Maloperation
Tripping of at Kurukshetra end. Poles 2&4 blocked on Cable Longitudinal Differential (CLD) protection operation. Pole 3
11 WR PGCIL 28-May-20 14:58 28-May-20 16:21 1:23 Nil Nil GI-2 Nil
1.+800kV HVDC Champa-Kurukshetra Poles 1,2,3&4 blocked on Common Neutral Area Protection (CNAP) maloperation at Champa end. Prior to the event each
pole was carrying 400 MW each.

Tripping of 800 kV HVDC Champa-Kurukshetra Poles 1&2 blocked on DC line fault.Fault Location was at tower No-2270 at
12 WR PGCIL 28-May-20 19:53 28-May-20 21:25 1:32 Nil Nil GI-2 Nil
1.800kV HVDC Champa-Kurukshetra Poles 1&2 846.7 km from Champa end. Prior to the event, each pole was carrying 375 MW.

Tripping of
Due to Extreme weather conditions, 220 kV Malanpur -Gwalior 1&2 and 220 kV Malanpur-Morena(Adani)
1.220 kV Malanpur-Gwalior 1&2
tripped on B-E fault. 220 kV Malanpur-Morena 1&2 tripped on B-Y fault and Y-E fault respectively. 132 kV
2.220 kV Malanpur-Morena 1&2
13 WR MPPTCL 29-May-20 19:08 29-May-20 20:02 0:54 Banmore 1 and 132 kV Mehgaon feeders tripped on R-E fault. Since 28.05.2020, 220kV Malanpur-Auraiya, 132 Nil 38 GD-1 0.0342
3.220 kV Malanpur-Morena(Adani)
kV Malanpur-Banmore 2 and 132 kV Malanpur-Badagaon were under forced outage. Malanpur substation
4.220/132 kV Malanpur ICTs 1,2&3
went blackout

Tripping of
1.400 kV Korba(W) Extension-Bhilai
While charging 400 kV Korba(W) Extension-Marwa, line tripped on SOTF and at the same time 400 kV
2400 kV Korba(W) Extension-Marwa.
14 WR CSPTCL/ CSPGCL 31-May-20 18:15 31-May-20 19:28 1:13 Korba(W) Extension-Bhilai, 210 MW Korba(W) Units 3&4 and 500 MW Korba(W) Unit 5 tripped. The reason 750 Nil GD-1 Nil
3.400/220 kV 500 MVA Korba(W) ICT 47
for the tripping is under investigation.
4.210 MW Korba(W) Units 3&4
5.500 MW Korba(W) Extension Unit 5
Southern Region-Grid Event Report for May 2020

Outage
Outage Revival Category as per Energy
Sl. Name of Elements Duration Event Generation Load Loss
Region Owner / Agency CEA Grid Unserved
No. (Tripped/Manually opened) (As reported) Loss (MW) (MW)
Standards (MU)
Date Time (Hrs) Date Time (Hrs) Time

Complete outage of 220kV Kolar, 220kV Malur, 220kV Sarjapur and 220kV VTP SS of KPTCL: During antecedent conditions,
220kV Kolar Kar, 220kV Malur, 220kV Sarjapur and 220kV Vikas Tech Park (VTP) SS are radially fed from 220kV Kolar PG SS.
Triggering incident was B phase jumper cut in 220kV Kolar PG- Kolar Kar line-1 . Subsequently Line tripped on operation of
i. 220kV Kolar PG - Kolar KA Line-1
1 SR KPTCL 9-May-20 22:41 9-May-20 23:10 29 mins Z1 distance protection at both the ends. At the same time, YB fault was observed in 220kV Kolar PG-Kolar Kar line-2 and line- ---- 360 MW GD-1 0.1740
ii. 220kV Kolar PG - Kolar KA Line-2
2 tripped on operation of non-directional OC protection at Kolar Kar end and Zone-2 operation at Kolar PG end. Due to
tripping of 220kV Kolar PG Kolar line-1 and 2, there was complete loss of supply at 220kV Kolar KA, 220kV Malur, 220kV
Sarjapur and 220kV Vikas Tech Park.

i. 220kV Nelamangala - Peenya-1


Complete outage of 220kV Peenya SS of KPTCL : Triggering incident was snapping of earth conductor at second tower from
ii. 220kV Nelamangala - Peenya-2
2 SR KPTCL 9-May-20 6:29 9-May-20 6:54 25 mins 400 kV receiving station Nelamangala. All other connected lines at 220kV Peenya tripped resulting in complete outage of ---- 150 MW GD-1 0.06
iii. 220kV Nelamangala - Peenya-3
220kV Peenya station. Details awaited from KPTCL.
iv. 220kV Nelamangala - Peenya-4
Complete outage of 220kV Alipura SS of KPTCL: Triggering incident was R-ph fault in 220kV Alipur - BTPS line. Line tripped on
operation of Zone-2 distance protection at BTPS end and Zone-1 distance protection at Alipur end. But from DR of at Alipur
i. 220kV Alipur - BTPS line
3 SR KPTCL 16-May-20 18:52 16-May-20 19:50 58 mins end, fault current was observed to be persistent for more than 400ms. Due to non-clearance of fault, 220kV Alipur - ---- 70 MW GD-1 0.07
ii. 220kV Alipur - Regulapadu line
Regulapadu line tripped only at Alipur end on operation of reverse Zone-4 distance protection. Tripping of both connected
220kV lines resulted in complete loss of supply at 220kV Alipur SS. Details are still awaited.

Multiple Tripping in 400kV/220kV Tumkur SS and Complete outage of 220kV Anthrasanahalli SS of KPTCL: During antecedent
conditions, due to outage of 220kV Shimoga - A’halli line and 220kV A’halli -Neelamangala line, 220kV A’halli SS was radially
fed from 220kV Tumkur_PG SS. At 10:10hrs, 220kV Tumkur_PG A’halli line was taken under shutdown for AMP works . At
i. 220kV Tumkur PG - Madhugiri KA line-1
10:14hrs, bus fault occurred at 220kV Tumkur_PG SS due to inadvertent closure of Bus-1 Earth Switch of A’halli line-2 while
4 SR ii. 220kV Tumkur PG - Madhugiri KA Line-2 KPTCL 18-May-20 10:14 18-May-20 10:45 31 mins ---- 120 MW GD-1 0.062
Bus-2 isolator of A’halli line-2 was in closed condition. Due to non-operation of BBP at 220kV Tumkur_PG SS, fault was
iii. 400/220kV Tumkur ICTs 1, 2 & 3
cleared by tripping of remote end feeders on Zone-2 operation and 400kV/220kV Tumkur ICT-1, 2 and 3 got tripped on
operation of HV side directional OC protection. This resulted in de-energization of 220kV Tumkur_PG bus. Since 220kV A’halli
SS was radially fed from 220kV Tumkur_PG SS, this resulted in complete loss of supply at 220kV A’halli SS of KPTCL .

Complete loss of supply at 220kV Manyata and 220kV Hebbal SS of KPTCL: In the antecedent 220kV Peenya - Hebbal, 220kV
Manyata - Hoody and 220kV Manyata - ITI were in idle charged condition. There was also heavy rain and wind. 220kV
5 SR i. 220kV Manyata - Yelahanka line KPTCL 24-May-20 14:55 24-May-20 17:58 3 hrs 3 mins Manyata - Yelanhanka line tripped on Zone-1, distance protection due to R-Y fault. As reported at tower location 67, ---- 100 MW GD-1 --
tarpauline sheet fell on the line. Since the only incoming souce to 220kV Hebbal was from Manyata, tripping of 220kV
Manyata - Yalahanka line resulted in complete loss of supply at 220kV Manyata and 220kV Hebbal stations of KPTCL.

Complete loss of supply at 220kV Khodays and 220kV Subramanyapura SS of KPTCL: In the antecedent conditions, 220kV
Subramanyapura - Peenya line was in idle charged condition. There was also heavy rain and wind. Triggering incident was Y-B
6 SR i. 220kV Somanahally - Khodays line KPTCL 24-May-20 15:15 24-May-20 16:55 1 hr 40 mins phase fault in 220kV Somanahally - Khodays line and the line tripped on Zone-1 distance protection. This resulted in ---- 110 MW GD-1 --
complete loss of supply at 220kV Khodays and 220kV Subramanyapura stations since these stations were radially fed from
Somanahalli station.

Complete outage of 220kV Talapalli SS of APTRANSCO: Triggering incident was R-phase CT blast connected to 220kV side of
All elements connected to 220kV Bus-1 and Bus-
7 SR Andhra Pradesh 28-May-20 19:41 28-May-20 22:35 2 hr 54 mins 400/220kV ICT-2 at Talapalli. Bus bar protection of both 220kV Bus-1 and Bus-2 operated and all connected elements tripped ---- 550 MW GD-1 --
2 at Talapalli.
resulting in complete outage of 220kV Talapalli station. Details are awaited.

Multiple Tripping in 220kV/33kV KSPDCL SS 4: Triggering incident was B ph Bus-2 PT failure at 220kV KSPDCL SS no.4. Bus-2
i. 220kV KPSDCL - Pavagada line-4 BBP operated resulting in the tripping of all the elements connected to Bus-2 at 220kV KSPDCL SS no.4. At the same time,
8 SR ii. 220kV/33kV 80 MVA transformer no. 1 & 2. KSPDCL 9-May-20 19:08 9-May-20 20:58 1 hr 50 mins RYBG fault occurred at 33kV cable feeder no.6 of KSPDCL 220/33kV SS-3. Cable got tripped on operation of Overcurrent ---- ---- GI-1 ----
iii. 220kV Pavagada - KSPDCL line-3 protection. At the same time, 220kV Pavagada KSPDCL line-3 got tripped only at Pavagada end on operation of DEF
protection . There was no delayed fault clearance during the event.

i. 220kV Vemagiri - Peddapuram line-2


Tripping of 220kV Bus-2 at 400/220kV Vemagiri station of APTRANSCO: As reported during relay testing of 220kV feeders at
ii. 220kV Vemagiri - Bommuru Line-2
9 SR APTRANSCO 14-May-20 11:54 14-May-20 12:25 31 mins Vemagiri station, LBB relay of 220kV Vemagiri - Peddapuram line-2 maloperated. This resulted in tripping of 220kV Bus-2 and ---- ---- GI-1 ----
iii. 220kV Vemagiri - Duvva line
all elements connected to Bus-2 tripped.
iv. 400/220kV ICT-2 at Vemagiri

Complete outage of 220kV side of 400/220kV Vemagiri station of APTRANSCO: As reported control cables caught fire at
i. All elements connected to Bus-1 and Bus-2 at
10 SR APTRANSCO 14-May-20 0:40 14-May-20 4:17 3 Hrs 37 mins 220kV Vemagiri switchyard. Bus bar protection of 220kV Bus-1 and Bus-2 operated resulting in tripping of all connected ---- ---- GI-1 ----
220kV Vemagiri
elements. 400/220kV ICT-1,2 and 3 also tripped.
i. 400/220kV ICT-1
Tripping of 220kV Bus-1 at 400/220kV Vemagiri station of APTRANSCO: Triggering incident was B-phase insulator disc
ii. 400/220kV ICT-3
11 SR APTRANSCO 15-May-20 18:07 15-May-20 18:38 31 mins flashover of 220kV Vemagiri - Bommuru line 2. Bus bar protection of 220kV Bus-1 operated resulting in tripping of all ---- ---- GI-1 ----
iii. 220kV Vemagiri - Bommuru line 2
elements connected to Bus-1.
iv. 220kV Vemagiri - Bheemavaram
i. 220kV Nunna - Bhimadolu line
ii. 220kV Nunna - Gunadala line Tripping of Bus-2 at 220kV Nunna SS of APTRANSCO: Triggering incident was failure of HV side CT connected to 220/132kV
12 SR iii. 220kV Nunna - KTPS line APTRANSCO 23-May-20 9:45 23-May-20 11:00 1 hr 15 mins ICT-1 at Nunna. Bus bar protection of Bus-2 operated and all Bus-2 connected elements tripped. There was no load / ---- ---- GI-1 ----
iv. 220kV Nunna - Gudivada line-2 generation loss during the event.
v. 400/220kV ICT-3 at Nunna
i. 220kV Nagarjunsagar - Tallapalli Line-1
Tripping of Bus A at 220kV Nagarjunsagar station of TSGENCO: Triggering incident was failure of HV side CT connected to
13 SR ii. 220kV Nagarjunsagar - Srisailam RB TSGENCO 29-May-20 0:08 29-May-20 2:51 2 Hrs 43 mins ---- ---- GI-1 ----
220/132kV ICT-1 at Nagarjunsagar. Bus bar protection of Bus-A operated and all Bus A connected elements tripped.
iii. Unit#5 at Nagarjunsagar

48
Eastern Region-Grid Event Report for May 2020

Outage Revival Outage Duration Category as per


Sl. Owner / Generation Loss Load Loss Loss of
Region Name of major elements tripped Event CEA Grid
No. Agency (MW) (MW) Energy(in MU)
Date Time Date Time Time Standards

On 5th May 2020, at 19:09 Hrs, 220 kV Darbhanga (DMTCL)-Darbhanga (BSPTCL) D/C tripped on Y phase to earth fault. At the
220 kV Darbhanga (DMTCL)-Darbhanga (Bihar) D/C same time 220 kV Dharbanga-Mushahari-1 also tripped resulting in load loss at Darbhanga, Madhubani and Pandaul. Later on it
1 ER BSPTCL 5-May-20 19:09 5-May-20 19:48 0:39 0 180 GD-1 0.1170
220 kV Dharbanga-Mushahari-1 was informed by BSPTCL that there was a Y-phase jumper snapping of 220 kV Darbhanga (DMTCL)-Darbhanga (BSPTCL) - 2 which
was the root cause of the event.
220 kV Chaibasa (JUSNL) – Chaibasa (PG) D/C At 01:13 hrs 400/220 kV ICT 1 & 2 at Chaibasa (PG) tripped from 220 kV side due to mal-operation of back up impedance relay. At
220 kV Chaibasa (JUSNL) – Ramchandrapur D/C 01:19 hrs, 220 kV Chaibasa (JUSNL) – Chaibasa (PG) D/C and 220 kV Chaibasa (JUSNL) – Ramchandrapur D/C tripped due to R
2 ER JUSNL 6-May-20 1:19 6-May-20 1:40 0:21 0 20 GD-1 0.0070
400/220 kV ICT 1 & 2 at Chaibasa (PG) phase to earth fault resulting in total power failure at 220/132 kV Chaibasa (JUSNL) S/S. 132 kV Rajkharswan – Goelkhera S/C also
132 kV Rajkharswan – Goelkhera S/C tripped at same time.

Tripping of 400 kV Barh - Motihari - 2 due to Y phase to earth fault, had led to loss of supply to Betiah/Raxaul/Motihari as being
3 ER 400 kV Barh – Motihari – 2 ISTS 7-May-20 12:51 7-May-20 13:26 0:35 0 85 GD-1 0.0496
the single source of supply.

At 18:47 Hrs, 400 KV Alipuduar - Jigmelling D/C tripped on R-Y-N fault caused tripping of Mangdechu units #1 and #2 (At
4 ER 400 KV Alipuduar - Jigmelling D/C ISTS 7-May-20 18:47 7-May-20 19:58 1:11 Bhutan) on no evacuation path. No generation and load loss at Indian grid. At Bhutan grid around 238 MW generation loss 0 0 GI-2 0.0000
occurred at Mangdechu.

220 kV Gaya Sonenagar – D/C tripped at 22:51 hrs due to R phase to earth fault resulting total power failure at Sonenagar S/S.
5 ER 220 kV Gaya Sonenagar – D/C BSPTCL 10-May-20 22:51 10-May-20 23:02 0:11 Around 130 MW load loss was reported at Aurangabad, Sonenagar, Rafi Ganj, Japla. Around 15 MW traction load loss was 0 130 GD-1 0.0238
reported at Japla, Garwah and Rafi Ganj.

Tripping of 400 kV Barh - Motihari - 2 due to Y phase to earth fault, had led to loss of supply to Betiah/Raxaul/Motihari as being
6 ER 400 kV Barh – Motihari – 2 ISTS 10-May-20 23:56 11-May-20 0:48 0:52 0 120 GD-1 0.1040
the single source of supply.

(Detail report
Tripping of 400 kV Barh - Motihari - 2 due to Y phase to earth fault, had led to loss of supply to Betiah/Raxaul/Motihari as being from Bihar SLDC
7 ER 400 kV Barh – Motihari – 2 ISTS 11-May-20 2:48 11-May-20 12:05 9:17 0 120 GD-1
the single source of supply. is yet to be
received)

220 kV Ranchi Hatia T/C 220 kV Ranchi Hatia T/C, 220 kV Patratu-Hatia D/C and 220/132KV 150MVA ICT-1, 2 and 3 at Hatia tripped at same time resulting
8 ER 220 kV Patratu-Hatia D/C JUSNL 14-May-20 15:33 14-May-20 16:08 0:35 in total power failure at 220/132 kV Hatia S/S. In Jamshedpur PMU data, one R phase to earth fault has been captured. Fault was 0 161 GD-1 0.0939
220/132KV 150MVA ICT-1, 2 and 3 at Hatia cleared at around 400 ms.

At 19:26 hrs. 400 kV Meramundali – JSPL – 1 tripped due to receipt of DT signal at Meramundali end. After around 1 min, 400 kV
9 ER 400 kV Meramundali JSPL D/C OPTCL 16-May-20 19:28 16-May-20 20:21 0:53 Meramundali – JSPL – 2 tripped due to same reason resulting total power failure at JSPL. Inclement weather condition was 230 160 GD-1 0.1413
reported at the time of the event.

220 kV TTPS – PTPS S/C tripped from PTPS end only on B phase to earth fault. 220 kV TTPS – PTPS S/C, unit 2 at TTPS and station
220 kV TTPS – PTPS S/C transformer 2 at TTPS were connected to 220 kV bus 2 at TTPS. So, both the running units at TTPS and 220 kV bus coupler at
10 ER JUSNL 18-May-20 0:53 18-May-20 2:35 1:42 302 0 GI-1 0.0000
Unit 1 and 2 at TTPS TTPS (tripping of bus coupler was verbally informed by TTPS) tripped to clear the fault. 220 kV TTPS – Bihar Sharif S/C and 220 kV
bus 1 at TTPS did not trip during this event.

132 kV side B phase CT of 220/132 kV ICT – 3 at 220/132 kV Hatia S/s got burst. At same time, 220 kV Ranchi Hatia 1 and 3,
220 kV Ranchi Hatia 1 and 3
11 ER JUSNL 19-May-20 2:56 19-May-20 3:22 0:26 220/132KV 150MVA ICT-1, 2 and 3 at Hatia tripped resulting total loss of supply at 132 kV voltage level of Hatia S/S. 220 kV bus 0 200 GI-1 0.0867
220/132KV 150MVA ICT-1, 2 and 3 at Hatia
at Hatia remained in service along with 220 kV PTPS – Hatia D/C and 220 kV Ranchi – Hatia – 2.

400 kV Teesta III – Dikchu S/C At 20:57 hrs both circuits tripped resulting in total power failure at Dikchu HEP. 400 kV Teesta III – Dikchu S/C tripped due to B
12 ER ISTS 19-May-20 20:57 19-May-20 21:35 0:38 55 0 GD-1 0.0000
400 kV Rangpo – Dikchu S/C phase to earth fault. 400 kV Rangpo – Dikchu S/C tripped due to direct trip signal received at Rangpo.

Tripping of 400 kV Barh - Motihari - 2 due to R phase to earth fault, had led to loss of supply to Betiah/Raxaul/Motihari as being
13 ER 400 kV Barh – Motihari – 2 ISTS 20-May-20 13:23 20-May-20 14:39 1:16 0 110 GD-1 0.1393
the single source of supply.

220 kV TTPS – PTPS S/C At 12:28 hrs 220 kV TTPS – Bihar Sharif S/C tripped due to R phase to earth fault. The whole power generated by TTPS was being
14 ER 220 kV TTPS - Bihar Sharif S/C JUSNL 24-May-20 12:38 24-May-20 13:01 0:23 evacuated through 220 kV TTPS – PTPS S/C. At 12:38 hrs, 220 kV TTPS – PTPS S/C tripped due to B phase to earth fault resulting 292 0 GD-1 0.0000
Unit 1 and 2 at TTPS in tripping of both running units at TTPS.

220 kV Muzaffarpur Dhalkebar D/C tripped due to B phase directional O/C resulting in loss of power supply to Dhalkebar. Prior to
15 ER 220 kV Muzaffarpur Dhalkebar D/C ISTS 24-May-20 19:51 24-May-20 20:21 0:30 the tripping export schedule to Nepal was 90 MW. Around 60-70 MW power was flowing through 220 kV Muzaffarpur Dhalkebar 0 0 GI-I 0.0000
D/C. At 19:49 hrs power through these two circuits increased to more than 145 MW. No load loss reported in Indian grid.

220 kV NJP- TLDP III S/C


At 00:56 Hrs. all 220 kV lines from 220 kV NJP tripped due to tripping of both 220 kiva Buses ,causing generation loss at TLDP III
16 ER 220 kV NJP- TLDP IV D/C WBSETCL 27-May-20 0:56 27-May-20 2:02 1:06 280 0 GD-1 0.0000
and TLDP IV on no evacuation path
220 kV NJP- Binaguri D/C
220 kV New Melli - Jorethang D/C 220 kV New Melli - Jorethang - 1 tripped on Y phase to earth fault from Jorethang end. 220 kV New Melli - Jorethang - 2 tripped
17 ER 220 kV Tashiding - New Melli S/C ISTS 27-May-20 4:28 27-May-20 4:50 0:22 on overcurrent protection from Jorethang end only. At same time 220 kV Tashiding - New Melli S/C and 220 kV Tashiding - 110 0 GD-1 0.0000
220 kV Tashiding - Rangpo S/C Rangpo S/C tripped from Tashiding end only on Y phase to earth fault.

At 19:22 hrs 400 kV Barh – Motihari – 2 tripped due to Y phase to earth fault. The tripping has led to loss of supply to Betiya and
18 ER 400 kV Barh – Motihari – 2 ISTS 30-May-20 19:22 30-May-20 21:59 2:37 0 126 GD-1 0.3297
Motihari as being the single source of supply causing Grid Disturbance 1 (GD-1) category event.

At 22:05 hrs 400 kV Barh – Motihari – 2 tripped due to Y phase to earth fault. The tripping has led to loss of supply to Motihari as
19 ER 400 kV Barh – Motihari – 2 ISTS 30-May-20 22:05 31-May-20 18:47 20:42 0 0 GD-1 0.0000
being the single source of supply causing Grid Disturbance 1 (GD-1) category event.

49
North Eastern Region-Grid Disturbances Report for May 2020
Generati Load Category as
Sl. Date and Time of Date and Time of Outage Generation Load Loss
Region Name of Element Owner / Agency Event on Loss Loss in per CEA Grid
No. Tripping Revival Duration Loss (MW) (MW)
in MU MU Standards
Karong area of Manipur Power System was connected with rest of NER Grid through 132 kV Imphal (MA) - Karong line and 132 kV
Kohima - Karong line.
132 kV Imphal (MA) - Karong line MSPCL & DoP,
1 NER 02-May-20 09:25 02-May-20 09:28 0:03:00 0 10 0 0.001 GD 1
132 kV Kohima - Karong line Nagaland At 09:25 Hrs on 02.05.2020, 132 kV Imphal (MA) - Karong line and 132 kV Kohima - Karong line tripped. Due to tripping of these
elements, Karong area of Manipur Power System was separated from rest of NER Grid and subsequently collapsed due to no source
in this area.
Lekhi and Nirjuli areas of Arunachal Pradesh Power System & Gohpur(Assam) load of Assam Power System were connected with rest
of NER Grid through 132 kV Pare - Lekhi line. 132 kV Lekhi - Itanagar line was kept open due to CT ratio restriction at Lekhi & Bus
POWERGRID & DoP, Coupler at Gohpur was kept open for system requirement.
2 NER 132 kV Pare - Lekhi line 02-May-20 10:11 02-May-20 10:28 0:17:00 0 21 0 0.006 GD 1
Arunachal Pradesh At 10:11 Hrs on 02.05.2020, 132 kV Pare - Lekhi line tripped. Due to tripping of this element, Lekhi & Nirjuli Area of Arunachal
Pradesh Power Sytem and Gohpur Load of Assam Power System were separated from rest of NER Grid and subsequently collapsed
due to no source in these areas.
Lekhi and Nirjuli areas of Arunachal Pradesh Power System & Gohpur(Assam) load of Assam Power System were connected with rest
of NER Grid through 132 kV Pare - Lekhi line. 132 kV Lekhi - Itanagar line was kept open due to CT ratio restriction at Lekhi & Bus
POWERGRID & DoP, Coupler at Gohpur was kept open for system requirement.
3 NER 132 kV Pare - Lekhi line 02-May-20 11:11 02-May-20 11:30 0:19:00 0 29 0 0.0090 GD 1
Arunachal Pradesh At 11:11 Hrs on 02.05.2020, 132 kV Pare - Lekhi line tripped. Due to tripping of this element, Lekhi & Nirjuli Area of Arunachal
Pradesh Power Sytem and Gohpur Load of Assam Power System were separated from rest of NER Grid and subsequently collapsed
due to no source in these areas.
Lekhi area of Arunachal Pradesh Power System was connected with rest of NER Grid through 132 kV Pare - Lekhi line and 132 kV
Lekhi - Nirjuli line. 132 kV Lekhi - Itanagar line was kept open due to CT ratio restriction at Lekhi.
132 kV Pare - Lekhi line POWERGRID & DoP,
4 NER 02-May-20 12:03 02-May-20 12:27 0:24:00 At 12:03 Hrs on 02.05.2020, 132 kV Pare - Lekhi line and 132 kV Lekhi - Nirjuli line tripped. Due to tripping of these elements, Lekhi 0 14 0 0.0060 GD 1
132 kV Lekhi - Nirjuli line Arunachal Pradesh
area of Arunachal Pradesh Power Sytem was separated from rest of NER Grid and subsequently collapsed due to no source in this
area.
Part of Tripura Power System and Comilla load of Bangladesh Power System were connected with the rest of NER Grid through 132
132 kV Palatana - Surajmaninagar line kV Palatana - Surajmaninagar line, 132 kV Jirania - Budhjungnagar line, 132 kV Agartala Dhalabil line, 132 kV Agartala - Rokhia D/C
132 kV Agartala - AGTCCPP D/C and 132 kV Agartala - AGTCCPP D/C.
POWERGRID, TSECL
5 NER 132 kV Jirania - Budhjungnagar line 06-May-20 21:46 06-May-20 23:40 1:54:00 At 21:46 Hrs on 06.05.20, 132 kV Palatana - Surajmaninagar line, 132 kV Jirania - Budhjungnagar line, 132 kV Agartala Dhalabil line, 98 211 0.26 0.4010 GD 2
and PGCB
132 kV Agartala Dhalabil line 132 kV Agartala - Rokhia D/C and 132 kV Agartala - AGTCCPP D/C tripped. Due to tripping of these elements, Part of Tripura Power
132 kV Agartala - Rokhia D/C System and Comilla load of Bangladesh Power System were separated from the rest of NER Grid and subsequently collapsed due to
load generation mismatch in these areas.
Pailapool area of Assam Power System was connected with the rest of NER Grid through 132 kV Jiribam-Pailapool line &132 kV
132 kV Jiribam-Pailapool line AEGCL and Pailapool-Srikona Line.
6 NER 08-May-20 07:12 08-May-20 07:30 0:18:00 0 12 0 0.0040 GD 1
132 kV Pailapool-Srikona Line POWERGRID At 07:12 Hrs on 08.05.2020, 132 kV Jiribam-Pailapool line & Pailapool-Srikona Line tripped. Due to tripping of these elements,
Pailapol area was separated from the rest of NER Grid and subsequently collapsed due to no source in this area.
Pasighat area of Arunachal Pradesh Power System was connected with the rest of NER Grid through 132 kV Along-Pasighat line
DoP, Arunachal (Owner- DoP, Arunachal Pradesh).
7 NER 132 kV Along-Pasighat line 08-May-20 15:47 08-May-20 16:06 0:19:00 0 10 0 0.0030 GD 1
Pradesh At 15:47 Hrs on 08.05.20, 132 kV Along-Pasighat line tripped. Due to tripping of this element, Along area was separated from the
rest of NER Grid and subsequently collapsed due to no source in this area.
Hailakandi area of Assam Power System was connected with the rest of NER Grid through 132 kV Hailakandi-Panchgram line, 132 kV
132 kV Hailakandi-Panchgram line Dullavchera-Hailakandi line &132 kV Hailakandi-Silchar D/C.
8 NER 132 kV Dullavchera-Hailakandi line AEGCL 13-May-20 11:20 13-May-20 11:42 0:22:00 At 11:20 Hrs on 13.05.2020, 132 kV Hailakandi-Panchgram line, 132 kV Dullavchera-Hailakandi line &132 kV Hailakandi-Silchar D/C 0 14 0 0.0044 GD 1
132 kV Hailakandi-Silchar D/C tripped. Due to tripping of these elements, Hailakandi area was separated from the rest of NER Grid and subsequently collapsed due
to no source in this area.
Daporijo area of Arunachal Pradesh Power System was connected with the rest of NER Grid through 132 kV Ziro-Daporijo line.
9 NER 132 kV Ziro-Daporijo line POWERGRID 17-May-20 22:46 17-May-20 23:01 0:15:00 At 22:46 Hrs on 17.05.2020, 132 kV Ziro-Daporijo line tripped. Due to tripping of this elements, Daporijo area was separated from 0 19 0 0.0050 GD 1
the rest of NER Grid and subsequently collapsed due to no source in this area.

Khupi area of Arunachal Pradesh Power System and Dikshi HEP were connected with the rest of NER Grid through 132 kV Balipara-
Tenga line.
NEEPCO & DoP,
10 NER 132 kV Balipara-Tenga line 21-May-20 07:00 21-May-20 07:16 0:16:00 11 11 0.003 0.0030 GD 1
Arunachal Pradesh At 07:00 Hrs on 21.05.2020, 132 kV Balipara-Tenga line tripped. Due to tripping of this element, Khupi area of Arunachal Pradesh
Power System and Dikshi HEP were separated from rest of NER Grid and subsequently collapsed due to load generation mismatch in
this area.
Along area of Arunachal Pradesh Power System was connected with the rest of NER Grid through 132 kV Daporijo-Along line.
DoP, Arunachal
11 NER 132 kV Daporijo-Along 26-May-20 07:36 26-May-20 07:54 0:18:00 At 07:36 Hrs on 26.05.2020, 132 kV Daporijo-Along line tripped. Due to tripping of this element, Along area of Arunachal Pradesh 0 14 0 0.0040 GD 1
Pradesh
Power System was separated from rest of NER Grid and and subsequently collapsed due to no source in this area.
Lumshnong area of Meghalaya Power System was connected with rest of NER Grid through 132 kV Lumshnong-Panchgram line. 132
kV Khleihriat- Lumshnong line was under forced outage since 21:56 Hrs on 26.05.20.
12 NER 132 kV Lumshnong-Panchgram line AEGCL & MePTCL 26-May-20 22:13 26-May-20 22:24 0:11:00 0 14 0 0.0026 GD 1
At 22:13 Hrs on 26.05.2020, 132 kV Lumshnong-Panchgram line tripped. Due to tripping of this element, Lumshnong area was
separated from rest of NER Grid and subsequently collapsed due to no source in this area.
Kohima area of Nagaland Power System & Karong Area of Manipur Power System were connected with the rest of NER Grid through
POWERGRID , 132 kV Dimapur - Kohima line.132 kV Kohima - Wokha line was declared faulty at 05:10 Hrs of 27.05.2020 and 132 kV
13 NER 132 kV Dimapur-Kohima line MSPCL & DoP, 27-May-20 11:38 27-May-20 12:06 0:28:00 Imphal(Yurembam)-Karong Line was under planned S/D w.e.f 09:05 Hrs of 10.05.2020. 0 11 0 0.0050 GD 1
Nagaland At 11:38 Hrs on 27.05.2020, 132 kV Dimapur-Kohima line tripped. Due to tripping of this element, Kohima & Karong areas were
separated from the rest of NER Grid and subsequently collapsed due to no source in these areas.
Kohima area of Nagaland Power System & Karong Area of Manipur Power System were connected with the rest of NER Grid through
POWERGRID, 132 kV Dimapur - Kohima line. 132 kV Kohima - Wokha line was declared faulty at 05:10 Hrs of 27.05.2020 and 132 kV
14 NER 132 kV Dimapur-Kohima line MSPCL & DoP, 27-May-20 15:58 27-May-20 16:16 0:18:00 Imphal(Yurembam)-Karong Line was under planned S/D w.e.f 09:05 Hrs of 10.05.2020. 0 26 0 0.0080 GD 1
Nagaland At 15:58 Hrs on 27.05.2020, 132 kV Dimapur-Kohima line tripped. Due to tripping of this element, Kohima & Karong areas were
separated from the rest of NER Grid and subsequently collapsed due to no source in these areas.
Kohima area of Nagaland Power System & Karong Area of Manipur Power System were connected with the rest of NER Grid through
132 kV Doyang- Sanis line. 132 kV Dimapur(PG) -Kohima line was declared faulty at 10:35 Hrs of 31.05.2020 and 132 kV
15 NER 132 kV Doyang- Sanis line DoP Nagaland 31-May-20 14:35 31-May-20 15:05 0:30:00 Imphal(Yurembam)-Karong Line was under planned S/D w.e.f 09:05 Hrs of 10.05.2020. 8 32 0.004 0.0160 GD 1
At 14:35 Hrs on 31.05.2020, 132 kV Doyang-Sanis line tripped. Due to tripping of this element, Kohima & Karong areas were
separated from the rest of50
NER Grid and subsequently collapsed due to load generation mismatch in these areas.
North Eastern Region-Grid Incidences Report for May 2020
Category as
Sl. Owner / Date and Time of Date and Time of Generation Load Loss Generation Loss Load Loss
Region Name of Element Outage Duration Event per CEA Grid
No. Agency Tripping Revival Loss (MW) (MW) in MU in MU
Standards
AGBPP Unit-2 tripped at 07:52 Hrs on 03-05-20 due to tripping of gas booster
1 NER AGBPP Unit-2 NEEPCO 03-May-20 07:52 03-May-20 09:00 1:08:00 30 0 0.030 0 GI 2
compressor#3. Revision done from Block No.37 on 03-05-20
AGBPP Unit-2 tripped at 05:55 Hrs on 07-05-20 due to tripping of Gas Booster
2 NER AGBPP Unit-2 NEEPCO 07-May-20 05:55 07-May-20 06:30 0:35:00 27.8 0 0.020 0 GI 2
compressor#1. Revision done from Block No.27 on 07-05-20
AGBPP Unit-1,2,3,4,5,6,7,8 AGBPP Unit-1,2,3,4,5,6,7,8,9 tripped at 11:47 Hrs on 10-05-20 due to tripping of Gas
3 NER NEEPCO 10-May-20 11:47 10-May-20 12:30 0:43:00 190 0 0.140 0 GI 2
&9 booster compressor. Revision done from Block No. 51 on 10-05-20
AGBPP Unit-2,4,5 &7 tripped at 06:38 Hrs on 16-05-20 due to tripping of gas booster.
4 NER AGBPP Unit-2,4,5 &7 NEEPCO 16-May-20 06:38 16-May-20 07:15 0:37:00 60 0 0.040 0 GI 2
Revision done from Block No. 30 on 16-05-20
AGTCCPP Unit- 5 tripped at 12:26 Hrs on 18-05-20 due to Console Trip (Vacuum
5 NER AGTCCPP Unit- 5 NEEPCO 18-May-20 12:26 18-May-20 13:15 0:49:00
Pressure Low). Revision done from Block No. 54 on 18-05-20
20.6 0 0.020 0 GI 1

AGBPP Unit-1 tripped at 21:33 Hrs on 25-05-20 due to Auxiliary power supply
6 NER AGBPP Unit- 1 NEEPCO 43976.89792 25-05-20 22:15 0:42:00 31 0 0.022 0 GI 2
failure. Revision done from Block No. 90 on 25-05-20
BgTPP Unit-2 tripped at 07:13 Hrs on 26-05-20 on generator electrical protection.
7 NER BGTPP unit 2 NTPC 26-May-20 07:13 26-06-20 8:00 0:47:00 125 0 1.200 0 GI 2
Revision done from Block No. 33 on 26-05-20
Pare Unit-1 tripped at 08:19 Hrs on 28-05-20 due to shaft seal pressure problem.
8 NER Pare Unit-1 NEEPCO 28-May-20 08:19 28-May-20 09:45 1:26:00 59 0 0.080 0 GI 1
Revision done from Block No. 40 on 28-05-20
AGBPP Unit-3 tripped at 14:37 Hrs on 29-05-20 due to low SF6 Gas pressure in GT
9 NER AGBPP Unit-3 NEEPCO 29-May-20 14:37 29-May-20 15:30 0:53:00 27.6 0 0.020 0 GI 2
CB. Revision done from Block No. 63 on 29-05-20

51
21. NEW ELEMENTS COMMISSIONED* IN MAY 2020
COMMISSIONING OF NEW GENERATING UNITS

REGION S.NO. CONSTITUENT UNIT NAME / LOCATION UNIT NO CAPACITY (MW) DATE
NIL

COMMISSIONING OF NEW ICTs


CAPACITY
REGION S.NO. CONSTITUENT VOLTAGE LEVEL (KVA) SUB-STATION ICT NO DATE
(MVA)
1 PGCIL 765/400/33 Maheshwaram GIS 2 800 kVA 20-05-2020
SR
2 TS 400/6.9 Manguru 2 90 27-05-2020

COMMISSIONING OF NEW TRANSMISSION LINES

LINE NAME VOLTAGE


REGION S.NO. CONSTITUENT CKT NO DATE
(kV)
Baharampur-Bheramara III 400 06-05-2020
ER 1 PGCIL
Baharampur-Bheramara IV 400 07-05-2020

LILO OF TRANSMISSION LINES


SL. LINE NAME VOLTAGE
REGION CONSTITUENT LILO AT DATE
NO. (kV)
NR 1 HVPNL Palwal-Rangala Rajpur Line 1&2 Prithala 220 02.05.2020

COMMISSIONING OF BUS/LINE REACTORS


SL. SUB-STATION
REGION CONSTITUENT VOLTAGE LEVEL CAPACITY (MVAR) DATE
NO.
NIL

COMMISSIONING OF FACTS DEVICE/SYSTEM


SL. SUB-STATION/CONSTITUENT VOLTAGE
REGION NAME RATINGS DATE
NO. (kV)
NIL

*Includes first time charging (FTC) as well

52
22.Voltage Profile
िवद् यु त िवभव परे खा माह - मई 2020 VOLTAGE PROFILE - May 2020
Date of reporting: 05-Jun-20
Number of hours
Voltage Deviation Index
.स. Sl. VOLTAGE < V(lower)* V(lower) < VOLTAGE < VOLTAGE > V(upper)* voltage was outside उ तम (िक.वो.) िन तम(िक.वो.) औसत (िक.वो.)
े REGION उपक SUBSTATION (%age of time voltage is
No. (V=380,728 kV) V(upper)* (V=420,800 kV) IEGC band during Maximum(kV) Minimum(kV) Average(kV)
outside range)
month
1 अं गुल ANGUL 0% 100% 0% 0% 0 797 748 772
2 गया GAYA 0% 100% 0% 0% 0 793 751 772
पू व े
3 झारसुगुड़ा JHARSUGUDA 0% 98% 2% 2% 14 807 777 791
ER
4 रांची RANCHI 0% 100% 0% 0% 0 795 758 780
5 सासाराम SASARAM 0% 100% 0% 0% 0 798 737 761
1 आगरा AGRA 0% 100% 0% 0% 1 805 743 777
2 आगरा (फ़तेहाबाद) AGRA (FATEHABAD) 0% 99% 1% 1% 8 808 726 774
3 अनपरा सी ANPARA-C 0% 100% 0% 0% 0 782 755 766
4 अनपरा डी ANPARA-D 0% 100% 0% 0% 0 782 753 765
5 अं ता ANTA 0% 100% 0% 0% 0 798 753 779
6 बिलया BALLIA 0% 100% 0% 0% 0 795 748 772
7 िभवानी BHIWANI 0% 99% 1% 1% 9 814 746 781
8 बरे ली BAREILLY 0% 98% 2% 2% 17 808 745 780
9 उ री े फ़तेहपु र FATEHPUR 0% 100% 0% 0% 0 800 733 765
10 NR े टर नोएडा GREATER NOIDA 0% 95% 5% 5% 39 812 752 785
11 झिटकरा JHATIKARA 0% 100% 0% 0% 2 809 744 778
12 कानपु र जीआईएस KANPUR GIS 0% 100% 0% 0% 0 795 750 775
13 लखनऊ LUCKNOW 0% 99% 1% 1% 4 802 745 778
14 लिलतपु र LALITPUR 0% 100% 0% 0% 0 797 734 770
15 मेरठ MEERUT 0% 98% 2% 2% 12 808 743 781
16 मोगा MOGA 0% 100% 0% 0% 0 802 739 774
17 फागी PHAGI 0% 99% 1% 1% 4 808 742 777
18 वाराणसी VARANASI 0% 100% 0% 0% 0 799 752 778
19 उ ाव UNNAO 0% 100% 0% 0% 0 792 734 763
1 अकोला AKOLA 0% 100% 0% 0% 0 796 742 775
2 औरं गाबाद AURANGABAD 0% 100% 0% 0% 0 801 750 776
3 भोपाल (बीडीटीसीएल) BHOPAL (BDTCL) 0% 100% 0% 0% 0 793 749 771
4 िबलासपु र BILASPUR 0% 100% 0% 0% 0 788 761 773
5 बीना BINA 0% 100% 0% 0% 1 802 753 776
6 चांपा CHAMPA 0% 100% 0% 0% 2 804 773 787
7 धमजयगढ़ DHARAMJAIGARH 0% 100% 0% 0% 0 792 764 777
8 धुले (बीडीटीसीएल) DHULE (BDTCL) 0% 100% 0% 0% 1 802 751 774
9 एकतुनी EKTUNI 0% 100% 0% 0% 0 797 746 775
10 ािलयर GWALIOR 0% 100% 0% 0% 2 806 749 779
11 इं दौर INDORE 0% 100% 0% 0% 0 792 748 770
12 जबलपु र JABALPUR 0% 100% 0% 0% 2 806 758 780
13 पि मी े कोरडी KORADI 0% 100% 0% 0% 0 784 747 765
14 WR पु णे PUNE 0% 100% 0% 0% 0 800 754 784
15 रायगढ़ पू िलंग RAIGARH POOLING 0% 100% 0% 0% 0 799 773 785
16 रायपु र पू िलंग RAIPUR POOLING 0% 100% 0% 0% 0 797 760 779
17 सासन SASAN 0% 100% 0% 0% 0 789 746 769
18 सतना SATNA 0% 100% 0% 0% 0 795 751 772
19 िसवनी SEONI 0% 100% 0% 0% 0 801 759 779
20 सीपत SIPAT 0% 100% 0% 0% 0 789 762 774
21 सोलापु र SOLAPUR 0% 99% 1% 1% 9 807 757 783
22 तामनार TAMNAR 0% 100% 0% 0% 0 798 774 785
23 ितरोड़ा TIRORA 0% 100% 0% 0% 0 776 750 761
24 वड़ोदरा VADODARA 0% 100% 0% 0% 1 802 761 783
25 िवं ाचल पू िलंग VINDHYACHAL PS 0% 100% 0% 0% 0 788 754 771
26 वधा WARDHA 0% 99% 1% 1% 4 806 756 780
1 कनूल KURNOOL 0% 100% 0% 0% 2 804 746 775
2 ने ू र पू िलंग NELLORE PS 0% 100% 0% 0% 2 803 749 775
3 दि णी े रायचू र RAICHUR 0% 100% 0% 0% 2 804 752 776
4 SR िनज़ामाबाद NIZAMABAD 0% 92% 8% 8% 60 813 762 789
5 ीकाकुलम SRIKAKULAM 0% 92% 8% 8% 63 813 764 789
6 ित वलम THIRUVALEM 0% 100% 0% 0% 3 809 737 775
1 अज़ारा AZARA (400 kV) 0% 100% 0% 0% 0 415 402 410
2 बािलपारा BALIPARA (400 kV) 0% 100% 0% 0% 1 426 385 407
3 िब नाथ च रआिल BISWANATH CHARIALI (400 kV) 0% 100% 0% 0% 0 424 383 405
4 बोंगाईगांव BONGAIGAON (400 kV) 0% 100% 0% 0% 0 417 393 407
5 पू व र े बोंगाईगांव टीपीएस BONGAIGAON TPS (400 kV) 0% 100% 0% 0% 0 418 394 409
6 NER बिनहाट BYRNIHAT (400 kV) 0% 100% 0% 0% 0 415 402 410
7 पालाटाना PALATANA (400 kV) 0% 100% 0% 0% 0 420 405 413
8 रं गानदी RANGANADI (400 kV) 0% 86% 14% 14% 105 429 393 414
9 मीसा MISA (400 kV) 0% 100% 0% 0% 2 426 388 409
10 िसलचर SILCHAR (400 kV) 2% 98% 53 0% 2% 14 422 354 409
All listed stations are 765 kV stations unless otherwise mentioned
*Percentage is calculated w.r.t. Time of one month.
23. List of Outages of Elements monitored by NLDC for the month of MAY-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month

Inter Regional Elements


1 132 kV Bina-Morwa Line NR/WR MO 27-05-2020 19:55 Power not required by Bina(UP) 01-06-2020 00:00 100:05:00 0
2 132 kV Rihand-Garwah 1 Line ER/NR TL 05-05-2020 21:00 line tripped due to heavy rain & storm. 05-05-2020 21:53 0:53:00 1
3 132 kV Rihand-Garwah 1 Line ER/NR TL 07-05-2020 15:22 Phase to earth fault B-N 07-05-2020 17:25 2:03:00 2
4 132 kV Rihand-Garwah 1 Line ER/NR TS 24-05-2020 15:23 Tripped Due to 132KV Bus dead at Rihand Hydel 24-05-2020 16:35 1:12:00 3
5 132 kV Rihand-Garwah 1 Line ER/NR TS 27-05-2020 16:28 no flag no relay operation has been detected on electro-mechanical type relay panel 27-05-2020 19:00 2:32:00 4
6 132 kV Rihand-Garwah 1 Line ER/NR TL 31-05-2020 15:22 Phase to earth fault R-N Y-Phase fault, zone-1, dist- 54 km from Rihand end. 31-05-2020 22:52 7:30:00 5
7 132 kV Rihand-Garwah 1 Line ER/NR ME 22-05-2020 11:26 open due to safety purpose 22-05-2020 13:55 2:29:00 5
8 132 kV Rihand-Sone nagar 1 Line ER/NR TL 05-05-2020 19:58 line tripped due to heavy rain & storm. 06-05-2020 01:48 5:50:00 1
9 132 kV Rihand-Sone nagar 1 Line ER/NR TL 27-05-2020 13:50 Phase to phase fault Y-B iy - 1251.28A ib - 1222.76A from Rihand end 27-05-2020 18:28 4:38:00 2
10 132 kV Rihand-Sone nagar 1 Line ER/NR SO 26-05-2020 13:40 Replacement of damaged R-phase jumper at loc. no.- 558 26-05-2020 20:13 6:33:00 2
Phase to earth fault B-N line tripped due to B-N fault Zone 1,, Fault current 4.02 kA. distance
11 132 kV Sahupuri-Karmanasa 1 Line ER/NR TL 10-05-2020 21:54 11-05-2020 05:48 1
10.1 km from sahupuri end 7:54:00
12 132kV Anpara-Morwa Line NR/WR TL 04-05-2020 03:08 R-N trip, Z-1 04-05-2020 05:15 2:07:00 1
13 132kV Lalitpur - Rajghat Line WR/NR MO 19-05-2020 18:03 Line hand tripped from Rajghat as requested from UPPTCL. 01-06-2020 00:00 293:57:00 0
14 220 kV Alipurduar-Salakati-II Line ER/NER TS 12-05-2020 12:10 Tripped from Salakati end only. 12-05-2020 12:44 0:34:00 1
15 220 kV Budhipadar-Korba-II Line ER/WR TL 01-05-2020 17:54 R-N Fault 01-05-2020 23:14 5:20:00 1
16 220 kV Budhipadar-Korba-II Line ER/WR TL 17-05-2020 12:58 Line tripped, indications Korba:B-E,3.47 kA,32.3 KM 17-05-2020 18:24 5:26:00 2
17 220 kV Mehgaon-Auraiya Line WR/NR TS 11-05-2020 04:30 Phase to earth fault R-N 11-05-2020 05:48 1:18:00 1
18 220 kV Mehgaon-Auraiya Line WR/NR TL 18-05-2020 11:40 Auraiya: B-N Fault,33.8 KM,Z1(Auraiya: B-N Fault,33.8 KM,Z1) 18-05-2020 14:26 2:46:00 2
19 220 kV Mehgaon-Auraiya Line WR/NR SO 18-05-2020 14:27 Line maintenance works 18-05-2020 18:21 3:54:00 2
20 220 kV Mehgaon-Auraiya Line WR/NR SE 19-05-2020 09:35 To attend hotspot 19-05-2020 17:50 8:15:00 2
Line tripped due to R-N fault ,Zone 1,Fault current L1 0.81 kA, Distance 37.2 km from sahupuri
21 220 kV Pusauli-Sahupuri Line ER/NR TL 10-05-2020 21:34 11-05-2020 16:09 1
end, 18:35:00
22 220 kV Pusauli-Sahupuri Line ER/NR TS 19-05-2020 21:26 LA blast at Sahupuri 20-05-2020 02:50 5:24:00 2
23 220 kV Pusauli-Sahupuri Line ER/NR SO 11-05-2020 16:12 Shutdown taken to attend R-phase disc broken found at location no 82 11-05-2020 23:04 6:52:00 2
24 220kV Ponda-Ambewadi Line WR/SR SO 09-05-2020 07:26 Debunching of 220 kV Ambewadi-Ponda 01-06-2020 00:00 544:34:00 0
25 220kV Xeldom-Ambewadi Line WR/SR TL 03-05-2020 12:34 Zone I, Distance: 21.1 Kms,Phase: B-N,Fault Current: 0.6kA. 03-05-2020 13:13 0:39:00 1
26 220kV Xeldom-Ambewadi Line WR/SR TL 12-05-2020 12:02 B- Ph fault, FD:62.2 km from Xeldam and FC:1.75 kA 12-05-2020 13:07 1:05:00 2
27 220kV Xeldom-Ambewadi Line WR/SR SO 16-05-2020 07:01 for pre monsoon work. 16-05-2020 15:40 8:39:00 2
28 400 kV Bhadrawati-Ramagundam-II Line WR/SR SO 19-05-2020 15:42 for jumper rectification at Location no.359 19-05-2020 22:41 6:59:00 0
29 400 kV Biharshariff-Balia-I Line ER/NR SO 26-05-2020 08:10 For replacement of flashed insulator at loc no 424 26-05-2020 20:31 12:21:00 0
30 400 kV Biharshariff-Balia-II Line ER/NR SO 27-05-2020 08:22 Replacement of flashover insulator at loc no 424(Top Phase)/Transposition tower 27-05-2020 20:08 11:46:00 0
31 400 kV Jeypore-Gazuwaka-I Line ER/SR TL 15-05-2020 12:44 Z1, B Ph Fault, FC: 1.47kA, 29 km from Gajuwaka 15-05-2020 13:31 0:47:00 1
32 400 kV Patna-Balia-I Line ER/NR SE 03-05-2020 05:15 Emergency hand tripped due to heavy sparking in Y-PH Line Isolator at Balia end. 03-05-2020 11:06 5:51:00 0
33 400 kV Patna-Balia-II Line ER/NR SO 29-05-2020 08:12 Insulator replacement 29-05-2020 20:40 12:28:00 0
34 400 kV Ranchi-Sipat-I Line ER/WR ME 26-05-2020 13:46 Man has climbed on tower. 26-05-2020 17:08 3:22:00 0
35 400 kV Ranchi-Sipat-II Line ER/WR ME 26-05-2020 13:47 Man has climbed on tower. 26-05-2020 17:11 3:24:00 0
36 400 kV Siliguri-Bongaigaon-I Line ER/NER SO 19-05-2020 09:46 New TWFL relay retrofitting &commissioning 19-05-2020 19:37 9:51:00 0
37 400 kV Siliguri-Bongaigaon-II Line ER/NER SO 13-05-2020 07:51 Re-positioning of Earth wire etc. 13-05-2020 12:19 4:28:00 0
38 400 kV Varanasi-Biharshariff-I Line ER/NR TL 26-05-2020 23:03 B-N Fault, 229km from Varanasi, 1.1 kA 27-05-2020 04:18 5:15:00 1
39 400 kV Vindhyachal-Rihand-I Line WR/NR TL 28-05-2020 17:26 Tripped (Heavy to very heavy storms reported) 28-05-2020 19:05 1:39:00 1
40 400 kV Vindhyachal-Rihand-II Line WR/NR TL 22-05-2020 12:09 R-N,16.8km,5.94KA: Vindhyachal 22-05-2020 13:23 1:14:00 1
41 400 kV Vindhyachal-Rihand-II Line WR/NR TL 28-05-2020 17:26 Tripped (Heavy to very heavy storms reported) 28-05-2020 19:30 2:04:00 2
42 400kV Barh-Gorakhpur Ckt-I Line ER/NR SO 14-05-2020 11:24 To attend clearance between R-ph and earth wire at some location 14-05-2020 15:51 4:27:00 0
43 400kV Barh-Gorakhpur Ckt-II Line ER/NR SC 01-05-2020 00:00 for the stringing at Gandak river of the LILO section on ERS towers . 01-06-2020 00:00 744:00:00 0
44 400kV Jharsuguda-Raigarh IV Line WR/ER TL 30-05-2020 00:24 Y-N fault. FD-145.5km, FC-3.015kA from Raigarh end 30-05-2020 08:51 8:27:00 1
45 765 kV Angul-Srikakulum-II Line ER/SR TL 16-05-2020 18:00 Tripped on Y-N fault 16-05-2020 18:12 0:12:00 1
46 765 kV Gaya-Varanasi-I Line ER/NR SO 07-05-2020 10:17 FOR STRENGTHENING OF 765 kV DELTA TYPE SUSPENSION TYPE TOWERS (WIND ZONE-2) 08-05-2020 21:21 35:04:00 0
47 765 kV Gaya-Varanasi-I Line ER/NR SO 08-05-2020 08:31 FOR STRENGTHENING OF 765 kV DELTA TYPE SUSPENSION TYPE TOWERS (WIND ZONE-2) 08-05-2020 20:22 11:51:00 0
48 765 kV Gaya-Varanasi-I Line ER/NR SO 09-05-2020 08:06 FOR STRENGTHENING OF 765 kV DELTA TYPE SUSPENSION TYPE TOWERS (WIND ZONE-2) 09-05-2020 20:47 12:41:00 0
49 765 kV Gaya-Varanasi-I Line ER/NR SO 10-05-2020 08:17 FOR STRENGTHENING OF 765 kV DELTA TYPE SUSPENSION TYPE TOWERS (WIND ZONE-2) 10-05-2020 21:25 13:08:00 0
50 765 kV Gaya-Varanasi-I Line ER/NR TS 10-05-2020 22:26 Phase to earth fault B-N FD: 119.7km from Varanasi, FC: 4.39KA at Varanasi 11-05-2020 00:00 1:34:00 1
51 765 kV Gaya-Varanasi-I Line ER/NR SO 11-05-2020 09:03 FOR STRENGTHENING OF 765 kV DELTA TYPE SUSPENSION TYPE TOWERS (WIND ZONE-2) 11-05-2020 19:59 10:56:00 1
52 765 kV Gaya-Varanasi-I Line ER/NR SO 12-05-2020 08:15 FOR STRENGTHENING OF 765 kV DELTA TYPE SUSPENSION TYPE TOWERS (WIND ZONE-2) 12-05-2020 20:05 11:50:00 1
53 765 kV Gaya-Varanasi-I Line ER/NR SO 13-05-2020 08:41 FOR STRENGTHENING OF 765 kV DELTA TYPE SUSPENSION TYPE TOWERS (WIND ZONE-2) 13-05-2020 19:43 11:02:00 1
54 765 kV Gaya-Varanasi-I Line ER/NR SO 14-05-2020 08:15 FOR STRENGTHENING OF 765 kV DELTA TYPE SUSPENSION TYPE TOWERS (WIND ZONE-2) 14-05-2020 19:54 11:39:00 1
55 765 kV Gaya-Varanasi-I Line ER/NR SO 15-05-2020 08:39 FOR STRENGTHENING OF 765 kV DELTA TYPE SUSPENSION TYPE TOWERS (WIND ZONE-2) 15-05-2020 20:52 12:13:00 1
56 765 kV Gaya-Varanasi-I Line ER/NR SO 16-05-2020 08:08 FOR STRENGTHENING OF 765 kV DELTA TYPE SUSPENSION TYPE TOWERS (WIND ZONE-2) 16-05-2020 19:51 11:43:00 1
54
List of Outages of Elements monitored by NLDC for the month of May-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month
57 765 kV Gaya-Varanasi-I Line ER/NR SO 17-05-2020 07:53 FOR STRENGTHENING OF 765 kV DELTA TYPE SUSPENSION TYPE TOWERS (WIND ZONE-2) 17-05-2020 19:41 11:48:00 1
58 765 kV Gaya-Varanasi-I Line ER/NR SO 18-05-2020 08:17 FOR STRENGTHENING OF 765 kV DELTA TYPE SUSPENSION TYPE TOWERS (WIND ZONE-2) 18-05-2020 20:09 11:52:00 1
59 765 kV Gaya-Varanasi-I Line ER/NR SO 19-05-2020 07:46 FOR STRENGTHENING OF 765 kV DELTA TYPE SUSPENSION TYPE TOWERS (WIND ZONE-2) 19-05-2020 19:56 12:10:00 1
60 765 kV Gaya-Varanasi-I Line ER/NR SO 27-05-2020 08:04 FOR STRENGTHENING OF 765 kV DELTA TYPE SUSPENSION TYPE TOWERS (WIND ZONE-2) 27-05-2020 19:58 11:54:00 1
61 765 kV Gaya-Varanasi-I Line ER/NR SO 28-05-2020 08:55 FOR STRENGTHENING OF 765 kV DELTA TYPE SUSPENSION TYPE TOWERS (WIND ZONE-2) 28-05-2020 21:24 12:29:00 1
62 765 kV Gaya-Varanasi-I Line ER/NR SO 29-05-2020 08:55 FOR STRENGTHENING OF 765 kV DELTA TYPE SUSPENSION TYPE TOWERS (WIND ZONE-2) 29-05-2020 21:07 12:12:00 1
63 765 kV Gwalior-Agra-I Line WR/NR TL 03-05-2020 19:34 R-N fault. FD: 64.9km from Agra and 58.3km from Gwalior FC: 7.6 kA 04-05-2020 15:58 20:24:00 1
64 765 kV Gwalior-Agra-I Line WR/NR TL 28-05-2020 18:37 B-N fault, R/I from Agra end: FD- 89.2kM, FC- 5kA 29-05-2020 08:49 14:12:00 2
65 765 kV Gwalior-Agra-I Line WR/NR SE 29-05-2020 08:50 Attending Hanging Earth-wire at Loc. No. 114 29-05-2020 16:09 7:19:00 2
66 765 kV Gwalior-Agra-II Line WR/NR TL 29-05-2020 19:10 line tripped due to R-N fault fault current- 6.61KA ,F.D.= 86.4Km from Agra end. 29-05-2020 22:12 3:02:00 1
67 765 kV Gwalior-Phagi-II Line WR/NR TL 03-05-2020 17:43 Tripped on B-ph fault, 141.5 km from Phagi end. 03-05-2020 20:17 2:34:00 1
68 765 kV New Ranchi-Dharamjaygarh-I Line ER/WR SO 05-05-2020 23:30 shutdown availed for rectification work in collapsed towers. 11-05-2020 22:23 142:53:00 0
69 765 kV New Ranchi-Dharamjaygarh-II Line ER/WR TL 05-05-2020 23:30 B-E fault, A/R successful.From Dharamjaygarh end: 297.7km, 3.1kA. 05-05-2020 23:31 0:01:00 1
For replacement of Y-phase L.A at Dharamjaigrah end due to L.A leakage current exceeded the
70 765 kV New Ranchi-Dharamjaygarh-II Line ER/WR SO 19-05-2020 13:56 20-05-2020 01:13 1
limit. 11:17:00
71 765 kV Sasaram-Fatehpur Line ER/NR TL 30-05-2020 17:27 R-N Fault FD: FTP- 53.5km, Sasaram- 272.22km FC: FTP- 6.96kA, Sasaram- 1.411kA 30-05-2020 19:12 1:45:00 1
72 765kV Durg-Jharsuguda Ckt-I Line WR/ER MO 10-05-2020 18:10 Manually opened due to High Voltage. 17-05-2020 01:43 151:33:00 0
73 765kV Durg-Jharsuguda Ckt-I Line WR/ER MO 17-05-2020 17:25 Manually opened due to High Voltage. 01-06-2020 00:00 342:35:00 0
74 765kV Durg-Jharsuguda Ckt-II Line WR/ER MO 04-05-2020 21:31 Manually opened due to High Voltage. 05-05-2020 07:57 10:26:00 0
75 765kV Durg-Jharsuguda Ckt-II Line WR/ER TL 04-05-2020 17:27 Y-B-N Fault. 04-05-2020 21:30 4:03:00 1
76 765kV Durg-Jharsuguda Ckt-II Line WR/ER TL 09-05-2020 16:57 R - Y ph fault Durg end : 32.8 KA, 6.2 Km 10-05-2020 00:35 7:38:00 2
77 765kV Durg-Jharsuguda Ckt-II Line WR/ER TL 16-05-2020 23:46 R-N,2.2KA,293km from Jharsuguda end / R-N, 20KA, 25km from Durg en 17-05-2020 11:19 11:33:00 3
Line tripped on R-E fault (600 ms after B ph has tripped). From Gwalior end, fault dist-84.4 km,
78 765kV Gwalior-Orai Line NR/WR TL 10-05-2020 16:57 10-05-2020 18:05 1
fault current-6.6 kA. From Orai end, fault dist-39.47 km, fault current-3.8 kA 1:08:00
79 765kV Satna-Orai Line WR/NR TL 10-05-2020 15:40 B-Ph fault , FD: Orai end 39.4kM, 8.8kA 10-05-2020 16:48 1:08:00 1
80 765kV Satna-Orai Line WR/NR TL 27-05-2020 13:40 R-N fault, 147.4 Km from Orai end, 4.1 KA 27-05-2020 15:07 1:27:00 2
81 765kV Satna-Orai Line WR/NR TL 28-05-2020 16:13 Tripped on Y ph fault 29-05-2020 04:23 12:10:00 3
82 Bhadrawati Pole-II HVDC WR/SR SE 17-05-2020 10:58 Hanging of PLC processor I/O card 17-05-2020 13:50 2:52:00 0
83 Bhadrawati Pole-II HVDC WR/SR SE 17-05-2020 23:05 To attend heavy arcing in Neutral/Earthing connection. 18-05-2020 04:03 4:58:00 0
84 Bhadrawati Pole-II HVDC WR/SR TS 09-05-2020 07:40 On VBE 2S Thyristor Redundancy - Exceeded. 09-05-2020 14:20 6:40:00 1
85 Biswanath Chariali-Agra Line-I HVDC NER/NR SC 12-05-2020 10:34 Blocked to facilitate,Balance Low Power Tests. 12-05-2020 11:24 0:50:00 0
86 Biswanath Chariali-Agra Line-I HVDC NER/NR SC 12-05-2020 13:38 Blocked to facilitate,Balance Low Power Tests. 13-05-2020 16:26 26:48:00 0
87 Biswanath Chariali-Agra Line-I HVDC NER/NR SC 14-05-2020 10:51 To initiate low power balance test 14-05-2020 17:40 6:49:00 0
Line fault shall be created at different places of line for tuning of Line fault locator. Tripping not
88 Biswanath Chariali-Agra Line-I HVDC NER/NR SC 23-05-2020 09:02 23-05-2020 16:13 0
envisaged subject to successful restart. 7:11:00
89 Biswanath Chariali-Agra Line-I HVDC NER/NR SC 29-05-2020 08:59 Balance Low Power Testing 29-05-2020 15:39 30:40:00 0
Testing of multiterminal operation with ground return mode in normal power direction. Testing
90 Biswanath Chariali-Agra Line-I HVDC NER/NR SC 31-05-2020 11:09 31-05-2020 16:18 0
started 11:40 Hr 5:09:00
91 Biswanath Chariali-Agra Line-II HVDC NER/NR MO 01-05-2020 00:00 Pole blocked on High Voltage 12-05-2020 14:27 278:27:00 0
92 Biswanath Chariali-Agra Line-II HVDC NER/NR SC 13-05-2020 14:24 For the purpose of carrying out balance low power test 24-05-2020 13:28 263:04:00 0
Line fault shall be created at different places of line for tuning of Line fault locator. Tripping not
93 Biswanath Chariali-Agra Line-II HVDC NER/NR SC 25-05-2020 11:53 25-05-2020 13:51 0
envisaged subject to successful restart. 1:58:00
94 Biswanath Chariali-Agra Line-II HVDC NER/NR SO 26-05-2020 16:56 switched to RVO mode due to inclement weather in NER (80%) 26-05-2020 18:21 0:17:00 0
95 Biswanath Chariali-Agra Line-II HVDC NER/NR SC 29-05-2020 09:10 Balance Low Power Testing 29-05-2020 16:07 30:57:00 0
96 Champa-Kurushetra pole-I HVDC WR/NR MO 01-05-2020 00:00 Pole blocked on High Voltage 12-05-2020 20:04 284:04:00 0
97 Champa-Kurushetra pole-I HVDC WR/NR TL 28-05-2020 14:58 Tripped on DC line fault 28-05-2020 16:22 1:24:00 1
98 Champa-Kurushetra pole-I HVDC WR/NR TL 28-05-2020 19:53 Transient DC Line fault 28-05-2020 21:25 1:32:00 2
99 Champa-Kurushetra pole-II HVDC WR/NR MO 01-05-2020 00:00 Pole blocked on High Voltage 16-05-2020 09:45 369:45:00 0
100 Champa-Kurushetra pole-II HVDC WR/NR TL 26-05-2020 14:37 HVDC Line Fault 26-05-2020 16:10 1:33:00 1
101 Champa-Kurushetra pole-II HVDC WR/NR TL 28-05-2020 14:58 Tripped on DC line fault 28-05-2020 16:35 1:37:00 2
102 Champa-Kurushetra pole-II HVDC WR/NR TL 28-05-2020 19:53 Transient DC Line fault 28-05-2020 21:36 1:43:00 3
103 Champa-Kurushetra pole-III HVDC WR/NR MO 01-05-2020 00:00 Pole blocked on High Voltage 22-05-2020 23:39 527:39:00 0
104 Champa-Kurushetra pole-III HVDC WR/NR SO 22-05-2020 23:47 Due to mal-operation of 286ACX relay, LBB operated at Kurukshetra end 23-05-2020 04:16 4:29:00 0
105 Champa-Kurushetra pole-III HVDC WR/NR TL 28-05-2020 14:58 Tripped on DC line fault 28-05-2020 17:11 2:13:00 1
106 Champa-Kurushetra pole-III HVDC WR/NR TL 28-05-2020 17:46 Tripped on DC line fault 29-05-2020 10:56 17:10:00 2
107 Champa-Kurushetra pole-III HVDC WR/NR MO 31-05-2020 04:10 Pole blocked on High Voltage 01-06-2020 00:00 19:50:00 2
108 Champa-Kurushetra pole-IV HVDC WR/NR TS 12-05-2020 18:10 DMR1 short circuit protection operation 12-05-2020 19:09 0:59:00 1
109 Champa-Kurushetra pole-IV HVDC WR/NR TL 26-05-2020 14:37 HVDC Line Fault 26-05-2020 16:35 1:58:00 2
110 Champa-Kurushetra pole-IV HVDC WR/NR TL 28-05-2020 14:58 Tripped on DC line fault 29-05-2020 10:36 19:38:00 3
111 Champa-Kurushetra pole-IV HVDC WR/NR TL 31-05-2020 19:14 DC line fault 31-05-2020 21:56 2:42:00 4
55
List of Outages of Elements monitored by NLDC for the month of May-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month
112 Champa-Kurushetra pole-IV HVDC WR/NR MO 31-05-2020 04:11 Pole blocked on High Voltage 31-05-2020 13:34 9:23:00 4
113 HVDC Agra-Alipurduar Line-3 HVDC NR/ER MO 01-05-2020 00:00 Pole blocked on High Voltage 14-05-2020 13:36 325:36:00 0
114 HVDC Agra-Alipurduar Line-3 HVDC NR/ER SC 28-05-2020 08:26 Low power order testing in HVDC 29-05-2020 07:46 23:20:00 0
115 HVDC Agra-Alipurduar Line-3 HVDC NR/ER MO 31-05-2020 11:21 Pole blocked to facilitate testing 01-06-2020 00:00 12:39:00 0
116 HVDC Agra-Alipurduar Line-3 HVDC NR/ER SC 14-05-2020 17:17 Blocked as Low power test for HVDC Agra-APD-BNC Link 22-05-2020 18:37 193:20:00 0
Line fault shall be created at different places of line for tuning of Line fault locator. Tripping not
117 HVDC Agra-Alipurduar Line-3 HVDC NR/ER SC 23-05-2020 09:02 23-05-2020 16:13 0
envisaged subject to successful restart. 7:11:00
118 HVDC Agra-Alipurduar Line-4 HVDC NR/ER MO 01-05-2020 00:00 Pole blocked on High Voltage 23-05-2020 20:28 548:28:00 0
119 HVDC Agra-Alipurduar Line-4 HVDC NR/ER SC 28-05-2020 08:31 Low power order testing in HVDC 29-05-2020 07:48 23:17:00 0
120 HVDC Agra-Alipurduar Line-4 HVDC NR/ER SE 24-05-2020 13:28 Emergency shutdown taken, Error in DC voltage measurement 24-05-2020 19:46 6:18:00 0
Line fault shall be created at different places of line for tuning of Line fault locator. Tripping not
121 HVDC Agra-Alipurduar Line-4 HVDC NR/ER SC 25-05-2020 11:53 25-05-2020 13:51 0
envisaged subject to successful restart. 1:58:00
122 HVDC Agra-Alipurduar Line-4 HVDC NR/ER SO 26-05-2020 16:56 switched to RVO mode due to inclement weather in NER (80%) 26-05-2020 18:21 0:17:00 0
123 Mundra-Mahendragarh Pole-II HVDC WR/NR SO 21-05-2020 15:57 for PLC filter capacitor and connector replacement work 21-05-2020 17:08 1:11:00 0
124 Vindhyachal Pole-I HVDC WR/NR TS 10-05-2020 21:55 HVDC Vindhyachal Block-1 tripped due to DC over current. 11-05-2020 00:06 2:11:00 1
125 Vindhyachal Pole-II HVDC WR/NR TS 13-05-2020 08:54 Thyristor Failure level 2 alarm 13-05-2020 15:29 6:35:00 1

56
List of Outages of Elements monitored by NLDC for the month of May-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month

Transnational Elements
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month
1 132 kV Kataiya-Kusaha Line Nepal TL 07-05-2020 15:40 distance protection relay optd, Fault current:3.77kA ,Distance 10km 08-05-2020 18:05 26:25:00 1
2 132 kV Salakati-Gelephu Line Bhutan TL 16-05-2020 18:14 B-N Fault, Charging attempted but line again tripped at 19:29 hrs 17-05-2020 10:20 16:06:00 1
3 132 kV Salakati-Gelephu Line Bhutan TL 25-05-2020 19:37 tripped on zone-1, B-phase fault,3.5 Km from Salakati end 25-05-2020 20:07 0:30:00 2
4 132 kV Surajmani Nagar - Comilla - 1 Line Bangladesh TS 06-05-2020 21:46 Loss of power at 132kV Surjamani S/S 07-05-2020 06:45 8:59:00 1
5 132 kV Surajmani Nagar - Comilla - 1 Line Bangladesh TL 27-05-2020 06:38 Tripped due to R-B Ph, Z2 27-05-2020 07:35 0:57:00 2
6 132 kV Surajmani Nagar - Comilla - 2 Line Bangladesh TS 06-05-2020 21:46 Loss of power at 132kV Surjamani S/S 07-05-2020 07:12 9:26:00 1
7 132 kV Surajmani Nagar - Comilla - 2 Line Bangladesh TL 27-05-2020 06:38 Tripped due to R-B Ph, Z2 27-05-2020 07:35 0:57:00 2
8 132kV Kataiya-Duhabi Line Nepal TL 07-05-2020 15:40 Distance protection relay optd, Fault current :C 3.77A ,Distance 10km 07-05-2020 20:27 4:47:00 1
9 132kV Rangia-Motanga S/C Line ER/BHUTAN TL 07-05-2020 22:09 Tripping indications from Rangia End: 54 km, BFR(Breaker failure relay) tripping , Zone-2 08-05-2020 09:40 1
11:31:00
10 220 kV Chukha - Birpara - I Line Bhutan TL 07-05-2020 19:19 R-Y-B fault 07-05-2020 20:03 0:44:00 1
11 220 kV Chukha - Birpara - II Line Bhutan TL 07-05-2020 17:26 Y-E Fault, Zone 1, 3.107 kA,FD-61.5 km from Birpara end 07-05-2020 17:57 0:31:00 1
12 220 kV Chukha - Birpara - II Line Bhutan TL 07-05-2020 19:19 R-Y-B fault 07-05-2020 20:06 0:47:00 2
13 220 kV Chukha - Birpara - II Line Bhutan SO 11-05-2020 09:03 for testing of trip circuit. 11-05-2020 13:26 4:23:00 2
14 220 kV Malbase - Birpara Line Bhutan SC 30-05-2020 18:38 Tower Diversion work of Loc No. 57 due to course change of Torsa river 01-06-2020 00:00 29:22:00 0
15 220 kV Malbase - Birpara Line Bhutan TS 07-05-2020 17:56 Bus bar protection operated at Malbase end 07-05-2020 18:02 0:06:00 1
16 220 Kv Muzaffarpur-Dhalkebar-I Line Nepal TL 07-05-2020 12:08 Earth fault reported at ER end, no indication from Nepal end). 07-05-2020 13:40 1:32:00 1
17 220 Kv Muzaffarpur-Dhalkebar-I Line Nepal TL 14-05-2020 14:33 on B ph directional earth fault. 14-05-2020 15:04 0:31:00 2
18 220 Kv Muzaffarpur-Dhalkebar-I Line Nepal TL 24-05-2020 19:50 Earth fault at Nepal side. 24-05-2020 20:21 0:31:00 3
19 220 Kv Muzaffarpur-Dhalkebar-II Line Nepal TL 14-05-2020 14:33 on B ph directional earth fault. 14-05-2020 15:07 0:34:00 1
20 220 Kv Muzaffarpur-Dhalkebar-II Line Nepal TL 24-05-2020 19:50 Earth fault at Nepal side. 24-05-2020 20:22 0:32:00 2
21 400 kV Malbase - Binaguri - I Line Bhutan TL 04-05-2020 16:40 B-N Fault. Line tripped from Bhutan end only. 04-05-2020 16:54 0:14:00 1
22 400 kV Malbase - Binaguri - I Line Bhutan TL 26-05-2020 13:31 Tripped due to Y-B-N fault 26-05-2020 14:20 0:49:00 2
23 400 kV Malbase - Binaguri - I Line Bhutan SO 28-05-2020 08:58 to replace broken insulators at location TPS-52 & 53, B-phase 29-05-2020 16:48 31:50:00 2
24 400 kV Tala - Binaguri - I Line Bhutan MO 01-05-2020 00:00 Manually opened due to high voltage. 21-05-2020 07:18 487:18:00 0
25 400 kV Tala - Binaguri - IV Line Bhutan TL 25-05-2020 21:22 R-N fault, 2.8kA 25-05-2020 21:54 0:32:00 1
26 400 kV Tala - Binaguri - IV Line Bhutan TL 29-05-2020 14:22 Tripped due to B phase fault 29-05-2020 15:00 0:38:00 2
27 400kV Alipurdaur-Jingmeling-I Line ER/BHUTAN MO 01-05-2020 00:00 Manually opened due to high voltage. 04-05-2020 16:12 88:12:00 0
R-Y fault,Jingmeling end details : FC- 0.79 kA(R phase), 0.62 kA(Y Phase), 0.2kA (B phase); FD-
28 400kV Alipurdaur-Jingmeling-I Line ER/BHUTAN TL 07-05-2020 18:47 08-05-2020 08:45 1
135.4 KM ,APD end details- R-Y fault, FC-4.05 kA, FD-78 KM 13:58:00
29 400kV Alipurdaur-Jingmeling-II Line ER/BHUTAN TL 07-05-2020 18:47 R-Y fault,APD end details- R-Y fault, FC-4.62 kA, FD-77 KM 07-05-2020 19:58 1:11:00 1
30 HVDC Behramara Pole-I HVDC Bangladesh TS 10-05-2020 07:27 external protection fault 10-05-2020 11:02 3:35:00 1
31 HVDC Behramara Pole-I HVDC Bangladesh TS 20-05-2020 22:13 Tripped due to problem at Bangladesh side 21-05-2020 09:46 11:33:00 2
32 HVDC Behramara Pole-II HVDC Bangladesh SO 01-05-2020 07:06 Disturbance in Valve Cooling System 01-05-2020 10:32 3:26:00 0
33 HVDC Behramara Pole-II HVDC Bangladesh TS 20-05-2020 22:13 Tripped due to problem at Bangladesh side 21-05-2020 17:01 18:48:00 1

57
23. List of Outages of Elements monitored by NLDC for the month of May-2020
List of Outages of Elements monitored by NLDC for the month of May-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month

Northern Region Elements


Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month
1 B/R-I at Agra Bus Reactor NR SO 23-05-2020 15:05 For checking of LBB function in M2 relay 23-05-2020 17:58 2:53:00 0
2 B/R-II at Agra Bus Reactor NR SO 25-05-2020 09:36 Checking of LBB function in M2 relay 25-05-2020 13:53 4:17:00 0
3 Balia-Bhiwadi Pole-I HVDC NR SE 20-05-2020 15:50 Arrest water leakage in valve hall 20-05-2020 18:09 2:19:00 0
4 Balia-Bhiwadi Pole-I HVDC NR SO 26-05-2020 07:27 For AMP work 26-05-2020 20:45 13:18:00 0
5 Balia-Bhiwadi Pole-I HVDC NR TS 05-05-2020 14:34 Tripped due to DC earth fault, FD=348.44km from Bhiwadi, FD=441.35km from Balia. 05-05-2020 15:48 1:14:00 1
6 Balia-Bhiwadi Pole-I HVDC NR TS 29-05-2020 17:45 pole tripped due to DC earth fault 750.789 km from Balia end. 29-05-2020 19:11 1:26:00 2
7 Balia-Bhiwadi Pole-II HVDC NR SO 10-05-2020 16:56 Went in to RVO mode(80%) 10-05-2020 20:21 0:41:00 0
8 Balia-Bhiwadi Pole-II HVDC NR SO 27-05-2020 07:34 For AMP work 27-05-2020 21:31 13:57:00 0
9 Balia-Bhiwadi Pole-II HVDC NR TS 29-05-2020 17:45 pole tripped due to DC earth fault loc .750.789 km from Balia end. 29-05-2020 19:15 1:30:00 1
10 HVDC Agra Pole-1 HVDC NR SC 12-05-2020 10:34 Blocked to facilitate,Balance Low Power Tests. 12-05-2020 11:24 0:50:00 0
11 HVDC Agra Pole-1 HVDC NR SC 12-05-2020 13:38 Blocked to facilitate,Balance Low Power Tests. 13-05-2020 16:26 26:48:00 0
12 HVDC Agra Pole-1 HVDC NR SC 14-05-2020 10:51 To initiate low power balance test 14-05-2020 17:40 6:49:00 0
13 HVDC Agra Pole-1 HVDC NR SC 23-05-2020 09:02 Line fault shall be created at different places of line for tuning of Line fault locator. Tripping not 23-05-2020 16:13 7:11:00 0
14 HVDC Agra Pole-1 HVDC NR SC 28-05-2020 08:59 Balance Low Power Testing 29-05-2020 15:38 30:39:00 0
15 HVDC Agra Pole-1 HVDC NR MO 30-05-2020 01:27 Pole blocked on High Voltage 31-05-2020 16:18 38:51:00 0
16 HVDC Agra Pole-2 HVDC NR MO 01-05-2020 00:00 Pole blocked on High Voltage 12-05-2020 14:27 278:27:00 0
17 HVDC Agra Pole-2 HVDC NR SC 13-05-2020 14:24 For the purpose of carrying out balance low power test 24-05-2020 13:28 263:04:00 0
18 HVDC Agra Pole-2 HVDC NR SC 25-05-2020 11:53 Line fault shall be created at different places of line for tuning of Line fault locator. Tripping not 25-05-2020 13:51 1:58:00 0
19 HVDC Agra Pole-2 HVDC NR SO 26-05-2020 16:56 switched to RVO mode due to inclement weather in NER (80%) 26-05-2020 18:21 0:17:00 0
20 HVDC Agra Pole-2 HVDC NR SC 28-05-2020 09:10 Balance Low Power Testing 29-05-2020 16:07 30:57:00 0
21 HVDC Agra Pole-2 HVDC NR MO 30-05-2020 02:08 Pole blocked on High Voltage 31-05-2020 11:30 33:22:00 0
22 HVDC Agra Pole-3 HVDC NR MO 01-05-2020 00:00 Pole blocked on High Voltage 14-05-2020 13:36 325:36:00 0
23 HVDC Agra Pole-3 HVDC NR SC 28-05-2020 08:26 Low power order testing in HVDC 29-05-2020 07:46 23:20:00 0
24 HVDC Agra Pole-3 HVDC NR SC 31-05-2020 11:21 Pole blocked to facilitate testing 01-06-2020 00:00 12:39:00 0
25 HVDC Agra Pole-3 HVDC NR SC 14-05-2020 17:17 Blocked as Low power test for HVDC Agra-APD-BNC Link 22-05-2020 18:37 193:20:00 0
26 HVDC Agra Pole-3 HVDC NR SC 23-05-2020 09:02 Line fault shall be created at different places of line for tuning of Line fault locator. Tripping not 23-05-2020 16:13 7:11:00 0
27 HVDC Agra Pole-3 HVDC NR TS 29-05-2020 19:26 tripped due on differential protection during 29-05-2020 21:21 1:55:00 1
28 HVDC Agra Pole-4 HVDC NR MO 01-05-2020 00:00 Pole blocked on High Voltage 23-05-2020 20:28 548:28:00 0
29 HVDC Agra Pole-4 HVDC NR SC 28-05-2020 08:31 Low power order testing in HVDC 29-05-2020 07:48 23:17:00 0
30 HVDC Agra Pole-4 HVDC NR SC 25-05-2020 11:53 Line fault shall be created at different places of line for tuning of Line fault locator. Tripping not 25-05-2020 13:51 1:58:00 0
31 HVDC Agra Pole-4 HVDC NR SO 26-05-2020 16:56 switched to RVO mode due to inclement weather in NER (80%) 26-05-2020 18:21 0:17:00 0
32 765/220 kV ICT-I at Lalitpur ICT NR TS 03-05-2020 19:58 All 765 kV emanating lines tripped due to inclement weather. 18-05-2020 21:10 361:12:00 1
33 765/220 kV ICT-I at Lalitpur ICT NR SE 20-05-2020 13:18 EMERGENCY SHUTDOWN TO SYNCH WITH GRID WITH 220KV NETWORK. DESYNCHRONIZED 20-05-2020 13:39 0:21:00 1
34 765/220 kV ICT-II at Lalitpur ICT NR TS 03-05-2020 19:58 TRIPPED DURING TOWER COLLAPSE DUE TO THUNDERSTORM. 18-05-2020 20:43 360:45:00 1
35 765/400 kV ICT-I at Antah ICT NR SO 06-05-2020 11:12 FOR 1 HALF YEARLY MAINTENANCE & For normalisation of Sapre ICT & take y ph ICT in circuit 06-05-2020 19:56 8:44:00 0
36 765/400 kV ICT-I at Antah ICT NR TS 12-05-2020 08:26 ICT tripped due to Y-phase 86B ,LBB operated. 12-05-2020 18:40 10:14:00 1
37 765/400 kV ICT-I at Bara ICT NR SE 19-05-2020 06:36 Misalignment in male-female isolator contact of Y Ph of Bay 405-89T of 400kV side 19-05-2020 07:19 0:43:00 0
38 765/400 kV ICT-I at Fatehabad ICT NR SO 10-05-2020 18:34 For re-connecting earth strip of to LA counter meter 10-05-2020 20:12 1:38:00 0
39 765/400 kV ICT-I at Fatehabad ICT NR TS 20-05-2020 14:22 DT receive from Lalitpur 20-05-2020 16:12 1:50:00 1
40 765/400 kV ICT-I at Meerut ICT NR SO 28-05-2020 08:58 For erection of Auxiliary Bus 28-05-2020 13:34 4:36:00 0
41 765/400 kV ICT-I at Moga ICT NR SO 20-05-2020 09:44 For AMP works 20-05-2020 19:34 9:50:00 0
42 765/400 kV ICT-I at Unnao ICT NR TS 02-05-2020 07:07 Maloperation of SPR Relay 02-05-2020 11:59 4:52:00 1
43 765/400 kV ICT-II at Moga ICT NR SO 21-05-2020 09:42 For AMP works 21-05-2020 18:49 9:07:00 0
44 765/400kV ICT- I at Hapur ICT NR SO 30-05-2020 10:52 For normalisation of ICT-1. R - Phase taken on service in place of Spare phase 30-05-2020 16:16 5:24:00 0
45 765/400kV ICT-II at Koteshwar ICT NR TS 31-05-2020 08:56 To perform HV Test on ICT 31-05-2020 19:28 10:32:00 1
46 765 kV Moga-Meerut Line NR MO 02-05-2020 15:14 Manually opened due to High Voltage. 18-05-2020 11:23 380:09:00 0
47 765 kV Moga-Meerut Line NR TL 29-05-2020 21:23 Line tripped due B-N fault fault current-12.69kA, Fault dist =20.7kM from Meerut S/S end 29-05-2020 22:51 1:28:00 1
48 765 kV Moga-Meerut Line NR MO 18-05-2020 18:23 Manually opened due to High Voltage. 18-05-2020 23:07 4:44:00 1
49 765 kV Moga-Meerut Line NR MO 19-05-2020 05:13 Manually opened due to High Voltage. 22-05-2020 16:51 83:38:00 1
50 765 kV Moga-Meerut Line NR MO 27-05-2020 18:43 Manually opened due to High Voltage. 29-05-2020 19:41 48:58:00 1
51 765 kV Moga-Meerut Line NR MO 30-05-2020 02:10 Manually opened due to High Voltage. 01-06-2020 00:00 45:50:00 1
52 765kV Agra-Aligarh Line NR SO 05-05-2020 09:55 AMP of Line Bay Equipments & Bay CB at Aligarh S/S 05-05-2020 19:33 9:38:00 0
53 765kV Agra-Aligarh Line NR TV 28-05-2020 18:02 Over voltage tripped at 1802 hrs due to over voltage protection operated at Agra end. Agra= 28-05-2020 20:49 2:47:00 1
54 765kV Agra-Aligarh Line NR TL 29-05-2020 19:31 Line tripped due to R-N fault F.C.= 5.27KA ,F.D.= 97.9KM from Aligarh, 29-05-2020 21:38 2:07:00 2
55 765kV Agra-Jhatikara Line NR TL 29-05-2020 19:40 line tripped Y-N fault fault current 9.3KA fault dist- 0.5km from Agra end. 29-05-2020 21:50 2:10:00 1
56 765kV Agra-Jhatikara Line NR MO 27-05-2020 18:01 Manually opened due to High Voltage. 27-05-2020 19:10 1:09:00 1
57 765kV Ajmer-Bikaner Ckt-I Line NR TL 06-05-2020 00:28 tripped on Y-N fault.FLR-Bikaner-236.2km/1.87KA. Ajmer-40.72km/5KA.Heavy wind strom /rain 06-05-2020 02:30 2:02:00 1
58 765kV Ajmer-Chittorgarh Ckt-I Line NR MO 01-05-2020 00:00 Manually opened due to high voltage. 11-05-2020 12:12 252:12:00 0
58
List of Outages of Elements monitored by NLDC for the month of May-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month
59 765kV Aligarh-G.Noida Line NR TL 11-05-2020 12:49 R Ph fault, FD:28.9km from Aligarh and FC:13.15kA 12-05-2020 09:31 20:42:00 1
60 765kV Aligarh-G.Noida Line NR TS 14-05-2020 11:51 Tripped on high voltage due to CVT measurement issue 15-05-2020 11:57 24:06:00 2
61 765kV Aligarh-Jhatikara Line NR SO 16-05-2020 09:42 For AMP works 16-05-2020 18:51 9:09:00 0
62 765kV Aligarh-Orai Ckt-1 Line NR SO 01-05-2020 09:15 AMP 01-05-2020 20:18 11:03:00 0
63 765kV Aligarh-Orai Ckt-1 Line NR TL 26-05-2020 14:38 R-N Fault, 54.7 Km from Orai 26-05-2020 15:17 0:39:00 1
64 765kV Aligarh-Orai Ckt-1 Line NR TL 29-05-2020 19:25 B-N fault, F.D 184km from Orai 29-05-2020 20:35 1:10:00 2
65 765kV Aligarh-Orai Ckt-1 Line NR SC 21-05-2020 07:54 For erection and commissioning of LAs at Aligarh 765KV GIS S/S 22-05-2020 03:42 19:48:00 2
66 765kV Anpara C-Unnao Line NR TL 30-05-2020 18:26 Line Tripped. 30-05-2020 20:17 1:51:00 1
67 765kV Antah-Phagi-I Line NR TL 04-05-2020 17:18 Y-N Fault, conductor broken at loc:347,349 01-06-2020 00:00 654:42:00 1
68 765kV Antah-Phagi-II Line NR TL 04-05-2020 17:18 Y-B-N Fault, Tower bend:355,356,393,394 12-05-2020 21:06 195:48:00 1
69 765kV Bara-Mainpuri-II Line NR TL 22-05-2020 14:24 Line tripped due to R-N fault ,Zone-1,Fault Current- 3.716 KA . Fault Location-123 kms from 22-05-2020 16:47 2:23:00 1
70 765kV Bikaner-Bhadla Ckt-I Line NR TL 29-05-2020 19:32 Tripped on Y-N fault.Bhadla-75.78km/2.33KA.Heavy wind storm/rain reported. 29-05-2020 23:48 4:16:00 1
71 765kV Fatehabad-Lalitpur-I Line NR MO 03-05-2020 16:31 Manually opened due to High Voltage. 03-05-2020 21:04 4:33:00 0
72 765kV Fatehabad-Lalitpur-I Line NR TL 03-05-2020 21:04 Was out on O/V since 16:31hrs (03.05.20). Charging  attempt failed at 21:24 (03.05.20).Tower 21-05-2020 21:08 432:04:00 1
73 765kV Fatehabad-Lalitpur-II Line NR TL 03-05-2020 19:54 Fatehabad : Fault phase -B(A,B, C) Fault location - 285.40km. Tower damaged at Loc no- 01-06-2020 00:00 676:06:00 1
74 765kV Fatehpur-Agra-I Line NR MO 22-05-2020 18:05 Manually opened due to High Voltage. 22-05-2020 23:23 5:18:00 0
75 765kV Fatehpur-Agra-I Line NR MO 23-05-2020 14:28 Manually opened due to High Voltage. 27-05-2020 16:22 97:54:00 0
76 765kV Fatehpur-Agra-I Line NR TV 28-05-2020 18:02 Tripped on O/V 28-05-2020 19:49 1:47:00 1
77 765kV Fatehpur-Agra-I Line NR TL 29-05-2020 20:04 Phase to earth fault B-N F.D.= 280.9KM from Fatehpur., F.C.= 2.62KA at Fatehpur 29-05-2020 23:03 2:59:00 2
78 765kV Fatehpur-Agra-I Line NR MO 29-05-2020 23:04 Manually opened due to High Voltage. 30-05-2020 09:28 10:24:00 2
79 765kV Fatehpur-Agra-I Line NR MO 31-05-2020 02:29 Manually opened due to High Voltage. 01-06-2020 00:00 21:31:00 2
80 765kV Fatehpur-Agra-II Line NR MO 01-05-2020 00:00 Manually opened due to high voltage. 22-05-2020 11:31 515:31:00 0
81 765kV Fatehpur-Agra-II Line NR SE 22-05-2020 14:12 To rectify alignment of Y-PH isolator at Fatehpur end 22-05-2020 15:24 1:12:00 0
82 765kV Fatehpur-Agra-II Line NR TL 27-05-2020 15:36 Phase to earth fault R-N FD:187.65 km, FC: 2.87kA from Fatehpur end 27-05-2020 16:32 0:56:00 1
83 765kV Fatehpur-Agra-II Line NR MO 27-05-2020 18:10 Manually opened due to High Voltage. 29-05-2020 21:09 50:59:00 1
84 765kV Fatehpur-Agra-II Line NR MO 30-05-2020 01:21 Manually opened due to High Voltage. 31-05-2020 08:16 30:55:00 1
85 765kV G'Noida-Mainpuri Line NR SO 14-05-2020 08:46 For Trees Trimming & Annual Maintenance of line 14-05-2020 21:12 12:26:00 0
86 765kV G'Noida-Mainpuri Line NR SO 17-05-2020 08:31 Tree cutting & AMP 17-05-2020 18:15 9:44:00 0
87 765kV G'Noida-Meerut Line NR SO 19-05-2020 09:51 Tower Strengthening works 19-05-2020 18:33 8:42:00 0
88 765kV G'Noida-Meerut Line NR SO 20-05-2020 09:21 Tower Strengthening works 20-05-2020 19:23 10:02:00 0
89 765kV G'Noida-Meerut Line NR SO 21-05-2020 09:26 Tower Strengthening works 21-05-2020 19:42 10:16:00 0
90 765kV G'Noida-Meerut Line NR SO 22-05-2020 09:25 Tower Strengthening works 22-05-2020 19:14 9:49:00 0
91 765kV G'Noida-Meerut Line NR SO 23-05-2020 09:32 Tower Strengthening works 23-05-2020 19:04 9:32:00 0
92 765kV G'Noida-Meerut Line NR SO 24-05-2020 09:29 Tower Strengthening works 24-05-2020 19:48 10:19:00 0
93 765kV G'Noida-Meerut Line NR SO 26-05-2020 09:45 Tower Strengthening work 26-05-2020 20:02 10:17:00 0
94 765kV G'Noida-Meerut Line NR TL 29-05-2020 21:23 line tripped due to B-N fault Z-1, fault current-5.6KA, fault dist-75.7 km from Gr. Noida end 29-05-2020 22:09 0:46:00 1
95 765kV G'Noida-Meerut Line NR SO 27-05-2020 09:08 Tower Strengthening work 27-05-2020 19:44 10:36:00 1
96 765kV Jhatikara-Bhiwani(PG) Line NR TL 31-05-2020 16:23 Tripped on Y-N fault, 7.5 kA and 72.8 km from Bhiwani end. 31-05-2020 18:28 2:05:00 1
97 765kV Kanpur-Aligarh Line NR MO 01-05-2020 00:00 Manually opened due to High Voltage. 01-05-2020 23:34 23:34:00 0
98 765kV Kanpur-Aligarh Line NR MO 02-05-2020 10:42 Manually opened due to High Voltage. 08-05-2020 09:27 142:45:00 0
99 765kV Kanpur-Aligarh Line NR MO 10-05-2020 10:31 Manually opened due to High Voltage. 16-05-2020 09:22 142:51:00 0
100 765kV Kanpur-Aligarh Line NR MO 28-05-2020 18:09 Manually opened due to High Voltage. 29-05-2020 19:52 25:43:00 0
101 765kV Kanpur-Aligarh Line NR MO 31-05-2020 03:43 Manually opened due to High Voltage. 02-06-2020 15:59 60:16:00 0
102 765kV Kanpur-Varanasi-I Line NR TL 30-05-2020 18:51 RN Fault FD: Kanpur- 268.5km, VNS- 55.7km. FC: Kanpur- 3.69KA, Varanasi- 7.8KA 30-05-2020 19:30 0:39:00 1
103 765kV Meerut-Bhiwani(PG) Line NR MO 01-05-2020 00:00 Manually opened due to High Voltage. 04-05-2020 08:06 80:06:00 0
104 765kV Meerut-Bhiwani(PG) Line NR MO 10-05-2020 11:53 Manually opened due to High Voltage. 11-05-2020 11:53 24:00:00 0
105 765kV Meerut-Bhiwani(PG) Line NR TL 05-05-2020 11:36 Line tripped on both side due to Y-N, fault, fault current-12KA fault dist-19.4km from Bhiwani 05-05-2020 15:48 4:12:00 1
106 765kV Meerut-Koteshwar CKt-I Line NR SO 06-05-2020 11:19 For tightening of CC Ring ( Y-Phase ) at tower location no. 29 of the above line. The above CC 06-05-2020 14:12 2:53:00 0
107 765kV Moga-Bhiwani(PG) Line NR TL 03-05-2020 18:01 Tripped on B-Ph fault. further details awaited. 04-05-2020 13:27 19:26:00 1
108 765kV Moga-Bhiwani(PG) Line NR TL 30-05-2020 13:35 line tripped due to bad weather . 30-05-2020 18:55 5:20:00 2
109 765kV Moga-Bikaner Ckt-I Line NR MO 11-05-2020 14:39 Manually opened due to High Voltage. 11-05-2020 16:23 1:44:00 0
110 765kV Moga-Bikaner Ckt-I Line NR MO 12-05-2020 18:15 Manually opened due to High Voltage. 26-05-2020 11:18 329:03:00 0
111 765kV Moga-Bikaner Ckt-II Line NR MO 01-05-2020 00:00 Manually opened due to high voltage. 11-05-2020 10:26 250:26:00 0
112 765kV Moga-Bikaner Ckt-II Line NR MO 26-05-2020 19:05 Manually opened due to high voltage. 01-06-2020 00:00 124:55:00 0
113 765kV Moga-Bikaner Ckt-II Line NR TL 11-05-2020 15:37 Y-B Fault, 5.4 kA 68kms from Moga end. Line kept out due to heavy spark in isolator at Moga. 12-05-2020 11:17 19:40:00 1
114 765kV Phagi-Bhiwani-I Line NR MO 10-05-2020 12:18 Manually opened due to High Voltage. 14-05-2020 23:20 107:02:00 0
115 765kV Phagi-Bhiwani-I Line NR TL 01-05-2020 22:51 Charging attempted at 22:50Hrs on 01.05.2020 but tripped due to R-Phase LA failure at Phagi 02-05-2020 21:16 22:25:00 1
116 765kV Phagi-Bhiwani-I Line NR MO 30-05-2020 02:01 Manually opened due to High Voltage. 01-06-2020 09:51 55:50:00 1
117 765kV Phagi-Bhiwani-II Line NR MO 03-05-2020 11:19 Manually opened due to High Voltage. 08-05-2020 12:53 121:34:00 0
118 765kV Phagi-Bhiwani-II Line NR MO 29-05-2020 02:26 Manually opened due to High Voltage. 29-05-2020 20:04 17:38:00 0
119 765kV Varanasi-Fatehpur-I Line NR TL 10-05-2020 18:10 B-Ph fault , 7.2 kM from Fatehpur SS, If: 9.47kA. Tower collapsed at loc 630,631 26-05-2020 18:48 384:38:00 1

59
List of Outages of Elements monitored by NLDC for the month of May-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month

Western Region Elements


1 330 MVAR Bus Reactor-1 at Warora Bus Reactor WR SO 01-05-2020 14:11 To attend the stranding issue in dropper jumper in Y phase. 01-05-2020 18:01 0
3:50:00
2 B/R-I at Bhuj Bus Reactor WR SO 01-05-2020 09:47 FOR IPS CHANGING & RTV WORK. Dia to be kept open. 01-05-2020 16:33 0
6:46:00
3 B/R-I at Sasan Bus Reactor WR SO 19-05-2020 09:18 AMP works 20-05-2020 16:59 0
31:41:00
4 B/R-I at Satna Bus Reactor WR TS 28-05-2020 17:19 Tripped on fault(Heavy to very heavy storms reported) 29-05-2020 03:09 1
9:50:00
5 B/R-II at Bina Bus Reactor WR SO 04-05-2020 10:42 AMP 04-05-2020 18:24 0
7:42:00
6 B/R-II at Raigarh Bus Reactor WR SO 18-05-2020 10:19 AMP Works 18-05-2020 18:45 0
8:26:00
7 B/R-II at Satna Bus Reactor WR TS 28-05-2020 17:19 Tripped on fault(Heavy to very heavy storms reported) 28-05-2020 19:39 1
2:20:00
8 765/400 kV ICT-I at Akola-II ICT WR SO 22-05-2020 09:24 Maintenance of ICT 22-05-2020 18:34 9:10:00 0
9 765/400 kV ICT-I at Aurangabad(PG) ICT WR SE 30-05-2020 09:03 Arresting of oil seepage from NCT 30-05-2020 14:30 5:27:00 0
10 765/400 kV ICT-I at Sasan ICT WR TS 28-05-2020 17:26 Tripped on fault(Heavy to very heavy storms reported) 28-05-2020 19:43 2:17:00 1
11 765/400 kV ICT-I at Satna ICT WR SO 19-05-2020 09:16 AMP works 19-05-2020 18:14 8:58:00 0
12 765/400 kV ICT-I at Vadodara ICT WR SO 29-05-2020 10:24 AMP 29-05-2020 18:19 7:55:00 0
13 765/400 kV ICT-I at Vindhyachal PS ICT WR TS 28-05-2020 17:26 Tripped on fault(Heavy to very heavy storms reported) 28-05-2020 20:02 2:36:00 1
14 765/400 kV ICT-I at Wardha ICT WR SO 06-05-2020 10:27 For AMP works 06-05-2020 19:41 9:14:00 0
15 765/400 kV ICT-II at Sasan ICT WR TS 28-05-2020 17:26 Tripped on fault(Heavy to very heavy storms reported) 28-05-2020 21:10 3:44:00 1
16 765/400 kV ICT-II at Satna ICT WR TS 28-05-2020 17:20 Tripped on fault(Heavy to very heavy storms reported) 28-05-2020 20:53 3:33:00 1
17 765/400 kV ICT-II at Vindhyachal PS ICT WR TS 28-05-2020 17:26 Tripped on fault(Heavy to very heavy storms reported) 28-05-2020 19:26 2:00:00 1
18 765/400 kV ICT-III at Raigarh-PS(Kotra) ICT WR SO 01-05-2020 09:47 AMP 01-05-2020 18:47 9:00:00 0
19 765/400 kV ICT-III at Vindhyachal PS ICT WR TS 28-05-2020 17:26 Tripped on fault(Heavy to very heavy storms reported) 28-05-2020 18:53 1:27:00 1
20 765/400 kV ICT-IV at Raigarh-PS(Kotra) ICT WR SC 11-05-2020 09:18 For extending 33kV tertiary bus to new 33kV AIS constructed under HVDC construction package 12-05-2020 20:49 0
35:31:00
21 765/400kV ICT-I at Khandwa(PS) ICT WR SO 07-05-2020 11:30 To arrest oil leakage 07-05-2020 16:00 4:30:00 0
For line AMP works & 765 kV Raipur PS - Champa - II AR to be keep in non auto mode for safety
22 765 kV Durg-Champa-I Line WR SO 30-05-2020 11:19 30-05-2020 20:04 0
measures. 8:45:00
18 765 kV Durg-Champa-II Line WR SO 29-05-2020 10:18 AMP 29-05-2020 23:08 12:50:00 0
19 765kV Akola-Ektuni-II Line WR TL 10-05-2020 16:05 Tripped on B-Phase Fault.Fault Location: 127.8kmFault Current: 3.5kA 10-05-2020 19:09 3:04:00 1
20 765kV Akola-Ektuni-II Line WR TL 13-05-2020 15:48 Zone-2 Y-Ph. Distance from Ektuni: 226.8 km, FC:1.8KA 13-05-2020 17:56 2:08:00 2
21 765kV Aurangabad-Dhule(BDTCL) Line WR SO 19-05-2020 11:13 To attend damaged CC ring at Dhule end 19-05-2020 16:09 4:56:00 0
22 765kV Aurangabad-Phadge Ckt-I Line WR MO 01-05-2020 00:00 Manually opened due to High Voltage. 11-05-2020 11:15 251:15:00 0
23 765kV Aurangabad-Sholapur-I Line WR MO 01-05-2020 00:00 Manually opened due to high voltage. 16-05-2020 06:34 366:34:00 0
24 765kV Aurangabad-Sholapur-II Line WR MO 16-05-2020 17:50 Manually opened due to High Voltage. 01-06-2020 00:00 366:10:00 0
25 765kV Bilaspur-Dharamjaigarh Line WR SO 06-05-2020 08:30 For AMP Works and Isolator 712 89A - Rph - Isolator ( T point) rectifcation works 06-05-2020 19:06 10:36:00 0
26 765kV Bilaspur-Rajnandgaon-I Line WR TL 01-05-2020 21:54 Line to Line fault 01-05-2020 23:51 1:57:00 1
From Bina end FAULT TYPE: Y -B Phase FaultFAULT CURRENT: 5.700 kA LOCATION:
27 765kV Bina-Gwalior-III Line WR tl 03-05-2020 19:19 03-05-2020 22:38 1
158.291kmFrom Gwalior endFAULT TYPE: Y - BFAULT CURRENT: 9.687 kALOCATION: 74.708kmd
3:19:00
28 765kV Bina-Jabalpur-I Line WR SE 08-05-2020 15:15 Y phase L/R oil leakage 08-05-2020 20:22 5:07:00 0
29 765kV Bina-Jabalpur-III Line WR MO 10-05-2020 15:46 Manually opened due to High Voltage. 11-05-2020 15:23 23:37:00 0
30 765kV Durg-Rajnandgaon-I Line WR SE 27-05-2020 06:41 Abnormal sound noticed from line side R ph LA 27-05-2020 15:18 8:37:00 0
31 765kV Durg-Wardha-I Line WR MO 01-05-2020 16:22 Manually opened due to High Voltage. 02-05-2020 17:24 25:02:00 0
Tripped on R-phase fault, 293.5km and 3.389kA from Durg end. 89.7km and 5.9kA from Wardha
32 765kV Durg-Wardha-II Line WR TL 06-05-2020 16:00 06-05-2020 18:48 1
end 2:48:00
33 765kV Durg-Wardha-IV Line WR MO 01-05-2020 16:57 Manually opened due to High Voltage. 01-06-2020 00:00 727:03:00 0
34 765kV Indore-Vadodara Line WR SO 30-05-2020 09:55 For AMP Works by Indore. Dia to be kept open at both ends. 30-05-2020 20:10 10:15:00 0
to attend sparking in R-phase wave trap, so shut down of line is required in order to attend the
35 765kV Jabalpur- Gadarwada- I Line WR SE 11-05-2020 10:13 11-05-2020 17:35 0
same 7:22:00
36 765kV Jabalpur-Bhopal Line WR SO 15-05-2020 21:18 For tree cutting purpose 15-05-2020 22:45 1:27:00 0
37 765kV Jabalpur-Bhopal Line WR TL 09-05-2020 15:44 R ph fault Jabalpur end : 13.22 KA, 29.9 Kms 09-05-2020 17:58 2:14:00 1
R-E fault, Bhopal End : Fault Distance:200.5KM Fault Current:2.72kA Jabalpur End: Fault
38 765kV Jabalpur-Bhopal Line WR TL 16-05-2020 16:46 16-05-2020 18:34 2
Distance:30.11KM Fault Current:13.7kA 1:48:00

60
List of Outages of Elements monitored by NLDC for the month of May-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month
Line tripped on R ph-E fault.From Jabalpur, fault dist-30 km, fault current-13 kA. From bhopal
39 765kV Jabalpur-Bhopal Line WR TL 18-05-2020 14:29 18-05-2020 21:23 3
end, 198 km, 2 kA 6:54:00
40 765kV Jabalpur-Dharamjaigarh-I Line WR MO 11-05-2020 18:12 Manually opened due to High Voltage. 01-06-2020 00:00 485:48:00 0
Line tripped on R ph-E fault. From Jabalpur, 195.1 km, 4.3 kA. From Dharamjaygarh end, 232.2
41 765kV Jabalpur-Dharamjaigarh-I Line WR TL 03-05-2020 14:21 03-05-2020 15:22 1
km, 3.4 kA 1:01:00
42 765kV Jabalpur-Dharamjaigarh-II Line WR MO 01-05-2020 00:00 Manually opened due to High Voltage. 11-05-2020 15:35 255:35:00 0
43 765kV Jabalpur-Dharamjaigarh-III Line WR MO 30-05-2020 18:22 Manually opened due to High Voltage. 01-06-2020 00:00 29:38:00 0
44 765kV Jabalpur-Dharamjaigarh-IV Line WR MO 01-05-2020 00:00 Manually opened due to High Voltage. 12-05-2020 10:44 274:44:00 0
Line charged at 10:44 Hrs.Line tripped due to LA got blast of R-Phase at Dgarh end and damaging
45 765kV Jabalpur-Dharamjaigarh-IV Line WR TS 12-05-2020 10:45 14-05-2020 22:25 1
the wave trap of same phase. 59:40:00
46 765kV Pune-Phadge Line WR MO 11-05-2020 18:34 Manually opened due to High Voltage. 13-05-2020 11:17 40:43:00 0
47 765kV Pune-Sholapur Line WR MO 31-05-2020 18:24 Manually opened due to High Voltage. 01-06-2020 00:00 5:36:00 0
For line AMP works & 765 kV Raipur PS - Kotra - II AR to be keep in non-auto mode for safety
48 765kV Raigarh-PS(Kotra)-Raipur-PS(Durg)-I Line WR SO 14-05-2020 08:59 14-05-2020 20:22 0
measures. 11:23:00
49 765kV Raigarh-PS(Kotra)-Raipur-PS(Durg)-II Line WR SO 10-05-2020 09:21 Rectification of 01 no. T-connector found broken at loc. No. 427. 10-05-2020 17:05 7:44:00 0
50 765kV Raigarh-PS(Kotra)-Raipur-PS(Durg)-II Line WR SO 15-05-2020 08:57 For AMP works 15-05-2020 20:28 11:31:00 0
51 765kV Raigarh-PS(Kotra)-Raipur-PS(Durg)-II Line WR TL 09-05-2020 19:04 R ph to fault Durg end If: 2.3 KA, 6.5 Kms Test charging code issued. 09-05-2020 20:38 1:34:00 1
52 765kV Sasan - Vindhyachal(PS)-I Line WR TS 28-05-2020 17:26 Tripped on fault(Heavy to very heavy storms reported) 28-05-2020 20:47 3:21:00 1
53 765kV Sasan - Vindhyachal(PS)-II Line WR TL 22-05-2020 12:09 Tripped on R-phase fault, 22KA, 4.9KM from vindhyachal end 22-05-2020 19:08 6:59:00 1
54 765kV Sasan - Vindhyachal(PS)-II Line WR TS 28-05-2020 17:18 Tripped on fault(Heavy to very heavy storms reported) 28-05-2020 20:17 2:59:00 2
55 765kV Sasan - Vindhyachal(PS)-II Line WR TL 31-05-2020 14:32 Tripped on Y phase fault, 2.5km and 15.4kA from Vindhyanchal PS end. 31-05-2020 15:28 0:56:00 3
Tripped on R-E fault, due to tower bent on location number 430./Tower Collapse
56 765kV Sasan-Satna-I Line WR TL 28-05-2020 15:49 01-06-2020 00:00 1
80:11:00
57 765kV Sasan-Satna-II Line WR SO 14-05-2020 10:41 To attend defective jumpers at loc no. 381 14-05-2020 18:21 7:40:00 0
58 765kV Sasan-Satna-II Line WR SO 21-05-2020 10:07 For Line AMP Works by Rewa TLM 21-05-2020 20:04 9:57:00 0
59 765kV Sasan-Satna-II Line WR TL 28-05-2020 17:09 Tripped due to tower bent on location number 673./Tower Collapse 01-06-2020 00:00 78:51:00 1
60 765kV Sasan-Satna-II Line WR TL 28-05-2020 15:50 Tripped on R-E fault 28-05-2020 16:59 1:09:00 2
61 765kV Satna-Bina-II Line WR TS 28-05-2020 17:18 Tripped on fault(Heavy to very heavy storms reported) 28-05-2020 20:25 3:07:00 1
62 765kV Satna-Gwalior-II Line WR TS 28-05-2020 17:09 Tripped on fault(Heavy to very heavy storms reported) 28-05-2020 21:29 4:20:00 1
63 765kV Satna-Gwalior-II Line WR TS 28-05-2020 22:12 DC Earth fault, DT Send by Satna. 29-05-2020 01:27 3:15:00 2
64 765kV Tirora-Koradi-I Line WR TL 01-05-2020 15:04 R-N Fault 01-05-2020 16:08 1:04:00 1
Y-B phase fault Vindhyachal end : 336 km, 1.8 kAJabalpur end : 34.3 km, 11.8 km.04 nos towers
65 765kV Vindhyachal(PS)- Jabalpur- I Line WR SO 01-05-2020 00:00 18-05-2020 22:11 0
(948-951) collapsed./Tower Collapse 430:11:00
66 765kV Vindhyachal(PS)- Jabalpur- I Line WR TS 28-05-2020 17:26 Tripped on fault(Heavy to very heavy storms reported) 28-05-2020 20:54 3:28:00 1
67 765kV Vindhyachal(PS)- Jabalpur- II Line WR SO 01-05-2020 00:00 04 nos towers (948-951) collapsed/Tower Collapse 18-05-2020 22:18 430:18:00 0
68 765kV Vindhyachal(PS)- Jabalpur- II Line WR SE 27-05-2020 15:41 To attend Oil leakage in R-phase Reactor 27-05-2020 17:42 2:01:00 0
69 765kV Vindhyachal(PS)- Jabalpur- II Line WR TS 28-05-2020 17:26 Tripped on fault(Heavy to very heavy storms reported) 30-05-2020 14:30 45:04:00 1
Satna- 85.27 kms/IR-9.1KAMPS, IY-9.5KAMPS, R-Y PH PH V-CHAL-176KMS/ IY-5.7KAMPS, R-Y PH
70 765kV Vindhyachal-Satna-I Line WR TL 04-05-2020 20:48 04-05-2020 22:17 1
PH 1:29:00
71 765kV Vindhyachal-Satna-I Line WR TS 28-05-2020 17:18 Tripped on fault(Heavy to very heavy storms reported) 29-05-2020 03:48 10:30:00 2
72 765kV Vindhyachal-Satna-I Line WR SE 29-05-2020 15:49 for attending/rectification of tilted CVT 29-05-2020 18:46 2:57:00 2
73 765kV Vindhyachal-Satna-II Line WR SE 11-05-2020 13:17 To rectify open jumper at location no 763 of B phase 11-05-2020 16:28 3:11:00 0
74 765kV Vindhyachal-Satna-II Line WR TS 28-05-2020 17:26 Tripped on fault(Heavy to very heavy storms reported) 29-05-2020 00:59 7:33:00 1
75 765kV Wardha-Aurangabad-II Line WR MO 01-05-2020 00:00 Manually opened due to High Voltage. 08-05-2020 12:28 180:28:00 0
76 765kV Wardha-Aurangabad-II Line WR MO 10-05-2020 17:57 Manually opened due to High Voltage. 01-06-2020 00:00 510:03:00 0
77 765kV Wardha-Aurangabad-III Line WR MO 04-05-2020 18:12 Manually opened due to High Voltage. 19-05-2020 12:31 354:19:00 0
78 765kV Wardha-Aurangabad-III Line WR TL 31-05-2020 16:00 Tripped on B phase fault. 31-05-2020 16:27 0:27:00 1
79 765kV Wardha-Aurangabad-IV Line WR MO 01-05-2020 00:00 Manually opened due to High Voltage. 04-05-2020 12:02 84:02:00 0
80 765kV Wardha-Aurangabad-IV Line WR MO 19-05-2020 17:32 Manually opened due to High Voltage. 23-05-2020 10:14 88:42:00 0
81 765kV Wardha-Aurangabad-IV Line WR TL 31-05-2020 16:00 Tripped on B phase fault. 31-05-2020 16:18 0:18:00 1
For relay testing & CVT dropper work & 765kV Gadarwara-Warora PG 2 AR to be kept in non-
82 765kV Warora-Gadarwara Ckt-I Line WR SO 26-05-2020 09:55 26-05-2020 19:02 0
auto mode 9:07:00

61
List of Outages of Elements monitored by NLDC for the month of May-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month

Eastern Region Elements


Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month
1 B/R-I at Sasaram Bus Reactor ER TS 28-05-2020 17:26 Tripped on fault(Heavy to very heavy storms reported) 28-05-2020 20:02 1
2:36:00
2 B/R-II at Ranchi New Bus Reactor ER SO 19-05-2020 09:32 AMP work 19-05-2020 17:22 0
7:50:00
3 HVDC Alipurdaur Pole-3 HVDC ER MO 01-05-2020 00:00 Pole blocked on High Voltage 14-05-2020 13:36 325:36:00 0
4 HVDC Alipurdaur Pole-3 HVDC ER SC 23-05-2020 13:09 Blocked as Low power test for HVDC Agra-APD-BNC Link 23-05-2020 13:25 0:16:00 0
5 HVDC Alipurdaur Pole-3 HVDC ER SC 28-05-2020 08:26 Low power order testing in HVDC 28-05-2020 10:15 1:49:00 0
6 HVDC Alipurdaur Pole-3 HVDC ER MO 31-05-2020 11:21 Pole blocked to facilitate testing 01-06-2020 00:00 12:39:00 0
7 HVDC Alipurdaur Pole-3 HVDC ER SC 14-05-2020 17:17 Blocked as Low power test for HVDC Agra-APD-BNC Link 21-05-2020 05:14 155:57:00 0
Line fault shall be created at different places of line for tuning of Line fault locator. Tripping not
8 HVDC Alipurdaur Pole-3 HVDC ER TL 23-05-2020 09:02 23-05-2020 16:13 1
envisaged subject to successful restart. 7:11:00
9 HVDC Alipurdaur Pole-4 HVDC ER MO 01-05-2020 00:00 Pole blocked on High Voltage 23-05-2020 20:28 548:28:00 0
10 HVDC Alipurdaur Pole-4 HVDC ER SC 28-05-2020 08:31 Low power order testing in HVDC 28-05-2020 12:28 3:57:00 0
11 HVDC Alipurdaur Pole-4 HVDC ER SE 24-05-2020 13:28 Emergency shutdown taken, Error in DC voltage measurement 24-05-2020 19:46 6:18:00 0
Line fault shall be created at different places of line for tuning of Line fault locator. Tripping not
12 HVDC Alipurdaur Pole-4 HVDC ER SC 25-05-2020 11:53 25-05-2020 13:51 0
envisaged subject to successful restart. 1:58:00
13 HVDC Alipurdaur Pole-4 HVDC ER SO 26-05-2020 16:56 switched to RVO mode due to inclement weather in NER (80%) 26-05-2020 18:21 0:17:00 0
14 765/400 kV ICT-I at Angul ICT ER TS 01-05-2020 15:11 Differential protection 02-05-2020 10:20 19:09:00 1
15 765/400 kV ICT-II at Angul ICT ER SO 01-05-2020 16:53 IPS Tube detached 01-05-2020 21:23 4:30:00 0
16 765/400 kV ICT-II at Gaya ICT ER TS 07-05-2020 10:17 For taking Spare ICT into service 07-05-2020 18:03 7:46:00 1
17 765/400 kV ICT-III at Jharsuguda ICT ER SO 26-05-2020 09:46 Spare changeover & Stool arrangement for LA 26-05-2020 20:15 10:29:00 0
18 765kV Angul-Jharsuguda-II Line ER MO 14-05-2020 18:32 Manually opened due to High Voltage. 16-05-2020 10:06 39:34:00 0
19 765kV Angul-Jharsuguda-III Line ER MO 16-05-2020 11:08 Manually opened due to High Voltage. 01-06-2020 00:00 372:52:00 0
20 765kV Angul-Jharsuguda-IV Line ER MO 01-05-2020 00:00 Manually opened due to high voltage. 11-05-2020 12:51 252:51:00 0
21 765kV Angul-Jharsuguda-IV Line ER TL 30-05-2020 00:52 R-N fault. F.D.= 13.7km from Jharsuguda, F.C.= 16.33kA 30-05-2020 02:06 1:14:00 1

Southern Region Elements


Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month
1 Bus Reactor - I at Thiruvalam Bus Reactor SR SO 21-05-2020 09:53 warranty testing of Bus reactors before completion of 01 year in service 21-05-2020 18:04 0
8:11:00
2 Bus Reactor - II at Thiruvalam Bus Reactor SR SO 22-05-2020 09:48 warranty testing of Bus reactors before completion of 01 year in service 22-05-2020 17:40 0
7:52:00
3 765/400 kV ICT-II at Nizamabad ICT SR SO 22-05-2020 06:55 AMP works 22-05-2020 16:27 9:32:00 0
4 765kV Cuddapah- Chilkuripetha Ckt-I Line SR MO 01-05-2020 00:00 Manually opened due to High Voltage. 09-05-2020 16:27 208:27:00 0
5 765kV Cuddapah- Chilkuripetha Ckt-I Line SR MO 15-05-2020 18:39 Manually opened due to High Voltage. 15-05-2020 20:50 2:11:00 0
6 765kV Cuddapah- Chilkuripetha Ckt-II Line SR MO 09-05-2020 16:57 Manually opened due to High Voltage. 11-05-2020 11:55 42:58:00 0
7 765kV Cuddapah- Chilkuripetha Ckt-II Line SR MO 16-05-2020 18:27 Manually opened due to High Voltage. 01-06-2020 00:00 365:33:00 0
8 765kV Cuddapah-Thiruvalam Ckt-I Line SR TV 11-05-2020 18:03 Tripped on O/V and kept open on high voltage. 12-05-2020 09:08 15:05:00 1
9 765kV Cuddapah-Thiruvalam Ckt-I Line SR MO 31-05-2020 17:54 Manually opened due to High Voltage. 01-06-2020 08:51 14:57:00 1
10 765kV Cuddapah-Thiruvalam Ckt-II Line SR MO 01-05-2020 00:00 Manually opened due to high voltage. 02-05-2020 08:37 32:37:00 0
11 765kV Cuddapah-Thiruvalam Ckt-II Line SR MO 17-05-2020 18:01 Manually opened due to High Voltage. 18-05-2020 07:03 13:02:00 0
12 765kV Cuddapah-Thiruvalam Ckt-II Line SR MO 19-05-2020 02:32 Manually opened due to High Voltage. 20-05-2020 10:07 31:35:00 0
13 765kV Kurnool-Cuddapah Ckt-I Line SR TV 15-05-2020 18:00 Tripped on O/V and kept open on high voltage. 15-05-2020 22:56 4:56:00 1
14 765kV Kurnool-Cuddapah Ckt-I Line SR TV 16-05-2020 18:02 Tripped on Over voltage and kept open on high voltage. 16-05-2020 19:06 1:04:00 2
15 765kV Kurnool-Cuddapah Ckt-II Line SR SE 15-05-2020 20:35 To remove cloth/foreign material on Tower no 30 15-05-2020 23:18 2:43:00 0
16 765kV Kurnool-Cuddapah Ckt-II Line SR MO 15-05-2020 23:19 Manually opened due to High Voltage. 16-05-2020 08:43 9:24:00 0
17 765kV Nizamabad- Maheswaram-I Line SR MO 31-05-2020 15:19 Manually opened due to High Voltage. 01-06-2020 12:46 21:27:00 0
18 765kV Nizamabad- Maheswaram-II Line SR MO 17-05-2020 18:06 Manually opened due to High Voltage. 18-05-2020 07:09 13:03:00 0

62
List of Outages of Elements monitored by NLDC for the month of May-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month

North Eastern Region Elements


Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month

1 HVDC Biswanath Chariali Pole-1 HVDC NER SC 31-05-2020 11:09 Pole blocked to facilitate testing 31-05-2020 16:18 5:09:00 0
2 HVDC Biswanath Chariali Pole-1 HVDC NER SC 12-05-2020 10:34 Blocked to facilitate,Balance Low Power Tests. 12-05-2020 11:24 0:50:00 0
3 HVDC Biswanath Chariali Pole-1 HVDC NER SC 12-05-2020 13:38 Blocked to facilitate,Balance Low Power Tests. 13-05-2020 16:26 26:48:00 0
4 HVDC Biswanath Chariali Pole-1 HVDC NER SC 14-05-2020 10:51 To initiate low power balance test 14-05-2020 17:40 6:49:00 0
5 HVDC Biswanath Chariali Pole-1 HVDC NER SC 28-05-2020 08:59 Balance Low Power Testing 29-05-2020 15:38 30:39:00 0
6 HVDC Biswanath Chariali Pole-1 HVDC NER MO 30-05-2020 01:27 Pole blocked on High Voltage 30-05-2020 11:27 10:00:00 0
Line fault shall be created at different places of line for tuning of Line fault locator. Tripping not
7 HVDC Biswanath Chariali Pole-1 HVDC NER TL 23-05-2020 09:02 23-05-2020 16:13 7:11:00 1
envisaged subject to successful restart.
8 HVDC Biswanath Chariali Pole-2 HVDC NER MO 01-05-2020 00:00 Pole blocked on High Voltage 12-05-2020 14:27 278:27:00 0
9 HVDC Biswanath Chariali Pole-2 HVDC NER SC 13-05-2020 14:24 Blocked for carrying out balance low power test 24-05-2020 13:28 263:04:00 0
Line fault shall be created at different places of line for tuning of Line fault locator. Tripping not
10 HVDC Biswanath Chariali Pole-2 HVDC NER SC 25-05-2020 11:53 25-05-2020 13:51 1:58:00 0
envisaged subject to successful restart.
11 HVDC Biswanath Chariali Pole-2 HVDC NER SO 26-05-2020 16:56 switched to RVO mode due to inclement weather in NER (80%) 26-05-2020 18:21 0:17:00 0
12 HVDC Biswanath Chariali Pole-2 HVDC NER SC 28-05-2020 09:10 Balance Low Power Testing 29-05-2020 16:07 30:57:00 0

TL= Tripping due to Line Fault


TS= Tripping due to S/S Fault
MO= Opened due to system constraints
TV= Tripped on Overvoltage
SC= Planned Shutdown for
construction activities
SO= Planned Shutdown for O&M activities
SE= Emergency Shutdown
TP= Protection Maloperation
ME= Miscellanous outage

63
System Reliability Indices Report for the month of May 2020

Percentage (%) of times ATC was violated

Number of Blocks Number of Hours


S.No. Corridor %Violation
Violated Violated
1 WR-NR 0 0.00 0.00

2 ER-NR 63 15.75 2.12

3 Import of NR 0 0.00 0.00

4 NEW-SR 4 1.00 0.13

5 NER Import 0 0.00 0.00

Percentage(%) of times (N-1) Criteria was violated

Number of Blocks Number of Hours


S.No. Corridor %Violation
Violated Violated
1 WR-NR 0 0.00 0.00

2 ER-NR 18 4.50 0.60

3 Import of NR 0 0.00 0.00

4 NEW-SR 0 0.00 0.00

4 NER Import 0 0.00 0.00

Remarks: Flows crossing Total Transfer Capability (TTC) on interregional corridors has been worked out as a
proxy for (N-1) violation.

64
POWER SYSTEM OPERATION CORPORATION LIMITED
पॉवर सिस्टम ऑपरे शन कारपोरे शन सिसमटे ड
NATIONAL LOAD DESPATCH CENTRE – राष्ट्रीय भार प्रेषण केन्द्र
First floor, B-9, Qutab Institutional Area,
Katwaria Sarai, New Delhi-110016.

65