Fire Case Sizing for PSV-171 on Instrument Air Receiver (1031-D-002A) PROCESS ENGINEERING
COMPUTER PROGRAM / TYPE SCP MAIN- PC PROGRAM NO. VERSION / RELEASE NO.
FRAME
Hysys NO ü 2006
CONTENT: SHEET:
1) PURPOSE OF CALCULATION 2
2) INPUT DATA AND ASSUMPTION 2
3) GENERAL BASIS OF DESIGN 2
4) CONTIGENCY CHECKLIST 3
5) FIRE CASE VAPOR OUTLET 4
6) FIRE CASE PSV SIZING 5
7) HYSYS SNAP SHOT - FIRE CASE 6
8) ATTACHMENT-1 (RELIEF SCENARIO NARRATIVE)
REFERENCES:
SUMMARY OF RESULTS
Relief Governing Contingency Relief Relieving Required Orifice Number Reference
Case flow temperature Orifice Area Size Area of PSV
kg/h °C mm² mm² #
7 Fire Case 18131 173 555 K 1186 1 Sheet # 5,6
NOTES:
1. PSV Size and Set pressure of PSV to be confirmed during EPC based on Vendor data.
2. Relief loads scenarios to be verified during EPC phase.
PURPOSE OF CALCULATION:
1) The purpose of this calculation is to determine the relief loads and their properties for all the relief scenarios
mentioned
2) Sizing in the
of relief attached
valve relief narrative.
and determine the governing scenario. The data will then be used to generate the data sheet for this valve.
Note: This Calculation is also applicable for the following PSV's which are on air receiver of same capacity:
PSV-175 - 1031-D-002B
PSV-211 - 1031-D-002C
• HYSYS simulation
The PSV calculation files are located at:
-Conventional type valve is selected, back pressure is expected less than 10% of set pressure. PSV discharge line open to ATM.
-Sizing calcs based on allowable overpressure for single valve of 10% for non fire and 21% for fire scenarios.
-Loads and PSV size are calculated for PSV-171.
Electronic documents, once printed, are non-controlled and may become outdated. Refer to the Electronic Document Management System for the current revision.
Bechtel Confidential
© Bechtel Oil, Gas and Chemicals, Inc. 2008. All rights reserved.
THE DESIG
CALCULATION SHEET
SUBJECT Fire Case Sizing for PSV-171 on Instrument Air Receiver (1031-D-002A) SHEET 3 OF 7 SHEETS
Valve Size
1 a.BLOCKED OUTLETS NO
b.BLOCKED OUTLETS NO
5 REFLUX FAILURE NO
6 LOSS OF FEED NO
b.GAS BLOW-BY NO
c.THERMAL EXPANSION NO
d.INADVERTING VALVE
NO
OPENING
e.CHECK VALVE LEACKAGE
OR FAILURE NO
Electronic documents, once printed, are non-controlled and may become outdated. Refer to the Electronic Document Management System for the current revision.
Bechtel Confidential
© Bechtel Oil, Gas and Chemicals, Inc. 2008. All rights reserved.
THE DESIGN OR PART THEREOF CONTAINED IN THIS DOCUMENT WAS DEVELOPED FOR TAKREER FOR THE PROJECT AND REMAINS THE PROPERTY OF TAKREER. ALL INTERNATIONAL BECHTEL CO. LTD. PROPRIETARY
INFORMATION OR UNDERLYING INTELLECTUAL PROPERTY UTILIZED IN THE CREATION OF THE DESIGN OR INFORMATION CONTAINED THEREIN SHALL REMAIN THE PROPERTY OF INTERNATIONAL BECHTEL CO. LTD.
CALCULATION SHEET
CALC. NO. 1031-MYC-M001-B0009
SIGNATURE MPS DATE 30-Jan-09 CHECKED RC DATE 30-Jan-09
PROJECT RUWAIS REFINERY EXPANSION PROJECT JOB NO. 25418
SUBJECT Fire Case Sizing for PSV-171 on Instrument Air Receiver (1031-D-002A) SHEET 4 OF 7 SHEETS
7. FIRE CASE
In case of fire, if the air receiver discharge line valve is closed, the pressure will start to increase in the system and the PSV will be required to relieve the air
once it has increased to the set pressure of the valve.
The relief load for the fire case has been considered based on PE-529 calculation spreadsheet (Page 5 of 7).The relief valve was sized using the Bechtel
standard PSV sizing vapor critical spread sheet PE-523.
.
Relief temperatures have been estimated based on Bechtel fire relief load calculation (gas expansion) program PE-529.
See Hysys PFD snapshot (Page 7 of 7) for calculation of relieving temperature & PSV discharge line properties.
Based on the above data the PSV-171 was sized for the fire case. All data regarding conditions for sizing & relief load for the valve is shown on the
PE-523 calculation spreadsheet (Page 5 of 7) and PE-529 calculation spreadsheet (Page 6 of 7).
CONCLUSIONS:
Electronic documents, once printed, are non-controlled and may become outdated. Refer to the Electronic Document Management System for the current revision.
Bechtel Confidential
© Bechtel Oil, Gas and Chemicals, Inc. 2008. All rights reserved.
THE DESIGN OR PART THEREOF CONTAINED IN THIS DOCUMENT WAS DEVELOPED FOR TAKREER FOR THE PROJECT AND REMAINS THE PROPERTY OF TAKREER. ALL INTERNATIONAL BECHTEL CO. LTD. PROPRIETARY INFORMATION OR UNDERLYING INTELLECTUAL PROPERTY
UTILIZED IN THE CREATION OF THE DESIGN OR INFORMATION CONTAINED THEREIN SHALL REMAIN THE PROPERTY OF INTERNATIONAL BECHTEL CO. LTD.
BECHTEL OG&C PROCESS DEPARTMENT
FIRE RELIEF LOAD SIZING CALCULATION (GAS EXPANSION), REV. 0
Program ID: PE529 Date : 02/Oct/20
FIRE RELIEF LOAD CALCULATION (GAS EXPANSION)
Note : This spreadsheet was developed from ANSI/API Standard 521 Fifth Edition (January 2007).
Please review these documents and any client requirements, before using this spreadsheet to calculate fire loads.
This is a Bechtel Confidential validated spreadsheet and as such is locked and password protected. THIS SPREADSHEET MUST NOT BE MODIFIED WITHOUT PRIOR
WRITTEN APPROVAL OF THE CHIEF PROCESS ENGINEER. The user can assume that the locked calculations are accurate and have previously been checked. The
engineer must determine if this spreadsheet is appropriate for the application and assure all input data is correct.
Electronic documents, once printed, are non-controlled and may become outdated. Refer to the Electronic Document Management System for the current revision.
© Bechtel Oil, Gas and Chemicals, Inc. 2007. All rights reserved.
CALCULATION SHEET
DATE 30/01/2009
PROJECT Ruwais Refinery Expansion Project CALC No. 1031-MYC_M001-B0009 JOB No 25418
SUBJECT Fire Case Sizing for PSV-171 on Instrument Air Receiver (Gas Expansion) FILE No
API 520 Sizing for Vapour Relief - Critical Flow, Rev. 0 Program ID: PE523
Method taken from API RP 520 7th Ed January 2000 Section 3.6
This calculation is only valid if flow is critical - otherwise use PE532 (Vapor Sub-Critical)
Pcf = Critical flow nozzle pressure (absolute pressure) k = Ratio of Specific Heats for Ideal Gas, Cp/(Cp-R)
P1 = Upstream relieving pressure (absolute pressure)
If the PSV backpressure is less than Pcf, the flow is critical and this method may be used.
( k +1 )
C=520 k
√( 2
k+1 ) ( k −1 )
C calculated using equation or API RP 520 Figure 32 (ideal gas assumption)
k = Ratio of Specific Heats for Ideal Gas, Cp/(Cp-R)
Selected Orifice K K
Number Duty Valves (excluding spares) 1 1
API Effective Area 1186 mm2 1.838 in2
Selected Area Rated Flow 38,721 kg/h 85,365 lb/h
This is a Bechtel Confidential validated spreadsheet and as such is locked and password protected. THIS SPREADSHEET MUST NOT
BE MODIFIED WITHOUT PRIOR WRITTEN APPROVAL OF THE CHIEF PROCESS ENGINEER. The user can assume that the locked
calculations are accurate and have been previously checked. The engineer must determine if this spreadsheet is appropriate for the
application and assure all input data is correct.
Electronic documents, once printed, are non-controlled and may become outdated.
Refer to the Electronic Document Management System for the current revision.
© Bechtel Oil, Gas and Chemicals, Inc. 2007. All rights reserved.
CALCULATION SHEET
Electronic documents, once printed, are non-controlled and may become outdated. Refer to the Electronic Document Management System for the current revision.
Bechtel Confidential
© Bechtel Oil, Gas and Chemicals, Inc. 2008. All rights reserved.
THE DESIGN OR PART THEREOF CONTAINED IN THIS DOCUMENT WAS DEVELOPED FOR TAKREER FOR THE PROJECT AND REMAINS THE PROPERTY OF TAKREER. ALL INTERNATIONAL BECHTEL CO. LTD. PROPRIETARY INFORMATION
OR UNDERLYING INTELLECTUAL PROPERTY UTILIZED IN THE CREATION OF THE DESIGN OR INFORMATION CONTAINED THEREIN SHALL REMAIN THE PROPERTY OF INTERNATIONAL BECHTEL CO. LTD.