Creating New Project

1- click the file tab in the menu bar and select new
Creating New Project
2- select the EPS what will include the project.
Creating New Project
4- Enter Planned start & Planned finish Dates or planned start only
Creating New Project
5- Select the Responsible manager for the project.
Creating New Project
6- Select the Price/unit.
Creating New Project
7- Select No and click next.
Creating New Project
8- Click finish.
Creating Work Break Down Structure.
A hierarchical arrangement of the products and services produced
during , and by a project .
• Each element contains the activities needed to produce the
deliverable.
•Enables you to divide a project into logical pieces for the purpose
of planning and control.
•Project is root of WBS.
•Child/parent relationships between elements enable lower levels to
be rolled up and summarized.
Creating WBS
1- in the directory bar, click WBS.
Creating WBS
1- click add in the command bar to add WBS elements.
Creating WBS
1- Enter the following Data.
Use the arrows to arrange them.
Adding Activities
1-Click Activities in the Directory bar.
Adding Activities
2-Select key dates and click add or (insert) tab in key board, and enter activity
name , duration.
Adding Activities
3-Select General tab and select activity type.
Adding Activities
4-Enter activities in every WBS.
Creating Retaliations:
1-Click on the activity, click on relation tab in activity details bar.
Creating Retaliations:
2-Click on assign in the successor, and select the activity from successor window.
Scheduling
Data date
• the date that is utilized as the starting point for the schedule
calculations.
• Used to schedule all remaining works.
• During the planning phase the data date should match the project
start date.