Tower Crane Safety


Ir. Tajul Ariffin bin
Mohamed Nori

T
he upgrading of city liveability and urbanisation draw people to live in the city. Apart
from that, government initiative in the affordable home market has raised the demand
for high rise residential buildings.

The construction of high rises is not In Malaysia, tower crane handling such as Public OSH in Construction
possible without hoisting machineries and management demand both S ite G uidel in es, 2007, an d R i sk
such as the tower crane, a piece of voluntary and mandatory requirements Assessment Guidelines, HIRARC,
iconic engineering machine in the to be practiced by the stakeholders. 2008. We will go through some safety
industry. This vital tool is very important Through SIRIM, the Department of requirements related to the safe
for ease of construction activity Standard Malaysia has provided some handling of tower cranes, including
and productivity, especially in the pointers in standards (MS 1803:2008 that specified in FMA, some OSHA
vertical transportation of construction - Cranes - Safety - Tower Crane and needs and to highlight a new
material. MS ISO 4310:2014 Cranes-Test Code directive, the Chief Inspector Special
The safety aspects of tower and Procedures) on tower crane safe Order 2017.
cranes have voluntary and mandatory handling that the construction industry 19
requirements. The voluntary requirement can follow. APPROVAL & AUTHORISATION
stipulated in standards and codes, As for legal obligation, the To operate a tower crane in Malaysia,
should be adhered to by the industry Department of Occupational Safety one needs approval and authorisation
to make sure that any fabrication of and Health (DOSH), is the government from DOSH. A tower crane is classified
the tower crane, from design stage a g e n c y e n f o rc i n g m a n d a t o r y as hoisting machinery in category
JURUTERA ● OCTOBER 2018

to operations at site, is integrated requirements on tower crane safety D (hoisting machinery come in 4
with safety elements that have been framework in Acts such as Factory categories: A, B, C and D). The tower
recommended as best practice. and Machinery Act 1967 (FMA), crane design must be submitted
The mandatory requirement, such Occupational Safety and Health to the Chief Inspector of Factory &
as laws imposed by government Act 1994 (OSHA) and other related Machinery for approval via SKUD
authorities (Acts, Regulations and regulations. To ensure the safety online system (skud.dosh.gov.my:88).
Code of Practice) must be complied of workers and the public, DOSH The application will be reviewed
with to protect the safety of the also provides additional guidelines by the DOSH Hoisting Machinery Unit,
public as well as the workers. and an Industrial Code of Practice, under the Industrial Safety Division,

THE INSTITUTION OF ENGINEERS, MALAYSIA


FEATURE
prior to fabrication, installation and is in accordance with the document
operation. submissions. When the height reaches
The local fabricator of hoisting approximately 10m, the competent
machinery such as a tower crane firm and DOSH will do a joint crane
must be registered with DOSH as inspection to verify that machinery
a Competent Firm. The applicant is in accordance with the approved
must submit a design approval design. At this point, the inspection
request in a formal application of safety devices function tests and
letter to the department along with crane load tests should be carried out.
related documents such as technical If the inspection is successful, DOSH
specifications (crane design, technical will issue a COF for the machinery,
design drawings, design calculations, which is valid for up to 15 months.
catalogue or technical specifications, The COF should be renewed after
load charts and operating manuals that period and periodical inspection
and maintenance), certifications and conducted in accordance to Section
test report, safety devices and details 40 of the FMA.
of safety features as well as additional
supporting documents such as Import ERECTION, MAINTENANCE &
Licence according to the respectively DISMANTLING
code or standard. Risk activity such as erection, jacking
up or dismantling of the tower crane
REGISTRATION & CERTIFICATE must be conducted by a competent
OF FITNESS firm registered with DOSH. The owner/
Section 19 of FMA and Regulation 10 of occupier of the tower crane must
Factory and Machinery (Notification, also ensure that it is periodically
Certificate of Fitness and Inspection) maintained (provision of section 21 of
Regulations stipulates that the owner the FMA) by a registered Competent
of every hoisting machinery shall hold Firm.
a valid Certificate of Fitness in respect Competence in the context of
thereof so long as such machinery tower cranes is a legal obligation.
remains in service and that any illegal As stipulated in Section 29A of the
use of certified machinery will result in FMA, “no person shall manufacture,
a penalty fine amounting to not more fabricate, test, install, maintain,
than RM150,000 or jail for a maximum dismantle or repair any machinery
period of three (3) years or both. which is prescribed unless a written
Furthermore, hoisting machinery authority has been issued by the
that needs a Certificate of Fitness chief inspector”. Competent firms
(COF) must be registered with in tower crane management need
DOSH via its online system, MyKKP to be recognised as those with
(mykkp.dosh.gov.my). At this stage, an the skills, knowledge, experience
applicant must apply through the and understanding of technical
DOSH regional office where the tower requirements related to tower crane
crane will be operated. When the operations. The recognition of
20 machinery is successfully registered, competence in a firm is determined by
the submission will be reviewed by the DOSH, based on certain requirements.
state DOSH officer.
If the information provided is ALTERATION OF STRUCTURE,
satisfactory, DOSH will arrange RE-ENGINEERING,
for a first inspection of the tower MODIFICATION & REPAIR
JURUTERA ● OCTOBER 2018

crane to ensure that its foundation When it comes to the cost and
design is in accordance with the process of getting a new tower
design document approved by crane, the owner has the option to
the professional engineer and as repair/refurbish rather than replace.
submitted in the application. At Occasionally, replacement parts are
the site inspection, DOSH inspectors not available, so a crane owner has
may give approval for the owner/ no choice but to do necessary repair
contractor to initiate the erection of the work. Severe damage can usually
crane structure, provided everything be fixed but there are cases which

THE INSTITUTION OF ENGINEERS, MALAYSIA


FEATURE
are beyond repair and required to all the workers involved in the is in good condition, all safety
modifications. operation of the tower cranes. devices are functioning properly
Before or during its life cycle, a It is important that the lifting and the cranes are in good
tower crane may require changes or plan be clearly understood and condition.
modifications in structure/components implemented by all those involved. Lifting equipment is a main
and the resubmission of modified A lifting plan should contain component of a tower crane. The
designs must get the appraisal of safety and control elements, lifting condition of the wire rope, hook
DOSH. The previously approved COF procedures to be implemented, block and safety latch must be
will be automatically revoked. lifting layouts, material positions, checked daily and any damage
A registered competent firm crane operation radius, position rectified immediately. Those who
or the crane manufacturer will be and the number of signalman fail to stop operations if there is
required to do the modification works. and riggers. It should also state any defect that may cause bodily
DOSH must be notified of major the means of protection for those injury to any person or damage
modifications such as re-engineering not involved with the tower crane to properties (Section 40 of the
the hoisting machine, in order to operation. FMA), can be fined a maximum of
get approval for the work. The crane The supervision of lifting RM250,000 or jail of not more than
must be re-evaluated, a new design works should also be included in five (5) years or both.
drawing required and the new design lifting plans, such as requirements 4. Personnel Involved With Tower
calculations done by a registered for supervisors to ensure that the Crane Operation – Tower crane
competent tower crane firm. plan is adhered to. The supervisor operators require a sufficient level
This requirement does not apply to should have sufficient knowledge, of competency to ensure that
part replacement (Original Equipment experience and the authority lifting work can be carried out
Manufacturer, OEM) which does not to control operations, including safely. To ensure that qualifications,
involve structure or capacity change stopping operations in case of experience, knowledge and
but it must be recorded. unsafe conditions. e x p e r t i s e i n t o w e r c ra n e s
The lifting plan should also operations are as required by
OPERATIONS & HANDLING clearly state the communication Acts and regulations, DOSH issues
Most cases of tower crane accidents method used between the crane a certificate of competence to
occur during operation and handling. operator and the signalman and eligible individuals and firms.
Crane movements increase the the safe working load (SWL) to Crane operators need to have this
probability of an accident. To ensure be lifted by the crane to avoid competence certificate but before
safety during use, consider the following: overloading which may cause an they can obtain this, they must
1. Safe System of Works – Section 15 accident. Also to be included is attend training conducted at a
(1) of Occupational Safety and the main reference for operating centre approved by DOSH. A valid
Health Act (OSHA) 1994, outlines cranes such as load char t, Crane Operator Licence will only be
the general duties of employers boom angle, load radius and issued to those who have passed
and self-employed persons to lifting capacity. Requirements for the tower crane assessment
their employees against risks to competent operators should examination. Signalmen, riggers
safety or health in relation with the be clearly stated to avoid illegal and lifting supervisors are also
activity of a workplace. operators handling the crane. required to attend lifting operation
In a construction site, lifting 3. Permit to Work & Daily Inspection training although they are not
works is usually a daily activity Checklist – It is important to ensure required to obtain the certificate
and this includes use of hoisting that impor tant requirements of competency.
machinery. There are risks that are in place before the lifting 21
need to be addressed in operating operation starts. The construction SAFETY DEVICES & FEATURES
tower cranes and it is compulsory management team can ensure All tower cranes must have safety
to conduct a risk assessment that all the essential elements features to avoid accidents or failures
before work can be carried out. are checked completely by that may occur due to human error
Any relevant risk must be properly practising a work permit system. or negligence, weather, material
JURUTERA ● OCTOBER 2018

managed and control measures First, the involved parties need to durability or any circumstance
implemented to ensure that work check and fill out the checklist that may increase accident risk.
to be performed is safe. pertaining to the safe lifting and These safety devices are extremely
2. Lifting Plan – Lifting works require a approvals by those authorised important and tower cranes should
lifting plan which must be provided before work starts. Prior to the be properly equipped with Safety Limit
by those with the necessary operation, a permit will be issued. Switch, Operator Warning and Guided
knowledge and experience. The Such a system will ensure Device, Weather and Aircraft Safety
lifting plan shall be documented t h a t c ra n e o p e ra to r s a re Device, Safety Features when the
and communicated effectively legitimate, the lifting equipment operator is outside the cabin, Fail-Safe

THE INSTITUTION OF ENGINEERS, MALAYSIA


FEATURE
Features and Anti-Collision Devices. imposed. The accused was convicted
Daily inspections and scheduled under Section 17 of OSHA (maximum
maintenance on all tower crane fine of up to RM50,000.00 or jail of
safety features can help prevent not more than two (2) years or both).
catastrophic crane failure.
CHIEF INSPECTOR SPECIAL
TOWER CRANE ACCIDENTS ORDER 2017
Any accident or dangerous occurrence DOSH has been carrying out
related to the workplace should enforcement and promotional activities
be reported immediately to the at construction sites on revisions
nearest DOSH office. This is outlined to the Act and Regulations, the
under Section 31 of the FMA, Section enhanc em en t of en forcem en t
32(1) of the OSHA, Regulation 8 of policies to promote and ensure
Factory and Machinery (Notification, compliance at construction sites, the
Certificate of Fitness and Inspection) promoting of preventive measures
Regulations 1970, and Regulation through Hazard, Risk and OSH
5(1) of Occupational Safety and management system but still, there
Health (Notification of Accident, are reports of tower crane related
Dangerous Occurrence, Occupational accidents.
Poisonous and Occupational Disease) After OSHA was introduced in
Regulations 2004. 1994, employers were supposed to
There have been many cases take a voluntary proactive approach
of crane accidents reported in the to e n s u re e ffe c t i ve a c c i d e n t
local media. Some involve fatalities preventive action rather than wait
and even the public. In one extremely for the government to take legal
shocking case in 2016, a woman action. A high level of compliance
who was driving past the site of a will reduce the number of accidents
hotel construction in Jalan Raja at construction sites. The aim of
Chulan, Kuala Lumpur, was crushed self-regulation is far better than
by a one-tonne hook block that fell compliance to descriptive FMA.
from a tower crane at approximately However, the lack of awareness
20-storeys high. She died at the in the industry with regards to self-
scene due to the impact. regulation and an increase in tower
This is an example of a case crane accidents have forced DOSH
with several factors that should not to regulate more firm directives to
be allowed by the management in individuals rather than take traditional
charge of the crane. According to approaches or punitive action against
media reports, the tower crane safety the organisations.
device had been tampered with, To ensure that worksites adhere
allowing the crane operating radius to all necessary requirements, DOSH
to go beyond the boundary of the has ordered all Construction Project
construction site and construction Managers (PM) to hold responsibility
hoarding onto public road. Even for safe handling and operation of
worse, the crane operator was tower cranes. In any construction 23
repor ted to have disappeared site, the PM is the one with overall
immediately after the accident and responsibility for all activities, project
the authorities had to seek help from progress, control and who can halt a
Interpol because he had fled the project.
country. The Chief Inspector of Factory
JURUTERA ● OCTOBER 2018

The absence of a proper, safe & Machinery is given the power to


working system such as Permit-to- direct special orders, spelt out under
Work by the contractor involved sub-section 27(1) of FMA, for factory
and an effective supervisory system and machinery. The directive, made
allowed the tower crane boom to be on 5 June, 2017, to all Construction
operated beyond the construction site PMs, can be found on the DOSH
perimeter. Punitive action was taken webpage (www.dosh.gov.my). The
against the contractors involved order is split into 3 parts and includes
and a fine of RM40,000.00 was the penalty. .my

THE INSTITUTION OF ENGINEERS, MALAYSIA


FEATURE
The first part requires the PM to of any provision in the order and the
ensure that the tower crane has all accused may be punished individually. REFERENCES
the approvals necessary, including a [1] F a c t o r y and Machinery Act
1967.
permit to install and that it complies CONCLUSION
[2] Occupational Safety and Health Act,
with DOSH requirements to install and The operation of machinery such as 1994.
has the COF. The second part states tower cranes involves broad aspects [3] www.dosh.gov.my
that the PM’s duty includes handling of safety, from design and built-in [4] Guidelines For Approval of Hoisting
and the maintenance of the tower security features to operations and Machine Design.
crane during operations, appointing ensure that safety requirements as [5] Christian Shelton, replace or repair?,
a valid crane operator registered with described are fully complied with. International Cranes and Specialised
Transport, Vol. 26, no. 4, January
DOSH, appointing a trained lifting Failure to identify the shortcomings 2018.
supervisor, signalman and riggers, of tower crane operations will hurt [6] Woman killed after crane part falls on
the implementation of Permit-to-Work the users and may jeopardise the car, The Star Online, 26 August, 2016.
system, daily inspection of lifting gear safety of construction workers. The [7] BUCG halts construction after crane
and safety device functionality as Chief Inspector Special Order to hook accident, www.malaymail.com,
26 August, 2016.
well as keeping a record of usage, Project Manager (2017) is intended
[8] DOSH confirms crane’s safety switch
inspection and maintenance. to ensure that parties dealing with the tampered, led to accident, www.
The third part states that PMs tower cranes comply with safety and thesundaily.my,12 October 2016.
should ensure that any crane service related laws. The penalty sentences [9] Contractor to be charged over fatal
crane mishap, The Star Online, 9
provider should have a contract show that DOSH is very serious about
December, 2016.
with the occupier to manage the ensuring that stakeholders pay
erection, jacking, maintenance, serious attention to worker safety
repair and dismantling of the tower and health of construction industry
crane in accordance with the law especially tower crane operation. It Author's Biodata
requirement. The PM should also pay is hoped that such a requirement will
Ir. Tajul Ariffin bin Mohamed Nori is a sub-
serious attention to the penalty reduce the number of occupational committee member of the Mechanical Engineering
that may apply upon conviction. accidents involving tower cranes. All Technical Division in IEM. He is a Factory and
Machinery Inspector (Senior Assistant Director)
The maximum amount of the fine Construction PMs must be aware of at Department of Occupational Safety and Health
imposed is RM200,000.00 or jail not current rules and play a vital role in Selangor.

exceeding 5 years or both. Violation tower crane safety and operations.

IEM COUNCIL ELECTIONS 2019/2020

NOTICE ON NOMINATION PAPERS FOR COUNCIL ELECTION


SESSION 2019/2020

A notice inviting nominations for the Election of Council Members for Session 2019/2020 will be
posted on the IEM Notice Board and IEM website from 16 November 2018 for the information of all
Corporate Members of IEM. Thereafter, following the close of nominations on 20 December 2018,
the election exercise will proceed. All Corporate Members residing overseas are requested to take
note of the requirements of the Bylaw, Section 5.12, as shown below.

24 The voting paper shall, not less than twenty eight (28) clear days before the date
of the Annual General Meeting, be sent by post to all Corporate Members
residing in Malaysia and to any other Corporate Members who may, in writing,
request to have the paper forwarded to him. The voting paper shall be returned to
the Honorary Secretary in a sealed envelope so as to reach him by a specified
date not less than seven (7) days before the Annual General Meeting.
JURUTERA ● OCTOBER 2018

Voting papers will be posted out by 25 February 2019.

Corporate Members residing outside Malaysia, who wish to receive voting papers, are advised
to write to the Honorary Secretary on or before 10 January 2019.

Thank you.

Election Officer, IEM

THE INSTITUTION OF ENGINEERS, MALAYSIA

You might also like