he upgrading of city liveability and urbanisation draw people to live in the city. Apart
from that, government initiative in the affordable home market has raised the demand
for high rise residential buildings.
The construction of high rises is not In Malaysia, tower crane handling such as Public OSH in Construction
possible without hoisting machineries and management demand both S ite G uidel in es, 2007, an d R i sk
such as the tower crane, a piece of voluntary and mandatory requirements Assessment Guidelines, HIRARC,
iconic engineering machine in the to be practiced by the stakeholders. 2008. We will go through some safety
industry. This vital tool is very important Through SIRIM, the Department of requirements related to the safe
for ease of construction activity Standard Malaysia has provided some handling of tower cranes, including
and productivity, especially in the pointers in standards (MS 1803:2008 that specified in FMA, some OSHA
vertical transportation of construction - Cranes - Safety - Tower Crane and needs and to highlight a new
material. MS ISO 4310:2014 Cranes-Test Code directive, the Chief Inspector Special
The safety aspects of tower and Procedures) on tower crane safe Order 2017.
cranes have voluntary and mandatory handling that the construction industry 19
requirements. The voluntary requirement can follow. APPROVAL & AUTHORISATION
stipulated in standards and codes, As for legal obligation, the To operate a tower crane in Malaysia,
should be adhered to by the industry Department of Occupational Safety one needs approval and authorisation
to make sure that any fabrication of and Health (DOSH), is the government from DOSH. A tower crane is classified
the tower crane, from design stage a g e n c y e n f o rc i n g m a n d a t o r y as hoisting machinery in category
JURUTERA ● OCTOBER 2018
to operations at site, is integrated requirements on tower crane safety D (hoisting machinery come in 4
with safety elements that have been framework in Acts such as Factory categories: A, B, C and D). The tower
recommended as best practice. and Machinery Act 1967 (FMA), crane design must be submitted
The mandatory requirement, such Occupational Safety and Health to the Chief Inspector of Factory &
as laws imposed by government Act 1994 (OSHA) and other related Machinery for approval via SKUD
authorities (Acts, Regulations and regulations. To ensure the safety online system (skud.dosh.gov.my:88).
Code of Practice) must be complied of workers and the public, DOSH The application will be reviewed
with to protect the safety of the also provides additional guidelines by the DOSH Hoisting Machinery Unit,
public as well as the workers. and an Industrial Code of Practice, under the Industrial Safety Division,
crane to ensure that its foundation When it comes to the cost and
design is in accordance with the process of getting a new tower
design document approved by crane, the owner has the option to
the professional engineer and as repair/refurbish rather than replace.
submitted in the application. At Occasionally, replacement parts are
the site inspection, DOSH inspectors not available, so a crane owner has
may give approval for the owner/ no choice but to do necessary repair
contractor to initiate the erection of the work. Severe damage can usually
crane structure, provided everything be fixed but there are cases which
managed and control measures First, the involved parties need to durability or any circumstance
implemented to ensure that work check and fill out the checklist that may increase accident risk.
to be performed is safe. pertaining to the safe lifting and These safety devices are extremely
2. Lifting Plan – Lifting works require a approvals by those authorised important and tower cranes should
lifting plan which must be provided before work starts. Prior to the be properly equipped with Safety Limit
by those with the necessary operation, a permit will be issued. Switch, Operator Warning and Guided
knowledge and experience. The Such a system will ensure Device, Weather and Aircraft Safety
lifting plan shall be documented t h a t c ra n e o p e ra to r s a re Device, Safety Features when the
and communicated effectively legitimate, the lifting equipment operator is outside the cabin, Fail-Safe
A notice inviting nominations for the Election of Council Members for Session 2019/2020 will be
posted on the IEM Notice Board and IEM website from 16 November 2018 for the information of all
Corporate Members of IEM. Thereafter, following the close of nominations on 20 December 2018,
the election exercise will proceed. All Corporate Members residing overseas are requested to take
note of the requirements of the Bylaw, Section 5.12, as shown below.
24 The voting paper shall, not less than twenty eight (28) clear days before the date
of the Annual General Meeting, be sent by post to all Corporate Members
residing in Malaysia and to any other Corporate Members who may, in writing,
request to have the paper forwarded to him. The voting paper shall be returned to
the Honorary Secretary in a sealed envelope so as to reach him by a specified
date not less than seven (7) days before the Annual General Meeting.