You are on page 1of 61
GOVERNMENT OF RAJASTHAN INDIRA GANDHI NAHAR PROJECT STAGE-II BASIC SCHEDULE OF RATES 2013-14 CHIEF ENGINEER INDIRA GANDHI NAHAR PROJECT BIKANER. Price Rs.250 Government of Rajasthan Indira Gandhi ‘Nahar Project No F.ABIBSRPAV/CE/IGNP/M2 . Bikaner, dated 28-02-2014 ORDER ‘As pet item No, 25 of Revised schedule of Powers, the enclosed Basic schedule of Retes for Indira Gandhi Nahar project Stage-ll is hereby ordered ‘0 be jn force with effect from 1* March 2044. The Basie Schedule of Rates now in force will not affect the past contracts and estimates meaning thereby that past cases, if any, will be dealt with as per the provisions of the earlier Basie Schedule Of Rates. Therefore all the new estimates ‘will hence forth be framed as per this Basic Schedule of Rates. “the Basic Schedule of Rates of PWD [B&R] of the respective city/district wit! be applicable for IGNP Stage-tl as far a5 ‘building works , road works es well ve for the iterns which are not covered under the Basic Schedule of Rates of IGNP Stage-tI. hig Basie Schedule of Rates will remain applicable to Indira Gandhi Nahar Project Stage-I as well as, Kanwar Sain Lift Canal System. Cpa AA (sc Mittal) (B.8.Bhatia) Chief Engineer, Chief Engineer, Indira Gandhi Nahar Project, Indira Gandhi Nahar Project, : Jaisalmer. Bikaner. 2 INDEX S.No} Chapter Particular Page 1 1 General rates for daily wages of labour 12 2 i |Material 35 3 it Leading, Unloading and Stacking 6 7 yy __ [Carriage of material excluding loading, 78 unloading and stacking 5 v___|Cutting and welding of M. S. pipe 9 6 vi |Jungle cutting and clearence 10 T 7 vii [Earthwork 11-15 8 vi Lining work 16-20 Preparation of mortar, Laying of 8 XX |concrete & Reinforcement eras 40 X [Masonry work 25-26 "1 xX) Plastering, Pointing & White whasing 27-29 12 Xi [Hire charges of Toots and Pants 30-34 13 xi {Laying of pipe line 32-34 14 xiv [Survey work 36 15 xv |Dismantting 36-38 "7 xvi [Miscellaneous 39-41 18 JAnnexures -xi 42-58 Chapter —1 General rates for daily wages of labour S.No. Particulars Rate (Rs.) 4 Mason, Mistry Grade —1 600 ry IMason, Excavator, Chowalia Grade-tI, Gauge reader | T_528 3 Carpenter Grade -! 600 4 [Carpenter Grade —I! 525 5 |() Plumber (Knowing masonry work also) Holder Driller Grade"! 600 \i)Plumber Grade — 525 jg [Belder. Bhisti coolies, Chowkidar (Male or Female) Sweeper, Lab 350) JAttendant, Water-man & Helper 7 [Blacksmith Grade-|, Driver for heavy vehicle 525 8 [Blacksmith Grade- 1! 500 9 Mate, Gauge-reader-!I, Hammer man 500 0 __ [Driver for light vehicle , Pump driver 500 11 {Camel Cart with steel tank 800 to 900 lit. capacity with attendant. 1000 12 |Camei Cart with attendant 950 13 __ [Dresser (Skilled) for surface dressing 500 14 [Surveyor -(i) . Degree holder 900 {ii) Diploma Holder 700 45 [Mal 400 16 [Electrician 600 47 [Mechanic 600 18 [Cook 400 1a [Welder 600 20__|Painter 525 21 [Security guard with licensed Gun owened by him 400 22 [Secunty guard without Gun 350 Driver for heavy machines like chaintype Dozer, 123 |Shovels, Excavator (long boom) JCB operator chaintype / Tyre 600 mounted etc. license holder 24 __ [Sweeper part time (2) [For 2 hours 90 (6) _ |For 4 hours 140 (c) [For full day 360 Notes 4. The grade designation of labour will be determined as per class and quality of the work desired from the particular category of labour. S.No. Particulars Rate (Rs.) >. The labous rates include the provision of payment for paid oldays such . as weekly «eat daye as pet minimum wages act. Therefore, payment for Weekly holidays shall not be made separately. Paid ‘hofidays shall be allowed as per qules/Government orders 3, These rates are for casual labour rates employment and do not include contractors profit. 4, The rates for skilled and semi skilled labour are inclusive of al necessary tools which ‘are normally carried by them according to trade practice in the region 5. Grade for labour will be determined as per class & quality ‘of work given by him. 6 Where rates are indicated by lower and upper limits, ower one wil be applicable in general for employing labour, and if higher rates are to be ‘aliowed, prior sanction of the Superintending Engineer, shall be necessary 7. Labour rates are inclusive of all the allowances except travelling allowance. 8. Labour rates shall be governed by minimum wages act in force, from time f0 time 9. Forthe labour engaged through contractors, a premium of 10% is to be added over the rates. Chapter -Il Materials S.No Particulars Unit Rate (Rs.) 1 [Lime (is 712-1984) T1_[Nagori Kali or Gotan Kali at Source (for white ‘nt. 500 |washing) 2 [Sand (iS 383-1970) 21 [Screened sand (Bajari) Cum, 210 3. |Coarse aggregate (Single size) at quarry free from lkatcha stuff deleterious & organic matter as per standard specifications of following sizes. 31 [40 mm nominal size (Crusher broken) Cum 400 3.2 [20 mm nominal size (Crusher broken) Cum 500 33 [12.5 mm nominal size (Crusher broken) cum 500 3.4 [10 mm nominal size (Crusher broken) Cum 500 4 |Stone for random rubble masonry for general Cum 400, irrigation works at least 75% stones not less than 15 [cm in size in any direction and weighing not less than 123 kg. 5 (a) [CR Masonry stone for face work of general Cum 470 structures hammer dressed not less than 20 cm in any direction and at least 50 % stones to be more: than 23 cm in depth 5 (6) [CR Stone headers, hammer dressed finished size Cum 620 not less than 20cm x 20 cm and depth not less than 30 cm 6 |BRICKS 61 | Clay bricks size 23*11%7 cm class designation 100 1000 nos. 3550 las per specifications, at kiln 6.2 | Clay bricks size 23*11*7 cm class ‘designation 75 as| 1000 Nos. 3000 per specifications, at kiln 7.1 [43/53 Grade ISI Mark cement (in bags 50 kg in Per bag 300 weight 7.2. |White cement (IS 8042-1989) Per bag 720 S.No Particulars Unit Rate (Rs.) @ [Boundary stone or bench mark stone or survey stone Each 125 lsize 15x 15x75 cm well dressed. 5 {Giay tles size 30*16*5 om Class designation 105 as] 1000 Nos 6500 per specification at kiln site. 70. [Tar paper Sam. 45 41 [Maxphalt grade 65/25 or 95/15 Kg 95 72 |Righ yield strength deformed steel bars MT 52000 NS 1786 {3 [Structural steel MT 51000 74 lEmiply Cement bag polythene in good condition Each a 75 [LOPE fim 250 micron as per IS specification Kg 170 75 [HDPE fim 300 micron as per IS specification Kg. 180 77 [Adhesive tape 150 mm wide 25 m long Per role 90 78 [Binding wire Ka @ FST POC Bioek in cement sand aggregate 12.5. mm well |” 1000 8250 Igraded crusher broken including finishing, curing etc. Nos complete as per specification with concrete grade M- 10 size 30x15x4. cm 20 [Bitumen primer confirming to 18-3384 Litre’ 760 Note: 1 All the rates are at quarry/kiln site unless otherwise specified ‘These rates are exclusive of contractor profit 2 Rate for materials, not included above shall be taken as per prevailing market rates. These rates are for estimation purposes. 3. Grading of fine aggregate (sand) when determined as described in 1S 2386 (Part!) Shall be within the limit given in table ~4 of IS 383 (Annexure!) 4 Grading of Coarse aggregate shall be as prescribed under clause 4.2 in table -2 of 1S 383 for the required nominal size (Annexure —I!) 5. ‘The FM. of Bair from Bikaner and Mud quarries shall vary from 2.2 to 3.2 whereas FM of Bajfi from Googri River bed & other locations in Jaisalmer zone may vary from 4.92 to 26. 6. Inall works 100 % Bajari shall be used 7. Grading of coarse aggregate and kankar shall be in limits (See Annexure -II!). @ The Measurements shall be made on the basis of stacks & deduction for voids will be done as prescribed in Annexure-\V. 8. The class of common burnt clay bricks are as per specification (Annexure-V) 10. Weight of building material is as per Annexure ~VI 41, Proportions of single size aggregate to be mixed with each other 10 get graded aggregates for cone. Mix shall be as per Annexure-VI. Chapter-Ill LOADING , UNLOADING AND STACKING Particulars Unit_[ Rate (Rs.) ‘Loading in truck or MG/BG wagon within 50 Meter lead. Stone, sand, ballast, bajri, earth, grit , lime, timber murrum & cum 90.00 Kankar Cement Tone 435.00 Other heavy materials like steel pipes up to 100 mm dia, steel, Tonne 96.00 APM biock, distance marks, sleepers, log of wood etc. which are unpacked |. Tiles size 30*15*5 cm/ PCC Block size 30x15x4 cm 1000 200.00 Nos. Bricks size 23%11*7 cm 1000 130.00 Nos. Unloading & stacking within 50 M. lead from truck or Railway wagon Stone, sand , ballast, bajri, earth, grit, lime, timber, murrum & Cum 90.00 kankar Cement Tonne 135.00 Other heavy material like steel pipes up to 100 mm dia, steel Tonne 96.00 APM block, distance marks, sleepers, log of wood ete. which are unpacked Tiles size 30x15x5 om / PCC Block size 30x15x4 cm 1000 200.00 Nos. . Bricks size 23«117 om 1000 130.00 Nos. Stacking of material with in 50 m lead Stone, sand, ballast, baji, earth, grit , lime, timber murrum & cum 35.00 Kankar Cement Tonne 77.00 Other heavy materials tike steel pipes up to 100 mm dia, steel, Tonne 35.00 APM block, distance marks, sleepers, log of wood ete. which are unpacked Tiles size 30x15%5 em / PCC Block size 30x15x4 cm 4000 110.00 Nos. Bricks size 23x11*7 cm 1000 100.00 Nos. see sus os'9 oszg 0098S 006r 00% ose OLE = wn sequi, ob sve os ose 0g7z9 0095 006r oz Ove DOLE auuoL jeooweas 6 jeuayews Keay Jeyjo BEIP WW OO} MoIOg BdId°D "YB osz osy 00's gg'ay Ser 00BE —OSZE —00Z_— ODP BULOL, D'OIIO/IO “P14 24S ‘eas weusg sigan Bulpung ove 00's oss oo'ss 006 coer ogee s0e Ooze ND ‘yeyuey pouaessun ‘winunua wr L see 009 os'9 ore 002s 000s Ker OSE oAZE wo euos Suyos 9 ore oss 009 ges coe Oey 0Ser Dee sz — ND BAIS JeuINHON wud oy are6eibBe vag S ayeBoi65e sapulopaug '9zIs |eUIWIOU ore co's oss co's © D0%y © OUeY «ose SOE © COLZ = uP Moled ayeBaibbe sums ‘ueleg y sve oo ope co's ©0019 «oes Oy «HORE OTE HIND ques ¢ 009 oot oolL © 90'0}.«GD'BG- «CO's «HEL © COD ODS col WO LxLLxez ezis S1UG Z ‘SON Us oxSx0e 2218 or oo ey wy 0% a1 puokaa | o1-S spoken poor: OO'DEL_OO'PLL 0086 0018 —_0O'ZL__ ODL 001d 90e WO ges nD OE aig AeId wy Jad pee| | wry sod pea! quanbasqns | yuano-osqns sopenxg | soy eux a wre TTL | Cay ul 184) ONIMOVLS GNV ONIGVOINN ‘ONIGYOT SNIGN1OxX3 SIWIMSLVW JO SOVINEVS Al iaideuo pe10ubi aq JIM WH z% BU $58] PUR UD} | Se PArAPISUOD ym BrOU! JO UY % JO SOUEISIP OA ‘uy | spaaoxe peal ay uaUM —*L ‘A ainxouuy sad se suojonpep Aressaoau Jeye equaueinseaus 4923s Jo $1829 24) UO POUINEaP 2q }EUS o12 setebGAsBBe "WH!NS "PUES ‘ygened ‘auors ‘2"! sjeveyew Jeujo Jo Anuend 9 (joes, eusyey 2q 1IEYS YEA) J3uYO Aue ' 0S paust|gers 1 jones6 yeyow dor yoeIG ‘a12:0u00 TvaUwAD aT WSULLEEH J0 HOS auiOS ARIS UBER OREN eA ‘speou jje APnjoul eus esodind siyy 40} SPeO! ened) ‘sore Jo aynpeuos yy swoy Jad se S9je! ]Ual9}IP Ye pred ac EUS SHOE PUDIEN PAS APCS! (eoond) pened ul aBeu10 4S ;youd $J019es1U00 pue S2Ine/'Sexe} Jo SPU TE JO en/snjOu! BFE SEH v g]6ixe 31 JanaraUM 'SOYe] BONG UO HOB} "CYTE 10} BAXE 707 PPV € Bele 10) SO}E! SUL z Suryoeis pue Gulpeojun Bupeo| Guypnjoxa saves snoay + 270) ose OSS «OUTS © OO'BBGS O'SEES DOr ODE 00 yhee OOE96Z WOOL ep wu ogg o Oort 4 os; —O0'SZZ ©—«OU'SDE OPES OO'BOEZ OO'LEEZ OD-BEEL 00AS9 oo'zsrL WOOL erp ww oozto 006 | cove, 0've-«O0'FOZ CONES. OBL OO'SSSI OD ZEEL 00SOKL ooegs WOOL erp wu 908 009 ooze OSzz) -OS'SEF © OO'FELL OOALL OO'SEOL OBB OS'OEL OS'EED WOOF eIpwio9so1 Ose os6y og'ed oss «00'8BL “OS TIL OOEZB O'ECS Oey COGE WOOL eip wi Oo or ose 8 ose oszs cues — 0O10LS OO'BOG DO'SY oSORE OSSIE cOeee WOOF erp uw ong + ose osey coy —0F09 ~OSOIF OFESE OSLO OOSSZ ODZ NOD! ep uu ose 2 os oz 0862 pore —ogeze OS'BeZ OSZSZ OZ OL: dO:DST Wi 0D ep wuagz © oozL ose asoz 08 661 OUBLL ODES OOEEL OFOrs 0066 WOOL pip uw ost ra) oueh coco) «OS SSL OSZw OZ aS'9OL Ose —006L OO eipuw sZt 9 ek ooh ovzl — oo;0zE- «OS GOV OSES COB. ««OS'99—OsSS WOOF eipwugo, © sadid ayasouoo passaisaid pue sadid 219/U09 paqso}UIOLuN) ‘sadid "|"9 'adid yoaig ‘sedid OOM bb wig [| uvp | uae | wae | way | wie 0) sueinoued ONS wy un 02, wy ‘oz puokea | -0, ou0fea | ot-s pucteg used pea, | wt s0d peal | wy Jed 99) juanbasgns | wonbasans | wend-asqns ropeaxy | sopenea | 30) es Chapter -V CUTTING AND WELDING OF M.S. PIPES S.No, Particulars Unit Rate (in Rs.) 7 Culling of MS. pipes of thickness varying from Meter of outer 187.00 8 to 12 mm and 800 to 1200 mm diameter _ circumference cutting by gas including gas cutting equipment and labour 2. Cutting of M.S. pipes of thickness varying from Meter of outer 145.00 6 to B mm and 450to 800 mm diameter cutting circumference by gas including gas cutting equipment and jabour 3 Culting of M.S. pipes of thickness varying from Meler of outer 119.00 6 to 8 mm and 200 to 450 mm diameter circumference cutting by gas including gas cutting equipment and labour 4 Taking out of above pipes from trench ‘Sqm of outer 6.50 surface area of pipe 5 Putting of above pipes in trench and stringing --do-- 425 6 End preparation, including gas equipment and Meter of outer 155.00 labour for both ends of a joint. circumference 7 Welding of M. S. pipe including welding Meter of outer 601.00 material , labour welding set & generator with circumference POL Chapter -VI JUNGLE CUTTING AND CLEARANCE S.No. Particulars Unit | Rate (in Rs.) 7 Clearing jungle including uprooting of rank vegetation . Toosqm 647.00 bushes, shurbs , brush wood , trees and sapiing of girth upto 30 cm measured at a height of 1m above ground level and Temoval of rubbish upto a distance of 50 m outside the periphery of the area cleared 2 Clearing grass and removal of rubbish upto a distance of 50 100sqm 327.00 m outside the periphery of the area cleared 3 Felling trees of the girth ( measured at a height of 1 m above ground level ) including cutting of trunks and branches removing the roots and stacking of servicable material and disposal of unserviceable material Lead upto 1000 m 4) Girth above 300 mm to 600 mm Each 193.00 ai) Girth above 600 mm to 1200 mm Each 866.00 ii) Girth above 1200 mm to 2400 mm Each 4,043.00 fv) Girth above 2400 mm Each 8,085.00 Note : 1 Cut tree shall be the property of the department and disposal of these trees shall be done as per prevailing rues. 2. Beyond 1000 mtrs. Rates from carnage chapter are payable. 10 Chapter —VIl EARTH WORK S.No. | Particulars [Unit _JRate (in Rs.) 4 Earth work excavation in ordinary soil, kassi work undressed 4gicury 580 2 Earth work excavation in Ordinary soil, undressed with combined lead up to 50 mtrs 10. cum 520) 3 Silt Clearance/removal of blown sand, undressed ‘with combined lead up to 50 m from lined canal section, a. For FSD up to 1m. 10. cum 760 6 For FSD more than 1m but less than 2m ‘10;eum 780 ¢. For FSD more than 2m 10 cum 800 S _Extra for additional lead beyond 50m up to 500 iM 49 cum 43.50/10m ordinary soil Beyond 500 M rate of carriage is to be paid as per chapter of carriage of materials, 5 Extra for wet earthwork from bottom of the excavation up to the top surface of wet earthisit 49 Gum ai (that will not support men's weight ) in ordinary soil or slush or daidal 6 Extra for hard soil having dry bulk density from 1.7 0 1.9 gmice requiring repeated blows of kasi 10 cum 90 7 Extra puddling 40 cum 80 8 Extra for admixture of shingle or kankar (in loose form in non cohesive binding material) with use of pick axe undressed with combined lead of 50 m with percentage of shingle or kankar a Upto 10% 10 cum Nit b. More than 10% to 20 % 10 cum 80 ¢. More than 20% to 30% 40 cum 150 d. More than 30% to 40% 410. cum 260 9 Compaction of earthwork 9.1 Extra for laying earth in 15 to 20 om layers, watering, dressing but excluding cost of Rolling 10. cum 50 9.2 Extra for laying earth in1S to 20 em layers, dressing but excluding watering and cost of rolling in case of 10. cum 30 ry compaction “ S.No. Particulars L_Unit_[Rate (in Rs.) 10 Extra for rolling of earth to 90 % of maximum dry density of soil by mechanically driven machines , rollers or Vibro compactors as per requirement of the soil 10.1 Ordinary soil 10 cum 200 10.2 Hard soil 10 cum 240 +1 Ramming of earthwork in layers by wooden iron rammers to obtain density from 1.55 to 1.60 gm/ec 11.1 Ordinary soil 40. cum 60 112 Hard soil 10.cum 80 12 Gravel work Gravel (in loose form in non cohesive binding material) work in excavation with use of pick axe, undressed with combined lead up to 50 M with percentage of gravel or kankar. 121 More than 40% to 60% 410 cum 830 12.2 More than 60% to 80% 10. cum 900 12.3. More than 80% to 100 % 10 cum 960 13 Extra for additional lead beyond 50 m for gravel 43.1 From 60 mto 250 m 10. cum 220 13.2. From 250 m to 500 m 410. cum 340 14 Beyond 500 M rate of carriage is to be paid as per chapter of carriage of materials. 15 Dressing of gravel or kankar mixed with soil 10 cum 20 16 Rehandling of gravel or kankar with in 50m lead 10. cum 30 17 Dressing of earthwork for all types of earth work 4g cum 10 new or repair work for all types of soil 18 Earthwork excavation in foundation, trenches or drains (not exceeding 1.5 m in width ) including dressing of sides and ramming of bottom lift up to 4.5 m including getting out the excavated soil and. 1° 4" 830 disposal of surplus excavated soil as directed with in a lead of 50 m all kind of soil 4841 Add extra over item no. 19 for every additional lift of 49 Guin 470 1.5 mor part thereof 49 Earthwork for rehandling upto 20 m 10 cum 100 20 Dressing of dowels, boundary roads & drains etc. 100M 400 24 Making new boundry road including levelling and dressing 3 M to 5 M wide 21.1. Inunploughed land 4100 M 200 21.2 Inploughed land 100M 330 22 Covering boundary road with 8 cm deep sarkanda or jungle up to 1 km lead including cutting supplying 100 M 630 sarkanda or jungle etc. 22.1 Extra for carriage of sarkanda or jungle 2 km 100M 120 22.2 Extra for carriage of sarkanda or jungle 3 km 100 M 400 2 S.No. Particulars Unit Rate (in Rs.) 22.3 224 23 24.1 242 25 26 27 28 29 294 29.2 29.3 30 uv 32 Extra for carriage of Sarkanda or jungle 4km Extra for carriage of sarkanda or jungle 5 km and subsequent kilometer Plouging or levelling borrow pits or trenches etc. Dag beliing single kassi's stroke minimum 8 cm deep Dag beiling repeated kassi strokes "V" shaped minimum 15 om deep. Excavation in ordinary murrum, earth mixed with bajri kankar or boulders pabbles or Dhandla or any similar strata having bulk density more than 1.9 gmice to 2.20 grec hard in excavation dry or moist including dressing of excavated material & disposal within a lead of 50 M Excavation in disintegrated rocks, or shale or soft rock or hard kankar or compact murrum or disintegrated or soft Jhangia or conglomerates or any similar strata including dressing of excavated material & disposal within initial leads of 50 m. Excavation in hard rocks, or compacted hard "Jhangia' or Compacted conglomerates dry and moist or any similar strata not requiring blasting, dressing of excavated material & disposal within initial leads of 50 M Excavation in hard rock , compact hard Jhangia’ and compacted hard conglomerates or any similar sirata requiring blasting (where hardness of rock is more than 2), drilling ete including dressing and disposal of excavated material within initial leads: of 50 M Including cost of explosives. Add extra for Disposal of excavated material like murrum, boulders, kankar, shale, disintegrated rock Jhangia, conglomerates, rock Form 50 m to 250 m Form 250 m to 500 m Beyond 500 M rate of carriage is to be paid as per chapter of carriage of materials. Labour charges for extracting of floating weeds (Jalkumbhi & other) disposal on the outer slopes of the banks of canal Labour charges for cutting/ uprooting of sarkanda disposal on the outer slopes of the banks of canal Supplying filling and stitching of empty cement bags with earth available at site, weight not less than 40 kg including excavation etc. complete 13 100 M 100m Perha. Per km Per Km. 10 cum 10 cum 10. cum 10 cum 10 cum 40. cum 10 sqm 10 sqm 80 60 860 250 380 960 1660 2190 3580 220 340 693.00 590 [S.No._] Particulars Unit [Rate (in Rs.) Plastic bag Per bag 9.00 33 Labour charges for making coffer dam/ring bund by loading transporting earth filled cement bags up to 1/2 km dropping at required location in water including all lead and lift complete excluding cost of empty cemet bags (a) _ «Placing in dry condition Per bag 44.20 (6) Placing in water er bag 4580 34 Providing and laying mulching on side slopes of the canalbank/berm of the road with fog/kheep/saniya/ shrub etc. as available on site including embedding 400 mtr. 513.00 the same in trenches of 25%25 om with carriage of material up to ¥% km lead . 35 Carriage of fog/kheep/saniya etc 36.1 Ist%ekm 100 mtr, Ni 36.2 lind % km 4100 mir. 18 35.3 Extra for 2% km 400 mtr. 16 35.4 Extra for 3° km 100 mtr, 12 35.5 Extra for 4" km 400 mtr. 10 36.6 Extra for 6" km 100 mtr. 8 367 ca for subsequent additional lead per km beyond 499 ynty, 7 36 Earthwork excavation of lip cutting for height from the designed bed of canal or outer slopes of canal as the case may be in the filling reaches or in case of cutting reaches with all lead and lift including dressing etc. complete as per specification a. F.S.D upto 1 meter 10 cum 507 b. F.SDabove 1 meter 10 cum 564 37 Add extra for earthwork taken from private land to. be arranged by the contractor through private negotiation . Item applicable on certification by 10 cum 66 ‘executive engineer tha no government land is avaible in borrow area. Notes 4 For the purpose of payment to the contractor, the above rates are through rates which include nicking, ploughing, picking, ordinary jungle clearance, dag balling, transportation of labour and hutting 4 S.No. Particulars Unit [Rate (in Rs.) | 2 Water allowance for drinking purpose is not payable to the 3. Lift up to 3 M would be converted into lead by multiptying it by 8, thereafter lif from 3M to 8 M would be 3 (If) 2and beyond 8 M iif, it would be multiplied by 24 to give equivalent lead. 4, Incase where hardness is found payable , approval of ‘Superintending Engineer would be required to be obtained. 5 Kassi work is defined as earth work involving an horizontal throw up to 2.00 metres and average vertical ft up to one meter. 8. Channels with authorised full supply discharge of 350 cusec oF above are classed as Main Canal & Branches and those with discharge less than 350 cusec as Disty. & Minors and Sub Minors. 7. Allthe soils with dry bulk densities up to 1.90 gmicc should be treated as earthwork and hardness: should be given wherever necessary, with prior approval of the Superintending Engineer. 8. Determination of different strata must be made at site by proper investigations and should be marked properly on each cross section and L-section in the Guard-file. a {f strata appears to be different than ordinary soil, on visual inspection, it should be got analyzed chemically, before using in 40. In case rock requires biasting , the case shall be examined by S.E of the concerning Circle. 411. In item no 3. quantity of silt/blown sand ‘shall be measured up to dowel 16 Chapter Vill LINING WORK S.No. Item Unit Rate (in Rs.) 10 “1 42 13 14 ‘Dreseing of bed & preparation of sub grade for lining, including removal of irregularties up to 7.5 em Dressing of side slopes & preparation of sub grade for lining, including removal of irregularities up to 7.5 cm Dressing of bed & preparation of sub grade for lining, including removal of irregularities up to 10 em in earthwork with admixture of shingle or kankar up to 40% Dressing of side slopes & preparation of sub grade for lining, including removal of irregularities up to 10 cm in earthwork with admixture of shingle or kankar up to 40% Dressing of bed & preparation of sub grade for lining, including removal of irregularities up to 10 em in earthwork with admixture of shingle or kankar more than 40% Dressing of side slopes & preparation of sub grade for lining, including removal of irregularities up to 10 cm in earthwork with admixture of shingle or kankar more than 40% Dressing of bed & preparation of sub grade for lining in rock or conglomerate ete. Dressing of side slope & preparation of sub grade for lining in. rock or conglomerate etc. Curing of lining for 28 days after completion of lining section . (Labour rate only) Extra for scaffolding & templates inclusuive of materials for tile fining Pumping charges for supply of water for lining & curing Laying & spreading of LOPE film on sub grade including jointing & cost of jointing material ete. Laying & spreading of tar paper on sub grade including cost of tar paper Reduction in rates for cement concrete lining when mechanical mixer is not used or mechanical mixer is provided by the department 16 70 sqm 10 sqm 10 sqm 10 sqm 40 sqm 10 sqm 10. sqm 10 sqm 10 sqm 10 sam 10. sqm 10sqm 40 sqm cum 98.00 157.00 153.00 491.00 191.00 255.00 285.00 327.00 43,00 30.00 49.00 14,00 63.00 50.00 ‘S.No. Item Unit |Rate (in Rs.) 75 la) Single We lining 84 mm thick with tle size 3OxTExB cm = 10.sqm 4673.00 (b) (ch 16 (a) in bed laid in 6 mm thick cement mortar 1:3 (1 cement 3 bajari ) over base plaster of 12 mm thick in cement mortar 4:6 (1 cement : 6 bajar! ) & 16 mm thick sandwich plaster in cement mortar 1:3 (1 cement : 3 bajari ) including mechanical mixing of mortar, dressing of bed,scaffolding, laying & jointing of LDPE & curing for 28 days complete as per specification ‘excluding cost of LDPE film, including cast of jointing Single brick lining 104 mm thick with brick size 23x11 10sqm 3735.00 x 7 cm in bed laid in 6 mm thick cement mortar 1:3 (1 ‘cement : 3 bajari ) over base plaster of 12 mm thick in’ cement mortart:6 (1 cement : 6 bajari ) & 16 mm thick sandwich plaster in cement mortar 1:3 (1 cement : 3 bajar ). including mechanical mixing of mortar, dressing of bed, scaffolding, laying & jointing of LDPE/HDPE film & curing for 28 days compiete as per specification excluding cost of LDPE/HDPE film Including cost of jointing material. Single PCC biock lining 74 mm thick with PCC block 10 sqm_—4712.00 size 30 x 15 x 4 cm in bed laid in 6 mm thick cement mortar 1:3.(1 cement : 3 bajari ) over base plaster of 42 mm thick in cement mortart:6 (1 cement : 6 bajari ) & 16 mm thick sandwich plaster in cement mortar 1:3, {1 cement : 3 bajari) including mechanical mixing of mortar, dressing of bed,scaffoiding, laying & jointing of LDPE/HDPE film & curing for 28 days complete as per specification excluding cost of LDPE/HDPE film including cost of jointing material Single tle lining 84 mm thick with tile size 30x1x5 cm 10sqm 4976.00 in side slope laid in 6 mm thick cement mortar 1:3 (1 cement : 3 bajari ) over base plaster of 12 mm thick in cement mortar 1:6 (1 cement : 6 bajari ) & 16 mm thick sandwich plaster in cement mortar 1:3 (1 cement 3 bajari ) including mechanical mixing of mortar, dressing of bed, scaffolding, taying & jointing of LDPE/HDPE film & curing for 28 days complete as per specification excluding cost of LDPE/HDPE film, including cost of jointing material. w S.No. Item Unit |Rate (in Rs.) (b) (9) 17 (a) {b) Single brick lining 104 mm thick with brick size 23 x 11 x7 cm in side slope laid in 6 mm thick cement mortar 4:3 (1 cement : 3 bajari ) over base plaster of 12 mm thick in cement mortar4:6 (1 cement : 6 bajari) & 16 mm thick sandwich plaster in cement mortar 1:3 (1 cement : 3 bajari). including mechanical mixing of mortar, dressing of bed,scaffolding, laying & jointing of LDPE & curing for 28 days complete as per specification excluding cost of LOPE film including cost of jointing material. Single PCC block lining 74 mm thick with PCC block size 30 x 15 x4 cm in side slope laid in 6 mm thick cement mortar 1:3 (1 cement : 3 bajari ) over base plaster of 12 mm thick in cement mortar1:6 (1 cement "6 bajari } & 16 mm thick sandwich plaster in cement mortar 1:3 (1 cement , 3 bajari) including mechanical mixing of mortar, dressing of bed,scaffolding, laying & jointing of LOPE/GDPE film & curing for 28 days complete as per specification excluding cost of LDPE/HDPE film including cost of jointing material Double tile lining 140 mm thick with tile size 30x15x 5 cm in bed, bottom layer laid in 6 mm thick cement mortar 1.5 (1 cement : 5 bajari ) over base plaster of 12 mm thick in cement mortar 1:6 (1 cement : 6 bajari ) & 16 mm thick sandwich plaster in cement mortar 4:3 (1 cement : 3 bajari ) & top layer of tile laid in 6 mm thick plaster in cement mortar 1:3 (1 cement : 3 bajari ) including mechanical mixing of mortar, dressing of bed,scaffolding, laying & jointing of LDPE/HDPE film & curing for 28 days complete as per specification excluding cost of LDPE/HDPE film includina cost of icintina material. Double PCC block lining 120 mm thick with PCC block size 30x15x4 cm in bed, bottom layer laid in 6 mm thick cement mortar 1:5 (1 cement : 5 bajari ) over base plaster of 12 mm thick in cement mortar 1:6 (1 cement : 6 bajar) & 16 mm thick sandwich plaster in cement mortar 1:3 (1 cement :3 bajari) & top layer of PCC Block laid in 6 mm thick plaster in cement mortar 1:3 (1 cement : 3 bajari) including mechanical mixing of mortar, dressing of bed,scaffolding, laying & jointing of LDPE/HDPE film & curing for 28 days complete as per specification excluding cost of LDPE/HDPE film 18 10 sqm 5447.00 10sqm 6015.00 40sqm 7483.00 10sqm —-7808.00 S.No. Item Unit |Rate (in Rs.) 18 19 20 {a) a a) (b) (i) Ww Double tile lining 140 mm thick with tile size 30x15x5_ 10sqm 7900.00 om in side slope , bottom layer laid in 6 mm thick cement mortar 1:5 (1 cement : 5 bajari ) over base plaster of 12 mm thick in cement mortar 1:6 (1 cement :6 bajar :) & 16 mm thick sandwich plaster in cement mortar 1:3 (1 cement : 3 bajari )& top layer of tile laid in 6 mm thick plaster in cement mortar 1:3 (1 cement : 3 bajari) including mechanical mixing of mortar, dressing of side slope,scaffolding, laying & jointing of LDPE & curing for 28 days complete as per specification excluding cost of LOPE film including cost of jointing material Double PCC block lining 120 mm thick with PCC 10sqm 8224.00 block size 30x15x4 cm in side slope, bottom layer laid in 6 mm thick cement mortar 4:5 (7 cement : 5 bajari ) over base plaster of 12 mm thick in cement mortar 1:6 (1 cement : 6 bajari) & 16 mm thick sandwich plaster in cement mortar 1:3 (1 cement : 3 bajari )& top layer of tile laid in 6 mm thick plaster in cement mortar 1:3, (4 cement : 3 bajari ) including mechanical mixing of mortar, dressing of side slope,scaffolding, laying & jointing of LDPE & curing for 28 days complete as per specification excluding cost of LOPE film and including cost of jointing material Cement concrete lining cast in situ 1:3:6 (1 cement: 3 Bajari (Coarse sand) : 6 grit (graded coarse aggregate) 20 mm nominal size) including use of mechanical mixer, scaffolding , form work, dressing, laying LDPE film , applying primer confirming to IS: 3384 on panel side finishing, curing for 28 days etc as per specifications complete in all respect including cost of primer & excluding the cost of LDPE film but including cost of jointing material. In bed. 7.5 cm thick lining 10 sqm 3428.00 10 cm thick lining 10 sqm 4502.00 In side slopes 7.5 cm thick lining 10 sqm 3617.00 10 om thick lining 10 sqm 4723.00 19 S.No. Item Unit [Rate (in Rs.) 24 @ @ “ ) @ tp 22 23 24 25 26 a 28 23 Cement concrete for sleeper cast in situ 1:36 (1 cement : 3 Bajari (Coarse sand) : 6 grit (graded coarse aggregate) 20 mm nominal size) including use ‘of mechanical mixer, scaffolding , form work, dressing, excavation of earth, laying tar paper , finishing, refilling of earth in the sides of sleeper, curing etc. as per specifications complete in all respect including cost of tar paper. In bed Size 75 x 150 mm RM 53.00 Size 100 x 200 mm RM 93.00 In side slope, Size 75 x 150 mm RM 58.00 Size 100 x 200 mm RM 97.00 Tile masonry for canal dowel in cament mortar 1:6 (1 Cum 1627.00 ‘cement :6 Bajari ) excluding cost of tiles Tile masonry for canal dowel in cement mortar 1:6 (1 cum 4550.00 ‘cement ‘6 Bajari ) including cost of tiles Brick masonry for canal dowel using class designation Cum 3902.00 75 in cement mortar 1:6 (1 cement :6 Bajari : ) P/L cement plaster 12 mm thick in cement mortar 1:5 10Sqm 1167.00 (1 cement 5 Bajari ) Flush cement pointing in cement mortar 1:3 (1 10.sqm 642.00 cement’: 3 bajari) for open joints of existing tile lining in bed including raking of joints. Flush cement pointing in cement mortar 1:3 (1 10.sqm 713.00 cement : 3 bajari) for apen joints of existing tile lining in side slope including raking of joints Repair of top layer of tle lining by replacing with new 10sqm 3625.00 files including removal of old mortar from sandwich plaster in cement mortar 1:3 (1 cement : 3 Bajari) including curing, and cleaning the surfae etc. complete. ‘Add extra for patch repair of any type of fining as per 10sqm 425.00 specification including removal of debries and making the patch in regular shape with preperation of subgrade etc complete. 10.sqm 20 Chapter - IX PREPARATION OF MORTARS & REINFORCEMENT S.No. Particulars ., | Rate (in Unit Rs.) 1.0 CEMENT MORTAR 4.1 Cement sand mortar 1:2 (1 cement : 2 Fine aggregate) Cum 6197.00 1.2 Cement sand mortar 1:3 (1 cement : 3 Fine aggregate) Cum 5093.00 1.3 Cement sand mortar 1:4 (1 cement : 4 Fine aggregate) Cum — 4162.00 1.4 Cement sand mortar 1:5 (1 cement : § Fine aggregate) Cum 3660.00 1.5 Cement sand mortar 1:6 (1 cement : 6 Fine aggregate) Cum — 3230.00 1.6 Cement sand mortar 1:8 (1 cement : 8 Fine aggregate) Cum — 2822.00 2.0 Lime MORTAR 2.1 Lime mortar 1 : 2 (1 lime putty : 2 Bajari) Cum — 2472.00 2.2 Lime mortar 1: 3 (1 lime putty : 3 Bajari) Cum 2349.00 2.3 Mud mortar having clay not less than 10% Cum 437.00 3.0 CEMENT CONCRETE (CAST -IN- SITU) Providing and laying cement concreting including curing, compaction etc. complete using stone aggregate 20 mm nominal size in foundation and plinth, excluding cost of shuttering using 3.1 M-25 grade mix 1:1:2 (1 cement ‘tooarse sand: 2 graded © Cum 6937.00 stone aggregate) 3.2 M-20 grade mix 1:1%:3 (1 cement : 1% coarse sand : 3 Cum 5395.00 graded stone aggregate). 3.3 M-15 grade mix 1:2'4 (1 cement 2 coarse sand: 4 graded = Cum 4944.00 stone aggregate) 3.4 M-10 grade mix 1:3:6 (1cement : coarse sand : 6 graded Cum 4445.00 ‘stone aggregate) Providing and laying cement concrete including curing, compaction etc. complete using stone aggregate 40 mm nominal size in foundation plinth, excluding the cost of shuttering using. 3.5 1 cement: 2 sand : 4 aggregate mix. Cum 4892.00 3.6 1 cement : 3 sand : 6 aggregate mix. Cum 4231.00 3.7 1 cement: 4 sand: 8 aggregate mix. Cum — 3874.00 3.8 1 cement : 5 sand : 10 aggregate mix. Cum 3680.00 3.9 Add extra for laying concrete in superstructure up to 4.5 mtr. Cum 85.00 height above plinth level, on rates of item no. 3.1 & 3.8 a S.No. Particulars Rate (in Unit | Rs) 3:10 Add extra for laying concrete in superstructure above 45M Cum 157.00 height for each subsequent height of 4.5 M or part there of on rates of item No. 341039 3.11 Add extra on item no. 2.0 & 3.1 to 3.8 for laying concrete in P.cum 25.00 or under water or liquid mud, including cost of pumping of | /M. depth bailing out water and removing slush etc, complete. 3.12 Add extra on item no. 2.0 & 3.1 to 3.6 for laying concrete in. Cum 53.00. ‘or under foul condition. 4,0 REINFORCED CAST IN SITU CONCRETE, PIL in position specified grade of reinforced cement concrete including curing, compaction, finishing with rendering in ‘cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints, excluding cost of shuttering, centring land reinforcement. All work up to plinth level. 4.1 M-25 grade mix 1:1:2 ( toement : 1 coarse sand: 2 graded © Cum 7203.00 stone aggregate 20 mm nominal size. 4.2 M-20 grade mix 1:1%:3 (1 Cement :1 Coarse sand : 2 Cum $738.00 graded stone aggregate 20 mm nominal sand size) 4.3 MAS grade mix 1:24 ( 1 Cement: 2 coarse sand: 4 graded Cum 5210.00 stone aggregate 20 mm nominal size 5.0|PIL reinforced cement concrete in wall (any thickness) including attached pilasters, buttresses, plinth, string courses, Kerbs and filets, columns, pillers, piers, abutments, posts and struts etc. in super structure up to floor three ievel including curing compaction finishing with rendering in \cement sand mortar 1:3 (1 cement <3 coarse sand ) & making good the joints excluding cost of shuttering and ‘centering & reinforcement M-20 grade mix.1:1.5:3 (1 cement 1.5 coarse sand '3 graded stone aggregate 20 mm nominal size ). 5.1 M.25 grade mix 1:1:2( 1cement: 4 coarse sand. 2 graded © Cum 7242.00 stone aggregate 20 mm nominal size. 5.2 M420 grade mix 1:11%:3 (1 Cement :1 Coarse sand : 2 cum 5777.00 graded stone aggregate 20 mm nominal sand size) 5.3 M-15 grade mix 1:24 (1 Cement: 2 coarse sand:4 graded Cum 5249.00 stone aggregate 20 mm nominal size. 22 S.No. Particulars Unit Rate (in Rs.) 0 PIL cement concrete in R.C.C. work for suspended floors, roofs, girders, cantilevers, stair cases, landing, balconies, shelves, chajja's, lintels bands, coping, bed plates, anchor blocks, sills & beams etc. in super structure up to floor three level including curing compaction finishing with rendering in cement sand mortar 1:3(1 cement :3 coarse sand) & making good the joints excluding cost of shuttering and centering & reinforcement. 6.1 M.25 grade mix 1:1:2 ( 1ement : 1 coarse sand : 2 graded stone aggregate 20 mm nominal size. 6.2 M-20 grade mix 1:1%4:3 ( 1 Cement :1 Coarse sand : 2 graded stone aggregate 20 mm nominal sand size) 6.3 M-15 grade mix 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size. 7 Add extra over item 5 to 6 for each subsequent height of 4,5m or part thereof SHUTTERING 8 Centering & shuttering with plywood or steel sheets including strutting, propping, bracing both ways and removal of form work for foundation in basement rafts beam, bases of columns etc up to plinth level including material. 9 Centering & shultering with plywood or ste! sheet including strutting. propping, bracing both ways with wooden members and removal of form work for superstructure up to 4.5 mtr. height above plinth level including material 9.1 Walls (any thickness) including attached pillarsters, buttresses, plinth and string course. 9.2 Suspended floors, roofs, landings, staircases, landing, balconies, girders, cantilevers, bands, coping , bed plates, anchor btocks, sills, chajjas etc. 9.3 Columns , pillers, posts and struts etc. 9.4 Grid roofing with panel area less than 2.5 sqm (contact area to be measured) 9.5 Grid roofing with panel area more than 2.5 sam (contact area to be measured) 23 Cum Cum cum cum Sqm Sqm Sqm Sqm Sqm 7538.00 8073.00 5544.00 187.00 83.00 150.00 161.00 181.00 162.00 144.00 S.No. Particulars. Unit Rate (in Rs.) 70 Add extra for shuttering in circular work overitemNo.5.0& Sqm 25.00 6.01064 11 Add extra for using steel props & bracing etc. instead of Sqm 20% wooden memebers over item no. 6.0 to 6.6 12 Add extra over item No. 6.0 to 6.4 for doing centering & Sqm. 7.25 ‘shuttering work for each subsequent height of 4.5 mtr. or part thereof. STEEL REINFORCEMENT 13 Labour charges for fabricating steel reinforcement for R.C.C. MT 1450.00 work including cutting bending, placing in position and bindings complete including cost of binding wire in foundation and super structure 4.5 mtr. height above plinth 14 Providing and fabricating steel reinforcement for R.C.C. work including straightening, cutting bending, placing in position and bindings complete including cost of binding wire in foundation and super structure 4.5 mtr. height above plinth level, Hot rolled deformed (|S 1139) cold twisted (IS: 1786) bars. MT — 68096.00 Note: 1.0 The rates are for all lead cement coarse aggregate, coarse sand etc. at site of work and inclusive of laying and mixing, all T & P, mixer vibrator with POL , scaffolding etc. 2.0 Concrete mix prepared by power driven meechanical mixer shall be used 3.0 Under exceptional conditions where mechanical mixer and vibrator are not used ( with the approval engineer incharge) rates to be reduce by Rs 50 and Rs. 35 per ‘cum respectively. 24 Chapter -X MASONRY WORK S.No. Particulars Unit | Rate (in Rs.) ‘A. STONE MASONRY 1 Random Rubble stone masonry for foundation and plinth (using R. R. stones where 75 % stones to be nat less 15 em in size int any direction and weighing not less 23, kg) for foundation including curing, all leads of construction material and all taxes. level etc. complete. (a) Inlime sand mortar 1:2 cum 3615.00 {b) In cement sand mortar 1:3 cum 4480.00 (c}Inccement sand mortar 1-4 Cum 4173.00 (4) In cement sand mortar 1:5 Cum 4007.00 (e) — Incement sand mortar 1:6 Cum 3865.00 2 Drystone masonry including alt lead of alt cum 2750.00 construction material. 3 Course rubble stone masonry facing first sort (using hammer dressed stones not less than 20.cm in any direction and at least 50% stones to be more than 23 om in depth} for foundation including curing ete. including all leads of all construction material complete For wall more than 30 cm thickness. (2) In lime sand mortar 1:2 cum 4506.00 (b) In cement sand mortar 1:3 cum 5293.00 (©) Incement sand mortar 1:4 cum 5013.00 (4) In cement sand mortar 1:5 cum 4863.00 (©) Incement sand mortar 1:6 cum 4734.00 4 Deduct from item No 3 for course rubble cum 321.00 facing second sort 5 Addextra overitem no 1104 (a) For wall thickness up to 30 om 363.00 () Extra for stone work in superstructure above 287.00 plinth level for every 5m and part thereof 25 ‘S.No. Particulars Unit | Rate (in Rs.) B. _ BRICKS MASONRY 6 Brick masonary in foundation and plinth with brick designation 75 (a) Inlime sand mortar #:2 Cum 3721.00 (bd) Incement sand mortar 1:3, cum 4377.00 (©) Incement sand mortar 1:4 cum 4144.00 (@)—Inccement sand mortar 1:5 cum 4018.00 (e)__Incement sand mortar 1:6 cum 3911.00 (tn cement sand mortar 1:8 cum 3809.00 7 Add extra over item no. 6 (a) For using brick class designation 100 instead Cum 432.00 of class designation 75 {b) Extra for brickwork in superstructure above Cum 108.00 plinth level for every Sm and part thereof (@) For brickwork in square or rectanglar pillars. Cum 438.00 (@) For brickwork in circular pillars cum 531.00 (for circular masonry curved in plan not cum 368,00 ‘exceeding 6 m in radious 8 Dry brick pitching in laid in diagonal herring Cum 2814.00 bone bond or other pattem wih bricks of class designation 75 9 Dry brick pitching in laid in diagonal herring Cum 3147.00 + bone bond or other pattern with bricks of class designation 100. 10 Brick on edge pitching with bricks of class Sqm 521.00 designation 75 including pointing in CM (1:3) complete laid on 12 mm thick bed of cement mortar 18 11 Brick on edge pitching with bricks of class Sam 552.00 designation 100 including pointing in CM (1:3) complete laid on 12 mm thick bed of cement mortar 1:6 Chapter —-XI PLASTERING, POINTING AND WHITE WASHING S.No. Particulars Unit | Rate (in Rs.)_| Plaster 1 Lime plaster with lime sand mortar (1:2) including racking of joints, smooth finishing with sandia and curing ete. complete including all leads of all construction materials of thickness. 1.1 26mm thick in 3 coats. Sqm 223.00 20mm thick in 2 coats, Sqm 192.00 4.3 12 mm thick in 4 coats. Sqm 139.00 2 Cement plaster with cement sand mortar (1:3) including racking of joints, smooth finishing and curing etc.complete including all leads of all construction materails of thickness. 24 25mm thick in 3 coats. Sqm 295.00 22 20mm thick in 2 coats. Sqm 251.00 412 mm thick in 1 coats. Sqm 177.00 10 mm thick in one coat Sqm 162.00 3 Cement plaster with cement sand mortar (1:4) including racking of joints, smooth finishing and curing etc.complete including all leads of ali construction materails of thickness. 341 25mm thick in 3 coats. Sqm 269.00 3.2 20mm thick in 2 coats. Sqm 230.00 33 12mm thick in 1 coats. Sqm 163.00 5.4 10 mm thick in one coat Sqm 153.00 4 Cement plaster with cement sand mortar (1:5) including racking of joints, smooth finishing and curing etc. complete including all leads of all construction materials of thickness, 41 25 mm thick in 3 coats. Sqm 255.00 4.2 20mm thick in 2 coats. Sqm 218,00 43 12 mmthick in 1 coats. Sqm 158.00 54 10 mmthick in one coat Sqm 147.00 ar ‘S.No. Particulars Unit | Rate (in Rs.) & Cement plaster with cement sand mortar (1:8) including racking of joints, smooth finishing and curing etc. complete including all leads of all construction materials of thickness. 5.1 25mm thick in 3 coats Sqm 243.00 §.2 20mm thick in 2 coats. Sqm 208.00 5.3. 12mm thick in 1 coats Sam 180.00 54 10 mmthick in one coat Sqm 142.00 6 Add extra over item no 1 to 5 for repairs to Sqm 24.00 plasters including cutting the patch in a uniform shape, racking preparing surface of wall, including all leads of all construction material complete in all respect. 7 Finishing with neat cement punning including Sqm 34.00 cost of coment 8 Add extra over item no 1 to 5 for plaster Sqm 20% done over ceiling 9 Add extra over item no 1 to for height fram Sqm 10% more than 5 m from base / floor level of structure for every additional height of 3m or art there of ( upward or downward) Pointing 10 Flush or ruled pointing on stone masonry including racking of joints and curing ete. complete. (@) Lime sand mortar (1:2) Sqm 186.00 (b) Cement sand mortar 1:3 Sqm 164.00 14 Raised and cut pointing on stone masonry including racking of joints and curing etc complete. (a) Cement sand morter 1:3 Sqm 200.00 42 Flush or ruled pointing on brick masonry including racking of joints and curing etc. complete, (a) Lime sand mortar (1:2) Sqm 99.00 {o) Cement sand mortar 13 Sqm 111.00 13 White washing (2) White washing with lime to give an even Sqm 17.00 shade new work three or more coats. (b) White washing with lime to give an even Sqm 10.00 shade old work two or more coats. 14 — Colour washing of all shade to give aneven Sqm 23.00 shade including all scaffolding. 28 S.No. Particulars Unit Rate {in Rs.) 78 Distempering with oll bound washable distemper of approved brand and manufacture to give an even shade including all scaffoldina: (@) New work (two or more coats) over and Sqm 58.00 including scrapping and priming coat with cement primer, (b) Old work (one or more coats} including ‘Sqm 18.00 scrapping surface and necessary repairs. 46 Painting with enamel paint of approved brand = Sqm and manufacture to give an even shade: (a) Two or more coats on new work Sqm 52.00 (b} One or more coats on old work. Sqm 34.00 17 Add extra over item no 10 to 16 for height Sqm 10% from more than5 m from base / floor level of structure for every additional height of 3m or part there of ( upward or downward) 29 Chapter — XI HIRE CHARGES FOR TOOLS & PLANTS: Hire charges for Tool & Plants (Machineries) Department Tools & Plants as well as Tools & Plants Obtained from External Sources Rate (in RS} S.No] Item Unit Without POL With P.O.L 7 [Tractor 20 HP. to 40 BPH. (without implements) per day 800 2000 2 |() Truck’ 7-10 tonne capacity with driver & helper per day 1200 4200 3 ({i Truck 4x4 , 6-7 tonne capacity with r driver & helper per day 1300 4800 |i) Additional per km rate after aK a8 working hours B Cement concrete mixture 10 to 14 cft capacity. With operator per day 650 1050 [Cement concrete mixture TIO TOR | por gay om 300 capacity with operator 7_|Vibrator with operator perday | 425 600 8 [Water tanker, 4500-5000 Itr. Capacity per day 200 9 [Tractor implements (ij Four wheeler trolly per day 160 (ii) Two wheeler trolly per day 420 (i) Blade / cuttivator per day 90. (iv) Bucket cutter per day 110) (v) Sheep foot roller 3 MT “per day 30 (vl) Sheep foot roller 5 MT. per day 110 (Vii) Plain Roller 3 MT per day 65 (Vill) Air compressor up to 160. cfm | _ per day 210 10 [Diesel Driven pump set. (j Upto 10 HP. per day 240 610 (li) Above10 HP. to 20 HP. perday 260 840 Ti_[Diesel Driven Generator set. (G15 to 24 KVA. per day 7250 2400 (ji) Up to 6 KVA per day 510 1200 (li) Above 6 KVA to 15 KVA perday 820 4600 72 |Hydroulic excavator / Loader like JCB \/Pocklain , H itachi etc. with all accessories having bucket capacity up to 40 cum Per hr 750 1050 above 40 cum to 75 cum Per hr 4200 1600 |Above 75 cum. Per hr 1550 2150 Notes : 1 Hire charges of Machineries/equipments given whenever taken per day for 8 hours of actual working excluding rest period 2. Idle charges will be levied only for the period the machines remain idle without any valid reasons. 3. In case the machines remain idle for a part of a day then the idle charges will be levied only for the hours, the machine remained idle i.e. 8 hours minus the hours the machines has worked. Rate per hour in such case will be 1/8 of the idle charges per day 4 Machines may be hired at the rates given in this only after prior permission of the Superintending Engineer and the validity of the rates should be assessed by inviting tenders within a month from the date of hiring. 5 No idie charges for private machines hired by the department shail be payable, but only the working hours shall be paid. However if machine works less than 8 hours a day. the rate will be reduced proportionately 6 The consumption of diesel for trucks to be hired by the department/agency shall be limited to as below- (a) Trucks above 5 tone capacity 3.0 kmflit on pucca routes. 2.5 kmnllit on katcha routes. (b) Truck up to 5 tone capacity 3.50 kmilit on pucca routes. 3.00 kmn/lit on katcha routes. {o) Jeep 10.00 kmmvlit on pucca routes. 8.00 kmflit on katcha routes. a Chapter — XIII LAYING OF PIPE LINE S.No Particulars Unit Rate (in Rs.) 1 GI.PIPES Labour charges for laying and fixing! G.1.Pipes including threading and jointing of pipes etc. complete as per specification 11. 75mm dia Mtr. 42.00 id 100 mm dia Mtr. 62.00 4.3 150mmdia Mtr. 98.00 2 VL Pipe Labour charges for laying and fixing ‘VI. pipes including jointing of pipes etc. complete as per specification 21° 75mmdia Mtr. 24.00 22 100mm dia Mtr. 31.00 23 150mm dia Mtr. 47.00 3 Supplying, laying, jointing, testing, commissioning, of buried HDPE pipe net work with Hasti / REI / Jain irrigation system or equivalent pipes as per IS -14151(PART-1) including excavation of earth work in all type of soil (except disintegrated rack), depth of trenches should be such that there is a minimum soil cover of 1.0 m over the pipes, refilling and disposal of extra excavated material. The rates are inclusive of all lead and fift of material and also inclusive of all kinds of taxes, levies, turn over tax, service tax, income tax, sales tax, octroi, panchayat tax, royalty and contractor orofit (@) Class 3 (working pressure 0.40 Mpa) @) ~do—75 mm dia Mtr. 205.00 (ii) -do—90 mm dia Mtr 269.00 (ii) --do—110 mm dia Mie 473.00 (iv) ~do-- 126 mm dia Mtr. 462.00 (v) ~do-- 140 mm dia Mtr, 587.00 (vi) ~do~ 160 mm dia Mtr. 710.00 (vil) ~do-- 180 mm dia Mer 879.00 (viii) do ~ 200 mm dia Mer 4062.00 32 fix) &) (b) ( ai) (ii) (iv) Ww) (vi) (vil) wiiiy (ix) ©) (i) () (ii) (iv) 4 a) (i) (ii) w Gy --do — 225 mm dia ~-do ~ 250 mm dia Class 4 (working pressure 0.60 Mpa) ~-do—75 mm dia ~-do—90 mm dia --do—110 mm dia --do-- 125 mm dia --do-- 140 mm dia ~-do-- 160 mm dia ~do-~ 180 mm dia ~-do -- 200 mm dia ~-do -- 225 mm dia --do -- 250 mm dia Providing, lowering, laying, aligning fixing in position in pipe line manually operated Cl D/F sluice valve of approved make (IS: 14846) PN 1.0 class of following dia complete including all material, labour testing and commissioning along with pipe line as per tectnical specification and as per direction of engineer incharge --do—65 mm dia ~-do—100 mm dia ~-do—125 mm dia --do-- 150 mm dia ~do-- 200 mm dia Providing supplying instaling Hydraulic Pressure Relief Valve of following size ~-do—50 mm dia --do—65 mm dia --o—80 mm dia Providing supplying instaling Cl Heavy duty Non Return Valve PN 1.0 (IS-1538) of following size ~ 60-100 mm dia --do—125 mm dia -do—150 mm dia 33 Mtr. Mtr. Mtr Mtr. Mtr. Mtr. Mtr. Mtr, Mtr, Mt. Mtr. Each Each Each Each Each Each Each Each Each Each Each 1330.00 1633.00 265.00 351.00 495.00 617.00 756.00 969.00 1207.00 1478.00 1839.00 2257.00 6050.00 7700.00 9900.00 11770,00 19360.00 14500.00 16000.00 22000.00 8000.00 11000.00 13500.00 0) i) (iii) @ (i Providing, lowering, laying, aligning fixing in position in pipe line manually operated Cl D/F butterfly valve of approved make (IS: 13095) PN 1.0 class of following dia complete including all material, labour testing and commissioning along with pipe line as per tectnical specification and as per direction of engineer incharge -- d0--100 mm dia Each ~-do—125 mm dia Each --do—150 mm dia Each Providing, installation, testing and commissioning of glycerin filled pressure gauge of following ranges with isolation valve and tape of pipe complete in all respect as per technical specofication and as per direction of engineer incharge 010 4.0 Kg/em2 Each 010 6.0 Kg/em2 Each 3100.00 5300.00 6400.00 516.00 637.00 Chapter ~ XIV SURVEY WORK S.No. Rate (in Particulars Unit Rs.) ben Double , levelling/shifting of bench marks Km 7734.00 Ranging, chaining, fixing flags including jungle clearance Km 1286.00 Single levelling along the alignment km 672.00 Supplying and fixing survey stones of 15*15%75cm with Each 143.00 numbering including local shifting up to 5 km Supplying and fixing block stones of 30x30x75 umbering Each 569.00 including local shifting up to 5 km ‘Sub rectangulation survey, at 825 ft. (250 M) grid including /Ha, 80.00 ranging, chaining fixing pegs of size 5x5x75cm inclusive of jungle clearance , supplying and fixing of survey stones, size 15%15*75 cm with painting numbering and transportation to work site complete in all respects as per specifications, with linear tolerance of 0.50% Excluding cost of survey stone Ma. 58.00 Rectangulation survey blocks at 6600 (2.00 km ) gridasper / Ha. 216.00 survey of india norms and sub rectangulation at 825 ft (250 mts) grid including fixing of pegs of size 5*5%75 om inclusive of jungle clearance supplying and fixing of survey stones size 15%15x75 cm with painting, numbering & transportation to work site, and leveling at 412.50 ft (125 M) grid along square line preparation of G.T. sheets scale 1:15840 showing contours at 0.5 M interval in flat area and 1.5 min dunes are with other topographical details, printing and supplying 20 sheets of each G.T. sheet, with linear tolerance of 0.50% and tolerance in levels 0.10% Providing and fixing tempopary bench mark with stone of | Each 300.00 size 15x15x75 cm with top 10 cm lenth cheisel dressed, 10 om embedded in cement concrete (1:4:8) block size 35x35x30 cm and top 20 cm kept above ground level and engraved at top for positioning of staff. Providing and fixing permanent bench mark with stone of | Each ‘850.00 size 30x30x60 cm with top 10 cm lenth cheisel dressed, 15, em embedded in cement concrete (1:3:6) block size 50x50x30 cm and top 20 cm kept above ground level and ‘engraved at top for positioning of staff. 36 Chapter — XV DISMANTLING S.No. Particulars 5 Rate (in Unit Rs.) 1 Dismantling stone rubble masonry including stacking of serviceable material and disposal of unserviceable material within 50 meters lead 1.1 Dry stone masonry Cum 214.00 1.2 Stone masonry in mud mortar Cum 233.00 1.3 Stone masonry in lime mortar Cum 426.00 1.4 Stone masonry in cement mortar cum 903.00 1.5 Removing mortar from stones and cleaning stones and concrete articles including stacking (net quantity of stacks of cleaned materials will be measured). (a) in lime mortar Cum 156.00 (b) In cement mortar Cum 233.00 2 Demolishing of Brick masonry including stacking of serviceable material and disposal of unserviceable material within 50 m lead 2.1 Brick masonry in lime mortar Cum 314.00 2.2 Brick masonry in cement mortar cum 757.00 2.3 Brick masonry in mud mortar Cum 260.00 3 Removing of mortar from bricks and stacking clean bricks 31 Brick masonry in lime mortar 4000 Nos. 2744.00 3.2 Brick masonry in cement mortar 4000 Nos. 3266.00 4 Dismantling of flooring and disposal of material with in 50 M lead (except base concrete) with skirting of dado. 4.1 Lime concrete up to 15 cm thick Sqm 60.00 4.2 Lime concrete above 15 cm thick cum 399,00 4.3 Brick flooring 10sqm 28.00 4.4 Cement concrete flooring 10sqm 100.00 5 Dismantling of RCC work with care and sorting out of steel bars and disposal of unuseful Cum 1300.00 material within a lead of 50 M. 36 (2) Extra for cutting reinforcement in RCC or RB work. (Payment shall be made on crossectional area of RCC or RB work) (b) Extra for scraping, cleaning and strengthening reinforcement from RCC & RB work 6 Dismantling roofs with care including stacking of serviceable material and disposal of unserviceable material with in 50 Mtr. lead for {a) Lime terrace. (b) Dismantling Stone slab roofing complete with lime dhar and kharanja 7 Dismanting of sheet roofing with all accessories and stacking all materiat 71 GI. sheet Roof. 72 Asbestos sheet roof 8 Dismantling of chajja, tand, shelves with care 8.1 Katla stone 8.2 Reinforced cement concrete 9 Dismantiing of cement concrete and disposal of material with in a lead of 50 m 91 Concrete 1:3:6 or richer 9.2 Concrete 1:4:8 or richer 10 Dismantling doors, windows and clearstory windows steel or wood shutter including chowkhats and holdfasts etc. complete and stackina within 50 meters lead {a) Of area 3 square meter and below, (b) Of area beyond 3 square meter 11 Dismantling steel work in single sections including dismembering and stacking within 50 11.1 RSyorsts 14.2 Channels, angles, tees & flats. 12 Dismantiing steel work in built up sections in angles, tees. flats, and channels ete, including dismembering and stacking within 50 meters lead. 13 Dismantling steel work in built up sections in angies, tees, flats, and channels etc. including without dismembering and stacking within 50 meters lead. 37 Sqm at Sqm Sqm Sqm Sqm Sqm Sqm cum Cum Each Each 100 kg 100 kg 100 kg 100 kg 492.00 367.00 71.00 730.00 70.00 33.00 79,00 177.00 892.00 553.00 158.00 214.00 127.00 89.00 224.00 137,00 14 Dismantling barbed wire or chain link fencing including bending making rolls and stacking within 50 meter lead 1 Dismantling tiles lining (a) Single tite lining (b) Double tile lining 46 Removing mortar from tiles and cleaning tiles including stacking within a lead of 50 meters (stacks of cleaned tiles shall be measured) 17 Dismantling old plaster or skirting with racking of joints and cleaning the surfce for plaster including disposal of rubbish with in 50 m lead. 38 au Sqm Sqm 1000 Nos. Sqm 1350.00 64.00 106.00 4282.00 22.00 Chapter — XVI Miscellanneous S.No. Particulars Unit [Rate (in Rs.) 1 Supply and fixing in position of APM black made of Cl as per standard specification with adjustable arrangement and required fixtures including transportation to site second stage concreting in CC 42:4 centering shuttering painting with red oxide finishing etc. complete in all respect cost of APM block (all size) per block per block 6852.00 Note: ‘APM block will be fixed in CC after adjusting throat with as per requirement and as per direction of engineer incharge. 2 De-watering by pumping all water to maintain desired water level including cost of P. O. L. / Power consumption etc. complete a 5to9HP Pet Hr 153.00 B 40:to 28 HP Perv Hr 184.00 6 2010.30 HP Perr 234.00 3 Designing. supplying, construcion, Installation, Testing & commissioning of Motor driven Horizontal Centrifugal Pumping sets of monoblock type for ‘operation on 3 phase 50 HZ AC supply between 300 to 440 voltage ranges & SAND CAST SS impeller. The set should as per IS 9079-2002 with latest amendments a 10H. Each 50833 b 125H.P. Each 57567.00 «15H Each 62540.00 da 20H.P Each 85457.00 e 25H. P. Each 106588,00 f 30H. P. Each 129689.00 4 Construction of Hydrant (Nakka ) for sprinkler irrigation system in all type of soil, inner size 0.90 m x0.90 m and depth 1.0 m in brick masonry 230 mm thick of class 100 bricks in cement sand mortar 1:5, 160 mm thick cement concrete 1:3:6 in foundation and 50 mm thick flooring M-15 grade,12 mm thick, inside plaster in cement mortar 1:6 finished with floating neat cement, 120 mm thick coping at top of Each 21293 masonry wall of cement concrete 1:2:4, 2 mm thick M.S sheet openable cover with locking arrangement and zinc coated M.S angle frame 50x50x6 mm.and making arrangement for connection to sprinkler set including sluce valve, butterfly valve and all accessories complete in all respect. 39 oece Naeacge Providing and fixing suction pipe to pipe inlet and delivery pipe from pump outlet to raising mains of respectine section with M.S. medium class pipe with required pipe and pipe fitings Such as flanges, bends, tees reducer, enlarger, tail pieces, blind flanges, puddel collar dismanting pieces, nut & bolts gaskets, ete including foot valve and suction strainer. 100 mm dia 125 mm dia 150 mm dia Supply and fixing of electric controt panel of 16 SWG (CRCA) in masonry wall for sitable for 2 nos. electic driven pump sets comprising MCCB, MCB, automatic star deita starter, ampere meter, volt meter, phase preventer, phase indicator, lighting arrangement etc. complete suitable for three phase pump set. All these equipments shall be fixed on 12 mm thick backalite sheet which fixed on M.S, angle frame of size 1800x1200 i.e. made angle iron 50x50x6 mm including making good the surface of wall 10H. P. 4254. P. 15H.P. 20H. P. 25H. P, 30H. P. Providing and laying PVC insulated and PVC sheathed cable of 1.1 KV grade with alluminium conductor of I8:1554 and approved make including testing extra etc, as required of size 10 sqmm 3 core core 16 sq mm 3 core 4 core 40 per meter per meter per meter Each Each Each Each Each Each per meter per meter per meter per meter 2066.00 2755.00 3317.00 43650.00 44600.00 45650,00 47750.00 52475.00 $7200.00 90.00 100.00 105.00 110.00 "1 12 Earthing with G.| earth plate 600mm x 600mm x ‘6mm thick including accessories embodying by digging 3 to 4 mts below the ground level and refilling with 6 to 10 alternate layers of salt and charcoal and providing masonary enclosure with cover plate and watering pipe with funnel etc. as per LS 3043 complete as required Each 4000.00 Providing & installing of Hydrocyclone Filter (IS 14743) capacity of 50 cum per hr, 75mm each 15000.00 capacity of 80 cum per hr, 100mm each 26000.00 capacity of 120 cum per hr ,150 mm each 4500.00 ‘Operation and maintenance of already installed pumping machinary including repairing of pump set electric panel etc, per month 44874,33 Operation & Maintanance of various size HDPE pipe lineincluding patrolling, dewatering, T&P, transportation of jointing material, reparing of pipe line, removal of choking of pipe line and operation of per km per valve ete, month 80,00 Employing patwari for recording irrigation, assessing cultivatorwise demand , collecting irrigation revenue and electric bill of pump house and depositing the revenue in the bank and bill amount in the JVVNL_ Office , framing Barabandi , issuing water siips to cultivators , enforcing barabandi and reporting against defaulters according to Rajasthan Farmers. Participation in Irrigation Management Act 2000 , Maintaining equipments and records according to REPIM 2000 and imparting three sessions of training In one year to members of WUA for operation and maintenance of sprinkler system and various records as per RFPIM 2000 per Ha CCA per annum 89.00 a ‘Annexure 1: 383-1970 FINE-AGGREGATES IS SIEVE PERCENTAGE PASSING FOR DESIGNATION | Grading Zone-1 | Grading Zone- | Grading Zone-l_| Grading Zone-lV 10mm 100 100 100) 100 4.75 mm ‘90-100 90-100 ‘90-100 95-100 236mm, 60-95 75-100 85-100 95-100 2.18 mm, 30-70 55-90 75-100 90-100 ‘600 micron 15-34 15-59 60-79 80-100 300 micron 5-20 8030 12-40 15-50 1150 micron’ 0-10 0-10 0-10 0-15 Note; For crushed stone sands, the permissible limit on 150 micron IS SIEVE Is increased to 20 percentage. 42 Annexure-tl 1's: 388-1970 COARSE AGGREGATE ‘PERCENTAGE PASSING FOR ‘GRADED AGGREGATE OF NOMINAL Size wp] 2 [ 1 | smn PERCENTAGE PASSING FOR SINGLE SIZED TS STEVE AGGREGATE AGGREGATE OF NOMINAL SiZE ae pape) iw p 7 z2paype!ets te a3 [wl a ‘amm i}. - 100 : ‘Simm Bw] ie | | 2 100 wom dio Paste | a5xs | 100 ‘ste | 10 | 100 3am Diss | Bt | > | ato [We] - | 20% | 95%) too | 100 20 100 7m | 100 Tamm — To wo | a) wel 100 300 15 me 7 nr To TT t60 45 | 100 100 Tome Ties | 05 | Oto we] dw | Tow | st | 30t | dias 20 30) 2 | 38 | 55 | 70 a7emm Toes Ot |oies | OW | Ow | Twi0 ro | 30 Por 7 Te —= 2 5 43 GRADING REQUIREMENT OF COARSE AGGREGATEFOR ROAD WORK ‘Annexure-tit GRADING NO. SIZE RANGE SIEVE PERCENT BY DESIGNATION _ | WEIGHT PASSING 1 ‘90 mm to-45 mm 125 mm 100 90mm 90-100 63mm 25-60 45mm 0-15 2.4mm. os 63 mm to 45 mm 90mm 100 63mm 90-100 53am 25-75 45mm 0-15 2.4mm Os ‘53 mm to 22.4 mm 63mm 100 53mm 95-100 45 mm 65-90 22.4 mm 0-10 1.2mm OS Note: The compacted thickness for a layer with Grade-l shalt be 100 mm while for layer with other grades Le. 2 to 3 it shall be 75 mm. 44 Annexure MEASUREMENTS OF MATERIALS Stack of materials shal be made to The fotlowing heights and shall be paid for 30 cms height a ‘Stone 35.0Cms 2 Earth 32.5 Gms r 3 Gajari 32,5 Cms 4 Slaked time 32.5 ms 5 Surkhi 32.5. Oms ~~ S ‘Muccum 32.5 Cms 7 Ballast 32.5 Cms 8 Gravel 32.5 Cms 9 Unslaked lime 32. 5cms 10 Kanker 32,5 Cms an "Grit 32.5. Cs 2 Excavaied rock BODE. 45, Annexure-V CLASSES OF COMMON BURNT CLAY BRICKS IS : 1077-1976 5.NO. CLASS DESIGNATION |___ AVERAGE COMPRESSIVE STRENGTH NOT LESS THAN LESS THAN k@s/cM’MiM? kGS/CMPMIM a 300 300 (10) 125 (12.5) 2 75 750753) 300 (25) 3 30 S06) 75175) a 5 3513.5) 3005) 46 ‘Annexure-VI UNIT WEIGHT OF MATERIAL 5.NO. MATERIALS WEIGHT INKG. UNIT 1 arth Ellovial undisturbed 1600 Cum. z Earth dry 1410-1850, cum. 3 Earth mont 7666-2000 Gam. 4 Clay wet compact 3086 Cum. 5 Clay moist compact 1760 Com. 6 Clay ary compact 1480 um. 7 Clay dry lumps 7089 Com. Gravelloose 1600 Com. 3 Gravel rammed 1920-2160 Cum. TO] Shingle 3 mm 38 mim 7460 com Ti | Sand dry clean 31540-1600 cum. 12 | Sand dey river 1880 Com: "| Sand dry wet ~ “y7e0 2000 cum. Ta | Sand compact 00) Cam 75 | Sand wet compact 1360 Cam. LIQUIDS: cam. 1 Creosote ae 1070 Cum. 2 Diesel oil 360 cam. 3 Petra 690 cum, a Varnishes 360 cum. 3 Water fresh 1000 cam. aa SNO, MATERIALS WEIGHT IN KG. UNIT BUILDING STONES 1600) Cum. 1 Basalt 2600 Cum. 2 Gneiss 2400-2690 cum 3 Graphite 2690-2800 Cum. a Latrite 2080-2400 Cum, 3 Time Stone 7400-2600 Cum. 6 Marble 7220 Cum, Pumice 800-1220 cum, 8 Quartizte 2640 Cum. 9 ‘Sand Stone 480-2400 um. 10 Slate 2800 Cum. er Chalk 1600-1920 Cum, MATERIAL & ALLOYS: 1 Tron pig 7200 Cum, 2 Iron gray cast 7030-7130 Cum. 3 Tron wrought 700 Cum. a Steel cast 7850 Cum, 5 Steel wrought mild 7800 Cum, 6 Copper cast 8790-8940 7 Copper wrought 3840-8940 Cum. a Tead cast 11340 Cum. 9 Lead weought 11360 Cum. 0 ‘Alluminium 2580-2710 Cum. i ‘Steel Black plates 79 ‘Sqm_/menthickness 48 S.NO. (MATERIALS, WEIGHT INKG. UNIT R Copper plates 869 Sam./mmthickness Lead plates 72.00 Sam./mmnthickness ‘Nilurainiura plates 02.80 Sqm. mimthickness Brass (Red white) 8190-8220, Cum. Brass yellow 8440-8680 Cur. po woo. 1 Hardwood such as axe 640-690 cum. _ ‘wood babu! ete 2 Light wood such as fur. 400-480 im Semul 3 Medium wood such as pine 480-640 cum. deodar, chir, mango a Teak 25 Cum. BRICKS. 1 ‘Common brunt clay bricks 1600-1920 Cum. 2 Engineering bricks 2160 cum. 3 Bricks ballast 1206 cum, 4 Brick dust{surkhi) 7010 Cun CEMENT: 1 Ordinery and allumine 1440 Com 2 Rapid hardening 1050-1280 cum. LIME: ~ ~ 1 Freshiy burnt in places 1880-1040 cum. unsiaked z Lime slacked fresh 580-640 cum. 3 Lime siacked aiter 10 days 800 cum. a Lime unslackedkankar 7180 cum, a Time siacked kankar 1020 cum. 49 3.0. MATERIALS WEIGHTINKG, NT 5 Lime concrete with brunt i920 Cum. clay with aggregates ‘CEMENT CONCRETE PLAIN: i crated 260 Cum 2 Brick aggregate 260 Gam. 3 ‘Stone ballast 2400 Com. REINFORCED CEMENT CONCRETE: 1 With 196 steel 7310-2070 cum. z With 2% steel 7370-2530 Cum 3 With 3% steel 2560-2720 cum. 4 Concrete with Brick 1920 Cum. MORTARS: i Cement 2080 Gm Time 1600-1840 Cum, MASONRY: T Brick masonry with common 1920 cum: burnt clay cricks z ‘Brick masonry with TM 2400 cum. bricks 3 Stone masonry dry rubble 2000 com 4 ‘Stone masonry in mortar of 720-7640 cum lime sand, stone, granite etc ‘ROOFING: i Country tiles (double) 20 Sqm. including battens 2 Country tiles (singie} 70 Sqm 3 ‘Mangalore tiles with battens 5 Sam 4 GCI sheet 3030 Sam. 5 ‘AC sheet 3a Sam Annexure-VIL PROPORTION OF SINGLE SIZE AGGREGATE TO BE MIXED WITH EACH OTHER TO GET GRADED. AGGREGATES FOR CONCRETE MIX. When coarse aggregate brought to site is single sized (un-graded) it shall be mixed with single size aggregate of different size, in the proportion indicated below to make it graded. ‘CEMENT CONTRETE | NOMINAL SE OF PART OF SINGLE SIZE AGGREGATE OF SES | GRADED Samm] adem [fom | 2Smm | Ome AGGREGATE | REUIRED Nem, 62 é 3 3 - - e2 ry F 3 3 350 %% we = 1530 76 = 7% We 7 : | a é z 7 ee i 0 5 7 136 a wi ry = 136 70 = om ie 7 a6 w > w 7 baa @ 5 We 7 Eee 38 7 a T ra 5 = - 3 1 Tes % : 2 2 7 Note: The proportions indicated above are by volume, when considered necessary, these proportions may be varied marginally by Engineer-in-charge after making sieve analysis of aggregate brought to site for obtaining required graded aggregate. No adjustments in rates shall be made for any variations in the proportions so ordered by the Engineer-in-charge. If single sie coarse aggregates are not premixed at site to obtain the graded coarse aggregate required for the mix the volume of single size ‘aggregates shall be suitably increased to account for reduction in total volume at the site of mixing 51 ‘Annexure-Vill ‘CONVERSION [ S.No. SCALE r LENGTH Tt /iinch 254 Centimeters 2 [Toot 30.48 Centimeters 3 [iyad 70.514 Meter 91.44 Centimeters @ | Tchain (Guntorsy 20.177 Meters 5 [aehain 66 Feet-100 Links 6 limite 52.807 Chains/1760 yaards 7 [knot 6.080 Feet/hour 8 | 39.37 inches T Meter 3 [03937 inches 7 Centimeter 10 | 3.2808 feet Meter Ti | 2.0836 yards Meter 12 0.62137 mile kilometer 33 | AREA 34 | 1Sq. inch 6.4516 59. Gm. 15/159. foor 928.03 Sam 0.0929 sqm. 16 | 15a. yards 083613 Sq Reve 7 [tacre 0.46868 Hactare 4047 59. Meter 38 lisa mile 258 Wactare 2.58999 Sq. Km, 39 | 1sq.em, 0.15559. in 20 Tisq. meter 10.76395q, feet | Tsq. meter 1.196 55, yards 2 [dacre ‘4820 59, yards 2 | Thactare DaTAA Acres, 10000 Sq, m 24 | Tbgha 165 Texas R 32 NO. ‘SCALE ‘GENERAL: 1 | Horse power 550.0 Foot/Lbs/sec. 2 | Horse power 10.7457 Kilo watt. 3 | Radians 57.30 Deg. Ress 4") Temperature "32° 5/9 temperature (OC) 5 | Mles/sec 3.281 Feer/Sec. 6 | Miles/rir. 1.467 Feet/sec, 7 | Ponds/tutk 16.02 Kes/eum. 3 | Ponds/Sa.in (0.07081 Kes/Sam. 3 | Newton 0161 Kilogram-fiorce 10 | Ponndals 128255 Dynes. | 1 Cusecs day 198 MART. VOLUME: i /iCuin 36.387 Gu, Centimeter y [acu re (0.028317 Cu. Meter 28.317 Litre 3 Cu. ¥d. “0.76455 Cu. Meter 76455 L. 4 | iGallon 4.54596 Litres 0.1605 Cu. Ft. 277.25.Cu. In 5 11USA Gallon (0.83254 Imperial Gallon 6 [rcuce. 0/061 Cu. In” 7 | 1Ci Dectetre 61.024 Cu. Gm. & [alite LO Cu. Gm. 2.0 1.7598 pint. 9 ~|1Cu Meter 35.3148 Cu. Ft [10 [acu Meter 130795 Cu. Yeard WEIGHT: 1 [26rain 0.648 gm 2 |2Panny weight 1.5852 gm, 3 | 108m 1772 gm. 53 [S.No Stale a@ [i Ounce 28.350 gm-437.0 grains 5 | TPount 453.59 gm_7.000 6 |i Hundred Weighttewn) 112 1B 0.50802 Qné\(M.T) 7 1 Tons (British) 1.016 Kg. 22401, 1.046 Tonnes 8 TA Miligramme 0.015 grain 9 | aGramme (0.00032046 Lb, 3.832 gram, 10/1 kilogramme 2.2046 Tb, 11 | 1 Quinta 100 Kg. = 220.46 Lb. 12/7 Tonne (Metric ton) 6.0842 Tonne ~ 3204.6 Lb. 1000.0 Kg. 54 AnnexuretX TABLE OF ROUND BARS Designation | Diameter mm | Crosssectional | Weight per | Perimeter Cm. ‘Area Cm. Meter Kg 1SRO-S 5.00 0.20 0.20 1.60 ISRO-6 6.00 0.28 022, 1.90 ISR 8.00 0.50 0.40 250 1SR-10 30.00 0.79 0.60 3.10 TSRO-12 12.00 118 0.90 3.80 1SRO-16 16.00 2.01 1.60 5.00 1SRO-20 20.00 | 3.14 2.50 6.30 1SRO=25 25.00 491 3.80 7.80 1SRO-28 28.00 6.16 4.80 880 1SRO-32 32.00 8.04 6.30 10.10 15RO-36 36.00 10.18 8.00 11.30 sn0-40 40.00, 1257 93.90 12.60 1SRO-45 45.00 14.90 12.50 14.10 1SRO:50 50.00 19.64 15.40 15.70 55, Annexure-x ‘SIZE OF MEASUREMENT BOXES Cement Concrete & Mortar (With 1 bag i.e. 50 ky.] Trem size REMARKS Cement 30x30x23 Cr For ¥é bag [Cement loose) Bajrh 30x30x15.4 Cm, Grit 30x30K19,4 Cm. Perforated botiom & sides of (Coarse aggregate) the box 56 ‘Annexure'X! CONSUMPTION OF MATERIAL STATEMENT TEM UNIT REQUIREMENT, CEMENT | BAIRI (Fine Coarse (mr) | aggregate) | agaregate (cuM.) ‘Cement Mortar 1:4 Per Cum. 0.38 1.07 Cement Mortar 1:5 Per Cum, 031 107 Cement Mortar 16 Percum. | 0.25 1.07 | PLASTER {2mm thick in cement mortar 1:3} Per 10 0.073 154 sqm, 2mm thick in cement mortar 1:4 | Per 10 (0.055 154 Sam. ‘Tzmm thick in cement mortar 1:5 | Per 10 0.045 154 sam. ‘12mm thick in cement mortar 1:6 | Per 20 0.036 354 Sam. Deep cut cement pointing on Peri0 | 0.016 0.03444 [Brick work 1:3 ‘sam. CEMENT CONCRETE Cement Concrete 1:1.5:3 Percum. | 04055 MT | 0.425 Cum. | 0.85 Cum | Cement Concrete 1:24 Ber cum, | 03196MT | 0.45 Cum. 0.90 Cum. Cement Concrete 13:6 Percum. | 0.224¢MT | 047 Cum, | 0.94Cum. ‘Cement Concrete 14:8 Percum, | 0.1688 MT | 0.47 Cum. 0.94 Cum. Cement Concrete 1:5:20 PerCom. | O.14MT | 0.475 Cum, 0.95 Cum. 57 ‘Annexure-xt 5. en oni REQUIREMENT NO. CEMENT | BARI | SAND (ty | (cum) 1 | Double tile fining 132 mm thick 10 | o.183mr| 0.1097 | 0.3292 Sqm.. cum. cum, 2 | Double tile ining 140 mm thick with [10 | 0.2005 ] 0.1327 | 03983 LDPE film Sqm. | mr Cum. Cum. 3 | PCC block ining 142 mm thick to | o183MmT | 0.1097 | 03257 Sqm. cum. cum | PcChiock ining 120 mm thick with | 10 | 0.194MT| 0.131 | 0393 LDPE film Sam. cum. Cum. S| Single PCC blockiining 74mm thick (10 [o162mT| 0.102 | 0.306 with LOPE film Sam. cum, cum, & | Single tle ining B4 mm thick 19 [osssmr| o10¢ | 0.312 Sqm. Cum. cum 7 | Cement concrete fining 75mm thick | 10 | 0.1683 | 0.3525 | sqm. | MT cum. & | Cement concrete lining 100mm thick | 10 | 0.2248 | 0.47 Cum. Sqm. MT 9 | Brick lining 20 mm thick 10 PoaasmT| 0.1075 Sam. cum, 10 | Sleeper size 150x75 mm rorm| 0.0252 | 0.0529 MT cum [REQUIREMENT OF TES Double tile fining 439.50 Nos./ 10 sam, Single Tile lining "215.28 Nos/ 10 sqm, 58

You might also like