Professional Documents
Culture Documents
CEA Installed - Capacity Aug 2020
CEA Installed - Capacity Aug 2020
(As on 31.08.2020)
(UTILITIES)
Abbreviation:- SHP=Small Hydro Project (≤ 25 MW), BP=Biomass Power, U&I=Urban & Industrial Waste Power, RES=Renewable Energy Sources
Note : - 1. RES include SHP, BP, U&I, Solar and Wind Energy. Installed capacity in respect of RES (MNRE) as on 31.08.2020
(As per latest information available with MNRE)
*Break up of RES all India as on 31.08.2020 is given below (in MW) :
Small Bio-Power Total
Wind Power Solar Power
Hydro Power BM Power/Cogen. Waste to Energy Capacity
4739.97 37999.55 10145.92 168.64 35739.35 88793.43