Consultant : Education - Out of School for UNICEF, West Bengal Office
UNICEF estimate Consultant’s proposal
S. Major Task Deliverable Specific Estimated Complete Cost (INR) No delivery travel timefram (All inclusive . date/deadlin required e for i.e. e for for deliverabl professional completion completion e fee, travel, of of DSA, deliverable deliverable communicatio (please (please n, etc.) mention as mention date/no. of destination days/month) / number of days) 1 Support School 1.1Road map March 2019 Education developed for Department in out of school 10 days analysis and for the age developing road map group of 14-18 for 2019 for the age through group of 14-18 consultation 1.1. Support Samagra 1.2 Strategy March 2019 Siksha Abhiyaan to and develop a road map operational for the age group 14- plan with 18 flexible strategies for 1.2. Develop the age group strategies and of 14-18 is in operation plan for place flexible options 1.3.2Mapping of 1.3 Mapping April2019 alternative report is ready educational options for 14-18 age for the age group of group 14-18 1.4. TA in designing 1.4. Pilot July 2019 pilot in one districts designed for 1.5 Monitoring visit flexible to the District strategy with technology in one Districts
1.5. Three August 2019,
monitoring October reports are in 2019 , place December 2019 2 Support State to 2.1. Startgies March 2019 30 days develop and package strategies/package (manual, for children in brick students kiln materials) 1.1. Develop developed for strategies/accelerate brick kiln to d package for mainstream children in brick kiln out of school 1.2 Capacity building children at the District level 1.3 Support NGO 2.2. Teachers March 2019 consortiums for (100) of Malda monitoring trained on the package
2.3. CSO April, July
consortium October, equipped to December monitor the 2019 programm. Monitoring reports (four ) are in place 3 Review and 3.1 Monitoring March 2019 30 days monitoring of strategies with initiatives on out of accountability school/reduction of matrix is in drop out in two place and Districts endorsed by 3.1. Support the Districts Districts(Two) in (Two Districts) developing monitoring strategies .3.2. 10 Monthly of out of school Monitoring reports 3.2. Support in reports on strengthening the implementatio capacity of District n of special and the CSO in training monitoring special 3.3 Strategy in August 2019 training place and 3.3. Support in endorsed by developing the Govt to set up strategy in setting up early warning early warning system system in one in one district District 3.4 Data analysis and documentation 3.4 Data December analysis report 2019 and documentatio n of case studies are in place 4 Development of life 4.1. Revised May 2019 10 days skill package /support Life skill to roll out with package is in Kanyashree club and place other youth collectives 4.2. July 2019 1.1. Adaptation of Operational life skill plan / training package for plan /training adolescent reports are in platforms place 1.2. Support State /Districts to 4.3 Three August roll out the monitoring 2019 training reports from /October 1.3. Monitoring Two Districts 2019 support of /December two districts 2019
5 Task 5: Support in 5.1Strategy March 2019 Included in
developing strategies and the earlier and monitoring operational days framework on plan improving school developed attendance 5.2 Monitoring March 2019 5.1.Develop strategy plan is in place and operational plan 5.2 Support in 5.3 Quarterly May , July developing reports(Three) October monitoring strategy 2019 5.3 Support in data analysis 5.4 Monitoring May , July 5.4.Support to two reports ( 3 ) October Districts to roll out 2019 the plan
Total amount in INR :
Shaded area to be filled in by consultant
Name of the Bidder:
Address: Contact no.: Email address: Date : Note: The contractor will work on his/her own computer(s) and use his/her own office resources and materials in the execution of this assignment, including personal email address(es) and mobile/smart phones. The contractor’s fee shall be inclusive of all office administrative costs.