Bala & Bloom Company memproduiksl 2 janis produk, yaitu produk Standard dan produk
Custom. Bort sajkan hea? data produ dar Balla & Bloom Company :
“Bella & Bloom Company | |
315 $45
seen
‘$825,000 | $90,000 $ 1.725.000.
oe Summary of Bost Recent Yoar’s Production | a
_ | standard || Custom Total ——
ie Ty:
5000 | 20,000
palieee, val ei ol
10000 | | 6900
=o $1,100,000, $ 600.000 $ 1.700,000
0M ieee 4
el 's
| i 1.350.000
et Heh see
paca General FAC wneinnnennnn a
Total Overhoad nn anennnnn \ rea le 3
oa Total Manufacturing COSt nen ie HF $5,475,000 a
= Formation of Acthity Cost Poots: 1 Ne
— | |
Production Engineering General Total
Total Overhead awienine $1,950,000, _$.450,000 $250,000 $ 2,050,000
oe Loss costs related to: (ert Narepoce set ome pF -—
ae S6LUPS ccnnenanee $180,000, | $250,000 | ''$ 100,000. $500,000
Dosignchanges.... $100,000. $100,000, _$75000_ $275,000
Ee Other Overhoad snes |'$100,000 ‘$75,000 $1,275,000 |
|
|
-—— _ {E§). Scanned:with ‘CamScanner me H
Scanned with CamScannerlama + Whlasiah Amini
im = Aeatsuad
eles! Akuntensi Gieye @ Dato: _
Perhiteagan Harge Pokek menggunakor sistem ABC
Belta 4 Gloom Company
Product Cost from Activity Based Costing System
Overhead Rates :
$500,000 batch-level costs devided by 50 setups (20430) = $10,000 per setor-
$ 300.000 Product (evel costs devided by [2 design change (745) : $25-000 per Design Change
44.275.000 other overhead devided by 170-600 direct (aber hours = $ 7-5 per DLB
Standard Custom Total
$ 300-000 1.725.000
$ Coo. 000 $1. Too .000
Overhead ¢ hed
$10.000 x 20 setups =
$10. 000 K 30 setts. $ 300.000 $500.00
$25.00 X 7 design change .
$26-000 K § design change . $300 -000
$7.5 x110.000, OLB...
$15 %c0.000 OLB... .... $450.00 1.275.000
Total Costs $3.435-000 -$2.375.000 $ 5.500.080
Wait Produced... 55-000 20. 000 =a
Cost Per Unie 2 2 ee eee es $56,8t $8,76