BILLS OF QUANTITIES

PROJECT NAME SAK ENGINEERING CONSULTANTS


LOCATION Bill No. - 00 (Rev. 0)
BUILDIONG NAME DIVISION - 15 - Mech. Works (HVAC)

Unit Price Amount


Ref. DESCRIPTION Quantity Unit SR SR

1.0 Packaged Air Cooled Rotary Screw Water Chillers

Supply, Installation and setting to work including all required


field wiring in rigid metal conduit from Chiller panel to local
isolators, condenser anti corrosion coatings, spring vibration
isolators, electrical isolators temperature controllers, testing and
commissioning etc. as per equipment schedule

Refrigerant : R- HFC 134 A


1.1 ACWC-01 capacity 00 ton / 00 GPM No. -
1.2 ACWC-02 capacity 00 ton /00 GPM (STD BY) No. -

2.0 Chilled Water AHU


Supply, Installation and setting to work including all required
field wiring in rigid metal conduit from AHU panel to local
isolators, condenser anti corrosion coatings, spring vibration
isolators, electrical isolators temperature controllers, testing and
commissioning etc. Complete (modulating 3 way valve
temperature controls) as per equipment schedule

2.1 AHU-1 capacity 25 ton No. -


2.2 AHU-2 capacity 30 ton No. -

3.0 Chilled Water Pump Set


Supply, installation and setting to work including all required
field wiring, galvanized rigid metal conduit from Pump panel to
local isolator & from Pump to Pump panel, electrical isolator,
pump control panel, controls, spring type vibration isolators
testing and commissioning etc., as per equipment schedule

3.1 CWPP-01 to 00 capacity 00 GPM @ 00 meter head (00 duty + 01 No. -


std by)
3.2 CWSP-01 to 00 capacity 00 GPM @ 00 meter head (00 duty + 01 No. -
std by)

To Bill Summary

10/12/2020 494556100.xlsHVAC Page 1of15


BILLS OF QUANTITIES
PROJECT NAME SAK ENGINEERING CONSULTANTS
LOCATION Bill No. - 00 (Rev. 0)
BUILDIONG NAME DIVISION - 15 - Mech. Works (HVAC)

Unit Price Amount


Ref. DESCRIPTION Quantity Unit SR SR

4.0 Roof Top Package Units:


Supply, lift into position, install, test, set to work, and
commission weatherproof Package Units, Units shall be complete
with internal & external. Anti vibration mounts, and a spare set
of filters shall be installed after commissioning. Installation shall
include all required field wiring, power wiring from an adjacent
disconnect switch (supplied and installed by others),
weatherproof cables, galvanized rigid metal conduits, condensate
drain, complete. operating at 380/3/60 Hz power supply including
thermostat and as specified in the equipment schedule. Package
unit time delay to be adjusted by the contractor.

4.1 Capacity 30 ton / 12000 CFM No. 820,000.00 -


4.2 Capacity 25 ton / 10000 CFM No. 73,000.00 -
4.3 Capacity 20 ton / 8000 CFM No. 60,000.00 -
4.4 Capacity 15 ton / 6000 CFM No. 45,500.00 -
4.5 Capacity 10 ton / 4000 CFM No. 30,000.00 -

5.0 DX Type Air Conditioning Unit


Supply, lift into position, install, test, set to work, and
commission DX type (mini-split A/C unit & ducted-split A/C
unit) complete with thermostat with ACU outside, Installation
shall include all required field control wiring, power wiring from
an adjacent disconnect switch (supplied and installed by others),
weatherproof cables, galvanized rigid metal conduits, refrigerant
pipes and insulation, support for ACCU, etc, complete to set to
work (as specified in the drawing). Out door refrigerant pipe
shall have canvas with two coats of foster paint and supported by
cable trays. All units to be suitable for externally locating and
Nominal capacities indicated.

5.1 Ducted Split Air Conditioning Unit


5.1.1 Capacity 5 ton No. 22,500.00 -
5.1.2 Capacity 4 ton No. 18,600.00 -
5.1.3 Capacity 3 ton No. 14,500.00 -
5.1.4 Capacity 2.5 ton No. 12,000.00 -
5.1.5 Capacity 2.0 ton No. 9,500.00 -
5.1.6 Capacity 1.5 ton No. 7,300.00 -

10/12/2020 494556100.xlsHVAC Page 2of15


BILLS OF QUANTITIES
PROJECT NAME SAK ENGINEERING CONSULTANTS
LOCATION Bill No. - 00 (Rev. 0)
BUILDIONG NAME DIVISION - 15 - Mech. Works (HVAC)

Unit Price Amount


Ref. DESCRIPTION Quantity Unit SR SR

To Bill Summary

5.2 Ducted Split Air Conditioning Unit


5.2.1 Capacity 2.0 ton No. 6,000.00 -
5.2.2 Capacity 1.5 ton No. 5,000.00 -
No.
5.3 Window AC No.
5.3.1 1.5 Tons No. 3,500.00 -

6.0 Extract Air Fans


Supply, lift into position, install, test, set to work and commission
Extract Air Fans. The Fan Units shall have Anti-back draught
shutters & internal Anti vibration mounts. Installation shall
include all required power wiring from an adjacent disconnect
switch weatherproof cables, galvanized rigid metal conduits, etc.,
complete. All fans are centrifugal and roof mounted and wall fans
are wall mounted.

6.1 EF-01 capacity 00 CFM @ 00" static (Roof top) No. -


6.2 EF-02 capacity 00 CFM @ 00" static (Inline) No. -
6.3 EF-03 capacity 100 CFM (wall mounted) No. -

7.0 Air curtains


Supply, lift into position, install, test, set to work and commission No. -
air curtains operating at 230/1/60 Hz power supply, capacity 00
CFM as per equipment schedule, from Mars or equal
manufacturer

8.0 Duct Works


8.1 Supply, installation and setting to work ductwork as per
SMACNA Standards including full sealing of all joints,
Rectangular volume control dampers, galvanized hangers and
supports, leak testing, air balancing and testing and
commissioning etc., complete For Air Conditioned Air &
Exhaust air.

8.1.1 20 GAUGE m2 185.00 -


8.1.2 22 GAUGE m 2
160.00 -
8.1.3 24 GAUGE m 2
145.00 -
8.1.4 26 GAUGE m2 140.00 -

8.2 Supply and installation Aluminum cladding 0.6 mm thickness to m2 125 -


exposed supply & return ducts including full sealing of all joints

10/12/2020 494556100.xlsHVAC Page 3of15


BILLS OF QUANTITIES
PROJECT NAME SAK ENGINEERING CONSULTANTS
LOCATION Bill No. - 00 (Rev. 0)
BUILDIONG NAME DIVISION - 15 - Mech. Works (HVAC)

Unit Price Amount


Ref. DESCRIPTION Quantity Unit SR SR

To Bill Summary

10/12/2020 494556100.xlsHVAC Page 4of15


BILLS OF QUANTITIES
PROJECT NAME SAK ENGINEERING CONSULTANTS
LOCATION Bill No. - 00 (Rev. 0)
BUILDIONG NAME DIVISION - 15 - Mech. Works (HVAC)

Unit Price Amount


Ref. DESCRIPTION Quantity Unit SR SR

8.3 Supply and installation Supply and installation Acoustic lining m2 50 -


fiber glass 25mm thick to supply and return duct up to 5 meter
length and of density 24 kg / m3 from AFICO or equal

8.4 Supply and installation Fiber glass Insulation 50mm thick 48 kg / m2 65 -


m3 density from AFICO or equal to exposed supply & return
ducts

8.5 Supply and installation Fiber glass Insulation 25mm thick 24 kg / m2 40 -


m3 density from AFICO or equal to indoor supply & return duct

8.6 Supply, installation and setting to work Flexible duct1.2m long as


per SMACNA Standards including full sealing of all joints,
Round volume control dampers, galvanized hangers and supports,
leak testing, air balancing and testing and commissioning etc.,
complete For Air Conditioned Air & Exhaust air. as per
drawings. from SAFID or equal manufacturer

8.6.1 250 mm (10 Inch) diameter No. 135 -


8.6.2 200 mm (8 Inch) diameter No. 125 -
8.6.3 150 mm (6 Inch) diameter No. 115 -

9.0 Air Distributing Equipment

9.1 Supply and install Supply air Ceiling Diffuser SCD with
internally insulated plenum boxes as per drawings. from GGC or
equal
9.1.1 600 x 600 mm (24 x 24) Inch No. 650 -
9.1.2 450 x 450 mm (18 x 18) Inch No. 500 -
9.1.3 300 x 300 mm (12 x 12) Inch No. 350 -
9.1.4 225 x 225 mm (9 x 9) Inch No. 300 -
9.1.5 150 x 150 mm (6 x 6) Inch No. 250 -

9.2 Supply and install Return air Ceiling Diffuser RCD, with
internally insulated plenum boxes unless it is not connected to
return duct, as per drawings. from GGC or equal

9.2.1 600 x 600 mm (24 x 24) Inch No. 450 -


9.2.2 450 x 450 mm (18 x 18) Inch No. 350 -
9.2.3 300 x 300 mm (12 x 12) Inch No. 225 -
9.2.4 225 x 225 mm (9 x 9) Inch No. 175 -
9.2.5 150 x 150 mm (6 x 6) Inch No. 150 -

To Bill Summary

10/12/2020 494556100.xlsHVAC Page 5of15


BILLS OF QUANTITIES
PROJECT NAME SAK ENGINEERING CONSULTANTS
LOCATION Bill No. - 00 (Rev. 0)
BUILDIONG NAME DIVISION - 15 - Mech. Works (HVAC)

Unit Price Amount


Ref. DESCRIPTION Quantity Unit SR SR

10/12/2020 494556100.xlsHVAC Page 6of15


BILLS OF QUANTITIES
PROJECT NAME SAK ENGINEERING CONSULTANTS
LOCATION Bill No. - 00 (Rev. 0)
BUILDIONG NAME DIVISION - 15 - Mech. Works (HVAC)

Unit Price Amount


Ref. DESCRIPTION Quantity Unit SR SR

9.3 Supply and install Exhaust air Ceiling Diffusers ECD with
plenum boxes internally insulated, as per drawings. from GGC or
equal
9.3.1 225 x 225 mm (9 x 9) Inch No. 275 -
9.3.2 150 x 150 mm (6 x 6) Inch No. 210 -

9.4 Supply and install Supply Linear Slot Diffusers LSD including
plenum boxes with internally insulation, as per drawings. from
GGC or equal
9.4.1 2 slot x 1 m No. -
9.4.2 3 slot x 1 m No. -

9.5 Supply and install Linear Bar air Supply Grill LBSG including
plenum boxes with internally insulation as per drawings. from
GGC or equal
9.5.1 1000 x 150 mm No. -
9.5.2 1500 x 200 mm No. -

9.6 Supply and install Return Linear Slot Diffusers RLSD including
plenum boxes with internally insulation unless it is not connected
to a return duct, as per drawings. from GGC or equal

9.6.1 2 slot x 1 m No. -


9.6.2 3 slot x 1 m No. -

9.7 Supply and install Linear Bar air Return Grill LBRG including
plenum boxes with internally insulation unless it is not connected
to a return duct, as per drawings. from GGC or equal

9.7.1 1000 x 150 mm No. -


9.7.2 1500 x 200 mm No. -

9.8 Supply and install Intake air Sand Trap Louver STL as per
drawings. from GGC or equal
9.8.1 2000 x 600 mm No. -

9.8 Supply and install Exhaust air Sand Trap Louver ESTL as per
drawings. from GGC or equal
9.8.1 2000 x 600 mm No. -

To Bill Summary

10/12/2020 494556100.xlsHVAC Page 7of15


BILLS OF QUANTITIES
PROJECT NAME SAK ENGINEERING CONSULTANTS
LOCATION Bill No. - 00 (Rev. 0)
BUILDIONG NAME DIVISION - 15 - Mech. Works (HVAC)

Unit Price Amount


Ref. DESCRIPTION Quantity Unit SR SR

10/12/2020 494556100.xlsHVAC Page 8of15


BILLS OF QUANTITIES
PROJECT NAME SAK ENGINEERING CONSULTANTS
LOCATION Bill No. - 00 (Rev. 0)
BUILDIONG NAME DIVISION - 15 - Mech. Works (HVAC)

Unit Price Amount


Ref. DESCRIPTION Quantity Unit SR SR

10.0 Chilled Water Pipe works


10.1 Supply, installation and setting to work chilled water pipes and
fittings including galvanized hangers and supports, vibration
isolators, expansion joints, thrust block, pressure testing, system
testing and commissioning all necessary accessories to finalize
work

10.1.1 300 mm (12 Inch) dia. black steel sch. 40 ERW m -


10.1.2 250 mm (10 Inch) dia. black steel sch. 40 ERW m -
10.1.3 200 mm (8 Inch) dia. black steel sch. 40 ERW m -
10.1.4 150 mm (6 Inch) dia. black steel sch. 40 ERW m -
10.1.5 100 mm (4 Inch) dia. black steel sch. 40 ERW m -
10.1.6 75 mm (3 Inch) dia. black steel sch. 40 ERW m -
10.1.7 65 mm (2 ½ Inch) dia. black steel sch. 40 ERW m -
10.1.8 50 mm (2 Inch) dia. black steel sch. 40 ERW m -
10.1.9 40 mm (1 ½ Inch) dia. black steel sch. 40 ERW m -
10.1.10 32 mm (1¼ Inch) dia. black steel sch. 40 ERW m -
10.1.11 25 mm (1 Inch) dia. black steel sch. 40 ERW m -

10.2 Supply, installation and setting to work exposed chilled water


pipes and fittings including galvanized hangers and supports,
vibration isolators, expansion joints, thrust block, pressure
testing, system testing and commissioning and all necessary
accessories to finalize work

10.2.1 300 mm (12 Inch) dia. black steel sch. 40 ERW m -


10.2.2 250 mm (10 Inch) dia. black steel sch. 40 ERW m -
10.2.3 200 mm (8 Inch) dia. black steel sch. 40 ERW m -
10.2.4 150 mm (6 Inch) dia. black steel sch. 40 ERW m -
10.2.5 100 mm (4 Inch) dia. black steel sch. 40 ERW m -
10.2.6 75 mm (3 Inch) dia. black steel sch. 40 ERW m -
10.2.7 65 mm (2 ½ Inch) dia. black steel sch. 40 ERW m -
10.2.8 50 mm (2 Inch) dia. black steel sch. 40 ERW m -
10.2.9 40 mm (1 ½ Inch) dia. black steel sch. 40 ERW m -
10.2.10 32 mm (1¼ Inch) dia. black steel sch. 40 ERW m -
10.2.11 25 mm (1 Inch) dia. black steel sch. 40 ERW m -

To Bill Summary

10/12/2020 494556100.xlsHVAC Page 9of15


BILLS OF QUANTITIES
PROJECT NAME SAK ENGINEERING CONSULTANTS
LOCATION Bill No. - 00 (Rev. 0)
BUILDIONG NAME DIVISION - 15 - Mech. Works (HVAC)

Unit Price Amount


Ref. DESCRIPTION Quantity Unit SR SR

10/12/2020 494556100.xlsHVAC Page 10of15


BILLS OF QUANTITIES
PROJECT NAME SAK ENGINEERING CONSULTANTS
LOCATION Bill No. - 00 (Rev. 0)
BUILDIONG NAME DIVISION - 15 - Mech. Works (HVAC)

Unit Price Amount


Ref. DESCRIPTION Quantity Unit SR SR

Supply and install Thermal insulation to chilled water pipework.


minimum density 64 kg/m3 pre-formed rigid fiber glass Thermal
Insulation with factory applied foil reinforced Kraft laminate
10.3 facing & 0.6 mm thick aluminium cladding for the external pipes

10.3.1 300 mm (12 Inch) dia. black steel sch. 40 ERW m -


10.3.2 250 mm (10 Inch) dia. black steel sch. 40 ERW m -
10.3.3 200 mm (8 Inch) dia. black steel sch. 40 ERW m -
10.3.4 150 mm (6 Inch) dia. black steel sch. 40 ERW m -
10.3.5 100 mm (4 Inch) dia. black steel sch. 40 ERW m -
10.3.6 75 mm (3 Inch) dia. black steel sch. 40 ERW m -
10.3.7 65 mm (2 ½ Inch) dia. black steel sch. 40 ERW m -
10.3.8 50 mm (2 Inch) dia. black steel sch. 40 ERW m -
10.3.9 40 mm (1 ½ Inch) dia. black steel sch. 40 ERW m -
10.3.10 32 mm (1 ¼ Inch) dia. black steel sch. 40 ERW m -

11.0 Chilled Water Valves and Accessories


11.1 Supply, install, set to work and commission all necessary Item -
sundries, supports, etc., complete

11.2 Supply, install, set to work and commission chemical dosing pot Item -
assembly (00 litres) including 1" dia. ball valves for filling, inlet
line, outlet line, and drain. Filling funnel with cap, automatic air
vent with cock, and all other accessories needed to finalise the
work as per drawings. From METITO or equal

11.3 Air Separator including gate valves for inlet, outlet and by-pass,
automatic air vent with cock, drain valve, and othe accessories
needed to finalise the work as per drawings. From TACO or equal

11.3.1 250 mm dia inlet/outlet connection No. -


11.3.2 Expansion tank 00 liters, bladder type similar or equal to TACO No. -

11.4 Valves and Pipeline Ancillaries


11.4.1 Supply, install, set to work and commission all valves and 1 Item -
pipeline ancillaries etc. complete. From Nibco/Crane/Bell &
Gossette

11.5 32 mm dia. water supply isolation valve for make-up water No. -

11.6 25 mm dia. Isolating gate valves - for dosing pot No. -


11.7 15 mm dia. drain valve for dosing pot No. -

To Bill Summary

10/12/2020 494556100.xlsHVAC Page 11of15


BILLS OF QUANTITIES
PROJECT NAME SAK ENGINEERING CONSULTANTS
LOCATION Bill No. - 00 (Rev. 0)
BUILDIONG NAME DIVISION - 15 - Mech. Works (HVAC)

Unit Price Amount


Ref. DESCRIPTION Quantity Unit SR SR

10/12/2020 494556100.xlsHVAC Page 12of15


BILLS OF QUANTITIES
PROJECT NAME SAK ENGINEERING CONSULTANTS
LOCATION Bill No. - 00 (Rev. 0)
BUILDIONG NAME DIVISION - 15 - Mech. Works (HVAC)

Unit Price Amount


Ref. DESCRIPTION Quantity Unit SR SR

11.8 25 mm dia. drain valve No. -


11.9 100 mm dia. check valves No. -
11.10 100 mm dia. butterfly valve No. -
11.11 50 mm dia. pressure relief valve No. -
11.12 150 mm dia. facia pressure gauge & gauge ports No. -
11.13 100 mm dia. pipeline Y - Strainer No. -
11.14 15 mm dia. Automatic air vent No. -
11.15 100 mm dia. flexible connectors for the pump (to be pump No. -
connection size)

12.0 Chilled water pump valves and accessories


12.1 15 mm dia. drain valve No. -
12.2 150 mm dia. triple duty valve No. -
12.3 50 mm dia. pressure relief valve No. -
12.4 150 mm dia. butterfly valve No. -
12.5 100 mm dia. check valves No. -
12.6 150 mm dia. Y-Strainer No. -
12.7 150 mm dia. fascia pressure gauge No. -
12.8 100 mm dia. flexible connectors for the pump (to be pump No. -
connection size)

13.0 Flushing and Water Treatment Chemicals


Supply, installation and setting to work including all necessary Item -
sundries, water requirement and proper waste water disposal,
laboratory test, etc., complete. From Metito or equal

14.0 Supply, installation, test and setting to work condensate drain item -
piping of AC machines connected to nearest drain point with
fittings and accessories completely

AA Mechanical Identification:
Supply and install approved services identification tags, markings item -
and flow direction arrows.

BB Civil Works
Provide for associated civil works required for the Mechanical job -
Services Installation as described and listed in this B of Q and as
shown on the drawings. The works shall include the formation of
all holes for the services to pass through etc., and the sealing of
the holes once the services have been installed. Provide structural
supports / framing for the WU, EU & ACU, EF at height such as
to allow for the installation of P- trap for condensate drain lines.

To Bill Summary

10/12/2020 494556100.xlsHVAC Page 13of15


BILLS OF QUANTITIES
PROJECT NAME SAK ENGINEERING CONSULTANTS
LOCATION Bill No. - 00 (Rev. 0)
BUILDIONG NAME DIVISION - 15 - Mech. Works (HVAC)

Unit Price Amount


Ref. DESCRIPTION Quantity Unit SR SR

BILL SUMMARY

00 -Bill #00 -Div.15 -HVAC -Rev.0 -Page 1 of 8

00 -Bill #00 -Div.15 -HVAC -Rev.0 -Page 2 of 8

00 -Bill #00 -Div.15 -HVAC -Rev.0 -Page 3 of 8

00 -Bill #00 -Div.15 -HVAC -Rev.0 -Page 4 of 8

00 -Bill #00 -Div.15 -HVAC -Rev.0 -Page 5 of 8

00 -Bill #00 -Div.15 -HVAC -Rev.0 -Page 6 of 8

00 -Bill #00 -Div.15 -HVAC -Rev.0 -Page 7 of 8

00 -Bill #00 -Div.15 -HVAC -Rev.0 -Page 8 of 8

10/12/2020 494556100.xlsHVAC Page 14of15


BILLS OF QUANTITIES
PROJECT NAME SAK ENGINEERING CONSULTANTS
LOCATION Bill No. - 00 (Rev. 0)
BUILDIONG NAME DIVISION - 15 - Mech. Works (HVAC)

Unit Price Amount


Ref. DESCRIPTION Quantity Unit SR SR

To General Summary

10/12/2020 494556100.xlsHVAC Page 15of15