You are on page 1of 1

Summary of Reports (Jul) 2020

Target (1) Down Time ≤ 0.8%


Target (4) Power Station Analysis

Target (5) Reduce stock in spare parts store≥ 10%


Target (2) Spare Part consumption = Total budget

Target (6) Manpower Over time


Target (3) Spare parts consumption of imports in 2019 ≥ 95%

Maintenance Manager
Khldoon Mohammed
Excellent Normal Warning

You might also like