You are on page 1of 1

Methods.

First we collect 10 different kinds of questionnaires, brain storming idea, collecting important thoughts
and mean, then started the survey in all section of grade 10 student, getting the 10% of the total grade
10 student is our respondent in each section there are atleast 40-68 student while applying all the
sequence in Pie Graph

Ex. Pie Graph/Optional


This image shown as the 100% f the different Pie Graph.
This graph represented an different outcomes in different factors.
This figure is all about ratings of different outcomes in a specific factor.
This graph is the ratings of results in our survey.
This is the different ratings of different Pie graph.
In each factor there is different outcome affecting the pie graph.

You might also like