You are on page 1of 4

S.No.

Category of Branches I II III IV V VI VII


1001 to 2001 to 5001 to 7501 to 10001 and
1 Equivalent Members Strength upto 500 501-1000
2000 5000 7500 10000 above
2 Unit of Area Sqft Sqft Sqft Sqft Sqft Sqft Sqft
A Inside Building
3 Branch Office - 300 600 1200 1500 1750 2000
4 Chairman’s cabin - 110 125 150 200 200 200
5 Admin Office - 130 200 250 300 350 400
Addl. Cabin (more than 1000
6 - - - 300 300 400 500
Members Branch)
Committee Room/
Teleconference/Video
7 - 150 250 600 700 800 1200
Conferencing facility (more than
1000 members branch)
8 Auditorium - - - 2400 2900 3000 3000
9 Multipurpose hall - 800 1200 1000 800 1000 1500
10 Class room/ Coaching Room - 650 800 1200 1800 3000 4500
Rooms for Orientation Course/
GMCS I/ GMCS II/ - 450 700 1000 1800 2100 3200
11 Elocution/debate
12 Faculty Room - 100 150 200 250 250 250
13 Library - 150 300 400 600 750 1200
14 Students Reading Room - 365 850 1200 2350 3000 4000
15 IT Lab - 400 750 1000 2000 2800 3500
16 Member's Lounge 150 200 300 400 400 600
17 Waiting Room/Reception - 200 250 300 700 800 1000
18 Canteen/Dinning Room 200 350 400 500 600 1000
19 Common Storage 100 150 200 250 250 300
Toilet facilities (male, female &
20 - 100 200 300 350 600 950
differently abled)
21 Drinking water Facility - 30 50 70 100 140 200
22 Lift Installation - 100 300 300 300 450 800
Total space
- 4485 7425 12770 18100 22640 30300
23 (3 to 21)
Add: Carpet to Built up (1:1.30)
24 - 1345.5 2227.5 3831 5430 6792 9090
@30%
Total space required (A)
- 5830.5 9652.5 16601 23530 29432 39390
25 (20 + 21)
Basement and outside
B -
Building
26 Security Guard Room - 40 100 100 100 120 160
27 Caretaker - 80 150 200 200 250 250

DG Set Earmarked Space (Open


Compound)/ Electric/EPBX - 50 100 100 150 200 200
28 Room/ Battery Room

Total Space Required (B)


- 170 350 400 450 570 610
29 (23 + 24 + 25)

Total Space Required (A+B)


- 6000.5 10002.5 17001 23980 30002 40000
30 (22) + (26)
Total Permissible
Construction area as per
Infra Policy - 6000 10000 17,000 24,000 30,000 40,000
(Excluding Parking area 25%
31 of 30)
Parking Area @ 25% of the
Indicative area of Building - 1500 2500 4250 6000 7500 10000
32 construction i.e. (28)
Total Permissible
Construction area With
permissible Parking @ 25% - 7500 12500 21250 30000 37500 50000

33 (28) + (29)
At the Helm
CA. Atul Kumar Gupta CA. Nihar Niranjan Jambusaria Shri Rakesh Sehgal
President Vice President Acting Secretary
Shri Rakesh Sehgal
Acting Secretary

You might also like