You are on page 1of 1

The design instructions of installing frame for the LED display

Technical requirements
1, 8mm
2,The whole steel frame needs to be levelling, and the discrepancy of
diagonal length not exceeding 10mm.
3,When installing, leave the corresponding gap in the about and above of
the LED Screen according to the inclination angle adjusted on the spot,
and the splicing common difference of the cabinet

5,The size in the list is just for reference. The concrete size is decided
by the specific lofting
6,Eliminating the slag after welding, sometimes may need to be welded
again if any rosin joint or missing welding.
7,Brush anticorrosive paint more than twice

The bearer frame should be designed and made by the professional


technician with relevant certificates. And the materials that our company
offered is just for reference. All the adverse consequences and loss caused
by the base and support frame, our company will be irresponsible

this drawing only for reference, not for construction .

You might also like