1) Impairment criteria

Project Term Reference


STT impact criteria/impairment NORSOK
frequency (10-4)
SV - CPP impact criteria/impairment Industry best-practice
frequency (8*10-5)
Salman impairment frequencies (1*10-4) SHELL’s DS 32, BSP Guidelines
Gallaf, CRD impairment frequencies (1*10-4) Assumption
HSD ALARP (1*10-3) Compare IRPA with ALARP
(Bureau Veritas (BV) has been
engaged by PVE to perform the
Fire, Explosion and Risk
Assessment (FERA) to identify
all potential hazards arise from
HSD Wellhead Platform
operation and determine the
individual risks during normal
operation)
STN impact criteria/impairment ISO 19901-3
frequency (10-4 or 10-5 depend
on the area)

2) Confined area

Confined area = total confined area - Obstacles volume

Obstacle