You are on page 1of 2

Project Completion Report Instructor MP Section

Producer ID#
Engineer ID#

Mix Engineer ID#


Artist ID#

A.F.M. Payments:
Indicate ‘L’ or ‘C’ next to name of Leader or Contractor. For ‘Type’ indicate ‘Ph’ for
Phono session, ‘J’ for Jingle or ‘FS’ for Film Score, and ‘R’ for Regular, ‘S’ for
Special.
Rehersal Players – L / C Hours Estimated Total Including Benefits

Session Type Total Scale ___%


Name (last, first) ID# Instrument and Hours Wages + OT Doubling EPW H&W Cartage Total $
Session #1 L/C

Session #2 L/C

Session #3 L/C

Signature of Leader or Contractor Total A.F.M. Payments = $

A.F.T.R.A. Payments:
If vocal recorded in more than one session, indicate this in ‘Session No.’ column, e.g. Lead Vocals as ‘1’ Backgrounds as ‘2’ etc.
Indicate C = Contractor, Type of Performances: S1 = Solo/Duo, S3 = Group of 3-5, S6 = Group of 6-8

Session Type of No. of Multiple Sweet- Playing Hours #/Length


Name (last, first) ID# No. Perf. Sides Track ening Time worked of Spots Total $

Subtotal = $
+10% (for benefits) = $

Signature of Lead Vocalist or Contractor Total A.F.T.R.A. Payments = $

Expenses:

Studio Time Total Hours @ $ =$ Misc. Expenses =$


Tape 2”, HI 8 @$ =$ =$
DAT (s) @$ =$ =$
CD-R (s) @$ =$ =$
Cassette(s) @ $ =$ Total Misc. Expenses = $
Total Studio Expenses =$

Composer =$ Total A.F.M. Expenses =$


Arranger =$ Total A.F.T.R.A. Expenses =$
Artist =$ Total Studio Expenses =$
Producer’s Fee =$ Total Artistic Expenses =$
Total Artistic Expenses =$ Total Misc. Expenses =$
GRAND TOTAL =$
In order to be eligible for the MT CD, the following MUST be provided:
Name: (last, first) City/Town & Country of Origin
Song Title:
__________________________
Producer: Producer Signature
Engineer:
__________________________
Producer’s Phone
Mix Engineer:
Artist(s):

(If the artist is a band, please specify the town where the band is based.)

You might also like