Professional Documents
Culture Documents
W E W E
S S
kiblat
Wangsa
\Maju
W E
PROPOSED DISCHARGE TO
EXISTING SUNGAI BATU LAKE
PL : 36.40
W E
JALAN NIAH 5
JALAN MIRI
JALAN BINTULU
S
10m
UNLESS OTHERSWISE STATED
JALAN 2/3
30m
30m 58002
20
KL 4
.1
36.04
m
0.27 Ek
8
23.907
JALAN SIBU 18
25.340
PERDAGANGAN
32.023
PARCEL 8
7m
JALAN SIBU 17
32.024
4.444
JALAN 1/18d
MENGANDUNGI;
SERAHAN JALAN 20.11M (66')
32.042
PERDAGANGAN 16.905
JALAN SIBU 15
12.302
6.3
PARCEL 7
50
20.149
6.403
55.942
PENGANGKUTAN AWAM.
DAN JEJANTAS SEDIA
ADA YANG
MENGHUBUNGKAN KE
STESEN KTM
4.38 Ek. STESEN TAMAN WAHYU.
ANJAKAN BAWAH
JALAN KUCHING
KL 3
1.70 Ek 7m
PERDAGANGAN
TANAH 2.3m
6m
ANJAKAN BANGUNAN
PARCEL 5
JALAN SIBU 12
7.25 Ek.
ANJAKAN BAWAH
(40m)
JALAN SIBU 8
JALAN SIBU 11
JALAN JINJANG PERMAI 9
61
10.9
TANAH
LANSKAP
JALAN SIBU 10
ANJAKAN BANGUNAN 6m
PERIMETER LANSKAP 2m
BAWAH
PERIMETER
STESEN
ANJAKAN
35.324
PAM IWK
91.830
PERIMETER
PARCEL 3
5
39.292
JALAN SIBU 9
26.040PERMAI
JALAN JINJANG PERMAI
6m
JALAN SIBU 8
32.86
JINJANG
UN P
JALAN SIBU 2
NG SKA 58
9
7m
BA 8.6
DENSITI 800 OSE AN
TER
LAN
5
JAK IME
70.87
HINGGA TINGKAT 5.
AN
PER
IP. 4 IP. 6
JALAN 5/18a
16.795 52.391
IP. 5
85 29.830
37.2
42.028
JALAN SIBU 6
JALURAN LANDSKAP 4m
57.421
JALAN 4/18a
KL 1 JALAN SIBU 5
PERDAGANGAN 1.06 Ek.
PARCEL 2
JALAN JINJANG PERMAI 4 6.46 Ek.
TINGKAT 1.
KL 2 NISBAH PLOT 1:8.54
0.37 Ek JALAN SIBU 4
7m
JALAN SIBU 2
KESINAMBUNGAN
AN 6m KAWASAN HIJAU DI
JALAN JINJANG PERMAI 2 N BANGUN
ANJAKA BAWAH TANAH
2.3m
PEMBANGUNAN LAKEVILLE
ANJAKAN
RESIDENCE.
12.877
JALAN 2/18a
(50')
15.24m 34.198
459
1
3
JALAN JINJANG PERMAI
10m
58.311
JALAN JINJANG PERMAI
7m
42.546
30m
PENCAWANG
34
30m MASUK UTAMA 11.7
38.116 29.012
(70m X 80m) JALAN SIBU 1 15.099
22.262
Attached Type
REZAB RENTIS
N
LAP
AN
G
PER
TANAH 2.3M
6M
SEN
DIR
BANGUNAN
IAN
ASA
JALAN JAMBU
PERDAGANGAN
BU BER
19.63 Ek.
JAM
S
JU
.3m)
GA
TRANSIT (MRT)(24
BU
3.822
M
JA
48
JA
.58
N
82
0
LA
LA
9.477 21.6
N
JA
JA
82.517
MBU
AH
ARA 51
12.1m
.79
ER
3
NG 6
M
49.99
BU
30.469
2
M
AH
RENTIS
JA
M
LA
REZAB
BU
JA
M
JA
(30m
)
N
LA
JA
PL : 47.10
UNTUK TETUAN: LAKE CITY KL NORTH SDN. BHD.
SCALE : N.T.S
LEGEND :
PL : 38.00
PROPOSED SILT FENCE
FOR DETAILS SEE DWG NO:
1905-LC-EW-TYP-001
PL : 47.10
.5 1:2
1:1 5M 5M
7.5M 10M
CUT SLOPE FILL SLOPE
NOTES:
1. Cut and export beyond Phase 2 boundary at designated dump site PROPOSED CHECK DAM @ 50m C/C
FOR DETAILS SEE DWG NO:
1905-LC-EW-TYP-001
2. The excavation, construction sequence for the installation of the
reinforced slope system shall be carried out by specialist contractors
such that the stability of the slope is not compromised during
construction at all times. all works must be supervised by an
experienced engineer
EARTHWORK LAYOUT
SCALE 1:400