PROPOSED SILT TRAP FOR DETAIL


SEE DWG : 1905-LC-EW-TYP-001
TO BE MAINTAINED THROUGHOUT
THE CONSTRUCTION PERIOD
S

PROPOSED DISCHARGE TO
EXISTING SUNGAI BATU LAKE

PL : 36.40

KEY PLAN LOCATION PLAN


SCALE : N.T.S SCALE : N.T.S
JALAN NIAH 1
N

W E
JALAN NIAH 5
JALAN MIRI

JALAN BINTULU
S
10m
UNLESS OTHERSWISE STATED
JALAN 2/3

30m

30m 58002
20

KL 4
.1

36.04
m

0.27 Ek
8
23.907

JALAN SIBU 18
25.340

PERDAGANGAN
32.023

PARCEL 8
7m

CADANGAN MEMBINA PEMBANGUNAN BERCAMPUR YANG


5.87 Ek
32.093

NISBAH PLOT 1:5.70


29.221

JALAN SIBU 17
32.024

4.444
JALAN 1/18d

MENGANDUNGI;
SERAHAN JALAN 20.11M (66')

32.042

PERDAGANGAN 16.905
JALAN SIBU 15

12.302
6.3

PARCEL 7
50

20.149

4.32 Ek JALAN SIBU 16

3 BLOK PANGSAPURI SUITE 835 UNIT;


NISBAH PLOT 1:6.00
36.575

PERDAGANGAN JALAN 3/18d


PARCEL 9
0.64 Ek 3.074
NISBAH PLOT 1:1.58
36.584

6.403

55.942

I) BLOK A DARI TINGKAT 1 HINGGA TINGKAT 43 (281 UNIT)


JALAN SIBU 15 20.058m
25.570

PERDAGANGAN CADANGAN PEJALAN KAKI


BERBUMBUNG 2 METER PEJALAN KAKI JALAN 5/18d
TANAH 2.3m
6m

MENGHUBUNGKAN KE BERBUMBUNG 2 METER


PARCEL 6 KAWASAN PERKHIDMATAN
ANJAKAN BANGUNAN

PENGANGKUTAN AWAM.
DAN JEJANTAS SEDIA
ADA YANG
MENGHUBUNGKAN KE
STESEN KTM
4.38 Ek. STESEN TAMAN WAHYU.
ANJAKAN BAWAH

JALAN KUCHING

JALAN JINJANG INDAH 11


NISBAH PLOT 1:6.90 TAMAN WAHYU
JALAN SIBU 14

KL 3
1.70 Ek 7m

II) BLOK B DARI TINGKAT 1 HINGGA TINGKAT 43 (281 UNIT)


8
JALAN JINJANG PERMAI
JALAN TEBING TIMOR

III) BLOK C DARI TINGKAT 2 HINGGA TINGKAT 32 (273 UNIT)


JALAN SIBU 13 JALAN 6/18a
15.240

PERDAGANGAN
TANAH 2.3m
6m
ANJAKAN BANGUNAN

PARCEL 5
JALAN SIBU 12
7.25 Ek.
ANJAKAN BAWAH

(40m)
JALAN SIBU 8

NISBAH PLOT 1:6.00


7m

JALAN SIBU 11
JALAN JINJANG PERMAI 9
61
10.9

BERSERTA 7 TINGKAT PODIUM YANG TERDIRI DARIPADA;


68
49.2
2.3m
2m
64.651
29.310

TANAH
LANSKAP

JALAN SIBU 10
ANJAKAN BANGUNAN 6m
PERIMETER LANSKAP 2m

BAWAH
PERIMETER

STESEN
ANJAKAN
35.324

PAM IWK
91.830
PERIMETER

I) 6 TINGKAT TEMPAT LETAK KERETA DI TINGKAT BAWAH


ANJAKAN LANSKAP
BANGUNAN 2m
PERDAGANGAN 6m
JALAN SIBU
3

PARCEL 3
5

JALAN JINJANG PERMAI 7 PERUMAHAN PERDAGANGAN


37.285

39.292

JALAN SIBU 9
26.040PERMAI
JALAN JINJANG PERMAI

MAMPU MILIK 9.00 Ek. PARCEL 4 JALAN 6/18a


NISBAH PLOT 1:7.28
PARCEL 3A 7.44 Ek. 32.193

6m
JALAN SIBU 8
32.86
JINJANG

3.30 Ek. AN 2m NISBAH PLOT 1:5.70


JALAN SIBU 7

UN P
JALAN SIBU 2

NG SKA 58
9
7m

BA 8.6
DENSITI 800 OSE AN
TER
LAN
5

JAK IME
70.87

HINGGA TINGKAT 5.
AN
PER

JALAN JINJANG PERMAI 6


39.564
JALAN
63.845

IP. 4 IP. 6
JALAN 5/18a

16.795 52.391
IP. 5
85 29.830
37.2

42.028
JALAN SIBU 6
JALURAN LANDSKAP 4m
57.421

II) 2 TINGKAT KEDAI (17 UNIT) DI TINGKAT BAWAH DAN


IP . 3

JALAN 4/18a

KL 1 JALAN SIBU 5
PERDAGANGAN 1.06 Ek.

PARCEL 2
JALAN JINJANG PERMAI 4 6.46 Ek.

TINGKAT 1.
KL 2 NISBAH PLOT 1:8.54
0.37 Ek JALAN SIBU 4
7m

JALAN SIBU 2

KESINAMBUNGAN
AN 6m KAWASAN HIJAU DI
JALAN JINJANG PERMAI 2 N BANGUN
ANJAKA BAWAH TANAH
2.3m
PEMBANGUNAN LAKEVILLE
ANJAKAN
RESIDENCE.
12.877
JALAN 2/18a

III) 1 TINGKAT KEDAI (13 UNIT) DI TINGKAT BAWAH.


47.083 SERAHAN
JALAN
JALAN SIBU 3
37.

(50')
15.24m 34.198
459
1

3
JALAN JINJANG PERMAI

10m
58.311
JALAN JINJANG PERMAI

7m
42.546
30m

PENCAWANG
34
30m MASUK UTAMA 11.7
38.116 29.012
(70m X 80m) JALAN SIBU 1 15.099
22.262

Attached Type

IV) RUANG KEMUDAHAN DI PODIUM TINGKAT BAWAH DAN


[Subject To TNB
1.691
Agreement]
3.243
35381
39.708
KAW
ASA

REZAB RENTIS
N
LAP
AN
G

PER
TANAH 2.3M
6M

SEN
DIR
BANGUNAN

IAN

TINGKAT 6, BLOK A (TINGKAT 44),BLOK B (TINGKAT 44)


ANJAKAN BAWAH
ANJAKAN
AIR MAWAR

ASA
JALAN JAMBU

PERDAGANGAN
BU BER

DAN BLOCK C (TINGKAT 33).


PARCEL 1
66
34.0

19.63 Ek.
JAM

NISBAH PLOT 1:6.35


JALAN

S
JU

.3m)
GA

TRANSIT (MRT)(24
BU

3.822
M
JA

48

JA
.58
N

82
0

LA
LA

9.477 21.6
N
JA
JA

82.517
MBU
AH

ARA 51
12.1m

.79
ER

3
NG 6
M

49.99
BU

30.469
2
M

AH

RENTIS
JA

DI ATAS PT 50062,JALAN SIBU, TAMAN WAHYU, MUKIM BATU,


ER
N

M
LA

REZAB
BU
JA

M
JA

(30m
)
N
LA
JA

WILAYAH PERSEKUTUAN KUALA LUMPUR.


LAYOUT PLAN

PL : 47.10
UNTUK TETUAN: LAKE CITY KL NORTH SDN. BHD.
SCALE : N.T.S

LEGEND :

PL : 38.00
PROPOSED SILT FENCE
FOR DETAILS SEE DWG NO:
1905-LC-EW-TYP-001

BOUNDARY LINE EN. YU XIONG WEI EN. TAI CHOON SENG


DIRECTOR DEPUTY CEO
(NO. PASSPORT : G50383606) (NO. K.P. : 710527-08-5677)
PROPOSED TEMPORARY EARTH DRAIN
LAKE CITY KL NORTH SDN. BHD. TEL : 603 - 62808181
LAKE CITY SALES GALLERY, FAX : 603 -62808282
PROPOSED SHEET PILES
NO.100, JALAN SIBU, TAMAN WAHYU,
BY OTHERS
68100 BATU CAVES,
WILAYAH PERSEKUTUAN
PROPOSED SEDIMENT FENCE KUALA LUMPUR.

RL : 47.10 PROPOSED ROAD LEVEL

PROPOSED 7 NOS OF CHECK DAM


AT APPROX.50m c/c PROPOSED CONSTRUCTION OF PERMANENT
SHEET PILES AS SLOPE PROTECTION WORKS
1.5M
1.5M

PL : 47.10
.5 1:2
1:1 5M 5M

7.5M 10M
CUT SLOPE FILL SLOPE

NOTES:

1. Cut and export beyond Phase 2 boundary at designated dump site PROPOSED CHECK DAM @ 50m C/C
FOR DETAILS SEE DWG NO:
1905-LC-EW-TYP-001
2. The excavation, construction sequence for the installation of the
reinforced slope system shall be carried out by specialist contractors
such that the stability of the slope is not compromised during
construction at all times. all works must be supervised by an
experienced engineer

3. Newly excavated slopes shall be protected from rainfall, runoff,


springs etc, and extreme weather using class 'a' plastic sheating.
Method statement must be submitted prior to excavation and all
excavation must be duly and properly supervised.

EARTHWORK LAYOUT
SCALE 1:400

1) "THE FINISHED LEVEL OF THE PROPOSED ROADS AND EARTHWORK


PLATFORM LEVELS ARE SUCH THAT THEY WILL PERMIT LAYOUT PLAN
CONNECTION OF ROADS TO ADJOINING EXISTING OR FUTURE
ROADS''

2) ''NO WATER PONDING WILL OCCUR AS A RESULT OF THE


PROPOSED EARTHWORKS.''
1905-LC-EW-LP-001 1 EW1

3) ''NO ENCROACHMENT INTO THE ADJACENT LOT WILL YWK


OCCUR.''
1:400 HA