You are on page 1of 2
FEASIBILITY STUDY OF CONSTRUCTION BUILDING, TECHNICAL AND ECONOMICAL 10. u 12, 15, 16, 17, 18, 19, 20, 21. INDICATORS IN TECHNICAL AND WORKING DRRAWINGS. Capacity (Annual manufacturing quantity of tradable goods, basic types, production process, service capability and service space, etc) Additional work position Total number of employees, including maintenance staff Labor structure Complete expenses Profit, level of profitable operations Construction’s budgeted expenses, including construction work and equipment expenses ‘Timeframe to recover expenses, including recovery of invested funds and foreign currency expenses Primary manufacturing fund (if factory operating, should be compared to balance sheets and annual reports) Duration of construction and Production costs, cost estimates, benefits of produced goods, market (including export ‘opportunities, sale price. Usage of produced goods: physical volume of raw material, materials, capacity of electrical installations ( including estimated usage _kilowatt, vapor_thr, heating __keal/hr, coal ___ thousand tons, oil products__ thousand tons, clear and sewerage water costs__ cubie meters/hr.) Machines, equipment, parts required for production duration, amount of raw materials, required foreign currency expenses Physical volume of essential materials required for construction (cement, brick and wood ‘material, etc.) Avtomatic and mechanical level of factory, level of manual work for primary and secondary productions Space to be used for construction of bui Working space Space to be utilized Construction volume more than 0.00, fess than 0.00 KI K2 Note: points 16 through 21 shall be included in feasibility indicators of technical and working Grawings, 26" detailed instruction CONCEPTRUAL DESIGN STRUCTURE OF CONSTRUCTION BUILDINGS Cover page- top of cover page shall include signature and stamp of general architect, who approved the conceptual design; building name, location, name of Director of the company that prepared conceptual design, architect’s name, signature, stamp, location and year of conceptual design completion. Remarks- shall include the grounds for conceptual design development, city planning documents con which construction volume was based, schematic figure of chosen technology, remarks and explanations on architectural decisions and estimated calculations of required water, heating, electricity, telecommunications supply needs. General planning- MI:1000 general planning of the site's roads, green space and M1:5000 scheme of surrounding area. Floor planning (furniture, equipment, etc) M1:200 ‘Schematic figure of technology M1:200 Intersections M1:200 Front parts M1:200 3 measurement drawings, street plans, visual aspects, etc shall be formatted in A4 and A3 and presented as an album, Note: If required, agreement arrangements can be made to prepare illustrative boards and 3 dimensional models.

You might also like