You are on page 1of 2

Develop Solar Car Project, Version 1

6/6/2017

Current Costs Current Cost of Quality

1.4 Testing $860.00

1.4.2 Track Testing $730.00

Total Cost $1,590.00

Future Costs of Failures


Team does not compete due to structural or electrical failure

1.5.1 Travel

1.5.2 Event

Total Cost

Testing saves $2,347.00


Future Cost of Quality

$2,642.00

$1,295.00

$3,937.00

Total Difference $2,347.00

You might also like