You are on page 1of 11
hom: (24 7-3-1794 PPR / 2000 tie, saftraret ere, fasta fer, GRR HAM MT dat 4, 1 strever arg, 2 warner, Bow arare Ta flare afte, re fore miter, RTS | GRR vez! ‘mere, wre fade aa fore wie, SRR FET ora a sett PRAT arqUTT—3 ‘rere Rates! sraeaR, 2017 faea : AMRUT ZIGAT Va Ease of Doing Business @ aff Business Reform Action Plan 2017 @ fara oy vas Prater ua fora wafati—zoos (aerate 2011 ya 2016) ¥ weer 3 we A | wes, fava & Waa A arama Hem & fH AMRUT Alor @ orf Trea YET Bq ARG GRO aT UIT Afser fafesr aTgeTG-2016 TM Ease of Doing Business # att ‘ART WAR B Business Reform Action Plan 2017 @ wraferan oy waa Prater vd flores ‘Bare 2000 (aemiehfrer 2011 Ya 2016) apfeaa eetert orate &) 2 Fe Me i a oe oer GT ee BT e fe BER WET TR Sor oR fears aPra—r973 BA uie—o7 } aD AMRUT dota & sitll ade YBNI &g HIG HON art one iser fafesr afcret—2016 TM Ease of Doing Business @ otra ART GOR S Business Reform Action Plan 2017 3 stansit va var arafeet 8g as Prato od flora ‘saftf—2008 (aoreivhfirr 2011 wt 2016) ¥ warra arger were Peters Heer fed arr aor Prof fern mar BI paar ats ar orgies are are gy otter ex ver aT arf Yor yaa AA FT He HY wera: weber | ie 124! (1) /e-3-17-34 fafa /2008-TaheaIH a FSM Prafatae a aprmel yet arr ararel bg ser — 1. war ud am Prato ae va are fata fart, aoun oar | 2. 5, TAT TY, TOMO AAG | 3. Mt afer Part, werae Pree, feRen, arara wey, Bono + ge area A dda fe wre Bafta FT aria aed Ey fart A ange W anes SA HT Se Fi 4 1S Wiel art &, ™~ (sista pare fie) ag wee Scanned by CamScanner SUATR_ WOT: [241 /6-3-17—34 Pf / 2008, Pertfe: 31 aaRaN, 2017 wT WaT 1. oye hor} orerfr aT BHR ENT oT tse fafes argaitst-2016 (Water re- use and recycling) & efter saa Prt ya fara waftt—z008 (aereizhitia 2011 We ote) 4 Prag ore 3.1.2.3 (xvi) Fat Pom oT SRR-3.1.23 (xvi) cere suai } yas rat aA 10 BOR shew WA aT rex Real BH ‘oe Tex Rereftein freer /‘Reréftes sex or agua yada are |” 2. aE DOT SB sieaefa Hd He aixi vd Aisct (Afes4 argeivI—-2016 (Sustainable Waste Management) @ gftera aaa Prater qa flare uafaft—zoos i 2011 Ya 2016) ¥ Prag wee 3.1.23 (xvii) Tor fea aT — SRRR3.1.2.3 (xvii) “soo whee 8 oft dame od omafta wet (gy sofia afta) wen waar thomerta wei 4 ag caer tg yes $ wie an S wis Ga Wa veR So (Biodegradable and non-biodegradable) seefta Ht araen at orn af wre Prora anr ofefet srefta & ar wea ox ad aera Seer daa we A ota oes wast dey, Gre, tay somfe tay ear ore ara er” 3 Syst Doi & sila ARI GOR EMI Te Also ARs aigeiiv—-zowe (Climate Resilient Construction-Integration of Environmental Clearance with Sanction) # gftera vas Pratt yd fara wofatt-2008 (emer 2011 yt 2016) ¥ Freraq eR 3.11.10 Fat fen are . Ease of Doing Business % sa Business Reform Action Plan 2017 & rata 2q Stipulate that Building plan approval is provided within 30 days # ¢ffer10 #47 Frater va facore safafe—2008 (aereieiferer 2011 ye 2016) H AY arer—-1 GS WIT aprer-2 aor wnfeers weenie fare wren & — WRAN_3.1.3.3 aed A WRREH3.1.3.3 aa fog GTet Teg 90 | fry OTe 30 a 4 CT To a Aare a Sar oa Peenfta a er we aR BR oo aS antew gre wae WH AarA | anda ENT wa WAG TEA SI WERT al Scanned by CamScanner (uy Pretfeer orate A orrrafter seer era | (II) Prefer ara A erarafee warer—crat grea 7 BA we aA 90 Ras arex gel uma a eA w A 30 aS orex a wd @ am eign ay Re ed are eegs eA ef 10 fea ae Prater ae wan &, eg Se orrafer bq rats tured S| srarafer Bg oreete fear A atarafeer area aay OT aT RMT GE | NATTA UT RT eT | Te PraForech . Ease of Doing Business orrfa Business Reform Action Plan 2017 3 ora 2g Stipulate that Plinth inspection is done within 7 days of intimation @ fte7rt aa Prater va fer sufet—zo0e (aemeenferr 2011 wat 2016) 4 Prva HAR 3.1.6 (®) ag fer ort Far R316 () Rae ard ar Peer ala aa Pat d ama eee afta } agen Ad oy Pat ord grit ae & eqaea 8 fore mite a aera ger sata ert eae Troi / Aas, tart 4 aavdta fore & omrta wrt oral yews) Bl visa Ae wT Ah @ veal or fore daa ow Prater ord ef a or we aes eer /Prafereat wre & Sitiws, a antics, fae wi wa & ae fetes steRR eet afta BT amos BR Mege BM, fora wer Fa ore oT WETS Ae (aAee—18) AY RTT ‘wen eT fh Ae oe Ole F Ta et AT fear aM S| ale aE WaT TTT] 2 fh war er /Pabredt ar Ste ates wer Prabr vd feore wotaiy | WeRA3.1.1 S arent athe ayET A sree ord Ten Tee wes we Pater wt flora afefar, 1973 4 oi-s2 @ seria oT at @ gax Paty ae rar 2 dt wredta after ane tie or fea a A we SE aiofer sat eth sik wad faq ae PRA ord DH aay ar eter Ae BET wera ure A oo Tet afte get 4a arate ue HF wre eros waa ear / Pratoranal aren weg Rawor a Aero /-aee arora on Tey w dene oa afea A) omeft (ofre—10) | gah Ger GB mh afer err ane smrom saree Prema miPrareor BARAT mega AL oh sar orem Sater wre ir Perea / ge? a Perko samme, Prorat Rarer arr fra omer mer Paras ort amor Rafe arf at dtears ae fem orem) ae enfardt anfteat o7 eri Par % gitar Ht ores . Ease of Doing Business # arrfat Business Reform Action Plan 2017 & arafaat 2q Stipulate that Final completion occupancy certificate is provided within 8 days Scanned by CamScanner 3 after oar Pitot qa Reorst wuPB2008, (weer i porataa vers ow wrerr2 ar saftey affrentr four wir & oe) 4 te 2 Ol WRR-3 2 BT WRR-3 SIRT BIT Oe SUTeAeT Bera Aa ore er we Seek re steer ofr er fer] aie o7 anetFeae A RR act sar ota } stay ux ees HIM 3 ager fore of ag ot ow wore rerer we art ara artrart art waa 4 Prefer wr oR 01 rdf A opto warm—oa one frat STEM | ggagas il lappy *4 a a wre far (Shs Ws) aT UT i HIM AG—2 BT WAS 2 BT WERE a/R ‘wea VARI a oe ey odes wet eM ort fener / | sitter art ard—feae H vita / ater wear wart arf We feere / Pat 7 @ Rett ¥ vom sea TE wig werd git yofen wAIM eet Gt oreo ad By Aa 7. Ease of Doing Business @ sirfa Business Reform Action Plan 2017 $ ore J Online building map sanction @ faq dare aracdae ed fara surat 2008 (werefeiferet 2011 wrert-2 ar sree fear ore o wae ty] WoT wi 2010) FT oe 3 wR Scanned by CamScanner 1 2 WRR-3.1.3.1 WRR-3.131 @) fora wet a aorta weet et wes sorrel /a-srse Ta & sare 300 af Mo aaa Taw gratia vat a Prater, wee Wem aM ort, afe ates argent cartes afer ent fan fa arn Bt nen BA OY Oe WaT Ua fet fiat arar et fee reerfta Prater / garter wero Vd war wareeaat + arqar 21 forg fatter net 4 aif waar ae, vite ante AT Oe Waa 1 (i) fore cee a atoms ae wie ere edad shornsii/ ase car A yaedta Rone} ori wat arate wai 3 Prato, gai frotere @ fe wroes SA wee eg aM ott Wi chefs wee afta o2 af aw 4 vue ao fa ort) var alas ili vifiert vet ya ated aac Sree (Sores) er opeT eA Ww aera argent carta aafes art a fra Gr we Se UE wa va ated fea ort fe seme Prt gett, nero wd ad sofettat & ager & are et) ga 8g fatter vet ¥ after Yow Tenet Yow, wert ome PREGA GAT AT See aml (ii) 300 at tex @ ate dana 3 arate, safatrat & agar ef cen wi waftrs feat after fear, wqaer Pram ag, uemong. oft 8 srrafer qavel 3 artis we whepfe wre | srreT Gi) Rare weer at sors cer emt ge aterrit/ a- nse ar 4 yang Rar & wf at Ber sa wR oranda qe > arf Ww ST RT STAT erm| wage arate 30 fea a craft 4H afr wr & Pratt a eh we we tte ar one ae argent ately after ERT ae WAT siftea et Pe ATARA Sao os wre ae fever ver aN XX Scanned by CamScanner SRre—15 Environmental Conditions for Building and Construction (Category “A”: 5000 samt - 20000 sqmt) S.No. Medium Environmental conditions 1 Natural Drainage The inlet and outlet point of natural drain system should be maintained with adequate size af channel for ensuring Unrestricted flow of water. 2 | Water conservation | A rain water harvesting plan needs fo be designed where the - recharge bores (minimum one per 5000 sqm of built-up area) Rain Water ‘shall be provided. The rain water harvested should be stored in Harvesting ‘a tank for reuse in household through a provision of separate and Ground Water _| water tank and pipelina to avaid mixing with potable municipal Recharge water supply. The excess rain water harvested be linked to the tube well bore in the premise through a pipeline after filtration in the Installed filters. 2(a) The unpaved area shall be more than or equal to 20% of the recreational open spaces. 3 Solid Waste ‘Separate wet and dry bins must be provided at the ground level Management for facilitating segregation of waste. 4 Energy In common areas, LED/ solar lignts must be provided. 5 Alr Quality and Dust, smoke and debris prevention measures such as screens, Noise barricading shall be installed at the site during construction, Plastic/ tarpaulin sheet covers must be used for trucks bringing in sand and material at the site. or) The exhaust pipe of the DG set, if installed, must be minimum 10m away from the building. In case it is less than 10m away, the exhaust pipe shall be taken up to 3m above the building. 6 | Green cover ‘A minimum of 1 tree for every 80 sqm of land shall be planted and maintained. The existing trees will be counted for this purpose. Preference shuuld be given to planting native species. 6(a) ‘Where the trees need to be cut, compensatory plantation in the ratio of 1:3 (ie. planting of 3 trees for every 1 tree that is cut) shall be done with the obligation to provide continued maintenance for such plantations. Scanned by CamScanner or Envir IC . | ‘nvironmental Conditions for Building and Construction (Catagory “B”: 20000 sqmt - 60000 sqmt) ‘Medium Natural Drainage Environmental conditions The inlet and outlet point of natural drain system should be maintained with adequate size of channel for ensuring unrestricted flow of water. 2 Water conservations — | A rain water harvesting plan needs to be designed where the Rain Water Harvesting | recharge bores (minimum one per 5000 sqm of built-up area) ‘andGround Water _| shall be provided. The rain water harvested should be stored Recharge In @ tank for reuse in household through a provision of separate water tank and pipeline to avoid mixing with potable municipal water supply. The excess rain water harvested be linked to the tube well bore in the premise through a pipeline after fitration in the installed filters. 2a) ‘The unpaved area shall be more than or equal to 20% of the recrealivial ypen spaces. Solid Waste ‘Separate wet and dry bins must be provided at the ground Management level for facilitating segregation of waste, 4. __| Energy Ih common areae, LED/ colar lights must be provided. (a) ‘At least 1% of connected applied load generated from renewable energy source such as photovoltaic cells or wind mills or hybrid should be provided. ib) ‘As per the provisions of the Ministry of New and Renewable energy solar water heater of minimum capacity 10 litres/4 poreons (2.5 litres per eapita) shall be installed. A(c) Use of flyash bricks: Fly ash should be used as building ‘material in the construction as per the provisions of Fly Ash Notification of September, 1999 and as amended from time totme, 3 | AirQuality and Noise | Dust, smoke and debris prevention measures such as ‘screens, barricading shall be installed at the site during construction. Plastic/ tarpaulin sheet covers must be used for trucks bringing in sand and material at the site. 5a) ‘The exhaust pipe of the DG set, if installed, must be minimum 10m away from the building. In case itis less than ‘10m away, the exhaust pipe stall be taken up to Im above the building. @ | Green cover ‘Arminimum of 4 tree for every 80 eqm of land shall ba planted and maintained. The existing trees will be counted for this purpose. Preference should be given to planting native species ea) Where the trees need lu be cul, compensatory plantation in the ratio of 1:3 (ie. planting of 3 trees for every 1 tree that Is ccut) shall be done with the obligation to provide continued maintenance for such plantations. Scanned by CamScanner Environmental Conditions for Bui aRre—17 (Category “C": 60000 samt= 180000 =e Medium Environmental conditions Natural Drainage ‘The inlet and outlet point of natural drait maintained with adequate size of chan Tor noe ee channel Unrestricted flow of water ene Water conservations Rain Water Harvesting and ‘Ground Water Recharge ‘A rain water harvesting plan needs to be designed where the recharge bores (minimum one per 5000 sqm of buit-up area) shall be provided. The rain water harvested should be stored in @ tank for reuse in household through a provision of Separate water tank and pipeline to avoid mixing with potable ‘municipal water supply. The excess rain watar harvested is to bbe linked to the tube well bore in the premise through a pipeline after filtration in the installed filters. 2a) ‘The unpaved area shall be more than or equal to 20% of the recreational open spaces. 2(b) 2(c) The ground water shall not be withdrawn without approval from the competent authority Use of potable water in construction should be minimized. 2) Low flow fixtures and sensors must be used to promote water conservation. ‘Separation of grey and black water should be done by the use of dual plumbing system. Solid Waste Management ‘Separate wet and ary bins must be provided at the ground level for facilitating segregation of waste. 3(a) All non-biadegradable waste shall be handed over to authorized recyclers for which a written tie-up must be done with the authorized recyclers. 3(b) Organic waste composterivermiculture pit with a minimum capacity of 0.3 Kghtenementiday must be installed wheiein the STP sludge may be used to be converted to manure which could be used at the site or handed over to authorized recyclers for which a written tie-up must be done with the authorized recyclore, Energy In common areas, LED/solar lights must be provided. 4) ‘At least 1% of connected applied load generated from renewable energy source such as photovoltaic cells or wind mills or hybrid should be provided. (b) ‘As per the provisions of the Ministry of New and Renewable eneiyy solar water heater of minimum capacity 10 litres/4 persons (2.5 litres per capita) shall be installed. Alo) Use of fiyash bricks: Fly ash should be used as building material in the construction as per the provisions of Fly Ash Notification of September, 1999 and as amended frum tine to time. q) Use of concapt of passive solar design of buildinas using architectural design approaches that minimize energy ‘consumption in buildings by Integrating conventional energy: Scanned by CamScanner Medium Environmental conditions efficient devices, such as mech Tee an fans, lating fixtures and other satya lesign elements, such as building orientati i efficient building envelope, “appromiece’ fname: increased day lighting design and thermal mass, ‘ 4(e) Optimize use of energy systems in buildin, moma Sacra aes 0 buaoe at a functional requirements of the building by following mandatary compliance measures (for all applicable buildings) as recommended in the Energy Conservation Building Code (ECBC) 2007 of the Bureau of Energy ficiency, Government fia, Air Quality and Noise Dust, smoke and debris prevention measures such as screens, barricading shall be installed at the site during construction. Plastic/ tarpaulin sheet covers must be used for trucks bringing in sand and material at the site. 5a) The exhaust pipe of the DG set, if installed, must be minimum 10m away from the building In case it is lass than 40m away, the exhaust pipe shall be taken up to 3m above the building. Green cover ‘A minimum of 1 tree for every 80 sqm of land shall be planted and maintained. The existing trees will be counted for this purpose. Preference should be given to planting native species (a) ‘Where the trees need to be cut, compensatory plantation in the ratio of 1:3 (ie. planting of 3 trees for every 1 tree that is, cut) shall be done with the obligation to provide continued maintenance for such plantations. ‘Sewage Treatment Plant Sewage treatment plant with capacity of treating 100% waste water shall be installed. Treated water must be recycled for gardening and flushing. Environment Management Pian The environment infrastructure like Sewage Treatment Plant, Landscaping, Rain Water Harvesting, Power backup for environment, Infrastructure, Environment Monitoring, Solid Waste Management and Solar and Energy conservation, should be kept operational through Environment Monitoring ‘Committee with defined functions and responsibility. Scanned by CamScanner ‘uRre—1g Wy (om eh oud Bay nfs eter doe we) ‘Sarena fiona oiftrexr Hw nomen TTT OA TAT. ae ae ot ar am wd or ern aver fr FRET ara T/A & 1. at i sons FAM nam TEAR Ate 8 (qqave a Rraer/tht a atm) @ awe Ho wh he rah amas 2 we fe (es ar feaRr/ ator wT aA) watt aor fever se Fanon ae Par aan & fore seer & a 4 ALA @-anftten, fr gd wre } wre we & fica vletmaw vars ae ver & ot AY ar Beret # 3. ue fe af ae orem ore @ A aaa eat /Pratornat art was aR Tat Pato gi Rens ca S merecas S ania aftr ger St omanfe orf wT Sa wee aR Peo ya floret afta, 1973 FH aise & arrht srgera Prefer ger Pimfor aperan crar & ch eerste oaftreer ret Aer we AR am A we ag nafs vet abit oft vad fig ae fet ont aA afghh a ara Tet BMT mei reert stron axa 3 fe Rage fd wa wat jas aR oh a oma Ww wel & cen gee aig ceg fora AKI za eI (aah / ert S EKER) Sot wat: Fea 4 owoht/eert wonfia awe & Pe ower ua A aR am 3 ae Ash aa yd orred & agen we & eel ge of foo ae tert wer waar gf ae /aet 1 (aoe /eraerit & BETER) ai wr: Scanned by CamScanner sfRc—19 (Rees ar Ree / ator et a or aig ret Perr seer ata | ) at mega fi my yfkae S are “ere oy my Prafor arash atcha ar wera we fem Pri ater fio... oO Rett Pear aT! erat Prey mae ux gIT ERT RGA fra wel OAT Ta / AT frre /afe ord rh (ware arftraren) (eee ata) fee : SOTA, .. w. Reet irae ay eee a ar ae f& quar wa w ge fat at ta oe & area ofa wel ar we ae (ot aT, TB BT a)! Scanned by CamScanner

You might also like