hom: (24 7-3-1794 PPR / 2000
tie,
saftraret ere,
fasta fer,
GRR HAM MT
dat 4,
1 strever arg, 2 warner,
Bow arare Ta flare afte, re fore miter,
RTS | GRR vez!
‘mere,
wre fade aa fore wie,
SRR FET
ora a sett PRAT arqUTT—3 ‘rere Rates! sraeaR, 2017
faea : AMRUT ZIGAT Va Ease of Doing Business @ aff Business Reform Action Plan 2017
@ fara oy vas Prater ua fora wafati—zoos (aerate 2011 ya 2016) ¥
weer 3 we A |
wes,
fava & Waa A arama Hem & fH AMRUT Alor @ orf Trea YET
Bq ARG GRO aT UIT Afser fafesr aTgeTG-2016 TM Ease of Doing Business # att
‘ART WAR B Business Reform Action Plan 2017 @ wraferan oy waa Prater vd flores
‘Bare 2000 (aemiehfrer 2011 Ya 2016) apfeaa eetert orate &)
2 Fe Me i a oe oer GT ee BT e fe BER WET TR Sor oR fears
aPra—r973 BA uie—o7 } aD AMRUT dota & sitll ade YBNI &g HIG HON
art one iser fafesr afcret—2016 TM Ease of Doing Business @ otra ART GOR S
Business Reform Action Plan 2017 3 stansit va var arafeet 8g as Prato od flora
‘saftf—2008 (aoreivhfirr 2011 wt 2016) ¥ warra arger were Peters Heer
fed arr aor Prof fern mar BI
paar ats ar orgies are are gy otter ex ver aT arf Yor yaa
AA FT He HY
wera: weber |
ie 124! (1) /e-3-17-34 fafa /2008-TaheaIH a
FSM Prafatae a aprmel yet arr ararel bg ser —
1. war ud am Prato ae va are fata fart, aoun oar |
2. 5, TAT TY, TOMO AAG |
3. Mt afer Part, werae Pree, feRen, arara wey, Bono + ge area A dda fe
wre Bafta FT aria aed Ey fart A ange W anes SA HT Se Fi
4 1S Wiel
art &,
™~
(sista pare fie)
ag wee
Scanned by CamScannerSUATR_ WOT: [241 /6-3-17—34 Pf / 2008, Pertfe: 31 aaRaN, 2017 wT WaT
1. oye hor} orerfr aT BHR ENT oT tse fafes argaitst-2016 (Water re-
use and recycling) & efter saa Prt ya fara waftt—z008 (aereizhitia 2011
We ote) 4 Prag ore 3.1.2.3 (xvi) Fat Pom oT
SRR-3.1.23 (xvi)
cere suai } yas rat aA 10 BOR shew WA aT rex Real BH
‘oe Tex Rereftein freer /‘Reréftes sex or agua yada are |”
2. aE DOT SB sieaefa Hd He aixi vd Aisct (Afes4 argeivI—-2016 (Sustainable
Waste Management) @ gftera aaa Prater qa flare uafaft—zoos i
2011 Ya 2016) ¥ Prag wee 3.1.23 (xvii) Tor fea aT —
SRRR3.1.2.3 (xvii)
“soo whee 8 oft dame od omafta wet (gy sofia afta) wen waar
thomerta wei 4 ag caer tg yes $ wie an S wis Ga Wa veR So
(Biodegradable and non-biodegradable) seefta Ht araen at orn af wre
Prora anr ofefet srefta & ar wea ox ad aera Seer daa we A ota oes
wast dey, Gre, tay somfe tay ear ore ara er”
3 Syst Doi & sila ARI GOR EMI Te Also ARs aigeiiv—-zowe (Climate
Resilient Construction-Integration of Environmental Clearance with Sanction) #
gftera vas Pratt yd fara wofatt-2008 (emer 2011 yt 2016) ¥ Freraq
eR 3.11.10 Fat fen are
. Ease of Doing Business % sa Business Reform Action Plan 2017 & rata
2q Stipulate that Building plan approval is provided within 30 days # ¢ffer10 #47
Frater va facore safafe—2008 (aereieiferer 2011 ye 2016) H AY arer—-1 GS WIT
aprer-2 aor wnfeers weenie fare wren & —
WRAN_3.1.3.3 aed A WRREH3.1.3.3
aa
fog GTet Teg 90 | fry OTe 30 a 4
CT To a Aare a Sar oa Peenfta a er we aR
BR oo aS antew gre wae WH AarA | anda ENT wa WAG TEA SI WERT
al
Scanned by CamScanner(uy Pretfeer orate A orrrafter seer era | (II) Prefer ara A erarafee warer—crat
grea 7 BA we aA 90 Ras arex gel uma a eA w A 30 aS orex a
wd @ am eign ay Re ed are eegs eA ef
10 fea ae Prater ae wan &,
eg Se orrafer bq rats tured S| srarafer Bg oreete fear A atarafeer
area aay OT aT RMT GE | NATTA UT RT eT | Te PraForech
. Ease of Doing Business orrfa Business Reform Action Plan 2017 3 ora
2g Stipulate that Plinth inspection is done within 7 days of intimation @ fte7rt
aa Prater va fer sufet—zo0e (aemeenferr 2011 wat 2016) 4 Prva HAR 3.1.6
(®) ag fer ort
Far R316 () Rae ard ar Peer ala
aa Pat d ama eee afta } agen Ad oy Pat ord grit ae &
eqaea 8 fore mite a aera ger sata ert eae Troi / Aas,
tart 4 aavdta fore & omrta wrt oral yews) Bl visa Ae wT Ah
@ veal or fore daa ow Prater ord ef a or we aes eer /Prafereat wre &
Sitiws, a antics, fae wi wa & ae fetes steRR eet afta
BT amos BR Mege BM, fora wer Fa ore oT WETS Ae (aAee—18) AY RTT
‘wen eT fh Ae oe Ole F Ta et AT fear aM S| ale aE WaT TTT]
2 fh war er /Pabredt ar Ste ates wer Prabr vd feore wotaiy |
WeRA3.1.1 S arent athe ayET A sree ord Ten Tee wes we Pater wt
flora afefar, 1973 4 oi-s2 @ seria oT at @ gax Paty ae rar
2 dt wredta after ane tie or fea a A we SE aiofer sat eth sik wad
faq ae PRA ord DH aay ar eter Ae BET
wera ure A oo Tet afte get 4a arate ue HF wre
eros waa ear / Pratoranal aren weg Rawor a Aero /-aee arora on Tey
w dene oa afea A) omeft (ofre—10) | gah Ger GB mh afer err ane
smrom saree Prema miPrareor BARAT mega AL oh sar orem Sater wre
ir Perea / ge? a Perko samme, Prorat Rarer arr fra omer mer Paras ort
amor Rafe arf at dtears ae fem orem) ae enfardt anfteat o7 eri Par
% gitar Ht ores
. Ease of Doing Business # arrfat Business Reform Action Plan 2017 & arafaat
2q Stipulate that Final completion occupancy certificate is provided within 8 days
Scanned by CamScanner3
after oar Pitot qa Reorst wuPB2008, (weer i
porataa vers ow wrerr2 ar saftey affrentr four wir & oe) 4 te
2 Ol WRR-3 2 BT WRR-3
SIRT BIT Oe SUTeAeT Bera Aa ore er we
Seek re steer ofr er fer] aie o7 anetFeae A RR act
sar ota } stay ux ees HIM
3 ager fore of ag ot ow
wore rerer we art ara
artrart art waa 4 Prefer wr oR 01
rdf A opto warm—oa one frat
STEM |
ggagas
il
lappy
*4
a
a
wre far (Shs Ws) aT UT
i
HIM AG—2 BT WAS 2 BT WERE
a/R ‘wea VARI a oe ey odes wet eM
ort fener / | sitter art ard—feae H vita / ater
wear wart arf
We feere / Pat 7
@ Rett ¥ vom sea TE
wig werd git yofen wAIM
eet Gt oreo ad By
Aa
7. Ease of Doing Business @ sirfa Business Reform Action Plan 2017 $ ore
J Online building map sanction @ faq dare aracdae
ed fara surat 2008 (werefeiferet 2011
wrert-2 ar sree
fear ore
o wae ty] WoT
wi 2010) FT oe 3 wR
Scanned by CamScanner1
2
WRR-3.1.3.1
WRR-3.131
@) fora wet a aorta
weet et wes sorrel /a-srse
Ta & sare 300 af Mo aaa Taw
gratia vat a Prater,
wee Wem aM ort, afe ates
argent cartes afer ent fan fa
arn Bt nen BA OY Oe WaT Ua fet
fiat arar et fee reerfta Prater / garter
wero Vd war wareeaat + arqar 21
forg fatter net 4 aif waar
ae, vite ante AT
Oe Waa 1
(i) fore cee a atoms ae
wie ere edad shornsii/ ase
car A yaedta Rone} ori wat
arate wai 3 Prato, gai
frotere @ fe wroes SA
wee eg aM ott Wi chefs
wee afta o2 af aw 4 vue
ao fa ort) var alas ili
vifiert vet ya ated aac
Sree (Sores) er
opeT eA Ww aera argent carta
aafes art a fra Gr we Se UE
wa va ated fea ort fe seme
Prt gett, nero wd ad
sofettat & ager & are et) ga 8g
fatter vet ¥ after Yow Tenet Yow,
wert ome PREGA GAT AT
See aml
(ii) 300 at tex @ ate dana 3
arate,
safatrat & agar ef cen wi waftrs
feat after fear, wqaer
Pram ag, uemong. oft 8 srrafer
qavel 3 artis we whepfe wre | srreT
Gi) Rare weer at sors cer
emt ge aterrit/ a- nse
ar 4 yang Rar & wf at
Ber sa wR oranda qe >
arf Ww ST RT STAT
erm| wage arate 30 fea a craft 4H
afr wr & Pratt a eh we we
tte ar one ae argent ately
after ERT ae WAT siftea et Pe ATARA
Sao os wre ae fever ver aN
XX
Scanned by CamScannerSRre—15
Environmental Conditions for Building and Construction
(Category “A”: 5000 samt - 20000 sqmt)
S.No. Medium Environmental conditions
1 Natural Drainage The inlet and outlet point of natural drain system should be
maintained with adequate size af channel for ensuring
Unrestricted flow of water.
2 | Water conservation | A rain water harvesting plan needs fo be designed where the
- recharge bores (minimum one per 5000 sqm of built-up area)
Rain Water ‘shall be provided. The rain water harvested should be stored in
Harvesting ‘a tank for reuse in household through a provision of separate
and Ground Water _| water tank and pipelina to avaid mixing with potable municipal
Recharge water supply. The excess rain water harvested be linked to the
tube well bore in the premise through a pipeline after filtration in
the Installed filters.
2(a) The unpaved area shall be more than or equal to 20% of the
recreational open spaces.
3 Solid Waste ‘Separate wet and dry bins must be provided at the ground level
Management for facilitating segregation of waste.
4 Energy In common areas, LED/ solar lignts must be provided.
5 Alr Quality and Dust, smoke and debris prevention measures such as screens,
Noise barricading shall be installed at the site during construction,
Plastic/ tarpaulin sheet covers must be used for trucks bringing
in sand and material at the site.
or) The exhaust pipe of the DG set, if installed, must be minimum
10m away from the building. In case it is less than 10m away,
the exhaust pipe shall be taken up to 3m above the building.
6 | Green cover ‘A minimum of 1 tree for every 80 sqm of land shall be planted
and maintained. The existing trees will be counted for this
purpose. Preference shuuld be given to planting native species.
6(a) ‘Where the trees need to be cut, compensatory plantation in the
ratio of 1:3 (ie. planting of 3 trees for every 1 tree that is cut)
shall be done with the obligation to provide continued
maintenance for such plantations.
Scanned by CamScanneror
Envir IC . |
‘nvironmental Conditions for Building and Construction
(Catagory “B”: 20000 sqmt - 60000 sqmt)
‘Medium
Natural Drainage
Environmental conditions
The inlet and outlet point of natural drain system should be
maintained with adequate size of channel for ensuring
unrestricted flow of water.
2 Water conservations — | A rain water harvesting plan needs to be designed where the
Rain Water Harvesting | recharge bores (minimum one per 5000 sqm of built-up area)
‘andGround Water _| shall be provided. The rain water harvested should be stored
Recharge In @ tank for reuse in household through a provision of
separate water tank and pipeline to avoid mixing with potable
municipal water supply. The excess rain water harvested be
linked to the tube well bore in the premise through a pipeline
after fitration in the installed filters.
2a) ‘The unpaved area shall be more than or equal to 20% of the
recrealivial ypen spaces.
Solid Waste ‘Separate wet and dry bins must be provided at the ground
Management level for facilitating segregation of waste,
4. __| Energy Ih common areae, LED/ colar lights must be provided.
(a) ‘At least 1% of connected applied load generated from
renewable energy source such as photovoltaic cells or wind
mills or hybrid should be provided.
ib) ‘As per the provisions of the Ministry of New and Renewable
energy solar water heater of minimum capacity 10 litres/4
poreons (2.5 litres per eapita) shall be installed.
A(c) Use of flyash bricks: Fly ash should be used as building
‘material in the construction as per the provisions of Fly Ash
Notification of September, 1999 and as amended from time
totme,
3 | AirQuality and Noise | Dust, smoke and debris prevention measures such as
‘screens, barricading shall be installed at the site during
construction. Plastic/ tarpaulin sheet covers must be used for
trucks bringing in sand and material at the site.
5a) ‘The exhaust pipe of the DG set, if installed, must be
minimum 10m away from the building. In case itis less than
‘10m away, the exhaust pipe stall be taken up to Im above
the building.
@ | Green cover ‘Arminimum of 4 tree for every 80 eqm of land shall ba planted
and maintained. The existing trees will be counted for this
purpose. Preference should be given to planting native
species
ea) Where the trees need lu be cul, compensatory plantation in
the ratio of 1:3 (ie. planting of 3 trees for every 1 tree that Is
ccut) shall be done with the obligation to provide continued
maintenance for such plantations.
Scanned by CamScannerEnvironmental Conditions for Bui
aRre—17
(Category “C": 60000 samt= 180000 =e
Medium
Environmental conditions
Natural Drainage
‘The inlet and outlet point of natural drait
maintained with adequate size of chan Tor noe ee
channel
Unrestricted flow of water ene
Water conservations
Rain Water
Harvesting and
‘Ground Water
Recharge
‘A rain water harvesting plan needs to be designed where the
recharge bores (minimum one per 5000 sqm of buit-up area)
shall be provided. The rain water harvested should be stored
in @ tank for reuse in household through a provision of
Separate water tank and pipeline to avoid mixing with potable
‘municipal water supply. The excess rain watar harvested is to
bbe linked to the tube well bore in the premise through a
pipeline after filtration in the installed filters.
2a)
‘The unpaved area shall be more than or equal to 20% of the
recreational open spaces.
2(b)
2(c)
The ground water shall not be withdrawn without approval
from the competent authority
Use of potable water in construction should be minimized.
2)
Low flow fixtures and sensors must be used to promote water
conservation.
‘Separation of grey and black water should be done by the use
of dual plumbing system.
Solid Waste
Management
‘Separate wet and ary bins must be provided at the ground
level for facilitating segregation of waste.
3(a)
All non-biadegradable waste shall be handed over to
authorized recyclers for which a written tie-up must be done
with the authorized recyclers.
3(b)
Organic waste composterivermiculture pit with a minimum
capacity of 0.3 Kghtenementiday must be installed wheiein
the STP sludge may be used to be converted to manure
which could be used at the site or handed over to authorized
recyclers for which a written tie-up must be done with the
authorized recyclore,
Energy
In common areas, LED/solar lights must be provided.
4)
‘At least 1% of connected applied load generated from
renewable energy source such as photovoltaic cells or wind
mills or hybrid should be provided.
(b)
‘As per the provisions of the Ministry of New and Renewable
eneiyy solar water heater of minimum capacity 10 litres/4
persons (2.5 litres per capita) shall be installed.
Alo)
Use of fiyash bricks: Fly ash should be used as building
material in the construction as per the provisions of Fly Ash
Notification of September, 1999 and as amended frum tine to
time.
q)
Use of concapt of passive solar design of buildinas using
architectural design approaches that minimize energy
‘consumption in buildings by Integrating conventional energy:
Scanned by CamScannerMedium
Environmental conditions
efficient devices, such as mech
Tee an
fans, lating fixtures and other satya
lesign elements, such as building orientati i
efficient building envelope, “appromiece’ fname:
increased day lighting design and thermal mass, ‘
4(e)
Optimize use of energy systems in buildin,
moma Sacra aes 0 buaoe at a
functional requirements of the building by following mandatary
compliance measures (for all applicable buildings) as
recommended in the Energy Conservation Building Code
(ECBC) 2007 of the Bureau of Energy ficiency, Government
fia,
Air Quality and Noise
Dust, smoke and debris prevention measures such as
screens, barricading shall be installed at the site during
construction. Plastic/ tarpaulin sheet covers must be used for
trucks bringing in sand and material at the site.
5a)
The exhaust pipe of the DG set, if installed, must be minimum
10m away from the building In case it is lass than 40m away,
the exhaust pipe shall be taken up to 3m above the building.
Green cover
‘A minimum of 1 tree for every 80 sqm of land shall be planted
and maintained. The existing trees will be counted for this
purpose. Preference should be given to planting native
species
(a)
‘Where the trees need to be cut, compensatory plantation in
the ratio of 1:3 (ie. planting of 3 trees for every 1 tree that is,
cut) shall be done with the obligation to provide continued
maintenance for such plantations.
‘Sewage Treatment
Plant
Sewage treatment plant with capacity of treating 100% waste
water shall be installed. Treated water must be recycled for
gardening and flushing.
Environment
Management Pian
The environment infrastructure like Sewage Treatment Plant,
Landscaping, Rain Water Harvesting, Power backup for
environment, Infrastructure, Environment Monitoring, Solid
Waste Management and Solar and Energy conservation,
should be kept operational through Environment Monitoring
‘Committee with defined functions and responsibility.
Scanned by CamScanner‘uRre—1g
Wy
(om eh oud Bay nfs eter doe we)
‘Sarena fiona oiftrexr
Hw nomen TTT OA TAT. ae
ae ot ar am wd or ern
aver fr FRET ara T/A &
1. at i sons FAM nam TEAR Ate 8
(qqave a Rraer/tht a atm) @ awe Ho wh he
rah amas
2 we fe (es ar feaRr/ ator wT aA) watt aor fever
se Fanon ae Par aan & fore seer & a 4 ALA @-anftten, fr gd
wre } wre we & fica vletmaw vars ae ver & ot AY ar Beret
#
3. ue fe af ae orem ore @ A aaa eat /Pratornat art was aR Tat
Pato gi Rens ca S merecas S ania aftr ger St omanfe orf
wT Sa wee aR Peo ya floret afta, 1973 FH aise & arrht
srgera Prefer ger Pimfor aperan crar & ch eerste oaftreer ret Aer we AR
am A we ag nafs vet abit oft vad fig ae fet ont aA afghh a
ara Tet BMT
mei reert stron axa 3 fe Rage fd wa wat jas aR oh a
oma Ww wel & cen gee aig ceg fora AKI za eI
(aah / ert S EKER)
Sot
wat:
Fea
4 owoht/eert wonfia awe & Pe ower ua A aR am
3 ae Ash aa yd orred & agen we & eel ge of foo ae tert wer
waar gf ae /aet 1
(aoe /eraerit & BETER)
ai
wr:
Scanned by CamScannersfRc—19
(Rees ar Ree / ator et a or aig
ret Perr seer ata | )
at mega fi my yfkae S are
“ere oy my Prafor arash atcha ar
wera we fem Pri ater fio... oO Rett Pear
aT! erat Prey mae ux gIT ERT RGA fra wel OAT Ta / AT
frre /afe ord rh
(ware arftraren)
(eee ata)
fee : SOTA, .. w. Reet irae ay eee a ar
ae f& quar wa w ge fat at ta oe & area ofa
wel ar we ae (ot aT, TB BT a)!
Scanned by CamScanner