FACTORY ATTENTION: FROM

XXXX XXXX XXXX

TEL FAX DATE


XXXX XXXX 2014-01-27

ECN Number: 2014-01-27

Article number: PL2WW1325


ENGINEERING CHANGE DESCRIPTION

Update of customer spec:


- Change P/N from PL2W1325 to PL2WW1325
- Change customer P/N from M1WW08431 to M1WW08431/2-454-60
- New requirement: CoC on XXXX template for all orders in the future

Agreed date of implementation:      


Signature:      
DATE OF IMPLEMENTATION

Purchase order number:       order line: From next orders

Future orders

FACTORY NOTES
Impacts (tooling, costs, lead time)

     

This document must be signed and returned to XXXX within 24H.

The Supplier undertakes to implement the change as written and signed above. The BUYER (XXXX) has the right

to claim any cost caused by not implementing the change as agreed in this document.

2003-03-21 2010-01-28 7.3.99 5


DATE DATE CHANGED REG.NO REVISION

XXXX XXXX 1/1 XXXX


ACCEPTED BY MADE BY PAGE COMPANY