Estimation of concrete strength with Schmidt Hammer (JSCE-G504)

Project Name Jabodebek LRT


Location Line 2, T2, Plinth 11
Referential Pier No.
Design Strength σ (MPa) 35
Test No. 1 2 3
Test Date 6/26/2020 6/26/2020
Pier Segment 57-58 58-59
Concrete Work
Test Date
Age (days)
Direction Track 2 Plinth 11 Track 2 Plinth 11
Cover Concrete (mm)

Rebound Reject Rebound Reject Rebound Reject


1 36 36 #DIV/0!
2 36 34 #DIV/0!
3 35 31 #DIV/0!
4 35 36 #DIV/0!
5 35 36 #DIV/0!
6 36 32 #DIV/0!
7 35 34 #DIV/0!
8 34 36 #DIV/0!
Measurement

9 33 35 #DIV/0!
10 35 36 #DIV/0!
11 X X #DIV/0!
12 X X #DIV/0!
13 X X #DIV/0!
14 X X #DIV/0!
15 X X #DIV/0!
16 X X #DIV/0!
17 X X #DIV/0!
18 X X #DIV/0!
19 X X #DIV/0!
20 X X #DIV/0!
Average 35 35 #DIV/0!
21 0 0 0
Additional

22 0 0 0
23
24
25
Average after Additional 18.0 17.0 0.0
Measurement
Estimated Strength
10.0 (NO) 8.9 (NO) (6.3) (NO)
F(N/mm2)
Average
4.2 (NO)
(N/mm2)
Each location 85% or more of σ ≧ 29.8 N/mm2
Design Criteria
Average no less than σ ≧ 35.0 N/mm2
Note 1: Measured rebounds which are deviated from the average more than ±20% shall be marked "x" in the column of
"Reject". Those measurements shall be replaced by the same number of additional measurements.

Note 2: F (N/mm2) = 0,01*R^2+0,7243*R-6,2857


Inspector (consultant) Attendant (Adhi Karya) Checked by Confirmed by
Estimation of concrete strength with Schmidt Hammer (JSCE-G504)
Project Name Jabodebek LRT
Location Line 2, 57-58
Referential Pier No.
Design Strength σ (MPa) 35
Test No. 1 2 3
Test Date
Pier Segment
Concrete Work
Test Date
Age (days)
Direction
Cover Concrete (mm)

Rebound Reject Rebound Reject Rebound Reject


1 #DIV/0! #DIV/0! #DIV/0!
2 #DIV/0! #DIV/0! #DIV/0!
3 #DIV/0! #DIV/0! #DIV/0!
4 #DIV/0! #DIV/0! #DIV/0!
5 #DIV/0! #DIV/0! #DIV/0!
6 #DIV/0! #DIV/0! #DIV/0!
7 #DIV/0! #DIV/0! #DIV/0!
8 #DIV/0! #DIV/0! #DIV/0!
Measurement

9 #DIV/0! #DIV/0! #DIV/0!


10 #DIV/0! #DIV/0! #DIV/0!
11 #DIV/0! #DIV/0! #DIV/0!
12 #DIV/0! #DIV/0! #DIV/0!
13 #DIV/0! #DIV/0! #DIV/0!
14 #DIV/0! #DIV/0! #DIV/0!
15 #DIV/0! #DIV/0! #DIV/0!
16 #DIV/0! #DIV/0! #DIV/0!
17 #DIV/0! #DIV/0! #DIV/0!
18 #DIV/0! #DIV/0! #DIV/0!
19 #DIV/0! #DIV/0! #DIV/0!
20 #DIV/0! #DIV/0! #DIV/0!
Average #DIV/0! #DIV/0! #DIV/0!
21 0 0 0
Additional

22 0 0 0
23
24
25
Average after Additional
Measurement 0.0 0.0 0.0
Estimated Strength
(6.3) (NO) (6.3) (NO) (6.3) (NO)
F(N/mm2)
Average
(6.3) (NO)
(N/mm2)
Each location 85% or more of σ ≧ 29.8 N/mm2
Design Criteria
Design Criteria
Average no less than σ ≧ 35.0 N/mm2
Note 1: Measured rebounds which are deviated from the average more than ±20% shall be marked "x" in the column of
"Reject". Those measurements shall be replaced by the same number of additional measurements.

Note 2: F (N/mm2) = 0,01*R^2+0,7243*R-6,2857


Inspector (consultant) Attendant (Adhi Karya) Checked by Confirmed by
Field Measurement and Inspection Summary Sheet [Schmidt Hammer & Dimensional Measurements]

Project Name #REF!


Location #REF!
Referential Pier No. #REF!
Test Date #REF!

Schmidt & Dimension Check


Location 1 Location 2 Location 3 Average

Check of Concrete Strength (Mpa)

Average Result (Mpa) #REF! #REF! #REF! #REF!


Design Strength σ = 33.2 Mpa ≧ 0.85 σ ≧ 0.85 σ ≧ 0.85 σ ≧ 0.85 σ

Dimensional check

Measured 1850 1850 1850 1850


Drawing 1850 1850 1850 1850
[Conformance to Tolerance]

Cover Meter Measurement


Location 1 Location 2 Location 3 Average

Measurement for Thickness


of Covering Concrete

Detection of R-bar

Snapshot of Referential Drawing

[Description of Detection Result]