You are on page 1of 2

PROJECT: Balance Jobs for FGRS Project

OWNER: M/s. Mangalore Refinery & Petrochemicals Limited


OWNER'S CONSULTANT: M/s. Mecon Ltd.
SUB CONTRACTOR: M/s. Hi-Technocrats Pvt. Ltd.
Construction Schedule Time Period

Sr. No. Description Month 1 Month 2 Month 3 Month 4 Month 5 Month 6


A Mechanical Works

I Fabrication & Erection


1 Pipes & Fittings
2 Valves
3 Steam Tracing system
4 Fire fighting Works

II Testing
1 Pipes & Fittings
2 Valves

III FGRS Skid


1 Erection of FGRS Skid
2 Alignment of FGRS Skid

B Civil Works

I Foundations
1 Excavation
2 PCC
3 Bar bending and shuttering
4 RCC

II Flooring
1 Excavation
2 PCC
3 Bar bending and shuttering
4 RCC

III Brick Work

IV Other Misc. works


C Electrical Works

I Cables and Cable Tray


1 Excavation of Trenches/Fixing of Cable Tray
2 Laying & Termination of Cable
3 Testing of Cables
4 Tagging/ of Cables

II Illumination system
1 Installation of Poles/Lights/etc.
2 Testing of Poles/Lights/etc.

III Earth Electrode


1 Making of Bore & Installation of Earth Electrode
2 Making of Earth Pit
3 Termination with GI Strip
4 Testing of Earth Electrode

D Instrumentation Works

I Cables and Cable Tray


1 Excavation of Trenches/Fixing of Cable Tray
2 Laying & Termination of Cable
3 Testing of Cables
4 Tagging/ of Cables

II Instruments
1 Installation of various Instruments
2 Testing of various Instruments

III Dismantling and Erecdtion of Instruments