You are on page 1of 1

P0

COCH
1
BOR LOG BO3

CLIENT MBITS PROJECT NAME p05 PROJECT NUMBER po5

DATE STARTED8/13/14 GROUND ELEVATION 0 m MSL HOLE SIZE70 mm

COMPLETED8/14/14
AT TIME OF DRILLING
--
DRILLING METHOD
ROTARY DRILLING AT END OF DRILLING
0.00 Elev 0.00 ft approx 5.5m above GL
GROUND WATER LEVELS: AFTER DRILLING
--

SPT N VALUE
20 40 60 80
PL MC LL
MATERIAL DESCRIPTION
20 40 60 80
FINES CONTENT (%)
0 20 40 60 80
CLAY SPT 1-0-1
1 (1)
SPT 2-2-3 11
WEATHERED ROCK 2 (5)
SPT 1-2-2
3 (4)
WEATHERED ROCK SPT 23-50-0
4 (50)
SPT 50-52-0
5 (52)
SPT 39-54-0
6 (54)
SPT 42-62-0
7 (62)

71

You might also like