You are on page 1of 1
CAPITAL EXPENDITURE REQUEST Project no: (EUR) General Information Project Starch Recovery Plant Date 21.07.2020 Project Leader Mihaels Bendic My Romania Plant Ghimbav Replacement [—] Purchase CX] fxtension [J] Lease [=] Bret Description Starch recovery equipment will be able to process water fresn poth chips lines : 81447 =127 kg/h raw potatoes. This wll ead toa efficiency af ate ee kare =309 ka/h output vacuum fter + 56% De — Reason for Capital Expenditure [select by ina ay SES GS 1 Productivity improvement [] Capacity Increase 1) Hesithysatety/tegs! =] Scrap reduction C1 auaity improvement 1 Environment ira] Yield tncrease [1 innovation Sales /marcer Information Technology (IT) =] Branded o Others peace cesoive Private Label oO Scheduled ston of project: TT] Scheduled completion | ET | ‘Capital expenditure Description (installation costs included, all exchuding VAT) Iovest KEUR Starch Recovery Plan (for KIREMKO Line and also for H & C PC2000 line) consists of 320 ‘pes Refining Sieve RB0-150 with feed pumps for both lines + manifold Recirculation Suet Tank = 5 m3 - with feeding pump + Overflow butfer Tank 3 Fe. Vacuum fiber unt type FCLOGAD forthe dewatering ofthe starch. +P. High pressure cleaning water pump fr therein seve and the vacuum fier 4Pe_Screw conveyor for discharge of the fiter cake into? big-bags. Electric cabinet fr automation +Hydrorylones unt HC-50 + Electropmeumatc Valves ‘Commissioning and Assistance on ste _ Installation on ite + Uuities -Power , Mechanic ,Hydraulch and Pneumatic cy Overhead NOVIDON Costs 24 —a ‘ADPendiCes [sheet parameters wil determine whats needed] no project description needed Financial indicators [worksheet Calculation will soni hare] Depreciation period [Yrs]: 10.0 Payback period {Yrs}: [__2.9 Return On Investment: 35.0% Net Present Value: [ 619 ariae —fainaats tion en cues lence aug eoboc Pevelsionee _frter tives! 23 oF Lodo

You might also like