rerra URd edt sdfdeoca fafties Wile Bharat Heavy Electricals Limited ‘URUU QIOR UAB, /TBG ff ear construction Management 400/220kV substation extension, Mysore Ref: TBSS/MYSORE/NOTICE/SLOW PROGRESS Date 29.10.2020 To, M/s Sri Sai Sadguru Engineering and Erectors #9-636-6, Rounaq Complex, Mydukur Road Proddatur-516360 Dist: Kadapa (Andhra Pradesh) Kind Attn: Sh. P. Nageswara Rao ‘Sub: Balance civil works of 400KV switchyard inclucing reactor and SPR for 400/220kV substation extension at Mysore in Karnataka: Notice regarding slow progress of work. Reference 1. Work Order: TBSM/ MYSORE/BAL_CIVIL/WC/01/20-21, Date 30.04.2020 Dear Sir, This is in reference to subject work awarded to you vide work order, dated 30.04.2020. BHEL has already requested you over phones and various emails to purchase the materials and deploy sufficient manpower to complete the balance work. It has been observed that despite various commitments, no action has been taken by M/s Sri Sai Sadguru Engineering and Erectors. As per your request, the detail specification and sources of materials have also been communicated to you. The time extension granted to you has already been expired on 30.09.2020. As on date following works are still balance: é SN | item Status Issue 1_| Road PCC Kerb stone = [Labour not available | 2 [Chain link] Only poles ere works completed. | Wire mesh not fencing Plastering work for 230 mtrs length and fixing of wire | purchased. Labour not | mesh and flat for 145 mts. lergth is balance. | available. 3 | Earth pit cover | 27 nos. earth pit cover balance | Material not purchased a = | Labour not available. It is once again requested to procure the required material and deploy sufficient manpower to complete the balance work at the earliest. In case no positive steps are taken by M/s Sri Sai Sadguru Engineering & Erectors to expedite the work, BHEL will be left with no other option but to execute the balance work at ‘Risk and Cost’ of M/s Sri Sai Sadiguru Engineering & Erectors as per terms and conditions of the contract for civil works ywtraye* (Nandial Vermnay Sr. Manager/ TBS Copy to: AGM/TBSM, Noida: For necessary action GM/ TSS, TBWS & TBTS

You might also like