You are on page 1of 2

DAFTAR PUSTAKA

Abdou, A., Haggag, M., & Al Khatib, O. (2016). Use of Building Defect Diagnosis in
Construction Litigation: Case Study of a Residential Building. Journal of Legal Affairs and
Dispute Resolution in Engineering and Construction, 8(1), 1–11.
https://doi.org/10.1061/(asce)la.1943-4170.0000177
Alone, R. continues to affect both cost and schedule performance throughout the construction
industry. T. direct costs, Industry, often tally to 5% of the total construction costs. U. the data
obtained from 359 construction projects in the C., Institute database, this paper assesses the
impacts of rework on construction cost performance for projects in various categories. I.,
addition, it identifies the sources of this rework, permitting further analyses and the development
of rework reduction initiatives. T., Having, results of this study establish that the impacts of
rework differ according to project characteristics and that the sources of rework, the greatest
impact are not significantly different among project categories. By recognizing the impacts of
rework and its sources, T., & Performance., construction industry can reduce rework and
ultimately improve project cost. (2009). Measuring the Impact of Rework on Construction.pdf.
March, 187–198. https://doi.org/10.1061/_ASCE_0733-9364_2009_135:3_187
Hyun, H., Kim, H., Lee, H. S., Park, M., & Lee, J. (2020). Integrated design process for modular
construction projects to reduce rework. Sustainability (Switzerland), 12(2), 1–19.
https://doi.org/10.3390/su12020530
Ika, L. A., Luo, H., & Zhou, Y. (2020). Rework , Failures and Unsafe Behavior : Moving
Toward an Error Management Mindset in Construction. March.
Jing, W., Naji, H. I., Zehawi, R. N., Ali, Z. H., Al-Ansari, N., & Yaseen, Z. M. (2019). System
dynamics modeling strategy for civil construction projects: The concept of successive legislation
periods. Symmetry, 11(5), 1–18. https://doi.org/10.3390/sym11050677
Kiani, H., Hosseini, S. H., & Abdi, F. (2018). A Model to Investigate the Effect of Work Ethic
Culture on Dynamics of Rework in Management of Projects. Interdisciplinary Description of
Complex Systems, 16(1), 40–59. https://doi.org/10.7906/indecs.16.1.3
Li, Y., & Taylor, T. R. B. (2014). Modeling the impact of design rework on transportation
infrastructure construction project performance. Journal of Construction Engineering and
Management, 140(9). https://doi.org/10.1061/(ASCE)CO.1943-7862.0000878
Love, P. E.D., Ackermann, F., Carey, B., Morrison, J., Ward, M., & Park, A. (2016). Praxis of
rework mitigation in construction. Journal of Management in Engineering, 32(5).
https://doi.org/10.1061/(ASCE)ME.1943-5479.0000442
Love, P. E.D., Holt, G. D., Shen, L. Y., Li, H., & Irani, Z. (2002). Using systems dynamics to
better understand change and rework in construction project management systems. International
Journal of Project Management, 20(6), 425–436. https://doi.org/10.1016/S0263-7863(01)00039-
4
Love, Peter E.D. (2020). Creating a mindfulness to learn from errors: Enablers of rework
containment and reduction in construction. Developments in the Built Environment, 1, 100001.
https://doi.org/10.1016/j.dibe.2019.100001
Love, Peter E.D., Irani, Z., & Edwards, D. J. (2004). A rework reduction model for construction
projects. IEEE Transactions on Engineering Management, 51(4), 426–440.
https://doi.org/10.1109/TEM.2004.835092
Madusanka, N., Siriwardana, C., & Karunarathna CSA Siriwardana, D. (2019). Errors and
Reworks Reduction Framework for High Rise Building Construction Projects. October.
https://www.researchgate.net/publication/336770844
Mills, A., Love, P. E. D., & Williams, P. (2009). Defect costs in residential construction. Journal
of Construction Engineering and Management, 135(1), 12–16.
https://doi.org/10.1061/(ASCE)0733-9364(2009)135:1(12)
Newton, L. A., & Christian, J. (2006). Impact of quality on building costs. Journal of
Infrastructure Systems, 12(4), 199–206. https://doi.org/10.1061/(ASCE)1076-
0342(2006)12:4(199)
Palaneeswaran, E. (2006). Reducing Rework to Enhance Project. Proceedings of the One Day
Seminar on Recent Developments in Project Management in Hong Kong, Hong Kong (10 Pp.).,
c, 1–10.
Sugiharto Alwi, K. H. and S. M. (1999). Investigation Into the Relationship Between Rework
and Site Supervision in High Rise Building Construction in Indonesia. 2nd CPR,Sydney, 1999,
1–7.
Taneja, P. (2019). Identification of the Manageable Construction Rework Indicators. April.
Trach, R., Pawluk, K., & Lendo-Siwicka, M. (2019). Causes of Rework in Construction Projects
in Ukraine. Archives of Civil Engineering, 65(3), 61–74. https://doi.org/10.2478/ace-2019-0034
Yehiel, R. (2013). Root-Cause Analysis of Construction-Cost Overruns. Journal of Construction
Engineering and Management, 138(January), 51–60. https://doi.org/10.1061/(ASCE)CO
Zhang, S., Duan, H., Zhao, X., Xia, B., Feng, Y., & Galvin, S. (2018). Learning on rework
management of construction projects: a case study. International Journal of Construction
Management, 0(0), 1–15. https://doi.org/10.1080/15623599.2018.1521361

You might also like