PERINCIAN BIAYA LANGSUNG PERSONIL

A. TEAM LEADER
1 Gaji Dasar 2,000,000.00
2 Beban Biaya Sosial 0.4 X GD 800,000.00
3 Beban Biaya Umum 1 X GD 2,000,000.00
4 Tunjangan Penugasan 0.3 X GD 600,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU 480,000.00
TOTAL 5,880,000.00

B. ARSITECTURE ENGINEER
1 Gaji Dasar 1,500,000.00
2 Beban Biaya Sosial 0.35 X GD 525,000.00
3 Beban Biaya Umum 0.9 X GD 1,350,000.00
4 Tunjangan Penugasan 0.2 X GD 300,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU 337,500.00
TOTAL 4,012,500.00

C. STRUCTURE ENGINEER
1 Gaji Dasar 1,500,000.00
2 Beban Biaya Sosial 0.35 X GD 525,000.00
3 Beban Biaya Umum 0.9 X GD 1,350,000.00
4 Tunjangan Penugasan 0.2 X GD 300,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU 337,500.00
TOTAL 4,012,500.00

D. GEODETIC ENGINEER
1 Gaji Dasar 1,500,000.00
2 Beban Biaya Sosial 0.35 X GD 525,000.00
3 Beban Biaya Umum 0.9 X GD 1,350,000.00
4 Tunjangan Penugasan 0.2 X GD 300,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU 337,500.00
TOTAL 4,012,500.00

E. COST & QUANTITY ESTIMATOR


1 Gaji Dasar 1,500,000.00
2 Beban Biaya Sosial 0.35 X GD 525,000.00
3 Beban Biaya Umum 0.9 X GD 1,350,000.00
4 Tunjangan Penugasan 0.2 X GD 300,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU 337,500.00
TOTAL 4,012,500.00
F. ASS. AHLI TEKNIK PENGUKURAN
1 Gaji Dasar 1,000,000.00
2 Beban Biaya Sosial 0.3 X GD 300,000.00
3 Beban Biaya Umum 0.75 X GD 750,000.00
4 Tunjangan Penugasan 0.2 X GD 200,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU 205,000.00
TOTAL 2,455,000.00

G. ASS. STRUCTURE
1 Gaji Dasar 1,000,000.00
2 Beban Biaya Sosial 0.3 X GD 300,000.00
3 Beban Biaya Umum 0.75 X GD 750,000.00
4 Tunjangan Penugasan 0.2 X GD 200,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU 205,000.00
TOTAL 2,455,000.00

H. ASS. AHLI KUANTITAS DAN HARGA


1 Gaji Dasar 1,000,000.00
2 Beban Biaya Sosial 0.3 X GD 300,000.00
3 Beban Biaya Umum 0.75 X GD 750,000.00
4 Tunjangan Penugasan 0.2 X GD 200,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU 205,000.00
TOTAL 2,455,000.00

I. DRAFTMAN
1 Gaji Dasar 750,000.00
2 Beban Biaya Sosial 0.35 X GD 262,500.00
3 Beban Biaya Umum 0.5 X GD 375,000.00
4 Tunjangan Penugasan 0.1 X GD 75,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU 138,750.00
TOTAL 1,601,250.00
REKAPITULASI

Satuan Kerja : Dinas Perumahan dan Kawasan Permukiman Provinsi Maluku Utara
Nama Paket : Perencanaan Pembangunan Pengaman Kawasan Pemukiman Togome
Oba Tengah Tidore Kepulauan
Lokasi : Tidore Kepulauan
Sumber Dana : APBD Tahun Anggaran 2019

JUMLAH HARGA
NO URAIAN
Rp

1 BIAYA LANGSUNG PERSONIL 27,683,400.00


2 BIAYA LANGSUNG NON ` 17,600,000.00
TOTAL 45,283,400.00
PPN 10 % 4,528,340.00
TOTAL ( Termasuk PPN ) 49,811,740.00
DIBULATKAN 49,812,000.00
Terbilang : Empat Puluh Sembilan Juta Delapan Ratus Dua Belas ribu Rupiah

Ternate, 10 Desember 2018


CV. ALENADA PLANNING

(WIJOYO SANTOSO.ST)
Direktur
RENCANA ANGGARAN BIAYA

Satuan Kerja : Dinas Perumahan dan Kawasan Permukiman Provinsi Maluku Utara
Nama Paket : Perencanaan Pembangunan Pengaman Kawasan Pemukiman Togome Oba Tengah Tid
Lokasi : Tidore Kepulauan
Sumber Dana : APBD Tahun Anggaran 2019

JUMLAH
N HARGA JUMLAH HARGA
URAIAN PERSONI SATUAN VOL.
O SATUAN (Rp) (Rp)
L
A BIAYA LANGSUNG PERSONIL
I Profesional Staff/Tenaga Ahli
1 Team Leader 1.00 OB 1.00 12,232,200.00 12,232,200.00
JUMLAH A.I 12,232,200.00
II Suporting Staff/Tenaga Pendukung
1 Estimator 1.00 OB 1.00 5,150,400.00 5,150,400.00
2 Operator CAD/Drafter 1.00 OB 5,150,400.00
1.00 5,150,400.00
3 Surveyor/Teknik Lapangan 1.00 OB 5,150,400.00
1.00 5,150,400.00
JUMLAH A.II 15,451,200.00
JUMLAH BIYA LAMGSUNG PERSONIL 27,683,400.00
B BIAYA LANGSUNG NON PERSONIL
I Biaya Perjalanan Survey dan Presentasi
1 Transport Tenaga Ahli Org/Trip 1.00 3,500,000.00 3,500,000.00
2 Transport Tenaga Surveyor Org/Trip 1.00 2,500,000.00 2,500,000.00
3 Transport Tenaga Estimator Org/Trip 1.00 2,500,000.00 2,500,000.00
JUMLAH B.I 8,500,000.00
II Biaya Operasional Kantor
1 ATK Bulan 1.00 1,100,000.00 1,100,000.00
2 Komputer dan Printer Unit-Bulan 1.00 1,500,000.00 1,500,000.00
3 Sewa Kendaraan Roda 2 Unit-Bulan 1.00 2,500,000.00 2,500,000.00
4 Komunikasi (Fax, Telepon, Seluler) Bulan 1.00 1,000,000.00 1,000,000.00
JUMLAH B.II 6,100,000.00
III Biaya Penggandaan Dokumen
1 Laporan Akhir
- Dokumen Buku 3 250,000.00 750,000.00
- Gambar Buku 3 250,000.00 750,000.00
- Rencana Buku 3 250,000.00 750,000.00
- Spesifika Buku 3 250,000.00 750,000.00
JUMLAH B.III 3,000,000.00
JUMLAH BIYA LANGSUNG ON PERSONIL 17,600,000.00
Beban Biaya Beban Biaya Jasa Keuntungan
Lamanya Gaji Dasar Sosial Umum Sub Total K Tunjangan Biaya Langsung
NO POSISI/JABATAN Pengalaman (BBS) (BBU) 0,1x(GD+BBS+BBU) Penugasan
Keahlian (GD) (Sosial Change) (Overhead) GD+BBS+BBU (TP) Personil
(Tahun) 0,3 x GD 0,56 x GD
1 2 3 4 5 = 0,3 x 3 6 = 0,56 x 3 7=3+4+5 8 = 10% x 6 9 10 = 6 + 7 + 8
PROFESIONAL STAFF/TENAGA AHLI
1 Team Leader 5 s/d 8 5,700,000.00 1,710,000.00 3,192,000.00 10,602,000.00 1,060,200.00 570,000.00 12,232,200.00
2 Ahli Arsitek 5 s/d 8 1,400,000.00 420,000.00 784,000.00 2,604,000.00 260,400.00 140,000.00 3,004,400.00
3 Ahli Struktur 5 s/d 8 1,400,000.00 420,000.00 784,000.00 2,604,000.00 260,400.00 140,000.00 3,004,400.00
4 Ahli Teknik Kuantitas dan Biaya/Estimator 5 s/d 8 1,400,000.00 420,000.00 784,000.00 2,604,000.00 260,400.00 140,000.00 3,004,400.00

SUB PROFESIONAL STAFF/ASS. TENAGA AHLI


1 Ass. Ahli Arsitek 4 s/d 7 4,650,000.00 1,395,000.00 2,604,000.00 8,649,000.00 864,900.00 465,000.00 9,978,900.00
2 Ass. Ahli Struktur 4 s/d 7 4,650,000.00 1,395,000.00 2,604,000.00 8,649,000.00 864,900.00 465,000.00 9,978,900.00
3 Ass. Ahli Teknik Kuantitas dan Biaya/Estimator 4 s/d 7 4,650,000.00 1,395,000.00 2,604,000.00 8,649,000.00 864,900.00 465,000.00 9,978,900.00

SUPPORTING STAFF/TENAGA PENUNJANG


1 Juru Gambar/Operator CAD 4 s/d 7 2,400,000.00 720,000.00 1,344,000.00 4,464,000.00 446,400.00 240,000.00 5,150,400.00
2 Surveyor/Teknisi Lapangan 4 s/d 7 2,400,000.00 720,000.00 1,344,000.00 4,464,000.00 446,400.00 240,000.00 5,150,400.00
3 Operator Komputer 3 2,400,000.00 720,000.00 1,344,000.00 4,464,000.00 446,400.00 240,000.00 5,150,400.00
4 Administrasi 3 2,400,000.00 720,000.00 1,344,000.00 4,464,000.00 446,400.00 240,000.00 5,150,400.00
5 Ofiice Boy 3 250,000.00 75,000.00 140,000.00 465,000.00 46,500.00 25,000.00 536,500.00
REKAPITULASI
OWNER ESTIMATE (OE)

PROGRAM #REF!
PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN GEDUNG KANTOR PENGADILAN AGAMA LABUHA
LOKASI #REF!
TAHUN ANGGARAN #REF!

JUMLAH HARGA
NO URAIAN
Rp
I BIAYA LANGSUNG PERSONIL

1 Professional Staff : 48,285,000.00

2 Sub-Professional Staff : 64,380,000.00

SUB-TOTAL I 112,665,000.00
II BIAYA LANGSUNG NON PERSONIL

1 Biaya Kantor 27,500,000.00

2 Biaya Perjalanan Dinas 30,000,000.00

3 Biaya Laporan 20,352,300.00

SUB-TOTAL II 77,852,300.00
TOTAL 190,517,300.00
PPN 10 % 19,051,730.00
TOTAL ( Termasuk PPN ) 209,569,030.00
DIBULATKAN 209,569,000.00
TERBILANG : Dua Ratus Sembilan Juta Lima Ratus Enam Puluh Sembilan Ribu Rupiah

Labuha,…………………….2015

PEJABAT PEMBUAT KOMITMEN

UMAR YAHYA,S.IP
NIP.196307091989021001
RINCIAN ANGGARAN BIAYA
PROGRAM #REF!
PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN GEDUNG KANTOR PENGADILAN AGAMA LABUHA
LOKASI #REF!
TAHUN ANGGARAN #REF!

HARGA SATUAN JUMLAH HARGA


NO URAIAN SAT Vol. BULAN
Rp Rp
I BIAYA LANGSUNG PERSONIL
A Professional Staff :
1 Site Engineer OB 1 5 9,657,000.00 48,285,000.00
JUMLAH A 48,285,000.00
B Sub-Professional Staff :
1 Inspector ( 2 orang ) OB 2 5 5,365,000.00 53,650,000.00
2 Administrasi ( 1 orang ) OB 1 5 2,146,000.00 10,730,000.00
JUMLAH B 64,380,000.00
II BIAYA LANGSUNG NON PERSONIL
A Biaya Kantor
1 Biaya Alat Tulis Kantor Bln 1 5 5,500,000.00 27,500,000.00
JUMLAH A 27,500,000.00
B Biaya Akomodasi dan Perumahan
1 Site Engineer OB 1 5 2,000,000.00 10,000,000.00
2 Tenaga Pendukung OB 2 5 2,000,000.00 20,000,000.00
JUMLAH B 30,000,000.00
C Biaya Laporan
1 Laporan Bulanan (Dokumentasi & Administrasi) Buku 3 5 1,000,000.00 15,000,000.00
2 Laporan Akhir Buku 3 1 1,784,100.00 5,352,300.00

JUMLAH C 20,352,300.00
PERINCIAN BIAYA LANGSUNG PERSONIL

A. SITE ENGINEERING
1 Gaji Dasar 1,000,000.00
2 Beban Biaya Sosial 0.4 X GD 400,000.00
3 Beban Biaya Umum 1 X GD 1,000,000.00
4 Tunjangan Penugasan 0.3 X GD 300,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU) 240,000.00
TOTAL 2,940,000.00

B. CHIEF INSPECTOR
1 Gaji Dasar 750,000.00
2 Beban Biaya Sosial 0.35 X GD 262,500.00
3 Beban Biaya Umum 0.9 X GD 675,000.00
4 Tunjangan Penugasan 0.2 X GD 150,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU) 168,750.00
TOTAL 2,006,250.00

C SURVEYOR
1 Gaji Dasar 450,000.00
2 Beban Biaya Sosial 0.3 X GD 135,000.00
3 Beban Biaya Umum 0.75 X GD 337,500.00
4 Tunjangan Penugasan 0.2 X GD 90,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU) 92,250.00
TOTAL 1,104,750.00

D INSPECTOR
1 Gaji Dasar 450,000.00
2 Beban Biaya Sosial 0.3 X GD 135,000.00
3 Beban Biaya Umum 0.75 X GD 337,500.00
4 Tunjangan Penugasan 0.2 X GD 90,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU) 92,250.00
TOTAL 1,104,750.00