A. TEAM LEADER
1 Gaji Dasar 2,000,000.00
2 Beban Biaya Sosial 0.4 X GD 800,000.00
3 Beban Biaya Umum 1 X GD 2,000,000.00
4 Tunjangan Penugasan 0.3 X GD 600,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU 480,000.00
TOTAL 5,880,000.00
B. ARSITECTURE ENGINEER
1 Gaji Dasar 1,500,000.00
2 Beban Biaya Sosial 0.35 X GD 525,000.00
3 Beban Biaya Umum 0.9 X GD 1,350,000.00
4 Tunjangan Penugasan 0.2 X GD 300,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU 337,500.00
TOTAL 4,012,500.00
C. STRUCTURE ENGINEER
1 Gaji Dasar 1,500,000.00
2 Beban Biaya Sosial 0.35 X GD 525,000.00
3 Beban Biaya Umum 0.9 X GD 1,350,000.00
4 Tunjangan Penugasan 0.2 X GD 300,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU 337,500.00
TOTAL 4,012,500.00
D. GEODETIC ENGINEER
1 Gaji Dasar 1,500,000.00
2 Beban Biaya Sosial 0.35 X GD 525,000.00
3 Beban Biaya Umum 0.9 X GD 1,350,000.00
4 Tunjangan Penugasan 0.2 X GD 300,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU 337,500.00
TOTAL 4,012,500.00
G. ASS. STRUCTURE
1 Gaji Dasar 1,000,000.00
2 Beban Biaya Sosial 0.3 X GD 300,000.00
3 Beban Biaya Umum 0.75 X GD 750,000.00
4 Tunjangan Penugasan 0.2 X GD 200,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU 205,000.00
TOTAL 2,455,000.00
I. DRAFTMAN
1 Gaji Dasar 750,000.00
2 Beban Biaya Sosial 0.35 X GD 262,500.00
3 Beban Biaya Umum 0.5 X GD 375,000.00
4 Tunjangan Penugasan 0.1 X GD 75,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU 138,750.00
TOTAL 1,601,250.00
REKAPITULASI
Satuan Kerja : Dinas Perumahan dan Kawasan Permukiman Provinsi Maluku Utara
Nama Paket : Perencanaan Pembangunan Pengaman Kawasan Pemukiman Togome
Oba Tengah Tidore Kepulauan
Lokasi : Tidore Kepulauan
Sumber Dana : APBD Tahun Anggaran 2019
JUMLAH HARGA
NO URAIAN
Rp
(WIJOYO SANTOSO.ST)
Direktur
RENCANA ANGGARAN BIAYA
Satuan Kerja : Dinas Perumahan dan Kawasan Permukiman Provinsi Maluku Utara
Nama Paket : Perencanaan Pembangunan Pengaman Kawasan Pemukiman Togome Oba Tengah Tid
Lokasi : Tidore Kepulauan
Sumber Dana : APBD Tahun Anggaran 2019
JUMLAH
N HARGA JUMLAH HARGA
URAIAN PERSONI SATUAN VOL.
O SATUAN (Rp) (Rp)
L
A BIAYA LANGSUNG PERSONIL
I Profesional Staff/Tenaga Ahli
1 Team Leader 1.00 OB 1.00 12,232,200.00 12,232,200.00
JUMLAH A.I 12,232,200.00
II Suporting Staff/Tenaga Pendukung
1 Estimator 1.00 OB 1.00 5,150,400.00 5,150,400.00
2 Operator CAD/Drafter 1.00 OB 5,150,400.00
1.00 5,150,400.00
3 Surveyor/Teknik Lapangan 1.00 OB 5,150,400.00
1.00 5,150,400.00
JUMLAH A.II 15,451,200.00
JUMLAH BIYA LAMGSUNG PERSONIL 27,683,400.00
B BIAYA LANGSUNG NON PERSONIL
I Biaya Perjalanan Survey dan Presentasi
1 Transport Tenaga Ahli Org/Trip 1.00 3,500,000.00 3,500,000.00
2 Transport Tenaga Surveyor Org/Trip 1.00 2,500,000.00 2,500,000.00
3 Transport Tenaga Estimator Org/Trip 1.00 2,500,000.00 2,500,000.00
JUMLAH B.I 8,500,000.00
II Biaya Operasional Kantor
1 ATK Bulan 1.00 1,100,000.00 1,100,000.00
2 Komputer dan Printer Unit-Bulan 1.00 1,500,000.00 1,500,000.00
3 Sewa Kendaraan Roda 2 Unit-Bulan 1.00 2,500,000.00 2,500,000.00
4 Komunikasi (Fax, Telepon, Seluler) Bulan 1.00 1,000,000.00 1,000,000.00
JUMLAH B.II 6,100,000.00
III Biaya Penggandaan Dokumen
1 Laporan Akhir
- Dokumen Buku 3 250,000.00 750,000.00
- Gambar Buku 3 250,000.00 750,000.00
- Rencana Buku 3 250,000.00 750,000.00
- Spesifika Buku 3 250,000.00 750,000.00
JUMLAH B.III 3,000,000.00
JUMLAH BIYA LANGSUNG ON PERSONIL 17,600,000.00
Beban Biaya Beban Biaya Jasa Keuntungan
Lamanya Gaji Dasar Sosial Umum Sub Total K Tunjangan Biaya Langsung
NO POSISI/JABATAN Pengalaman (BBS) (BBU) 0,1x(GD+BBS+BBU) Penugasan
Keahlian (GD) (Sosial Change) (Overhead) GD+BBS+BBU (TP) Personil
(Tahun) 0,3 x GD 0,56 x GD
1 2 3 4 5 = 0,3 x 3 6 = 0,56 x 3 7=3+4+5 8 = 10% x 6 9 10 = 6 + 7 + 8
PROFESIONAL STAFF/TENAGA AHLI
1 Team Leader 5 s/d 8 5,700,000.00 1,710,000.00 3,192,000.00 10,602,000.00 1,060,200.00 570,000.00 12,232,200.00
2 Ahli Arsitek 5 s/d 8 1,400,000.00 420,000.00 784,000.00 2,604,000.00 260,400.00 140,000.00 3,004,400.00
3 Ahli Struktur 5 s/d 8 1,400,000.00 420,000.00 784,000.00 2,604,000.00 260,400.00 140,000.00 3,004,400.00
4 Ahli Teknik Kuantitas dan Biaya/Estimator 5 s/d 8 1,400,000.00 420,000.00 784,000.00 2,604,000.00 260,400.00 140,000.00 3,004,400.00
PROGRAM #REF!
PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN GEDUNG KANTOR PENGADILAN AGAMA LABUHA
LOKASI #REF!
TAHUN ANGGARAN #REF!
JUMLAH HARGA
NO URAIAN
Rp
I BIAYA LANGSUNG PERSONIL
SUB-TOTAL I 112,665,000.00
II BIAYA LANGSUNG NON PERSONIL
SUB-TOTAL II 77,852,300.00
TOTAL 190,517,300.00
PPN 10 % 19,051,730.00
TOTAL ( Termasuk PPN ) 209,569,030.00
DIBULATKAN 209,569,000.00
TERBILANG : Dua Ratus Sembilan Juta Lima Ratus Enam Puluh Sembilan Ribu Rupiah
Labuha,…………………….2015
UMAR YAHYA,S.IP
NIP.196307091989021001
RINCIAN ANGGARAN BIAYA
PROGRAM #REF!
PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN GEDUNG KANTOR PENGADILAN AGAMA LABUHA
LOKASI #REF!
TAHUN ANGGARAN #REF!
JUMLAH C 20,352,300.00
PERINCIAN BIAYA LANGSUNG PERSONIL
A. SITE ENGINEERING
1 Gaji Dasar 1,000,000.00
2 Beban Biaya Sosial 0.4 X GD 400,000.00
3 Beban Biaya Umum 1 X GD 1,000,000.00
4 Tunjangan Penugasan 0.3 X GD 300,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU) 240,000.00
TOTAL 2,940,000.00
B. CHIEF INSPECTOR
1 Gaji Dasar 750,000.00
2 Beban Biaya Sosial 0.35 X GD 262,500.00
3 Beban Biaya Umum 0.9 X GD 675,000.00
4 Tunjangan Penugasan 0.2 X GD 150,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU) 168,750.00
TOTAL 2,006,250.00
C SURVEYOR
1 Gaji Dasar 450,000.00
2 Beban Biaya Sosial 0.3 X GD 135,000.00
3 Beban Biaya Umum 0.75 X GD 337,500.00
4 Tunjangan Penugasan 0.2 X GD 90,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU) 92,250.00
TOTAL 1,104,750.00
D INSPECTOR
1 Gaji Dasar 450,000.00
2 Beban Biaya Sosial 0.3 X GD 135,000.00
3 Beban Biaya Umum 0.75 X GD 337,500.00
4 Tunjangan Penugasan 0.2 X GD 90,000.00
5 Keuntungan 0.1 X (GD+BBS+BBU) 92,250.00
TOTAL 1,104,750.00