Base Weight COG

(T) x

Water depth
Dry weight 675
Lift weight 720.5
Load out weight
SLWJ01 Jacket LSF/skid shoes weight
Piles 648
Conductors
Boat landing 40
Shiploose items 9.8
SLWJ01

Dry weight
SLWJ01 Topside Lift weight 798.5
Load out weight
LSF/skid shoes weight
Shiploose items

Dry weight 244.9


Lift weight 260.9
CPWA07 CPWA07 Module
Load out weight
LSF/ skid shoes weight 16
Shiploose items

Water depth
Dry weight 717.17
Lift weight 776.13
Load out weight
Egret Jacket LSF/skid shoes weight
Piles 743.9
Conductors
Boat landing 36.5
Shiploose items 9
Egret
Egret

Dry weight
Egret Topside Lift weight 425.8
Load out weight
LSF/skid shoes weight
Shiploose items
Rev - Pre Bid
COG Factors Factored weight COG
y z (T) x y z

46m
1.2 810
1.2 864.6

1.2 777.6

1.2 48
1.2 11.76

1.2 958.2

1.2 293.88
1.2 313.08

1.2 19.2

60m
1.2 860.604
1.2 931.356

1.2 892.68

1.2 43.8
1.2 10.8
1.2 510.96
Design/ Drawings Remarks Base Weight COG
(T) x
Drawings: Elevation/ Framing/
Pile make up

OD 1372

Heli deck/ Main deck/ Mezz deck/


Cellar deck/ Sub deck
Span: 13.716 x 13.716 m

EL +0.00/ EL +4.00/ EL +8.00


Span: 14.7m x 9.6m

Drawings: Elevation/ Framing/


Pile make up

OD 1067
Main deck/ Mezz deck/ Cellar
deck/ Sub deck
Span: 12.192 x 12.192 m