Employer: Contractor: Engineer:

INSPECTION REQUEST IR No.: Date:


PROJECT: PROJECT NO.:
ENGINEER:
Architectural Structural MEP Testing Others (Specify…)
Inspection Requested at: Time : Date:
Location: Bldg.: Drawing Ref. No.:
Item :

Works ready for inspection by Time: Date:


Relevant personnel Name Signature Date
Project Manager
MEP
QA/QC
Surveyor
Sub-contractor
ENGINEER'S INSPECTION REPORT
A B C D
Aproved as Noted Revise & Re-submit
Approved as Submitted Rejected
Incorporate & Proceed before work proceed
Inspection Carried Out: Time: Date:
Engineer's Comments:

Inspected By Name & Signature


Structural Engineer
MEP Engineer
Architectural Engineer

Inspection Request should be submitted 24 hours prior to inspection


Received by contractor (Please sign below, Retain Original & Return Copy)
Name: Signature: Date: