Professional Documents
Culture Documents
Audit Plan IMS
Audit Plan IMS
Organization:
Energoprojekt - Niskogradnja A.D.
Organizacija:
Address:
Bulevar Mihaila Pupina 12, 11070 Novi Beograd, Serbia
Adresa:
Audit type:
SA
Vrsta provere:
Visit Number: Actual Visit Date:
03 07.07.2020.
Broj posete: Datum provere:
Visit Due by Date:
For auditor information only
Očekivani datum /
Informacije samo za proveravače
posete:
Lead Auditor:
Vodeći EMS: Ivana Kalajdžić (IK)
proveravač:
QMS: Marko Jeknić (MJ), Zlatko Janković (ZJ) QM28.2
Team Members:
EMS: Zoran Karapandža (ZK)
Članovi tima:
OHS: Jovana Zečević (JZ), Slavenka Javorina (SJ), Mirko Gavrilović OH1
Additional
Attendees and
Roles: Technical Expert – Mladen Čalija EM29
Ostali učesnici i
njihove uloge:
Standards:
ISO 9001:2015; ISO 14001:2015; ISO 45001:2018
Standardi:
Audit Language:
Serbian / Srpski
Jezik provere:
Audit Scope: Civil engineering and contracting.
Predmet provere: Izvođenje radova i inženjering objekata niskogradnje.
Audit objectives: To determine conformity of the management system, or parts of it with audit criteria and its:
- ability to ensure applicable statutory, regulatory and contractual requirements are met,
- effectiveness to ensure the client can reasonably expect to achieve specified objectives
and to identify as applicable areas for potential improvement.
Ciljevi provere: Da se utvrdi nivo usaglašenosti sistema menadžmenta, ili njegovih delova sa kriterijumima provere i
njegova:
- sposobnost da ispuni zahteve iz primenljivih zakona, propisa i ugovora,
- efektivnost koja osigurava da organizacija može da očekuje ostvarenje postavljenih ciljeva i da identifikuje oblasti
za potencijalno poboljšavanje.
Date Time Auditor Organisational and Functional Units/ Processes and Activities Key Contact
Datum Vreme Proveravač Organizacione i funkcionalne jedinice/ Procesi i aktivnosti Kontakt
07.07.20. 0845 All/ Svi Arrive on site/ Dolazak na lokaciju
Opening meeting/ Uvodni sastanak
0900 All/ Svi -Introduction/ Predstavljanje
-Scope of the audit/ Područje provere
0915 MJ Top Management / Najviše rukovodstvo QMS
- Context of the organization/ Kontekst organizacije
- Interested parties/ Zainteresovane strane
Notes to Client:
Times are approximate and will be confirmed at the opening meeting prior to commencement of the audit.
SGS auditors reserve the right to change or add to the elements listed before or during the audit depending on the results of on-site
investigation.
A private place for preparation, review and conferencing is requested for the auditor’s use.
Your contract with SGS is an integral part of this audit plan and details confidentiality arrangements, audit scope, information on follow
up activities and any special reporting requirements.
Napomene za klijenta:
Vremena su okvirna i biće konačno utvrđena tokom uvodnog sastanka pre početka provere.
SGS proveravači zadržavaju pravo da izmene ili dodaju pojedine elemente pre ili tokom provere zavisno od nalaza.
Potrebno je obezbediti odgovarajući prostor za rad tima proveravača.
Vaš ugovor sa SGS-om je integralni deo plana provere kao i poverljivi detalji oko područja primene, aktivnosti nakon provere i bilo kojih
posebnih zahteva oko izveštavanja.