‘warm alway Bigs 206-15 Hchihts POF Donoas
HIGHLIGHTS:
1) No inerease in passenger fares and freight charges
in Mumbai — Ahmedabad sector
3) Plan to hike speed of trains to 160 200 Kmph in 9 sectors
4) — Online platform for unreserved tickets
5) Online booking to support 7,200 tickets per minute; to allow 1.2 lakh users simultaneously
6) Combo parking-platform tickets at stations
2 4,000 women constables to be recruited to ensure personal safety of women; 17,000 RPF
constables to provide safety to passengers
8) Cleanliness budget up by 40% over the last year; CCTVs to be used at stations for monitoring
cleanliness
9) Battery-operated cars for differently-abled and senior citizens at major stations
10) Retiring room facility to be extended to all the stations
11) Feedback services through IVRS on food quality
12) Food can be ordered through SMS, phone; Food courts at major stations
13) Setting up of corpus fund for stations’ upkeep; RO drinking water in some stations & trains
14) Automatic door closing in mainline and suburban coaches
15) 58 new trains and extension of 11; 864 additional EMUs to be introduced in Mumbai over 2 years
16) FDI in railway projects, except in operations
17) FDI, domestic investments in rail infrastructure
atatexthiml charsel=ul-8,%69Cpt20syle%9D% 22padkngV3A%20 te %200pr%IBY.20mar gn -2AY-200px9.98%.200uine%eIAN2ONONENSBVZDIS- sy... 1M‘wesnos Raalway Budget 2014-15 H ghlighs POF Downlcas
18) Internet and workstation facilities on selected trains; Wi-Fi in Al, A category stations and in
selected trains
19) Railways university for technical and non-technical subjects
20) Some stations to be developed to international standards through PPP model
21) Parcel traffic to be segregated to separate terminals to make passenger traffic unhindered
22) Loss per passenger per kilometer up from 10% in 2000-01 to 23% in 2012-13
Study Daily Current Affairs here
23) Solar energy to be tapped at major stations
24) Highest ever plan layout of Rs.65,455 Crore for 2014-15
25) Expenditure in 2014-15 pegged at Rs. 149,176 Crore; Receipts in FY1S pegged at Rs. 1.64 lakh
Crore
26) Indian railways to become the largest freight carrier in the world
27) Social obligation of railways in 2013-14 was Rs. 20,000 Crore
28) Gross traffic receipts in 2013-14 was Rs. 12,35,558 Crore; Operating ratio was 94%
29) Indian railways spent Rs. 41,000 Crore in laying of 3700 Km of new lines in 10 years
30) Fare vision will bring in Rs.8000 Crore; need another Rs.9000 Crore for golden quadrilateral project
31) With 12,500 trains, railways move 23million passengers every day
32) Separate housekeeping wing at 50 major stations
33) Mechanized laundry will be introduced
atatexthiml charsel=ul-8,%9Cpt20syle%9D% 22padkngV3A%20 te %200px 9B. 20mar gn -2AY-200px9.38%200ulineTeIAN-2ONONENSBYZDS-sy.. 2M‘wesnos Raalway Budget 2014-15 H ghlighs POF Downlcas
34) Dedicated freight corridor in eastern and western corridors
35) 5400 unmanned level crossing removed
36) Tourist trains to be introduced to link all major places of tourist interests across the country
37) Ultrasonic system to detect problem in track
38) Diamond Quadrilateral project of high speed trains to connect all major metros
39) GIS mapping and digitization of railway Land. Extension of logistics support to various e-
Commerce companies
40) Facilitate milk through rail; Special milk transportation trains in association with Amul and National
Dairy Association Board
41) One ticket to reach from Delhi to Srinagar. Uddhampur to Banihal by bus and Banihal to Srinagar by
train,
42) Train connectivity to Char Dham
43) Paperless office of Indian railways in 5 years; digital reserve charts at stations
44) Ready-to-eat meals of reputed brands to be introduced in phased manners
New Services
New Trains
+17 Premium trains
+ 38 Express trains
+ 10P
+ 4MEMU
+ 3DEMU
ssenger trains
Extension and Increase in frequency
atatexthiml charsel=ul-8,%69CpM20syle%9D%22padkngV3A%20 te %-200px IBY. 20mar gn 2AY-200px9.8%.20oulineTeIAN-2ONONEN.SBYZDIS-sy.. 3M‘wesnos Raalway Budget 2014-15 H ghlighs POF Downlcas
+ 3 Extension of trains
+ 3 increase in frequency
Budget Estimates 2014-15
Freight loading of 1101 MT, 51 MT more than 2013-14
Growth in passenger traffic — 2%
Freight Earnings — 1,05,770 cr.
Passenger Eamings ~ 44,645 cr, after revenue foregone of 610 cr on account of rollback in monthly
season ticket fares
Total Receipts — 1,64,374 er; Total Expenditure — 1,49,176 er;
Pension estimated at 28,850 cr.
Dividend payment estimated at 9,135 er.
Operating Ratio to be 92.5%, an improvement of 1% over 2013-14
atatexthiml charsel=ut-8,%9CpM20syle%9D% 22padkng¥3A%20 te %200px IBY. 20mar gn 2AY-200px%.8%.200uineTeIAN2ONONEN.SBYZDS-sy.. 44