300 mm
Lebar pondasi (B) = 500 mm u
Tebal pondasi (d) = 150 mm 200 mm
Tulangan = dia8 - 200
Jumlah tul.per lebar pondasi = 4 bh
d=
150
C. Analisa
Data penyelidikan tanah gelam
g (Wet density) = 1.289 t/m3 f10-6m
f (angle of internal friction) = 4.5 o
Ng = 0 0.5
B=500
Mydoc/titip/jal/design/pondasi.xls
B^2 ³ Pu/s'lentur, B^2 = 205035 mm2
B = 453 mm
Mydoc/titip/jal/design/pondasi.xls
0.378
Mydoc/titip/jal/design/pondasi.xls
Design Pondasi Tanki Depo BBM Modul3 Blok V
A. Data teknis
Gaya aksial Perlu/vertikal (Pu) = 718.333 kg
Gaya aksial Perlu/horizontal (Ph) = 0 kg
Momen perlu (Mu) = 10 kgm
f'c = 22.5 Mpa
fy = 240 Mpa Pu
Lebar kolom (b) = 150 mm
dimensi Pondasi
Lebar pondasi (B) = 500 mm
Tebal pondasi (d) = 100 mm
B. Analisa
Berat tangki = 2000 kg M
u
Berat minyak tanah = 17430 kg b= ###
Berat sendiri plat (t:10 cm) = 2880 kg
Berat total = 22310 kg
d=
100
Daya dukung tanah + gelam = 18000 kg
Berat sisa (untuk satu kolom) = 718.333 kg
gelam
Data penyelidikan tanah f10-6m
g (Wet density) = 1.289 t/m3
f (angle of internal friction) = 4.5 o
500
Nq = 1 1.6
300
B=
Ng = 0 0.5
b
Untuk sudut geser (f) = 4.5 o
Nc = 7.14
Nq = 1.54
Ng = 0.45 B= 500 125 panjang po 500
qult = 1,3.c.Nc.+q.Nq+0,4.g.B.Ng = 0.466 kg/cm 2
lebar pon 500 mm
SF ( safety factor) = 1.5 D gelam 100 mm
qa tanah = qult/SF = 0.311 kg/cm 2
jml gelam 2 bh
Daya dukung gelamf10-600 = 0.02 kg/cm 2
x 125
Rencana jumlah gelam = 4 bh y 125
Daya dukung gelam totalf10-600 = 0.08 kg/cm2 luas perlu 62500
qa tanah + gelam = 0.391 kg/cm2 = 0.0391 N/mm2 jml gelam 2
Pu/B^2 <s'lentur jumlah gel 4
B^2 ³ Pu/s'lentur, B^2 = 183742 mm2
B = 429 mm
d=
200
Berat sisa (untuk satu kolom) = 288.295 kg
Gaya aksial Perlu/vertikal (Pu) = 288.295 kg
gelam
Data penyelidikan tanah f10-6m
g (Wet density) = 1.289 t/m3
f (angle of internal friction) = 4.5 o
1000
Nq = 1 1.6
300
B=
Ng = 0 0.5
b
Untuk sudut geser (f) = 4.5 o
Nc = 7.14
Nq = 1.54
Ng = 0.45 B= 1000 125 panjang po 500
qult = 1,3.c.Nc.+q.Nq+0,4.g.B.Ng = 0.469 kg/cm 2
lebar pon 500 mm
SF ( safety factor) = 1.5 D gelam 100 mm
qa tanah = qult/SF = 0.312 kg/cm 2
jml gelam 2 bh
Daya dukung T. Listrik DPC-9-100 = 1.233 kg/cm 2
x 125
Rencana jumlah T. Listrik = 2 bh y 125
Daya dukung T. Listrik total = 2.466 kg/cm2 luas perlu 62500
qa tanah + T. Listrik = 2.778 kg/cm2 = 0.2778 N/mm2 jml gelam 2
Pu/B^2 <s'lentur jumlah gel 4
B^2 ³ Pu/s'lentur, B^2 = 10376 mm2
B = 102 mm
A. Data teknis
Gaya aksial (b. mati+b. hidup) (Pu) = ### kg
Gaya aksial Perlu/horizontal (Ph) = 0 kg Pu
Momen perlu (M1) = 70 kgm
Mutu beton (K125 ,K175, K225) = 225 kg/cm2
fy = 320 Mpa Ph
Lebar kolom pondasi(b) = 60 cm
Lebar tiang pancang(b') = 35 cm
M
Lebar pile cap (B) = 220 cm u
Tebal pile cap (ht) = 60 cm
1 2
Penutup beton (Pb) = 7.5 cm
d=
60
B. Analisa
a.Tebal pile cap dan penulangan T.
Berat sendiri pile cap = 6970 kg Pancang
35x35
Beban pertiang (ada 4tiang) = 81742 kg
0.5 0.3 0.6 0.3 0.5
Geser Pons
h=ht-Pb = 52.5 cm B=220
luas bidang geser =4(b+h)*h = 4(60+h)*h T.
tbpu =Pu/(4(b+h)*h) <= t*bpu = 10.2 kg/cm2 < 15 Ok Pancang
35x35
Cek Geser
b
potongan 2-2 b
D2-2= Ptiang - berat sendiri kepala
= tiang
80323 kg
B=220
Cu = q
52.5 = 4.352 1 0.8
1.5*(48031.68) Tabel Cara kekuatan batas
2(0.5)*(2.2)*(225) Ir. Wiratman
d = 0.2 0.3
q = 0.088 1 P=81742.4kg
t*au = 2780 kg/cm 2
Amin=q*B*h*(2*0.5*mutu
t beton)
= 81.8 cm2
dicoba dia. Tul (d) = 14 mm
jarak = 9 cm
Luas tulan = 37.63 cm2 < 82 No Ok
Mydoc/titip/jal/design/pondasi.xls
A'=0.2*Amin = 16.4 cm2
dicoba dia. Tul (d) = 14 mm
jarak = 9 cm
Luas tulan = 37.63 cm2 > 16 Ok !!!
Mydoc/titip/jal/design/pondasi.xls
Design Pile Cap (Tanpa tulangan geser)
A. Data teknis
Gaya aksial (b. mati+b. hidup) (Pu) = 2028 kg
Momen perlu (M1) = 147 kgm Pu
Mutu beton (K125 ,K175, K225) = 175 kg/cm2
fy = 240 Mpa
Lebar kolom pondasi(b) = 20 cm Ph
Lebar tiang pancang(b') = 30 cm
d=
12
B. Analisa
a.Tebal pile cap dan penulangan T.
Berat sendiri pile cap = 1152 kg Pancang
35x35
Beban pertiang (ada 4tiang) = 1302 kg
akibat My 0.35 0.4 0.2 0.4 0.35
tiang 1,3 ----> tertarik keatas
P1 = P3 = 1229 kg B=200
tiang 2,4----> tertekan kebawah T.
P2 = P4 = 1376 kg Pancang
35x35
b
Geser Pons b
h=ht-Pb = 8 cm
B=200
Cek Geser
potongan 2-2 B=200
D2-2= Ptiang - berat sendiri kepala tiang kg
= -328.5
1 P=1376kg
Cu = 8 = 3.989
1.5*(938.4) Tabel Cara kekuatan batas
2(0.5)*(2)*(175) Ir. Wiratman
Mydoc/titip/jal/design/pondasi.xls
d = 0.2
q = 0.068
t*au = 2080 kg/cm2
Amin=q*B*h*(2*0.5*mutu
t beton)= 9.087 cm2
dicoba dia. Tul (d) = 10 mm
jarak = 15 cm
Luas tulan = 10.47 cm2 > 9.09 Ok !!!