Pilecap Grid L/C Fy Mx Mz

PC1 M5 103 1347.873 0 0


PC2 B6 104 2238.168 -1230.02 -109.155
B2 104 3484.004 -1220.67 38.933
G2 103 2722.432 -17.214 638.078
PC3 M3 102 3644.114 -30.219 644.736
PC4 L6 102 4866.357 -1.09 900.887
L6 105 4534.903 -814.441 -54.492
L3 103 5598.466 -21.63 662.907
M4 102 4561.406 -20.899 1400.688
D3 104 5422.583 -980.852 -3.837
D3 103 3082.587 -34.703 626.279
B3 101 5655.644 -35.703 -3.365
PC5 D6 105 4538 -825 -113
D6 103 3917 6.3 850
D2 104 4270.271 -980.648 44.523
L2 104 4072.335 -920.66 85.301
G6 103 4112.54 -6.259 902.127
M6 103 3801.22 0.42 852.493
PC6 B4 104 6657.326 -3147.94 -55.812
B4 103 5183.173 1.778 1291.58
D4 103 7523.374 -11.921 1353.567
PC7 Lift, J3 103 9748.85 -31.648 2340.78
PC8 J&L4 103 10737.1 48.353 2984.52
J&L4 108 6766.08 -4230.16 58.055