You are on page 1of 202

R E S U M E N GENERAL D E M E T R A D O S

OBRAS NUEVAS OBRAS EXTERIORES CERCOS E INGR


I.E.I. I.E.I N°1455 - PUEBLO NUEVO

TANQUE ELEVADO

HALL DE INGRESO
AREA DE JUEGOS

BIODEGESTOR

PORTADA DE
EXTERIORES
FORMACION
UBICACIÓN : PUEBLO NUEVO - SAN BENITO - CONTUMAZÁ - CAJAMARCA

CISTERNA Y
MODULO 1

MODULO 2

PATIO DE

INGRESO
PARCIAL

PARCIAL
OBRAS
ELABORADO :

ITEMS DESCRIPCION UND

VOLUMEN 01: INFRAESTRUCTURA


04 INSTALACIONES SANITARIAS
04.01 MOVIMIENTO DE TIERRAS
04.01.01 EXCAVACION
RELLENO DE ZANJASPARA ZANJAS CON MATERIAL PROPIO
COMPACTADO m3 23.50 13.40 36.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01.02 m3 22.60 12.50 35.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02 APARATOS SANITARIOS
INODORO TANQUE BAJO BLANCO (incl. sumin. e inst.)
04.02.01 und 2.00 0.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.02 INODORO TANQUE
LAVATORIOS BAJOBLANCO
DE PARED BLANCO1- LLAVE
TIPO BABY (incl. sumin.
(incl. sumin. e inst.)
e inst.) und 2.00 2.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.03 und 5.00 2.00 7.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.04 LAVADERO
KIT DE COCINA
ACCESORIOS PARA DE ACERO INOXIDABLE C/ ESCURRIDOR (Incl. sumin. e inst.)
BAÑO und 0.00 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.05 und 4.00 2.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.06 BARRA DE ALUMINIO D= 1 1/2" EN SS.HH. MINUSVALIDOS pza 4.00 2.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.03 SISTEMA DE AGUA FRIA
04.03.01 SALIDA DE PVC SAP PARA AGUA FRIA pto 9.00 5.00 14.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.03.02 ml 20.50 11.80 32.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.03.03 ml 8.90 42.00 50.90 0.00 0.00 5.50 0.00 0.00 5.50 0.00 0.00
04.03.04 ml 21.30 18.70 40.00 0.00 0.00 5.50 0.00 0.00 5.50 0.00 0.00
04.03.05 ml 17.40 12.00 29.40 0.00 0.00 6.80 0.00 0.00 6.80 0.00 0.00
04.03.06 ml 1.80 0.00 1.80 0.00 0.00 3.70 0.00 0.00 3.70 0.00 0.00
04.03.07 VALVULA DE INTERRUPCION ESFERICA DE 1/2" ml 0.00 0.00 0.00 0.00 0.00 6.70 0.00 0.00 6.70 0.00 0.00
04.03.08 VALVULA DE INTERRUPCION ESFERICA DE 3/4" pza 1.00 1.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.03.09 VALVULA DE INTERRUPCION ESFERICA DE 1 1/4” pza 3.00 1.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.03.10 VALVULA DE INTERRUPCION ESFERICA DE 1 1/2” pza 1.00 0.00 1.00 0.00 0.00 2.00 0.00 0.00 2.00 0.00 0.00
04.03.11 pza 0.00 1.00 1.00 0.00 0.00 2.00 0.00 0.00 2.00 0.00 0.00
04.03.12 LLAVE DE RIEGO C/GRIFO DE ½" EN CAJUELA CONCRETO F'c =140 und 0.00 2.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.03.13 VALVULA CHECK 3/4" pza 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00
04.03.14 VALVULA CHECK 1 1/4" pza 0.00 0.00 0.00 0.00 0.00 2.00 0.00 0.00 2.00 0.00 0.00
04.03.15 VALVULA CHECK 1 1/2" pza 0.00 0.00 0.00 0.00 0.00 2.00 0.00 0.00 2.00 0.00 0.00
04.04 SISTEMA
TUBERIADE DRENAJE
PVC PLUVIAL
-SAP Ø 4" PARA EVACUACION DE AGUA PLUVIAL
04.04.01 CANALETA EVAC AGUAS PLUVIALES C/ PLANCHA ACERO GALV. TIPO CALAMINA ml 48.60 93.40 142.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.04.02 CANALETA DE C° F'C= 175 kg/cm2, P/ EVAC. PLUVIAL CON REJILLA ml 40.20 33.30 73.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.04.03 ml 18.80 15.30 34.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.04.04 CAJA DE REGISTRO DE AGUA PLUVIAL DE 25 X 50 cm. ml 22.90 23.90 46.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.04.05 und 3.00 3.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.05 SISTEMA DE DESAGUE Y VENTILACION
04.05.01 SALIDAS DE PVC SAP PARA DESAGUE DE Ø 2" pto 5.00 3.00 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.05.02 SALIDASDE
SALIDA DEPVC
PVCSAP
SAPPARA
PARAVENTILACION
DESAGUE DEDE
ØØ4" 2" pto 4.00 2.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.05.03 RED DE DISTRIBUCION TUBERIA PVC - SAP Ø 2" pto 3.00 2.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.05.04 RED DE DISTRIBUCION TUBERIA PVC - SAP Ø 4" ml 8.20 3.90 12.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.05.05 ml 48.20 24.90 73.10 0.00 0.00 0.00 2.00 0.00 2.00 0.00 0.00
04.05.06 SUMIDERO DE
REGISTRO DE BRONCE
BRONCE DE
3" Ø 4” und 6.00 4.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.05.07 CAJA DE REGISTRO DE DESAGUE DE 25 X 50 cm. und 7.00 4.00 11.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.05.08 und 4.00 2.00 6.00 0.00 0.00 0.00 1.00 0.00 1.00 0.00 0.00
04.05.09 und 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 1.00 0.00 0.00
04.05.10 und 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 1.00 0.00 0.00
04.05.11 und 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 1.00 0.00 0.00
04.05.12 BIODIGESTOR ROTOPLAS 3000 LITROS und 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 1.00 0.00 0.00
04.06 PRUEBA
PRUEBAHIDRAULICA
HIDRAULICA DE REDES DE AGUA FRIA + DESIFECCION DE TUBERIAS
04.06.01 PRUEBA HIDRAULICA DE REDES DE DESAGUE ml 69.90 84.50 154.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.06.02 ml 105.00 122.20 227.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1
ERAL D E M E T R A D O S
CERCOS E INGRESOS

PERIMETRICO

CONTENCION
MUROS DE
RESUMEN

PARCIAL
CERCO
GENERAL
METRADOS

0.00 0.00 0.00 36.90


0.00 0.00 0.00 35.10

0.00 0.00 0.00 2.00


0.00 0.00 0.00 4.00
0.00 0.00 0.00 7.00
0.00 0.00 0.00 1.00
0.00 0.00 0.00 6.00
0.00 0.00 0.00 6.00

0.00 0.00 0.00 14.00


0.00 0.00 0.00 32.30
0.00 0.00 0.00 56.40
0.00 0.00 0.00 45.50
0.00 0.00 0.00 36.20
0.00 0.00 0.00 5.50
0.00 0.00 0.00 6.70
0.00 0.00 0.00 2.00
0.00 0.00 0.00 4.00
0.00 0.00 0.00 3.00
0.00 0.00 0.00 3.00
0.00 0.00 0.00 2.00
0.00 0.00 0.00 1.00
0.00 0.00 0.00 2.00
0.00 0.00 0.00 2.00

0.00 0.00 0.00 142.00


0.00 0.00 0.00 73.50
0.00 0.00 0.00 34.10
0.00 0.00 0.00 46.80
0.00 0.00 0.00 6.00

0.00 0.00 0.00 8.00


0.00 0.00 0.00 6.00
0.00 0.00 0.00 5.00
0.00 0.00 0.00 12.10
0.00 0.00 0.00 75.10
0.00 0.00 0.00 10.00
0.00 0.00 0.00 11.00
0.00 0.00 0.00 7.00
0.00 0.00 0.00 1.00
0.00 0.00 0.00 1.00
0.00 0.00 0.00 1.00
0.00 0.00 0.00 1.00

0.00 0.00 0.00 154.40


0.00 0.00 0.00 227.20

2
RESUMEN METRADOS MODULO 1

I.E.I. : I.E.I N°1455 - PUEBLO NUEVO


UBICACIÓN : PUEBLO NUEVO - SAN BENITO - CONTUMAZÁ - CAJAMARCA
ELABORADO : 0

ITEMS DESCRIPCION UND METRADO


0.00 VOLUMEN 01: INFRAESTRUCTURA 0.00
#REF! #REF! 0.00
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
01.02 TRABAJOS PRELIMINARES 0
01.02.01 LIMPIEZA DE TERRENO
NIVELACION, TRAZADO MANUAL
Y REPLANTEO C/EQUIPO m2 176.90
01.02.02 m2 176.90
0.00 0.00 0 0.00
02 ESTRUCTURAS 0 0.00
02.01 MOVIMIENTO DE TIERRAS 0 0.00
02.01.02 REFINE DE TERRENO HASTA e= 0.10 m. m2 176.90
02.01.09 EXCAVACION PARA ZAPATAS m3 69.70
02.01.10 EXCAVACION PARA VIGA DE CIMENTACION m3 11.20
02.01.14 RELLENO
RELLENO COMPACTADO
COMPACTADO CON
CON MATERIAL
MATERIALPROPIO SELECCIONADO
AFIRMADO PARA VEREDAS m3 30.40
02.01.15 RELLENO COMPACTADO CON MATERIAL AFIRMADO PARA PISOS INTERIORES m3 7.50
02.01.16 m3 26.50
02.01.18 ACARREO DE MATERIAL EXCEDENTE CON CARRETILLA D=30m m3 98.60
02.01.19 ELIMINACION MATERIAL EXCDENTE C/MAQUINARIA m3 123.20
02.02 OBRAS DE CONCRETO SIMPLE 0 0.00
02.02.01 SOLADO DE 4" C°S° C:H - 1:10 m2 55.80
02.02.03 SOBRECIMIENTO DE CONCRETO F'C = 175 KG/CM2 m3 7.30
02.02.04 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2 74.40
02.02.05 FALSA COLUMNA
ENCOFRADO DE CONCRETODEF'C=175
Y DESENCFRADO KG/CM²
FALSA COLUMNA m3 0.20
02.02.06 m2 2.90
02.03 OBRAS DE CONCRETO ARMADO 0 0.00
02.03.01 ZAPATAS 0 0.00
02.03.01.01 ZAPATAS: CONCRETO F'C = 210 KG/CM2 m3 23.90
02.03.01.02 ZAPATAS: ACERO DE REFUERZO fy = 4200 Kg/cm2 kg 659.30
02.03.02 VIGA DE CIMENTACION 0 0.00
02.03.02.01 VIGAS DE CIMENTACION: CONCRETO F'C = 210 KG/CM2 m3 10.20
02.03.02.02 VIGAS
VIGAS DE
DE CIMENTACION:
CIMENTACION: ACERO DE REFUERZO
ENCOFRADO fy = 4200 Kg/cm2
Y DESENCOFRADO kg 1,037.50
02.03.02.03 m2 84.30
02.03.05 COLUMNAS 0 0.00
02.03.05.01 COLUMNAS: CONCRETO F'C = 210 KG/CM2 m3 9.80
02.03.05.02 COLUMNAS:
COLUMNAS: ACERO DE REFUERZO
ENCOFRADO fy = 4200 Kg/cm2
Y DESENCOFRADO kg 1,764.50
02.03.05.03 m2 81.60
02.03.06 COLUMNETAS 0 0.00
02.03.06.01 COLUMNETAS: CONCRETO F'C = 175 KG/CM2 m3 3.10
02.03.06.02 COLUMNETAS:
COLUMNETAS: ACERO DE REFUERZO
ENCOFRADO fy = 4200 Kg/cm2
Y DESENCOFRADO kg 410.20
02.03.06.03 m2 36.20
02.03.07 VIGUETAS DE ALFEIZER 0 0.00
02.03.07.01 VIGUETAS DE ALFEIZER: CONCRETO F'C = 175 KG/CM2 m3 1.00
02.03.07.02 VIGUETAS
VIGUETAS DE
DE ALFEIZER:
ALFEIZER: ACERO DE REFUERZO
ENCOFRADO fy = 4200 Kg/cm2
Y DESENCOFRADO kg 123.80
02.03.07.03 m2 12.90
02.03.08 VIGAS 0 0.00
02.03.08.01 VIGAS: CONCRETO F'C = 210 KG/CM2 m3 12.80
02.03.08.02 VIGAS:
VIGAS: ACERO DE REFUERZO
ENCOFRADO fy = 4200 Kg/cm2
Y DESENCOFRADO kg 2,385.20
02.03.08.03 m2 117.90
02.03.09 LOSA ALIGERADA 0 0.00
02.03.09.01 LOSA ALIGERADA: POLIESTIRENO EXPANDIDO 15X30X120 PROV.Y COLOCADO und 290.00
02.03.09.02 LOSA ALIGERADA: CONCRETO F'C = 210 KG/CM2 m3 17.50
02.03.09.03 LOSA
LOSA ALIGERADA:
ALIGERADA: ACERO DE REFUERZO
ENCOFRADO fy = 4200 Kg/cm2
Y DESENCOFRADO kg 989.60
02.03.09.04 m2 139.00
0.00 0.00 0 0.00
03 ARQUITECTURA 0 0.00
03.01 MUROS Y TABIQUES DE ALBAÑILERIA 0 0.00
03.01.01 MURO DE SOGA LADRILLO DE ARCILLA 9x12x23 cm. MORTERO DOSIFICADO 1:4 m2 55.10
03.01.02 MURO DE CABEZA LADRILLO DE ARCILLA9x13x24 cm. MORTERO DOSIFICADO 1:4 m2 70.80
03.01.03 JUNTA SISMICA
ALAMBRE ENCORRUGADO
DE 1/4" TABIQUES E=1"
REFUERZO HORIZONTAL EN MUROS ml 37.50
03.01.04 kg 188.90
03.01.05 TAPAJUNTA CON JEBE MICROPOROSO EN JUNTA SISMICA DE 1" ml 37.50
03.02 REVOQUES, ENLUCIDOS Y REVESTIMIENTOS 0 0.00
03.02.01 TARRAJEO PRIMARIO RAYADO CON MORTERO C:A 1:5 m2 48.50
03.02.02 TARRAJEO RES MOD.-1 m2
TARRAJEO DE
DE MUROS
MUROS INTERIORES
EXTERIORES , ,E=1.5
e=1.5CM
cmCON
CONMORTERO
MORTEROC:A
C:A1:51:5 111.00
03.02.03 m2 52.00
03.02.04 TARRAJEO DE COLUMNAS, E=1.5 CM CON MORTERO C:A 1:5 m2 95.20
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

VOLUMEN 01: INFRAESTRUCTURA


#REF!
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
01.02 TRABAJOS PRELIMINARES
01.02.01 LIMPIEZA DE TERRENO MANUAL m2
area total de modulo 1 m2
NIVELACION, TRAZADO Y REPLANTEO C/EQUIPO
01.02.02 m2
area total de modulo 1 m2

02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
02.01.01 EXPLANACION Y NIVELACION DE TERRENO m3
area total de modulo 1 m3

02.01.02 REFINE DE TERRENO HASTA e= 0.10 m. m2


area total de modulo 1 m2

02.01.09 EXCAVACION PARA ZAPATAS m3


Z1 m3
Z2 m3

02.01.10 EXCAVACION PARA VIGA DE CIMENTACION m3


EJE A
tramo 1-3 m3
EJE B
tramo 1-3 m3
EJE B"
tramo 1-3 m3
EJE C
tramo 1-3 m3
EJE D
tramo 1-3 m3
EJE E
tramo 1-3 m3
EJE F
tramo 1-3 m3
EJE G
tramo 1-3 m3
EJE 1 Y3
tramo A-B m3
tramo B-C m3
tramo C-D m3
tramo D-E m3
tramo E-F m3
tramo F-G m3
EJE 2
tramo A-B m3
tramo B-C m3
tramo F-G m3

02.01.14 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO m3


ZAPATAS Y ZANJAS EN LA PARTE INFERIOR
Z1 m3
Z2 m3
EJE 1 Y3
tramo A-B m3
tramo B-C m3

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

tramo C-D m3
tramo D-E m3
tramo E-F m3
tramo F-G m3
EJE 2
tramo A-B m3
tramo B-C m3
EJE 2"
tramo A-B m3
tramo F-G m3

RELLENO COMPACTADO CON MATERIAL AFIRMADO PARA VEREDAS


02.01.15 m3
EJE 1
tramo A-G m3
EJE 2
tramo A-G m3
EJE A
tramo 1-3 m3
EJE G
tramo 1-3 m3

RELLENO COMPACTADO CON MATERIAL AFIRMADO PARA PISOS INTERIORES


02.01.16 m3
AULA 01 m3
S.S.H.H. AULA 01 m3
DEPOSITO AULA 02 m3
TOPICO m3
AREA DE ESPERA m3
DEPOSITO MATERIAL DIDACTICO m3
DIRECCION m3
S.S.H.H. ADMINISTRATIVO m3
S.S.H.H. DISCAPACITADOS m3

02.01.18 ACARREO DE MATERIAL EXCEDENTE CON CARRETILLA D=30m m3


EXPLANACION Y NIVELACION DE TERRENO m3
CORTE Y REFINE DE TERRENO HASTA e=0.10m. m3
EXCAVACION PARA ZAPATAS m3
EXCAVACION PARA VIGAS DE CIMENTACION m3

02.01.19 ELIMINACION MATERIAL EXCDENTE C/MAQUINARIA m3


EXPLANACION Y NIVELACION DE TERRENO m3
CORTE Y REFINE DE TERRENO HASTA e=0.10m. m3
EXCAVACION PARA ZAPATAS m3
EXCAVACION PARA VIGAS DE CIMENTACION m3

02.02 OBRAS DE CONCRETO SIMPLE


02.02.01 SOLADO DE 4" C°S° C:H - 1:10 m2
Z1 m2
Z2 m2
EJE A
tramo 1-3 m2
EJE B
tramo 1-3 m2
EJE B"
tramo 1-3 m2
EJE C
tramo 1-3 m2
EJE D

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

tramo 1-3 m2
EJE E
tramo 1-3 m2
EJE F
tramo 1-3 m2
EJE G
tramo 1-3 m2
EJE 1 Y3
tramo A-B m2
tramo B-C m2
tramo C-D m2
tramo D-E m2
tramo E-F m2
tramo F-G m2
EJE 2
tramo A-B m2
tramo B-C m2
tramo F-G m2

02.02.03 SOBRECIMIENTO DE CONCRETO F'C = 175 KG/CM2 m3


EJE A
tramo 1-3 m3
EJE B
tramo 1-3 m3
EJE B"
tramo 1-3 m3
EJE C
tramo 1-3 m3
EJE D
tramo 1-3 m3
EJE F
tramo 1-3 m3
EJE G
tramo 1-3 m3
EJE 2
tramo A-B m3
tramo B-C m3
EJE 2"
tramo A-B m3
tramo F-G m3
EJE 1
tramo A-B m3
tramo B-C m3
tramo C-D m3
tramo D-E m3
tramo E-F m3
tramo F-G m3
EJE 3
tramo A-B m3
tramo B-C m3
tramo C-D m3
tramo D-E m3
tramo E-F m3
tramo F-G m3

02.02.04 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2


EJE A
tramo 1-3 m2
EJE B
tramo 1-3 m2

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

EJE B"
tramo 1-3 m2
EJE C
tramo 1-3 m2
EJE D
tramo 1-3 m2
EJE F
tramo 1-3 m2
EJE G
tramo 1-3 m2
EJE 2
tramo A-B m2
tramo B-C m2
EJE 2"
tramo A-B m2
tramo F-G m2
EJE 1
tramo A-B m2
tramo B-C m2
tramo C-D m2
tramo D-E m2
tramo E-F m2
tramo F-G m2
EJE 3
tramo A-B m2
tramo B-C m2
tramo C-D m2
tramo D-E m2
tramo E-F m2
tramo F-G m2

02.02.05 FALSA COLUMNA DE CONCRETO F'C=175 KG/CM² m3


falsa columna m3

ENCOFRADO Y DESENCFRADO DE FALSA COLUMNA


02.02.06 m2
falsa columna m2
falsa columna m2

02.03 OBRAS DE CONCRETO ARMADO


02.03.01 ZAPATAS
02.03.01.01 ZAPATAS: CONCRETO F'C = 210 KG/CM2 m3
Z1 m3
Z2 m3

02.03.01.02 ZAPATAS: ACERO DE REFUERZO fy = 4200 Kg/cm2 kg


Z1 kg
kg
Z2 kg
kg

02.03.02 VIGA DE CIMENTACION


02.03.02.01 VIGAS DE CIMENTACION: CONCRETO F'C = 210 KG/CM2 m3
EJE A
tramo 1-3 m3
EJE B
tramo 1-3 m3
EJE B"

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

tramo 1-2 m3
EJE C
tramo 1-3 m3
EJE D
tramo 1-3 m3
EJE E
tramo 1-3 m3
EJE F
tramo 1-3 m3
EJE G
tramo 1-2 m3
EJE 1
tramo A-B m3
tramo B-C m3
tramo C-D m3
tramo D-E m3
tramo E-F m3
tramo F-G m3
EJE 2
tramo A-B m3
tramo B-C m3
EJE 2"
tramo A-B m3
tramo F-G m3
EJE 3
tramo A-B m3
tramo B-C m3
tramo C-D m3
tramo D-E m3
tramo E-F m3
tramo F-G m3

02.03.02.02 VIGAS DE CIMENTACION: ACERO DE REFUERZO fy = 4200 Kg/cm2 kg


Recubrimiento Laterales 0.040
Empalme 0.00

0.25
EJE A
tramo 1-3
2 Ø 3/8" kg
4 Ø 1/2" kg
EJE B
tramo 1-3
2 Ø 3/8" kg
4 Ø 1/2" kg
EJE C
tramo 1-2
2 Ø 3/8" kg
4 Ø 1/2" kg
EJE E
tramo 1-3
2 Ø 3/8" kg
4 Ø 1/2" kg
EJE G
tramo 1-3
2 Ø 3/8" kg
4 Ø 1/2" kg
tramo B-C
tramo 1-3
2 Ø 3/8" kg
4 Ø 1/2" kg

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

tramo F-G
tramo 1-3
2 Ø 3/8" kg
4 Ø 1/2" kg
EJE 2"
tramo 1-2
2 Ø 3/8" kg
4 Ø 1/2" kg
EJE 1
tramo A-B
2 Ø 3/8" kg
4 Ø 1/2" kg
tramo B-C
2 Ø 3/8" kg
4 Ø 1/2" kg
tramo C-D
2 Ø 3/8" kg
4 Ø 1/2" kg
tramo D-E
2 Ø 3/8" kg
4 Ø 1/2" kg
tramo E-F
2 Ø 3/8" kg
4 Ø 1/2" kg
tramo F-G
2 Ø 3/8" kg
4 Ø 1/2" kg
EJE 2
tramo A-B
2 Ø 3/8" kg
4 Ø 1/2" kg
tramo B-C
2 Ø 3/8" kg
4 Ø 1/2" kg
EJE 2"
tramo A-B
2 Ø 3/8" kg
4 Ø 1/2" kg
tramo F-G
2 Ø 3/8" kg
4 Ø 1/2" kg
EJE 3
tramo A-B
2 Ø 3/8" kg
4 Ø 1/2" kg
tramo B-C
2 Ø 3/8" kg
4 Ø 1/2" kg
tramo C-D
2 Ø 3/8" kg
4 Ø 1/2" kg
tramo D-E
2 Ø 3/8" kg
4 Ø 1/2" kg
tramo E-F
2 Ø 3/8" kg
4 Ø 1/2" kg
tramo F-G
2 Ø 3/8" kg
4 Ø 1/2" kg
Estribos 1
Recubrimiento 0.03

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

0.25

0.50

EJE A
tramo 1-3
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg
tramo 1-3
tramo 1-3
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg
EJE C
tramo 1-2
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg
tramo 1-3
tramo 1-3
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg
EJE F
tramo 1-3
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg
tramo 1-2
tramo 1-3
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg
tramo B-C
tramo 1-3
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg
tramo E-F
tramo 1-2
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg
EJE 1
tramo A-B
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg
tramo B-C
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg
tramo C-D
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg
tramo D-E
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg
tramo E-F
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg
tramo F-G
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg
EJE 2
tramo A-B
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg
tramo B-C
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg
EJE 2"
tramo A-B
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg
tramo F-G
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg
EJE 3
tramo A-B
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg
tramo B-C
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg
tramo C-D
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg
tramo D-E
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

tramo E-F
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg
tramo F-G
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg

VIGAS DE CIMENTACION: ENCOFRADO Y DESENCOFRADO


02.03.02.03 m2
EJE A
tramo 1-3 m2
tramo 1-3 m2
tramo 1-2 m2
tramo 1-3 m2
tramo 1-3 m2
tramo 1-3 m2
tramo 1-3 m2
tramo 1-2 m2
EJE 1
tramo A-B m2
tramo B-C m2
tramo C-D m2
tramo D-E m2
tramo E-F m2
tramo F-G m2
EJE 2
tramo A-B m2
tramo B-C m2
EJE 2"
tramo A-B m2
tramo F-G m2
EJE 3
tramo A-B m2
tramo B-C m2
tramo C-D m2
tramo D-E m2
tramo E-F m2
tramo F-G m2

02.03.05 COLUMNAS
02.03.05.01 COLUMNAS: CONCRETO F'C = 210 KG/CM2 m3
C1 m3
C2 m3
C3 m3
C4 m3

02.03.05.02 COLUMNAS: ACERO DE REFUERZO fy = 4200 Kg/cm2 kg


COLUMNA (C1)
Recubrimiento Laterales 0.040
Empalme 0.000
0.30

4.65

0.30
estribo 2 Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m
C1
8 Ø 5/8" kg
estribo 2 Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg
COLUMNA (C2)
Recubrimiento Laterales 0.040

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

Empalme 0.000
0.30

4.65

0.30
estribo 2 Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m
EJE 1
6 Ø 5/8" kg
4 Ø 1/2" kg
estribo 2 Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg
COLUMNA (C3)
Recubrimiento Laterales 0.040
Empalme 0.000
0.30

5.05

0.30
estribo Ø 3/8" 1@ 0.05, 8@ 0.10, R@ 0.20m
EJE 1
4 Ø 5/8" kg
estribo Ø 3/8" 1@ 0.05, 8@ 0.10, R@ 0.20m kg
COLUMNA (C4)
Recubrimiento Laterales 0.040
Empalme 0.000
0.30

4.75

0.30
estribo Ø 3/8" 1@ 0.05, 8@ 0.10, R@ 0.20m
EJE 1
4 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 8@ 0.10, R@ 0.20m kg

COLUMNAS: ENCOFRADO Y DESENCOFRADO


02.03.05.03 m2
C1 m2
C2 m2
C3 m2
C4 m2

02.03.06 COLUMNETAS
02.03.06.01 COLUMNETAS: CONCRETO F'C = 175 KG/CM2 m3
primer piso
EJE1
tramo A-B m3
tramo B-C m3
m3
m3
tramo C-D m3
tramo D-E m3
tramo E-F m3
tramo F-G m3
EJE2
tramo B-C m3
tramo B-C m3
EJE 3
tramo A-B m3

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

tramo B-C m3
tramo C-D m3
tramo D-E m3
tramo E-F m3
tramo F-G m3
EJE A
tramo 2-3 m3
EJE F
tramo 1-3 m3
EJE G
tramo 2-3 m3

02.03.06.02 COLUMNETAS: ACERO DE REFUERZO fy = 4200 Kg/cm2 kg


Recubrimiento Laterale 0.040
Empalme 0.000
0.20

X
3/8"

0.20

primer piso
EJE1
tramo A-B kg
1 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg
tramo B-C kg
1 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg
tramo b" c" kg
1 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg
0.00 kg
1 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg
tramo C-D kg
1 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg
tramo D-E kg
1 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg
tramo E-F kg
1 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg
tramo F-G kg
1 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg
EJE2
tramo B-C kg
1 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg
tramo B-C kg
1 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg
EJE 3
tramo A-B kg
1 Ø 3/8" kg

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg


tramo B-C kg
1 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg
tramo C-D kg
1 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg
tramo D-E kg
1 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg
tramo E-F kg
1 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg
tramo F-G kg
1 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg
EJE A
tramo 2-3 kg
1 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg
EJE F
tramo 1-3 kg
1 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg
EJE G kg
tramo 2-3 kg
1 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg

COLUMNETAS: ENCOFRADO Y DESENCOFRADO


02.03.06.03 m2
primer piso
EJE1
tramo A-B m2
tramo B-C m2
m2
m2
tramo C-D m2
tramo D-E m2
tramo E-F m2
tramo F-G m2
EJE2
tramo B-C m2
tramo B-C m2
EJE 3
tramo A-B m2
tramo B-C m2
tramo C-D m2
tramo D-E m2
tramo E-F m2
tramo F-G m2
EJE A
tramo 2-3 m2
EJE F
tramo 1-3 m2
EJE G
tramo 2-3 m2

02.03.07 VIGUETAS DE ALFEIZER


02.03.07.01 VIGUETAS DE ALFEIZER: CONCRETO F'C = 175 KG/CM2 m3
primer piso

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

EJE1
tramo A-B m3
tramo B-C m3
tramo B-C m3
tramo C-D m3
tramo D-E m3
tramo E-F m3
tramo F-G m3
EJE1
tramo A-B m3
tramo B-C m3
tramo C-D m3
tramo D-E m3
tramo E-F m3
tramo F-G m3

02.03.07.02 VIGUETAS DE ALFEIZER: ACERO DE REFUERZO fy = 4200 Kg/cm2 kg


Recubrimiento Latera 0.04
Empalme 0.00
X
0.20

estribo Ø 8mm 1@ 0.05, 5@ 0.10, R@ 0.25m

primer piso
EJE1
tramo A-B kg
1 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 5@ 0.10, R@ 0.25m kg
tramo B-C kg
1 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg
tramo C-D kg
1 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg
tramo D"-E kg
1 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg
tramo E-F kg
1 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg
tramo F-G kg
1 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg
tramo G-H kg
1 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg
EJE1
tramo A-B kg
1 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg
tramo B-C kg
1 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg
tramo C-D kg
1 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg
tramo D"-E kg
1 Ø 3/8" kg

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg


tramo E-F kg
1 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg
tramo F-G kg
1 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg

VIGUETAS DE ALFEIZER: ENCOFRADO Y DESENCOFRADO


02.03.07.03 m2
primer piso
EJE1
tramo A-B m2
tramo B-C m2
tramo B-C m2
tramo C-D m2
tramo D-E m2
tramo E-F m2
tramo F-G m2
EJE1
tramo A-B m2
tramo B-C m2
tramo C-D m2
tramo D-E m2
tramo E-F m2
tramo F-G m2

02.03.08 VIGAS
02.03.08.01 VIGAS: CONCRETO F'C = 210 KG/CM2 m3
VIGAS (V1 - CUMBRERA)
PRIMER PISO
EJE 2 m3
VIGAS (V2 - 025 x 0.45 )
EJE 1-3
tramo A-B m3
tramo B-C m3
tramo C-D m3
tramo D-E m3
tramo E-F m3
tramo F-G m3
VIGAS (V3 - 0.25 x 0.50 (INCLINADO))
PRIMER PISO
EJE E
tramo 1-3 m3
VIGAS (V4 - 0.25 x 0.20 (HORIZONTAL))
PRIMER PISO
EJE A
tramo 1-3 m3
EJE B
tramo 1-3 m3
EJE C
tramo 1-3 m3
EJE D
tramo 1-3 m3
EJE F
tramo 1-3 m3
EJE F"
tramo 1-3 m3
EJE G
tramo 1-3 m3
VIGAS (V4 - 0.25 x 0.20 (INCLINADA))

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

PRIMER PISO
EJE A
tramo 1-2 m3
tramo 2-3 m3
EJE B
tramo 1-2 m3
tramo 2-3 m3
EJE C
tramo 1-2 m3
tramo 2-3 m3
EJE D
tramo 1-2 m3
tramo 2-3 m3
EJE F
tramo 1-2 m3
tramo 2-3 m3
EJE G
tramo 1-2 m3
tramo 2-3 m3
GIGAS (V5 - 020 x 0.15 (VIGA DE BORDE) )
PRIMER PISO
EJE 1
tramo A-G m3
EJE 3
tramo A-G m3
EJE A
tramo 1-3 m3
EJE G
tramo 1-3 m3
EJE 2"
tramo A-B m3
EJE 2"
tramo F-G m3
EJE G
tramo 1-3 m3

02.03.08.02 VIGAS: ACERO DE REFUERZO fy = 4200 Kg/cm2 kg


VIGAS (V1 - CUMBRERA)
Acero principal 01 Estribos 5
Recubrimiento Laterales 0.02 Recubrimiento
X
0.15
Empalme 0.75

PRIMER PISO
EJE 2 kg
5 Ø 1/2" kg
estribo Ø 3/8" 1@ 0.05, R@ 0.20m kg
VIGAS (V2 - 025 x 0.45 )
Acero principal 01 Estribos 5
Recubrimiento Laterales 0.02 Recubrimiento
X
0.15
Empalme 0.00

EJE 1-3
tramo A-B kg
4 Ø 5/8" kg
4 Ø 3/8" kg
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

tramo B-C kg
4 Ø 5/8" kg
4 Ø 3/8" kg
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg
tramo C-D kg
4 Ø 5/8" kg
4 Ø 3/8" kg
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg
tramo D-E kg
4 Ø 5/8" kg
4 Ø 3/8" kg
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg
tramo E-F kg
4 Ø 5/8" kg
4 Ø 3/8" kg
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg
tramo F-G kg
4 Ø 5/8" kg
4 Ø 3/8" kg
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg
VIGAS (V3 - 0.25 x 0.50 (INCLINADO))
Acero principal 01 Estribos 5
Recubrimiento Laterales 0.02 Recubrimiento
X
0.15
Empalme 0.00

PRIMER PISO
EJE E kg
tramo 1-3 kg
4 Ø 5/8" kg
estribo Ø 3/8" 1@ 0.05, 5@ 0.10, R@ 0.20m kg
VIGAS (V4 - 0.25 x 0.20 (HORIZONTAL))
Acero principal 01 Estribos 5
Recubrimiento Laterales 0.02 Recubrimiento
X
0.15
Empalme 0.00

PRIMER PISO
EJE A
tramo 1-3 kg
4 Ø 1/2" kg
estribo Ø 3/8" 5@ 0.05, 10@ 0.10, R@ 0.20m kg
EJE B
tramo 1-3 kg
4 Ø 5/8" kg
estribo Ø 3/8" 5@ 0.05, 10@ 0.10, R@ 0.20m kg
EJE C
tramo 1-3 kg
4 Ø 5/8" kg
estribo Ø 3/8" 5@ 0.05, 10@ 0.10, R@ 0.20m kg
EJE D
tramo 1-3 kg
4 Ø 5/8" kg
estribo Ø 3/8" 5@ 0.05, 10@ 0.10, R@ 0.20m kg
EJE F
tramo 1-3 kg

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

4 Ø 5/8" kg
estribo Ø 3/8" 5@ 0.05, 10@ 0.10, R@ 0.20m kg
EJE F"
tramo 1-3 kg
4 Ø 5/8" kg
estribo Ø 3/8" 5@ 0.05, 10@ 0.10, R@ 0.20m kg
EJE G
tramo 1-3 kg
4 Ø 5/8" kg
estribo Ø 3/8" 5@ 0.05, 10@ 0.10, R@ 0.20m kg
VIGAS (V4 - 0.25 x 0.20 (HORIZONTAL))
Acero principal 01 Estribos 5
Recubrimiento Laterales 0.02 Recubrimiento
X
0.15
Empalme 0.00

PRIMER PISO
tramo 1-3 kg
4 Ø 5/8" kg
estribo Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.15m kg
VIGAS (V4 - 0.25 x 0.20 (INCLINADA)) kg
Acero principal 01 Estribos 5
Recubrimiento Laterales 0.02 Recubrimiento
X
0.10
Empalme 0.00

PRIMER PISO kg
EJE A kg
tramo 1-2 kg
4 Ø 1/2" kg
estribo Ø 3/8" 5@ 0.05, 10@ 0.10, R@ 0.20m kg
tramo 2-3 kg
4 Ø 1/2" kg
estribo Ø 3/8" 5@ 0.05, 10@ 0.10, R@ 0.20m kg
EJE B
tramo 1-2 kg
4 Ø 1/2" kg
estribo Ø 3/8" 5@ 0.05, 10@ 0.10, R@ 0.20m kg
tramo 2-3 kg
4 Ø 1/2" kg
estribo Ø 3/8" 5@ 0.05, 10@ 0.10, R@ 0.20m kg
EJE C
tramo 1-2 kg
4 Ø 1/2" kg
estribo Ø 3/8" 5@ 0.05, 10@ 0.10, R@ 0.20m kg
tramo 2-3 kg
4 Ø 1/2" kg
estribo Ø 3/8" 5@ 0.05, 10@ 0.10, R@ 0.20m kg
EJE D
tramo 1-2 kg
4 Ø 1/2" kg
estribo Ø 3/8" 5@ 0.05, 10@ 0.10, R@ 0.20m kg
tramo 2-3 kg
4 Ø 1/2" kg
estribo Ø 3/8" 5@ 0.05, 10@ 0.10, R@ 0.20m kg
EJE F
tramo 1-2 kg

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

4 Ø 1/2" kg
estribo Ø 3/8" 5@ 0.05, 10@ 0.10, R@ 0.20m kg
tramo 2-3 kg
4 Ø 1/2" kg
estribo Ø 3/8" 5@ 0.05, 10@ 0.10, R@ 0.20m kg
EJE G
tramo 1-2 kg
4 Ø 1/2" kg
estribo Ø 3/8" 5@ 0.05, 10@ 0.10, R@ 0.20m kg
tramo 2-3 kg
4 Ø 1/2" kg
estribo Ø 3/8" 5@ 0.05, 10@ 0.10, R@ 0.20m kg
GIGAS (V5 - 020 x 0.15 (VIGA DE BORDE) )
Acero principal 01 Estribos 5
Recubrimiento Laterales 0.02 Recubrimiento
X
0.10
Empalme 0.00

PRIMER PISO
EJE 1
tramo A-G kg
4 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 5@ 0.10, R@ 0.25m kg
EJE 3 kg
tramo A-G kg
4 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 5@ 0.10, R@ 0.25m kg
EJE A kg
tramo 1-3 kg
4 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 5@ 0.10, R@ 0.25m kg
EJE G
tramo 1-3 kg
4 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 5@ 0.10, R@ 0.25m kg
EJE 2" kg
tramo A-B kg
4 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 5@ 0.10, R@ 0.25m kg
EJE 2" kg
tramo F-G kg
4 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 5@ 0.10, R@ 0.25m kg
EJE 2" kg
tramo 1-3 kg
4 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 5@ 0.10, R@ 0.25m kg
EJE G kg
tramo 1-3 kg
4 Ø 3/8" kg
estribo Ø 8mm 1@ 0.05, 5@ 0.10, R@ 0.25m kg

VIGAS: ENCOFRADO Y DESENCOFRADO


02.03.08.03 m2
VIGAS (V1 - CUMBRERA)
PRIMER PISO
EJE 2 m2
VIGAS (V2 - 025 x 0.45 )
EJE 1-3

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

tramo A-B m2
tramo B-C m2
tramo C-D m2
tramo D-E m2
tramo E-F m2
tramo F-G m2
VIGAS (V3 - 0.25 x 0.50 (INCLINADO))
PRIMER PISO
EJE E
tramo 1-3 m2
VIGAS (V4 - 0.25 x 0.20 (HORIZONTAL))
PRIMER PISO
EJE A
tramo 1-3 m2
EJE B
tramo 1-3 m2
EJE C
tramo 1-3 m2
EJE D
tramo 1-3 m2
EJE F
tramo 1-3 m2
EJE F"
tramo 1-3 m2
EJE G
tramo 1-3 m2
VIGAS (V4 - 0.25 x 0.20 (INCLINADA))
PRIMER PISO
EJE A
tramo 1-2 m2
tramo 2-3 m2
EJE B
tramo 1-2 m2
tramo 2-3 m2
EJE C
tramo 1-2 m2
tramo 2-3 m2
EJE D
tramo 1-2 m2
tramo 2-3 m2
EJE F
tramo 1-2 m2
tramo 2-3 m2
EJE G
tramo 1-2 m2
tramo 2-3 m2
GIGAS (V5 - 020 x 0.15 (VIGA DE BORDE) )
PRIMER PISO
EJE 1
tramo A-G m2
EJE 3
tramo A-G m2
EJE A
tramo 1-3 m2
EJE G
tramo 1-3 m2
EJE 2"
tramo A-B m2
EJE 2"
tramo F-G m2
EJE G
tramo 1-3 m2

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

02.03.09 LOSA ALIGERADA


02.03.09.01 LOSA ALIGERADA: POLIESTIRENO EXPANDIDO 15X30X120 PROV.Y COLOCADO und
A 0.30 m
V 0.10 m
L 1.20 m

ALIGERADO EN AMBIENTES
ENTRE TRAMO 1-2 Y TRAMO A-B und
ENTRE TRAMO 1-2 Y TRAMO B-C und
ENTRE TRAMO 1-2 Y TRAMO C-D und
ENTRE TRAMO 1-2 Y TRAMO D-E und
ENTRE TRAMO 1-2 Y TRAMO E-F und
ENTRE TRAMO 1-2 Y TRAMO F-G und
ENTRE TRAMO 2-3 Y TRAMO A-B und
ENTRE TRAMO 2-3 Y TRAMO B-C und
ENTRE TRAMO 2-3 Y TRAMO C-D und
ENTRE TRAMO 2-3 Y TRAMO D-E und
ENTRE TRAMO 2-3 Y TRAMO E-F und
ENTRE TRAMO 2-3 Y TRAMO F-G und
ALIGERADO EN VOLADIZO
ENTRE EJE 1 TRAMO VOLADIZO-A und
ENTRE EJE 1 TRAMO A-B und
ENTRE EJE 1 TRAMO B-C und
ENTRE EJE 1 TRAMO C-D und
ENTRE EJE 1 TRAMO D-E und
ENTRE EJE 1 TRAMO E-F und
ENTRE EJE 1 TRAMO F-G und
ENTRE EJE 1 TRAMO G-VOLADIZO und
ENTRE EJE 3 TRAMO VOLADIZO-A und
ENTRE EJE 3 TRAMO A-B und
ENTRE EJE 3 TRAMO B-C und
ENTRE EJE 3 TRAMO C-D und
ENTRE EJE 3 TRAMO D-E und
ENTRE EJE 3 TRAMO E-F und
ENTRE EJE 3 TRAMO F-G und
ENTRE EJE 3 TRAMO G-VOLADIZO und
ENTRE EJE A TRAMO 1-2 und
ENTRE EJE A TRAMO 2-3 und
ENTRE EJE G TRAMO 1-2 und
ENTRE EJE G TRAMO 2-3 und

02.03.09.02 LOSA ALIGERADA: CONCRETO F'C = 210 KG/CM2 m3


A 0.30 m
V 0.10 m
L 1.20 m

ALIGERADO EN AMBIENTES
ENTRE TRAMO 1-2 Y TRAMO A-B m3
ENTRE TRAMO 1-2 Y TRAMO B-C m3
ENTRE TRAMO 1-2 Y TRAMO C-D m3
ENTRE TRAMO 1-2 Y TRAMO D-E m3
ENTRE TRAMO 1-2 Y TRAMO E-F m3
ENTRE TRAMO 1-2 Y TRAMO F-G m3
ENTRE TRAMO 2-3 Y TRAMO A-B m3
ENTRE TRAMO 2-3 Y TRAMO B-C m3
ENTRE TRAMO 2-3 Y TRAMO C-D m3
ENTRE TRAMO 2-3 Y TRAMO D-E m3
ENTRE TRAMO 2-3 Y TRAMO E-F m3
ENTRE TRAMO 2-3 Y TRAMO F-G m3

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

ALIGERADO EN VOLADIZO
ENTRE EJE 1 TRAMO VOLADIZO-A m3
ENTRE EJE 1 TRAMO A-B m3
ENTRE EJE 1 TRAMO B-C m3
ENTRE EJE 1 TRAMO C-D m3
ENTRE EJE 1 TRAMO D-E m3
ENTRE EJE 1 TRAMO E-F m3
ENTRE EJE 1 TRAMO F-G m3
ENTRE EJE 1 TRAMO G-VOLADIZO m3
ENTRE EJE 3 TRAMO VOLADIZO-A m3
ENTRE EJE 3 TRAMO A-B m3
ENTRE EJE 3 TRAMO B-C m3
ENTRE EJE 3 TRAMO C-D m3
ENTRE EJE 3 TRAMO D-E m3
ENTRE EJE 3 TRAMO E-F m3
ENTRE EJE 3 TRAMO F-G m3
ENTRE EJE 3 TRAMO G-VOLADIZO m3
ENTRE EJE A TRAMO 1-2 m3
ENTRE EJE A TRAMO 2-3 m3
ENTRE EJE G TRAMO 1-2 m3
ENTRE EJE G TRAMO 2-3 m3

02.03.09.03 LOSA ALIGERADA: ACERO DE REFUERZO fy = 4200 Kg/cm2 kg

Baston Izquierdo 01 0.15 on Derecho 01

Recubrimiento Laterales 0.040 ento Laterales


Empalme 0.00 Empalme

VOLADIZO
EJE A kg
EJE I kg

1/2" 1/2"
Refuerzo Superior 01 Refuerzo Superior 02
X

PRIMER PISO
EJE B kg
EJEC kg
EJE D kg
EJE E kg
EJE F kg

Acero Longitudinal 01 0.15

Recubrimiento Laterales 0.04


Empalme 0.6

PRIMER PISO
en planta kg

Acero de Temperatura Longitudinal

Acero de T. Longitudinal 01

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

Recubrimiento Laterales
Empalme
PRIMER PISO
en planta kg

Acero de Temperatura Transversal

Acero de T. Transversal 01 0.10


X
Recubrimiento Laterales 0.04
Empalme 0.00
PRIMER PISO
en planta kg
en planta kg

LOSA ALIGERADA: ENCOFRADO Y DESENCOFRADO


02.03.09.04 m2
ALIGERADO EN AMBIENTES
ENTRE TRAMO 1-2 Y TRAMO A-B m2
ENTRE TRAMO 1-2 Y TRAMO B-C m2
ENTRE TRAMO 1-2 Y TRAMO C-D m2
ENTRE TRAMO 1-2 Y TRAMO D-E m2
ENTRE TRAMO 1-2 Y TRAMO E-F m2
ENTRE TRAMO 1-2 Y TRAMO F-G m2
ENTRE TRAMO 2-3 Y TRAMO A-B m2
ENTRE TRAMO 2-3 Y TRAMO B-C m2
ENTRE TRAMO 2-3 Y TRAMO C-D m2
ENTRE TRAMO 2-3 Y TRAMO D-E m2
ENTRE TRAMO 2-3 Y TRAMO E-F m2
ENTRE TRAMO 2-3 Y TRAMO F-G m2
ALIGERADO EN VOLADIZO m2
ENTRE EJE 1 TRAMO VOLADIZO-A m2
ENTRE EJE 1 TRAMO A-B m2
ENTRE EJE 1 TRAMO B-C m2
ENTRE EJE 1 TRAMO C-D m2
ENTRE EJE 1 TRAMO D-E m2
ENTRE EJE 1 TRAMO E-F m2
ENTRE EJE 1 TRAMO F-G m2
ENTRE EJE 1 TRAMO G-VOLADIZO m2
ENTRE EJE 3 TRAMO VOLADIZO-A m2
ENTRE EJE 3 TRAMO A-B m2
ENTRE EJE 3 TRAMO B-C m2
ENTRE EJE 3 TRAMO C-D m2
ENTRE EJE 3 TRAMO D-E m2
ENTRE EJE 3 TRAMO E-F m2
ENTRE EJE 3 TRAMO F-G m2
ENTRE EJE 3 TRAMO G-VOLADIZO m2
ENTRE EJE A TRAMO 1-2 m2
ENTRE EJE A TRAMO 2-3 m2
ENTRE EJE G TRAMO 1-2 m2
ENTRE EJE G TRAMO 2-3 m2

03 ARQUITECTURA
03.01 MUROS Y TABIQUES DE ALBAÑILERIA
03.01.01 MURO DE SOGA LADRILLO DE ARCILLA 9x12x23 cm. MORTERO DOSIFICADO 1:4 m2
PRIMER PISO
EJE 1
tramo A-B m2

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

tramo B-B" m2
tramo B"-C m2
tramo C-D m2
tramo D-E m2
tramo E-F m2
tramo F-G m2
EJE 2
tramo A-B m2
tramo B-C m2
EJE 2"
tramo D-E m2
tramo H-I m2
EJE 3
tramo A-B m2
tramo B-C m2
tramo C-D m2
tramo D-E m2
tramo E-F m2
tramo F-G m2
EJE B"
tramo 1-2 m2
muros de timpano
EJE A
tramo 1-2 m2
tramo 2-3 m2
EJE B
tramo 2-3 m2
EJE C
tramo 1-2 m2
tramo 2-3 m2
EJE D
tramo 1-2 m2
tramo 2-3 m2
EJE E
tramo 1-2 m2
tramo 2-3 m2
EJE G
tramo 1-2 m2
tramo 2-3 m2

03.01.02 MURO DE CABEZA LADRILLO DE ARCILLA9x13x24 cm. MORTERO DOSIFICADO 1:4 m2


PRIMER PISO
EJE A
tramo 1-2 m2
tramo 2-3 m2
m2
EJE B
tramo 2-3 m2
EJE C
tramo 1-2 m2
tramo 2-3 m2
EJE D
tramo 1-2 m2
tramo 2-3 m2
EJE E
tramo 1-2 m2
m2
tramo 2-3 m2
m2
EJE G
tramo 1-2 m2

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

tramo 2-3 m2
m2

03.01.03 JUNTA SISMICA EN TABIQUES E=1" ml


PRIMER PISO
EJE 1
tramo A-B ml
tramo B-C ml
ml
tramo C-D ml
tramo D-E ml
tramo E-F ml
tramo F-G ml
EJE 3
tramo A-B ml
tramo B-C ml
tramo C-D ml
tramo D-E ml
tramo E-F ml
tramo F-G ml

ALAMBRE DE 1/4" CORRUGADO REFUERZO HORIZONTAL EN MUROS


03.01.04 kg
area de muros de soga kg
area de muros de caveza kg

03.01.05 TAPAJUNTA CON JEBE MICROPOROSO EN JUNTA SISMICA DE 1" ml


PRIMER PISO
EJE 1
tramo A-B ml
tramo B-C ml
ml
tramo C-D ml
tramo D-E ml
tramo E-F ml
tramo F-G ml
EJE 3
tramo A-B ml
tramo B-C ml
tramo C-D ml
tramo D-E ml
tramo E-F ml
tramo F-G ml

03.02 REVOQUES, ENLUCIDOS Y REVESTIMIENTOS


03.02.01 TARRAJEO PRIMARIO RAYADO CON MORTERO C:A 1:5 m2
PRIMER PISO
S.S.H.H. ADMINISTRATIVOS m2
S.S.H.H. DISCAPACITADOS m2
S.S.H.H. AULA 01 m2

03.02.02 TARRAJEO DE MUROS INTERIORES , E=1.5 CM CON MORTERO C:A 1:5 m2


PRIMER PISO
DIRECCION m2
m2
m2
m2
m2

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

SS.HH. ADMINISTRATIVO m2
m2
SS.HH. DISCAP. m2
m2
DEPOSITO MATERIAL DIDACTICO m2
m2
m2
m2
AREA DE ESPERA m2
m2
m2
m2
TOPICO m2
m2
m2
AULA 1 m2
m2
m2
m2
m2
m2
m2
DEPOSITO DE AULA 1 m2
m2
m2
m2
SS.HH. AULA 1 m2
m2
m2
m2

TARRAJEO DE MUROS EXTERIORES , e=1.5 cm CON MORTERO C:A 1:5


03.02.03 m2
PRIMER PISO
EJE 1
tramo A-B m2
tramo B-C m2
tramo B"-C m2
tramo C-D m2
tramo D-E m2
tramo E-F m2
tramo F-G m2
EJE 3
tramo A-B m2
tramo B-C m2
tramo C-D m2
tramo D-E m2
tramo E-F m2
tramo F-G m2
EJE A
tramo 1-2 m2
tramo 2-3 m2
timpano m2
EJE G
tramo 1-2 m2
tramo 2-3 m2
timpano m2

03.02.04 TARRAJEO DE COLUMNAS, E=1.5 CM CON MORTERO C:A 1:5 m2


C1 m2
C2 m2

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

m2
m2
m2
C3 m2
m2
m2
C4 m2
CC1 m2
m2
m2
m2
m2
m2
m2
m2
m2
CC2 m2

03.02.05 TARRAJEO DE VIGAS, E=1.5 CM CON MORTERO C:A 1:5 m2


VIGAS (V1 - CUMBRERA)
PRIMER PISO
EJE 2 m2
VIGAS (V2 - 025 x 0.45 )
EJE 1-3
tramo A-B m2
tramo B-C m2
tramo C-D m2
tramo D-E m2
tramo E-F m2
tramo F-G m2
VIGAS (V3 - 0.25 x 0.50 (INCLINADO))
PRIMER PISO
EJE E
tramo 1-3 m2
VIGAS (V4 - 0.25 x 0.20 (HORIZONTAL))
EJE A
tramo 1-3 m2
EJE B
tramo 1-3 m2
EJE C
tramo 1-3 m2
EJE D
tramo 1-3 m2
EJE F
tramo 1-3 m2
EJE F"
tramo 1-3 m2
EJE G m2
tramo 1-3 m2
VIGAS (V4 - 0.25 x 0.20 (INCLINADA))
PRIMER PISO
EJE A
tramo 1-2 m2
tramo 2-3 m2
EJE B
tramo 1-2 m2
tramo 2-3 m2
EJE C
tramo 1-2 m2
tramo 2-3 m2
EJE D

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

tramo 1-2 m2
tramo 2-3 m2
EJE F
tramo 1-2 m2
tramo 2-3 m2
EJE G
tramo 1-2 m2
tramo 2-3 m2
GIGAS (V5 - 020 x 0.15 (VIGA DE BORDE) )
PRIMER PISO
EJE 1
tramo A-G m2
EJE 3
tramo A-G m2
EJE A
tramo 1-3 m2
EJE G
tramo 1-3 m2
EJE 2"
tramo A-B m2
EJE 2"
tramo F-G m2
EJE G
tramo 1-3 m2

03.02.06 TARRAJEO DE CIELO RASO, E=1.5CM CON MORTERO C:A 1:4 m2


ALIGERADO EN AMBIENTES
ENTRE TRAMO 1-2 Y TRAMO A-B m2
ENTRE TRAMO 1-2 Y TRAMO B-C m2
ENTRE TRAMO 1-2 Y TRAMO C-D m2
ENTRE TRAMO 1-2 Y TRAMO D-E m2
ENTRE TRAMO 1-2 Y TRAMO E-F m2
ENTRE TRAMO 1-2 Y TRAMO F-G m2
ENTRE TRAMO 2-3 Y TRAMO A-B m2
ENTRE TRAMO 2-3 Y TRAMO B-C m2
ENTRE TRAMO 2-3 Y TRAMO C-D m2
ENTRE TRAMO 2-3 Y TRAMO D-E m2
ENTRE TRAMO 2-3 Y TRAMO E-F m2
ENTRE TRAMO 2-3 Y TRAMO F-G m2
ALIGERADO EN VOLADIZO m2
ENTRE EJE 1 TRAMO VOLADIZO-A m2
ENTRE EJE 1 TRAMO A-B m2
ENTRE EJE 1 TRAMO B-C m2
ENTRE EJE 1 TRAMO C-D m2
ENTRE EJE 1 TRAMO D-E m2
ENTRE EJE 1 TRAMO E-F m2
ENTRE EJE 1 TRAMO F-G m2
ENTRE EJE 1 TRAMO G-VOLADIZO m2
ENTRE EJE 3 TRAMO VOLADIZO-A m2
ENTRE EJE 3 TRAMO A-B m2
ENTRE EJE 3 TRAMO B-C m2
ENTRE EJE 3 TRAMO C-D m2
ENTRE EJE 3 TRAMO D-E m2
ENTRE EJE 3 TRAMO E-F m2
ENTRE EJE 3 TRAMO F-G m2
ENTRE EJE 3 TRAMO G-VOLADIZO m2
ENTRE EJE A TRAMO 1-2 m2
ENTRE EJE A TRAMO 2-3 m2
ENTRE EJE G TRAMO 1-2 m2
ENTRE EJE G TRAMO 2-3 m2

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

03.02.07 VESTIDURA DE DERRAMES ml


P1 ml
P2 ml
P3 ml
P4 ml
P5 ml
P6 ml
P7 ml
V1 ml
V2 ml
V3 ml
V4 ml
V5 ml
V6 ml
V7 ml
V8 ml
V9 ml

03.02.08 BRUÑAS DE E=1 cm. ml


PRIMER PISO
EJE A
tramo 1-2
muro ml
timpano ml
tramo 2-3
muro ml
muro ml
timpano ml
EJE B
tramo 1-2
timpano ml
tramo 2-3
muro ml
timpano ml
EJE C
tramo 1-2
muro ml
timpano ml
tramo 2-3
muro ml
timpano ml
EJE D
tramo 1-2
muro ml
timpano ml
tramo 2-3
muro ml
timpano ml
EJE F
tramo 1-2
muro ml
muro ml
timpano ml
tramo 2-3
muro ml
muro ml
timpano ml
EJE G
tramo 1-2
muro ml

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

timpano ml
tramo 2-3
muro ml
muro ml
timpano ml
EJE 1
tramo A-B
tabique ml
tramo B-B"
tabique ml
tramo B"-C
tabique ml
tramo C-D
tabique ml
tramo D-E
tabique ml
tramo E-F
tabique ml
tramo F-G
tabique ml
EJE 1
tramo A-B
muro ml
timpano ml
tramo B-C
muro ml
timpano ml
timpano ml
timpano ml
EJE 3
tramo A-B
tabique ml
tramo B-C
tabique ml
tramo C-D
tabique ml
tramo D-E
tabique ml
tramo E-F
tabique ml
tramo F-G
tabique ml

REVESTIMIENTO DE MUROS CON CERÁMICO DE COLOR 30X30 cm.


03.02.09 m2
S.S.H.H. ADMINISTRATIVOS m2
S.S.H.H. DISCAPACITADOS m2
S.S.H.H. AULA 01 m2

03.03 PISOS Y VEREDAS


FALSO PISO DE C° S° C:H - 1:8 E = 4" EN AMBIENTES INTERIORES
03.03.01 m2
AULA 01 m2
S.S.H.H. AULA 01 m2
DEPOSITO AULA 01 m2
TOPICO m2
AREA DE ESPERA m2
DEPOSITO MATERIAL DIDACTICO m2
DIRECCION m2
S.S.H.H. ADMINISTRATIVO m2

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

S.S.H.H. DISCAPACITADOS m2

03.03.02 CONTRAPISO DE 40MM. m2


PRIMER PISO
AULA 01 m2
S.S.H.H. AULA 01 m2
DEPOSITO AULA 01 m2
TOPICO m2
AREA DE ESPERA m2
DEPOSITO MATERIAL DIDACTICO m2
DIRECCION m2
S.S.H.H. ADMINISTRATIVO m2
S.S.H.H. DISCAPACITADOS m2

03.03.03 PISO VINILICO DE ALTO TRANSITO m2


PRIMER PISO
AULA 01 m2
AREA DE ESPERA m2
DIRECCION m2

03.03.04 PISO CON CERÁMICO ANTIDESLIZANTE DE 30X30 CM m2


PRIMER PISO
S.S.H.H. AULA 01 m2
TOPICO m2
S.S.H.H. ADMINISTRATIVO m2
S.S.H.H. DISCAPACITADOS m2

03.03.06 VEREDAS - CONCRETO 175 Kg/cm2 e=4" m2


VEREDAS m2
DEPOSITO MATERIAL DIDACTIVO m2
VEREDAS m2
m2
m2

03.03.07 PISO DE CEMENTO PULIDO Y BRUÑADO e=2" m2


PRIMER PISO
DEPOSITO TOPICO m2
DEPOSITO AULA 2 m2
DESPENSA m2
VEREDAS m2
m2
m2

03.03.08 JUNTA DE DILATACION PISOS Y VEREDAS e=1" ml


PRIMER PISO
AULA 01 ml
S.S.H.H. AULA 01 ml
DEPOSITO AULA 01 ml
TOPICO ml
AREA DE ESPERA ml
DEPOSITO MATERIAL DIDACTICO ml
DIRECCION ml
S.S.H.H. ADMINISTRATIVO ml
S.S.H.H. DISCAPACITADOS ml
VEREDAS ml
ml

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

ml

RELLENO DE JUNTA DE DILATACION CON MASA ASFALTICA PISOS Y VEREDAS e=5"


03.03.09 ml
PRIMER PISO
AULA 01 ml
S.S.H.H. AULA 01 ml
DEPOSITO AULA 01 ml
TOPICO ml
AREA DE ESPERA ml
DEPOSITO MATERIAL DIDACTICO ml
DIRECCION ml
S.S.H.H. ADMINISTRATIVO ml
S.S.H.H. DISCAPACITADOS ml
VEREDAS ml
ml
ml

SELLADO DE JUNTAS DE DILATACION CON MASILLA FLEXIBLE ELASTOMERICA e=1"


03.03.10 ml
PRIMER PISO
AULA 01 ml
S.S.H.H. AULA 01 ml
DEPOSITO AULA 01 ml
TOPICO ml
AREA DE ESPERA ml
DEPOSITO MATERIAL DIDACTICO ml
DIRECCION ml
S.S.H.H. ADMINISTRATIVO ml
S.S.H.H. DISCAPACITADOS ml
VEREDAS ml
ml
ml

03.03.11 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2


VEREDA m2
VEREDA m2

03.05 CONTRAZOCALOS
03.05.01 CONTRAZOCALO DE CEMENTO PULID, H = 0.30 m. e=1.5 cm CON MORTERO C:A 1:2 ml
PRIMER PISO
EXTERIOS ml

03.05.02 CONTRAZOCALO DE CEMENTO PULIDO H=0.20 m. e= 1.5 cm. CON MORTERO C:A 1:2 ml
PRIMER PISO
DEPOSITO AULA 01 ml
DEPOSITO MATERIAL DIDACTICO ml

03.05.03 CONTRAZOCALO VINILICO, H=0.10 m. ml


PRIMER PISO
AULA 01 ml
TOPICO ml
AREA DE ESPERA ml
DIRECCION ml

03.07 COBERTURA
03.07.01 CORREA DE MADERERA 1.5" x 2" ml

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

EJE A-G
tramo 1-2 ml
EJE A-G
tramo 2-3 ml

03.07.02 COBERTURA CON TEJA ANDINA m2


EJE A-G
tramo 1-2 m2
EJE A-G
tramo 2-3 m2

03.07.03 CUMBRERA CON TEJA ANDINA ml


EJE A-J
tramo 1-2 ml

03.08 CARPINTERIA DE MADERA


03.08.01 PUERTAS DE MADERA C/TABLEROS, INCLUYE INSTALACION m2
PRIMER PISO
P1 m2
P5 m2
P6 m2

03.08.02 PUERTAS DE MELAMINE e=18mm. C/TABLEROS, INCLUYE INSTALACION m2


PRIMER PISO
P2 m2

03.08.03 PUERTAS DE MELAMINE P/BAÑOS, INCLUYE INSTALACION m2


PRIMER PISO
P3 m2
P4 m2
P7 m2

03.08.04 VENTANA DE MADERA, INCLUYE INSTALACION m2


P6 m2
P7 m2
V1 m2
V2 m2
V3 m2
V4 m2
V5 m2
V6 m2
V7 m2
V8 m2
V9 m2

03.10 CERRAJERIA
CERRADURA TIPO PESADA DE SOBREPONER 3 GOLPES
03.10.01 pza
PRIMER PISO
P1 pza
P5 pza
P6 #REF!

03.10.02 CERRADURA DE PERILLA DE EMBUTIR pza


PRIMER PISO

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

P2 pza

CERROJO DE ALUMINIO DE 4"


03.10.03 und
PRIMER PISO
P3 und
P4 und
P7 und

CERROJO DE ALUMINIO DE 3" 1/2


03.10.04 und
V1 und
V2 und
V3 und
V4 und
V5 und
V6 und
V7 und
V8 und
V9 und

03.10.05 BISAGRA ALUMINIZADA CAPUCHINA DE 4" x 4" pza


PRIMER PISO
P1 pza
P2 pza
P3 pza
P4 pza
P5 pza
P6 pza
P7 pza

03.10.06 BISAGRA ALUMINIZADA CAPUCHINA PARA PORTAÑUELAS DE 2 1/2" x 2 1/2" pza


V1 pza
V2 pza
V3 pza
V4 pza
V5 pza
V6 pza
V7 pza
V8 pza
V9 pza

03.11 VIDRIOS, CRISTALES Y SIMILARES


03.11.01 VIDRIOS CRUDO INCOLORO 4 mm m2
ver metrados de ventanas m2

03.12 PINTURA
03.12.01 PINTURA LATEX EN MUROS INTERIORES, 2 MANOS m2
tarrajeo de mutros interiores
ver metrados de tarrajeos m2

PINTURA LATEX EN MUROS EXTERIORES, 2 MANOS


03.12.02 m2
tarrajeo de mutros exteriores
ver metrados de tarrajeos m2

PINTURA LATEX EN CIELORRASOS, 2 MANOS


03.12.03 m2

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

tarrajeo de cielorraso
ver metrados de tarrajeos m2

PINTURA LATEX EN COLUMNAS, DERRAMES Y VIGAS , 2 MANOS


03.12.04 m2
ver metrados de tarrajeos
tarrajeo de columnas m2
tarrajeo de derrames m2
tarrajeo de vigas m2

PINTURA OLEO MATE EN CONTRAZÓCALOS H=30cm , 2 MANOS


03.12.05 m2
ver metrados de contrazocalos
contrazocalo de cemento pulido m2

03.12.06 PINTURA EN CARPINTERIA DE MADERA C/BARNIZ 2 MANOS m2


ver metrados carp.madera
PUERTAS CON TABLEROS DE MADERA CEDRO m2
PUERTAS CON TABLEROS DE MELAMINE e=18mm m2
PUERTAS DE MELAMINE P/ BAÑOS, INCLUYE INSTALACION m2
VENTANAS m2

03.13 SEGURIDAD SEÑALIZACION


03.13.01 SEÑALIZACION CON STIKERT DE PLASTICO und
STIKERTS und

03.13.02 EXTINTOR DE INCENDIOS TIPO 3 de 6 Kg. und


EXTINTORES und

03.14 VARIOS
03.14.01 PINTADO DE MURALES GLB
murales GLB

03.14.02 PLACA RECORDATORIA und


placa recordatoria und

03.14.03 PARASOL DE ALUMINIO, INCLUYE INSTALACION m2


PARASOL m2
m2

04 INSTALACIONES SANITARIAS
04.01 MOVIMIENTO DE TIERRAS
04.01.01 EXCAVACION DE ZANJAS m3
CR1 - CR2 m3
CR2 - CR3 m3
CR3 - CR6 m3
CR6 - BIODIGESTOR m3
CANALETA - CR9 m3
DREN 03 m3
DREN 04 m3
CR7 - CR8 m3
DREN 01 m3
DREN 02 m3

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

RELLENO COMPACTADO PARA ZANJAS CON MATERIAL PROPIO


04.01.02 m3
CR1 - CR2 m3
CR2 - CR3 m3
CR3 - CR6 m3
CR6 - BIODIGESTOR m3
CANALETA - CR9 m3
DREN 03 m3
DREN 04 m3
CR7 - CR8 m3
DREN 01 m3
DREN 02 m3

04.02 APARATOS SANITARIOS


INODORO TANQUE BAJO BLANCO (incl. sumin. e inst.)
04.02.01 und
S.S.H.H. DISCAP. und
SS.HH. ADMIN. und
TOPICO und
S.S.H.H. AULA 1 und
EXTERIOR und

04.02.02 INODORO TANQUE BAJO BLANCO - TIPO BABY (incl. sumin. e inst.) und
S.S.H.H. DISCAP. und
SS.HH. ADMIN. und
TOPICO und
S.S.H.H. AULA 1 und
EXTERIOR und

LAVATORIOS DE PARED BLANCO 1 LLAVE (incl. sumin. e inst.)


04.02.03 und
S.S.H.H. DISCAP. und
SS.HH. ADMIN. und
TOPICO und
S.S.H.H. AULA 1 und
EXTERIOR und

KIT ACCESORIOS PARA BAÑO


04.02.05 und
S.S.H.H. DISCAP. und
SS.HH. ADMIN. und
TOPICO und
S.S.H.H. AULA 1 und
EXTERIOR und

04.02.06 BARRA DE ALUMINIO D= 1 1/2" EN SS.HH. MINUSVALIDOS pza


S.S.H.H. DISCAP. pza
SS.HH. ADMIN. pza
TOPICO pza
S.S.H.H. AULA 1 pza
EXTERIOR pza

04.03 SISTEMA DE AGUA FRIA


04.03.01 SALIDA DE PVC SAP PARA AGUA FRIA pto
S.S.H.H. DISCAP. pto
SS.HH. ADMIN. pto
TOPICO pto
S.S.H.H. AULA 1 pto

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

EXTERIOR pto

04.03.02 ml
S.S.H.H. DISCAP. ml
SS.HH. ADMIN. ml
TOPICO ml
S.S.H.H. AULA 1 ml
EXTERIOR ml

04.03.03 ml
S.S.H.H. DISCAP. ml
SS.HH. ADMIN. ml
TOPICO ml
S.S.H.H. AULA 1 ml
EXTERIOR ml

04.03.04 ml
EXTERIOR PRIMER NIVEL ml

04.03.05 ml
EXTERIOR PRIMER NIVEL ml

04.03.06 ml
EXTERIOR PRIMER NIVEL ml

VALVULA DE INTERRUPCION ESFERICA DE 1/2"


04.03.08 pza
TOPICO pza
VALVULA DE INTERRUPCION ESFERICA DE 3/4"
04.03.09 pza
S.S.H.H. DISCAP. pza
SS.HH. ADMIN. pza
TOPICO pza
S.S.H.H. AULA 1 pza
EXTERIOR pza

VALVULA DE INTERRUPCION ESFERICA DE 1 1/4”


04.03.10 pza
EXTERIOR (GENERAL 1ER NIVEL) pza

04.04 SISTEMA TUBERIA


DE DRENAJE PLUVIAL
PVC -SAP Ø 4" PARA EVACUACION DE AGUA PLUVIAL
04.04.01 ml
BAJADA DESDE TEJA ANDINA ml
BAJADA DESDE TEJA ANDINA ml
BAJADA DESDE TEJA ANDINA ml
BAJADA DESDE TEJA ANDINA ml
HACIA LA CANALETA ml
HACIA LA CANALETA ml
HACIA LA CR7 ml
HACIA LA CR8 ml
CR7-CR8 ml
CANALETA - CR09 ml
ZANJA DE INFILTRACION 01 ml
ZANJA DE INFILTRACION 02 ml
ZANJA DE INFILTRACION 03 ml
ZANJA DE INFILTRACION 04 ml

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

CANALETA EVAC AGUAS PLUVIALES C/ PLANCHA ACERO GALV. TIPO CALAMINA


04.04.02 ml
MODLO 01 ml

CANALETA DE C° F'C= 175 kg/cm2, P/ EVAC. PLUVIAL CON REJILLA


04.04.03 ml
C° Canaleta ml

04.04.04 ml
DREN 01 ml
DREN 02 ml
DREN 03 ml
DREN 04 ml

CAJA DE REGISTRO DE AGUA PLUVIAL DE 25 X 50 cm.


04.04.05 und
CR 7 und
CR 8 und
CR 9 und

04.05 SISTEMA DE DESAGUE Y VENTILACION


04.05.01 SALIDAS DE PVC SAP PARA DESAGUE DE Ø 2" pto
S.S.H.H. DISCAP. pto
SS.HH. ADMIN. pto
TOPICO pto
S.S.H.H. AULA 1 pto
EXTERIOR pto

04.05.02 SALIDAS DE PVC SAP PARA DESAGUE DE Ø 4" pto


S.S.H.H. DISCAP. pto
SS.HH. ADMIN. pto
TOPICO pto
S.S.H.H. AULA 1 pto
EXTERIOR pto

SALIDA DE PVC SAP PARA VENTILACION DE Ø 2"


04.05.03 pto
S.S.H.H. DISCAP. pto
SS.HH. ADMIN. pto
TOPICO pto
S.S.H.H. AULA 1 pto
EXTERIOR pto

RED DE DISTRIBUCION TUBERIA PVC - SAP Ø 2"


04.05.04 ml
S.S.H.H. DISCAP. ml
SS.HH. ADMIN. ml
TOPICO ml
S.S.H.H. AULA 1 ml
EXTERIOR ml

RED DE DISTRIBUCION TUBERIA PVC - SAP Ø 4"


04.05.05 ml
S.S.H.H. DISCAP. ml
SS.HH. ADMIN. ml
TOPICO ml
S.S.H.H. AULA 1 ml

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

CR1 - CR2 ml
CR2 - CR3 ml
CR3 - CR6 ml
CR5 - COLECTOR ml

04.05.06 SUMIDERO DE BRONCE 3" und


S.S.H.H. DISCAP. und
SS.HH. ADMIN. und
TOPICO und
S.S.H.H. AULA 1 und
EXTERIOR und

REGISTRO DE BRONCE DE Ø 4”
04.05.07 und
S.S.H.H. DISCAP. und
SS.HH. ADMIN. und
TOPICO und
S.S.H.H. AULA 1 und
EXTERIOR und

CAJA DE REGISTRO DE DESAGUE DE 25 X 50 cm.


04.05.08 und
EXTERIOR und

04.06 PRUEBA HIDRAULICA


PRUEBA HIDRAULICA DE REDES DE AGUA FRIA + DESIFECCION DE TUBERIAS
04.06.01 ml
TUBERIA PVC SAP Ø 1/2" CLASE 10 ml
TUBERIA PVC SAP Ø 3/4" CLASE 10 ml
TUBERIA PVC SAP Ø 1" CLASE 10 ml
TUBERIA PVC SAP Ø 1 1/4" CLASE 10 ml
TUBERIA PVC SAP Ø 1 1/2" CLASE 10 ml

PRUEBA HIDRAULICA DE REDES DE DESAGUE


04.06.02 ml
RED DE DISTRIBUCION TUBERIA PVC -SAP Ø 2" ml
RED DE DISTRIBUCION TUBERIA PVC -SAP Ø 4" ml
TUBERIA PVC -SAP Ø 4" PARA EVACUACION DE AGUA PLUVIAL ml

05 INSTALACIONES ELECTRICAS, COMUNICACIONES Y MECANICAS


05.02 SALIDAS PARA ALUMBRADO, TOMACORRIENTES, FUERZA Y SEÑALES DEBILES
05.02.01 SALIDA PARA CENTRO DE LUZ P/EQ. ADOSADO pto
PRIMER PISO # SALIDAS
SS.HH. DISCAP. pto
S.S.H.H. ADM. pto
AREA DE ESPERA pto
DIRECCION pto
DEPOSITO MAT. DIDACTICO pto
TOPICO pto
AULA 1 pto
DEPOSITO AULA 1 pto
SS.HH. AULA 1 pto
EXTERIOR pto

05.02.02 SALIDA DE EQ. ILU. DE EMERGENCIA PARED pto


PRIMER PISO # SALIDAS
SS.HH. DISCAP. pto
S.S.H.H. ADM. pto

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

AREA DE ESPERA pto


DIRECCION pto
DEPOSITO MAT. DIDACTICO pto
TOPICO pto
AULA 1 pto
DEPOSITO AULA 1 pto
SS.HH. AULA 1 pto
EXTERIOR pto

05.02.03 SALIDA PARA TOMACORRIENTE DOBLE C/TOMA A TIERRA pto


PRIMER PISO # SALIDAS
SS.HH. DISCAP. pto
S.S.H.H. ADM. pto
AREA DE ESPERA pto
DIRECCION pto
DEPOSITO MAT. DIDACTICO pto
TOPICO pto
AULA 1 pto
DEPOSITO AULA 1 pto
SS.HH. AULA 1 pto
EXTERIOR pto

05.02.04 SALIDA PARA TOMACORRIENTE DOBLE C/TOMA A TIERRA ESTABILIZADO EN PARED / TECHO pto
PRIMER PISO # SALIDAS
SS.HH. DISCAP. pto
S.S.H.H. ADM. pto
AREA DE ESPERA pto
DIRECCION pto
DEPOSITO MAT. DIDACTICO pto
TOPICO pto
AULA 1 pto
DEPOSITO AULA 1 pto
SS.HH. AULA 1 pto
EXTERIOR pto

05.02.05 SALIDA PARA TOMACORRIENTE DOBLE C/TOMA A TIERRA A PRUEBA DE AGUA pto
PRIMER PISO # SALIDAS
SS.HH. DISCAP. pto
S.S.H.H. ADM. pto
AREA DE ESPERA pto
DIRECCION pto
DEPOSITO MAT. DIDACTICO pto
TOPICO pto
AULA 1 pto
DEPOSITO AULA 1 pto
SS.HH. AULA 1 pto
EXTERIOR pto

05.02.06 SALIDA PARA INTERRUPTOR pto


PRIMER PISO # SALIDAS
SS.HH. DISCAP. pto
S.S.H.H. ADM. pto
AREA DE ESPERA pto
DIRECCION pto
DEPOSITO MAT. DIDACTICO pto
TOPICO pto
AULA 1 pto
DEPOSITO AULA 1 pto

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

SS.HH. AULA 1 pto


EXTERIOR pto

05.03 SALIDAS PARA COMUNICACIONES Y SEÑALES


05.03.01 SALIDA PARA TOMA DE DATOS - INTERNET pto
PRIMER PISO # SALIDAS
SS.HH. DISCAP. pto
S.S.H.H. ADM. pto
AREA DE ESPERA pto
DIRECCION pto
DEPOSITO MAT. DIDACTICO pto
TOPICO pto
AULA 1 pto
DEPOSITO AULA 1 pto
SS.HH. AULA 1 pto
EXTERIOR pto

05.03.02 SALIDA PARA TELEFONO pto


PRIMER PISO # SALIDAS
SS.HH. DISCAP. pto
S.S.H.H. ADM. pto
AREA DE ESPERA pto
DIRECCION pto
DEPOSITO MAT. DIDACTICO pto
TOPICO pto
AULA 1 pto
DEPOSITO AULA 1 pto
SS.HH. AULA 1 pto
EXTERIOR pto

05.03.03 SALIDA PARA TV CABLE pto


PRIMER PISO # SALIDAS
SS.HH. DISCAP. pto
S.S.H.H. ADM. pto
AREA DE ESPERA pto
DIRECCION pto
DEPOSITO MAT. DIDACTICO pto
TOPICO pto
AULA 1 pto
DEPOSITO AULA 1 pto
SS.HH. AULA 1 pto
EXTERIOR pto

05.03.05 SALIDA PARA BOCINA pto


PRIMER PISO # SALIDAS
SS.HH. DISCAP. pto
S.S.H.H. ADM. pto
AREA DE ESPERA pto
DIRECCION pto
DEPOSITO MAT. DIDACTICO pto
TOPICO pto
AULA 1 pto
DEPOSITO AULA 1 pto
SS.HH. AULA 1 pto
EXTERIOR pto

05.03.06 SALIDA PARA TIMBRE pto

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

PRIMER PISO # SALIDAS


SS.HH. DISCAP. pto
S.S.H.H. ADM. pto
AREA DE ESPERA pto
DIRECCION pto
DEPOSITO MAT. DIDACTICO pto
TOPICO pto
AULA 1 pto
DEPOSITO AULA 1 pto
SS.HH. AULA 1 pto
EXTERIOR pto

05.04 CONDUCTORES Y CABLES DE ENERGIA EN TUBERIAS


05.04.01 CABLEADO P/ SALIDA DE CENTRO DE LUZ P/EQ. ADOSADO pto
PRIMER PISO # SALIDAS
SS.HH. DISCAP. pto
S.S.H.H. ADM. pto
AREA DE ESPERA pto
DIRECCION pto
DEPOSITO MAT. DIDACTICO pto
TOPICO pto
AULA 1 pto
DEPOSITO AULA 1 pto
SS.HH. AULA 1 pto
EXTERIOR pto

05.04.02 CABLEADO P/ SALIDA DE EQ. ILU. DE EMERGENCIA PARED pto


PRIMER PISO # SALIDAS
SS.HH. DISCAP. pto
S.S.H.H. ADM. pto
AREA DE ESPERA pto
DIRECCION pto
DEPOSITO MAT. DIDACTICO pto
TOPICO pto
AULA 1 pto
DEPOSITO AULA 1 pto
SS.HH. AULA 1 pto
EXTERIOR pto

#REF! #REF! #REF!


05.04.03 CABLEADO P/ SALIDA DE TOMACORRIENTE DOBLE C/TOMA A TIERRA ESTABILIZADO EN PARED / TECHO pto
PRIMER PISO # SALIDAS
SS.HH. DISCAP. pto
S.S.H.H. ADM. pto
AREA DE ESPERA pto
DIRECCION pto
DEPOSITO MAT. DIDACTICO pto
TOPICO pto
AULA 1 pto
DEPOSITO AULA 1 pto
SS.HH. AULA 1 pto
EXTERIOR pto

05.04.04 CABLEADO P/ SALIDA DE TOMACORRIENTE DOBLE C/TOMA A TIERRA pto


PRIMER PISO # SALIDAS
SS.HH. DISCAP. pto
S.S.H.H. ADM. pto
AREA DE ESPERA pto
DIRECCION pto

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

DEPOSITO MAT. DIDACTICO pto


TOPICO pto
AULA 1 pto
DEPOSITO AULA 1 pto
SS.HH. AULA 1 pto
EXTERIOR pto

05.04.05 CABLEADO P/ SALIDA DE TOMACORRIENTE DOBLE C/TOMA A TIERRA A PRUEBA DE AGUA pto
PRIMER PISO # SALIDAS
SS.HH. DISCAP. pto
S.S.H.H. ADM. pto
AREA DE ESPERA pto
DIRECCION pto
DEPOSITO MAT. DIDACTICO pto
TOPICO pto
AULA 1 pto
DEPOSITO AULA 1 pto
SS.HH. AULA 1 pto
EXTERIOR pto

05.04.06 CABLEADO P/ SALIDA DE INTERRUPTOR SIMPLE pto


PRIMER PISO # SALIDAS
SS.HH. DISCAP. pto
S.S.H.H. ADM. pto
AREA DE ESPERA pto
DIRECCION pto
DEPOSITO MAT. DIDACTICO pto
TOPICO pto
AULA 1 pto
DEPOSITO AULA 1 pto
SS.HH. AULA 1 pto
EXTERIOR pto

05.04.07 CABLEADO P/ SALIDA DE INTERRUPTOR DOBLE pto


PRIMER PISO # SALIDAS
SS.HH. DISCAP. pto
S.S.H.H. ADM. pto
AREA DE ESPERA pto
DIRECCION pto
DEPOSITO MAT. DIDACTICO pto
TOPICO pto
AULA 1 pto
DEPOSITO AULA 1 pto
SS.HH. AULA 1 pto
EXTERIOR pto

05.04.08 CABLEADO P/ SALIDA DE INTERRUPTOR CONMUTACION SIMPLE pto


PRIMER PISO # SALIDAS
SS.HH. DISCAP. pto
S.S.H.H. ADM. pto
AREA DE ESPERA pto
DIRECCION pto
DEPOSITO MAT. DIDACTICO pto
TOPICO pto
AULA 1 pto
DEPOSITO AULA 1 pto
SS.HH. AULA 1 pto
EXTERIOR pto

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

05.05 CONDUCTORES PARA COMUNICACIONES Y SEÑALES


05.05.01 CABLEADO P/ SALIDA DE VOZ Y DATA pto
PRIMER PISO # SALIDAS
SS.HH. DISCAP. pto
S.S.H.H. ADM. pto
AREA DE ESPERA pto
DIRECCION pto
DEPOSITO MAT. DIDACTICO pto
TOPICO pto
AULA 1 pto
DEPOSITO AULA 1 pto
SS.HH. AULA 1 pto
EXTERIOR pto

05.05.02 CABLEADO P/ SALIDA DE TELEFONO pto


PRIMER PISO # SALIDAS
SS.HH. DISCAP. pto
S.S.H.H. ADM. pto
AREA DE ESPERA pto
DIRECCION pto
DEPOSITO MAT. DIDACTICO pto
TOPICO pto
AULA 1 pto
DEPOSITO AULA 1 pto
SS.HH. AULA 1 pto
EXTERIOR pto

05.05.03 CABLEADO P/ SALIDA TV - CABLE pto


PRIMER PISO # SALIDAS
SS.HH. DISCAP. pto
S.S.H.H. ADM. pto
AREA DE ESPERA pto
DIRECCION pto
DEPOSITO MAT. DIDACTICO pto
TOPICO pto
AULA 1 pto
DEPOSITO AULA 1 pto
SS.HH. AULA 1 pto
EXTERIOR pto

05.05.05 CABLEADO P/ SALIDA DE BOCINA pto


PRIMER PISO # SALIDAS
SS.HH. DISCAP. pto
S.S.H.H. ADM. pto
AREA DE ESPERA pto
DIRECCION pto
DEPOSITO MAT. DIDACTICO pto
TOPICO pto
AULA 1 pto
DEPOSITO AULA 1 pto
SS.HH. AULA 1 pto
EXTERIOR pto

05.05.06 CABLEADO P/ SALIDA DE TIMBRE pto


PRIMER PISO # SALIDAS

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

SS.HH. DISCAP. pto


S.S.H.H. ADM. pto
AREA DE ESPERA pto
DIRECCION pto
DEPOSITO MAT. DIDACTICO pto
TOPICO pto
AULA 1 pto
DEPOSITO AULA 1 pto
SS.HH. AULA 1 pto
EXTERIOR pto

05.05.07 CABLEADO DE FIBRA OPTICA ml


EXTERIOR ml

05.06 ARTEFACTOS
05.06.01 SUM. E INSTAL. ARTEF. P/ADOSAR 1x36 C/DIF. ACRILICO,AF,BALASTRO ELECT. SIMILAR GENIUS 1x36. und
PRIMER PISO # SALIDAS
AULA 01 und
S.S.H.H. AULA 01 und
DEPOSITO AULA 01 und
TOPICO und
AREA DE ESPERA und
DEPOSITO MATERIAL DIDACTICO und
DIRECCION und
S.S.H.H. ADMINISTRATIVO und
S.S.H.H. DISCAPACITADOS und
EXTERIOR und

05.06.02 SUM. E INSTAL. ARTEF. P/ADOSAR 3x36 C/REJ.MET,AF,BALASTRO ELECT. SIMILAR RAS 3x36,INCLUYE ACCES. und
PRIMER PISO # SALIDAS
AULA 01 und
S.S.H.H. AULA 01 und
DEPOSITO AULA 01 und
TOPICO und
AREA DE ESPERA und
DEPOSITO MATERIAL DIDACTICO und
DIRECCION und
S.S.H.H. ADMINISTRATIVO und
S.S.H.H. DISCAPACITADOS und
EXTERIOR und

05.06.03 SUM. E INSTAL. ARTEF. P/ADOSAR 4x36 C/REJ.MET,AF,BALASTRO ELECT. SIMILAR RAS 4x36,INCLUYE ACCES. und
PRIMER PISO # SALIDAS
AULA 01 und
S.S.H.H. AULA 01 und
DEPOSITO AULA 01 und
TOPICO und
AREA DE ESPERA und
DEPOSITO MATERIAL DIDACTICO und
DIRECCION und
S.S.H.H. ADMINISTRATIVO und
S.S.H.H. DISCAPACITADOS und
EXTERIOR und

05.06.04 SUM. E INSTAL. SPOT ADOSADO C/REFLECTOR FACET. ALUMI., C/VIDRIO ARENADO 4MM SOCKETE E-27,C/2 LAMP. AHORR und
PRIMER PISO # SALIDAS
AULA 01 und

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

S.S.H.H. AULA 01 und


DEPOSITO AULA 01 und
TOPICO und
AREA DE ESPERA und
DEPOSITO MATERIAL DIDACTICO und
DIRECCION und
S.S.H.H. ADMINISTRATIVO und
S.S.H.H. DISCAPACITADOS und
CISTERNA und

SUM. E INSTAL. LUMINARIA DE EMERGENCIA ADOSADA A LA PARED


05.06.05 und
PRIMER PISO # SALIDAS
AULA 01 und
S.S.H.H. AULA 01 und
DEPOSITO AULA 01 und
TOPICO und
AREA DE ESPERA und
DEPOSITO MATERIAL DIDACTICO und
DIRECCION und
S.S.H.H. ADMINISTRATIVO und
S.S.H.H. DISCAPACITADOS und
EXTERIOR und

05.06.09 SUM. E INSTAL. CAMPANILLA DE TIMBRE DE 2" CON TRANF 220/12V und
PRIMER PISO # SALIDAS
AULA 01 und
S.S.H.H. AULA 01 und
DEPOSITO AULA 01 und
TOPICO und
AREA DE ESPERA und
DEPOSITO MATERIAL DIDACTICO und
DIRECCION und
S.S.H.H. ADMINISTRATIVO und
S.S.H.H. DISCAPACITADOS und
EXTERIOR und

SUM. E INSTAL. TRANSFORMADOR DE AISLAMIENTO CON TENSION ESTABILIZADA 220/220 4 KVA


05.06.10 und
PRIMER PISO # SALIDAS
AULA 01 und
S.S.H.H. AULA 01 und
DEPOSITO AULA 01 und
TOPICO und
AREA DE ESPERA und
DEPOSITO MATERIAL DIDACTICO und
DIRECCION und
S.S.H.H. ADMINISTRATIVO und
S.S.H.H. DISCAPACITADOS und
EXTERIOR und

05.07 ACCESORIOS
05.07.01 TOMACORRIENTE DOBLE C/ TOMA A TIERRA und
PRIMER PISO # ACCES.
SS.HH. DISCAP. und
S.S.H.H. ADM. und
AREA DE ESPERA und
DIRECCION und
DEPOSITO MAT. DIDACTICO und
TOPICO und

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

AULA 1 und
DEPOSITO AULA 1 und
SS.HH. AULA 1 und
EXTERIOR und

05.07.02 TOMACORRIENTE DOBLE C/ TOMA A TIERRA ESTABILIZADO EN PARED / TECHO und


PRIMER PISO # ACCES.
SS.HH. DISCAP. und
S.S.H.H. ADM. und
AREA DE ESPERA und
DIRECCION und
DEPOSITO MAT. DIDACTICO und
TOPICO und
AULA 1 und
DEPOSITO AULA 1 und
SS.HH. AULA 1 und
EXTERIOR und

05.07.03 TOMACORRIENTE DOBLE C/ TOMA A TIERRA A PRUEBA DE AGUA und


PRIMER PISO # ACCES.
SS.HH. DISCAP. und
S.S.H.H. ADM. und
AREA DE ESPERA und
DIRECCION und
DEPOSITO MAT. DIDACTICO und
TOPICO und
AULA 1 und
DEPOSITO AULA 1 und
SS.HH. AULA 1 und
EXTERIOR und

05.07.04 INTERRUPTOR SIMPLE UNIPOLAR 10 A und


PRIMER PISO # ACCES.
SS.HH. DISCAP. und
S.S.H.H. ADM. und
AREA DE ESPERA und
DIRECCION und
DEPOSITO MAT. DIDACTICO und
TOPICO und
AULA 1 und
DEPOSITO AULA 1 und
SS.HH. AULA 1 und
EXTERIOR und

05.07.05 INTERRUPTOR DOBLE 10 A und


PRIMER PISO # ACCES.
SS.HH. DISCAP. und
S.S.H.H. ADM. und
AREA DE ESPERA und
DIRECCION und
DEPOSITO MAT. DIDACTICO und
TOPICO und
AULA 1 und
DEPOSITO AULA 1 und
SS.HH. AULA 1 und
EXTERIOR und

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

05.07.06 INTERRUPTOR CONMUTACION UNIPOLAR 10 A und


PRIMER PISO # ACCES.
SS.HH. DISCAP. und
S.S.H.H. ADM. und
AREA DE ESPERA und
DIRECCION und
DEPOSITO MAT. DIDACTICO und
TOPICO und
AULA 1 und
DEPOSITO AULA 1 und
SS.HH. AULA 1 und
EXTERIOR und

05.07.08 PULSADOR DE TIMBRE und


PRIMER PISO # ACCES.
SS.HH. DISCAP. und
S.S.H.H. ADM. und
AREA DE ESPERA und
DIRECCION und
DEPOSITO MAT. DIDACTICO und
TOPICO und
AULA 1 und
DEPOSITO AULA 1 und
SS.HH. AULA 1 und
EXTERIOR und

05.07.09 PLACA TOMA DE DATOS - INTERNET und


PRIMER PISO # ACCES.
SS.HH. DISCAP. und
S.S.H.H. ADM. und
AREA DE ESPERA und
DIRECCION und
DEPOSITO MAT. DIDACTICO und
TOPICO und
AULA 1 und
DEPOSITO AULA 1 und
SS.HH. AULA 1 und
EXTERIOR und

05.07.10 PLACA DE TELEFONO DIRECTO und


PRIMER PISO # ACCES.
SS.HH. DISCAP. und
S.S.H.H. ADM. und
AREA DE ESPERA und
DIRECCION und
DEPOSITO MAT. DIDACTICO und
TOPICO und
AULA 1 und
DEPOSITO AULA 1 und
SS.HH. AULA 1 und
EXTERIOR und

05.07.11 PLACA DE TV CABLE und


PRIMER PISO # ACCES.
SS.HH. DISCAP. und
S.S.H.H. ADM. und
AREA DE ESPERA und
DIRECCION und

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

DEPOSITO MAT. DIDACTICO und


TOPICO und
AULA 1 und
DEPOSITO AULA 1 und
SS.HH. AULA 1 und
EXTERIOR und

05.08 CAJAS
05.08.01 CAJA DE FºGº 100x100mm C/TAPA und
PRIMER PISO # CAJAS
SS.HH. DISCAP. und
S.S.H.H. ADM. und
AREA DE ESPERA und
DIRECCION und
DEPOSITO MAT. DIDACTICO und
TOPICO und
AULA 1 und
DEPOSITO AULA 1 und
SS.HH. AULA 1 und
EXTERIOR und

05.08.02 CAJA DE FºGº 150x150mm C/TAPA und


PRIMER PISO # CAJAS
SS.HH. DISCAP. und
S.S.H.H. ADM. und
AREA DE ESPERA und
DIRECCION und
DEPOSITO MAT. DIDACTICO und
TOPICO und
AULA 1 und
DEPOSITO AULA 1 und
SS.HH. AULA 1 und
EXTERIOR und

05.08.03 CAJA DE FºGº 300x300mm C/TAPA und


PRIMER PISO # CAJAS
SS.HH. DISCAP. und
S.S.H.H. ADM. und
AREA DE ESPERA und
DIRECCION und
DEPOSITO MAT. DIDACTICO und
TOPICO und
AULA 1 und
DEPOSITO AULA 1 und
SS.HH. AULA 1 und
EXTERIOR und

05.08.04 CAJA DE PASO OCTOGONAL und


PRIMER PISO # CAJAS
SS.HH. DISCAP. und
S.S.H.H. ADM. und
AREA DE ESPERA und
DIRECCION und
DEPOSITO MAT. DIDACTICO und
TOPICO und
AULA 1 und
DEPOSITO AULA 1 und
SS.HH. AULA 1 und

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

EXTERIOR und

TABLEROS GENERAL Y DE DISTRIBUCION


05.09
05.09.02 TABLERO DE DISTRIBUCION TD-1, 36 POLOS (01 INT. TERMOMAGNETICO 2x32 A., 03 INT TM 2x20 A., 04 INT TM. 2x16 A., und
AREA DE ESPERA und

#REF! #REF! #REF!


05.09.03 TABLERO DE BOMBAS TB, 24 POLOS (01 INT. TERMOMAGNETICO 2x32 A., 03 INT TM 2x20 A., 02 INT TM. 2x16 A., 05 INT. und
EXTERIOR und

05.09.04 TABLERO DE TENSION ESTABILIZADA 4KW, 12 POLOS (01 INT. TERMOMAGNETICO 2x32 A., 02 INT TM 2x20 A., 02 INT. DIF und
AREA DE ESPERA und

05.12 SISTEMA SALIDA


DE ALARMA
PARA CONTRA
SENSORESINCENDIO
DE HUMO Y TEMPERATURA
05.12.01 pto
PRIMER PISO # PUNTOS
SS.HH. DISCAP. pto
S.S.H.H. ADM. pto
AREA DE ESPERA pto
DIRECCION pto
DEPOSITO MAT. DIDACTICO pto
TOPICO pto
AULA 1 pto
DEPOSITO AULA 1 pto
SS.HH. AULA 1 pto
EXTERIOR pto

SALIDA PARA DISPOSITIVO DE ACCIONAMIENTO MANUAL


05.12.02 pto
PRIMER PISO # PUNTOS
SS.HH. DISCAP. pto
S.S.H.H. ADM. pto
AREA DE ESPERA pto
DIRECCION pto
DEPOSITO MAT. DIDACTICO pto
TOPICO pto
AULA 1 pto
DEPOSITO AULA 1 pto
SS.HH. AULA 1 pto
EXTERIOR pto

05.12.03 SALIDA PARA LUZ (SIRENA CONTRA INCENDIO) pto


05.12.04 DETECTOR DE HUMO DIRECCIONAL EN54 INCLUYE BASE und
PRIMER PISO
SS.HH. DISCAP. und
S.S.H.H. ADM. und
AREA DE ESPERA und
DIRECCION und
DEPOSITO MAT. DIDACTICO und
TOPICO und
AULA 1 und
DEPOSITO AULA 1 und
SS.HH. AULA 1 und
EXTERIOR und

05.12.06 DISPOSITIVO DE ACCIONAMIENTO MANUAL und


PRIMER PISO
SS.HH. DISCAP. und

Sust mod.-1
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADM

I.E.I. :
Ubicación :
Elaborado por :
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

PARTIDA DESCRIPCIÓN UND

S.S.H.H. ADM. und


AREA DE ESPERA und
DIRECCION und
DEPOSITO MAT. DIDACTICO und
TOPICO und
AULA 1 und
DEPOSITO AULA 1 und
SS.HH. AULA 1 und
EXTERIOR und

05.13 CONEXIONES A RED SUBTERRANEA


05.13.01 EXCAVACION PARA CABLE SUBTERRANEO m3
DEL TG AL C3 m3
DEL C3 AL TB m3
DEL C3 AL TD-1 m3
DEL C3 AL TTE m3

05.13.02 RELLENO CON MATERIAL PROPIO m3


DEL TG AL C3 m3
DEL C3 AL TB m3
DEL C3 AL TD-1 m3
DEL C3 AL TTE m3

05.13.03 RELLENO CON MATERIAL DE PRESTAMO m3


DEL TG AL C3 m3
DEL C3 AL TB m3
DEL C3 AL TD-1 m3
DEL C3 AL TTE m3

05.13.04 ELIMINACION MATERIAL EXCEDENTE CON CARRETILLA D=30m m3


DEL TG AL C3 m3
DEL C3 AL TB m3
DEL C3 AL TD-1 m3
DEL C3 AL TTE m3

05.14 ALIMENTADORES SECUNDARIOS CANALIZACION, CONDUCTOS O TUBERIAS


05.14.01 SUM. E INSTAL. CABLE N2X0H (2-1x6 + 1x10(T)) mm2, Ø 25 mm PVC - P und
DEL TG AL C3 und

05.14.02 SUM. E INSTAL. CABLE N2X0H (2-1x4 + 1x10(T)) mm2, Ø 25 mm PVC - P und
DEL C3 AL TB und
DEL C3 AL TD-1 und

05.14.03 PROTECCION Y SEÑALIZACION DE CABLE SUBTERRANEO ml


DEL TG AL C3 ml
DEL C3 AL TB ml
DEL C3 AL TD-1 ml
DEL C3 AL TTE ml

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und

AREA 176.90
1.00 176.88 1.00 176.88

176.90
1.00 176.88 1.00 176.88

area 0.00
1.00 0.00 0.35 1.00 0.00

176.90
1.00 20.10 8.80 1.00 176.88

69.70
4.00 1.55 1.55 1.75 1.00 16.82
10.00 1.95 1.55 1.75 1.00 52.89

11.20

1.00 4.70 0.25 0.70 1.00 0.82

1.00 4.70 0.25 0.70 1.00 0.82

1.00 2.97 0.25 0.70 1.00 0.52

1.00 4.70 0.25 0.70 1.00 0.82

1.00 4.70 0.25 0.70 1.00 0.82

1.00 4.70 0.25 0.70 1.00 0.82

1.00 4.70 0.25 0.70 1.00 0.82

1.00 4.70 0.25 0.70 1.00 0.82

2.00 0.62 0.25 0.70 1.00 0.22


2.00 1.85 0.25 0.70 1.00 0.65
2.00 1.45 0.25 0.70 1.00 0.51
2.00 1.30 0.25 0.70 1.00 0.46
2.00 1.30 0.25 0.70 1.00 0.46
2.00 0.63 0.25 0.70 1.00 0.22

2.00 2.22 0.25 0.70 1.00 0.78


2.00 3.55 0.25 0.70 1.00 1.24
1.00 2.22 0.25 0.70 1.00 0.39

30.40

4.00 1.55 1.30 0.80 1.00 1.00


10.00 1.95 1.30 0.80 1.00 6.50

2.00 0.63 0.10 0.30 1.00 1.06


2.00 1.85 0.10 0.30 1.00 3.50

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
2.00 1.45 0.10 0.30 1.00 2.70
2.00 1.30 0.10 0.30 1.00 2.40
2.00 1.30 0.10 0.30 1.00 2.40
2.00 0.63 0.10 0.30 1.00 1.06

1.00 2.22 0.10 0.30 1.00 2.12


1.00 3.55 0.10 0.30 1.00 3.45

1.00 2.22 0.10 0.30 1.00 2.12


1.00 2.22 0.10 0.30 1.00 2.12

7.50

1.00 20.10 0.60 0.15 1.00 1.81

1.00 20.10 1.50 0.15 1.00 4.52

1.00 6.70 0.60 0.15 1.00 0.60

1.00 6.70 0.60 0.15 1.00 0.60

AREA 26.50
1.00 32.09 0.30 1.00 9.63
1.00 7.59 0.30 1.00 2.28
1.00 3.25 0.30 1.00 0.98
1.00 16.98 0.30 1.00 5.09
1.00 9.29 0.30 1.00 2.79
1.00 5.01 0.30 1.00 1.50
1.00 8.95 0.30 1.00 2.69
1.00 2.22 0.30 1.00 0.67
1.00 2.86 0.30 1.00 0.86

volumen 98.60
1.00 0.00 1.00 0.00
1.00 17.69 1.00 17.69
1.00 69.70 1.00 69.70
1.00 11.20 1.00 11.20

volumen factor de expancion 123.20


1.00 0.00 1.25 0.00
1.00 17.69 1.25 22.11
1.00 69.70 1.25 87.13
1.00 11.20 1.25 14.00

55.80
4.00 1.55 1.55 1.00 9.61
10.00 1.95 1.55 1.00 30.23

1.00 4.70 0.25 1.00 1.18

1.00 4.70 0.25 1.00 1.18

1.00 2.97 0.25 1.00 0.74

1.00 4.70 0.25 1.00 1.18

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
1.00 4.70 0.25 1.00 1.18

1.00 4.70 0.25 1.00 1.18

1.00 4.70 0.25 1.00 1.18

1.00 4.70 0.25 1.00 1.18

2.00 0.62 0.25 1.00 0.31


2.00 1.85 0.25 1.00 0.93
2.00 1.45 0.25 1.00 0.73
2.00 1.30 0.25 1.00 0.65
2.00 1.30 0.25 1.00 0.65
2.00 0.63 0.25 1.00 0.31
0.00
2.00 2.22 0.25 1.00 1.11
2.00 3.55 0.25 1.00 1.78
1.00 2.22 0.25 1.00 0.56

7.30

1.00 5.80 0.25 0.60 1.00 0.87

1.00 1.63 0.25 0.60 1.00 0.24

1.00 2.97 0.15 0.60 1.00 0.27

1.00 5.80 0.25 0.60 1.00 0.87

1.00 5.80 0.25 0.60 1.00 0.87

1.00 3.30 0.25 0.60 1.00 0.50

1.00 5.80 0.25 0.60 1.00 0.87

1.00 2.22 0.15 0.60 1.00 0.20


1.00 0.80 0.15 0.60 1.00 0.07

1.00 2.22 0.15 0.60 1.00 0.20


1.00 2.22 0.15 0.60 1.00 0.20

1.00 1.32 0.15 0.60 1.00 0.12


1.00 2.70 0.15 0.60 1.00 0.24
1.00 2.30 0.15 0.60 1.00 0.21
1.00 2.15 0.15 0.60 1.00 0.19
1.00 2.15 0.15 0.60 1.00 0.19
1.00 1.32 0.15 0.60 1.00 0.12

1.00 0.45 0.15 0.60 1.00 0.04


1.00 1.72 0.15 0.60 1.00 0.15
1.00 1.33 0.15 0.60 1.00 0.12
1.00 1.08 0.15 0.60 1.00 0.10
2.00 2.15 0.15 0.60 1.00 0.39
2.00 1.32 0.15 0.60 1.00 0.24

74.40
lados
1.00 5.80 0.60 2.00 6.96
lados
1.00 1.63 0.60 2.00 1.96

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
lados
1.00 2.97 0.60 2.00 3.56
lados
1.00 5.80 0.60 2.00 6.96
lados
1.00 5.80 0.60 2.00 6.96
lados
1.00 3.30 0.60 2.00 3.96
lados
1.00 5.80 0.60 2.00 6.96

1.00 2.22 0.60 2.00 2.66


1.00 0.80 0.60 2.00 0.96

1.00 2.22 0.60 2.00 2.66


1.00 2.22 0.60 2.00 2.66

1.00 1.32 0.60 2.00 1.58


1.00 2.70 0.60 2.00 3.24
1.00 2.30 0.60 2.00 2.76
1.00 2.15 0.60 2.00 2.58
1.00 2.15 0.60 2.00 2.58
1.00 1.32 0.60 2.00 1.58

1.00 0.45 0.60 2.00 0.54


1.00 1.72 0.60 2.00 2.06
1.00 1.33 0.60 2.00 1.60
1.00 1.08 0.60 2.00 1.30
2.00 2.15 0.60 2.00 5.16
2.00 1.32 0.60 2.00 3.17

0.20
4.00 0.25 0.20 1.10 1.00 0.22

lados 2.90
4.00 0.20 1.10 2.00 1.76
4.00 0.25 1.10 1.00 1.10

23.90
4.00 1.55 1.55 0.60 1.00 5.77
10.00 1.95 1.55 0.60 1.00 18.14

# bar. Ø (pulg) Peso (kg/m) 659.30


4.00 1.40 9.00 5/8" 1.55 78.22
4.00 1.40 9.00 5/8" 1.55 78.22
10.00 1.80 11.00 5/8" 1.55 307.30
10.00 1.40 9.00 5/8" 1.55 195.55

10.20

1.00 5.80 0.25 0.50 1.00 0.73

1.00 5.80 0.25 0.50 1.00 0.73

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
1.00 2.97 0.25 0.50 1.00 0.37

1.00 5.80 0.25 0.50 1.00 0.73

1.00 5.80 0.25 0.50 1.00 0.73

1.00 5.80 0.25 0.50 1.00 0.73

1.00 5.80 0.25 0.50 1.00 0.73

1.00 5.80 0.15 0.50 1.00 0.44

1.00 1.87 0.25 0.50 1.00 0.23


1.00 3.25 0.25 0.50 1.00 0.41
1.00 2.85 0.25 0.50 1.00 0.36
1.00 2.70 0.25 0.50 1.00 0.34
1.00 2.70 0.25 0.50 1.00 0.34
1.00 1.87 0.25 0.50 1.00 0.23

1.00 2.22 0.25 0.50 1.00 0.28


1.00 3.55 0.25 0.50 1.00 0.44

1.00 2.22 0.25 0.50 1.00 0.28


1.00 2.22 0.25 0.50 1.00 0.28

1.00 1.87 0.25 0.50 1.00 0.23


1.00 3.25 0.25 0.50 1.00 0.41
1.00 2.85 0.25 0.50 1.00 0.36
1.00 2.70 0.25 0.50 1.00 0.34
1.00 2.70 0.25 0.50 1.00 0.34
1.00 1.87 0.25 0.50 1.00 0.23

1,037.50

3.80

Peso (kg/m) # Piezas


1.00 5.80
1.00 6.22 0.56 2.00 6.97
1.00 6.22 0.99 4.00 24.63

1.00 5.80
1.00 6.22 0.56 2.00 6.97
1.00 6.22 0.99 4.00 24.63

1.00 2.97
1.00 3.39 0.56 2.00 3.80
1.00 3.39 0.99 4.00 13.42

1.00 5.80
1.00 6.22 0.56 2.00 6.97
1.00 6.22 0.99 4.00 24.63

1.00 5.80
1.00 6.22 0.56 2.00 6.97
1.00 6.22 0.99 4.00 24.63

1.00 5.80
1.00 6.22 0.56 2.00 6.97
1.00 6.22 0.99 4.00 24.63

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und

1.00 5.80
1.00 6.22 0.56 2.00 6.97
1.00 6.22 0.99 4.00 24.63

1.00 5.80
1.00 6.22 0.56 2.00 6.97
1.00 6.22 0.99 4.00 24.63

1.00 1.87
1.00 2.29 0.56 2.00 2.56
1.00 2.29 0.99 4.00 9.07
1.00 3.25
1.00 3.67 0.56 2.00 4.11
1.00 3.67 0.99 4.00 14.53
1.00 2.85
1.00 3.27 0.56 2.00 3.66
1.00 3.27 0.99 4.00 12.95
1.00 2.70
1.00 3.12 0.56 2.00 3.49
1.00 3.12 0.99 4.00 12.36
1.00 2.70
1.00 3.12 0.56 2.00 3.49
1.00 3.12 0.99 4.00 12.36
1.00 1.87
1.00 2.29 0.56 2.00 2.56
1.00 2.29 0.99 4.00 9.07

1.00 2.22
1.00 2.64 0.56 2.00 2.96
1.00 2.64 0.99 4.00 10.45
1.00 3.55
1.00 3.97 0.56 2.00 4.45
1.00 3.97 0.99 4.00 15.72

1.00 2.22
1.00 2.64 0.56 2.00 2.96
1.00 2.64 0.99 4.00 10.45
1.00 2.22
1.00 2.64 0.56 2.00 2.96
1.00 2.64 0.99 4.00 10.45

1.00 1.87
1.00 2.29 0.56 2.00 2.56
1.00 2.29 0.99 4.00 9.07
1.00 3.25
1.00 3.67 0.56 2.00 4.11
1.00 3.67 0.99 4.00 14.53
1.00 2.85
1.00 3.27 0.56 2.00 3.66
1.00 3.27 0.99 4.00 12.95
1.00 2.70
1.00 3.12 0.56 2.00 3.49
1.00 3.12 0.99 4.00 12.36
1.00 2.70
1.00 3.12 0.56 2.00 3.49
1.00 3.12 0.99 4.00 12.36
1.00 1.87
1.00 2.29 0.56 2.00 2.56
1.00 2.29 0.99 4.00 9.07

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und

Peso (kg/m) # Estribos


1.00 5.80
1.00 1.42 0.56 41.00 32.60
Peso (kg/m) # Estribos
1.00 5.80
1.00 1.42 0.56 41.00 32.60
Peso (kg/m) # Estribos
1.00 2.97
1.00 1.42 0.56 27.00 21.47
Peso (kg/m) # Estribos
1.00 5.80
1.00 1.42 0.56 41.00 32.60
Peso (kg/m) # Estribos
1.00 5.80
1.00 1.42 0.56 41.00 32.60
Peso (kg/m) # Estribos
1.00 5.80
1.00 1.42 0.56 41.00 32.60
Peso (kg/m) # Estribos
1.00 5.80
1.00 1.42 0.56 41.00 32.60
Peso (kg/m) # Estribos
1.00 5.80
1.00 1.42 0.56 41.00 32.60

1.00 1.87
1.00 1.42 0.56 19.00 15.11
1.00 3.25
1.00 1.42 0.56 29.00 23.06
1.00 2.85
1.00 1.42 0.56 27.00 21.47
1.00 2.70
1.00 1.42 0.56 25.00 19.88
1.00 2.70
1.00 1.42 0.56 25.00 19.88
1.00 1.87
1.00 1.42 0.56 19.00 15.11

1.00 2.22
1.00 1.42 0.56 23.00 18.29
1.00 3.55
1.00 1.42 0.56 31.00 24.65

1.00 2.22
1.00 1.42 0.56 23.00 18.29
1.00 2.22
1.00 1.42 0.56 23.00 18.29

1.00 1.87
1.00 1.42 0.56 19.00 15.11
1.00 3.25
1.00 1.42 0.56 29.00 23.06
1.00 2.85
1.00 1.42 0.56 27.00 21.47
1.00 2.70
1.00 1.42 0.56 25.00 19.88

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
1.00 2.70
1.00 1.42 0.56 25.00 19.88
1.00 1.87
1.00 1.42 0.56 19.00 15.11

84.30
# LADOS
1.00 5.80 0.50 2.00 5.80
1.00 5.80 0.50 2.00 5.80
1.00 2.97 0.50 2.00 2.97
1.00 5.80 0.50 2.00 5.80
1.00 5.80 0.50 2.00 5.80
1.00 5.80 0.50 2.00 5.80
1.00 5.80 0.50 2.00 5.80
1.00 5.80 0.50 2.00 5.80

1.00 1.87 0.50 2.00 1.87


1.00 3.25 0.50 2.00 3.25
1.00 2.85 0.50 2.00 2.85
1.00 2.70 0.50 2.00 2.70
1.00 2.70 0.50 2.00 2.70
1.00 1.87 0.50 2.00 1.87

1.00 2.22 0.50 2.00 2.22


1.00 3.55 0.50 2.00 3.55

1.00 2.22 0.50 2.00 2.22


1.00 2.22 0.50 2.00 2.22

1.00 1.87 0.50 2.00 1.87


1.00 3.25 0.50 2.00 3.25
1.00 2.85 0.50 2.00 2.85
1.00 2.70 0.50 2.00 2.70
1.00 2.70 0.50 2.00 2.70
1.00 1.87 0.50 2.00 1.87

9.80
4.00 3.25 1.00 0.16 2.11
10.00 3.25 1.00 0.19 6.18
6.00 3.25 1.00 0.06 1.17
1.00 3.25 1.00 0.11 0.36

1,764.50

Peso (kg/m) # Piezas


4.00 1.55 5.21 8.00 258.42
4.00 2.56 0.56 36.00 206.44

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und

Peso (kg/m) # Piezas


7.00 1.55 5.21 6.00 339.17
7.00 1.55 5.21 4.00 226.11
7.00 2.74 0.56 36.00 386.67

Peso (kg/m) # Piezas


6.00 1.55 5.61 4.00 208.69
6.00 0.84 0.56 36.00 101.61

Peso (kg/m) # Piezas


1.00 0.56 5.61 4.00 12.57
1.00 1.77 0.39 36.00 24.85

perimetro 81.60
4.00 1.40 3.25 1.00 18.20
10.00 1.55 3.25 1.00 50.38
6.00 0.50 3.25 1.00 9.75
1.00 1.00 3.25 1.00 3.25

3.10

2.00 0.25 0.15 1.42 1.00 0.11


1.00 0.25 0.15 1.42 1.00 0.05
1.00 0.25 0.15 3.05 1.00 0.11
1.00 0.25 0.15 2.10 1.00 0.08
2.00 0.25 0.15 1.42 1.00 0.11
2.00 0.25 0.15 1.42 1.00 0.11
2.00 0.25 0.15 1.42 1.00 0.11
2.00 0.25 0.15 2.10 1.00 0.16

1.00 0.25 0.15 4.25 1.00 0.16


1.00 0.70 0.15 4.25 1.00 0.45

2.00 0.25 0.15 2.10 1.00 0.16

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
2.00 0.25 0.15 1.42 1.00 0.11
2.00 0.25 0.15 1.42 1.00 0.11
2.00 0.25 0.15 1.42 1.00 0.11
2.00 0.25 0.15 1.42 1.00 0.11
2.00 0.25 0.15 2.10 1.00 0.16

1.00 0.25 0.15 4.25 1.00 0.16

4.00 0.25 0.15 4.25 1.00 0.64

1.00 0.25 0.15 4.25 1.00 0.16

410.20
Estribos 1 Ca 1.42 2.05
Recubrimi 0.025 3.05 4.05
2.10 2.48
0.15 4.25 5.05

0.25

Peso (kg/m) # PIEZAS


2.00 1.42
2.00 0.56 2.05 4.00 2.37 10.62
2.00 0.80 0.39 13.00 8.11
1.00 1.42
1.00 0.56 2.05 4.00 2.37 5.31
1.00 0.80 0.39 13.00 4.06
1.00 3.05
1.00 0.56 4.05 4.00 4.37 9.79
1.00 0.80 0.39 19.00 5.93
1.00 2.10
1.00 0.56 2.48 4.00 2.80 6.27
1.00 0.80 0.39 15.00 4.68
2.00 1.42
2.00 0.56 2.05 4.00 2.37 10.62
2.00 0.80 0.39 13.00 8.11
2.00 1.42
2.00 0.56 2.05 4.00 2.37 10.62
2.00 0.80 0.39 13.00 8.11
2.00 1.42
2.00 0.56 2.05 4.00 2.37 10.62
2.00 0.80 0.39 13.00 8.11
2.00 2.10
2.00 0.56 2.48 4.00 2.80 12.54
2.00 0.80 0.39 15.00 9.36

1.00 4.25
1.00 0.56 5.05 4.00 5.37 12.03
1.00 0.80 0.39 25.00 7.80
1.00 4.25
1.00 0.56 5.05 4.00 5.37 12.03
1.00 0.80 0.39 25.00 7.80

2.00 2.10
2.00 0.56 2.48 4.00 2.80 12.54

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
2.00 0.80 0.39 15.00 9.36
2.00 1.42
2.00 0.56 2.05 4.00 2.37 10.62
2.00 0.80 0.39 13.00 8.11
2.00 1.42
2.00 0.56 2.05 4.00 2.37 10.62
2.00 0.80 0.39 13.00 8.11
2.00 1.42
2.00 0.56 2.05 4.00 2.37 10.62
2.00 0.80 0.39 13.00 8.11
2.00 1.42
2.00 0.56 2.05 4.00 2.37 10.62
2.00 0.80 0.39 13.00 8.11
2.00 2.10
2.00 0.56 2.48 4.00 2.80 12.54
2.00 0.80 0.39 15.00 9.36

1.00 4.25
1.00 0.56 5.05 4.00 5.37 12.03
1.00 0.80 0.39 25.00 7.80

4.00 4.25
4.00 0.56 5.05 4.00 5.37 48.12
4.00 0.80 0.39 25.00 31.20

1.00 4.25
1.00 0.56 5.05 4.00 5.37 12.03
1.00 0.80 0.39 25.00 7.80

36.20

2.00 0.25 1.42 2.00 1.42


1.00 0.25 1.42 2.00 0.71
1.00 0.25 3.05 2.00 1.53
1.00 0.25 2.10 2.00 1.05
2.00 0.25 1.42 2.00 1.42
2.00 0.25 1.42 2.00 1.42
2.00 0.25 1.42 2.00 1.42
2.00 0.25 2.10 2.00 2.10

1.00 0.25 4.25 2.00 2.13


1.00 0.70 4.25 2.00 5.95

2.00 0.25 2.10 2.00 2.10


2.00 0.25 1.42 2.00 1.42
2.00 0.25 1.42 2.00 1.42
2.00 0.25 1.42 2.00 1.42
2.00 0.25 1.42 2.00 1.42
2.00 0.25 2.10 2.00 2.10

1.00 0.55 4.25 1.00 2.34

4.00 0.15 4.25 1.00 2.55

1.00 0.55 4.25 1.00 2.34

1.00

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und

1.00 1.82 0.15 0.25 1.00 0.07


1.00 1.27 0.15 0.25 1.00 0.05
1.00 1.77 0.15 0.25 1.00 0.07
1.00 2.80 0.15 0.25 1.00 0.11
1.00 2.65 0.15 0.25 1.00 0.10
1.00 2.65 0.15 0.25 1.00 0.10
1.00 1.82 0.15 0.25 1.00 0.07

1.00 0.95 0.15 0.25 1.00 0.04


1.00 2.22 0.15 0.25 1.00 0.08
1.00 1.83 0.15 0.25 1.00 0.07
1.00 1.58 0.15 0.25 1.00 0.06
1.00 2.65 0.15 0.25 1.00 0.10
1.00 1.82 0.15 0.25 1.00 0.07

123.80
Estribos 1
Recubrimi 0.04
0.15

0.25

Peso (kg/m) # Piezas


1.00 1.82
1.00 2.14 0.56 4.00 4.79
1.00 0.68 0.39 15.00 3.98
1.00 1.27
1.00 2.14 0.56 4.00 4.79
1.00 0.68 0.39 13.00 3.45
1.00 1.77
1.00 2.09 0.56 4.00 4.68
1.00 0.68 0.39 15.00 3.98
1.00 2.80
1.00 3.12 0.56 4.00 6.99
1.00 0.68 0.39 19.00 5.04
1.00 2.65
1.00 2.97 0.56 4.00 6.65
1.00 0.68 0.39 19.00 5.04
1.00 2.65
1.00 2.97 0.56 4.00 6.65
1.00 0.68 0.39 19.00 5.04
1.00 1.82
1.00 2.14 0.56 4.00 4.79
1.00 0.68 0.39 15.00 3.98

1.00 0.95
1.00 1.27 0.56 4.00 2.84
1.00 0.68 0.39 13.00 3.45
1.00 2.22
1.00 2.54 0.56 4.00 5.69
1.00 0.68 0.39 17.00 4.51
1.00 1.83
1.00 2.15 0.56 4.00 4.82
1.00 0.68 0.39 15.00 3.98
1.00 1.58
1.00 1.90 0.56 4.00 4.26

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
1.00 0.68 0.39 15.00 3.98
1.00 2.65
1.00 2.97 0.56 4.00 6.65
1.00 0.68 0.39 19.00 5.04
1.00 1.82
1.00 2.14 0.56 4.00 4.79
1.00 0.68 0.39 15.00 3.98

12.90

# LADOS
1.00 1.82 0.25 2.00 0.91
1.00 1.27 0.25 2.00 0.64
1.00 1.77 0.25 2.00 0.89
1.00 2.80 0.25 2.00 1.40
1.00 2.65 0.25 2.00 1.33
1.00 2.65 0.25 2.00 1.33
1.00 1.82 0.25 2.00 0.91

1.00 0.95 0.25 2.00 0.48


1.00 2.22 0.25 2.00 1.11
1.00 1.83 0.25 2.00 0.92
1.00 1.58 0.25 2.00 0.79
1.00 2.65 0.25 2.00 1.33
1.00 1.82 0.25 2.00 0.91

12.80

AREA
1.00 21.10 0.09 1.00 1.90

2.00 1.87 0.11 1.00 0.40


2.00 3.25 0.11 1.00 0.69
2.00 2.85 0.11 1.00 0.60
2.00 2.70 0.11 1.00 0.57
2.00 2.70 0.11 1.00 0.57
2.00 1.88 0.11 1.00 0.40

0.00
1.00 7.00 0.25 0.50 1.00 0.88

1.00 6.70 0.25 0.20 1.00 0.34

1.00 4.17 0.25 0.20 1.00 0.21

1.00 6.70 0.25 0.20 1.00 0.34

1.00 6.70 0.25 0.20 1.00 0.34

1.00 6.70 0.25 0.20 1.00 0.34

1.00 2.80 0.25 0.20 1.00 0.14


0.00
1.00 6.70 0.25 0.20 1.00 0.34

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und

1.00 4.12 0.25 0.20 1.00 0.21


1.00 5.06 0.25 0.20 1.00 0.25

1.00 4.12 0.25 0.20 1.00 0.21


1.00 5.06 0.25 0.20 1.00 0.25

1.00 4.12 0.25 0.20 1.00 0.21


1.00 5.06 0.25 0.20 1.00 0.25

1.00 4.12 0.25 0.20 1.00 0.21


1.00 5.06 0.25 0.20 1.00 0.25

1.00 4.12 0.25 0.20 1.00 0.21


1.00 5.06 0.25 0.20 1.00 0.25

1.00 4.12 0.25 0.20 1.00 0.21


1.00 5.06 0.25 0.20 1.00 0.25

1.00 21.10 0.15 0.20 1.00 0.63

1.00 21.10 0.15 0.20 1.00 0.63

1.00 8.50 0.15 0.20 1.00 0.26

1.00 8.50 0.15 0.20 1.00 0.26

1.00 2.23 0.15 0.20 1.00 0.07

1.00 2.23 0.15 0.20 1.00 0.07

1.00 2.85 0.15 0.20 1.00 0.09

2,385.20

Estribos 5
Recubrimiento 0.04
0.25

0.60

Peso (kg/mt) # Piezas


1.00 21.10
1.00 22.11 2.24 5.00 247.63
1.00 1.27 0.56 108.00 76.81

Estribos 5
Recubrimiento 0.04
0.25

0.40

Peso (kg/mt) # Piezas


2.00 1.87
2.00 2.13 1.55 4.00 26.41
2.00 2.13 0.56 4.00 9.54
2.00 1.76 0.56 28.00 55.19

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
2.00 3.25
2.00 3.51 1.55 4.00 43.52
2.00 3.51 0.56 4.00 15.72
2.00 1.20 0.56 28.00 37.63
2.00 2.85
2.00 3.11 1.55 4.00 38.56
2.00 3.11 0.56 4.00 13.93
2.00 1.20 0.56 26.00 34.94
2.00 2.70
2.00 2.96 1.55 4.00 36.70
2.00 2.96 0.56 4.00 13.26
2.00 1.20 0.56 26.00 34.94
2.00 2.70
2.00 2.96 1.55 4.00 36.70
2.00 2.96 0.56 4.00 13.26
2.00 1.20 0.56 26.00 34.94
2.00 1.88
2.00 2.14 1.55 4.00 26.54
2.00 2.14 0.56 4.00 9.59
2.00 1.20 0.56 20.00 26.88

Estribos 5
Recubrimiento 0.04
0.25

0.50

Peso (kg/mt) # Piezas


1.00 7.00
1.00 7.26 1.55 4.00 45.01
1.00 1.40 0.56 42.00 32.93

Estribos 5
Recubrimiento 0.04
0.25

0.20

1.00 6.70 Peso (kg/mt) # Piezas


1.00 6.96 0.99 4.00 27.56
1.00 1.40 0.56 52.00 40.77

1.00 4.17
1.00 4.43 1.55 4.00 27.47
1.00 1.40 0.56 40.00 31.36

1.00 6.70
1.00 6.96 1.55 4.00 43.15
1.00 1.40 0.56 52.00 40.77

1.00 6.70
1.00 6.96 1.55 4.00 43.15
1.00 1.40 0.56 52.00 40.77

1.00 6.70

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
1.00 6.96 1.55 4.00 43.15
1.00 1.40 0.56 52.00 40.77

1.00 2.80
1.00 3.06 1.55 4.00 18.94
1.00 1.40 0.56 32.00 25.09

1.00 6.70
1.00 6.96 1.55 4.00 43.15
1.00 1.40 0.56 52.00 40.77

Estribos 5
Recubrimiento 0.04
0.25

0.40

Peso (kg/mt) # Piezas


1.00 7.00
1.00 7.26 1.55 4.00 45.01
1.00 1.38 0.56 56.00 43.28

Estribos 5
Recubrimiento 0.04
0.25

0.20

Peso (kg/mt) # Piezas

1.00 4.12
1.00 4.28 0.99 4.00 16.95
1.00 0.80 0.56 40.00 17.92
1.00 5.06
1.00 5.22 0.99 4.00 20.67
1.00 0.80 0.56 44.00 19.71

1.00 4.12
1.00 4.28 1.55 4.00 26.54
1.00 0.80 0.56 44.00 19.71
1.00 5.06
1.00 5.22 1.55 4.00 32.36
1.00 0.80 0.56 16.00 7.17

1.00 4.12
1.00 4.28 1.55 4.00 26.54
1.00 0.80 0.56 44.00 19.71
1.00 5.06
1.00 5.22 1.55 4.00 32.36
1.00 0.80 0.56 16.00 7.17

1.00 4.12
1.00 4.28 1.55 4.00 26.54
1.00 0.80 0.56 44.00 19.71
1.00 5.06
1.00 5.22 1.55 4.00 32.36
1.00 0.80 0.56 16.00 7.17

1.00 4.12

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
1.00 4.28 1.55 4.00 26.54
1.00 0.80 0.56 44.00 19.71
1.00 5.06
1.00 5.22 1.55 4.00 32.36
1.00 0.80 0.56 16.00 7.17

1.00 4.12
1.00 4.28 1.55 4.00 26.54
1.00 0.80 0.56 44.00 19.71
1.00 5.06
1.00 5.22 1.55 4.00 32.36
1.00 0.80 0.56 16.00 7.17

Estribos 5
Recubrimiento 0.04
0.15

0.20

Peso (kg/mt) # Piezas

1.00 21.10
1.00 21.26 0.99 4.00 84.19
1.00 0.60 0.39 100.00 23.40

1.00 21.10
1.00 21.26 0.99 4.00 84.19
1.00 0.60 0.39 100.00 23.40

1.00 8.50
1.00 8.66 0.99 4.00 34.29
1.00 0.60 0.39 50.00 11.70

1.00 8.50
1.00 8.66 0.99 4.00 34.29
1.00 0.60 0.39 50.00 11.70

1.00 2.23
1.00 2.39 0.99 4.00 9.46
1.00 0.60 0.39 26.00 6.08

1.00 2.23
1.00 2.39 0.99 4.00 9.46
1.00 0.60 0.39 26.00 6.08

1.00 2.85
1.00 3.01 0.99 4.00 11.92
1.00 0.60 0.39 28.00 6.55

1.00 2.85
1.00 3.01 0.99 4.00 11.92
1.00 0.60 0.39 28.00 6.55

117.90

#LADOS
1.00 21.10 0.42 2.00 17.72

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
2.00 1.87 0.70 2.00 5.24
2.00 3.25 0.70 2.00 9.10
2.00 2.85 0.70 2.00 7.98
2.00 2.70 0.70 2.00 7.56
2.00 2.70 0.70 2.00 7.56
2.00 1.88 0.70 2.00 5.26

1.00 7.00 0.50 2.00 7.00

1.00 6.70 0.20 2.00 2.68

1.00 4.17 0.20 2.00 1.67

1.00 6.70 0.20 2.00 2.68

1.00 6.70 0.20 2.00 2.68

1.00 6.70 0.20 2.00 2.68

1.00 2.80 0.20 2.00 1.12

1.00 6.70 0.20 2.00 2.68

1.00 4.12 0.20 1.00 0.82


1.00 5.06 0.20 1.00 1.01

1.00 4.12 0.20 1.00 0.82


1.00 5.06 0.20 1.00 1.01

1.00 4.12 0.20 1.00 0.82


1.00 5.06 0.20 1.00 1.01

1.00 4.12 0.20 1.00 0.82


1.00 5.06 0.20 1.00 1.01

1.00 4.12 0.20 1.00 0.82


1.00 5.06 0.20 1.00 1.01

1.00 4.12 0.20 1.00 0.82


1.00 5.06 0.20 1.00 1.01

1.00 21.10 0.35 1.00 7.39

1.00 21.10 0.35 1.00 7.39

1.00 8.50 0.35 1.00 2.98

1.00 8.50 0.35 1.00 2.98

1.00 2.23 0.35 1.00 0.78

1.00 2.23 0.35 1.00 0.78

1.00 2.85 0.35 1.00 1.00

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und

290.00

1.00 2.22 2.90 1.00 6.44 13.41


1.00 3.55 2.90 1.00 10.30 21.45
1.00 3.15 2.90 1.00 9.14 19.03
1.00 3.00 2.90 1.00 8.70 18.13
1.00 3.00 2.90 1.00 8.70 18.13
1.00 2.22 2.90 1.00 6.44 13.41
1.00 2.22 2.90 1.00 6.44 13.41
1.00 3.55 2.90 1.00 10.30 21.45
1.00 3.15 2.90 1.00 9.14 19.03
1.00 3.00 2.90 1.00 8.70 18.13
1.00 3.00 2.90 1.00 8.70 18.13
1.00 2.22 2.90 1.00 6.44 13.41

1.00 0.60 0.42 1.00 0.25 0.53


1.00 2.22 0.42 1.00 0.93 1.94
1.00 3.55 0.42 1.00 1.49 3.11
1.00 3.15 0.42 1.00 1.32 2.76
1.00 3.00 0.42 1.00 1.26 2.63
1.00 3.00 0.42 1.00 1.26 2.63
1.00 2.22 0.42 1.00 0.93 1.94
1.00 0.60 0.42 1.00 0.25 0.53
1.00 0.60 1.36 1.00 0.82 1.70
1.00 2.22 1.36 1.00 3.02 6.29
1.00 3.55 1.36 1.00 4.83 10.06
1.00 3.15 1.36 1.00 4.28 8.93
1.00 3.00 1.36 1.00 4.08 8.50
1.00 3.00 1.36 1.00 4.08 8.50
1.00 2.22 1.36 1.00 3.02 6.29
1.00 0.60 1.36 1.00 0.82 1.70
1.00 0.60 2.90 1.00 1.74 3.63
1.00 0.60 2.90 1.00 1.74 3.63
1.00 0.60 2.90 1.00 1.74 3.63
1.00 0.60 2.90 1.00 1.74 3.63

17.50

#POLIESTIRENO(und)
1.00 13.41 6.44 0.56
1.00 21.45 10.30 0.90
1.00 19.03 9.14 0.80
1.00 18.13 8.70 0.76
1.00 18.13 8.70 0.76
1.00 13.41 6.44 0.56
1.00 13.41 6.44 0.56
1.00 21.45 10.30 0.90
1.00 19.03 9.14 0.80
1.00 18.13 8.70 0.76
1.00 18.13 8.70 0.76
1.00 13.41 6.44 0.56

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und

1.00 21.45 10.30 0.90


1.00 19.03 9.14 0.80
1.00 18.13 8.70 0.76
1.00 18.13 8.70 0.76
1.00 13.41 6.44 0.56
1.00 13.41 6.44 0.56
1.00 21.45 10.30 0.90
1.00 19.03 9.14 0.80
1.00 18.13 8.70 0.76
1.00 18.13 8.70 0.76
1.00 13.41 6.44 0.56
0.00 0.00 0.00 0.00
1.00 0.53 0.25 0.02
1.00 1.94 0.93 0.08
1.00 3.11 1.49 0.13
1.00 2.76 1.32 0.12
1.00 2.63 1.26 0.11
1.00 2.63 1.26 0.11
1.00 1.94 0.93 0.08
1.00 0.53 0.25 0.02

989.60

on Derecho 01 0.15

ento Laterales 0.040


Empalme 0.00

Ø (pulg)Peso (kg/mt) # PIEZAS


1.00 1.60 1/2" 0.99 18.00 1.71 30.47
1.00 1.55 1/2" 0.99 18.00 1.66 29.58

1/2" 1
/
X 2
"

Ø (pulg)Peso (kg/mt) # PIEZAS


1.00 2.20 1/2" 0.99 18.00 39.20
1.00 2.50 1/2" 0.99 18.00 44.55
1.00 2.30 1/2" 0.99 18.00 40.99
1.00 2.25 1/2" 0.99 18.00 40.10
1.00 1.95 1/2" 0.99 18.00 34.75

Ø (pulg)Peso (kg/mt) # PIEZAS


1.00 22.72 1/2" 0.99 18.00 404.87

0.15

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
X
0.04
0.6
Ø (pulg)Peso (kg/mt) # PIEZAS
1.00 22.72 1/4" 0.25 19.00 25.34 120.37

Ø (pulg)Peso (kg/mt) # PIEZAS


1.00 4.45 1/4" 0.25 92.00 4.45 102.35
1.00 4.45 1/4" 0.25 92.00 4.45 102.35

139.00
area
1.00 6.44 1.00 6.44
1.00 10.30 1.00 10.30
1.00 9.14 1.00 9.14
1.00 8.70 1.00 8.70
1.00 8.70 1.00 8.70
1.00 6.44 1.00 6.44
1.00 6.44 1.00 6.44
1.00 10.30 1.00 10.30
1.00 9.14 1.00 9.14
1.00 8.70 1.00 8.70
1.00 8.70 1.00 8.70
1.00 6.44 1.00 6.44
1.00 0.00 1.00 0.00
1.00 0.25 1.00 0.25
1.00 0.93 1.00 0.93
1.00 1.49 1.00 1.49
1.00 1.32 1.00 1.32
1.00 1.26 1.00 1.26
1.00 1.26 1.00 1.26
1.00 0.93 1.00 0.93
1.00 0.25 1.00 0.25
1.00 0.82 1.00 0.82
1.00 3.02 1.00 3.02
1.00 4.83 1.00 4.83
1.00 4.28 1.00 4.28
1.00 4.08 1.00 4.08
1.00 4.08 1.00 4.08
1.00 3.02 1.00 3.02
1.00 0.82 1.00 0.82
1.00 1.74 1.00 1.74
1.00 1.74 1.00 1.74
1.00 1.74 1.00 1.74
1.00 1.74 1.00 1.74

55.10

1.00 1.32 0.82 1.00 1.08

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
1.00 1.03 0.82 1.00 0.84
1.00 1.53 1.50 1.00 2.30
1.00 2.30 0.82 1.00 1.89
1.00 2.15 0.82 1.00 1.76
1.00 2.15 0.82 1.00 1.76
1.00 1.32 1.50 1.00 1.98

1.00 2.22 2.45 1.00 5.44


1.00 0.80 2.45 1.00 1.96

1.00 2.22 2.45 1.00 5.44


1.00 2.22 2.45 1.00 5.44

1.00 0.45 1.50 1.00 0.68


1.00 1.72 0.82 1.00 1.41
1.00 1.33 0.82 1.00 1.09
1.00 1.08 0.82 1.00 0.89
1.00 2.15 0.82 1.00 1.76
1.00 1.32 1.50 1.00 1.98

1.00 2.97 2.45 1.00 7.28

area
1.00 0.96 1.00 0.96
1.00 0.96 1.00 0.96

1.00 0.74 1.00 0.74

1.00 0.96 1.00 0.96


1.00 0.96 1.00 0.96

1.00 0.96 1.00 0.96


1.00 0.96 1.00 0.96

1.00 0.87 1.00 0.87


1.00 0.87 1.00 0.87

1.00 0.96 1.00 0.96


1.00 0.88 1.00 0.88

70.80

1.00 2.78 2.65 1.00 7.37


1.00 1.00 2.65 1.00 2.65
1.00 1.62 2.65 1.00 4.29

1.00 1.62 2.65 1.00 4.29

1.00 2.78 2.65 1.00 7.37


1.00 2.78 2.65 1.00 7.37

1.00 2.78 2.65 1.00 7.37


1.00 2.78 2.65 1.00 7.37

1.00 0.65 2.65 1.00 1.72


1.00 0.93 2.65 1.00 2.46
1.00 0.78 2.65
2.00 0.80 2.65 1.00 4.24

1.00 2.78 2.65 1.00 7.37

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
1.00 0.78 2.65 1.00 2.07
1.00 1.85 2.65 1.00 4.90

37.50

2.00 1.67 1.00 3.34


1.00 2.35 1.00 2.35
1.00 1.67 1.00 1.67
2.00 1.67 1.00 3.34
2.00 1.67 1.00 3.34
2.00 1.67 1.00 3.34
2.00 2.35 1.00 4.70

1.00 2.35 1.00 2.35


1.00 1.67 1.00 1.67
1.00 1.67 1.00 1.67
1.00 1.67 1.00 1.67
2.00 1.67 1.00 3.34
2.00 2.35 1.00 4.70

Fact. (Kg/ml) 188.90


1.00 6.00 0.25 1.00 55.10 82.65
1.00 6.00 0.25 1.00 70.80 106.20

37.50

2.00 1.67 1.00 3.34


1.00 2.35 1.00 2.35
1.00 1.67 1.00 1.67
2.00 1.67 1.00 3.34
2.00 1.67 1.00 3.34
2.00 1.67 1.00 3.34
2.00 2.35 1.00 4.70

1.00 2.35 1.00 2.35


1.00 1.67 1.00 1.67
1.00 1.67 1.00 1.67
1.00 1.67 1.00 1.67
2.00 1.67 1.00 3.34
2.00 2.35 1.00 4.70

48.50
perimetro
1.00 5.95 1.60 1.00 9.52
1.00 7.30 1.60 1.00 11.68
1.00 17.05 1.60 1.00 27.28

111.00

1.00 2.78 2.65 1.00 7.37


1.00 1.32 0.90 1.00 1.19
1.00 1.03 0.90 1.00 0.93
1.00 2.97 2.65 1.00 7.87
1.00 2.22 2.65 1.00 5.88

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
1.00 1.00 0.55 1.00 0.55
1.00 2.22 0.55 1.00 1.22
1.00 1.62 0.55 1.00 0.89
1.00 2.22 0.55 1.00 1.22
1.00 2.97 2.65 1.00 7.87
1.00 2.78 2.65 1.00 7.37
1.00 0.80 2.65 1.00 2.12
1.00 1.52 1.70 1.00 2.58
1.00 1.62 2.65 1.00 4.29
1.00 0.80 2.65 1.00 2.12
1.00 2.78 2.65 1.00 7.37
1.00 1.72 1.70 1.00 2.92
1.00 2.30 0.90 1.00 2.07
1.00 2.78 2.65 1.00 7.37
1.00 1.33 0.90 1.00 1.20
1.00 2.78 2.65 1.00 7.37
1.00 2.15 0.90 1.00 1.94
1.00 1.08 0.90 1.00 0.97
1.00 0.65 2.65 1.00 1.72
1.00 0.93 2.65 1.00 2.46
1.00 0.78 2.65 1.00 2.07
1.00 0.80 2.65 1.00 2.12
1.00 2.22 2.65 1.00 5.88
1.00 1.85 2.65 1.00 4.90
1.00 0.80 2.65 1.00 2.12
1.00 1.32 1.70 1.00 2.24
1.00 0.65 0.55 1.00 0.36
1.00 0.93 0.55 1.00 0.51
1.00 0.78 0.55 1.00 0.43
1.00 2.78 0.55 1.00 1.53

52.00

1.00 1.32 0.90 1.00 1.19


1.00 1.03 0.90 1.00 0.93
1.00 1.52 1.50 1.00 2.28
1.00 2.30 0.90 1.00 2.07
1.00 2.15 0.90 1.00 1.94
1.00 2.15 0.90 1.00 1.94
1.00 1.33 1.50 1.00 2.00

1.00 0.45 1.50 1.00 0.68


1.00 1.72 0.90 1.00 1.55
1.00 1.33 0.90 1.00 1.20
1.00 1.08 0.90 1.00 0.97
1.00 2.15 0.90 1.00 1.94
1.00 1.32 1.50 1.00 1.98

1.00 2.78 2.65 1.00 7.37


1.00 2.78 2.65 1.00 7.37
1.00 0.96 1.00 0.96

1.00 2.78 2.65 1.00 7.37


1.00 2.78 2.65 1.00 7.37
1.00 0.96 1.00 0.96

95.20
4.00 1.30 2.60 1.00 13.52
1.00 1.75 2.60 1.00 4.55

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
3.00 1.70 2.60 1.00 13.26
2.00 1.60 2.60 1.00 8.32
4.00 1.45 2.60 1.00 15.08
1.00 0.85 2.60 1.00 2.21
4.00 0.50 2.60 1.00 5.20
1.00 0.35 2.60 1.00 0.91
1.00 1.00 2.60 1.00 2.60
1.00 0.65 2.60 1.00 1.69
3.00 0.55 2.60 1.00 4.29
1.00 0.40 2.60 1.00 1.04
1.00 0.35 2.60 1.00 0.91
2.00 0.15 2.60 1.00 0.78
1.00 0.65 1.90 1.00 1.24
3.00 0.65 1.22 1.00 2.38
6.00 0.50 1.90 1.00 5.70
13.00 0.50 1.22 1.00 7.93
1.00 1.40 2.60 1.00 3.64

80.70

# LADOS
1.00 21.10 0.42 1.00 8.86

2.00 1.87 0.00 2.00 0.00


2.00 3.25 0.00 2.00 0.00
2.00 2.85 0.00 2.00 0.00
2.00 2.70 0.00 2.00 0.00
2.00 2.70 0.00 2.00 0.00
2.00 1.88 0.00 2.00 0.00

1.00 7.00 0.50 2.00 7.00

1.00 6.70 0.20 2.00 2.68

1.00 4.17 0.20 2.00 1.67

1.00 6.70 0.20 2.00 2.68

1.00 6.70 0.20 2.00 2.68

1.00 6.70 0.20 2.00 2.68

1.00 2.80 0.20 2.00 1.12


0.00 0.00 0.00 2.00 0.00
1.00 6.70 0.20 2.00 2.68

1.00 4.12 0.20 2.00 1.65


1.00 5.06 0.20 2.00 2.02

1.00 4.12 0.20 2.00 1.65


1.00 5.06 0.20 2.00 2.02

1.00 4.12 0.20 2.00 1.65


1.00 5.06 0.20 2.00 2.02

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
1.00 4.12 0.20 2.00 1.65
1.00 5.06 0.20 2.00 2.02

1.00 4.12 0.20 2.00 1.65


1.00 5.06 0.20 2.00 2.02

1.00 4.12 0.20 2.00 1.65


1.00 5.06 0.20 2.00 2.02

1.00 21.10 0.20 2.00 8.44

1.00 21.10 0.20 2.00 8.44

1.00 8.50 0.20 2.00 3.40

1.00 8.50 0.20 2.00 3.40

1.00 2.23 0.20 2.00 0.89

1.00 2.23 0.20 2.00 0.89

1.00 2.85 0.20 2.00 1.14

139.00
area
1.00 6.44 1.00 6.44
1.00 10.30 1.00 10.30
1.00 9.14 1.00 9.14
1.00 8.70 1.00 8.70
1.00 8.70 1.00 8.70
1.00 6.44 1.00 6.44
1.00 6.44 1.00 6.44
1.00 10.30 1.00 10.30
1.00 9.14 1.00 9.14
1.00 8.70 1.00 8.70
1.00 8.70 1.00 8.70
1.00 6.44 1.00 6.44
1.00 0.00 1.00 0.00
1.00 0.25 1.00 0.25
1.00 0.93 1.00 0.93
1.00 1.49 1.00 1.49
1.00 1.32 1.00 1.32
1.00 1.26 1.00 1.26
1.00 1.26 1.00 1.26
1.00 0.93 1.00 0.93
1.00 0.25 1.00 0.25
1.00 0.82 1.00 0.82
1.00 3.02 1.00 3.02
1.00 4.83 1.00 4.83
1.00 4.28 1.00 4.28
1.00 4.08 1.00 4.08
1.00 4.08 1.00 4.08
1.00 3.02 1.00 3.02
1.00 0.82 1.00 0.82
1.00 1.74 1.00 1.74
1.00 1.74 1.00 1.74
1.00 1.74 1.00 1.74
1.00 1.74 1.00 1.74

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und

# LADOS 136.20
1.00 1.10 2.10 2.00 5.30
3.00 0.90 2.10 2.00 15.30
1.00 0.80 2.10 2.00 5.00
1.00 1.00 2.10 2.00 5.20
1.00 0.90 2.10 2.00 5.10
2.00 1.00 2.10 2.00 10.40
1.00 0.70 2.10 2.00 4.90
1.00 1.60 1.38 2.00 5.96
3.00 2.70 1.38 2.00 24.48
3.00 1.88 0.70 2.00 15.48
1.00 2.85 1.38 2.00 8.46
1.00 1.85 1.38 2.00 6.46
1.00 2.25 1.38 2.00 7.26
1.00 1.80 0.70 2.00 5.00
1.00 1.30 1.38 2.00 5.36
1.00 1.88 1.38 2.00 6.52

625.00

# LADOS
1.00 10.85 2.00 21.70
1.00 5.95 2.00 11.90

1.00 7.30 2.00 14.60


1.00 8.55 2.00 17.10
1.00 5.95 2.00 11.90

1.00 5.95 2.00 11.90

1.00 8.55 2.00 17.10


2.00 5.95 2.00 23.80

1.00 10.85 2.00 21.70


1.00 5.95 2.00 11.90

1.00 10.85 2.00 21.70


1.00 5.95 2.00 11.90

1.00 10.85 2.00 21.70


1.00 5.95 2.00 11.90

1.00 10.85 2.00 21.70


1.00 5.95 2.00 11.90

1.00 6.60 2.00 13.20


1.00 7.15 2.00 14.30
1.00 5.95 2.00 11.90

1.00 6.85 2.00 13.70


1.00 6.90 2.00 13.80
1.00 5.95 2.00 11.90

1.00 10.85 2.00 21.70

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
2.00 5.95 2.00 23.80

1.00 7.30 2.00 14.60


1.00 8.55 2.00 17.10
2.00 5.95 2.00 23.80

1.00 4.29 2.00 8.58

1.00 3.69 2.00 7.38

1.00 6.05 2.00 12.10

1.00 6.40 2.00 12.80

1.00 5.94 2.00 11.88

1.00 5.94 2.00 11.88

1.00 5.65 2.00 11.30

1.00 9.35 2.00 18.70


2.00 2.22 2.00 8.88

1.00 6.50 2.00 13.00


1.00 0.90 2.00 1.80
1.00 0.80 2.00 1.60
2.00 0.90 2.00 3.60

1.00 3.90 2.00 7.80

1.00 5.09 2.00 10.18

1.00 4.29 2.00 8.58

1.00 3.79 2.00 7.58

1.00 5.93 2.00 11.86

1.00 5.65 2.00 11.30

48.50
1.00 5.95 1.60 1.00 9.52
1.00 7.30 1.60 1.00 11.68
1.00 17.05 1.60 1.00 27.28

area 111.00
1.00 39.90 1.00 39.90
1.00 9.31 1.00 9.31
1.00 4.97 1.00 4.97
1.00 20.25 1.00 20.25
1.00 11.39 1.00 11.39
1.00 6.12 1.00 6.12
1.00 12.08 1.00 12.08
1.00 2.62 1.00 2.62

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
1.00 4.38 1.00 4.38

111.00
area
1.00 39.90 1.00 39.90
1.00 9.31 1.00 9.31
1.00 4.97 1.00 4.97
1.00 20.25 1.00 20.25
1.00 11.39 1.00 11.39
1.00 6.12 1.00 6.12
1.00 12.08 1.00 12.08
1.00 2.62 1.00 2.62
1.00 4.38 1.00 4.38

63.40
area
1.00 39.90 1.00 39.90
1.00 11.39 1.00 11.39
1.00 12.08 1.00 12.08

36.60
area
1.00 9.31 1.00 9.31
1.00 20.25 1.00 20.25
1.00 2.62 1.00 2.62
1.00 4.38 1.00 4.38

103.60
1.00 - 4.97 - 1.00 4.97
1.00 - 6.12 - 1.00 6.12
2.00 20.10 0.60 - 1.00 24.12
2.00 20.10 1.50 1.00 60.30
2.00 6.70 0.60 1.00 8.04

107.70
area
1.00 - 3.19 - 1.00 3.19
1.00 - 6.32 - 1.00 6.32
1.00 - 10.27 - 1.00 10.27
1.00 31.33 1.90 1.00 59.53
1.00 31.33 0.60 1.00 18.80
2.00 8.00 0.60 1.00 9.60

176.70
PERIMETRO
1.00 26.80 1.00 26.80
1.00 13.15 1.00 13.15
1.00 9.25 1.00 9.25
1.00 19.40 1.00 19.40
1.00 13.75 1.00 13.75
1.00 10.35 1.00 10.35
1.00 14.90 1.00 14.90
1.00 7.15 1.00 7.15
1.00 8.60 1.00 8.60
1.00 51.20 1.00 51.20
1.00 1.50 1.00 1.50

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
1.00 0.60 1.00 0.60

176.70

1.00 26.80 1.00 26.80


1.00 13.15 1.00 13.15
1.00 9.25 1.00 9.25
1.00 19.40 1.00 19.40
1.00 13.75 1.00 13.75
1.00 10.35 1.00 10.35
1.00 14.90 1.00 14.90
1.00 7.15 1.00 7.15
1.00 8.60 1.00 8.60
1.00 51.20 1.00 51.20
1.00 1.50 1.00 1.50
1.00 0.60 1.00 0.60

176.70

1.00 26.80 1.00 26.80


1.00 13.15 1.00 13.15
1.00 9.25 1.00 9.25
1.00 19.40 1.00 19.40
1.00 13.75 1.00 13.75
1.00 10.35 1.00 10.35
1.00 14.90 1.00 14.90
1.00 7.15 1.00 7.15
1.00 8.60 1.00 8.60
1.00 51.20 1.00 51.20
1.00 1.50 1.00 1.50
1.00 0.60 1.00 0.60

# LADOS 17.30
1.00 8.80 0.30 2.00 5.28
1.00 20.10 0.30 2.00 12.06

47.20
vanos
1.00 51.20 4.00 1.00 47.20

17.80
vanos
1.00 9.25 0.90 1.00 8.35
1.00 10.35 0.90 1.00 9.45

66.60
vanos
1.00 26.80 2.90 1.00 23.90
1.00 19.40 1.00 1.00 18.40
1.00 13.75 3.50 1.00 10.25
1.00 14.90 0.90 1.00 14.00

201.00

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und

5.00 20.10 1.00 100.50

5.00 20.10 1.00 100.50

184.50

1.00 20.10 4.12 1.00 82.81

1.00 20.10 5.06 1.00 101.71

20.10

1.00 20.10 1.00 20.10

8.40

1.00 1.10 2.10 1.00 2.31


1.00 0.90 2.10 1.00 1.89
2.00 1.00 2.10 1.00 4.20

5.70

3.00 0.90 2.10 1.00 5.67

5.30

1.00 0.80 2.10 1.00 1.68


1.00 1.00 2.10 1.00 2.10
1.00 0.70 2.10 1.00 1.47

38.20
2.00 1.00 2.10 1.00 4.20
1.00 0.70 2.10 1.00 1.47
1.00 1.60 1.38 1.00 2.21
3.00 2.70 1.38 1.00 11.18
3.00 1.88 0.70 1.00 3.95
1.00 2.85 1.38 1.00 3.93
1.00 1.85 1.38 1.00 2.55
1.00 2.25 1.38 1.00 3.11
1.00 1.80 0.70 1.00 1.26
1.00 1.30 1.38 1.00 1.79
1.00 1.88 1.38 1.00 2.59

4.00

1.00 1.00 1.00


1.00 1.00 1.00
2.00 1.00 2.00

3.00

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
3.00 1.00 3.00

3.00

1.00 1.00 1.00


1.00 1.00 1.00
1.00 1.00 1.00

# UND POR VENTANA 52.00


1.00 4.00 4.00
3.00 4.00 12.00
3.00 4.00 12.00
1.00 4.00 4.00
1.00 4.00 4.00
1.00 4.00 4.00
1.00 4.00 4.00
1.00 4.00 4.00
1.00 4.00 4.00

# UND POR PUERTA 55.00

3.00 4.00 12.00


4.00 3.00 12.00
1.00 3.00 3.00
3.00 3.00 9.00
2.00 4.00 8.00
2.00 4.00 8.00
1.00 3.00 3.00

# UND POR VENTANA 104.00


1.00 8.00 8.00
3.00 8.00 24.00
3.00 8.00 24.00
1.00 8.00 8.00
1.00 8.00 8.00
1.00 8.00 8.00
1.00 8.00 8.00
1.00 8.00 8.00
1.00 8.00 8.00

detalle 38.20
1.00 38.20 1.00 38.20

111.00
detalle
1.00 111.00 1.00 111.00

52.00
detalle
1.00 52.00 1.00 52.00

139.00

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
detalle
1.00 139.00 1.00 139.00

196.30
detalle
1.00 95.20 1.00 95.20
1.00 20.43 1.00 20.43
1.00 80.70 1.00 80.70

47.20
detalle
1.00 47.20 1.00 47.20

57.60
detalle
1.00 8.40 1.00 8.40
1.00 5.70 1.00 5.70
1.00 5.30 1.00 5.30
1.00 38.20 1.00 38.20

23.00
23.00 1.00 23.00

6.00
6.00 1.00 6.00

1.00
1.00 1.00 1.00

1.00
1.00 1.00 1.00

8.40
1.00 3.06 1.38 1.00 4.22
1.00 3.06 1.38 1.00 4.22

PROF. INICIAL
PROF. FINAL 23.50
1.00 5.55 0.45 0.30 0.36 0.82
1.00 9.78 0.45 0.36 0.46 1.80
1.00 8.41 0.45 0.46 0.54 1.89
1.00 6.51 0.45 0.54 0.61 1.68
1.00 18.80 0.45 0.15 0.24 1.65
1.00 6.36 0.55 0.24 0.27 0.89
1.00 8.70 0.55 0.27 0.36 1.51
1.00 18.15 0.45 0.21 0.30 2.08
1.00 11.92 0.55 1.15 1.21 7.74
1.00 5.32 0.55 1.15 1.18 3.41

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und

VOL. INICIAL VOL. DEDUCIR 22.60


1.00 5.55 0.82 0.05 0.77
1.00 9.78 1.80 0.09 1.72
1.00 8.41 1.89 0.08 1.82
1.00 6.51 1.68 0.06 1.63
1.00 18.80 1.65 0.17 1.48
1.00 6.36 0.89 0.06 0.83
1.00 8.70 1.51 0.08 1.43
1.00 18.15 2.08 0.17 1.92
1.00 11.92 7.74 0.11 7.63
1.00 5.32 3.41 0.05 3.36

2.00
1.00 1.00 1.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00

2.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
2.00 1.00 2.00
0.00 1.00 0.00

5.00
1.00 1.00 1.00
1.00 1.00 1.00
1.00 1.00 1.00
2.00 1.00 2.00
0.00 1.00 0.00

4.00
1.00 1.00 1.00
1.00 1.00 1.00
0.00 1.00 0.00
2.00 1.00 2.00
0.00 1.00 0.00

4.00
1.00 1.00 1.00
1.00 1.00 1.00
0.00 1.00 0.00
2.00 1.00 2.00
0.00 1.00 0.00

9.00
2.00 1.00 2.00
2.00 1.00 2.00
1.00 1.00 1.00
4.00 1.00 4.00

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
0.00 1.00 0.00

20.50
1.00 3.61 1.00 3.61
1.00 3.14 1.00 3.14
1.00 5.14 1.00 5.14
1.00 8.60 1.00 8.60
1.00 0.00 1.00 0.00

8.90
1.00 2.40 1.00 2.40
1.00 1.42 1.00 1.42
1.00 0.00 1.00 0.00
1.00 5.09 1.00 5.09
1.00 0.00 1.00 0.00

21.30
1.00 21.34 1.00 21.34

17.40
1.00 17.39 1.00 17.39

1.80
1.00 1.83 1.00 1.83

1.00
1.00 1.00

3.00
1.00 1.00 1.00
1.00 1.00 1.00
0.00 1.00 0.00
1.00 1.00 1.00
0.00 1.00 0.00

1.00
1.00 1.00 1.00

48.60
1.00 4.00 1.00 4.00
1.00 4.00 1.00 4.00
1.00 4.00 1.00 4.00
1.00 4.00 1.00 4.00
1.00 1.59 1.00 1.59
1.00 1.44 1.00 1.44
1.00 0.94 1.00 0.94
1.00 0.94 1.00 0.94
1.00 18.15 1.00 18.15
1.00 0.19 1.00 0.19
1.00 0.21 1.00 0.21
1.00 2.55 1.00 2.55
1.00 4.04 1.00 4.04
1.00 2.55 1.00 2.55

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und

40.20
2.00 20.10 1.00 40.20

18.80
1.00 18.80 1.00 18.80

22.90
1.00 6.15 1.00 6.15
1.00 6.15 1.00 6.15
1.00 5.32 1.00 5.32
1.00 5.32 1.00 5.32

3.00
1.00 1.00 1.00
1.00 1.00 1.00
1.00 1.00 1.00

5.00
1.00 1.00 1.00
1.00 1.00 1.00
1.00 1.00 1.00
2.00 1.00 2.00
0.00 1.00 0.00

4.00
1.00 1.00 1.00
1.00 1.00 1.00
0.00 1.00 0.00
2.00 1.00 2.00
0.00 1.00 0.00

3.00
1.00 1.00 1.00
0.00 1.00 0.00
1.00 1.00 1.00
1.00 1.00 1.00
0.00 1.00 0.00

8.20
1.00 2.25 1.00 2.25
1.00 0.19 1.00 0.19
1.00 2.10 1.00 2.10
1.00 3.69 1.00 3.69
1.00 0.00 1.00 0.00

48.20
1.00 4.88 1.00 4.88
1.00 0.42 1.00 0.42
1.00 5.12 1.00 5.12
1.00 7.52 1.00 7.52

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
1.00 5.55 1.00 5.55
1.00 9.78 1.00 9.78
1.00 8.41 1.00 8.41
1.00 6.51 1.00 6.51

6.00
1.00 1.00 1.00
1.00 1.00 1.00
1.00 1.00 1.00
3.00 1.00 3.00
0.00 1.00 0.00

7.00
2.00 1.00 2.00
1.00 1.00 1.00
1.00 1.00 1.00
3.00 1.00 3.00
0.00 1.00 0.00

4.00
4.00 1.00 4.00

69.90
1.00 20.50 1.00 20.50
1.00 8.90 1.00 8.90
1.00 21.30 1.00 21.30
1.00 17.40 1.00 17.40
1.00 1.80 1.00 1.80

105.00
1.00 8.20 1.00 8.20
1.00 48.20 1.00 48.20
1.00 48.60 1.00 48.60

23.00
# SALIDAS
1.00 1.00 1.00
1.00 1.00 1.00
2.00 1.00 2.00
2.00 1.00 2.00
1.00 1.00 1.00
2.00 1.00 2.00
4.00 1.00 4.00
1.00 1.00 1.00
2.00 1.00 2.00
7.00 1.00 7.00

6.00
# SALIDAS
0.00 1.00 0.00
0.00 1.00 0.00

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
0.00 1.00 0.00
1.00 1.00 1.00
0.00 1.00 0.00
1.00 1.00 1.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
3.00 1.00 3.00

19.00
# SALIDAS
0.00 1.00 0.00
0.00 1.00 0.00
2.00 1.00 2.00
3.00 1.00 3.00
1.00 1.00 1.00
3.00 1.00 3.00
5.00 1.00 5.00
1.00 1.00 1.00
0.00 1.00 0.00
4.00 1.00 4.00

6.00
# SALIDAS
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
1.00 1.00 1.00
0.00 1.00 0.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
2.00 1.00 2.00
1.00 1.00 1.00

1.00
# SALIDAS
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00

13.00
# SALIDAS
1.00 1.00 1.00
1.00 1.00 1.00
1.00 1.00 1.00
1.00 1.00 1.00
1.00 1.00 1.00
1.00 1.00 1.00
1.00 1.00 1.00
1.00 1.00 1.00

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
2.00 1.00 2.00
3.00 1.00 3.00

5.00
# SALIDAS
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
1.00 1.00 1.00
0.00 1.00 0.00
1.00 1.00 1.00
2.00 1.00 2.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00

2.00
# SALIDAS
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00

3.00
# SALIDAS
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00

2.00
# SALIDAS
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
2.00 1.00 2.00

1.00

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
# SALIDAS
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00

23.00
# SALIDAS
1.00 1.00 1.00
1.00 1.00 1.00
2.00 1.00 2.00
2.00 1.00 2.00
1.00 1.00 1.00
2.00 1.00 2.00
4.00 1.00 4.00
1.00 1.00 1.00
2.00 1.00 2.00
7.00 1.00 7.00

6.00
# SALIDAS
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
0.00 1.00 0.00
1.00 1.00 1.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
3.00 1.00 3.00

19.00
# SALIDAS
0.00 1.00 0.00
0.00 1.00 0.00
2.00 1.00 2.00
3.00 1.00 3.00
1.00 1.00 1.00
3.00 1.00 3.00
5.00 1.00 5.00
1.00 1.00 1.00
0.00 1.00 0.00
4.00 1.00 4.00

6.00
# SALIDAS
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
1.00 1.00 1.00

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
0.00 1.00 0.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
2.00 1.00 2.00
1.00 1.00 1.00

1.00
# SALIDAS
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00

7.00
# SALIDAS 12.00
1.00 1.00 1.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
3.00 1.00 3.00
1.00 1.00 1.00

4.00
# SALIDAS
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
1.00 1.00 1.00
0.00 1.00 0.00
1.00 1.00 1.00
0.00 1.00 0.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00

2.00
# SALIDAS
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
2.00 1.00 2.00

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und

5.00
# SALIDAS
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
1.00 1.00 1.00
0.00 1.00 0.00
1.00 1.00 1.00
2.00 1.00 2.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00

2.00
# SALIDAS
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00

3.00
# SALIDAS
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00

2.00
# SALIDAS
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
2.00 1.00 2.00

1.00
# SALIDAS

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00

22.40
1.00 22.35 1.00 22.35

6.00
# SALIDAS
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
6.00 1.00 6.00

2.00
# SALIDAS
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
2.00 1.00 2.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00

6.00
# SALIDAS
4.00 1.00 4.00
0.00 1.00 0.00
0.00 1.00 0.00
2.00 1.00 2.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00

9.00
# SALIDAS
0.00 1.00 0.00

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
2.00 1.00 2.00
1.00 1.00 1.00
0.00 1.00 0.00
2.00 1.00 2.00
1.00 1.00 1.00
0.00 1.00 0.00
1.00 1.00 1.00
1.00 1.00 1.00
1.00 1.00 1.00

6.00
# SALIDAS
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
3.00 1.00 3.00

1.00
# SALIDAS
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00

1.00
# SALIDAS
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00

19.00
# ACCES.
0.00 1.00 0.00
0.00 1.00 0.00
2.00 1.00 2.00
3.00 1.00 3.00
1.00 1.00 1.00
3.00 1.00 3.00

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
5.00 1.00 5.00
1.00 1.00 1.00
0.00 1.00 0.00
4.00 1.00 4.00

6.00
# ACCES.
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
1.00 1.00 1.00
0.00 1.00 0.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
2.00 1.00 2.00
1.00 1.00 1.00

1.00
# ACCES.
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00

7.00
# ACCES.
1.00 1.00 1.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
3.00 1.00 3.00
1.00 1.00 1.00

4.00
# ACCES.
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
1.00 1.00 1.00
0.00 1.00 0.00
1.00 1.00 1.00
0.00 1.00 0.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
2.00
# ACCES.
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
2.00 1.00 2.00

1.00
# ACCES.
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00

5.00
# ACCES.
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
1.00 1.00 1.00
0.00 1.00 0.00
1.00 1.00 1.00
2.00 1.00 2.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00

2.00
# ACCES.
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00

3.00
# ACCES.
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
1.00 1.00 1.00

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00

1.00
# CAJAS
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00

3.00
# CAJAS
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
2.00 1.00 2.00

1.00
# CAJAS
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00

3.00
# CAJAS
1.00 1.00 1.00
0.00 1.00 0.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
0.00 1.00 0.00

1.00
1.00 1.00 1.00

1.00
1.00 1.00 1.00

1.00
1.00 1.00 1.00

4.00
# PUNTOS
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
1.00 1.00 1.00
0.00 1.00 0.00
1.00 1.00 1.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00

1.00
# PUNTOS
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00

4.00
# UND
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00
1.00 1.00 1.00
0.00 1.00 0.00
1.00 1.00 1.00
1.00 1.00 1.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00

1.00
# UND
0.00 1.00 0.00

Sust mod.-1
. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Rt = 1.23 kg/cm² Df = 1.20 m
E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
0.00 1.00 0.00
1.00 1.00 1.00

13.00
1.00 15.64 0.60 0.80 1.00 7.51
1.00 4.97 0.60 0.80 1.00 2.39
1.00 2.92 0.60 0.80 1.00 1.40
1.00 3.54 0.60 0.80 1.00 1.70

#FACTOR 10.40
1.00 15.64 0.60 0.80 0.80 6.01
1.00 4.97 0.60 0.80 0.80 1.91
1.00 2.92 0.60 0.80 0.80 1.12
1.00 3.54 0.60 0.80 0.80 1.36

#FACTOR 3.90
1.00 15.64 0.60 0.80 0.30 2.25
1.00 4.97 0.60 0.80 0.30 0.72
1.00 2.92 0.60 0.80 0.30 0.42
1.00 3.54 0.60 0.80 0.30 0.51

#FACTOR 2.60
1.00 15.64 0.60 0.80 0.20 1.50
1.00 4.97 0.60 0.80 0.20 0.48
1.00 2.92 0.60 0.80 0.20 0.28
1.00 3.54 0.60 0.80 0.20 0.34

15.60
1.00 15.64 1.00 15.64

7.90
1.00 4.97 1.00 4.97
1.00 2.92 1.00 2.92

23.50
1.00 15.64 1.00 15.64
1.00 4.97 1.00 4.97
1.00 2.92 1.00 2.92
1.00 3.54 1.00 3.54

Sust mod.-1
RESUMEN METRADOS MODULO 2

I.E.I. : I.E.I N°1455 - PUEBLO NUEVO


UBICACIÓN : PUEBLO NUEVO - SAN BENITO - CONTUMAZÁ - CAJAMARCA
ELABORADO : 0

ITEMS DESCRIPCION UND METRADO


0.00 VOLUMEN 01: INFRAESTRUCTURA 0.00
#REF! #REF! 0.00
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
01.02 TRABAJOS PRELIMINARES 0 0.00
01.02.01 LIMPIEZA DE TERRENO
NIVELACION, TRAZADO MANUAL
Y REPLANTEO C/EQUIPO m2 153.80
01.02.02 m2 153.80
0.00 0.00 0 0.00
02 ESTRUCTURAS 0 0.00
02.01 MOVIMIENTO DE TIERRAS 0 0.00
02.01.02 REFINE DE TERRENO HASTA e= 0.10 m. m2 153.80
02.01.09 EXCAVACION PARA ZAPATAS m3 47.30
02.01.10 EXCAVACION PARA VIGA DE CIMENTACION m3 11.40
02.01.14 RELLENO
RELLENO COMPACTADO
COMPACTADO CON
CON MATERIAL
MATERIALPROPIO SELECCIONADO
AFIRMADO PARA VEREDAS m3 25.20
02.01.15 RELLENO COMPACTADO CON MATERIAL AFIRMADO PARA PISOS INTERIORES m3 7.10
02.01.16 m3 10.90
02.01.18 ACARREO DE MATERIAL EXCEDENTE CON CARRETILLA D=30m m3 48.90
02.01.19 ELIMINACION MATERIAL EXCDENTE C/MAQUINARIA m3 61.10
02.02 OBRAS DE CONCRETO SIMPLE 0 0.00
02.02.01 SOLADO DE 4" C°S° C:H - 1:10 m2 48.00
02.02.03 SOBRECIMIENTO DE CONCRETO F'C = 175 KG/CM2 m3 4.90
02.02.04 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2 49.30
02.02.05 FALSA COLUMNA
ENCOFRADO DE CONCRETODEF'C=175
Y DESENCFRADO KG/CM²
FALSA COLUMNA m3 0.20
02.02.06 m2 2.30
02.03 OBRAS DE CONCRETO ARMADO 0 0.00
02.03.01 ZAPATAS 0 0.00
02.03.01.01 ZAPATAS: CONCRETO F'C = 210 KG/CM2 m3 20.30
02.03.01.02 ZAPATAS: ACERO DE REFUERZO fy = 4200 Kg/cm2 kg 530.70
02.03.02 VIGA DE CIMENTACION 0 0.00
02.03.02.01 VIGAS DE CIMENTACION: CONCRETO F'C = 210 KG/CM2 m3 7.90
02.03.02.02 VIGAS
VIGAS DE
DE CIMENTACION:
CIMENTACION: ACERO DE REFUERZO
ENCOFRADO fy = 4200 Kg/cm2
Y DESENCOFRADO kg 774.70
02.03.02.03 m2 65.20
02.03.05 COLUMNAS 0 0.00
02.03.05.01 COLUMNAS: CONCRETO F'C = 210 KG/CM2 m3 7.80
02.03.05.02 COLUMNAS:
COLUMNAS: ACERO DE REFUERZO
ENCOFRADO fy = 4200 Kg/cm2
Y DESENCOFRADO kg 1,859.70
02.03.05.03 m2 62.80
02.03.06 COLUMNETAS 0 0.00
02.03.06.01 COLUMNETAS: CONCRETO F'C = 175 KG/CM2 m3 2.10
02.03.06.02 COLUMNETAS:
COLUMNETAS: ACERO DE REFUERZO
ENCOFRADO fy = 4200 Kg/cm2
Y DESENCOFRADO kg 294.80
02.03.06.03 m2 28.20
02.03.07 VIGUETAS DE ALFEIZER 0 0.00
02.03.07.01 VIGUETAS DE ALFEIZER: CONCRETO F'C = 175 KG/CM2 m3 0.80
02.03.07.02 VIGUETAS
VIGUETAS DE
DE ALFEIZER:
ALFEIZER: ACERO DE REFUERZO
ENCOFRADO fy = 4200 Kg/cm2
Y DESENCOFRADO kg 96.20
02.03.07.03 m2 10.50
02.03.08 VIGAS 0 0.00
02.03.08.01 VIGAS: CONCRETO F'C = 210 KG/CM2 m3 13.00
02.03.08.02 VIGAS:
VIGAS: ACERO DE REFUERZO
ENCOFRADO fy = 4200 Kg/cm2
Y DESENCOFRADO kg 2,022.80
02.03.08.03 m2 78.80
02.03.09 LOSA ALIGERADA 0 0.00
02.03.09.01 LOSA ALIGERADA: POLIESTIRENO EXPANDIDO 15X30X120 PROV.Y COLOCADO und 240.00
02.03.09.02 LOSA ALIGERADA: CONCRETO F'C = 210 KG/CM2 m3 10.10
02.03.09.03 LOSA
LOSA ALIGERADA:
ALIGERADA: ACERO DE REFUERZO
ENCOFRADO fy = 4200 Kg/cm2
Y DESENCOFRADO kg 1,292.00
02.03.09.04 MESA DE CONCRETO m2 115.10
02.03.11 0 0.00
02.03.11.01 MESA DE CONCRETO: CONCRETO F'C = 175 KG/CM2 m3 0.30
02.03.11.02 MESA
MESA DE
DE CONCRETO:
CONCRETO: ACERO DE REFUERZO
ENCOFRADO fy = 4200 Kg/cm2
Y DESENCOFRADO kg 18.80
02.03.11.03 m2 3.90
0.00 0.00 0 0.00
03 ARQUITECTURA 0 0.00
03.01 MUROS Y TABIQUES DE ALBAÑILERIA 0 0.00
03.01.01 MURO DE SOGA LADRILLO DE ARCILLA 9x12x23 cm. MORTERO DOSIFICADO 1:4 m2 36.00
03.01.02 MURO DE CABEZA LADRILLO DE ARCILLA9x13x24 cm. MORTERO DOSIFICADO 1:4 m2 54.20
03.01.03 JUNTA SISMICA
ALAMBRE ENCORRUGADO
DE 1/4" TABIQUES E=1"
REFUERZO HORIZONTAL EN MUROS ml 26.60
03.01.04 RES MOD.-2 kg 135.30
03.01.05 TAPAJUNTA CON JEBE MICROPOROSO EN JUNTA SISMICA DE 1" ml 26.60
03.02 REVOQUES, ENLUCIDOS Y REVESTIMIENTOS 0 0.00
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO

VOLUMEN 01: INFRAESTRUCTURA


#REF!
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
01.02 TRABAJOS PRELIMINARES
01.02.01 LIMPIEZA DE TERRENO MANUAL m2
area total de modulo 2 m2 1.00 16.63 9.25
NIVELACION, TRAZADO Y REPLANTEO C/EQUIPO
01.02.02 m2
area total de modulo 2 m2 1.00 16.63 9.25

02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
02.01.02 REFINE DE TERRENO HASTA e= 0.10 m. m2
area total de modulo 2 m2 1.00 16.63 9.25

02.01.09 EXCAVACION PARA ZAPATAS m3


zapata 1 m3 4.00 1.55 1.55 1.40
zapata 2 m3 8.00 1.95 1.55 1.40

|
02.01.10 EXCAVACION PARA VIGA DE CIMENTACION m3
EJE 4
tramo H-I m3 1.00 1.83 0.25 0.80
tramo I-J m3 1.00 1.09 0.25 0.80
tramo J-K m3 1.00 0.96 0.25 0.80
tramo K-L m3 1.00 1.14 0.25 0.80
tramo L-M m3 1.00 1.83 0.25 0.80
EJE 5
tramo H-I m3 1.00 2.22 0.25 0.80
tramo L-M m3 1.00 3.43 0.25 0.80
EJE 6
tramo H-I m3 1.00 1.83 0.25 0.80
tramo I-J m3 1.00 1.09 0.25 0.80
tramo J-K m3 1.00 0.96 0.25 0.80
tramo K-L m3 1.00 1.14 0.25 0.80
tramo L-M m3 1.00 1.83 0.25 0.80
EJE H
tramo 4-5 m3 1.00 4.70 0.25 0.80
EJE I
tramo 4-5 m3 1.00 4.70 0.25 0.80
EJE J
tramo 4-5 m3 3.00 4.70 0.25 0.80
EJE K
tramo 4-5 m3 1.00 4.70 0.25 0.80
EJE L
tramo 4-5 m3 1.00 4.70 0.25 0.80
EJE M
tramo 4-5 m3 1.00 4.70 0.25 0.80

02.01.14 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO m3


zapata 1 m3 4.00 1.30 1.55 0.80
zapata 2 m3 8.00 1.70 1.55 0.80
EJE 4
tramo H-I m3 1.00 1.83 0.25 0.20
tramo I-J m3 1.00 1.09 0.25 0.20
tramo J-K m3 1.00 0.96 0.25 0.20
tramo K-L m3 1.00 1.14 0.25 0.20
tramo L-M m3 1.00 1.83 0.25 0.20
EJE 5

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO
tramo H-I m3 1.00 2.22 0.25 0.20
tramo L-M m3 1.00 3.43 0.25 0.20
EJE 6
tramo H-I m3 1.00 1.83 0.25 0.20
tramo I-J m3 1.00 1.09 0.25 0.20
tramo J-K m3 1.00 0.96 0.25 0.20
tramo K-L m3 1.00 1.14 0.25 0.20
tramo L-M m3 1.00 1.83 0.25 0.20
EJE J
tramo 4-5 m3 3.00 4.70 0.25 0.20
EJE K
tramo 4-5 m3 1.00 4.70 0.25 0.20

RELLENO COMPACTADO CON MATERIAL AFIRMADO PARA VEREDAS


02.01.15 m3
EJE 4
tramo H-M m3 1.00 16.63 0.60 0.15
EJE 6
tramo H-M m3 1.00 19.63 1.50 0.15
EJE H
tramo 4-6 m3 1.00 6.70 0.60 0.15
EJE M
tramo 4-6 m3 1.00 6.70 0.60 0.15

RELLENO COMPACTADO CON MATERIAL AFIRMADO PARA PISOS INTERIORES


02.01.16 m3
COCINA m3 1.00 0.15
DESPENSA QALIWUARMA m3 1.00 0.15
AULA DE PSICOMOTRICIDAD - SUM m3 1.00 0.15
DEPOSITO m3 1.00 0.15
SS.HH m3 1.00 0.15

02.01.18 ACARREO DE MATERIAL EXCEDENTE CON CARRETILLA D=30m m3 VOLUMEN


CORTE Y REFINE DE TERRENO HASTA e=0.10 m. m3 1.00 15.38
EXCAVACION PARA ZAPATAS m3 1.00 47.30
EXCAVACION PARA VIGA DE CIMENTACION m3 1.00 11.40
RELLENO COMPACTADO C/EQUIPO MAT./ PROPIO m3 1.00 -25.20

02.01.19 ELIMINACION MATERIAL EXCDENTE C/MAQUINARIA m3 VOL. N FACT. EXP.


CORTE Y REFINE DE TERRENO HASTA e=0.10 m. m3 1.00 15.38
EXCAVACION PARA ZAPATAS m3 1.00 47.30
EXCAVACION PARA VIGA DE CIMENTACION m3 1.00 11.40
RELLENO COMPACTADO C/EQUIPO MAT./ PROPIO m3 1.00 -25.20

02.02 OBRAS DE CONCRETO SIMPLE


02.02.01 SOLADO DE 4" C°S° C:H - 1:10 m2
zapata 1 m2 4.00 1.55 1.55
zapata 2 m2 8.00 1.95 1.55
EJE 4
tramo H-I m2 1.00 1.83 0.25
tramo I-J m2 1.00 1.09 0.25
tramo J-K m2 1.00 0.96 0.25
tramo K-L m2 1.00 1.14 0.25
tramo L-M m2 1.00 1.83 0.25
EJE 5
tramo H-I m2 1.00 2.22 0.25
tramo L-M m2 1.00 3.43 0.25
EJE 6
tramo H-I m2 1.00 1.83 0.25

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO
tramo I-J m2 1.00 1.09 0.25
tramo J-K m2 1.00 0.96 0.25
tramo K-L m2 1.00 1.14 0.25
tramo L-M m2 1.00 1.83 0.25
EJE H
tramo 4-5 m2 1.00 4.70 0.25
EJE I
tramo 4-5 m2 1.00 4.70 0.25
EJE J
tramo 4-5 m2 3.00 4.70 0.25
EJE K
tramo 4-5 m2 1.00 4.70 0.25
EJE L
tramo 4-5 m2 1.00 4.70 0.25
EJE M
tramo 4-5 m2 1.00 4.70 0.25
.

02.02.03 SOBRECIMIENTO DE CONCRETO F'C = 175 KG/CM2 m3


EJE 4
tramo H-I m3 1.00 1.32 0.15 0.60
tramo I-J m3 1.00 1.94 0.15 0.60
tramo J-K m3 1.00 1.81 0.15 0.60
tramo K-L m3 1.00 1.98 0.15 0.60
tramo L-M m3 1.00 2.52 0.15 0.60
EJE 5
tramo H-I m3 1.00 2.22 0.15 0.60
tramo L-M m3 1.00 2.16 0.15 0.60
EJE 6
tramo H-I m3 1.00 1.32 0.15 0.60
tramo I-J m3 1.00 0.86 0.15 0.60
tramo J-K m3 1.00 1.81 0.15 0.60
tramo K-L m3 1.00 0.91 0.15 0.60
tramo L-M m3 1.00 1.55 0.15 0.60
EJE H
tramo 4-5 m3 1.00 5.80 0.25 0.60
EJE I
tramo 4-5 m3 1.00 3.30 0.25 0.60
EJE L
tramo 4-5 m3 1.00 5.80 0.25 0.60
EJE M
tramo 4-5 m3 1.00 5.80 0.25 0.60

02.02.04 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2


EJE 4 # CARAS
tramo H-I m2 1.00 1.32 0.60
tramo I-J m2 1.00 1.94 0.60
tramo J-K m2 1.00 1.81 0.60
tramo K-L m2 1.00 1.98 0.60
tramo L-M m2 1.00 2.52 0.60
EJE 5
tramo H-I m2 1.00 2.22 0.60
tramo L-M m2 1.00 2.16 0.60
EJE 6
tramo H-I m2 1.00 1.32 0.60
tramo I-J m2 1.00 0.86 0.60
tramo J-K m2 1.00 1.81 0.60
tramo K-L m2 1.00 0.91 0.60
tramo L-M m2 1.00 1.55 0.60
EJE H

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO
tramo 4-5 m2 1.00 5.80 0.60
EJE I
tramo 4-5 m2 1.00 3.30 0.60
EJE L
tramo 4-5 m2 1.00 5.80 0.60
EJE M
tramo 4-5 m2 1.00 5.80 0.60

02.02.05 FALSA COLUMNA DE CONCRETO F'C=175 KG/CM² m3


EXTERIOR
FALSA COLUMNA m3 1.00 0.25 0.20 3.48

ENCOFRADO Y DESENCFRADO DE FALSA COLUMNA


02.02.06 m2
EXTERIOR # CARAS
FALSA COLUMNA m2 1.00 0.20 3.48
FALSA COLUMNA m2 1.00 0.25 3.48

02.03 OBRAS DE CONCRETO ARMADO


02.03.01 ZAPATAS
02.03.01.01 ZAPATAS: CONCRETO F'C = 210 KG/CM2 m3
Z1 m3 4.00 1.55 1.55 0.60
Z2 m3 8.00 1.95 1.55 0.60

02.03.01.02 ZAPATAS: ACERO DE REFUERZO fy = 4200 Kg/cm2 kg


Z1 Peso (kg/m)
Ø 5/8" kg 4.00 1.40 1.55
Ø 5/8" kg 4.00 1.40 1.55
Z2
Ø 5/8" kg 8.00 1.40 1.55
Ø 5/8" kg 8.00 1.80 1.55

02.03.02 VIGA DE CIMENTACION


02.03.02.01 VIGAS DE CIMENTACION: CONCRETO F'C = 210 KG/CM2 m3
EJE 4
tramo H-I m3 1.00 1.87 0.25 0.50
tramo I-J m3 1.00 2.51 0.25 0.50
tramo J-K m3 1.00 2.36 0.25 0.50
tramo K-L m3 1.00 2.53 0.25 0.50
tramo L-M m3 1.00 3.08 0.25 0.50
EJE 5
tramo H-I m3 1.00 2.22 0.15 0.50
tramo L-M m3 1.00 3.43 0.15 0.50
EJE 6
tramo H-I m3 1.00 1.87 0.25 0.50
tramo I-J m3 1.00 2.51 0.25 0.50
tramo J-K m3 1.00 2.36 0.25 0.50
tramo K-L m3 1.00 2.53 0.25 0.50
tramo L-M m3 1.00 3.08 0.25 0.50
EJE H
tramo 1-3 m3 1.00 5.80 0.25 0.50
EJE I
tramo 1-3 m3 1.00 5.80 0.25 0.50
EJE J
tramo 1-3 m3 1.00 5.80 0.25 0.50
EJE K
tramo 1-3 m3 1.00 5.80 0.25 0.50
EJE L

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO
tramo 1-3 m3 1.00 5.80 0.25 0.50
EJE M
tramo 1-3 m3 1.00 5.80 0.25 0.50

02.03.02.02 VIGAS DE CIMENTACION: ACERO DE REFUERZO fy = 4200 Kg/cm2 kg


Recubrimiento Laterales 0.040
Empalme 0.00

0.25
EJE 4 Peso (kg/m)
tramo H-I kg 1.00 1.87
4 Ø 1/2" kg 1.00 2.29 0.99
2 Ø 3/8" kg 1.00 2.29 0.56
tramo I-J kg 1.00 2.51
4 Ø 1/2" kg 1.00 2.93 0.99
2 Ø 3/8" kg 1.00 2.93 0.56
tramo J-K kg 1.00 2.36
4 Ø 1/2" kg 1.00 2.78 0.99
2 Ø 3/8" kg 1.00 2.78 0.56
tramo K-L kg 1.00 2.53
4 Ø 1/2" kg 1.00 2.95 0.99
2 Ø 3/8" kg 1.00 2.95 0.56
tramo L-M kg 1.00 3.08
4 Ø 1/2" kg 1.00 3.50 0.99
2 Ø 3/8" kg 1.00 3.50 0.56
EJE 5
tramo H-I kg 1.00 2.22
4 Ø 1/2" kg 1.00 2.64 0.99
2 Ø 3/8" kg 1.00 2.64 0.56
tramo L-M kg 1.00 3.43
4 Ø 1/2" kg 1.00 3.85 0.99
2 Ø 3/8" kg 1.00 3.85 0.56
EJE 6
tramo H-I kg 1.00 1.87
4 Ø 1/2" kg 1.00 2.29 0.99
2 Ø 3/8" kg 1.00 2.29 0.56
tramo I-J kg 1.00 2.51
4 Ø 1/2" kg 1.00 2.93 0.99
2 Ø 3/8" kg 1.00 2.93 0.56
tramo J-K kg 1.00 2.36
4 Ø 1/2" kg 1.00 2.78 0.99
2 Ø 3/8" kg 1.00 2.78 0.56
tramo K-L kg 1.00 2.53
4 Ø 1/2" kg 1.00 2.95 0.99
2 Ø 3/8" kg 1.00 2.95 0.56
tramo L-M kg 1.00 3.08
4 Ø 1/2" kg 1.00 3.50 0.99
2 Ø 3/8" kg 1.00 3.50 0.56
EJE H
tramo 1-3 kg 1.00 5.80
4 Ø 1/2" kg 1.00 6.22 0.99
2 Ø 3/8" kg 1.00 6.22 0.56
EJE I
tramo 1-3 kg 1.00 5.80
4 Ø 1/2" kg 1.00 6.22 0.99
2 Ø 3/8" kg 1.00 6.22 0.56
EJE J
tramo 1-3 kg 1.00 5.80
4 Ø 1/2" kg 1.00 6.22 0.99

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO
2 Ø 3/8" kg 1.00 6.22 0.56
EJE K
tramo 1-3 kg 1.00 5.80
4 Ø 1/2" kg 1.00 6.22 0.99
2 Ø 3/8" kg 1.00 6.22 0.56
EJE L
tramo 1-3 kg 1.00 5.80
4 Ø 1/2" kg 1.00 6.22 0.99
2 Ø 3/8" kg 1.00 6.22 0.56
EJE M
tramo 1-3 kg 1.00 5.80
4 Ø 1/2" kg 1.00 6.22 0.99
2 Ø 3/8" kg 1.00 6.22 0.56
Estribos 1
Recubrimiento 0.025
0.25

0.60

EJE 4 Peso (kg/m)


tramo H-I kg 1.00 1.87
estribo Ø 3/8" 1@ 0.05, 4@ 0.10, R@ 0.20m kg 1.00 1.66 0.56
tramo I-J kg 1.00 2.51
estribo Ø 3/8" 1@ 0.05, 4@ 0.10, R@ 0.20m kg 1.00 1.66 0.56
tramo J-K kg 1.00 2.36
estribo Ø 3/8" 1@ 0.05, 4@ 0.10, R@ 0.20m kg 1.00 1.66 0.56
tramo K-L kg 1.00 2.53
estribo Ø 3/8" 1@ 0.05, 4@ 0.10, R@ 0.20m kg 1.00 1.66 0.56
tramo L-M kg 1.00 3.08
estribo Ø 3/8" 1@ 0.05, 4@ 0.10, R@ 0.20m kg 1.00 1.66 0.56
EJE 5
tramo H-I kg 1.00 2.22
estribo Ø 3/8" 1@ 0.05, 4@ 0.10, R@ 0.20m kg 1.00 1.66 0.56
tramo L-M kg 1.00 3.43
estribo Ø 3/8" 1@ 0.05, 4@ 0.10, R@ 0.20m kg 1.00 1.66 0.56
EJE 6
tramo H-I kg 1.00 1.87
estribo Ø 3/8" 1@ 0.05, 4@ 0.10, R@ 0.20m kg 1.00 1.66 0.56
tramo I-J kg 1.00 2.51
estribo Ø 3/8" 1@ 0.05, 4@ 0.10, R@ 0.20m kg 1.00 1.66 0.56
tramo J-K kg 1.00 2.36
estribo Ø 3/8" 1@ 0.05, 4@ 0.10, R@ 0.20m kg 1.00 1.66 0.56
tramo K-L kg 1.00 2.53
estribo Ø 3/8" 1@ 0.05, 4@ 0.10, R@ 0.20m kg 1.00 1.66 0.56
tramo L-M kg 1.00 3.08
estribo Ø 3/8" 1@ 0.05, 4@ 0.10, R@ 0.20m kg 1.00 1.66 0.56
EJE H
tramo 1-3 kg 1.00 5.80
estribo Ø 3/8" 1@ 0.05, 4@ 0.10, R@ 0.20m kg 1.00 1.66 0.56
EJE I
tramo 1-3 kg 1.00 5.80
estribo Ø 3/8" 1@ 0.05, 4@ 0.10, R@ 0.20m kg 1.00 1.66 0.56
EJE J
tramo 1-3 kg 1.00 5.80
estribo Ø 3/8" 1@ 0.05, 4@ 0.10, R@ 0.20m kg 1.00 1.66 0.56
EJE K
tramo 1-3 kg 1.00 5.80
estribo Ø 3/8" 1@ 0.05, 4@ 0.10, R@ 0.20m kg 1.00 1.66 0.56

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO
EJE L
tramo 1-3 kg 1.00 5.80
estribo Ø 3/8" 1@ 0.05, 4@ 0.10, R@ 0.20m kg 1.00 1.66 0.56
EJE M
tramo 1-3 kg 1.00 5.80
estribo Ø 3/8" 1@ 0.05, 4@ 0.10, R@ 0.20m kg 1.00 1.66 0.56

VIGAS DE CIMENTACION: ENCOFRADO Y DESENCOFRADO


02.03.02.03 m2
EJE 4 # CARAS
tramo H-I m2 1.00 1.87 0.50
tramo I-J m2 1.00 2.51 0.50
tramo J-K m2 1.00 2.36 0.50
tramo K-L m2 1.00 2.53 0.50
tramo L-M m2 1.00 3.08 0.50
EJE 5
tramo H-I m2 1.00 2.22 0.50
tramo L-M m2 1.00 3.43 0.50
EJE 6
tramo H-I m2 1.00 1.87 0.50
tramo I-J m2 1.00 2.51 0.50
tramo J-K m2 1.00 2.36 0.50
tramo K-L m2 1.00 2.53 0.50
tramo L-M m2 1.00 3.08 0.50
EJE H
tramo 1-3 m2 1.00 5.80 0.50
EJE I
tramo 1-3 m2 1.00 5.80 0.50
EJE J
tramo 1-3 m2 1.00 5.80 0.50
EJE K
tramo 1-3 m2 1.00 5.80 0.50
EJE L
tramo 1-3 m2 1.00 5.80 0.50
EJE M
tramo 1-3 m2 1.00 5.80 0.50

02.03.05 COLUMNAS
02.03.05.01 COLUMNAS: CONCRETO F'C = 210 KG/CM2 m3
C1 m3 4.00 3.25
C2 m3 8.00 3.25
C3 m3 4.00 3.25

02.03.05.02 COLUMNAS: ACERO DE REFUERZO fy = 4200 Kg/cm2 kg


COLUMNA (C1)
Recubrimiento Laterales 0.040 Estribos 1
Empalme 0.000 Recubrimien0.04
0.30 0.25

4.68 0.45

0.30

bloque 02 Peso (kg/m)


8 Ø 5/8" kg 4.00 1.55 5.28
estribo 2 Ø 3/8" 1@ 0.05, 8@ 0.10, R@ 0.20m kg 4.00 2.56 0.56
COLUMNA (C2)
Recubrimiento Laterales 0.040 Estribos 1
Empalme 0.000 Recubrimien0.04

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO
0.30 0.25

4.99 0.45

0.30

bloque 02 Peso (kg/m)


6 Ø 5/8" kg 8.00 1.55 5.59
4 Ø 1/2" kg 8.00 1.55 5.59
estribo 2 Ø 3/8" 1@ 0.05, 10@ 0.10, R@ 0.20m kg 8.00 3.34 0.56
COLUMNA (C1)
Recubrimiento Laterales 0.040 Estribos 1
Empalme 0.000 Recubrimien0.04
0.30 0.25

4.68 0.35

0.30

bloque 02 Peso (kg/m)


4 Ø 5/8" kg 4.00 1.55 5.28
estribo 2 Ø 3/8" 1@ 0.05, 8@ 0.10, R@ 0.20m kg 4.00 2.68 0.56

COLUMNAS: ENCOFRADO Y DESENCOFRADO


02.03.05.03 m2 PERIM.
C1 m2 4.00 1.40 3.05
C2 m2 8.00 1.50 3.05
C3 m2 4.00 0.50 3.05

02.03.06 COLUMNETAS
02.03.06.01 COLUMNETAS: CONCRETO F'C = 175 KG/CM2 m3
EJE 4
tramo H-I m3 2.00 0.25 0.15 2.10
tramo I-J m3 2.00 0.25 0.15 1.42
tramo J-K m3 2.00 0.25 0.15 1.42
tramo K-L m3 2.00 0.25 0.15 1.42
tramo L-M m3 2.00 0.25 0.15 1.42
EJE 5
tramo L-M m3 1.00 0.25 0.15 4.47
EJE 6
tramo H-I m3 2.00 0.25 0.15 2.10
tramo I-J m3 2.00 0.25 0.15 1.42
tramo J-K m3 2.00 0.25 0.15 1.42
tramo K-L m3 2.00 0.25 0.15 1.42
tramo L-M m3 2.00 0.25 0.15 1.42
EJE H
tramo 5-6 m3 1.00 0.25 0.15 4.18
EJE I
tramo 4-6 m3 4.00 0.25 0.15 4.18

02.03.06.02 COLUMNETAS: ACERO DE REFUERZO fy = 4200 Kg/cm2 kg


Recubrimiento Laterale 0.040 Estribos 1 Ca 2.10
Empalme 0.000 Recubrimi 0.03 1.42
0.15 4.18
0.15 4.47

3/8" X 0.25

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO
0.15

EJE 4 Peso (kg/m)


tramo H-I kg 2.00 2.10
4 Ø 3/8" kg 2.00 0.56 2.75
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg 2.00 0.76 0.39
tramo I-J kg 2.00 1.42
4 Ø 3/8" kg 2.00 0.56 2.05
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg 2.00 0.76 0.39
tramo J-K kg 2.00 1.42
4 Ø 3/8" kg 2.00 0.56 2.05
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg 2.00 0.76 0.39
tramo K-L kg 2.00 1.42
4 Ø 3/8" kg 2.00 0.56 2.05
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg 2.00 0.76 0.39
tramo L-M kg 2.00 1.42
4 Ø 3/8" kg 2.00 0.56 2.05
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg 2.00 0.76 0.39
EJE 5
tramo L-M kg 1.00 4.47
4 Ø 3/8" kg 1.00 0.56 4.85
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg 1.00 0.76 0.39
EJE 6
tramo H-I kg 2.00 2.10
4 Ø 3/8" kg 2.00 0.56 2.75
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg 2.00 0.76 0.39
tramo I-J kg 2.00 1.42
4 Ø 3/8" kg 2.00 0.56 2.05
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg 2.00 0.76 0.39
tramo J-K kg 2.00 1.42
4 Ø 3/8" kg 2.00 0.56 2.05
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg 2.00 0.76 0.39
tramo K-L kg 2.00 1.42
4 Ø 3/8" kg 2.00 0.56 2.05
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg 2.00 0.76 0.39
tramo L-M kg 2.00 1.42
4 Ø 3/8" kg 2.00 0.56 2.05
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg 2.00 0.76 0.39
EJE H
tramo 5-6 kg 1.00 4.18
4 Ø 3/8" kg 1.00 0.56 4.75
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg 1.00 0.76 0.39
EJE I
tramo 4-6 kg 4.00 4.18
4 Ø 3/8" kg 4.00 0.56 4.75
estribo Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0.25m kg 4.00 0.76 0.39

COLUMNETAS: ENCOFRADO Y DESENCOFRADO


02.03.06.03 m2
EJE 4
tramo H-I m2 2.00 0.25 2.10
tramo I-J m2 2.00 0.25 1.42
tramo J-K m2 2.00 0.25 1.42
tramo K-L m2 2.00 0.25 1.42
tramo L-M m2 2.00 0.25 1.42
EJE 5
tramo L-M m2 1.00 0.25 4.47
EJE 6

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO
tramo H-I m2 2.00 0.25 2.10
tramo I-J m2 2.00 0.25 1.42
tramo J-K m2 2.00 0.25 1.42
tramo K-L m2 2.00 0.25 1.42
tramo L-M m2 2.00 0.25 1.42
EJE H
tramo 5-6 m2 1.00 0.25 4.18
EJE I
tramo 4-6 m2 4.00 0.25 4.18

02.03.07 VIGUETAS DE ALFEIZER


02.03.07.01 VIGUETAS DE ALFEIZER: CONCRETO F'C = 175 KG/CM2 m3
EJE 4
tramo H-I m3 1.00 1.82 0.15 0.25
tramo I-J m3 1.00 2.44 0.15 0.25
tramo J-K m3 1.00 2.31 0.15 0.25
tramo K-L m3 1.00 2.49 0.15 0.25
tramo L-M m3 1.00 3.02 0.15 0.25
EJE 6
tramo H-I m3 1.00 1.82 0.15 0.25
tramo I-J m3 1.00 1.36 0.15 0.25
tramo J-K m3 1.00 2.31 0.15 0.25
tramo K-L m3 1.00 1.41 0.15 0.25
tramo L-M m3 1.00 2.05 0.15 0.25

02.03.07.02 VIGUETAS DE ALFEIZER: ACERO DE REFUERZO fy = 4200 Kg/cm2 kg


Recubrimiento Latera 0.04 Estribos 1
Empalme 0.00 Recubrimi 0.04
X 0.15
0.20
0.25
estribo Ø 8mm 1@ 0.05, 5@ 0.10, R@ 0.25m

EJE 4 Peso (kg/m)


tramo H-I kg 1.00 1.82
1 Ø 3/8" kg 1.00 2.14 0.56
estribo Ø 8mm 1@ 0.05, 5@ 0.10, R@ 0.25m kg 1.00 0.68 0.39
tramo I-J kg 1.00 2.44
1 Ø 3/8" kg 1.00 2.76 0.56
estribo Ø 8mm 1@ 0.05, 5@ 0.10, R@ 0.25m kg 1.00 0.68 0.39
tramo J-K kg 1.00 2.31
1 Ø 3/8" kg 1.00 2.63 0.56
estribo Ø 8mm 1@ 0.05, 5@ 0.10, R@ 0.25m kg 1.00 0.68 0.39
tramo K-L kg 1.00 2.49
1 Ø 3/8" kg 1.00 2.81 0.56
estribo Ø 8mm 1@ 0.05, 5@ 0.10, R@ 0.25m kg 1.00 0.68 0.39
tramo L-M kg 1.00 3.02
1 Ø 3/8" kg 1.00 3.34 0.56
estribo Ø 8mm 1@ 0.05, 5@ 0.10, R@ 0.25m kg 1.00 0.68 0.39
EJE 6
tramo H-I kg 1.00 1.82
1 Ø 3/8" kg 1.00 2.14 0.56
estribo Ø 8mm 1@ 0.05, 5@ 0.10, R@ 0.25m kg 1.00 0.68 0.39
tramo I-J kg 1.00 1.36
1 Ø 3/8" kg 1.00 1.68 0.56
estribo Ø 8mm 1@ 0.05, 5@ 0.10, R@ 0.25m kg 1.00 0.68 0.39
tramo J-K kg 1.00 2.31
1 Ø 3/8" kg 1.00 2.63 0.56

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO
estribo Ø 8mm 1@ 0.05, 5@ 0.10, R@ 0.25m kg 1.00 0.68 0.39
tramo K-L kg 1.00 1.41
1 Ø 3/8" kg 1.00 1.73 0.56
estribo Ø 8mm 1@ 0.05, 5@ 0.10, R@ 0.25m kg 1.00 0.68 0.39
tramo L-M kg 1.00 2.05
1 Ø 3/8" kg 1.00 2.37 0.56
estribo Ø 8mm 1@ 0.05, 5@ 0.10, R@ 0.25m kg 1.00 0.68 0.39

VIGUETAS DE ALFEIZER: ENCOFRADO Y DESENCOFRADO


02.03.07.03 m2
EJE 4
tramo H-I m2 1.00 1.82 0.25
tramo I-J m2 1.00 2.44 0.25
tramo J-K m2 1.00 2.31 0.25
tramo K-L m2 1.00 2.49 0.25
tramo L-M m2 1.00 3.02 0.25
EJE 6
tramo H-I m2 1.00 1.82 0.25
tramo I-J m2 1.00 1.36 0.25
tramo J-K m2 1.00 2.31 0.25
tramo K-L m2 1.00 1.41 0.25
tramo L-M m2 1.00 2.05 0.25

02.03.08 VIGAS
02.03.08.01 VIGAS: CONCRETO F'C = 210 KG/CM2 m3
VIGAS (V1 - CUMBRERA) AREA
EJE 5 m3 1.00 16.63 0.09
VIGAS (V2 - 025 x 0.45 ) AREA
EJE 4 m3 1.00 15.43 0.16
EJE 6 m3 1.00 15.43 0.16
VIGAS (V3 - 0.25 x 0.50 )
EJE J
tramo 4-5 m3 1.00 3.03 0.25 0.50
tramo 5-6 m3 1.00 3.03 0.25 0.50
EJE K
tramo 4-5 m3 1.00 3.03 0.25 0.50
tramo 5-6 m3 1.00 3.03 0.25 0.50
VIGAS (V4 - 0.25 x 0.20 (HORIZONTAL))
EJE H
tramo 5-6 m3 1.00 5.80 0.25 0.20
EJE I
tramo 5-6 m3 1.00 5.80 0.25 0.20
EJE I"
tramo 5-6 m3 1.00 3.67 0.25 0.20
EJE L
tramo 5-6 m3 1.00 5.80 0.25 0.20
EJE M
tramo 5-6 m3 1.00 5.80 0.25 0.20
VIGAS (V4 - 0.25 x 0.20 (INCLINADA))
EJE H
tramo 4-5 m3 1.00 4.12 0.25 0.20
tramo 5-6 m3 1.00 5.06 0.25 0.20
EJE I
tramo 4-5 m3 1.00 4.12 0.25 0.20
tramo 5-6 m3 1.00 5.06 0.25 0.20
EJE J,K
tramo 5-6 m3 2.00 2.18 0.25 0.20
EJE L
tramo 4-5 m3 1.00 4.12 0.25 0.20
tramo 5-6 m3 1.00 5.06 0.25 0.20
EJE M

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO
tramo 4-5 m3 1.00 4.12 0.25 0.20
tramo 5-6 m3 1.00 5.06 0.25 0.20
VIGAS (V5 - 020 x 0.15 (VIGA DE BORDE) )
EJE 4
tramo 5-6 m3 1.00 16.63 0.15 0.20
EJE 6
tramo 5-6 m3 1.00 16.63 0.15 0.20
EJE 5
tramo A-B m3 1.00 2.22 0.15 0.20
tramo 5-6 m3 1.00 3.43 0.15 0.20
EJE H
tramo 5-6 m3 1.00 8.51 0.15 0.20
EJE H
tramo 5-6 m3 1.00 8.51 0.15 0.20

02.03.08.02 VIGAS: ACERO DE REFUERZO fy = 4200 Kg/cm2 kg


VIGAS (V1 - CUMBRERA)
Acero principal 01 Estribos 5
Recubrimiento Laterales 0.02 Recubrimiento 0.04
X
0.10
Empalme 0.00

EJE 5 kg 1.00 16.63 Peso (kg/mt)


5 Ø 1/2" kg 1.00 16.79 0.99
estribo Ø 3/8" 1@ 0.05, R@ 0.20m kg 1.00 1.27 0.56
VIGAS (V2 - 025 x 0.45 )
Acero principal 01 Estribos 2
Recubrimiento Laterales 0.04 Recubrimiento 0.04
X 0.25
0.15
Empalme 0.75 0.40

EJE 4 kg 1.00 15.43 Peso (kg/mt)


4 Ø 5/8" kg 1.00 17.90 1.55
2 Ø 3/8" kg 1.00 17.90 0.56
estribo Ø 3/8" 1@ 0.05, 10@ 0.12, R@ 0.20m kg 1.00 1.68 0.56
EJE 6 kg 1.00 15.43
4 Ø 5/8" kg 1.00 17.90 1.55
2 Ø 3/8" kg 1.00 17.90 0.56
estribo Ø 3/8" 1@ 0.05, 10@ 0.12, R@ 0.20m kg 1.00 1.68 0.56
VIGAS (V3 - 0.25 x 0.50 )
Acero principal 01 Estribos 3
Recubrimiento Laterales 0.02 Recubrimiento 0.04
X 0.25
0.15
Empalme 0.00 0.50

EJE J Peso (kg/mt)


tramo 4-5 kg 1.00 6.20
4 Ø 5/8" kg 1.00 6.46 1.55
estribo Ø 3/8" 1@ 0.05, 5@ 0.10, R@ 0.20m kg 1.00 1.40 0.56
tramo 5-6 kg 1.00 6.20
4 Ø 5/8" kg 1.00 6.46 1.55
estribo Ø 3/8" 1@ 0.05, 5@ 0.10, R@ 0.20m kg 1.00 1.40 0.56
EJE K
tramo 4-5 kg 1.00 6.20

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO
4 Ø 5/8" kg 1.00 6.46 1.55
estribo Ø 3/8" 1@ 0.05, 5@ 0.10, R@ 0.20m kg 1.00 1.40 0.56
tramo 5-6 kg 1.00 6.20
4 Ø 5/8" kg 1.00 6.46 1.55
estribo Ø 3/8" 1@ 0.05, 5@ 0.10, R@ 0.20m kg 1.00 1.40 0.56
VIGAS (V4 - 0.25 x 0.20 (HORIZONTAL))
Acero principal 01 Estribos 3
Recubrimiento Laterales 0.04 Recubrimiento 0.04
X 0.25
0.15
Empalme 0.00 0.20

EJE H Peso (kg/mt)


tramo 5-6 kg 1.00 6.20
4 Ø 1/2" kg 1.00 6.42 0.99
estribo Ø 3/8" 1@ 0.05, 5@ 0.10, R@ 0.20m kg 1.00 0.80 0.56
EJE I
tramo 5-6 kg 1.00 6.20
4 Ø 1/2" kg 1.00 6.42 0.99
estribo Ø 3/8" 1@ 0.05, 5@ 0.10, R@ 0.20m kg 1.00 2.40 0.56
EJE I"
tramo 5-6 kg 1.00 6.20
4 Ø 1/2" kg 1.00 6.42 0.99
estribo Ø 3/8" 1@ 0.05, 5@ 0.10, R@ 0.20m kg 1.00 2.40 0.56
EJE L
tramo 5-6 kg 1.00 6.20
4 Ø 1/2" kg 1.00 6.42 0.99
estribo Ø 3/8" 1@ 0.05, 5@ 0.10, R@ 0.20m kg 1.00 2.40 0.56
EJE M
tramo 5-6 kg 1.00 6.20
4 Ø 1/2" kg 1.00 6.42 0.99
estribo Ø 3/8" 1@ 0.05, 5@ 0.10, R@ 0.20m kg 1.00 2.40 0.56
VIGAS (V4 - 0.25 x 0.20 (INCLINADA))
Acero principal 01 Estribos 3
Recubrimiento Laterales 0.02 Recubrimiento 0.04
X 0.25
0.15
Empalme 0.00 0.20

EJE H Peso (kg/mt)


tramo 4-5 kg 1.00 9.18
4 Ø 1/2" kg 1.00 9.44 0.99
estribo Ø 3/8" 1@ 0.05, 5@ 0.10, R@ 0.20m kg 1.00 0.80 0.56
tramo 5-6 kg 1.00 9.18
4 Ø 1/2" kg 1.00 9.44 0.99
estribo Ø 3/8" 1@ 0.05, 5@ 0.10, R@ 0.20m kg 1.00 0.80 0.56
EJE I
tramo 4-5 kg 1.00 9.18
4 Ø 1/2" kg 1.00 9.44 0.99
estribo Ø 3/8" 1@ 0.05, 5@ 0.10, R@ 0.20m kg 1.00 0.80 0.56
tramo 5-6 kg 1.00 9.18
4 Ø 1/2" kg 1.00 9.44 0.99
estribo Ø 3/8" 1@ 0.05, 5@ 0.10, R@ 0.20m kg 1.00 0.80 0.56
EJE J,K
tramo 5-6 kg 3.00 2.19
4 Ø 1/2" kg 3.00 2.45 0.99
estribo Ø 3/8" 1@ 0.05, 5@ 0.10, R@ 0.20m kg 3.00 0.80 0.56

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO
EJE L
tramo 4-5 kg 1.00 9.18
4 Ø 1/2" kg 1.00 9.44 0.99
estribo Ø 3/8" 1@ 0.05, 5@ 0.10, R@ 0.20m kg 1.00 0.80 0.56
tramo 5-6 kg 1.00 9.18
4 Ø 1/2" kg 1.00 9.44 0.99
estribo Ø 3/8" 1@ 0.05, 5@ 0.10, R@ 0.20m kg 1.00 0.80 0.56
EJE M
tramo 4-5 kg 1.00 9.18
4 Ø 1/2" kg 1.00 9.44 0.99
estribo Ø 3/8" 1@ 0.05, 5@ 0.10, R@ 0.20m kg 1.00 0.80 0.56
tramo 5-6 kg 1.00 9.18
4 Ø 1/2" kg 1.00 9.44 0.99
estribo Ø 3/8" 1@ 0.05, 5@ 0.10, R@ 0.20m kg 1.00 0.80 0.56
VIGAS (V5 - 020 x 0.15 (VIGA DE BORDE) )
Acero principal 01 Estribos 3
Recubrimiento Laterales 0.02 Recubrimiento 0.03
X 0.15
0.15
Empalme 0.00 0.20

EJE 4 Peso (kg/mt)


tramo 5-6 kg 1.00 23.22
4 Ø 3/8" kg 1.00 23.48 0.56
estribo Ø 8mm 1@ 0.05, 5@ 0.10, R@ 0.25m kg 1.00 0.68 0.39
EJE 6
tramo 5-6 kg 1.00 23.22
4 Ø 3/8" kg 1.00 23.48 0.56
estribo Ø 8mm 1@ 0.05, 5@ 0.10, R@ 0.25m kg 1.00 0.68 0.39
EJE 5
tramo A-B kg 1.00 8.50
4 Ø 3/8" kg 1.00 8.76 0.56
estribo Ø 8mm 1@ 0.05, 5@ 0.10, R@ 0.25m kg 1.00 0.68 0.39
tramo 5-6 kg 1.00 8.50
4 Ø 3/8" kg 1.00 8.76 0.56
estribo Ø 8mm 1@ 0.05, 5@ 0.10, R@ 0.25m kg 1.00 0.68 0.39
EJE H
tramo 5-6 kg 1.00 8.50
4 Ø 3/8" kg 1.00 8.76 0.56
estribo Ø 8mm 1@ 0.05, 5@ 0.10, R@ 0.25m kg 1.00 0.68 0.39
EJE H
tramo 5-6 kg 1.00 8.50
4 Ø 3/8" kg 1.00 8.76 0.56
estribo Ø 8mm 1@ 0.05, 5@ 0.10, R@ 0.25m kg 1.00 0.68 0.39

VIGAS: ENCOFRADO Y DESENCOFRADO


02.03.08.03 m2
VIGAS (V1 - CUMBRERA) PER.
EJE 5 m2 1.00 16.63 0.42
VIGAS (V2 - 025 x 0.45 ) PER.
EJE 4 m2 1.00 15.43 0.65
EJE 6 m2 1.00 15.43 0.65
VIGAS (V3 - 0.25 x 0.50 )
EJE J PER.
tramo 4-5 m2 1.00 3.03 0.50
tramo 5-6 m2 1.00 3.03 0.50
EJE K
tramo 4-5 m2 1.00 3.03 0.50
tramo 5-6 m2 1.00 3.03 0.50

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO
VIGAS (V4 - 0.25 x 0.20 (HORIZONTAL))
EJE H
tramo 5-6 m2 1.00 5.80 0.20
EJE I
tramo 5-6 m2 1.00 5.80 0.20
EJE I"
tramo 5-6 m2 1.00 3.67 0.20
EJE L
tramo 5-6 m2 1.00 5.80 0.20
EJE M
tramo 5-6 m2 1.00 5.80 0.20
VIGAS (V4 - 0.25 x 0.20 (INCLINADA))
EJE H
tramo 4-5 m2 1.00 4.12 0.25
EJE I
tramo 4-5 m2 1.00 4.12 0.25
tramo 5-6 m2 1.00 5.06 0.25
EJE J,K
tramo 5-6 m2 2.00 2.18 0.25
EJE L
tramo 4-5 m2 1.00 4.12 0.25
EJE M
tramo 4-5 m2 1.00 4.12 0.25
VIGAS (V5 - 020 x 0.15 (VIGA DE BORDE) )
EJE 4 PER.
tramo 5-6 m2 1.00 16.63 0.40
EJE 6
tramo 5-6 m2 1.00 16.63 0.40
EJE 5
tramo A-B m2 1.00 2.22 0.40
tramo 5-6 m2 1.00 3.43 0.40
EJE H
tramo 5-6 m2 1.00 8.51 0.40
EJE H
tramo 5-6 m2 1.00 8.51 0.40

02.03.09 LOSA ALIGERADA


02.03.09.01 LOSA ALIGERADA: POLIESTIRENO EXPANDIDO 15X30X120 PROV.Y COLOCAD und
A 0.30 m
V 0.10 m
L 1.20 m

almacen de alimentos und 1.00


cocina und 1.00
sum und 1.00
ss.hh und 1.00
deposito und 1.00
voladizo und 1.00

02.03.09.02 LOSA ALIGERADA: CONCRETO F'C = 210 KG/CM2 m3


A 0.30 m
V 0.10 m
L 1.20 m
#POLIESTIRENO(un
almacen de alimentos m3 1.00
cocina m3 1.00
sum m3 1.00
ss.hh m3 1.00
deposito m3 1.00
voladizo m3 1.00

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO

02.03.09.03 LOSA ALIGERADA: ACERO DE REFUERZO fy = 4200 Kg/cm2 kg

Baston Izquierdo 01 0.15 on Derecho 01 0.15

Recubrimiento Laterales 0.040 ento Laterales 0.040


Empalme 0.00 Empalme 0.00

LOSA Ø (pulg)Peso (kg/mt)


EJE H kg 1.00 1.53 1/2" 0.99
EJE M kg 1.00 2.00 1/2" 0.99

1/2" 1/2" 1
Refuerzo Superior 01 Refuerzo Superior 02
/
X X 2
"

LOSA Ø (pulg)Peso (kg/mt)


EJE I kg 1.00 1.85 1/2" 0.99
EJE J kg 1.00 2.05 1/2" 0.99
EJE K kg 1.00 2.05 1/2" 0.99
EJE L kg 1.00 2.30 1/2" 0.99

Acero Longitudinal 01 0.15


X
Recubrimiento Laterales 0.04
Empalme 0.6

LOSA Ø (pulg)Peso (kg/mt)


en planta kg 1.00 9.01 1/2" 0.99

Acero de Temperatura Longitudinal

Acero de T. Longitudinal 01 0.1


X
Recubrimiento Laterales 0.04
Empalme 0.6
LOSA Ø (pulg)Peso (kg/mt)
en planta kg 1.00 16.93 1/2" 0.99

LOSA ALIGERADA: ENCOFRADO Y DESENCOFRADO


02.03.09.04 m2
area
almacen de alimentos m2 1.00 9.78
cocina m2 1.00 9.78
sum m2 1.00 47.28
ss.hh m2 1.00 7.81
deposito m2 1.00 4.56
voladizo m2 1.00 35.85

MESA DE CONCRETO
02.03.11

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO
02.03.11.01 MESA DE CONCRETO: CONCRETO F'C = 175 KG/CM2 m3
mesade concreto ubicada en concina m3 1.00 2.43 0.60 0.10
m3 1.00 3.07 0.60 0.10

02.03.11.02 MESA DE CONCRETO: ACERO DE REFUERZO fy = 4200 Kg/cm2 kg

Recubrimiento Laterales 0.020 rales 0.020


Empalme 0.00 alme 0.00
Longitudinal Transversal
0.60 5.50
Peso (kg/mt)
longitudinales
1 Ø 3/8" kg 1.00 0.56 0.56
Transversales
1 Ø 3/8" kg 1.00 5.46 0.56

Recubrimiento Laterales 0.020 rales 0.020


Empalme 0.00 alme 0.00
Longitudinal Transversal
0.60 0.60
0.80 Peso (kg/mt)
longitudinales
1 Ø 1/4" kg 1.00 0.56 0.25
Transversales
1 Ø 1/4" kg 1.00 0.56 0.25

MESA DE CONCRETO: ENCOFRADO Y DESENCOFRADO


02.03.11.03 m2
mesade concreto ubicada en concina m2 1.00 2.43 0.60
m2 1.00 3.07 0.60
m2 1.00 5.50 0.10

03 ARQUITECTURA
03.01 MUROS Y TABIQUES DE ALBAÑILERIA
03.01.01 MURO DE SOGA LADRILLO DE ARCILLA 9x12x23 cm. MORTERO DOSIFICADO 1: m2
EJE 4
tramo H-I m2 1.00 1.32 1.50
tramo I-J m2 1.00 1.94 0.82
tramo J-K m2 1.00 1.81 0.82
tramo K-L m2 1.00 1.99 0.82
tramo L-M m2 1.00 2.52 0.82
EJE 5
tramo L-M m2 1.00 2.18 2.85
tramo L-M m2 1.00 1.00 0.82
EJE 5"
tramo H-I m2 1.00 2.22 2.85
EJE 6
tramo H-I m2 1.00 1.32 1.50
tramo I-J m2 1.00 0.86 0.82
tramo J-K m2 1.00 1.81 0.82
tramo K-L m2 1.00 0.91 0.82
tramo L-M m2 1.00 1.55 0.82
MUROS DE TIMPANOS
EJE H
tramo 4-5 m2 1.00 0.96
tramo 5-6 m2 1.00 0.96
EJE I
tramo 4-5 m2 1.00 0.96
tramo 5-6 m2 1.00 0.96

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO
EJE L
tramo 4-5 m2 1.00 0.96
tramo 5-6 m2 1.00 0.96
EJE M
tramo 4-5 m2 1.00 0.96
tramo 5-6 m2 1.00 0.96

03.01.02 MURO DE CABEZA LADRILLO DE ARCILLA9x13x24 cm. MORTERO DOSIFICADO m2


EJE H
tramo 4-5 m2 1.00 2.78 2.65
tramo 5-6 m2 1.00 2.78 2.65
EJE I
tramo 4-5 m2 1.00 1.88 2.65
tramo 5-6 m2 1.00 1.88 2.65
EJE L
tramo 4-5 m2 1.00 2.78 2.65
tramo 5-6 m2 1.00 2.78 2.65
EJE M
tramo 4-5 m2 1.00 2.78 2.65
tramo 5-6 m2 1.00 2.78 2.65

03.01.03 JUNTA SISMICA EN TABIQUES E=1" ml


EJE 4
tramo H-I ml 2.00 2.73
tramo I-J ml 1.00 1.67
tramo J-K ml 2.00 1.67
tramo K-L ml 1.00 1.67
tramo L-M ml 1.00 1.67
EJE 6
tramo H-I ml 1.00 2.73
tramo I-J ml 1.00 1.67
tramo J-K ml 2.00 1.67
tramo K-L ml 1.00 1.67
tramo L-M ml 2.00 1.67

ALAMBRE DE 1/4" CORRUGADO REFUERZO HORIZONTAL EN MUROS


03.01.04 kg (ml/m2) Fact. (Kg/ml)
AREA MUROS DE SOGA kg 1.00 6.00
AREA MUROS DE CABEZA kg 1.00 6.00

03.01.05 TAPAJUNTA CON JEBE MICROPOROSO EN JUNTA SISMICA DE 1" ml


EJE 4
tramo H-I ml 2.00 2.73
tramo I-J ml 1.00 1.67
tramo J-K ml 2.00 1.67
tramo K-L ml 1.00 1.67
tramo L-M ml 1.00 1.67
EJE 6
tramo H-I ml 1.00 2.73
tramo I-J ml 1.00 1.67
tramo J-K ml 2.00 1.67
tramo K-L ml 1.00 1.67
tramo L-M ml 2.00 1.67

03.02 REVOQUES, ENLUCIDOS Y REVESTIMIENTOS


03.02.01 TARRAJEO PRIMARIO RAYADO CON MORTERO C:A 1:5 m2
COCINA m2 1.00 7.26 1.60
SS.HH. m2 1.00 12.25 1.60

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO

03.02.02 TARRAJEO DE MUROS INTERIORES , E=1.5 CM CON MORTERO C:A 1:5 m2


DESPENSA m2 1.00 7.74 2.80
m2 1.00 2.73 1.55
COCINA m2 1.00 5.21 2.80
m2 1.00 2.78 1.25
SUM m2 1.00 5.56 2.90
m2 1.00 3.76 2.90
m2 1.00 8.30 1.65
SS.HH. m2 1.00 8.08 1.40
DEPOSITO m2 1.00 5.28 2.80
m2 1.00 1.83 1.55

TARRAJEO DE MUROS EXTERIORES , e=1.5 cm CON MORTERO C:A 1:5


03.02.03 m2
EJE 4
tramo H-I m2 1.00 1.83 1.60
tramo I-J m2 1.00 2.44 0.92
tramo J-K m2 1.00 2.31 0.92
tramo K-L m2 1.00 2.49 0.92
tramo L-M m2 1.00 3.03 0.92
EJE 6
tramo H-I m2 1.00 1.83 1.60
tramo I-J m2 1.00 1.36 0.92
tramo J-K m2 1.00 2.31 0.92
tramo K-L m2 1.00 1.41 0.92
tramo L-M m2 1.00 2.05 0.92
EJE H
tramo4-5 m2 1.00 2.78 2.70
tramo 5-6 m2 1.00 2.78 2.70
EJE M
tramo4-5 m2 1.00 2.78 2.70
tramo 5-6 m2 1.00 2.78 2.70

03.02.04 TARRAJEO DE COLUMNAS, E=1.5 CM CON MORTERO C:A 1:5 m2 perimetro


C1 m2 4.00 1.40 2.85
C2 m2 8.00 1.70 2.85
C3 m2 4.00 0.50 2.85

03.02.05 TARRAJEO DE VIGAS, E=1.5 CM CON MORTERO C:A 1:5 m2


VIGAS (V1 - CUMBRERA) # CARAS
EJE 5 m2 1.00 16.63 0.42
VIGAS (V2 - 025 x 0.45 )
EJE 4 m2 1.00 15.43 0.65
EJE 6 m2 1.00 15.43 0.65
VIGAS (V3 - 0.25 x 0.50 )
EJE J
tramo 4-5 m2 1.00 3.03 0.50
tramo 5-6 m2 1.00 3.03 0.50
EJE K
tramo 4-5 m2 1.00 3.03 0.50
VIGAS (V4 - 0.25 x 0.20 (HORIZONTAL))
EJE H
tramo 5-6 m2 1.00 5.80 0.20
EJE I
tramo 5-6 m2 1.00 5.80 0.20

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO
EJE I"
tramo 5-6 m2 1.00 3.67 0.20
EJE L
tramo 5-6 m2 1.00 5.80 0.20
EJE M
tramo 5-6 m2 1.00 5.80 0.20
VIGAS (V4 - 0.25 x 0.20 (INCLINADA))
EJE H
tramo 4-5 m2 1.00 4.12 0.20
EJE I
tramo 4-5 m2 1.00 4.12 0.20
tramo 5-6 m2 1.00 5.06 0.20
EJE J,K
tramo 5-6 m2 2.00 2.18 0.20
EJE L
tramo 4-5 m2 1.00 4.12 0.20
EJE M
tramo 4-5 m2 1.00 4.12 0.20
VIGAS (V5 - 020 x 0.15 (VIGA DE BORDE) )
EJE 4
tramo 5-6 m2 1.00 16.63 0.20
EJE 6
tramo 5-6 m2 1.00 16.63 0.20
EJE 5
tramo A-B m2 1.00 2.22 0.20
tramo 5-6 m2 1.00 3.43 0.20
EJE H
tramo 5-6 m2 1.00 8.51 0.20

03.02.06 TARRAJEO DE CIELO RASO, E=1.5CM CON MORTERO C:A 1:4 m2


almacen de alimentos m2 1.00
cocina m2 1.00
sum m2 1.00
ss.hh m2 1.00
deposito m2 1.00
voladizo m2 1.00

03.02.07 VESTIDURA DE DERRAMES ml # LADOS


P1 ml 1.00 0.80 2.10
P2 ml 1.00 0.90 2.10
P3 ml 2.00 1.00 2.60
P4 ml 2.00 1.10 2.60
V1 ml 1.00 1.88 0.27
V2 ml 1.00 1.87 0.68
VA1 ml 2.00 2.15 0.95
VA2 ml 1.00 3.25 0.95
VA4 ml 1.00 2.08 0.70
VA5 ml 1.00 3.08 1.36
VA6 ml 3.00 3.25 1.36

03.02.08 BRUÑAS DE E=1 cm. ml


EJE 4
tramo H-I perimetro
vigueta ml 1.00 1.82
columneta ml 2.00 2.35
tramo I-J
vigueta ml 1.00 2.44
columneta ml 2.00 1.42
tramo J-K

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO
vigueta ml 1.00 2.31
columneta ml 2.00 1.42
tramo K-L
vigueta ml 1.00 2.49
columneta ml 2.00 1.42
tramo L-M
vigueta ml 1.00 3.02
columneta ml 2.00 1.42
EJE 6
tramo H-I
vigueta ml 1.00 1.82
columneta ml 1.00 2.35
tramo I-J
vigueta ml 1.00 1..36
columneta ml 1.00 1.42
tramo J-K
vigueta ml 1.00 2.31
columneta ml 2.00 1.42
tramo K-L
vigueta ml 1.00 1.41
columneta ml 1.00 1.42
tramo L-M
vigueta ml 1.00 2.05
columneta ml 1.00 1.42
EJE H
tramo 4-6
columna ml 2.00 3.26
columna ml 1.00 3.26
columna ml 2.00 2.78
EJE i
tramo 4-6
columna ml 4.00 3.26
columna ml 1.00 3.26
columna ml 3.00 2.78
EJE j
tramo 4-6
columna ml 1.00 3.26
columna ml 1.00 3.26
Viga peraltada ml 1.00 2.78
EJE K
tramo 4-6
columna ml 1.00 3.26
columna ml 1.00 3.26
Viga peraltada ml 1.00 2.78
EJE L
tramo 4-6
columna ml 2.00 3.26
columna ml 1.00 3.26
columna ml 2.00 2.78
EJE M
tramo 4-6
tabiqueria ml 2.00 3.26
columna ml 1.00 3.26
columna ml 2.00 2.78

REVESTIMIENTO DE MUROS CON CERÁMICO DE COLOR 30X30 cm.


03.02.09 m2
COCINA m2 1.00 7.26 1.60
SS.HH m2 1.00 12.25 1.60

03.02.10 MESA DE CONCRETO REVESTIDA DE CERAMICO m2

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO
mesa de concreto en cocina m2 1.00 2.43 0.60
m2 1.00 3.07 0.60
m2 3.00 1.20 0.10

03.02.11 PERFIL DE ALUMINIO ml


EN SS.HH. ml 2.00 1.10

03.03 PISOS Y VEREDAS


FALSO PISO DE C° S° C:H - 1:8 E = 4" EN AMBIENTES INTERIORES
03.03.01 m2
area
AULA DE PSICOMOTRICIDAD - SUM m2 1.00 56.05
DEPOSITO (AULA DE PSICOMTRICIDAD - SUM) m2 1.00 4.97
S.S.H.H. (AULA DE PSICOMTRICIDAD - SUM) m2 1.00 9.31
COCINA m2 1.00 10.99
DESPENSA QALIWARMA m2 1.00 10.65

03.03.02 CONTRAPISO DE 40MM. m2


AREA
AULA DE PSICOMOTRICIDAD - SUM m2 1.00 56.05
DEPOSITO (AULA DE PSICOMTRICIDAD - SUM) m2 1.00 4.97
S.S.H.H. (AULA DE PSICOMTRICIDAD - SUM) m2 1.00 9.31
COCINA m2 1.00 10.99
DESPENSA QALIWARMA m2 1.00 10.65

03.03.03 PISO VINILICO DE ALTO TRANSITO m2 AREA


AULA DE PSICOMOTRICIDAD - SUM m2 1.00 71.11

03.03.04 PISO CON CERÁMICO ANTIDESLIZANTE DE 30X30 CM m2 AREA


COCINA m2 1.00 10.99
SS.HH. m2 1.00 9.31

03.03.05 SUMINISTRO Y COLOCACION DE ADOQUINES DE CONCRETO 4x10x20 cm COL m2


03.03.06 VEREDAS - CONCRETO 175 Kg/cm2 e=4" m2
DEPOSITO (AULA DE PSICOMTRICIDAD - SUM) m2 1.00 4.97
DESPENSA QALIWARMA m2 1.00 10.65
VEREDAS m2 1.00 16.63 0.60
m2 1.00 16.63 1.50
m2 2.00 8.80 0.60

03.03.07 PISO DE CEMENTO PULIDO Y BRUÑADO e=2" m2


DEPOSITO (AULA DE PSICOMTRICIDAD - SUM) m2 1.00 10.19
DESPENSA QALIWARMA m2 1.00 6.00
VEREDAS m2 1.00 27.12 0.60
m2 1.00 27.12 1.50
m2 2.00 6.70 0.60

03.03.08 JUNTA DE DILATACION PISOS Y VEREDAS e=1" ml


AULA DE PSICOMOTRICIDAD - SUM ml 1.00 38.10
DEPOSITO (AULA DE PSICOMTRICIDAD - SUM) ml 1.00 9.25
S.S.H.H. (AULA DE PSICOMTRICIDAD - SUM) ml 1.00 13.15
COCINA ml 1.00 13.50
DESPENSA QALIWARMA ml 1.00 13.30
VEREDAS ml 1.00 49.00
ml 4.00 1.50
ml 6.00 0.60

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO

RELLENO DE JUNTA DE DILATACION CON MASA ASFALTICA PISOS Y VEREDAS e=5"


03.03.09 ml
DEPOSITO (AULA DE PSICOMTRICIDAD - SUM) ml 1.00 9.25
DESPENSA QALIWARMA ml 1.00 13.30
VEREDAS ml 1.00 49.00
ml 4.00 1.50
ml 6.00 0.60

SELLADO DE JUNTAS DE DILATACION CON MASILLA FLEXIBLE ELASTOMERICA e=1"


03.03.10 ml
DEPOSITO (AULA DE PSICOMTRICIDAD - SUM) ml 1.00 9.25
DESPENSA QALIWARMA ml 1.00 13.30
VEREDAS ml 1.00 49.00
ml 4.00 1.50
ml 6.00 0.60

03.03.11 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 # LADOS


VEREDAS m2 1.00 8.80 0.30
VEREDAS m2 1.00 16.63 0.30

03.05 CONTRAZOCALOS
03.05.01 CONTRAZOCALO DE CEMENTO PULID, H = 0.30 m. e=1.5 cm CON MORTERO C: ml VANOS
EXTERIOS ml 1.00 44.26 2.20

03.05.02 CONTRAZOCALO DE CEMENTO PULIDO H=0.20 m. e= 1.5 cm. CON MORTERO C ml VANOS
DEPOSITO (AULA DE PSICOMTRICIDAD - SUM) ml 1.00 9.25 0.90
DESPENSA QALIWARMA ml 1.00 13.30 0.90

03.05.03 CONTRAZOCALO VINILICO, H=0.10 m. ml VANOS


SUM ml 1.00 38.10 4.00

03.06 ZOCALOS
03.06.01 ZOCALO DE CERAMICO DE COLOR 0.30x0.30 m. m2 VANOS
COCINA m2 1.00 7.26 1.60
SS.HH. m2 1.00 12.25 1.60

03.07 COBERTURA
03.07.01 CORREA DE MADERERA 1.5" x 2" ml
EJE 4-5
tramo H-M ml 4.00 16.63
EJE 5-6
tramo MH-M ml 5.00 16.63

03.07.02 COBERTURA CON TEJA ANDINA m2


EJE 4-5
tramo M-S m2 1.00 16.93 4.33
EJE 5-6
tramo M-S m2 1.00 16.93 4.33

03.07.03 CUMBRERA CON TEJA ANDINA ml


EJE 5
tramo M-S ml 1.00 16.63

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO

03.08 CARPINTERIA DE MADERA


03.08.01 PUERTAS DE MADERA C/TABLEROS, INCLUYE INSTALACION m2
P1 m2 2.00 0.90 2.10
P6 m2 1.00 1.00 2.10

03.08.02 PUERTAS DE MELAMINE e=18mm. C/TABLEROS, INCLUYE INSTALACION m2


P3 m2 1.00 0.90 2.10
P4 m2 1.00 1.00 2.10

03.08.03 PUERTAS DE MELAMINE P/BAÑOS, INCLUYE INSTALACION m2


P2 m2 1.00 1.00 2.10
P4 m2 1.00 0.80 2.10

03.08.04 VENTANA DE MADERA, INCLUYE INSTALACION m2


V3 m2 1.00 1.88 0.27
V 10 m2 1.00 2.15 1.38
V 11 m2 3.00 2.08 1.38
V 12 m2 3.00 3.25 1.38
V 13 m2 1.00 3.08 1.38

03.10 CERRAJERIA
CERRADURA TIPO PESADA DE SOBREPONER 3 GOLPES
03.10.01 pza
P1 pza 2.00
P6 pza 1.00

03.10.02 CERRADURA DE PERILLA DE EMBUTIR pza


P3 pza 1.00
P4 pza 1.00

CERROJO DE ALUMINIO DE 4"


03.10.03 und
P2 und 1.00
P4 und 1.00

CERROJO DE ALUMINIO DE 3" 1/2


03.10.04 und UND POR VENTAN
V3 und 1.00
V 10 und 1.00
V 11 und 3.00
V 12 und 3.00
V 13 und 1.00

03.10.05 BISAGRA ALUMINIZADA CAPUCHINA DE 4" x 4" pza PZA POR PUERTA
P1 pza 1.00
P2 pza 3.00
P3 pza 1.00
P4 pza 3.00
P6 pza 3.00

03.10.06 BISAGRA ALUMINIZADA CAPUCHINA PARA PORTAÑUELAS DE 2 1/2" x 2 1/2" pza PZA POR VENTAN
V3 pza 1.00
V 10 pza 1.00
V 11 pza 3.00
V 12 pza 3.00

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO
V 13 pza 1.00

03.11 VIDRIOS, CRISTALES Y SIMILARES


03.11.01 VIDRIOS CRUDO INCOLORO 4 mm m2
VENTANAS detalle
VER METRADOS DE VENTANAS m2 1.00 29.80

03.12 PINTURA
03.12.01 PINTURA LATEX EN MUROS INTERIORES, 2 MANOS m2
tarrajeo de mutros interiores detalle
ver metrados de tarrajeos m2 1.00 113.60
PINTURA LATEX EN MUROS EXTERIORES, 2 MANOS
03.12.02 m2
tarrajeo de mutros exteriores detalle
ver metrados de tarrajeos m2 1.00 51.90

PINTURA LATEX EN CIELORRASOS, 2 MANOS


03.12.03 m2
tarrajeo de cielorraso detalle
ver metrados de tarrajeos m2 1.00 115.10

PINTURA LATEX EN COLUMNAS, DERRAMES Y VIGAS , 2 MANOS


03.12.04 m2
ver metrados de tarrajeos detalle
tarrajeo de columnas m2 1.00 60.40
tarrajeo de derrames m2 1.00 16.11
tarrajeo de vigas m2 1.00 76.20

PINTURA OLEO MATE EN CONTRAZÓCALOS H=30cm , 2 MANOS


03.12.05 m2 detalle
contrazocalos m2 1.00 42.10 0.30
contrazocalos m2 2.00 20.80 0.20

03.12.06 PINTURA EN CARPINTERIA DE MADERA C/BARNIZ 2 MANOS m2 detalle


PUERTAS CON TABLEROS DE MADERA TORNILLO m2 1.00 5.90
PUERTAS CON TABLEROS DE MELAMINE e=18mm m2 1.00 4.00
PUERTAS DE MELAMINE P/BAÑOS, INCLUYE INSTALACION m2 1.00 3.80
VENTANAS m2 1.00 29.80

04 INSTALACIONES SANITARIAS
04.01 MOVIMIENTO DE TIERRAS
04.01.01 EXCAVACION DE ZANJAS m3 PROF. INICIAL
CR4 - CR5 m3 1.00 13.04 0.45 0.30
CR5 - CR6 m3 1.00 2.00 0.45 0.43
CANALETA m3 1.00 15.33 0.45 0.45
CR11 - CR12 m3 1.00 14.68 0.45 0.15
DREN 05 m3 1.00 12.98 0.55 0.22
DREN 06 m3 1.00 2.25 0.55 0.15
CANALETA - CR8 m3 1.00 3.98 0.45 0.16
DREN 07 m3 1.00 3.28 0.55 0.85
DREN 08 m3 1.00 2.00 0.55 0.85
DREN 09 m3 1.00 2.55 0.55 0.85

RELLENO COMPACTADO PARA ZANJAS CON MATERIAL PROPIO


04.01.02 m3 VOL. INICIAL VOL. DEDUCIR
CR4 - CR5 m3 1.00 13.04 2.14
CR5 - CR6 m3 1.00 2.00 0.40
CANALETA m3 1.00 15.33 3.62
CR11 - CR12 m3 1.00 14.68 1.22

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO
DREN 05 m3 1.00 12.98 1.78
DREN 06 m3 1.00 2.25 0.19
CANALETA - CR8 m3 1.00 3.98 0.30
DREN 07 m3 1.00 3.28 1.55
DREN 08 m3 1.00 2.00 0.94
DREN 09 m3 1.00 2.55 1.20

04.02 APARATOS SANITARIOS


04.02.02 INODORO TANQUE BAJO BLANCO - TIPO BABY (incl. sumin. e inst.) und
COCINA und 0.00
S.S.H.H. DE AULA DE PSICOMOTRICIDAD und 2.00
EXTERIOR und 0.00

LAVATORIOS DE PARED BLANCO 1 LLAVE (incl. sumin. e inst.)


04.02.03 und
COCINA und 0.00
S.S.H.H. DE AULA DE PSICOMOTRICIDAD und 2.00
EXTERIOR und 0.00

04.02.04 LAVADERO DE COCINA DE ACERO INOXIDABLE C/ ESCURRIDOR (Incl. sumin. e i und


COCINA und 1.00
S.S.H.H. DE AULA DE PSICOMOTRICIDAD und 0.00
EXTERIOR und 0.00

KIT ACCESORIOS PARA BAÑO


04.02.05 und
COCINA und 0.00
S.S.H.H. DE AULA DE PSICOMOTRICIDAD und 2.00
EXTERIOR und 0.00

04.02.06 BARRA DE ALUMINIO D= 1 1/2" EN SS.HH. MINUSVALIDOS pza


COCINA pza 0.00
S.S.H.H. DE AULA DE PSICOMOTRICIDAD pza 2.00
EXTERIOR pza 0.00

04.03 SISTEMA DE AGUA FRIA


04.03.01 SALIDA DE PVC SAP PARA AGUA FRIA pto
COCINA pto 1.00
S.S.H.H. DE AULA DE PSICOMOTRICIDAD pto 4.00
EXTERIOR pto 0.00

04.03.02 ml
COCINA ml 1.00 2.61
S.S.H.H. DE AULA DE PSICOMOTRICIDAD ml 1.00 9.14
EXTERIOR ml 1.00 0.00

04.03.03 ml
COCINA ml 1.00 0.00
S.S.H.H. DE AULA DE PSICOMOTRICIDAD ml 1.00 4.68
EXTERIOR ml 1.00 6.54
TRAMO DE GRIFOS DE RIEGO ml 1.00 30.82

04.03.04 ml
EXTERIOR ml 1.00 18.68

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO

04.03.05 ml
EXTERIOR ml 1.00 1.57
ml 1.00 1.09
ml 1.00 1.35
ml 1.00 1.59
ml 1.00 2.80
ml 1.00 3.56

VALVULA DE INTERRUPCION ESFERICA DE 1/2"


04.03.08 pza
COCINA pza 1.00

VALVULA DE INTERRUPCION ESFERICA DE 3/4"


04.03.09 pza
S.S.H.H. DE PSICOMOTRICIDAD pza 1.00
VALVULA DE INTERRUPCION ESFERICA DE 1 1/4”
04.03.10 VALVULA DE INTERRUPCION ESFERICA DE 1 1/2” pza
04.03.11 pza
EXTERIOR (GENERAL MOD. 02) pza 1.00

04.03.12 LLAVE DE RIEGO C/GRIFO DE ½" EN CAJUELA CONCRETO F'c =140 und
EXTERIOR und 2.00

04.04 SISTEMA TUBERIA


DE DRENAJE PLUVIAL
PVC -SAP Ø 4" PARA EVACUACION DE AGUA PLUVIAL
04.04.01 ml
BAJADA DESDE TEJA ANDINA ml 1.00 4.00
BAJADA DESDE TEJA ANDINA ml 1.00 4.00
BAJADA DESDE TEJA ANDINA ml 1.00 4.00
BAJADA DESDE TEJA ANDINA ml 1.00 4.00
HACIA LA CANALETA ml 1.00 2.17
HACIA LA CANALETA ml 1.00 1.45
HACIA LA CR11 ml 1.00 0.85
HACIA LA CR12 ml 1.00 0.85
CR11-CR12 ml 1.00 14.68
CANALETA - CR10 ml 1.00 1.80
ZANJA DE INFILTRACION 05 ml 1.00 20.86
ZANJA DE INFILTRACION 06 ml 1.00 5.33
ZANJA DE INFILTRACION 07 ml 1.00 18.58
ZANJA DE INFILTRACION 08 ml 1.00 5.42
ZANJA DE INFILTRACION 09 ml 1.00 5.42

CANALETA EVAC AGUAS PLUVIALES C/ PLANCHA ACERO GALV. TIPO CALAMINA


04.04.02 ml
MODULO 1 ml 2.00 16.63

CANALETA DE C° F'C= 175 kg/cm2, P/ EVAC. PLUVIAL CON REJILLA


04.04.03 ml
C° Canaleta ml 1.00 15.33

04.04.04 ml
DREN 05 ml 1.00 2.33
DREN 06 ml 1.00 5.33
DREN 07 ml 1.00 5.42
DREN 08 ml 1.00 5.42
DREN 09 ml 1.00 5.42

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
CAJA DE REGISTRO DE AGUA PLUVIAL DE 25 X 50 cm. LARGO ANCHO ALTO
04.04.05 und
CR - 10 und 1.00
CR - 11 und 1.00
CR - 12 und 1.00

04.05 SISTEMA DE DESAGUE Y VENTILACION


04.05.01 SALIDAS DE PVC SAP PARA DESAGUE DE Ø 2" pto
COCINA pto 1.00
S.S.H.H. DE AULA DE PSICOMOTRICIDAD pto 2.00
EXTERIOR pto 0.00

04.05.02 SALIDAS DE PVC SAP PARA DESAGUE DE Ø 4" pto


COCINA pto 0.00
S.S.H.H. DE AULA DE PSICOMOTRICIDAD pto 2.00
EXTERIOR pto 0.00

SALIDA DE PVC SAP PARA VENTILACION DE Ø 2"


04.05.03 pto
COCINA pto 1.00
S.S.H.H. DE AULA DE PSICOMOTRICIDAD pto 1.00
EXTERIOR pto 0.00

RED DE DISTRIBUCION TUBERIA PVC - SAP Ø 2"


04.05.04 ml
COCINA ml 1.00 1.11
S.S.H.H. DE AULA DE PSICOMOTRICIDAD ml 1.00 2.78
EXTERIOR ml 1.00 0.00

RED DE DISTRIBUCION TUBERIA PVC - SAP Ø 4"


04.05.05 ml
COCINA ml 1.00 1.13
S.S.H.H. DE AULA DE PSICOMOTRICIDAD ml 1.00 8.76
EXTERIOR ml 1.00 15.04

04.05.06 SUMIDERO DE BRONCE 3" und


COCINA und 1.00
S.S.H.H. DE AULA DE PSICOMOTRICIDAD und 3.00
EXTERIOR und 0.00

REGISTRO DE BRONCE DE Ø 4”
04.05.07 und
COCINA und 1.00
S.S.H.H. DE AULA DE PSICOMOTRICIDAD und 3.00
EXTERIOR und 0.00

CAJA DE REGISTRO DE DESAGUE DE 25 X 50 cm.


04.05.08 und
CR- 4, CR- 5 und 2.00

04.06 PRUEBA HIDRAULICA


PRUEBA HIDRAULICA DE REDES DE AGUA FRIA + DESIFECCION DE TUBERIAS
04.06.01 ml detalle
TUBERIA PVC SAP Ø 1/2" CLASE 10 ml 1.00 11.80
TUBERIA PVC SAP Ø 3/4" CLASE 10 ml 1.00 42.00
TUBERIA PVC SAP Ø 1" CLASE 10 ml 1.00 18.70
TUBERIA PVC SAP Ø 1 1/2" CLASE 10 ml 1.00 12.00

PRUEBA HIDRAULICA DE REDES DE DESAGUE


04.06.02 ml detalle

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO
RED DE DISTRIBUCION TUBERIA PVC -SAP Ø 2" ml 1.00 3.90
RED DE DISTRIBUCION TUBERIA PVC -SAP Ø 4" ml 1.00 24.90
TUBERIA PVC -SAP Ø 4" PARA EVACUACION DE AGUA PLUVIAL ml 1.00 93.40

05 INSTALACIONES ELECTRICAS, COMUNICACIONES Y MECANICAS


05.02 SALIDAS PARA ALUMBRADO, TOMACORRIENTES, FUERZA Y SEÑALES DEBILES
05.02.01 SALIDA PARA CENTRO DE LUZ P/EQ. ADOSADO pto
COCINA pto 2.00
ALMACEN DE ALIMENTOS pto 1.00
AULA DE PSICOMOTRICIDAD - SUM pto 6.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM pto 2.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM pto 1.00
EXTERIOR pto 5.00

05.02.02 SALIDA DE EQ. ILU. DE EMERGENCIA PARED pto


COCINA pto 1.00
ALMACEN DE ALIMENTOS pto 0.00
AULA DE PSICOMOTRICIDAD - SUM pto 1.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM pto 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM pto 0.00
EXTERIOR pto 2.00

05.02.03 SALIDA PARA TOMACORRIENTE DOBLE C/TOMA A TIERRA pto


COCINA pto 2.00
ALMACEN DE ALIMENTOS pto 2.00
AULA DE PSICOMOTRICIDAD - SUM pto 9.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM pto 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM pto 1.00
EXTERIOR pto 4.00

05.02.04 SALIDA PARA TOMACORRIENTE DOBLE C/TOMA A TIERRA ESTABILIZADO EN P pto


COCINA pto 0.00
ALMACEN DE ALIMENTOS pto 0.00
AULA DE PSICOMOTRICIDAD - SUM pto 2.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM pto 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM pto 0.00
EXTERIOR pto 0.00

05.02.05 SALIDA PARA TOMACORRIENTE DOBLE C/TOMA A TIERRA A PRUEBA DE AGUA pto
COCINA pto 2.00
ALMACEN DE ALIMENTOS pto 0.00
AULA DE PSICOMOTRICIDAD - SUM pto 0.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM pto 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM pto 0.00
EXTERIOR pto 0.00

05.02.06 SALIDA PARA INTERRUPTOR pto


COCINA pto 1.00
ALMACEN DE ALIMENTOS pto 1.00
AULA DE PSICOMOTRICIDAD - SUM pto 2.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM pto 2.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM pto 1.00
EXTERIOR pto 2.00

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO
05.03 SALIDAS PARA COMUNICACIONES Y SEÑALES
05.03.01 SALIDA PARA TOMA DE DATOS - INTERNET pto
COCINA pto 0.00
ALMACEN DE ALIMENTOS pto 0.00
AULA DE PSICOMOTRICIDAD - SUM pto 2.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM pto 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM pto 0.00
EXTERIOR pto 0.00

05.03.03 SALIDA PARA TV CABLE pto


COCINA pto 0.00
ALMACEN DE ALIMENTOS pto 0.00
AULA DE PSICOMOTRICIDAD - SUM pto 1.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM pto 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM pto 0.00
EXTERIOR pto 0.00

05.03.04 SALIDA PARA PARLANTES pto


COCINA pto 0.00
ALMACEN DE ALIMENTOS pto 0.00
AULA DE PSICOMOTRICIDAD - SUM pto 6.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM pto 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM pto 0.00
EXTERIOR pto 0.00

05.03.05 SALIDA PARA BOCINA pto


COCINA pto 0.00
ALMACEN DE ALIMENTOS pto 0.00
AULA DE PSICOMOTRICIDAD - SUM pto 0.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM pto 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM pto 0.00
EXTERIOR pto 1.00

05.04 CONDUCTORES Y CABLES DE ENERGIA EN TUBERIAS


05.04.01 CABLEADO P/ SALIDA DE CENTRO DE LUZ P/EQ. ADOSADO pto
COCINA pto 2.00
ALMACEN DE ALIMENTOS pto 1.00
AULA DE PSICOMOTRICIDAD - SUM pto 6.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM pto 2.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM pto 1.00
EXTERIOR pto 5.00

#REF! #REF! #REF!


05.04.02 CABLEADO P/ SALIDA DE EQ. ILU. DE EMERGENCIA PARED pto
COCINA pto 1.00
ALMACEN DE ALIMENTOS pto 0.00
AULA DE PSICOMOTRICIDAD - SUM pto 1.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM pto 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM pto 0.00
EXTERIOR pto 2.00

05.04.03 CABLEADO P/ SALIDA DE TOMACORRIENTE DOBLE C/TOMA A TIERRA ESTABIL pto


COCINA pto 2.00
ALMACEN DE ALIMENTOS pto 2.00
AULA DE PSICOMOTRICIDAD - SUM pto 9.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM pto 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM pto 1.00

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO
EXTERIOR pto 4.00

05.04.04 CABLEADO P/ SALIDA DE TOMACORRIENTE DOBLE C/TOMA A TIERRA pto


COCINA pto 0.00
ALMACEN DE ALIMENTOS pto 0.00
AULA DE PSICOMOTRICIDAD - SUM pto 2.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM pto 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM pto 0.00
EXTERIOR pto 0.00

05.04.05 CABLEADO P/ SALIDA DE TOMACORRIENTE DOBLE C/TOMA A TIERRA A PRUE pto


COCINA pto 2.00
ALMACEN DE ALIMENTOS pto 0.00
AULA DE PSICOMOTRICIDAD - SUM pto 0.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM pto 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM pto 0.00
EXTERIOR pto 0.00

05.04.06 CABLEADO P/ SALIDA DE INTERRUPTOR SIMPLE pto


COCINA pto 0.00
ALMACEN DE ALIMENTOS pto 1.00
AULA DE PSICOMOTRICIDAD - SUM pto 0.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM pto 2.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM pto 1.00
EXTERIOR pto 0.00

05.04.07 CABLEADO P/ SALIDA DE INTERRUPTOR DOBLE pto


COCINA pto 1.00
ALMACEN DE ALIMENTOS pto 0.00
AULA DE PSICOMOTRICIDAD - SUM pto 0.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM pto 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM pto 0.00
EXTERIOR pto 0.00

05.04.08 CABLEADO P/ SALIDA DE INTERRUPTOR CONMUTACION SIMPLE pto


COCINA pto 0.00
ALMACEN DE ALIMENTOS pto 0.00
AULA DE PSICOMOTRICIDAD - SUM pto 0.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM pto 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM pto 0.00
EXTERIOR pto 2.00

05.04.09 CABLEADO P/ SALIDA DE INTERRUPTOR CONMUTACION DOBLE pto


COCINA pto 0.00
ALMACEN DE ALIMENTOS pto 0.00
AULA DE PSICOMOTRICIDAD - SUM pto 2.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM pto 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM pto 0.00
EXTERIOR pto 0.00

05.05 CONDUCTORES PARA COMUNICACIONES Y SEÑALES


05.05.01 CABLEADO P/ SALIDA DE VOZ Y DATA pto
COCINA pto 0.00
ALMACEN DE ALIMENTOS pto 0.00
AULA DE PSICOMOTRICIDAD - SUM pto 2.00

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM pto 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM pto 0.00
EXTERIOR pto 0.00

05.05.03 CABLEADO P/ SALIDA TV - CABLE pto


COCINA pto 0.00
ALMACEN DE ALIMENTOS pto 0.00
AULA DE PSICOMOTRICIDAD - SUM pto 1.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM pto 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM pto 0.00
EXTERIOR pto 0.00

05.05.04 CABLEADO P/ SALIDA DE PARLANTE pto


COCINA pto 0.00
ALMACEN DE ALIMENTOS pto 0.00
AULA DE PSICOMOTRICIDAD - SUM pto 6.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM pto 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM pto 0.00
EXTERIOR pto 0.00

05.05.05 CABLEADO P/ SALIDA DE BOCINA pto


COCINA pto 0.00
ALMACEN DE ALIMENTOS pto 0.00
AULA DE PSICOMOTRICIDAD - SUM pto 0.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM pto 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM pto 0.00
EXTERIOR pto 1.00

05.06 ARTEFACTOS
05.06.01 SUM. E INSTAL. ARTEF. P/ADOSAR 1x36 C/DIF. ACRILICO,AF,BALASTRO ELECT und
COCINA und 0.00
ALMACEN DE ALIMENTOS und 0.00
AULA DE PSICOMOTRICIDAD - SUM und 0.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM und 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM und 0.00
EXTERIOR und 5.00

05.06.02 SUM. E INSTAL. ARTEF. P/ADOSAR 3x36 C/REJ.MET,AF,BALASTRO ELECT. SIM und
COCINA und 2.00
ALMACEN DE ALIMENTOS und 0.00
AULA DE PSICOMOTRICIDAD - SUM und 6.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM und 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM und 0.00
EXTERIOR und 0.00

05.06.04 SUM. E INSTAL. SPOT ADOSADO C/REFLECTOR FACET. ALUMI., C/VIDRIO AR und
COCINA und 0.00
ALMACEN DE ALIMENTOS und 1.00
AULA DE PSICOMOTRICIDAD - SUM und 0.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM und 2.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM und 1.00
EXTERIOR und 0.00

SUM. E INSTAL. LUMINARIA DE EMERGENCIA ADOSADA A LA PARED


05.06.05 und
COCINA und 1.00

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO
ALMACEN DE ALIMENTOS und 0.00
AULA DE PSICOMOTRICIDAD - SUM und 1.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM und 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM und 0.00
EXTERIOR und 2.00

SUM. E INSTAL. PARLANTES DE MUSICA AMBIENTAL CIRCULARES EMPOTRADOS EN TECHO


05.06.06 und
COCINA und 0.00
ALMACEN DE ALIMENTOS und 0.00
AULA DE PSICOMOTRICIDAD - SUM und 6.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM und 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM und 0.00
EXTERIOR und 0.00

SUM. E INSTAL. AMPLIFICADOR 1500W CON 4 SALIDAS PARA MICROFONO


05.06.07 und
COCINA und 0.00
ALMACEN DE ALIMENTOS und 0.00
AULA DE PSICOMOTRICIDAD - SUM und 1.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM und 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM und 0.00
EXTERIOR und 0.00

SUM. E INSTAL. DE BOCINAS


05.06.08 und
COCINA und 0.00
ALMACEN DE ALIMENTOS und 0.00
AULA DE PSICOMOTRICIDAD - SUM und 0.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM und 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM und 0.00
EXTERIOR und 1.00

05.07 ACCESORIOS
05.07.01 TOMACORRIENTE DOBLE C/ TOMA A TIERRA und
COCINA und 2.00
ALMACEN DE ALIMENTOS und 2.00
AULA DE PSICOMOTRICIDAD - SUM und 9.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM und 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM und 1.00
EXTERIOR und 4.00

05.07.02 TOMACORRIENTE DOBLE C/ TOMA A TIERRA ESTABILIZADO EN PARED / TECH und


COCINA und 0.00
ALMACEN DE ALIMENTOS und 0.00
AULA DE PSICOMOTRICIDAD - SUM und 2.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM und 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM und 0.00
EXTERIOR und 0.00

05.07.03 TOMACORRIENTE DOBLE C/ TOMA A TIERRA A PRUEBA DE AGUA und


COCINA und 2.00
ALMACEN DE ALIMENTOS und 0.00
AULA DE PSICOMOTRICIDAD - SUM und 0.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM und 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM und 0.00
EXTERIOR und 0.00

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO
05.07.04 INTERRUPTOR SIMPLE UNIPOLAR 10 A und
COCINA und 0.00
ALMACEN DE ALIMENTOS und 1.00
AULA DE PSICOMOTRICIDAD - SUM und 0.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM und 2.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM und 1.00
EXTERIOR und 0.00

05.07.05 INTERRUPTOR DOBLE 10 A und


COCINA und 1.00
ALMACEN DE ALIMENTOS und 0.00
AULA DE PSICOMOTRICIDAD - SUM und 0.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM und 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM und 0.00
EXTERIOR und 0.00

05.07.06 INTERRUPTOR CONMUTACION UNIPOLAR 10 A und


COCINA und 0.00
ALMACEN DE ALIMENTOS und 0.00
AULA DE PSICOMOTRICIDAD - SUM und 0.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM und 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM und 0.00
EXTERIOR und 2.00

05.07.07 INTERRUPTOR CONMUTACION DOBLE 10 A und


COCINA und 0.00
ALMACEN DE ALIMENTOS und 0.00
AULA DE PSICOMOTRICIDAD - SUM und 2.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM und 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM und 0.00
EXTERIOR und 0.00

05.07.09 PLACA TOMA DE DATOS - INTERNET und


COCINA und 0.00
ALMACEN DE ALIMENTOS und 0.00
AULA DE PSICOMOTRICIDAD - SUM und 2.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM und 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM und 0.00
EXTERIOR und 0.00

05.07.10 PLACA DE TELEFONO DIRECTO und


05.07.11 PLACA DE TV CABLE und
COCINA und 0.00
ALMACEN DE ALIMENTOS und 0.00
AULA DE PSICOMOTRICIDAD - SUM und 1.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM und 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM und 0.00
EXTERIOR und 0.00

05.08 CAJAS
05.08.01 CAJA DE FºGº 100x100mm C/TAPA und
COCINA und 0.00
ALMACEN DE ALIMENTOS und 0.00
AULA DE PSICOMOTRICIDAD - SUM und 3.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM und 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM und 0.00
EXTERIOR und 0.00

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO

05.08.02 CAJA DE FºGº 150x150mm C/TAPA und 0.00


COCINA und 0.00
ALMACEN DE ALIMENTOS und 1.00
AULA DE PSICOMOTRICIDAD - SUM und 0.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM und 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM und 0.00
EXTERIOR und 2.00

05.08.04 CAJA DE PASO OCTOGONAL und 0.00


COCINA und 1.00
ALMACEN DE ALIMENTOS und 0.00
AULA DE PSICOMOTRICIDAD - SUM und 0.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM und 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM und 0.00
EXTERIOR und 0.00

TABLEROS GENERAL Y DE DISTRIBUCION


05.09
05.09.01 TABLERO DE DISTRIBUCION TG, 36 POLOS (01 INT. TERMOMAGNETICO 2x50 A., und
ALMACEN DE ALIMENTOS und 1.00

05.12 SISTEMA SALIDA


DE ALARMA CONTRA INCENDIO
PARA SENSORES DE HUMO Y TEMPERATURA
05.12.01 pto
COCINA pto 1.00
ALMACEN DE ALIMENTOS pto 0.00
AULA DE PSICOMOTRICIDAD - SUM pto 1.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM pto 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM pto 0.00
EXTERIOR pto 0.00

SALIDA PARA DISPOSITIVO DE ACCIONAMIENTO MANUAL


05.12.02 pto
COCINA pto 0.00
ALMACEN DE ALIMENTOS pto 0.00
AULA DE PSICOMOTRICIDAD - SUM pto 0.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM pto 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM pto 0.00
EXTERIOR pto 1.00

05.12.03 SALIDA PARA LUZ (SIRENA CONTRA INCENDIO) pto


COCINA pto 0.00
ALMACEN DE ALIMENTOS pto 0.00
AULA DE PSICOMOTRICIDAD - SUM pto 0.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM pto 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM pto 0.00
EXTERIOR pto 1.00

05.12.04 DETECTOR DE HUMO DIRECCIONAL EN54 INCLUYE BASE und


COCINA und 0.00
ALMACEN DE ALIMENTOS und 0.00
AULA DE PSICOMOTRICIDAD - SUM und 1.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM und 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM und 0.00
EXTERIOR und 0.00

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO
05.12.05 DETECTOR DE HUMO TEMPERATURA EN54 INCLUYE BASE und
COCINA und 1.00
ALMACEN DE ALIMENTOS und 0.00
AULA DE PSICOMOTRICIDAD - SUM und 0.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM und 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM und 0.00
EXTERIOR und 0.00

05.12.06 DISPOSITIVO DE ACCIONAMIENTO MANUAL und


COCINA und 0.00
ALMACEN DE ALIMENTOS und 0.00
AULA DE PSICOMOTRICIDAD - SUM und 0.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM und 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM und 0.00
EXTERIOR und 1.00

05.12.07 LUZ Y PARLANTE (SIRENA CONTRA INCENDIO) und


COCINA und 0.00
ALMACEN DE ALIMENTOS und 0.00
AULA DE PSICOMOTRICIDAD - SUM und 0.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM und 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM und 0.00
EXTERIOR und 1.00

05.12.08 PANEL DE ALARMA CONTRA INCENDIO HASTA 250 ZONAS DETECCION und
COCINA und 0.00
ALMACEN DE ALIMENTOS und 0.00
AULA DE PSICOMOTRICIDAD - SUM und 1.00
S.S.H.H. AULA DE PSICOMOTRICIDAD - SUM und 0.00
DEPOSITO AULA DE PSICOMOTRICIDAD - SUM und 0.00
EXTERIOR und 0.00

05.13 CONEXIONES A RED SUBTERRANEA


05.13.01 EXCAVACION PARA CABLE SUBTERRANEO m3
DEL MEDIDO AL TG m3 1.00 4.59 0.60 0.80

05.13.02 RELLENO CON MATERIAL PROPIO m3


DEL MEDIDO AL TG m3 1.00 4.59 0.60 0.80

05.13.03 RELLENO CON MATERIAL DE PRESTAMO m3


DEL MEDIDO AL TG m3 1.00 4.59 0.60 0.80

05.13.04 ELIMINACION MATERIAL EXCEDENTE CON CARRETILLA D=30m m3


DEL MEDIDO AL TG m3 1.00 4.59 0.60 0.80

05.14
05.14.01 ALIMENTADORES SECUNDARIOS
SUM. E INSTAL. CANALIZACION,
CABLE N2X0H CONDUCTOS
(2-1x6 + 1x10(T)) mm2, Ø 25Omm
TUBERIAS
PVC - P und
05.14.02 SUM. E INSTAL. CABLE N2X0H (2-1x4 + 1x10(T)) mm2, Ø 25 mm PVC - P und
DEL TG AL TD-01 und 1.00 11.11

05.14.03 PROTECCION Y SEÑALIZACION DE CABLE SUBTERRANEO ml


DEL TG AL TD-01 ml 1.00 15.00

Sust mod.-2
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENS

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS
PARTIDA DESCRIPCIÓN UND elem.
LARGO ANCHO ALTO

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und

153.80
1.00 153.83

153.80
1.00 153.83

153.80
1.00 153.83

47.30
1.00 13.45
1.00 33.85

11.40

1.00 0.37
1.00 0.22
1.00 0.19
1.00 0.23
1.00 0.37

1.00 0.44
1.00 0.69

1.00 0.37
1.00 0.22
1.00 0.19
1.00 0.23
1.00 0.37

1.00 0.94

1.00 0.94

1.00 2.82

1.00 0.94

1.00 0.94

1.00 0.94

25.20
1.00 6.45
1.00 16.86

1.00 0.09
1.00 0.05
1.00 0.05
1.00 0.06
1.00 0.09

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und
1.00 0.11
1.00 0.17

1.00 0.09
1.00 0.05
1.00 0.05
1.00 0.06
1.00 0.09

1.00 0.71

1.00 0.24

7.10

1.00 1.50

1.00 4.42

1.00 0.60

1.00 0.60

10.90
1.00 8.98 1.35
1.00 8.98 1.35
1.00 43.69 6.55
1.00 3.25 0.49
1.00 7.59 1.14

48.90
1.00 15.38
1.00 47.30
1.00 11.40
1.00 -25.20

FACT. EXP. 61.10


1.25 19.23
1.25 59.13
1.25 14.25
1.25 -31.50

48.00
1.00 9.61
1.00 24.18

1.00 0.46
1.00 0.27
1.00 0.24
1.00 0.29
1.00 0.46

1.00 0.56
1.00 0.86

1.00 0.46

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und
1.00 0.27
1.00 0.24
1.00 0.29
1.00 0.46

1.00 1.18

1.00 1.18

1.00 3.53

1.00 1.18

1.00 1.18

1.00 1.18

4.90

1.00 0.12
1.00 0.17
1.00 0.16
1.00 0.18
1.00 0.23

1.00 0.20
1.00 0.19

1.00 0.12
1.00 0.08
1.00 0.16
1.00 0.08
1.00 0.14

1.00 0.87

1.00 0.50

1.00 0.87

1.00 0.87

49.30
# CARAS
2.00 1.58
2.00 2.33
2.00 2.17
2.00 2.38
2.00 3.02

2.00 2.66
2.00 2.59

2.00 1.58
2.00 1.03
2.00 2.17
2.00 1.09
2.00 1.86

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und
2.00 6.96

2.00 3.96

2.00 6.96

2.00 6.96

0.20

1.00 0.17

2.30
# CARAS
2.00 1.39
1.00 0.87

20.30
1.00 5.77
1.00 14.51

530.70
# BAR.
9.00 78.12
9.00 78.12

10.00 173.60
9.00 200.88

7.90

1.00 0.23
1.00 0.31
1.00 0.30
1.00 0.32
1.00 0.39

1.00 0.17
1.00 0.26
0.00
1.00 0.23
1.00 0.31
1.00 0.30
1.00 0.32
1.00 0.39

1.00 0.73

1.00 0.73

1.00 0.73

1.00 0.73

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und
1.00 0.73

1.00 0.73

774.70

3.80

# Piezas

4.00 9.07
2.00 2.56

4.00 11.60
2.00 3.28

4.00 11.01
2.00 3.11

4.00 11.68
2.00 3.30

4.00 13.86
2.00 3.92

4.00 10.45
2.00 2.96

4.00 15.25
2.00 4.31

4.00 9.07
2.00 2.56

4.00 11.60
2.00 3.28

4.00 11.01
2.00 3.11

4.00 11.68
2.00 3.30

4.00 13.86
2.00 3.92

4.00 24.63
2.00 6.97

4.00 24.63
2.00 6.97

4.00 24.63

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und
2.00 6.97

4.00 24.63
2.00 6.97

4.00 24.63
2.00 6.97

4.00 24.63
2.00 6.97

# Piezas

15.00 13.94

19.00 17.66

19.00 17.66

19.00 17.66

21.00 19.52

17.00 15.80

23.00 21.38

15.00 13.94

19.00 17.66

19.00 17.66

19.00 17.66

21.00 19.52

35.00 32.54

35.00 32.54

35.00 32.54

35.00 32.54

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und

35.00 32.54

35.00 32.54

65.20
# CARAS
2.00 1.87
2.00 2.51
2.00 2.36
2.00 2.53
2.00 3.08

2.00 2.22
2.00 3.43
0.00
2.00 1.87
2.00 2.51
2.00 2.36
2.00 2.53
2.00 3.08

2.00 5.80

2.00 5.80

2.00 5.80

2.00 5.80

2.00 5.80

2.00 5.80

7.80
1.00 0.16 2.11
1.00 0.19 4.88
1.00 0.06 0.81

1,859.70

# Piezas
8.00 261.89
33.00 189.24

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und

# Piezas
6.00 415.90
4.00 277.26
31.00 463.86

# Piezas
2.00 65.47
31.00 186.10

62.80
1.00 18.08
1.00 37.60
1.00 7.10

2.10

1.00 0.16
1.00 0.11
1.00 0.11
1.00 0.11
1.00 0.11

1.00 0.17

1.00 0.16
1.00 0.11
1.00 0.11
1.00 0.11
1.00 0.11

1.00 0.16

1.00 0.63

294.80
2.75
2.05
4.75
4.85

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und

# PIEZAS

4.00 2.90 12.99


15.00 8.89
1.00
4.00 2.20 9.86
13.00 7.71
1.00
4.00 2.20 9.86
13.00 7.71
1.00
4.00 2.20 9.86
13.00 7.71
1.00
4.00 2.20 9.86
13.00 7.71

1.00
4.00 5.00 11.20
25.00 7.41

1.00
4.00 2.90 12.99
15.00 8.89
1.00
4.00 2.20 9.86
13.00 7.71
1.00
4.00 2.20 9.86
13.00 7.71
1.00
4.00 2.20 9.86
13.00 7.71
1.00
4.00 2.20 9.86
13.00 7.71

1.00
4.00 4.90 10.98
25.00 7.41

1.00
4.00 4.90 43.90
25.00 29.64

28.20
#CARAS
2.00 2.10
2.00 1.42
2.00 1.42
2.00 1.42
2.00 1.42

2.00 2.24

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und
2.00 2.10
2.00 1.42
2.00 1.42
2.00 1.42
2.00 1.42

2.00 2.09

2.00 8.36

0.80

1.00 0.07
1.00 0.09
1.00 0.09
1.00 0.09
1.00 0.11

1.00 0.07
1.00 0.05
1.00 0.09
1.00 0.05
1.00 0.08

96.20

# Piezas

4.00 4.79
15.00 3.98

4.00 6.18
17.00 4.51

4.00 5.89
17.00 4.51

4.00 6.29
17.00 4.51

4.00 7.48
19.00 5.04

4.00 4.79
15.00 3.98

4.00 3.76
13.00 3.45

4.00 5.89

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und
17.00 4.51

4.00 3.88
13.00 3.45

4.00 5.31
15.00 3.98

10.50
#CARAS
2.00 0.91
2.00 1.22
2.00 1.16
2.00 1.25
2.00 1.51

2.00 0.91
2.00 0.68
2.00 1.16
2.00 0.71
2.00 1.03

13.00

1.00 1.50

1.00 2.47
1.00 2.47

1.00 0.38
1.00 0.38

1.00 0.38
1.00 0.38

1.00 0.29

1.00 0.29

1.00 0.18

1.00 0.29

1.00 0.29

1.00 0.21
1.00 0.25

1.00 0.21
1.00 0.25

1.00 0.22

1.00 0.21
1.00 0.25

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und
1.00 0.21
1.00 0.25

1.00 0.50

1.00 0.50

1.00 0.07
1.00 0.10

1.00 0.26

1.00 0.26

2,022.80

# Piezas
5.00 83.11
84.00 59.74

# Piezas
4.00 110.98
2.00 20.05
86.00 80.91

4.00 110.98
2.00 20.05
86.00 80.91

# Piezas

4.00 40.05
38.00 29.79

4.00 40.05
38.00 29.79

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und
4.00 40.05
38.00 29.79

4.00 40.05
38.00 29.79

# Piezas

4.00 25.42
38.00 17.02

4.00 25.42
38.00 51.07

4.00 25.42
38.00 51.07

4.00 25.42
38.00 51.07

4.00 25.42
38.00 51.07

# Piezas

4.00 37.38
54.00 24.19

4.00 37.38
54.00 24.19

4.00 37.38
54.00 24.19

4.00 37.38
54.00 24.19

4.00 29.11
18.00 24.19

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und

4.00 37.38
54.00 24.19

4.00 37.38
54.00 24.19

4.00 37.38
54.00 24.19

4.00 37.38
54.00 24.19

# Piezas

4.00 52.60
102.00 27.05

4.00 52.60
102.00 27.05

4.00 19.62
42.00 11.14

4.00 19.62
42.00 11.14

4.00 19.62
42.00 11.14

4.00 19.62
42.00 11.14

78.80
#CARAS
1.00 6.98

1.00 10.03
1.00 10.03

2.00 3.03
2.00 3.03

2.00 3.03
2.00 3.03

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und

2.00 2.32

2.00 2.32

2.00 1.47

2.00 2.32

2.00 2.32

1.00 1.03

1.00 1.03
1.00 1.27

1.00 1.09

1.00 1.03

1.00 1.03

1.00 6.65

1.00 6.65

1.00 0.89
1.00 1.37

1.00 3.40

1.00 3.40

240.00

1.00 9.78 20.38


1.00 9.78 20.38
1.00 47.28 98.50
1.00 7.81 16.27
1.00 4.56 9.50
1.00 35.85 74.69

10.10

#POLIESTIRENO(und)
20.38 9.78 0.86
20.38 9.78 0.86
98.50 47.28 4.14
16.27 7.81 0.68
9.50 4.56 0.40
74.69 35.85 3.14

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und

1,292.00

# PIEZAS
17.00 1.64 27.60
17.00 2.11 35.51

# PIEZAS
17.00 31.14
17.00 34.50
17.00 34.50
17.00 38.71

# PIEZAS
68.00 11.63 782.93

# PIEZAS
17.00 18.25 307.15

115.10

1.00 9.78
1.00 9.78
1.00 47.28
1.00 7.81
1.00 4.56
1.00 35.85

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und
0.30
1.00 0.15
1.00 0.18

18.80

# Piezas

28.00 8.78

3.00 9.17

# Piezas

3.00 0.42

3.00 0.42

#caras 3.90
1.00 1.46
1.00 1.84
1.00 0.55

36.00

1.00 1.98
1.00 1.59
1.00 1.48
1.00 1.63
1.00 2.07

1.00 6.21
1.00 0.82

1.00 6.33

1.00 1.98
1.00 0.71
1.00 1.48
1.00 0.75
1.00 1.27

1.00 0.96
1.00 0.96

1.00 0.96
1.00 0.96

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und

1.00 0.96
1.00 0.96

1.00 0.96
1.00 0.96

54.20

1.00 7.37
1.00 7.37

1.00 4.98
1.00 4.98

1.00 7.37
1.00 7.37

1.00 7.37
1.00 7.37

26.60

1.00 5.46
1.00 1.67
1.00 3.34
1.00 1.67
1.00 1.67

1.00 2.73
1.00 1.67
1.00 3.34
1.00 1.67
1.00 3.34

Fact. (Kg/ml) 135.30


0.25 36.00 54.00
0.25 54.20 81.30

26.60

1.00 5.46
1.00 1.67
1.00 3.34
1.00 1.67
1.00 1.67

1.00 2.73
1.00 1.67
1.00 3.34
1.00 1.67
1.00 3.34

11.60
1.00 11.62
1.00 19.60

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und

113.60
1.00 21.67
1.00 4.23
1.00 14.59
1.00 3.48
1.00 16.12
1.00 10.90
1.00 13.70
1.00 11.31
1.00 14.78
1.00 2.84

51.90

1.00 2.93
1.00 2.24
1.00 2.13
1.00 2.29
1.00 2.79

1.00 2.93
1.00 1.25
1.00 2.13
1.00 1.30
1.00 1.89

1.00 7.51
1.00 7.51

1.00 7.51
1.00 7.51

60.40
1.00 15.96
1.00 38.76
1.00 5.70

76.20
# CARAS
1.00 6.98

2.00 20.06
2.00 20.06

2.00 3.03
2.00 3.03

2.00 3.03

1.00 1.16

1.00 1.16

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und

1.00 0.73

1.00 1.16

1.00 1.16

1.00 0.82

1.00 0.82
1.00 1.01

1.00 0.87

1.00 0.82

1.00 0.82

1.00 3.33

1.00 3.33

1.00 0.44
1.00 0.69

1.00 1.70

115.10
1.00 9.78
1.00 9.78
1.00 47.28
1.00 7.81
1.00 4.56
1.00 35.85

# LADOS 107.40
2.00 5.00
2.00 5.10
2.00 12.40
2.00 12.60
2.00 4.30
2.00 5.10
2.00 12.40
2.00 8.40
2.00 5.56
2.00 8.88
2.00 27.66

329.60

#lados
2.00 3.64
2.00 9.40

2.00 4.88
2.00 5.68

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und
2.00 4.62
2.00 5.68

2.00 4.98
2.00 5.68

2.00 6.04
2.00 5.68

2.00 3.64
2.00 4.70

2.00 2.00
2.00 2.84

2.00 4.62
2.00 5.68

2.00 2.82
2.00 2.84

2.00 4.10
2.00 2.84

3.00 19.56
2.00 6.52
2.00 11.12

3.00 39.12
2.00 6.52
2.00 16.68

4.00 13.04
4.00 13.04
2.00 5.56

4.00 13.04
4.00 13.04
2.00 5.56

3.00 19.56
2.00 6.52
2.00 11.12

3.00 19.56
2.00 6.52
2.00 11.12

31.20
1.00 11.62
1.00 19.60

3.70

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und
1.00 1.46
1.00 1.84
1.00 0.36

#lados 4.40
2.00 4.40

92.00

1.00 56.05
1.00 4.97
1.00 9.31
1.00 10.99
1.00 10.65

92.00

1.00 56.05
1.00 4.97
1.00 9.31
1.00 10.99
1.00 10.65

71.10
1.00 71.11

20.30
1.00 10.99
1.00 9.31

61.10
1.00 4.97
1.00 10.65
1.00 9.98
1.00 24.95
1.00 10.56

81.20
1.00 10.19
1.00 6.00
1.00 16.27
1.00 40.68
1.00 8.04

145.90
1.00 38.10
1.00 9.25
1.00 13.15
1.00 13.50
1.00 13.30
1.00 49.00
1.00 6.00
1.00 3.60

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und

81.20
1.00 9.25
1.00 13.30
1.00 49.00
1.00 6.00
1.00 3.60

81.20
1.00 9.25
1.00 13.30
1.00 49.00
1.00 6.00
1.00 3.60

# LADOS 15.30
2.00 5.28
2.00 9.98

42.10
1.00 42.06

20.80
1.00 8.35
1.00 12.40

34.10
1.00 34.10

19.50
1.00 7.26
1.00 12.25

149.70

1.00 66.52

1.00 83.15

146.60

1.00 73.31

1.00 73.31

16.60

1.00 16.63

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und

5.90
1.00 3.78
1.00 2.10

4.00
1.00 1.89
1.00 2.10

3.80
1.00 2.10
1.00 1.68

29.80
1.00 0.51
1.00 2.97
1.00 8.59
1.00 13.46
1.00 4.25

3.00
1.00 2.00
1.00 1.00

2.00
1.00 1.00
1.00 1.00

2.00
1.00 1.00
1.00 1.00

UND POR VENTANA 36.00


4.00 4.00
4.00 4.00
4.00 12.00
4.00 12.00
4.00 4.00

PZA POR PUERTA 15.00


2.00 2.00
1.00 3.00
1.00 1.00
2.00 6.00
1.00 3.00

PZA POR VENTANA 72.00


8.00 8.00
8.00 8.00
8.00 24.00
8.00 24.00

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und
8.00 8.00

29.80

1.00 29.80

113.60

1.00 113.60

51.90

1.00 51.90

115.10

1.00 115.10

152.70

1.00 60.40
1.00 16.11
1.00 76.20

21.00
1.00 12.63
1.00 8.32

43.50
1.00 5.90
1.00 4.00
1.00 3.80
1.00 29.80

PROF. FINAL 13.40


0.43 2.14
0.45 0.40
0.60 3.62
0.22 1.22
0.28 1.78
0.16 0.19
0.18 0.30
0.87 1.55
0.86 0.94
0.86 1.20

VOL. DEDUCIR 12.50


0.16 1.99
0.02 0.37
0.18 3.44
0.18 1.05

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und
0.16 1.63
0.03 0.16
0.05 0.26
0.04 1.51
0.02 0.92
0.03 1.17

2.00
1.00 0.00
1.00 2.00
1.00 0.00

2.00
1.00 0.00
1.00 2.00
1.00 0.00

1.00
1.00 1.00
1.00 0.00
1.00 0.00

2.00
1.00 0.00
1.00 2.00
1.00 0.00

2.00
1.00 0.00
1.00 2.00
1.00 0.00

5.00
1.00 1.00
1.00 4.00
1.00 0.00

11.80
1.00 2.61
1.00 9.14
1.00 0.00

42.00
1.00 0.00
1.00 4.68
1.00 6.54
1.00 30.82

18.70
1.00 18.68

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und

12.00
1.00 1.57
1.00 1.09
1.00 1.35
1.00 1.59
1.00 2.80
1.00 3.56

1.00
1.00 1.00

1.00
1.00 1.00

1.00
1.00 1.00

2.00
1.00 2.00

93.40
1.00 4.00
1.00 4.00
1.00 4.00
1.00 4.00
1.00 2.17
1.00 1.45
1.00 0.85
1.00 0.85
1.00 14.68
1.00 1.80
1.00 20.86
1.00 5.33
1.00 18.58
1.00 5.42
1.00 5.42

33.30
1.00 33.26

15.30
1.00 15.33

23.90
1.00 2.33
1.00 5.33
1.00 5.42
1.00 5.42
1.00 5.42

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und
3.00
1.00 1.00
1.00 1.00
1.00 1.00

3.00
1.00 1.00
1.00 2.00
1.00 0.00

2.00
1.00 0.00
1.00 2.00
1.00 0.00

2.00
1.00 1.00
1.00 1.00
1.00 0.00

3.90
1.00 1.11
1.00 2.78
1.00 0.00

24.90
1.00 1.13
1.00 8.76
1.00 15.04

4.00
1.00 1.00
1.00 3.00
1.00 0.00

4.00
1.00 1.00
1.00 3.00
1.00 0.00

2.00
1.00 2.00

84.50
1.00 11.80
1.00 42.00
1.00 18.70
1.00 12.00

122.20

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und
1.00 3.90
1.00 24.90
1.00 93.40

17.00
1.00 2.00
1.00 1.00
1.00 6.00
1.00 2.00
1.00 1.00
1.00 5.00

4.00
1.00 1.00
1.00 0.00
1.00 1.00
1.00 0.00
1.00 0.00
1.00 2.00

18.00
1.00 2.00
1.00 2.00
1.00 9.00
1.00 0.00
1.00 1.00
1.00 4.00

2.00
1.00 0.00
1.00 0.00
1.00 2.00
1.00 0.00
1.00 0.00
1.00 0.00

2.00
1.00 2.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00

9.00
1.00 1.00
1.00 1.00
1.00 2.00
1.00 2.00
1.00 1.00
1.00 2.00

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und

2.00
1.00 0.00
1.00 0.00
1.00 2.00
1.00 0.00
1.00 0.00
1.00 0.00

1.00
1.00 0.00
1.00 0.00
1.00 1.00
1.00 0.00
1.00 0.00
1.00 0.00

6.00
1.00 0.00
1.00 0.00
1.00 6.00
1.00 0.00
1.00 0.00
1.00 0.00

1.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 1.00

17.00
1.00 2.00
1.00 1.00
1.00 6.00
1.00 2.00
1.00 1.00
1.00 5.00

4.00
1.00 1.00
1.00 0.00
1.00 1.00
1.00 0.00
1.00 0.00
1.00 2.00

18.00
1.00 2.00
1.00 2.00
1.00 9.00
1.00 0.00
1.00 1.00

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und
1.00 4.00

2.00
1.00 0.00
1.00 0.00
1.00 2.00
1.00 0.00
1.00 0.00
1.00 0.00

2.00
1.00 2.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00

4.00
1.00 0.00
1.00 1.00
1.00 0.00
1.00 2.00
1.00 1.00
1.00 0.00

1.00
1.00 1.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00

2.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 2.00

2.00
1.00 0.00
1.00 0.00
1.00 2.00
1.00 0.00
1.00 0.00
1.00 0.00

2.00
1.00 0.00
1.00 0.00
1.00 2.00

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und
1.00 0.00
1.00 0.00
1.00 0.00

1.00
1.00 0.00
1.00 0.00
1.00 1.00
1.00 0.00
1.00 0.00
1.00 0.00

6.00
1.00 0.00
1.00 0.00
1.00 6.00
1.00 0.00
1.00 0.00
1.00 0.00

1.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 1.00

5.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 5.00

8.00
1.00 2.00
1.00 0.00
1.00 6.00
1.00 0.00
1.00 0.00
1.00 0.00

4.00
1.00 0.00
1.00 1.00
1.00 0.00
1.00 2.00
1.00 1.00
1.00 0.00

4.00
1.00 1.00

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und
1.00 0.00
1.00 1.00
1.00 0.00
1.00 0.00
1.00 2.00

6.00
1.00 0.00
1.00 0.00
1.00 6.00
1.00 0.00
1.00 0.00
1.00 0.00

1.00
1.00 0.00
1.00 0.00
1.00 1.00
1.00 0.00
1.00 0.00
1.00 0.00

1.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 1.00

18.00
1.00 2.00
1.00 2.00
1.00 9.00
1.00 0.00
1.00 1.00
1.00 4.00

2.00
1.00 0.00
1.00 0.00
1.00 2.00
1.00 0.00
1.00 0.00
1.00 0.00

2.00
1.00 2.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und
4.00
1.00 0.00
1.00 1.00
1.00 0.00
1.00 2.00
1.00 1.00
1.00 0.00

1.00
1.00 1.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00

2.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 2.00

2.00
1.00 0.00
1.00 0.00
1.00 2.00
1.00 0.00
1.00 0.00
1.00 0.00

2.00
1.00 0.00
1.00 0.00
1.00 2.00
1.00 0.00
1.00 0.00
1.00 0.00

1.00
1.00 0.00
1.00 0.00
1.00 1.00
1.00 0.00
1.00 0.00
1.00 0.00

3.00
1.00 0.00
1.00 0.00
1.00 3.00
1.00 0.00
1.00 0.00
1.00 0.00

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und

3.00
1.00 0.00
1.00 1.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 2.00

1.00
1.00 1.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00

1.00
1.00 1.00

2.00
1.00 1.00
1.00 0.00
1.00 1.00
1.00 0.00
1.00 0.00
1.00 0.00

1.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 1.00

1.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 1.00

1.00
1.00 0.00
1.00 0.00
1.00 1.00
1.00 0.00
1.00 0.00
1.00 0.00

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und
1.00
1.00 1.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00

1.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 1.00

1.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 1.00

1.00
1.00 0.00
1.00 0.00
1.00 1.00
1.00 0.00
1.00 0.00
1.00 0.00

2.20
1.00 2.20

1.80
1.00 1.76

0.40
1.00 0.44

0.70
1.00 0.66

11.10
1.00 11.11

15.00
1.00 15.00

Sust mod.-2
C. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

FECHA : Corregido Diciembre 2016


Df = 1.20 m
E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

Metrado
PARCIAL TOTAL
log. Area vol. Kg und

Sust mod.-2
RESUMEN METRADOS PATIO DE FORMACION

.E.I. : I.E.I N°1455 - PUEBLO NUEVO


UBICACIÓN : PUEBLO NUEVO - SAN BENITO - CONTUMAZÁ - CAJAMARCA
ELABORADO : 0

ITEMS DESCRIPCION UND METRADO


0.00 VOLUMEN 01: INFRAESTRUCTURA 0.00
#REF! #REF! 0.00
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
01.02 TRABAJOS PRELIMINARES 0 0.00
01.02.01 LIMPIEZA DE TERRENO
NIVELACION, TRAZADOMANUAL
Y REPLANTEO C/EQUIPO m2 64.20
01.02.02 m2 64.20
0.00 0.00 0 0.00
02 ESTRUCTURAS 0 0.00
02.01 MOVIMIENTO DE TIERRAS 0 0.00
02.01.02 REFINE DE TERRENO HASTA e= 0.10 m. m2 64.20
02.01.04 EXCAVACION PARA PATIO DE FORMACION m3 9.60
02.01.14 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO m3 9.60
02.01.18 ACARREO DE MATERIAL EXCEDENTE CON CARRETILLA D=30m m3 16.10
02.01.19 ELIMINACION MATERIAL EXCDENTE C/MAQUINARIA m3 20.10
02.02 OBRAS DE CONCRETO SIMPLE 0 0.00
02.02.07 SARDINEL, CONCRETO 1:8+25% P.M. m3 1.50
02.02.08 SARDINEL CONCRETO:
PATIOS Y VEREDA ENCOFRADO
CONCRETO Y DESENCOFRADO
175 kg/cm² E=6" FROT.Y BRUÑADO m2 10.00
02.02.11 m2 66.80
02.02.12 CONCRETO FC=175 KG/CM2 PARA LOSA m3 5.00
0.00 0.00 0 0.00
03 ARQUITECTURA 0 0.00
03.03 PISOS Y VEREDAS 0 0.00
03.03.08 JUNTA DE DE
RELLENO DILATACION
JUNTA DE PISOS Y VEREDAS
DILATACION CON e=1"
MASA ASFALTICA PISOS Y VEREDAS e=5" ml 62.40
03.03.09 SELLADO DE JUNTAS DE DILATACION CON MASILLA FLEXIBLE ELASTOMERICA e=1" ml 62.40
03.03.10 ml 62.40
03.07 COBERTURA 0 0.00
03.07.04 COBERTURA CON MALLA RASHELL SUMINISTRO E INSTALACION m2 43.30
03.09 CARPINTERIA METALICA 0 0.00
03.09.03 ASTA PARA BANDERA und 1.00
0.00 0.00 0 0.00
0.00 0.00
0.00 0.00 0 0.00
0.00 0.00 0
0.00 0.00 0
0.00 0.00 0
0.00 0.00 0
0.00 0

RES. PAT.FORMACION
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
PARTIDA DESCRIPCIÓN UND elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und

VOLUMEN 01: INFRAESTRUCTURA


#REF!
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES
01.02 TRABAJOS PRELIMINARES
01.02.01 LIMPIEZA DE TERRENO MANUAL m2 64.20
area total disponible m2 1.00 10.70 6.00 1.00 64.20
NIVELACION, TRAZADO Y REPLANTEO C/EQUIPO
01.02.02 m2 64.20
area total disponible m2 1.00 10.70 6.00 1.00 64.20

02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
02.01.02 REFINE DE TERRENO HASTA e= 0.10 m. m2 64.20
PATIO DE FORMACION m2 1.00 10.70 6.00 1.00 64.20

02.01.04 EXCAVACION PARA PATIO DE FORMACION m3 9.60


PATIO DE FORMACION m3 1.00 10.70 6.00 0.15 1.00 9.63

02.01.14 RELLENO COMPACTADO CON MATERIAL PRO m3 AREA 9.60


PATIO DE FORMACION m3 1.00 64.20 0.15 1.00 9.63

02.01.18 ACARREO DE MATERIAL EXCEDENTE CON CA m3 volumen 16.10


EXCAVACION PARA PATIO DE FORMACIO m3 1.00 9.63 1.00 9.63
REFINE DE TERRENO HASTA H=10cm m3 1.00 6.42 1.00 6.42

02.01.19 ELIMINACION MATERIAL EXCDENTE C/MAQU m3 volumen FACTOR DE EXPANSIÓN 20.10


EXCAVACION PARA PATIO DE FORMACIO m3 1.00 9.63 1.25 12.04
REFINE DE TERRENO HASTA H=10cm m3 1.00 6.42 1.25 8.03

02.02 OBRAS DE CONCRETO SIMPLE


02.02.07 SARDINEL, CONCRETO 1:8+25% P.M. m3 1.50
PATIO DE FORMACION m3 1.00 33.40 0.15 0.30 1.00 1.50

02.02.08 SARDINEL CONCRETO: ENCOFRADO Y DES m2 10.00


PATIO DE FORMACION m2 1.00 33.40 0.30 1.00 10.02

PATIOS Y VEREDA CONCRETO 175 kg/cm² E=6" FROT.Y BRUÑADO


02.02.11 m2 AREA 66.80
PATIO DE FORMACION m2 1.00 64.20 1.00 64.20
RAMPAS m2 2.00 1.30 1.00 2.60

02.02.12 CONCRETO FC=175 KG/CM2 PARA LOSA m3 5.00


VERTICALES m3 1.00 11.00 0.15 1.00 1.65
HORIZONTALES m3 3.00 6.00 0.15 1.00 2.70
RAMPAS m3 4.00 1.00 0.15 1.00 0.60

03 ARQUITECTURA
03.03 PISOS Y VEREDAS
03.03.08 JUNTA DE DILATACION PISOS Y VEREDAS e= ml 62.40
HORIZONTALES ml 1.00 11.00 1.00 11.00
VERTICAL ml 3.00 6.00 1.00 18.00
PERIMETRO ml 1.00 33.40 1.00 33.40

RELLENO DE JUNTA DE DILATACION CON MASA ASFALTICA PISOS Y VEREDAS e=5"


03.03.09 ml 62.40
HORIZONTALES ml 1.00 11.00 1.00 11.00
VERTICAL ml 3.00 6.00 1.00 18.00
PERIMETRO ml 1.00 33.40 1.00 33.40

SELLADO DE JUNTAS DE DILATACION CON MASILLA FLEXIBLE ELASTOMERICA e=1"


03.03.10 ml 62.40
HORIZONTALES ml 1.00 11.00 1.00 11.00
VERTICAL ml 3.00 6.00 1.00 18.00
PERIMETRO ml 1.00 33.40 1.00 33.40

03.03.11 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2


03.07 COBERTURA
03.07.04 COBERTURA CON MALLA RASHELL SUMINISTRO E IN m2 AREA 43.30
PATIO DE FORMACION m2 6.00 7.21 1.00 43.26

03.09 CARPINTERIA METALICA


03.09.03 ASTA PARA BANDERA und 1.00
asta de bandera und 1.00 1.00 1.00

Sust pat.formacion
RESUMEN METRADOS AREA DE JUEGOS

I.E.I. : I.E.I N°1455 - PUEBLO NUEVO


UBICACIÓN : PUEBLO NUEVO - SAN BENITO - CONTUMAZÁ - CAJAMARCA
ELABORADO : 0

ITEMS DESCRIPCION UND METRADO


0.00 VOLUMEN 01: INFRAESTRUCTURA 0.00
#REF! #REF! 0.00
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
01.02 TRABAJOS PRELIMINARES 0 0.00
01.02.01 LIMPIEZA DE TERRENO
NIVELACION, TRAZADO MANUAL
Y REPLANTEO C/EQUIPO m2 56.40
01.02.02 m2 56.40
0.00 0.00 0 0.00
02 ESTRUCTURAS 0 0.00
02.01 MOVIMIENTO DE TIERRAS 0 0.00
02.01.02 REFINE DE TERRENO HASTA e= 0.10 m. m2 56.40
02.01.05 EXCAVACION PARA AREA DE JUEGOS m3 8.50
02.01.17 CAMA DE ARENA GRUESA m3 8.50
02.01.18 ACARREO DE MATERIAL EXCEDENTE CON CARRETILLA D=30m m3 14.10
02.01.19 ELIMINACION MATERIAL EXCDENTE C/MAQUINARIA m3 17.70
0.00 0.00 0 0.00
03 ARQUITECTURA 0 0.00
03.07 COBERTURA 0 0.00
03.07.04 COBERTURA CON MALLA RASHELL SUMINISTRO E INSTALACION m2 43.30
0.00 0.00 0 0.00
0.00 0.00
0.00 0.00 0 0.00
0.00 0.00 0
0.00 0.00 0
0.00 0.00 0
0.00 0.00 0
0.00 0

RES. A. JUEGOS
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
PARTIDA DESCRIPCIÓN UND elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und

VOLUMEN 01: INFRAESTRUCTURA


#REF!
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINA
01.02 TRABAJOS PRELIMINARES
01.02.01 LIMPIEZA DE TERRENO MANUAL m2 56.40
area total disponible m2 1.00 9.40 6.00 1.00 56.40
NIVELACION, TRAZADO Y REPLANTEO C/EQUIPO
01.02.02 m2 56.40
area total disponible m2 1.00 9.40 6.00 1.00 56.40

02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
02.01.02 REFINE DE TERRENO HASTA e= 0.10 m. m2 56.40
AREA DE JUEGOS m2 1.00 9.40 6.00 1.00 56.40

02.01.05 EXCAVACION PARA AREA DE JUEGOS m3 8.50


AREA DE JUEGOS m3 1.00 9.40 6.00 0.15 1.00 8.46

02.01.17 CAMA DE ARENA GRUESA m3 8.50


AREA DE JUEGOS m3 1.00 9.40 6.00 0.15 1.00 8.46

02.01.18 ACARREO DE MATERIAL EXCEDENTE CO m3 volumen 14.10


EXCAVACION PARA AREA DE JUEGOS m3 1.00 8.50 1.00 8.50
REFINE DE TERRENO HASTA 10cm m3 1.00 5.64 1.00 5.64

02.01.19 ELIMINACION MATERIAL EXCDENTE C/ m3 volumen factor de exp. 17.70


EXCAVACION PARA AREA DE JUEGOS m3 1.00 8.50 1.25 10.63
REFINE DE TERRENO HASTA 10cm m3 1.00 5.64 1.25 7.05

03 ARQUITECTURA
03.07 COBERTURA
03.07.04 COBERTURA CON MALLA RASHELL SUMIN m2 AREA 43.30
AREA DE JUEGOS m2 6.00 7.21 1.00 43.26

Sust A. juegos
RESUMEN METRADOS DE SISTEMA HIDRONEUMATICO Y DE BOMBEO DE AGUA PLUVIAL

.E.I. : I.E.I N°1455 - PUEBLO NUEVO


UBICACIÓN : PUEBLO NUEVO - SAN BENITO - CONTUMAZÁ - CAJAMARCA
ELABORADO : 0

ITEMS DESCRIPCION UND METRADO


0.00 VOLUMEN 01: INFRAESTRUCTURA 0.00
#REF! #REF! 0.00
0.00 0.00 0 0.00
02 ESTRUCTURAS 0 0.00
02.01 MOVIMIENTO DE TIERRAS 0 0.00
02.01.06 EXCAVACION PARA CISTERNA m3 7.30
02.01.09 EXCAVACION PARA ZAPATAS m3 2.70
02.01.14 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO m3 4.50
02.01.18 ACARREO DE MATERIAL EXCEDENTE CON CARRETILLA D=30m m3 10.00
02.02 OBRAS DE CONCRETO SIMPLE 0 0.00
02.02.01 SOLADO DE 4" C°S° C:H - 1:10 m2 5.60
02.03 OBRAS DE CONCRETO ARMADO 0 0.00
02.03.01 ZAPATAS 0 0.00
02.03.01.01 ZAPATAS: CONCRETO F'C = 210 KG/CM2 m3 0.70
02.03.01.02 ZAPATAS: ACERO DE REFUERZO fy = 4200 Kg/cm2 kg 19.50
02.03.05 COLUMNAS 0 0.00
02.03.05.01 COLUMNAS: CONCRETO F'C = 210 KG/CM2 m3 0.60
02.03.05.02 COLUMNAS: ENCOFRADO
COLUMNAS: ACERO DE REFUERZO fy = 4200 Kg/cm2
Y DESENCOFRADO kg 104.50
02.03.05.03 m2 5.70
02.03.10 LOSAS MACIZA 0 0.00
02.03.10.01 LOSA MACIZA: CONCRETO F'C = 210 KG/CM2 m3 1.40
02.03.10.02 LOSA MACIZA:
LOSA MACIZA: ENCOFRADO
ACERO DE REFUERZO fy = 4200 Kg/cm2
Y DESENCOFRADO kg 117.90
02.03.10.03 m2 12.50
0.00 0.00 0 0.00
03 ARQUITECTURA 0 0.00
03.01 MUROS Y TABIQUES DE ALBAÑILERIA 0 0.00
03.01.01 MURO DE SOGA LADRILLO DE ARCILLA 9x12x23 cm. MORTERO DOSIFICADO 1:4 m2 10.90
03.02 REVOQUES, ENLUCIDOS Y REVESTIMIENTOS 0 0.00
03.02.04 TARRAJEO DE COLUMNAS, E=1.5 CM CON MORTERO C:A 1:5 m2 4.20
03.02.06 TARRAJEO DE CIELO RASO, E=1.5CM CON MORTERO C:A 1:4 m2 5.10
03.03 PISOS Y VEREDAS 0 0.00
03.03.06 VEREDAS - CONCRETO 175 Kg/cm2 e=4" m2 4.40
03.03.07 PISO DE CEMENTO PULIDO Y BRUÑADO e=2" m2 4.40
03.03.08 JUNTA DE DILATACION PISOS Y VEREDAS e=1" ml 8.40
03.10 CERRAJERIA 0 0.00
03.10.07 TAPA DE FIERRO EN CISTERNA und 2.00
03.12 PINTURA PINTURA LATEX EN CIELORRASOS, 2 MANOS 0 0.00
03.12.03 PINTURA LATEX EN COLUMNAS, DERRAMES Y VIGAS , 2 MANOS m2 4.20
03.12.04 m2 5.10
03.14 VARIOS 0 0.00
03.14.04 CONEXION A LA RED PUBLICA DE AGUA GLB 1.00
03.14.05 EQUIPO DE BOMBEO, 02 ELECTROBOMBA 0.5 HP und 1.00
03.14.06 TANQUE ELEVADO DE POLIETILENO 600 LITROS und 1.00
03.14.07 CISTERNA DE POLIETILENO 1200 LITROS und 1.00
0.00 0.00 0 0.00
04 INSTALACIONES SANITARIAS 0 0.00
TUBERIA PVC CLASE 10 - Ø 3/4" ROSCADA
04.03 SISTEMA DE AGUA FRIA 0 0.00
TUBERIA PVC CLASE 10 - Ø 1" ROSCADA
04.03.03 ml 5.50
TUBERIA PVC CLASE 10 - Ø 1 1/4" ROSCADA
04.03.04 ml 5.50
TUBERIA PVC CLASE 10 - Ø 1 1/2" ROSCADA
04.03.05 ml 6.80
TUBERIA PVC CLASE 10 - Ø 2" ROSCADA
04.03.06 ml 3.70
04.03.07 VALVULA DE INTERRUPCION ESFERICA DE 1 1/4” ml 6.70
04.03.10 VALVULA DE INTERRUPCION ESFERICA DE 1 1/2” pza 2.00
04.03.11 pza 2.00
04.03.13 VALVULA CHECK 3/4" pza 1.00
04.03.14 VALVULA CHECK 1 1/4" pza 2.00
04.03.15 VALVULA CHECK 1 1/2" pza 2.00
0.00 0.00 0.00
0.00 0.00 0 0.00
0.00 0.00 0
0.00 0.00 0
0.00 0.00 0
0.00 0.00 0
0.00 0

RES. CISTERNA
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
PARTIDA DESCRIPCIÓN UND elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und

VOLUMEN 01: INFRAESTRUCTURA


#REF!
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
02.01.06 EXCAVACION PARA CISTERNA m3 AREA 7.30
CISTERNA m3 1.00 4.15 1.75 1.00 7.26

02.01.09 EXCAVACION PARA ZAPATAS m3 2.70


Z1 m3 1.00 1.20 1.20 1.85 1.00 2.66

02.01.14 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO m3 4.50


Z1 m3 1.00 4.28 0.90 1.00 3.85
VEREDA m3 1.00 2.10 2.10 0.15 1.00 0.66

02.01.18 ACARREO DE MATERIAL EXCEDENTE CON CARRETILLA D=30m m3 VOLUMEN 10.00


CISTERNA m3 1.00 7.30 1.00 7.30
Z1 m3 1.00 2.66 1.00 2.66

02.02 OBRAS DE CONCRETO SIMPLE


02.02.01 SOLADO DE 4" C°S° C:H - 1:10 m2 5.60
Z1 m2 1.00 1.20 1.20 1.00 1.44
CISTERNA m2 1.00 4.15 1.00 4.15

02.03 OBRAS DE CONCRETO ARMADO


02.03.01 ZAPATAS
02.03.01.01 ZAPATAS: CONCRETO F'C = 210 KG/CM2 m3 0.70
Z1 m3 1.00 1.20 1.20 0.50 1.00 0.72

02.03.01.02 ZAPATAS: ACERO DE REFUERZO fy = 4200 Kg/cm2 kg Ø (pulg)Peso (kg/m)#piezas 19.50


Z1 kg 1.00 1.05 5/8" 1.55 6.00 9.77
kg 1.00 1.05 5/8" 1.55 6.00 9.77

02.03.05 COLUMNAS
02.03.05.01 COLUMNAS: CONCRETO F'C = 210 KG/CM2 m3 area 0.60
c1 m3 1.00 0.13 4.55 1.00 0.59

02.03.05.02 COLUMNAS: ACERO DE REFUERZO fy = 4200 Kg/cm2 kg 104.50


Estribos 1
Recubrimiento Laterales 0.040 Recubrimiento 0.025
Empalme 0.000 0.25
0.30
3/8"
4.55 0.50

0.30

c1 kg Peso (kg/mt) #piezas


8 Ø 5/8" kg 1.00 5.07 1.55 8.00 62.87
estribo Ø 3/8" R@ 0.075m kg 1.00 1.22 0.56 61.00 41.68

COLUMNAS: ENCOFRADO Y DESENCOFRADO


02.03.05.03 m2 #veces 5.70
c1 m2 1.00 1.26 4.55 1.00 5.73

02.03.10 LOSAS MACIZA


02.03.10.01 LOSA MACIZA: CONCRETO F'C = 210 KG/CM2 m3 AREA 1.40
LOZA PARA TANQUE CISTERNA m3 1.00 3.46 0.20 1.00 0.69
TANQUE ELEVADO m3 1.00 7.06 0.10 1.00 0.71

02.03.10.02 LOSA MACIZA: ACERO DE REFUERZO fy = 4200 Kg/cm2 kg 117.90


TANQUE CISTERNA
Acero Longitudinal 01 0.15
2.08 2.29
10.5 Recubrimiento Laterales 0.040
Empalme 0.00

VERTICAL Peso (kg/mt) #piezas


Ø 3/8" kg 2.00 2.30 0.56 11.00 28.34
HORIZONTAL
Ø 3/8" kg 2.00 2.51 0.56 11.00 30.92
TANQUE ELEVADO
Acero Longitudinal 01 0.15
2.02 2.3
10.5 Recubrimiento Laterales 0.040
Empalme 0.00

VERTICAL Peso (kg/mt) #piezas


Ø 3/8" kg 2.00 2.24 0.56 11.00 27.60
HORIZONTAL
Ø 3/8" kg 2.00 2.52 0.56 11.00 31.05

LOSA MACIZA: ENCOFRADO Y DESENCOFRADO


02.03.10.03 m2 area 12.50
tanque cisterna m2 1.00 3.46 1.00 3.46
m2 1.00 6.60 0.20 1.00 1.32
tanque elavado m2 1.00 7.06 1.00 7.06
m2 1.00 7.07 0.10 1.00 0.71

03 ARQUITECTURA
03.01 MUROS Y TABIQUES DE ALBAÑILERIA
03.01.01 MURO DE SOGA LADRILLO DE ARCILLA 9x12x23 cm. MORTERO DOSIFICADO 1 m2 10.90
tanque cisterna m2 1.00 6.60 1.65 1.00 10.89

03.02 REVOQUES, ENLUCIDOS Y REVESTIMIENTOS


03.02.04 TARRAJEO DE COLUMNAS, E=1.5 CM CON MORTERO C:A 1:5 m2 4.20
C1 m2 1.00 1.26 3.35 1.00 4.22

03.02.06 TARRAJEO DE CIELO RASO, E=1.5CM CON MORTERO C:A 1:4 m2 5.10
LOSA DE TANQUE ELAVADO m2 1.00 3.46 1.00 3.46
m2 1.00 8.40 0.20 1.00 1.68

03.03 PISOS Y VEREDAS


03.03.06 VEREDAS - CONCRETO 175 Kg/cm2 e=4" m2 4.40
VEREDAD m2 1.00 2.10 2.10 1.00 4.41

03.03.07 PISO DE CEMENTO PULIDO Y BRUÑADO e=2" m2 4.40


VEREDAD m2 1.00 2.10 2.10 1.00 4.41

03.03.08 JUNTA DE DILATACION PISOS Y VEREDAS e=1" ml 8.40


VEREDAD ml 4.00 2.10 1.00 8.40

03.10
03.10.06 CERRAJERIA
BISAGRA ALUMINIZADA CAPUCHINA PARA PORTAÑUELAS DE 2 1/2" x 2 1/2" pza
03.10.07 TAPA DE FIERRO EN CISTERNA und 2.00
tanque cisterna und 1.00 1.00 1.00
sist. Bombeo und 1.00 1.00 1.00

03.12 PINTURA
03.12.01 PINTURA
PINTURA LATEX
LATEX EN
EN MUROS
MUROS INTERIORES,
EXTERIORES, 22 MANOS
MANOS m2
03.12.02 PINTURA LATEX EN CIELORRASOS, 2 MANOS m2
03.12.03 m2 DETALLE 4.20
VER METRADOS DE TARRAJEO m2 1.00 4.20 1.00 4.20

PINTURA LATEX EN COLUMNAS, DERRAMES Y VIGAS , 2 MANOS


03.12.04 m2 DETALLE 5.10
VER METRADOS DE TARRAJEOS m2 1.00 5.10 1.00 5.10

03.14 VARIOS
03.14.04 CONEXION A LA RED PUBLICA DE AGUA GLB 1.00
TANQUE HIDRONEUMATICO GLB 1.00 1.00 1.00

03.14.05 EQUIPO DE BOMBEO, 02 ELECTROBOMBA 0.5 HP und 1.00


ELECTROBOMBA 0.50 HP und 1.00 1.00 1.00

03.14.06 TANQUE ELEVADO DE POLIETILENO 600 LITROS und 1.00


TANQUE ROTOPLAS 600 LITROS und 1.00 1.00 1.00

03.14.07 CISTERNA DE POLIETILENO 1200 LITROS und 1.00


CISTERNA ROTOPLAS 1200 LITROS und 1.00 1.00 1.00

04 INSTALACIONES SANITARIAS
04.03 SISTEMA DE AGUA FRIA
04.03.03 ml 5.50
MANTANTE QUE BAJA AGUA ml 1.00 5.52 1.00 5.52

04.03.04 ml 5.50
MANTANTE QUE BAJA AGUA ml 1.00 5.52 1.00 5.52

04.03.05 ml 6.80
TUBERIA DE IMPULSION ml 1.00 6.75 1.00 6.75

04.03.06 ml 3.70
tuberia succion ml 1.00 3.67 1.00 3.67

04.03.07 ml 6.70
BAJA REBOSE DE T.E. ml 1.00 6.69 1.00 6.69

VALVULA DE INTERRUPCION ESFERICA DE 1 1/4”


04.03.10 pza 2.00
AREA DE SIST. HIDRONEUMATICO pza 2.00 1.00 2.00

VALVULA DE INTERRUPCION ESFERICA DE 1 1/2”


04.03.11 pza 2.00
VALVULA DE INTERRUPCION pza 2.00 1.00 2.00

04.03.13 VALVULA CHECK 3/4" pza 1.00


area de cisterna pza 1.00 1.00 1.00

04.03.14 VALVULA CHECK 1 1/4" pza 2.00


AREA DE SIST. HIDRONEUMATICO pza 2.00 1.00 2.00

04.03.15 VALVULA CHECK 1 1/2" pza 2.00


AREA DE SIST. HIDRONEUMATICO pza 2.00 1.00 2.00

Sust cisterna
RESUMEN METRADOS OBRAS EXTERIORES

.I. : I.E.I N°1455 - PUEBLO NUEVO


UBICACIÓN : PUEBLO NUEVO - SAN BENITO - CONTUMAZÁ - CAJAMARCA
ELABORADO : 0

ITEMS DESCRIPCION UND METRADO


#REF! VOLUMEN 01: INFRAESTRUCTURA #REF!
#REF! #REF! #REF!
02 ESTRUCTURAS 0.00
02.01 MOVIMIENTO DE TIERRAS 0.00
02.01.07 EXCAVACION PARA BIODIGESTOR Y POZO PERCOLADOR m3 34.50
02.01.12 RELLENO CON GRAVA MAX. 6" P/ POZO PERCOLADOR m3 8.50
02.01.14 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO m3 1.30
02.01.18 ACARREO DE MATERIAL EXCEDENTE CON CARRETILLA D=30m m3 34.50
02.01.19 ELIMINACION MATERIAL EXCDENTE C/MAQUINARIA m3 43.10
02.02 OBRAS DE CONCRETO SIMPLE 0.00
02.02.12 CONCRETO
ENCOFRADOFC=175 KG/CM2 PARAEN
Y DESENCOFRADO LOSA
LOSAS Y SARDINELES SUMERGIDOS m3 0.40
02.02.13 m2 0.90
03 ARQUITECTURA 0.00
03.01 MUROS Y TABIQUES DE ALBAÑILERIA 0.00
03.01.01 MURO DE SOGA LADRILLO DE ARCILLA 9x12x23 cm. MORTERO DOSIFICADO 1:4 m2 19.30
04 INSTALACIONES SANITARIAS 0.00
04.05 SISTEMA DEDE
RED DESAGUE Y VENTILACION
DISTRIBUCION TUBERIA PVC - SAP Ø 4" 0.00
04.05.05 CAJA DE REGISTRO DE DESAGUE DE 25 X 50 cm. ml 2.00
CAJA DE REGISTRO DE DESAGUE DE 30 X 60 cm.
04.05.08 und 1.00
CAJA DE LODOS DE 100 X 100 cm.
04.05.07 und 1.00
CAJA REPARTIDORA DE CAUDAL 60 X 90 cm.
04.05.08 und 1.00
04.05.09 und 1.00
04.05.10 BIODIGESTOR ROTOPLAS 3000 LITROS und 1.00

RES. BIODEGESTOR
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
PARTIDA DESCRIPCIÓN UND elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und

VOLUMEN 01: INFRAESTRUCTURA


#REF!

02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
02.01.07 EXCAVACION PARA BIODIGESTOR Y POZO PERCOLADOR m3 34.50
POZO PERCOLADOR m3 1.00 5.64 2.40 1.00 13.54
BIODIGESTOR m3 1.00 6.59 2.66 1.00 17.53
CAJA 0.40x0.40 m. m3 1.00 0.40 0.40 0.82 1.00 0.13
CAJA DE LODOS m3 1.00 1.20 1.20 1.80 1.00 2.59
CAJA REPARTIDORA m3 1.00 0.90 0.60 1.25 1.00 0.68

02.01.12 RELLENO CON GRAVA MAX. 6" P/ POZO PERCOLADOR m3 VOUMEN 8.50
FONDO DE LOSA (POZO PERCOLADOR) m3 1.00 0.33 1.00 0.33
PERIMETRO EXTERIOR (POZO PERCOLADOR) m3 1.00 8.22 1.00 8.22

02.01.14 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCION m3 VOLUMEN 1.30


BIODEGESTOR m3 1.00 1.33 1.00 1.33

02.01.18 ACARREO DE MATERIAL EXCEDENTE CON CARRETILLA D=30 m3 34.50


VER METRADO DE EXCAVACION m3 1.00 34.50 1.00 34.50

02.01.19 ELIMINACION MATERIAL EXCDENTE C/MAQUINARIA m3 43.10


VER METRADO DE EXCAVACION m3 1.00 34.50 1.25 43.13

02.02 OBRAS DE CONCRETO SIMPLE


02.02.12 CONCRETO FC=175 KG/CM2 PARA LOSA m3 0.40
LOSA DE FONDO (BIODIGESTOR) m3 1.00 0.75 0.75 0.10 1.00 0.06
LOSA DE FONDO (POZO PERCOLADOR) m3 1.00 1.51 0.10 1.00 0.15
TAPA (POZO PERCOLADOR) m3 1.00 2.22 0.10 1.00 0.22

ENCOFRADO Y DESENCOFRADO EN LOSAS Y SARDINELES SUMERGIDOS


02.02.13 m2 0.90
LOSA DE FONDO (BIODIGESTOR) m2 4.00 0.75 0.10 1.00 0.30
LOSA DE FONDO (POZO PERCOLADOR) m2 4.00 0.75 0.10 1.00 0.30
TAPA (POZO PERCOLADOR) m2 4.00 0.75 0.10 1.00 0.30

03 ARQUITECTURA
03.01 MUROS Y TABIQUES DE ALBAÑILERIA
03.01.01 MURO DE SOGA LADRILLO DE ARCILLA 9x12x23 cm. MORTERO m2 19.30
BIODIGESTOR m2 1.00 7.82 1.05 1.00 8.21
POZO PERCOLADOR m2 1.00 5.26 2.10 1.00 11.05

04 INSTALACIONES SANITARIAS
04.05 SISTEMA DEDE
RED DESAGUE Y VENTILACION
DISTRIBUCION TUBERIA PVC - SAP Ø 4"
04.05.05 ml 2.00
exterior ml 1.00 1.00 1.00 1.00
exterior ml 1.00 1.00 1.00 1.00

CAJA DE REGISTRO DE DESAGUE DE 25 X 50 cm.


04.05.08 und 1.00
exterior und 1.00 1.00 1.00

04.05.07 und 1.00


exterior und 1.00 1.00 1.00

04.05.08 und 1.00


exterior und 1.00 1.00 1.00

CAJA REPARTIDORA DE CAUDAL 60 X 90 cm.

04.05.09 und 1.00


exterior und 1.00 1.00 1.00

04.05.10 BIODIGESTOR ROTOPLAS 3000 LITROS und 1.00


exterior und 1.00 1.00 1.00

Sust biodegestor
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
PARTIDA DESCRIPCIÓN UND elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und

Sust biodegestor
RESUMEN METRADOS OBRAS EXTERIORES

.I. : I.E.I N°1455 - PUEBLO NUEVO


UBICACIÓN : PUEBLO NUEVO - SAN BENITO - CONTUMAZÁ - CAJAMARCA
ELABORADO : 0

ITEMS DESCRIPCION UND METRADO


0.00 VOLUMEN 01: INFRAESTRUCTURA 0.00
#REF! #REF! 0.00
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
01.01 OBRAS PROVISIONALES
01.01.01 CARTEL DE OBRA 2.40x3.60 pza 1.00
01.01.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS,MADERA Y HERRAMIENTAS VJE 2.00
01.01.03 CAMPAMENTO DE OBRA GLB 1.00
01.01.04 CERCO PROVISIONAL DE TRIPLAY ml 127.56
01.02 TRABAJOS PRELIMINARES 0 0.00
01.02.01 LIMPIEZA DE TERRENO
NIVELACION, TRAZADOMANUAL
Y REPLANTEO C/EQUIPO
m2 491.68
01.02.02 m2 491.68
01.03 SEGURIDAD Y SALUD 0 0.00
01.03.01 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJ GLB 1.00
01.03.02 EQUIPOS DE PROTECCION INDIVIDUAL und 10.00
01.03.03 EQUIPOS DE PROTECCION COLECTIVA GLB 1.00
01.03.04 SEÑALIZACION TEMPORAL DE SEGURIDAD GLB 1.00
01.03.05 CAPACITACION EN SEGURIDAD Y SALUD GLB 1.00
01.03.06 RECURSOS PARA RESPUESTA ANTE EMERGENCIAS EN SEGURIDAD Y SALUD EN EL TRABAJO GLB 1.00
0.00 0.00 0 0.00
02 ESTRUCTURAS 0 0.00
02.01 MOVIMIENTO DE TIERRAS 0 0.00
02.01.01 EXPLANACION Y NIVELACION DE TERRENO m3 850.07
02.01.02 REFINE DE TERRENO HASTA e= 0.10 m. m2 491.68
02.01.19 ELIMINACION MATERIAL EXCDENTE C/MAQUINARIA m3 1,124.00
0.00 0.00 0 0.00
03
03.08.01 ARQUITECTURA
PUERTAS DE MADERA C/TABLEROS, INCLUYE INSTALACION 0
m2 0.00
03.15 MITIGACION DE IMPACTO AMBIENTAL 0 0.00
03.15.01 HABILITACION DE BOTADEROS GLB 1.00
03.15.02 CIERRE DE BOTADEROS GLB 1.00
03.15.03 REFORESTACION DE BOTADEROS GLB 1.00
03.16 GESTION DE RIESGOS EN LA PLANIFICACION DE LA EJECUCION DE OBRAS 0 0.00
03.16.01 ANALISIS DE RIESGO mes 8.00
03.17 FLETE FLETE TERRESTRE A CANCATE 0 0.00
03.17.01 kg 265,101.02
0.00 0.00 0 0.00
0.00 0.00 0 0.00
05 INSTALACIONES ELECTRICAS, COMUNICACIONES Y MECANICAS 0 0.00
05.01 TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO DE INSTALACIONES ELECTRICAS 0
05.01.01 GLB 1.00
05.10 SISTEMA DE PUESTA TIERRA
SUMINISTRO E INSTAL. DE PUESTA A TIERRA 0 0.00
05.10.01 PRUEBAS ELECTRICAS PUESTA A TIERRA und 4.00
05.10.02 LIMPIEZA FINAL DE OBRA und 4.00
05.10.03 GLB 1.00
05.11 ILUMINACION EXTERIOR
POSTE de Fe 5 mts altura, diámetro 4", tapa roscada, 1 brazo metalico y conexión con la luminaria. 0 0.00
05.11.01 SUM. E INSTAL. EQUIPO DE ILUMINACION TIPO FAROLA DE 70 W und 5.00
05.11.02 und 5.00
05.15 PRUEBAS ELECTRICAS 0 0.00
05.15.01 PRUEBAS ELECTRICAS, CAIDA DE TENSION Y AISLAMIENTO, PUESTA TIERRA und 4.00
05.16 VARIOS 0 0.00
05.16.01 ACOMETIDA DE HIDRANDINA A I.E. GLB 1.00
0.00 0.00 0.00

RES. COOEE
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
PARTIDA DESCRIPCIÓN UND elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und

VOLUMEN 01: INFRAESTRUCTURA


#REF!
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y
01.01 OBRAS PROVISIONALES
01.01.01 CARTEL DE OBRA 2.40x3.60 pza 1.00
en general pza 1.00 1.00 1.00

01.01.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS,MADERA Y HER VJE 2.00


en general VJE 2.00 1.00 2.00

01.01.03 CAMPAMENTO DE OBRA GLB 1.00


en general GLB 1.00 1.00 1.00

01.01.04 CERCO PROVISIONAL DE TRIPLAY ml 127.56


en general ml 1.00 127.56 1.00 127.56

01.02 TRABAJOS PRELIMINARES


01.02.01 LIMPIEZA DE TERRENO MANUAL m2 area 491.68
en general m2 1.00 491.68 1.00 491.68

NIVELACION, TRAZADO Y REPLANTEO C/EQUIPO


01.02.02 m2 area 491.68
en general m2 1.00 491.68 1.00 491.68

01.03 SEGURIDAD Y SALUD


01.03.01 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN D GLB 1.00
en general GLB 1.00 1.00 1.00

01.03.02 EQUIPOS DE PROTECCION INDIVIDUAL und 10.00


en general und 10.00 1.00 10.00

01.03.03 EQUIPOS DE PROTECCION COLECTIVA GLB 1.00


en general GLB 1.00 1.00 1.00

01.03.04 SEÑALIZACION TEMPORAL DE SEGURIDAD GLB 1.00


en general GLB 1.00 1.00 1.00

01.03.05 CAPACITACION EN SEGURIDAD Y SALUD GLB 1.00


en general GLB 1.00 1.00 1.00

01.03.06 RECURSOS PARA RESPUESTA ANTE EMERGENCIAS EN SEGURIDAD GLB 1.00


en general GLB 1.00 1.00 1.00

02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
02.01.01 EXPLANACION Y NIVELACION DE TERRENO m3 area 850.07
Área de toda la I.E.I. m3 1.00 1,000.08 0.85 1.00 850.07

02.01.02 REFINE DE TERRENO HASTA e= 0.10 m. m2 area 491.68


Área de toda la I.E.I. m2 1.00 491.68 1.00 491.68

02.01.19 ELIMINACION MATERIAL EXCDENTE C/MAQUINARIA m3 volumen factor de expancion 1,124.00


EXPLANACION Y NIVELACION DE TERRENO m3 1.00 850.07 1.25 1,062.59
CORTE Y REFINE DE TERRENO HASTA e=0.10m. m3 1.00 49.17 1.25 61.46

03 ARQUITECTURA
03.15 MITIGACION DE IMPACTO AMBIENTAL
03.15.01 HABILITACION DE BOTADEROS GLB 1.00
en general GLB 1.00 1.00 1.00

03.15.02 CIERRE DE BOTADEROS GLB 1.00


en general GLB 1.00 1.00 1.00

03.15.03 REFORESTACION DE BOTADEROS GLB 1.00


en general GLB 1.00 1.00 1.00

03.16 GESTION DE RIESGOS EN LA PLANIFICACION DE LA EJECUCION D


03.16.01 ANALISIS DE RIESGO mes MES 8.00
en general mes 1.00 8.00 1.00 8.00

03.17 FLETE FLETE TERRESTRE A CANCATE


03.17.01 kg KG 265,101.02
en general kg 265,101.02 1.00 265,101.02

05 INSTALACIONES ELECTRICAS, COMUNICACIONES Y MECANICAS


05.01 TRABAJOSTRAZO
PRELIMINARES
Y REPLANTEO DE INSTALACIONES ELECTRICAS
05.01.01 GLB 1.00
TODA LA I.E.I. GLB 1.00 1.00 1.00 1.00

05.10 SISTEMA SUMINISTRO


DE PUESTA TIERRA
E INSTAL. DE PUESTA A TIERRA
05.10.01 und 4.00
TG - TD-01 - TTE - TB und 4.00 1.00 4.00
PRUEBAS ELECTRICAS PUESTA A TIERRA
05.10.02 und 4.00

Sust mod. ooee


PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
PARTIDA DESCRIPCIÓN UND elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
TG - TD-01 - TTE - TB und 4.00 1.00 4.00
LIMPIEZA FINAL DE OBRA
05.10.03 GLB 1.00
TODA LA I.E.I. GLB 1.00 1.00 1.00

05.11 ILUMINACION
POSTEEXTERIOR
de Fe 5 mts altura, diámetro 4", tapa roscada, 1 brazo metalico y conexión con la luminaria.
05.11.01 und 5.00
EXTERIOR und 5.00 1.00 5.00
SUM. E INSTAL. EQUIPO DE ILUMINACION TIPO FAROLA DE 70 W
05.11.02 und 5.00
EXTERIOR 0 5.00 1.00 5.00
05.15 PRUEBAS ELECTRICAS
05.15.01 PRUEBAS ELECTRICAS, CAIDA DE TENSION Y AISLAMIENTO, PU und 4.00
TG - TD-01 - TTE - TB und 4.00 1.00 4.00

05.16 VARIOS
05.16.01 ACOMETIDA DE HIDRANDINA A I.E. GLB 1.00
TODA LA I.E.I. GLB 1.00 1.00 1.00

Sust mod. ooee


RESUMEN METRADOS HALL DE INGRESO

I. : I.E.I N°1455 - PUEBLO NUEVO


UBICACIÓN : PUEBLO NUEVO - SAN BENITO - CONTUMAZÁ - CAJAMARCA
ELABORADO : 0

ITEMS DESCRIPCION UND METRADO


0.00 VOLUMEN 01: INFRAESTRUCTURA 0.00
#REF! #REF! 0.00
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
01.02 TRABAJOS PRELIMINARES 0 0.00
01.02.01 LIMPIEZA DE TERRENO MANUAL
NIVELACION, TRAZADO Y REPLANTEO C/ EQUIPO
m2 23.50
01.02.02 m2 23.50
0.00 0.00 0 0.00
02 ESTRUCTURAS 0 0.00
02.01 MOVIMIENTO DE TIERRAS 0 0.00
02.01.01 EXPLANACION Y NIVELACION DE TERRENO m3 0.00
02.01.02 REFINE DE TERRENO HASTA e= 0.10 m. m2 23.50
02.01.03 EXCAVACION PARA HALL DE INGRESO m3 3.50
02.01.14 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO m3 2.40
02.01.17 CAMA DE ARENA GRUESA m3 0.20
02.01.18 ACARREO DE MATERIAL EXCEDENTE CON CARRETILLA D=30m m3 5.90
02.01.19 ELIMINACION MATERIAL EXCDENTE C/MAQUINARIA m3 7.30
02.02 OBRAS DE CONCRETO SIMPLE 0 0.00
02.02.07 SARDINEL, CONCRETO 1:8+25% P.M. m3 0.40
02.02.08 SARDINEL CONCRETO: ENCOFRADO Y DESENCOFRADO m2 7.50
0.00 0.00 0 0.00
03 ARQUITECTURA 0 0.00
03.03 PISOS Y VEREDAS 0 0.00
03.03.05 SUMINISTRO Y COLOCACION DE ADOQUINES DE CONCRETO 4x10x20 cm COLOR ROJO m2 23.50
03.03.06 VEREDAS - CONCRETO 175 Kg/cm2 e=4" m2 15.00
03.03.07 PISO DE CEMENTO PULIDO Y BRUÑADO e=2" m2 15.00
03.04 RAMPAS 0 0.00
03.04.01 RAMPAS DE CONCRETO 175 kg/cm2 E=6" BRUÑADO S/DISEÑO m2 1.50
0.00 0.00 0.00
0.00 0.00 0 0.00
0.00 0.00 0
0.00 0.00 0
0.00 0.00 0
0.00 0.00 0
0.00 0

RES. H. INGRESO
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
PARTIDA DESCRIPCIÓN UND elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und

VOLUMEN 01: INFRAESTRUCTURA


#REF!
01.02 TRABAJOS PRELIMINARES
01.02.01 LIMPIEZA DE TERRENO MANUAL m2 area 23.50
hall de ingreso m2 1.00 23.51 1.00 23.51

NIVELACION, TRAZADO Y REPLANTEO C/EQUIPO


01.02.02 m2 area 23.50
hall de ingreso m2 1.00 23.51 1.00 23.51

02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
02.01.02 REFINE DE TERRENO HASTA e= 0.10 m. m2 area 23.50
MOVIMIENTO DE TI m2 1.00 23.51 1.00 23.51

02.01.03 EXCAVACION PARA HALL DE INGRESO m3 area 3.50


MOVIMIENTO DE TI m3 1.00 23.51 0.15 1.00 3.53

02.01.14 RELLENO COMPACTADO CON MATERIAL P m3 area 2.40


EXCAVACION PA m3 1.00 23.51 0.10 1.00 2.35

02.01.17 CAMA DE ARENA GRUESA m3 area 0.20


EXCAVACION PA m3 1.00 23.51 0.01 1.00 0.24

02.01.18 ACARREO DE MATERIAL EXCEDENTE CON m3 volumen 5.90


refine de terreno has m3 1.00 2.35 1.00 2.35
excavacion para hall d m3 1.00 3.53 1.00 3.53

02.01.19 ELIMINACION MATERIAL EXCDENTE C/MA m3 volumen factor de expansion 7.30


refine de terreno has m3 1.00 2.35 1.25 2.94
excavacion para hall d m3 1.00 3.53 1.25 4.41

02.02 OBRAS DE CONCRETO SIMPLE


02.02.07 SARDINEL, CONCRETO 1:8+25% P.M. m3 0.40
hall de ingreso m3 1.00 25.09 0.10 0.15 1.00 0.38

02.02.08 SARDINEL CONCRETO: ENCOFRADO Y D m2 7.50


hall de ingreso m2 1.00 25.09 0.15 2.00 7.53

03 ARQUITECTURA
03.03 PISOS Y VEREDAS
03.03.05 SUMINISTRO Y COLOCACION DE ADOQUI m2 area 23.50
hall de ingreso m2 1.00 23.51 1.00 23.51

03.03.06 VEREDAS - CONCRETO 175 Kg/cm2 e=4" m2 area 15.00


hall de ingreso m2 1.00 14.96 1.00 14.96

03.03.07 PISO DE CEMENTO PULIDO Y BRUÑADO e= m2 area 15.00


hall de ingreso m2 1.00 14.96 1.00 14.96

03.04 RAMPAS
03.04.01 RAMPAS DE CONCRETO 175 kg/cm2 E=6" m2 1.50
rampa en hall de ingreso m2 1.00 1.50 1.00 1.00 1.50

Sust h. ingreso
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
PARTIDA DESCRIPCIÓN UND elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und

Sust h. ingreso
RESUMEN METRADOS PORTADA DE INGRESO

I.E.I. : I.E.I N°1455 - PUEBLO NUEVO


UBICACIÓN : PUEBLO NUEVO - SAN BENITO - CONTUMAZÁ - CAJAMARCA
ELABORADO : 0

ITEMS DESCRIPCION UND METRADO


0.00 VOLUMEN 01: INFRAESTRUCTURA 0.00
#REF! #REF! 0.00
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
01.02 TRABAJOS PRELIMINARES 0 0.00
01.02.01 LIMPIEZA DE TERRENO
NIVELACION, TRAZADO MANUAL
Y REPLANTEO C/EQUIPO m2 5.00
01.02.02 m2 5.00
0.00 0.00 0 0.00
02 ESTRUCTURAS 0 0.00
02.01
02.01.01 MOVIMIENTO DE TIERRAS
EXPLANACION Y NIVELACION DE TERRENO m30 0.00
02.01.02 REFINE DE TERRENO HASTA e= 0.10 m. m2 5.00
02.01.09 EXCAVACION PARA ZAPATAS m3 6.40
02.01.10 EXCAVACION PARA VIGA DE CIMENTACION m3 0.20
02.01.14 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO m3 2.20
02.01.18 ACARREO DE MATERIAL EXCEDENTE CON CARRETILLA D=30m m3 7.10
02.02 OBRAS DE CONCRETO SIMPLE 0 0.00
02.02.01 SOLADO DE 4" C°S° C:H - 1:10 m2 3.90
02.03 OBRAS DE CONCRETO ARMADO 0 0.00
02.03.01 ZAPATAS 0 0.00
02.03.01.01 ZAPATAS: CONCRETO F'C = 210 KG/CM2 m3 2.20
02.03.01.02 ZAPATAS: ACERO DE REFUERZO fy = 4200 Kg/cm2 kg 39.50
02.03.02 VIGA DE CIMENTACION 0 0.00
02.03.02.01 VIGAS DE CIMENTACION: CONCRETO F'C = 210 KG/CM2 m3 0.20
02.03.02.02 VIGAS
VIGAS DE
DE CIMENTACION:
CIMENTACION: ACERO DE REFUERZO
ENCOFRADO fy = 4200 Kg/cm2
Y DESENCOFRADO kg 16.70
02.03.02.03 m2 2.30
02.03.05 COLUMNAS 0 0.00
02.03.05.01 COLUMNAS: CONCRETO F'C = 210 KG/CM2 m3 3.80
02.03.05.02 COLUMNAS:
COLUMNAS: ACERO DE REFUERZO
ENCOFRADO fy = 4200 Kg/cm2
Y DESENCOFRADO kg 112.40
02.03.05.03 m2 8.20
02.03.08 VIGAS 0 0.00
02.03.08.01 VIGAS: CONCRETO F'C = 210 KG/CM2 m3 0.70
02.03.08.02 VIGAS:
VIGAS: ACERO DE REFUERZO
ENCOFRADO fy = 4200 Kg/cm2
Y DESENCOFRADO kg 38.70
02.03.08.03 m2 9.50
0.00 0.00 0 0.00
03 ARQUITECTURA 0 0.00
03.02 REVOQUES, ENLUCIDOS Y REVESTIMIENTOS 0 0.00
03.02.04 TARRAJEO DE COLUMNAS, E=1.5 CM CON MORTERO C:A 1:5 m2 8.20
03.02.05 TARRAJEO DE VIGAS, E=1.5 CM CON MORTERO C:A 1:5 m2 10.20
03.09 CARPINTERIA METALICA
PUERTA METÁLICA DE TUBO NEGRO RECTANGULAR SEGUN DISEÑO. INC. COLOCACION. 0 0.00
03.09.01 PUERTA DE INGRESO SEGUN DISEÑO. INC. COLOCACION. und 1.00
03.09.02 und 1.00
03.12 PINTURA PINTURA LATEX EN COLUMNAS, DERRAMES Y VIGAS , 2 MANOS 0 0.00
03.12.04 PINTURA OLEO MATE EN CONTRAZÓCALOS H=30cm , 2 MANOS m2 18.40
03.12.05 m2 1.00
03.12.06 PINTURA EN CARPINTERIA DE MADERA C/BARNIZ 2 MANOS m2 1.00
03.13 SEGURIDAD SEÑALIZACION 0 0.00
03.13.01 SEÑALIZACION CON STIKERT DE PLASTICO und 1.00
03.13.02 EXTINTOR DE INCENDIOS TIPO 3 de 6 Kg. und 1.00
03.14 VARIOS 0 0.00
03.14.08 INSIGNIA Y NOMENCLATURA DE LA I.E. CON PINTURA EN OLEO MATE GLB 1.00
0.00 0.00 0 0.00
0.00 0.00 0.00
0.00 0.00 0 0.00
0.00 0.00 0
0.00 0.00 0
0.00 0.00 0
0.00 0.00 0
0.00 0

RES. PORTADA
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
PARTIDA DESCRIPCIÓN UND elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und

VOLUMEN 01: INFRAESTRUCTURA


#REF!
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y
01.02 TRABAJOS PRELIMINARES
01.02.01 LIMPIEZA DE TERRENO MANUAL m2 5.00
PORTADA DE INGRESO m2 1.00 4.50 1.10 1.00 4.95

NIVELACION, TRAZADO Y REPLANTEO C/EQUIPO


01.02.02 m2 5.00
PORTADA DE INGRESO m2 1.00 4.50 1.10 1.00 4.95

02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
02.01.02 REFINE DE TERRENO HASTA e= 0.10 m. m2 5.00
PORTADA DE INGRESO m2 1.00 4.50 1.10 1.00 4.95

02.01.09 EXCAVACION PARA ZAPATAS m3 6.40


Z-P m3 3.00 1.10 1.10 1.75 1.00 6.35

02.01.10 EXCAVACION PARA VIGA DE CIMENTACION m3 0.20


VIGAS m3 1.00 1.95 0.15 0.60 1.00 0.18

02.01.11
02.01.13 EXCAVACION
RELLENO PARA CIMIENTOS
COMPACTADO CORRIDOS
CON MATERIAL AFIRMADO m3
02.01.14 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONA m3 2.20
Z-P m3 3.00 1.10 1.10 0.60 1.00 2.18

02.01.18 ACARREO DE MATERIAL EXCEDENTE CON CARRETILLA D=30m m3 VOLUMEN 7.10


CORTE Y REFINE DE TERRENO HASTA E= m3 1.00 0.50 1.00 0.50
EXCAVACION PARA ZAPATAS m3 1.00 6.40 1.00 6.40
EXCAVACION PARA VIGAS DE CIMENTACI m3 1.00 0.20 1.00 0.20

02.02 OBRAS DE CONCRETO SIMPLE


02.02.01 SOLADO DE 4" C°S° C:H - 1:10 m2 3.90
Z-P m2 3.00 1.10 1.10 1.00 3.63
VIGAS DE CIMENTACION m2 1.00 1.95 0.15 1.00 0.29

02.03 OBRAS DE CONCRETO ARMADO


02.03.01 ZAPATAS
02.03.01.01 ZAPATAS: CONCRETO F'C = 210 KG/CM2 m3 2.20
Z-P m3 3.00 1.10 1.10 0.60 1.00 2.18

02.03.01.02 ZAPATAS: ACERO DE REFUERZO fy = 4200 Kg/cm2 kg 39.50


Z-P Peso (kg/m) #pieza
Ø 1/2" kg 3.00 0.95 0.99 7.00 19.75
Ø 1/2" kg 3.00 0.95 0.99 7.00 19.75

02.03.02 VIGA DE CIMENTACION


02.03.02.01 VIGAS DE CIMENTACION: CONCRETO F'C = 210 KG/CM2 m3 0.20
viga de cimentacion m3 1.00 1.95 0.15 0.60 1.00 0.18

02.03.02.02 VIGAS DE CIMENTACION: ACERO DE REFUERZO fy = 4200 K kg 16.70


Acero principal 01 Estribos 1
Recubrimiento Laterales 0.04 Recubrimiento 0.04
X 0.15
0.25
Empalme 0.00 0.60

RELLENO COMPACTADO CON MATERIAL AFIRMADO PARA VEREDAS

viga de cimentacion kg 1.00 1.95 Peso (kg/mt)


# Piezas
6 Ø 3/8" kg 1.00 2.37 0.56 6.00 7.96
estribo Ø 8mm 1@ 0.05, 3@ 0.1 kg 1.00 1.40 0.39 16.00 8.74

VIGAS DE CIMENTACION: ENCOFRADO Y DESENCOFRADO


02.03.02.03 m2 #caras 2.30
viga de cimentacion m2 1.00 1.95 0.60 2.00 2.34

02.03.05 COLUMNAS
02.03.05.01 COLUMNAS: CONCRETO F'C = 210 KG/CM2 m3 AREA 3.80
CC1 m3 1.00 0.38 3.40 1.00 1.28
m3 1.00 0.38 3.40 1.00 1.28
m3 1.00 0.38 3.40 1.00 1.28

02.03.05.02 COLUMNAS: ACERO DE REFUERZO fy = 4200 Kg/cm2 kg 112.40


COLUMNA (C3)
Recubrimiento Laterales 0.040 Estribos 1
Empalme 0.000 Recubrimie 0.04
0.30 0.25
5.06
3.21 4.90 5.83 0.60

0.30

guardiania Peso (kg/m) # Piezas


CC1
4 Ø 3/8" kg 1.00 0.56 5.42 4.00 12.14
estribo 1 Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0. kg 1.00 1.60 0.39 26.00 16.22
CC1
4 Ø 3/8" kg 1.00 0.56 16.48 4.00 36.92
estribo 1 Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0. kg 1.00 1.60 0.39 30.00 18.72
CC1

Sust portada
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
PARTIDA DESCRIPCIÓN UND elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
4 Ø 3/8" kg 1.00 0.56 5.42 4.00 12.14
estribo 1 Ø 8mm 1@ 0.05, 4@ 0.10, R@ 0. kg 1.00 1.60 0.39 26.00 16.22

COLUMNAS: ENCOFRADO Y DESENCOFRADO


02.03.05.03 m2 #caras 8.20
CC1 m2 1.00 0.80 3.40 1.00 2.72
m2 1.00 0.80 3.40 1.00 2.72
m2 1.00 0.80 3.40 1.00 2.72

02.03.08 VIGAS
02.03.08.01 VIGAS: CONCRETO F'C = 210 KG/CM2 m3 0.70
portada parte superior m3 1.00 4.46 0.15 0.45 1.00 0.30
m3 1.00 3.30 0.15 0.45 1.00 0.22
m3 1.00 2.10 0.15 0.45 1.00 0.14

02.03.08.02 VIGAS: ACERO DE REFUERZO fy = 4200 Kg/cm2 kg 38.70


Acero principal 01 Estribos 3
Recubrimiento Laterales 0.02 Recubrimiento 0.04
X 0.15 0.15 0.15
0.15
Empalme 0.00 0.45 0.90 1.35

COLUMNAS: CONCRETO F'C = 210 KG/CM2


CC1 kg 1.00 4.46 Peso (kg/mt)
# Piezas
2 Ø 3/8" kg 1.00 4.72 0.56 2.00 5.29
estribo Ø 3/8" 1@ 0.05, 5@ 0.10, kg 1.00 1.10 0.56 4.00 2.46
CC1 kg 1.00 3.30 Peso (kg/mt)
# Piezas
2 Ø 3/8" kg 1.00 3.56 0.56 2.00 3.99
estribo Ø 3/8" 1@ 0.05, 5@ 0.10, kg 1.00 2.00 0.56 6.00 6.72
CC1 kg 1.00 2.10 Peso (kg/mt)
# Piezas
2 Ø 3/8" kg 1.00 2.36 0.56 3.00 3.96
estribo Ø 3/8" 1@ 0.05, 5@ 0.10, kg 1.00 2.90 0.56 10.00 16.24

VIGAS: ENCOFRADO Y DESENCOFRADO


02.03.08.03 m2 #caras 9.50
vigas m2 1.00 4.46 - 0.45 2.00 4.01
m2 1.00 4.46 0.15 - 1.00 0.67
m2 1.00 3.30 - 0.45 2.00 2.97
m2 1.00 2.10 - 0.45 2.00 1.89

03 ARQUITECTURA
03.02 REVOQUES, ENLUCIDOS Y REVESTIMIENTOS
03.02.04 TARRAJEO DE COLUMNAS, E=1.5 CM CON MORTERO C:A 1:5 m2 8.20
CC1 m2 1.00 0.80 3.40 1.00 2.72
m2 1.00 0.80 3.40 1.00 2.72
m2 1.00 0.80 3.40 1.00 2.72

03.02.05 TARRAJEO DE VIGAS, E=1.5 CM CON MORTERO C:A 1:5 m2 #lados 10.20
vigas m2 1.00 4.46 - 0.45 2.00 4.01
m2 1.00 4.46 0.15 - 2.00 1.34
m2 1.00 3.30 - 0.45 2.00 2.97
m2 1.00 2.10 - 0.45 2.00 1.89

03.09 CARPINTERIA METALICA


PUERTA METÁLICA DE TUBO NEGRO RECTANGULAR SEGUN DISEÑO. INC. COLOCACION.
03.09.01 und 1.00
puerta metalica und 1.00 1.00 1.00

PUERTA DE INGRESO SEGUN DISEÑO. INC. COLOCACION.


03.09.02 und 1.00
puerta de ingreso und 1.00 1.00 1.00

03.12 PINTURA PINTURA LATEX EN COLUMNAS, DERRAMES Y VIGAS , 2 MANOS


03.12.04 m2 18.40
ver metrados de tarrajeos detalle
columnas m2 1.00 8.20 1.00 8.20
vigas m2 1.00 10.20 1.00 10.20

03.14 VARIOS
03.14.08 INSIGNIA Y NOMENCLATURA DE LA I.E. CON PINTURA EN OL GLB 1.00
insignia GLB 1.00 1.00 1.00

Sust portada
RESUMEN METRADOS HALL DE INGRESO

I.E.I. : I.E.I N°1455 - PUEBLO NUEVO


UBICACIÓN : PUEBLO NUEVO - SAN BENITO - CONTUMAZÁ - CAJAMARCA
ELABORADO : 0

ITEMS DESCRIPCION UND METRADO


0.00 VOLUMEN 01: INFRAESTRUCTURA 0.00
#REF! #REF! 0.00
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
01.02 TRABAJOS PRELIMINARES 0 0.00
01.02.01 LIMPIEZA DE TERRENO
NIVELACION, TRAZADO MANUAL
Y REPLANTEO C/EQUIPO m2 28.60
01.02.02 m2 28.60
0.00 0.00 0 0.00
02 ESTRUCTURAS 0 0.00
02.01
02.01.01 MOVIMIENTO DE TIERRAS
EXPLANACION Y NIVELACION DE TERRENO 0
m3 0.00
02.01.02 REFINE DE TERRENO HASTA e= 0.10 m. m2 28.60
02.01.11
02.01.13 EXCAVACION
RELLENO PARA CIMIENTOS
COMPACTADO CORRIDOS
CON MATERIAL AFIRMADO m3 50.10
0.00
02.01.14 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO m3 16.10

RES. CERCO
RESUMEN METRADOS HALL DE INGRESO

I.E.I. : I.E.I N°1455 - PUEBLO NUEVO


UBICACIÓN : PUEBLO NUEVO - SAN BENITO - CONTUMAZÁ - CAJAMARCA
ELABORADO : 0

ITEMS DESCRIPCION UND METRADO


02.01.18 ACARREO DE MATERIAL EXCEDENTE CON CARRETILLA D=30m m3 53.00
02.01.19 ELIMINACION MATERIAL EXCDENTE C/MAQUINARIA m3 0.00
02.02 OBRAS DE CONCRETO SIMPLE 0 0.00
02.02.02 CIMIENTOS DE CONCRETO CICLOPERO 1:10 C-H + 30% P.G. máx. 8" m3 20.00
02.02.03 SOBRECIMIENTO DE CONCRETO F'C = 175 KG/CM2 m3 3.20
02.02.04 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2 42.90
02.03 OBRAS DE CONCRETO ARMADO 0 0.00
02.03.03 VIGAS ARRIOSTRE 0 0.00
02.03.03.01 VIGAS DE ARRIOSTRE: CONCRETO F'C = 175 KG/CM2 m3 4.30
02.03.03.02 VIGAS
VIGAS DE
DE ARRIOSTRE:
ARRIOSTRE: ACERO DE REFUERZO
ENCOFRADO fy = 4200 Kg/cm2
Y DESENCOFRADO kg 297.80
02.03.03.03 m2 57.20
02.03.05 COLUMNAS 0 0.00
02.03.05.01 COLUMNAS: CONCRETO F'C = 210 KG/CM2 m3 7.30
02.03.05.02 COLUMNAS:
COLUMNAS: ACERO DE REFUERZO
ENCOFRADO fy = 4200 Kg/cm2
Y DESENCOFRADO kg 1,738.70
02.03.05.03 m2 97.50
02.03.08 VIGAS 0 0.00
02.03.08.01 VIGAS: CONCRETO F'C = 210 KG/CM2 m3 3.70
02.03.08.02 VIGAS:
VIGAS: ACERO DE REFUERZO
ENCOFRADO fy = 4200 Kg/cm2
Y DESENCOFRADO kg 366.90
02.03.08.03 m2 49.20
0.00 0.00 0 0.00
03 ARQUITECTURA 0 0.00
03.01 MUROS Y TABIQUES DE ALBAÑILERIA 0 0.00
03.01.01 MURO DE SOGA LADRILLO DE ARCILLA 9x12x23 cm. MORTERO DOSIFICADO 1:4 m2 266.90
03.01.03 JUNTA SISMICA
ALAMBRE ENCORRUGADO
DE 1/4" TABIQUES E=1"
REFUERZO HORIZONTAL EN MUROS ml 69.00
03.01.04 kg 400.40
03.01.05 TAPAJUNTA CON JEBE MICROPOROSO EN JUNTA SISMICA DE 1" ml 138.00
03.02 REVOQUES, ENLUCIDOS Y REVESTIMIENTOS 0 0.00
03.02.04 TARRAJEO DE COLUMNAS, E=1.5 CM CON MORTERO C:A 1:5 m2 81.30
03.02.05 TARRAJEO DE VIGAS, E=1.5 CM CON MORTERO C:A 1:5 m2 49.20
03.05 CONTRAZOCALOS 0 0.00
03.05.01 CONTRAZOCALO DE CEMENTO PULID, H = 0.30 m. e=1.5 cm CON MORTERO C:A 1:2 ml 246.00
03.12 PINTURA PINTURA LATEX EN COLUMNAS, DERRAMES Y VIGAS , 2 MANOS 0 0.00
03.12.04 PINTURA OLEO MATE EN CONTRAZÓCALOS H=30cm , 2 MANOS m2 130.50
03.12.05 m2 246.00
0.00 0.00 0.00
0.00 0.00 0 0.00
0.00 0.00 0
0.00 0.00 0
0.00 0.00 0
0.00 0.00 0
RES. CERCO
0.00 0
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
PARTIDA DESCRIPCIÓN UND elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und

VOLUMEN 01: INFRAESTRUCTURA


#REF!
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARE
01.02 TRABAJOS PRELIMINARES
01.02.01 LIMPIEZA DE TERRENO MANUAL m2 28.60
tramo 1-2 m2 1.00 15.91 0.60 1.00 9.55
tramo 3-4 m2 1.00 31.79 0.60 1.00 19.07
NIVELACION, TRAZADO Y REPLANTEO C/EQUIPO
01.02.02 m2 28.60
tramo 1-2 m2 1.00 15.91 0.60 1.00 9.55
tramo 3-4 m2 1.00 31.79 0.60 1.00 19.07

02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
02.01.02 REFINE DE TERRENO HASTA e= 0.10 m. m2 28.60
cerco perimetrico m2 1.00 15.91 0.60 1.00 9.55
m2 1.00 31.79 0.60 1.00 19.07

02.01.11 EXCAVACION PARA CIMIENTOS CORRIDOS m3 50.10


cerco perimetrico m3 1.00 15.91 0.60 1.75 1.00 16.71
m3 1.00 31.79 0.60 1.75 1.00 33.38

02.01.14 RELLENO COMPACTADO CON MATERIAL PR m3 16.10


cerco perimetrico m3 1.00 15.91 0.45 0.75 1.00 5.37
m3 1.00 31.79 0.45 0.75 1.00 10.73

02.01.18 ACARREO DE MATERIAL EXCEDENTE CON C m3 volumen 53.00


CORTE Y REFINE DE TERREN m3 1.00 2.86 1.00 2.86
EXCAVACION PARA CIMIEN m3 1.00 50.10 1.00 50.10

02.02 OBRAS DE CONCRETO SIMPLE


02.02.02 CIMIENTOS DE CONCRETO CICLOPERO 1:10 m3 20.00
cerco perimetrico m3 1.00 15.91 0.60 0.70 1.00 6.68
m3 1.00 31.79 0.60 0.70 1.00 13.35

02.02.03 SOBRECIMIENTO DE CONCRETO F'C = 175 m3 3.20


cerco perimetrico m3 1.00 15.91 0.15 0.45 1.00 1.07
m3 1.00 31.79 0.15 0.45 1.00 2.15

02.02.04 ENCOFRADO Y DESENCOFRADO PARA SOBR m2 #caras 42.90


cerco perimetrico m2 1.00 15.91 0.45 2.00 14.32
m2 1.00 31.79 0.45 2.00 28.61

02.03 OBRAS DE CONCRETO ARMADO


02.03.03 VIGAS ARRIOSTRE
02.03.03.01 VIGAS DE ARRIOSTRE: CONCRETO F'C = m3 4.30
cerco perimetrico m3 1.00 15.91 0.15 0.60 1.00 1.43
m3 1.00 31.79 0.15 0.60 1.00 2.86

02.03.03.02 VIGAS DE ARRIOSTRE: ACERO DE REFUER kg 297.80


Acero principal 01 Estribos 1
Recubrimiento Laterales 0.04 Recubrimiento 0.04
X 0.15
0.12
Empalme 0.00 0.60

SOBRECIMIENTO DE CONCRETO F'C


viga kg 1.00 15.91 Peso (kg/mt)
# Piezas
6 Ø 3/8" kg 1.00 16.07 0.56 6.00 54.00
estribo Ø 8mm 1 kg 1.00 1.40 0.39 86.00 46.96
viga kg 1.00 31.79
6 Ø 3/8" kg 1.00 31.95 0.56 6.00 107.35
estribo Ø 8mm 1 kg 1.00 1.40 0.39 164.00 89.54

VIGAS DE ARRIOSTRE: ENCOFRADO Y DESENCOFRADO


02.03.03.03 m2 #caras 57.20
cerco perimetrico m2 1.00 15.91 0.60 2.00 19.09
m2 1.00 31.79 0.60 2.00 38.15

02.03.05 COLUMNAS
02.03.05.01 COLUMNAS: CONCRETO F'C = 210 KG/CM2 m3 7.30
columnas AREA
tramo 1-2 m3 6.00 0.04 3.00 1.00 0.68
tramo 3.4 m3 12.00 0.04 3.00 1.00 1.35
columnas EN MC
tramo 1-2 m3 5.00 0.04 3.00 1.00 0.56
tramo 2-3 m3 22.00 0.04 3.00 1.00 2.48
tramo 3-1 m3 20.00 0.04 3.00 1.00 2.25

02.03.05.02 COLUMNAS: ACERO DE REFUERZO fy = 42 kg 1,738.70


COLUMNA (C3)
Recubrimiento Laterales 0.040 Estribos 1
Empalme 0.000 Recubrimie 0.04
### 0.15

3.50 4.45 0.25

Sust cerco
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
PARTIDA DESCRIPCIÓN UND elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
###

columnas Peso (kg/m) # Piezas


tramo 1-2 kg 6.00
4 Ø 1/2" kg 6.00 0.99 4.67 4.00 110.96
estribo 1 Ø 3/8" kg 6.00 0.70 0.56 28.00 65.86
tramo 3.4 kg 12.00
4 Ø 1/2" kg 12.00 0.99 4.67 4.00 221.92
estribo 1 Ø 3/8" kg 12.00 0.70 0.56 28.00 131.71
columnas EN MC
tramo 1-2 kg 5.00
4 Ø 1/2" kg 5.00 0.99 3.72 4.00 73.66
estribo 1 Ø 3/8" kg 5.00 0.70 0.56 28.00 54.88
tramo 2-3 kg 22.00
4 Ø 1/2" kg 22.00 0.99 3.72 4.00 324.09
estribo 1 Ø 3/8" kg 22.00 0.70 0.56 28.00 241.47
tramo 3-1 kg 20.00
4 Ø 1/2" kg 20.00 0.99 3.72 4.00 294.62
estribo 1 Ø 3/8" kg 20.00 0.70 0.56 28.00 219.52

COLUMNAS: ENCOFRADO Y DESENCOFRADO


02.03.05.03 m2 97.50
columnas PERIMETRO
tramo 1-2 m2 6.00 0.50 3.00 1.00 9.00
tramo 3.4 m2 12.00 0.50 3.00 1.00 18.00
columnas EN MC
tramo 1-2 m2 5.00 0.50 3.00 1.00 7.50
tramo 2-3 m2 22.00 0.50 3.00 1.00 33.00
tramo 3-1 m2 20.00 0.50 3.00 1.00 30.00

02.03.08 VIGAS
02.03.08.01 VIGAS: CONCRETO F'C = 210 KG/CM2 m3 3.70
tramo 1-2 m3 1.00 9.90 0.15 0.20 1.00 0.30
m3 1.00 11.93 0.15 0.20 1.00 0.36
tramo 2-3 m3 1.00 36.33 0.15 0.20 1.00 1.09
tramo 3-4 m3 1.00 31.79 0.15 0.20 1.00 0.95
tramo 4-1 m3 1.00 33.05 0.15 0.20 1.00 0.99

02.03.08.02 VIGAS: ACERO DE REFUERZO fy = 4200 K kg 366.90


Acero principal 01 Estribos 1
Recubrimiento Laterales 0.02 Recubrimiento 0.03
X 0.15
0.10
Empalme 0.45 0.20

VIGAS
tramo 1-2 kg 1.00 9.90 Peso (kg/mt)
# Piezas
4 Ø 3/8" kg 1.00 10.51 0.56 4.00 23.54
estribo Ø 6mm 1 kg 1.00 0.72 0.22 48.00 7.60
0.00 kg 1.00 11.93
4 Ø 3/8" kg 1.00 12.54 0.56 4.00 28.09
estribo Ø 6mm 1 kg 1.00 0.72 0.22 56.00 8.87
tramo 2-3 kg 1.00 36.33
4 Ø 3/8" kg 1.00 36.94 0.56 4.00 82.75
estribo Ø 6mm 1 kg 1.00 0.72 0.22 154.00 24.39
tramo 3-4 kg 1.00 31.79
4 Ø 3/8" kg 1.00 32.40 0.56 4.00 72.58
estribo Ø 6mm 1 kg 1.00 0.72 0.22 136.00 21.54
tramo 4-1 kg 1.00 33.05
4 Ø 3/8" kg 1.00 33.66 0.56 4.00 75.40
estribo Ø 6mm 1 kg 1.00 0.72 0.22 140.00 22.18

VIGAS: ENCOFRADO Y DESENCOFRADO


02.03.08.03 m2 #CARAS 49.20
tramo 1-2 m2 1.00 9.90 0.20 2.00 3.96
m2 1.00 11.93 0.20 2.00 4.77
tramo 2-3 m2 1.00 36.33 0.20 2.00 14.53
tramo 3-4 m2 1.00 31.79 0.20 2.00 12.72
tramo 4-1 m2 1.00 33.05 0.20 2.00 13.22

03 ARQUITECTURA
03.01 MUROS Y TABIQUES DE ALBAÑILERIA
03.01.01 MURO DE SOGA LADRILLO DE ARCILLA 9x1 m2 266.90
tramo 1-2 m2 1.00 8.40 2.50 1.00 21.00
m2 1.00 10.68 2.50 1.00 26.70
tramo 2-3 m2 1.00 30.83 2.50 1.00 77.08
tramo 3-4 m2 1.00 28.79 2.50 1.00 71.98
tramo 4-1 m2 1.00 28.05 2.50 1.00 70.13

03.01.03 JUNTA SISMICA EN TABIQUES E=1" ml 69.00


tramo 1-2 ml 2.00 3.00 1.00 6.00
ml 4.00 3.00 1.00 12.00
tramo 2-3 ml 7.00 3.00 1.00 21.00
tramo 3-4 ml 3.00 3.00 1.00 9.00
tramo 4-1 ml 7.00 3.00 1.00 21.00

ALAMBRE DE 1/4" CORRUGADO REFUERZO HORIZONTAL EN MUROS


03.01.04 kg factor/ kg 400.40
area de muros de soga kg 1.00 6.00 0.25 1.00 266.90 400.35

03.01.05 TAPAJUNTA CON JEBE MICROPOROSO EN JU ml #lados 138.00


tramo 1-2 ml 2.00 3.00 2.00 12.00
ml 4.00 3.00 2.00 24.00
tramo 2-3 ml 7.00 3.00 2.00 42.00
tramo 3-4 ml 3.00 3.00 2.00 18.00
tramo 4-1 ml 7.00 3.00 2.00 42.00

Sust cerco
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
PARTIDA DESCRIPCIÓN UND elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und

03.02 REVOQUES, ENLUCIDOS Y REVESTIMIENTOS


03.02.04 TARRAJEO DE COLUMNAS, E=1.5 CM CON M m2 81.30
columnas perimetro
tramo 1-2 m2 6.00 0.50 2.50 1.00 7.50
tramo 3.4 m2 12.00 0.50 2.50 1.00 15.00
columnas EN MC
tramo 1-2 m2 5.00 0.50 2.50 1.00 6.25
tramo 2-3 m2 22.00 0.50 2.50 1.00 27.50
tramo 3-1 m2 20.00 0.50 2.50 1.00 25.00

03.02.05 TARRAJEO DE VIGAS, E=1.5 CM CON MORTE m2 #CARAS 49.20


tramo 1-2 m2 1.00 9.90 0.20 2.00 3.96
0.00 m2 1.00 11.93 0.20 2.00 4.77
tramo 2-3 m2 1.00 36.33 0.20 2.00 14.53
tramo 3-4 m2 1.00 31.79 0.20 2.00 12.72
tramo 4-1 m2 1.00 33.05 0.20 2.00 13.22

03.05 CONTRAZOCALOS
03.05.01 CONTRAZOCALO DE CEMENTO PULID, H = 0 ml 246.00
exterior y interior #lados
tramo 1-2 ml 1.00 9.90 2.00 19.80
0.00 ml 1.00 11.93 2.00 23.86
tramo 2-3 ml 1.00 36.33 2.00 72.66
tramo 3-4 ml 1.00 31.79 2.00 63.58
tramo 4-1 ml 1.00 33.05 2.00 66.10

03.12 PINTURA PINTURA LATEX EN COLUMNAS, DERRAMES Y VIGAS , 2 MANOS


03.12.04 m2 130.50
VER METRADOS DE TARRAJEOS detalle
COLUMNAS m2 1.00 81.30 1.00 81.30
VIGAS m2 1.00 49.20 1.00 49.20

PINTURA OLEO MATE EN CONTRAZÓCALOS H=30cm , 2 MANOS


03.12.05 m2 246.00
VER METRADO DE CONTRAZOCALOS detalle
contrazocalos m2 1.00 246.00 1.00 246.00

Sust cerco
RESUMEN METRADOS MUROS DE CONTENCION

I.E.I. : I.E.I N°1455 - PUEBLO NUEVO


UBICACIÓN : PUEBLO NUEVO - SAN BENITO - CONTUMAZÁ - CAJAMARCA
ELABORADO : 0

ITEMS DESCRIPCION UND METRADO


0.00 VOLUMEN 01: INFRAESTRUCTURA 0.00
#REF! #REF! 0.00
0.00 0.00 0 0.00
02 ESTRUCTURAS 0 0.00
02.01 MOVIMIENTO DE TIERRAS 0 0.00
02.01.08 EXCAVACION PARA MUROS DE CONTENCION m3 239.70
02.01.13 RELLENO COMPACTADO CON MATERIAL AFIRMADO m3 155.80
02.02 OBRAS DE CONCRETO SIMPLE 0 0.00
02.02.09 MUROS DE CONTENCION, CONCRETO 1:10+30%PG m3 22.40
02.02.10 MUROS DE CONTENCION: ENCOFRADO Y DESENCOFRADO m2 64.70
02.03 OBRAS DE CONCRETO ARMADO 0 0.00
02.03.04 MUROS DE CONTENCION 0 0.00
02.03.04.01 MUROS DE CONTENCION: CONCRETO F'C = 175 KG/CM2 m3 151.80
02.03.04.02 MUROS DE CONTENCION: ACERO DE REFUERZO fy = 4200 Kg/cm2 kg 8,948.60
02.03.04.03 MUROS DE CONTENCION: ENCOFRADO Y DESENCOFRADO (DOS CARAS) m2 294.60
0.00 0.00 0 0.00
03 ARQUITECTURA 0 0.00
03.14 VARIOS 0 0.00
03.14.09 GEODREN PARA MURO m2 287.00
03.14.10 TUBERIA DE DRENAJE PERFORADO HDPE Ø=4" ml 79.40
03.14.11 TUBERIA DE DRENAJE PVC-SAL 2" EN MURO D/CONCRETO ml 41.50
03.14.12 JUNTA SISMICA E=1" CON TEKNOPORT ml 68.50
03.14.13 CURADO CON ADITIVO QUIMICO EN CONCRETO m2 300.60
0.00 0.00 0.00
0.00 0.00 0 0.00
0.00 0.00 0
0.00 0.00 0
0.00 0.00 0
0.00 0.00 0
0.00 0

RES. M. CONTENCION
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
PARTIDA DESCRIPCIÓN UND elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und

VOLUMEN 01: INFRAESTRUCTURA


#REF!

02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS 273.70
02.01.08 EXCAVACION PARA MUROS DE CONTENCION m3 239.70
tramo 1-2 m3 1.00 10.00 2.10 0.70 1.00 14.70
tramo 2-3 m3 1.00 36.33 1.70 0.70 1.00 43.23
tramo 4-1 m3 1.00 33.05 2.20 2.50 1.00 181.78

166.70
02.01.13 RELLENO COMPACTADO CON MATERIAL AFIR m3 area 155.80
tramo 1-2 m3 1.00 10.00 1.55 - 1.00 15.50
tramo 2-3 m3 1.00 36.33 1.88 - 1.00 68.30
tramo 4-1 m3 1.00 33.05 2.18 - 1.00 72.05

5.00
02.02 OBRAS DE CONCRETO SIMPLE
02.02.09 MUROS DE CONTENCION, CONCRETO 1:10+3 m3 area 22.40
tramo 1-2 m3 1.00 10.00 2.24 - 1.00 22.40

02.02.10 MUROS DE CONTENCION: ENCOFRADO Y DES m2 64.70


tramo 1-2 m2 2.00 10.00 3.00 1.00 60.00
m2 3.00 - 1.56 - 1.00 4.68

02.03 OBRAS DE CONCRETO ARMADO


02.03.04 MUROS DE CONTENCION
02.03.04.01 MUROS DE CONTENCION: CONCRETO F'C = m3 AREA 151.80
tramo 2-3 m3 1.00 36.33 1.19 1.00 43.05
tramo 4-1 m3 1.00 33.05 3.29 1.00 108.73

02.03.04.02 MUROS DE CONTENCION: ACERO DE REFUER kg 8,948.60


MC-5.0A
0.49
Recubrimiento Laterales
0.040
Empalme 0.00
6.66 5
3.52
0.37

Ø (pulg)Peso (kg/m)#piezas
AS4 kg 7.00 4.18 5/8" 1.55 34.00 1,542.00
AS3 kg 7.00 4.18 1/2" 0.99 34.00 984.89
AST kg 7.00 5.66 1/2" 0.99 28.00 1,098.27
AS1 kg 7.00 5.41 5/8" 1.55 30.00 1,760.96
AS2 kg 7.00 1.30 5/8" 1.55 30.00 423.15
ASM kg 7.00 5.41 1/2" 0.99 18.00 674.84
Ad1 kg 7.00 5.66 1/2" 0.99 15.00 588.36
Ad2 kg 7.00 5.66 3/8" 0.56 14.00 310.62
MC-3.5R
0.17
Recubrimiento Laterales
0.040
Empalme 0.00
6.66 3
1.7
0.22

Ø (pulg)Peso (kg/m)#piezas
AS4 kg 7.00 2.06 3/8" 0.56 30.00 242.26
AS3 kg 7.00 2.06 3/8" 0.56 30.00 242.26
AST kg 7.00 5.36 3/8" 0.56 12.00 252.13
AS1 kg 7.00 3.26 3/8" 0.56 34.00 434.49
ASM kg 7.00 1.15 3/8" 0.56 18.00 81.14
Ad1 kg 7.00 3.26 3/8" 0.56 13.00 166.13
Ad2 kg 7.00 5.36 3/8" 0.56 7.00 147.08

02.03.04.03 MUROS DE CONTENCION: ENCOFRADO Y D m2 294.60


tramo 2-3 m2 1.00 36.33 3.50 1.00 127.16
area m2 1.00 - 1.48 1.00 1.48
tramo 4-1 m2 1.00 33.05 5.00 1.00 165.25
area m2 1.00 - 0.68 1.00 0.68

03.14 VARIOS
03.14.09 GEODREN PARA MURO m2 287.00
tramo 1-2 m2 1.00 10.00 2.37 1.00 23.70
MUROS DE CONTENCIO ARMADOS m2
tramo 2-3 m2 1.00 36.33 3.20 1.00 116.26
tramo 4-1 m2 1.00 33.05 4.45 1.00 147.07

03.14.10 TUBERIA DE DRENAJE PERFORADO HDPE Ø=4" ml 79.40


tramo 1-2 ml 1.00 10.00 1.00 10.00
MUROS DE CONTENCIO ARMADOS ml
tramo 2-3 ml 1.00 36.33 1.00 36.33
tramo 4-1 ml 1.00 33.05 1.00 33.05

Sust m. contencion
PABELLÓN 1: 02 AU + SS.HH. + ESC. + CISTERNA + ASCENSOR / ADMINIS. + ESC. + ASCENSOR

I.E.I. :
Ubicación : FECHA : Corregido Diciembre 2016
Elaborado por : Rt = 1.23 kg/cm² Df = 1.20 m
Planos de referencia : AG-04, AG-05, E-22, E-23, E-24, E-25, E-26, E-27, E-28, E-29, E-30, E-31, E-32, E-33, A-01, A-02, A-03, A-04

MEDIDAS Metrado
PARTIDA DESCRIPCIÓN UND elem. PARCIAL TOTAL
LARGO ANCHO ALTO log. Area vol. Kg und
03.14.11 TUBERIA DE DRENAJE PVC-SAL 2" EN MURO ml #tramos 41.50
tramo 1-2 ml 5.00 1.35 2.00 13.50
MUROS DE CONTENCIO ARMADOS ml
tramo 2-3 ml 5.00 0.50 7.00 17.50
tramo 4-1 ml 5.00 0.70 3.00 10.50

03.14.12 JUNTA SISMICA E=1" CON TEKNOPORT ml #tramos 68.50


tramo 1-2 ml 3.00 3.00 1.00 9.00
MUROS DE CONTENCIO ARMADOS ml
tramo 2-3 ml 7.00 5.00 1.00 35.00
tramo 4-1 ml 7.00 3.50 1.00 24.50

03.14.13 CURADO CON ADITIVO QUIMICO EN CONCRET m2 300.60


MG m2 #tramos
MC m2 1.00 10.00 3.36 1.00 33.60
m2 1.00 36.33 3.20 1.00 116.26
m2 1.00 33.05 4.56 1.00 150.71

Sust m. contencion

You might also like