Proposed Tower E “Navitas ” (G+13 Storey Building) At "Akoya

PROJECT Oxygen" On Plot. No. AO.MU.002, At Al Yufrah 2, Dubai U.A.E


(Project Code:P106.20)

CLIENT Front Line Investment Management Llc

CONSULTANT Lacasa Architects & Engineering Consultants

MAIN CONTRACTOR Al Qandeel Contracting CO. L.L.C

MEP CONTRACTOR Mac Electromechanical Engineering Contracting L.L.C

PRODUCT PIPE SUPPORTS


INDEX

1. Reply to Consultant Comments


2. Brief description of material.
3. Project Specs.
4. Vendor list.
5. B.O.Q.
6. Compliance statement.
7. Schedule of material.
8. Product catalogue.
9. Authorities’ approval.
10. Product Certificates.
11. Warranty.
12. Spare parts list.
13. Supplier Profile.
14. Chilled Water Riser Calculation
15. Previous Approvals
16. Country of Origin

P.O. Box No. 261738, RM 404 Pinnacle Bldg, Shk Zayed Road, Al Barsha, Dubai, U.A.E.

TEL. : 00971 4 3957772, FAX: 00971 4 3957773 e-mail:enquiry@fischer.ae , Website: www.fischer.ae


1. REPLY TO CONSULTANT
COMMENTS
fischer FZE
PO Box 261738 Tel: +971 4 8837477
Jebel Ali Freezone Fax: +971 4 8837476
Dubai technical@fischer.ae
REPLY TO CONSULTANT COMMENTS
UNITED ARAB EMIRATES www.fischer.ae

Proposed Tower E “Navitas ” (G+13 Storey Building) at "Akoya Oxygen" on Plot. No. AO.MU.002,
PROJECT:
at Al Yufrah 2, Dubai U.A.E (Project Code:P106.20)
CLIENT: Front Line Investment Management LLC
ENGINEER: LACASA Architects & Engineering Consultants
Main Cont.: Al Qandeel Contracting CO. L.L.C
MEP Cont.: MAC ELECTROMECHANICAL ENGINEERING LLC.

SL. No Consultant Comments Fischer Response

Contractor shall copy same the specification paragraph to complaince sheet without
Comply, compliance will be provided for entire
1 any modification or deletion of specification words. Any modification or deletions of
specification
specifications words will be considered as a violation to contract documents.
Provide accurate support proposal for chilled water system in compliance with project
Comply, Details will be provided in Schedule of
2 specification clause 2.1.4A for horizontal pipe installations, vertical pipes instalation
materials
and pipes intalation within plant rom
Provide accurate support selection/proposal compatible with project requirements
inline with project specification. Provide support selection for following services :
- Chilled water system as per pipe sizes as specified in clause 2.1.4 A
- Chilled water system riser clamp Comply, Details will be provided in Schedule of
3
- Insulated cold cooled water supply materials
- Insulated Hot water supply system
- Drainage system
- Water supply system
4 Provide compliance statement for clause 3.3 "Vertical Supports" Comply
Povide compliance ststement for clause 2.1.8 "Support Insulators". Proivde the
Comply, test certificates for Rubber inserts
5 speciifcation for the compliance statement and test certificate for load and
attached
temeprature.

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : 00971 4 8837477, Fax: 00971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae
fischer FZE
PO Box 261738 Tel: +971 4 8837477
Jebel Ali Freezone Fax: +971 4 8837476
Dubai technical@fischer.ae
UNITED ARAB EMIRATES www.fischer.ae REPLY TO CONSULTANT COMMENTS

Proposed Tower E “Navitas ” (G+13 Storey Building) at "Akoya Oxygen" on Plot. No. AO.MU.002,
PROJECT:
at Al Yufrah 2, Dubai U.A.E (Project Code:P106.20)
CLIENT: Front Line Investment Management LLC
ENGINEER: LACASA Architects & Engineering Consultants
Main Cont.: Al Qandeel Contracting CO. L.L.C
MEP Cont.: MAC ELECTROMECHANICAL ENGINEERING LLC.

SL. No Consultant Comments Fischer Response

1 The submittal should include a copy of tender sepcification Comply


2 Provide specification compliance statement for all pecification clauses Comply
Comply, details given in the compliance
Indicate in compliance statement the proposed supports type, specification , model,
3 statement and also Index 2 - Brief description
number for each pipe size wit catalogue page No.
of materials
Provide schedule of the proposed materials indicating the service, pipe size , support
4 Comply
model No. and Catalogue Page no.
5 Provide sample board for the proposed materials along with material sumittals Sample board will be provided
The submittal should be stamped by main contractor and MEP contractor in additional
6 Noted
to supplier stamp
Comply, country of origin attached in the
7 Provide the copy of origin certificate
submittals

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : 00971 4 8837477, Fax: 00971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae
2. BRIEF DESCRIPTION OF
MATERIAL
PRODUCT NAME DESCRIPTION

RUBBER LINED SPLIT CLAMPS FRSR

U BOLT
μ

μ
U STRAPS USP
μ

RUBBER SUPPORT INSERTS FRSI

μ
Clevis Hangers

Fix point Clamps FFPS & saddle FFPK

P.O. Box No. 261738, R/A 07- BA 01- 04, Jebel Ali Free Zone, Dubai, U.A.E

TEL. : 00971 4 883 7477, FAX: 00971 4 883 7476, e-mail: enquiry@fischer.ae , Website: www.fischer.ae
3. PROJECT SPECS
4. VENDOR LIST
NOT APPLICABLE
5. BOQ
NOT APPLICABLE
6. COMPLIANCE STATEMENT
PROJECT: Proposed Tower E “Navitas ” (G+13 Storey Building) at "Akoya Oxygen" on Plot. No. AO.MU.002, at Al Yufrah 2, Dubai U.A.E (Project Code:P106.20)
CLIENT: Front Line Investment Management LLC
ENGINEER: LACASA Architects & Engineering Consultants
Main Cont.: AlQandeel Contracting CO. L.L.C
MEP Cont.: MAC ELECTROMECHANICAL ENGINEERING LLC.
MAT Ref#
Revision
Proposed Material Compliance Statement Date
Status
Comply
S.N Specification Ref# Specification Supplier MAC Electromechanical
[Yes/No]

1.0 GENERAL

1.1 Reference

Conform to General Requirements for Mechanical Services of Division Fifteen Noted

1.2 Description of work

This Section includes piping supports complete for all piping systems except as otherwise
1.2.1 Yes Comply
specified.

1.3 Quality Control

1.3.1 Reference Standards

Noted , In principle the propose product comply


A British Heating & Ventilating Contractors Association recommendations with BS3974 product types. The clamps primarily
Comply with MSS SP 69/MSS SP 58

Noted , In principle the propose product comply


B Relevant British Standards. BS 3974 Specification for pipe supports. with BS3974 product types. The clamps primarily
Comply with MSS SP 69/MSS SP 58
PROJECT: Proposed Tower E “Navitas ” (G+13 Storey Building) at "Akoya Oxygen" on Plot. No. AO.MU.002, at Al Yufrah 2, Dubai U.A.E (Project Code:P106.20)
CLIENT: Front Line Investment Management LLC
ENGINEER: LACASA Architects & Engineering Consultants
Main Cont.: AlQandeel Contracting CO. L.L.C
MEP Cont.: MAC ELECTROMECHANICAL ENGINEERING LLC.
MAT Ref#
Revision
Proposed Material Compliance Statement Date
Status
Comply
S.N Specification Ref# Specification Supplier MAC Electromechanical
[Yes/No]

1.4 Submittals

A. All materials submittals shall include a detailed, clausewise, compliance statement.


B. All materials submittals shall include detailed catalogues, product literature and
descriptions of all equipment and fittings with selection charts, capacities etc.
C. All material submittals shall include copies of relevant standards.
D. Provide detailed shop drawings of the items of equipment being provided,
indicating the dimensions, materials and characteristics. Noted
E. Materials selection data to be submitted.
F. Shop drawings to include typical details for both vertical and horizontal pipe work
including locations.
G. Contractor to submit details and calculations of how proposed loads can be safely
accommodated by the structure.

2.0 PRODUCTS

Materials
All hangers, supports, anchors, and guides shall be in accordance with the British In principle the propose product comply with
2.1.1 Standard BS 3974. YES BS3974 product types. The clamps primarily
Comply with MSS SP 69/MSS SP 58
Proposed FRSR lined split clamps is having EPDM
Dielectric Protection. Furnish acceptable protection or copper plated hangers between
2.1.2 YES Dammgulast lining to avoid dissimilar contact of
ferrous and nonferrous metal pipe and hangers on all water piping.
materials

Proposed steel products are available in HDG finish


2.1.3 All pipes supports, hangers and associated accessories used inside plant rooms, shafts, YES
upon request by contractor.
roof, ceiling, air conditioned areas and in non air-conditioned areas shall be Hot dipped Galvanized to ASTM A153/153M.
PROJECT: Proposed Tower E “Navitas ” (G+13 Storey Building) at "Akoya Oxygen" on Plot. No. AO.MU.002, at Al Yufrah 2, Dubai U.A.E (Project Code:P106.20)
CLIENT: Front Line Investment Management LLC
ENGINEER: LACASA Architects & Engineering Consultants
Main Cont.: AlQandeel Contracting CO. L.L.C
MEP Cont.: MAC ELECTROMECHANICAL ENGINEERING LLC.
MAT Ref#
Revision
Proposed Material Compliance Statement Date
Status
Comply
S.N Specification Ref# Specification Supplier MAC Electromechanical
[Yes/No]

2.1.4 Hangers, Supports, Anchors And Guides.

Provide one of the following types of hangers for piping manufactured by one of the
approved makes.

A. Chilled water pipes

1. Horizontal installation:
Comply for proposed products. Proposed products
a) For Pipe size up to 2ӯ = Use split clamp with rubber support insert.
are Split Clamp with Rubber inlay, U Bolts, U straps
A b) For Pipe size 2 ½” Ø to 6” Ø = Use 100 x 50 x 5 mm C Channel and U Strap clamp with rubber support insert. YES
and Rubber Inserts
c) For Pipe size above 6” Ø = Use 125 x 6 mm C- Channel and Ustrap clamp with rubber support Insert.
Details will be provided in schedule of materials
d) For Individual pipe support above 2” Ø = Use clevis hanger support with rubber insert

All supports for main pipes within plant rooms shall be with spring type vibration isolators.

2. Vertical installation: Support vertical pipes on C- channel with U- Bolt.

B Drainage pipes: Use rubber lined split clamps. YES Proposed products FRSR Rubber lined split clamps

C Water supply pipes : Use rubber lined split clamps. YES Proposed products FRSR Rubber lined split clamps

Firefighting pipes:
1. Horizontal installation:
D Not Part of this submittal
a) For pipe size upto 2"= Use UL Listed/ FM Approved adjustable swivel ring.
b) For pipe size above 2"= Use UL Listed/ FM Approved clevis hanger.

D 2. Vertical installation: Support vertical pipes on C- channel with U- Bolt. YES Proposed products C Channels with U bolts
PROJECT: Proposed Tower E “Navitas ” (G+13 Storey Building) at "Akoya Oxygen" on Plot. No. AO.MU.002, at Al Yufrah 2, Dubai U.A.E (Project Code:P106.20)
CLIENT: Front Line Investment Management LLC
ENGINEER: LACASA Architects & Engineering Consultants
Main Cont.: AlQandeel Contracting CO. L.L.C
MEP Cont.: MAC ELECTROMECHANICAL ENGINEERING LLC.
MAT Ref#
Revision
Proposed Material Compliance Statement Date
Status
Comply
S.N Specification Ref# Specification Supplier MAC Electromechanical
[Yes/No]
Gas pipes: Not Part of this submittal
E YES
Support vertical carbon steel pipes on C- channel with U- Bolt, and horizontal carbon steel pipes with Split clamp.

For pipes 200 mm and larger, and where provision for expansion and contraction is required, provide single pipe roll support with two rods and
F Not in our product range
adjustable sockets. For pipes 150mm and smaller provide adjustable swivel pipe roll with one rod.

Provide trapeze hangers where several pipes can be installed parallel and at the same level, and fabricate from structural steel shapes. Use roller
chairs or pipe roll
stands where provision for expansion is required.
G 1. Spacing shall not be farther than the closest interval required for any size pipe supported thereby, or as necessary to prevent damage or failure Not Part of this submittal
to the structure.
2. Where there is doubt of the structural capacity for concentrated loads necessary structural calculations shall be carried out and the load
distributed sufficiently.

Copper Tubing Support.


1. Hangers Touching Pipe; provide copper plated, split ring extension hanger.
H Not Part of this submittal
2. Hangers on Outside of Insulation; furnish same as specified for steel pipe.
3. For un-insulated vertical lines, provide copper finished steel riser clamp or plastic coated steel riser clamp.

Floor Supports: Provide one of the following means of supporting horizontal piping
from floor:
1. Where bottom of piping is less than 450 mm above finished floor, furnish
I yes Comply
cast-iron pipe rests with pipe nipples to suit. Fasten to floor.
2. Contractor to fabricate galvanized steel frame to suit the site conditions to
the approval of the CONSULTANT.

Wall Supports. Provide one of the following means of supporting horizontal piping
from wall:
1. Furnish steel J hook for pipe located close to wall (up to 80 mm pipe).For
J hanger suspension with 280 kg maximum loading furnish light welded - yes Comply
steel bracket with hole for one rod, 19 mm diameter.
2. For pipe roll stand support, furnish welded steel brackets. The dimensions
of steel members to be used for brackets shall be suitable for the supported load and to consultant's approval

Beam Clamps:
A. Non"CStyle" beam clamps shall be malleable iron for 9.5 mm hanger rods, forged steel for hanger rod up to 38mm.
2.1.5 B. "CStyle" beam clamps shall be adjustable hanger rod type, malleable iron with set screw, jam nut, retaining clip, FM and UL approved. Not Part of this submittal
C. Where beam configuration does not allow horizontal movement of C clamp when set screw and jam nut are positioned, retaining clips may be
omitted.
PROJECT: Proposed Tower E “Navitas ” (G+13 Storey Building) at "Akoya Oxygen" on Plot. No. AO.MU.002, at Al Yufrah 2, Dubai U.A.E (Project Code:P106.20)
CLIENT: Front Line Investment Management LLC
ENGINEER: LACASA Architects & Engineering Consultants
Main Cont.: AlQandeel Contracting CO. L.L.C
MEP Cont.: MAC ELECTROMECHANICAL ENGINEERING LLC.
MAT Ref#
Revision
Proposed Material Compliance Statement Date
Status
Comply
S.N Specification Ref# Specification Supplier MAC Electromechanical
[Yes/No]

Inserts and Expansion bolts:


A. Furnish and set inserts in concrete forms. Provide reinforcing rods for pipe sizes over 80 mm or equivalent.
B. Concrete inserts shall be as follows: Black malleable iron universal type for threaded connections with lateral adjustment for pipe sizes up to
200mm.
2.1.6 noted
C. For pipes 200 mm and over or equivalent group of pipes on trapeze, use two or more inserts to prevent exceeding maximum loading.
D. As an alternative to the above mentioned inserts the Contractor may use expansion bolts. If the Contractor uses expansion bolts, the maximum
spacing between supports may need to be reduced so as not to exceed the maximum
loading and the expansion bolt locations shall be determined in coordination with the structural elements.

Shields:
2.1.7 yes comply
Provide shields where required, to protect insulation at areas of contact with hangers and supports.

Support Insulators.
The Contractor shall provide molded hard rubber insulators at all supports of insulated pipe work to transmit pipe load to hangers (or supports) Proposed products FRSI test certificate attached,
2.1.8 without crushing the insulation. The rubber density shall not be less than 1100 kg/m3 and operating temperature range shall be 20 deg C to 110 yes Density is 1268.16kg/m3, Thermal conductivity is comply
deg C. The thickness of insulators shall be same as the insulation, and vapour barrier (where specified) shall be continuous across the outside of the 0.2190 W/m.K.
insulators.

All supports, clamps or frames shall be protected against corrosion by either galvanizing. Supports/clamps or frames used outside the building shall
2.1.9 YES comply
be galvanized.
PROJECT: Proposed Tower E “Navitas ” (G+13 Storey Building) at "Akoya Oxygen" on Plot. No. AO.MU.002, at Al Yufrah 2, Dubai U.A.E (Project Code:P106.20)
CLIENT: Front Line Investment Management LLC
ENGINEER: LACASA Architects & Engineering Consultants
Main Cont.: AlQandeel Contracting CO. L.L.C
MEP Cont.: MAC ELECTROMECHANICAL ENGINEERING LLC.
MAT Ref#
Revision
Proposed Material Compliance Statement Date
Status
Comply
S.N Specification Ref# Specification Supplier MAC Electromechanical
[Yes/No]

3.0 EXECUTION

Installation / Application / Performance /Erection

Provide hangers to support the required loads. Where necessary, supports shall be designed to permit movement due to expansion and
A yes comply
contraction.

Support piping with hangers in direct contact with the pipe for insulated piping not requiring a vapor barrier. Size hangers to fit on the outside of
B yes comply
insulation requiring a vapor barrier.

Hang pipe from substantial building structure. Piping shall not be hung from other piping. All rigid hangers shall provide a means of vertical
C yes comply
adjustment after erection. Do not suspend pipe from metal roof deck.

D "C" clamps shall be installed as per manufaturer's recommendations yes comply

E Where non insulated pipes, in which vibration may occur, pass through walls, floors, or partitions, encase pipe within acoustical wall sleeves. yes comply

F Chilled water pipe supports shall not penetrate insulation vapor. yes comply
PROJECT: Proposed Tower E “Navitas ” (G+13 Storey Building) at "Akoya Oxygen" on Plot. No. AO.MU.002, at Al Yufrah 2, Dubai U.A.E (Project Code:P106.20)
CLIENT: Front Line Investment Management LLC
ENGINEER: LACASA Architects & Engineering Consultants
Main Cont.: AlQandeel Contracting CO. L.L.C
MEP Cont.: MAC ELECTROMECHANICAL ENGINEERING LLC.
MAT Ref#
Revision
Proposed Material Compliance Statement Date
Status
Comply
S.N Specification Ref# Specification Supplier MAC Electromechanical
[Yes/No]

3.2 Horizontal Piping Support Schedule

Support horizontal piping on threaded, galvanized, hot rolled steel rod hangers. Threaded rod shall not be smaller than hanger thread size. Where
3.2.1 proprietary hangers are being used, the threaded rod size shall be as required for the hanger. The maximum spacing shall be based on the load yes comply
carrying capacity of the hanger, after allowing a safety factory of 50% on the insulated full pipe weights.

Steel Pipe.
3.2.2
Maximum Spacing between Single Pipe Supports:

yes comply

Copper Tubing
3.2.3
Maximum Spacing between Single Pipe Supports:
PROJECT: Proposed Tower E “Navitas ” (G+13 Storey Building) at "Akoya Oxygen" on Plot. No. AO.MU.002, at Al Yufrah 2, Dubai U.A.E (Project Code:P106.20)
CLIENT: Front Line Investment Management LLC
ENGINEER: LACASA Architects & Engineering Consultants
Main Cont.: AlQandeel Contracting CO. L.L.C
MEP Cont.: MAC ELECTROMECHANICAL ENGINEERING LLC.
MAT Ref#
Revision
Proposed Material Compliance Statement Date
Status
Comply
S.N Specification Ref# Specification Supplier MAC Electromechanical
[Yes/No]

yes comply

UPVC, PPR Tubing


3.2.3
Maximum Spacing between Single Pipe Supports:

yes comply

3.2.4 Support steel piping 300 mm and larger at 6 m intervals or less to ensure even distribution of loading on structural members yes comply

The spacing specified herein in included to limit deflection in the pipe to an acceptable minimum, shorten intervals as necessary so as not exceed
3.2.5 yes comply
the support manufacturer's maximum recommended safe load values in accordance with BS 3974.

3.2.6 Cast iron pipe shall be, as a minimum, supported at each hub. yes comply

Trapeze Hanger. Spacing shall not be farther than the closest interval required for any size pipe supported thereby, or as necessary to prevent
3.2.7 noted
damage or failure to the structure. Provide additional framing as required to transfer loads to adequate structure.

3.2.8 Supporting rods over 450 mm long shall be braced at every fourth hanger with diagonal bracing attached to the structure yes comply

The Contractor shall select support distances such that the precast structure is not subjected to excessive point loads. The contractor will be
3.2.9 yes comply
required to submit calculations to demonstrate that the proposed loads can be safely supported from the structure.
PROJECT: Proposed Tower E “Navitas ” (G+13 Storey Building) at "Akoya Oxygen" on Plot. No. AO.MU.002, at Al Yufrah 2, Dubai U.A.E (Project Code:P106.20)
CLIENT: Front Line Investment Management LLC
ENGINEER: LACASA Architects & Engineering Consultants
Main Cont.: AlQandeel Contracting CO. L.L.C
MEP Cont.: MAC ELECTROMECHANICAL ENGINEERING LLC.
MAT Ref#
Revision
Proposed Material Compliance Statement Date
Status
Comply
S.N Specification Ref# Specification Supplier MAC Electromechanical
[Yes/No]
3.3 Vertical Piping Support
Proposed products FFPS & FFPK Fix point steel
Support vertical piping with steel riser clamps. Make adequate provision for expansion, contraction, and lateral stability by using expansion joints. clamps. Please find the design & calculations at
Also, account for vertical expansion and lateral movement of the building structures. Support steel pipe at a minimum of every floor as required to yes section 14. comply
relieve joint stresses.
7. SCHEDULE OF MATERIALS
Material Schedule - Pipe Supports
Specified
Proposed Temperature
SR.NO Description Product Description Proposed Model Temperature
Range
Range

A Chilled Water Pipes

Horizontal Installation

1 For Pipe size upto 2" Dia Unlined split clamp with Rubber Inserts FRSR N & FRSI 5.5 - 50 Deg C 0 to 50 °C

2 For Pipe size 2 1/2" to 6" Dia 100x50x5mm C Channel with U U Straps & FRSI 5.5 - 50 Deg C 0 to 50 °C

125x6mm Channel with U straps and Rubber


3 For Pipe size above 6" Dia U Straps & FRSI 5.5 - 50 Deg C 0 to 50 °C
inserts

4 For individual Pipe support above 2" Clevis Hanger with Rubber inserts FCH & FRSI 5.5 - 50 Deg C 0 to 50 °C

Vertical Installation C Channel with U bolts U Bolts & FRSI 5.5 - 50 Deg C 0 to 50 °C

B Hot Water System Rubber Lined Split clamp FRSR 60 Deg C -40 °C to +100 °C

C Cold Water system Rubber Lined Split clamp FRSR 35 Deg C -40 °C to +100 °C

D Cold cooled Water system Rubber Lined Split clamp FRSR 25 Deg C -40 °C to +100 °C

E Drainage System Rubber Lined Split clamp FRSR 25 Deg C 40 °C to +100 °C


8. PRODUCT CATALOGUE
9. AUTHORITY APPROVALS
fischer FZE
PO Box 261738 Tel: +971 4 8837477
Jebel Ali Freezone Fax: +971 4 8837476
Dubai technical@fischer.ae
UNITED ARAB EMIRATES www.fischer.ae

May 18, 2020

Reference # : 20200518-TEC-UAE-TT-MAC-NAVITAS-DM RENEWAL-R0

To : MAC ELECTROMECHANICAL

Project : NAVITAS G+13 STAR HOTEL & COMMERCIAL BUILDING AT YUFRAH 2.

Subject : DUBAI MUNICIPALITY REGISTRATION RENEWAL

Dear Sir / Madam,

With reference to the above subjected, Fischer is listed as an approved vendor with Dubai Municipality for
our range of Mechanical Anchors, Chemical Anchors, Hangers, Supports and Passive Fire Protection
Products.

We are in the process of renewing our registration with Dubai Municipality as the same had been due. We
hereby confirm that the renewal process has started and renewed certificates shall be submitted at the
earliest.

Best Regards

Tinu Thomas
Technical Manager - UAE

Mobile: +971 507086116


tinu.thomas@fischer.ae

___________________________________________________________________________________________
P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : 00971 4 8837477, Fax: 00971 4 8837476.
License Reg. No. 7260, e-mail: technical@fischer.ae , Website: www.fischer.ae
10. PRODUCT CERTIFICATES
11. WARRANTY
DEPARTMENT: Technical

REFERENCE : FZE/TD/05/2020

DATE : 29/08/2020

SUBJECT: WARRANTY CERTIFICATE

PROJECT: Proposed Tower E “Navitas ” (G+13 Storey Building) at "Akoya Oxygen" on Plot. No.
AO.MU.002, at Al Yufrah 2, Dubai U.A.E (Project Code:P106.20)
CLIENT: Front Line Investment Management LLC
CONSULTANT: Lacasa Architects & Engineering Consultants
MAIN CONTACTOR: Al Qandeel Contracting CO. L.L.C
MEP CONTRCATOR: Mac Electromechanical Engineering Contracting L.L.C

Hereby we confirm that our product

 Rubber Lined Split Clamps FRSR


 U Bolt
 U Straps
 Rubber Support Insert FRSI
 FCH Clevis hangers
 FFPS & FFPK Fix point Clamps

Are free from any manufacturing defects. The supplied products carry a warranty of 2
Years from Date of Supply. This warranty is against any manufacturing defects and subject
to Installation as per Manufacturers recommended Guidelines.

However the above warranty doesn’t cover malfunctioning arising due to misuse of the
product during its usage.

Mostafa A. El-Hoseiny

Technical Manager

________________________________________________________________________________________________

P.O. Box No. 261738, Jebel Ali, Dubai, U.A.E., Tel. : +971 4 8837477, Fax: +971 4 8837476.

License Reg. No. 7260, e-mail: technical@fischer.ae , website: www.fischer.ae


12. SPARE PART LIST
NOT APPLICABLE
13. SUPPLIER PROFILE
 !"#$%&!

1234564-74892:6--;--)*%+,-<=>?@A-
1234564-BC$ -DEFGHE )*%+,-./0

7789:9:;< =>?:(>@>? )I%J+,-.,


KCLM95N-B9L4 ABCDEFG:ABHBIJ:KKD
7789:9:;< =>?:(>@>? "0?OP+,-.Q,
RS9T4-B9L4 ABCDEFG:ABHBIJ:KKD

14d9:-RNM4 KLMLNOP:KLQRLSLNT:DUMVQWTXKKDY Z[\]:^>_`a ]:b 8 UVWX?Y+,-<ZJ+,


bcM2SN-7984 ccdecdcfcf `?aPXQ,-]^_?A [66\4-7984 cgdecdcfef 0,(>Q,-]^_?A

-7ij-7klkBkm-n--BC :f -------gh+?+,-./%+, f925-1234564-BC$ :hijfki e,-)*%+,-./0


s4d2684S-BC$ :efhlejm "0?OP+,-<O
+,-./0 7KK[-BC$ :ejlfel )o%p+,-)^Wqr

1234564-f4Lt4S6--;-u,%v,-
mz9S4-;-x +, sC:4-;-)@+, B982C59:28N-;-)=
wO+, B9L4-;-.Q, -BC$;xyJ+,-./0

nQWQoOp:d:(q\] BWPLQ:d:\<r_ 3st3>u:vu(w] :gheeje

1234564-{382|28246--;--)^_?OP+,-)*%+,-}?JX--
|}LSPLWo:~:DUWNp}€NLUW:nQNOpLQS:pQPLWo x3<y_ : `]:Z03z{
DUWNp}€NLUW:D…OML€QS:pQPLWo x3<y_ ::‚ (ƒ:^q[3„>=_ : `„_ :Z03z{
ALpO:GOLNQWN:~:GONQpPQWN:nQNOpLQS:pQPLWo †q,_ :03@st‡:^)t3„_ [:^][3ˆ„_ : `„_ :Z03z{
{TTS466-;--,Ww+,
‚zC54-BC W@=€A ‚$ƒ$-jCc chekgj (^&„-…†(w>
9c-BC ~I?o ‚9S34:-[7 mll‰iel )Y+,-./0
fCt2:4-BC lke‰mf‰immkhlc ‡% Pˆ-‰A?Š :Š‹:Œyu‰:7`s=]: :(@:Ž:\„]:Ž:\>)$:>@_ :‘’]‰kh:“”0:2`s ]
•[ :^>3<-_

s4L9S‹6-;-Œ?Žh+,

‚S258-7984 gfdecdcfel eg–gc )r?+,-]^_?A s4342M8-BC$ egiejjmc ?^Q,-./0


—?\_ :˜8 :‹:`-’_:Xb3-{ d[Y:hlhl:•™:^-š(_ :“”0:Œ$0›:œZ(>-ˆ_ :^>-<_ :Œ3$(_ :žš:Ž]:^q43zs_ :‘s-š0:\q\z{:˜Ÿ :‘<=„q
IU :TU}:€QW:pOWO :TU}p:NpQPO:SL€OWO:RT:OWPLWo:Q:NO¡N:MOQoO:XCnCY::COWP:TU}p:NpQPO:SL€OWO:W}MROp:NU:hlhl:X¢}d:FNLQSQNY:NU:pO€OL£O:VQTMOWN:

'''0$+*#0)0*34567 89:;<9=>?@A7 BC8 57 D9E9:>7 ?@?F= 670?:9@G4H ?:6EG7 8I J63:45GJ5>89@586GF6?:E5GK7L?M:N5


 !"#  $%"!#&&$'#!($!&#)"*!$+,!(-*!%"!./ "%# -%"!01#.,!(# "&2#",#&#!
'''0$+*#0)0*
`?I%J+,-‘ €ˆ
‚9S854S6
1234564-74892:6--;--)*%+,-<=>?@A-

-7ij-7klkBkm------¤:BC$ gh+?+,-./%+,-- 1234564-BC$ :hijfki )*%+,-./0


:f

1234564-‚9S854S6--;-)*%+,-’? >,

mz9S4-;-x +, mS$-BC$;xyJ+,-<
€
ˆ B982C59:28N-;-)=
wO+, B9L4-;-.Q,
:mefffffff« :ilckfi b 03] :d:¥WLNOP:¦pQR:FMLpQNO D¦§B¦K:BIFGI¦B¨I¦K:JG¨¥§:¨A:FIFG§GBCFC:K:
7:7:8:—q43@„’_:3t`©3t(st :3s>3ª:^`„z]:d:K:D
:ilfffffff« :gheekl 3>t3„_ :d:JOpMQWT ¬{ :Š­:7 :vu:3t`>©3t(st :(@>?

‚S258-7984 gfdecdcfel eg–gc )r?+,-]^_?A s4342M8-BC$ egiejjmc ?^Q,-./0


—?\_ :˜8 :‹:`-’_:Xb3-{ d[Y:hlhl:•™:^-š(_ :“”0:Œ$0›:œZ(>-ˆ_ :^>-<_ :Œ3$(_ :žš:Ž]:^q43zs_ :‘s-š0:\q\z{:˜Ÿ :‘<=„q
IU :TU}:€QW:pOWO :TU}p:NpQPO:SL€OWO:RT:OWPLWo:Q:NO¡N:MOQoO:XCnCY::COWP:TU}p:NpQPO:SL€OWO:W}MROp:NU:hlhl:X¢}d:FNLQSQNY:NU:pO€OL£O:VQTMOWN:

'''0$+*#0)0*34567 89:;<9=>?@A7 BC8 57 D9E9:>7 ?@?F= 670?:9@G4H ?:6EG7 8I J63:45GJ5>89@586GF6?:E5GK7L?M:N5


 !"#  $%"!#&&$'#!($!&#)"*!$+,!(-*!%"!./ "%# -%"!01#.,!(# "&2#",#&#!
'''0$+*#0)0*
"0?OP+,-<O
+,-U“-)I%”-(=/-%a”-•–?a”
KCLL4S329:-s4d2684S
s4d2684S-74892:6--;-(=˜˜Y+,-<=>?@A-
f925-1234$-BS :hijfki e—,-)*%+,-./0 s4d2684S-BC$ :efhlejm (=Y+,-./0

KCLM95N-B9L4 7789:9:;< =>?:(>@>?


ABCDEFG:ABHBIJ:KKD
14d9:-RNM4 KLMLNOP:KLQRLSLNT:DUMVQWTXKKDY Z[\]:^>_`a ]:b 8 UVWX?Y+,-<ZJ+,

bcM2SN-7984 ccdecdcfcf `?aPXQ,-]^_?A s4d$-7984 cgdecdcfef 0,(>Q,-]^_?A


-7ij-7klkBkm------¤: gh+?+,-./%+,--
:f
BC$

K9M289:-74892:6--;-?h+,-™,0-<=>?@A-
BCL25984T- :f -hQ,
‚92T :e®fff®fff -šWo(h+,
BC$-C›-mz9S46 :f .a—,-–(r
K\SS453N ¥¦F:¢Lp…QM Š¯ 03] :“°0 )€h+,

-1234564-{TTS466-;-)*%+,-,Wwr
•[ :^>3<-_ :Š‹:Œyu‰:7`s=]: :(@:Ž:\„]:Ž:\>)$:>@_ :‘’]‰kh:“”0:2`s ]

KCLL4S34-{TTS466-;-œ0?OP+,-<O
+,-,Wwr

•[ :^>3<-_ :Š‹:Œyu‰:7`s=]: :(@:Ž:\„]:Ž:\>)$:>@_ :‘’]‰kh:“”0:2`s ]


s4d2684S-{382|28246-;-<O
+,-)JX
|}LSPLWo:~:DUWNp}€NLUW:nQNOpLQS:pQPLWo x3<y_ : `]:Z03z{
ALpO:GOLNQWN:~:GONQpPQWN:nQNOpLQS:pQPLWo †q,_ :03@st‡:^)t3„_ [:^][3ˆ„_ : `„_ :Z03z{
DUWNp}€NLUW:D…OML€QS:pQPLWo x3<y_ ::‚ (ƒ:^q[3„>=_ : `„_ :Z03z{

‚S258-7984 gfdecdcfel eg–gc )r?+,-]^_?A s4342M8-BC$ egiejjmc ?^Q,-./0


—?\_ :˜8 :‹:`-’_:Xb3-{ d[Y:hlhl:•™:^-š(_ :“”0:Œ$0›:œZ(>-ˆ_ :^>-<_ :Œ3$(_ :žš:Ž]:^q43zs_ :‘s-š0:\q\z{:˜Ÿ :‘<=„q
IU :TU}:€QW:pOWO :TU}p:NpQPO:SL€OWO:RT:OWPLWo:Q:NO¡N:MOQoO:XCnCY::COWP:TU}p:NpQPO:SL€OWO:W}MROp:NU:hlhl:X¢}d:FNLQSQNY:NU:pO€OL£O:VQTMOWN:

'''0$+*#0)0*34567 89:;<9=>?@A7 BC8 57 D9E9:>7 ?@?F= 670?:9@G4H ?:6EG7 8I J63:45GJ5>89@586GF6?:E5GK7L?M:N5


 !"#  $%"!#&&$'#!($!&#)"*!$+,!(-*!%"!./ "%# -%"!01#.,!(# "&2#",#&#!
'''0$+*#0)0*
14. CHILLED WATER
RISER CALCULATION
15. PREVIOUS APPROVALS
1) No Objection
2) No two different brand to be used for one type of installation
3) Mock-up to be raised using the two types of fixing (Hilti & Fisher) Load test to be
verified and inspection raised.
4) Notification to be provide when Alternative make is being used and were & raised for
Approval prior installation.
5) Subject to TA Approval.

05th Sep 2018


Roy Almeida

1) Subject to the above comments being addressed,


2) Maximum deflection of a channel member to be as indicated in the specification,
3) Pull Out test to be organized,
4) Please use the correct approval form for the equipment not referenced in the
Vendor list

Anna Chrabol
Chrabol, Anna
Digitally signed by Chrabol, Anna
DN: E=Anna.Chrabol@WSP.com, CN="Chrabol, Anna", OU=Dubai (Ubora Tower), OU=Accounts, OU=UAE,
OU=MiddleEast, DC=corp, DC=pbwan, DC=net
Date: 2018.09.18 08:49:23+04'00'
18th Sep 2018
1) No Objection
2) No two different brand to be used for one type of installation
3) Mock-up to be raised using the two types of fixing (Hilti & Fisher) Load test to be
verified and inspection raised.
4) Notification to be provide when Alternative make is being used and were & raised for
Approval prior installation.
5) Subject to TA Approval.

05th Sep 2018


Roy Almeida

1) Subject to the above comments being addressed,


2) Maximum deflection of a channel member to be as indicated in the specification,
3) Pull Out test to be organized,
4) Please use the correct approval form for the equipment not referenced in the
Vendor list

Anna Chrabol
Chrabol, Anna
Digitally signed by Chrabol, Anna
DN: E=Anna.Chrabol@WSP.com, CN="Chrabol, Anna", OU=Dubai (Ubora Tower), OU=Accounts, OU=UAE,
OU=MiddleEast, DC=corp, DC=pbwan, DC=net
Date: 2018.09.18 08:49:23+04'00'
18th Sep 2018
BM DOCUMENT REVIEW STAMP

Reviewed By:
Jafar Jabith

Approved By:
Craig Murray

 
                      
          
             
                     
          
               

SUBMITTAL STATUS

     A APPROVED

B APPROVED AS NOTED

C NOT APPROVED/RESUBMIT
         
D REJECTED

This submittal has been reviewed for compliance


with design intent. This does not relieve the
         submitting agency from contractual
responsibilities.


 
 
The Engineer The Employer The Contractor

Project Name: F-1007- Kifaf Development Phase II (Plot No.5)


JDE: 5164391 Asset Name: Kifaf Phase II

Material Submittal Ref. No. 5164391-MAS-MECH-11 - 0

Originator of Submittal:Sahil Dhiman Date: 1/8/2020


Discipline: Mechanical Req.By: 1/22/2020
Is it a revision: No Programme Start Date: 8/1/2019
Previous Reference: _ Programme Start Finish: 4/2/2022
Contractor's reference: MS-SSY-F1007-MEP-ME-051
Material: Material Specified Manufacturer/Supplier: Manufacturer / Supplier Specified
Material Description: Others - Specify - MECH
Fischer Anchors & Fasteners

Material Detail
Specification Reference: Other:D3060
BOQ Reference: _
Drawing Reference: _
Material Specified: Others - Specify - MECH
Fischer Anchors & Fasteners (Germany / China)
Material Proposed: _
Manufacturer/Supplier: Others - Specify - MECH
Fischer Innovative Solutions
Manufacturer/Supplier Alternative: _
Remarks:
Enclosure
Vendor's Technical Literature Previous Test Results Copy of the Related Specs.
Samples with Sample Tag List of Previous Project Done Draft Warranty Certificate
Compliance Statement Doc. ✔ Others (Specify)
Compliance Statement:

SI.No. Description Specified Proposed 5164391


Remarks
Contractor Statement: We certify that the material submitted herewith has been reviewed in details and is in compliance with the contract drawings and
specifications except as otherwise stated hereabove

Contractor's Authorisation:Mohammad Malek Al Seid|09/01/2020 15:29:00

ATKINS Engineer's comments: _ ▲AI LA EHIA


21/01/2020

Design and Engineering Site Operations Page 1 of 5


.. vtsrponmlihfeaWVUTSRPONMLJIFEDCBA
0£1U WATEMRONT
M JERIALSUBMITTAl FORM 1 J:UiV£1«>PMEtn' lkLC .
UANGVO"'I*fi:lJ~ JV
-.-..
Ceniultaney S@¥Vitti Deira Waterfront Development Phl - Plot 3

Material Submittal For Chilled Water Pipe Support 25 Sep 2917


~ U Strap & Rubber Support Insert FRSI (Electro
Galvanized)
13010883-MAT-M EC-028 00 7
We are sendi ng herewith under separate cover (please check one box):
lJArchitectural lJstructural ~Mechanil lJElectrical IJPlumbing
CJ interior !:!Landscape [J Infrastructure yspifecI
[J Other (specify)

~f. No. ·1~Qfpton 1 ~J>tion ·. ,·. ·1t!>nLes I Rema~


3 Hard For your Review
Drawing I Copy
I Material Submittal For Chilled Water Pipe Support- U Strap & and Approval
Specs. +
I Rubber Support Insert FRSI (Electro Galvanized) 1 Soft
I
B.O.Q. Copy
I
Location of use:
0Manufacturer's Data
li:'.lcatalogue
0sample
0other
I IJGuarantee 0 Licenses & Certificates
-
0rest Certificate
-
FISCHER
Contractor Name:
Name and Signature: Signature:
AHMED H. SAID
(Project Director)

Date:24-Sep-2017 Date:

Approved
[J

Consultant Name I Signature I Date

Oiltrib - --- ·-QAE7 (Origi nal)


-•-.t-.,UJU:..
PROJECT LIST
SL. NO . PROJECT NAME CONSULTANT LOCATION
1 GE OFFICES AND WORKSHOP AL WASL AL JADEED CONSULTANTS DUBAI
2 C & J FACILITIES IN JAFZA SOUTH AL WASL AL JADEED CONSULTANTS DUBAI
3 ARABIAN RANCHES 2 DEVELOPMENT AZALEA COMMUNITY VILLAS (108) AL WASL AL JADEED CONSULTANTS DUBAI

4 G+M+2 AUDI SERVICE CENTRE PLOT NO 12 AL AMAR A AL SHARQA ARCHITECTURAL CONSULTANT ABU DHABI
5 3B+G+9+ GYM RESIDENTIAL BULDING ABDUL RAHIM ARCHITECTURAL CONSULTANT DUBAI
6 1B+G+_5TYP+GYM&SWIMMING POOL ABDULLAH AHMED ALMOOSA DUBAI

7 COMMERCIAL BUILDING FOR H.E.Dr.AHMED ALI AL MAZROUEI AL TORATH ENGINEERING CONSULTANT ABU DHABI
8 CONSTRUCTION OF CICPA CAMPS AT SHAH AL HOSN GAS DEVELOPMENT COMPANY ABU DHABI
9 ABU DHABI TERMINAL 1 & 3, BUS GATE AND T3 SCREENING EXPANSION TAYLOR WOODROW FIBREX-ADAC ABU DHABI

10 PRIVE BY DAMAC LACASA DUBAI


11 MASDAR INSTITUTE-PHASE 1B ARABIAN CONSTRUCTION COMPANY ABU DHABI

12 ETIHAD TOWERS PROJECT ARABIAN CONSTRUCTION COMPANY ABU DHABI


13 EMIRATI HOUSING DEVELOPMENT AT JABEL HAFEET ACE INTERNATIONAL- CONSULTING ENGINEERS AL AIN

14 AL FAHAD 1 & AL FAHAD 2 RESIDENTIAL TOWER ACE INTERNATIONAL- CONSULTING ENGINEERS SHARJAH
15 AL JIMI MALL-PHASE 3 ARCHITECTURAL CONSULTING GROUP-ACG AL AIN
16 NAJMAT RESIDENTIAL PROJECT PLOT CI(55) TOWER ARCHITECTURAL CONSULTING GROUP-ACG ABU DHABI
17 ABU DHABI TERMINAL-3, EXPANSION TAYLOR WOODROW FIBREX-ADAC ABU DHABI

DESIGN, BUILD OF TERMINAL 1 CREW ENTRANCE AT ABU DHABI INTERNATIONAL


18 ADAC ABU DHABI
AIRPORT

19 MIDFIELD TERMINAL BUILDING AECOM ABU DHABI

20 EPC FOR AL DABBI"YA SURFACE FACILITIES PHASE III PROJECT ADCO ABU DHABI
21 EPC FOR RUMAITHA/SHANATEL FACILITIES-PHASE III DEVELOPMENT ADCO ABU DHABI

22 INTEGRATED GAS DEVELOPMENT PROJECT ADGAS ABU DHABI


DESIGN ANDCONSTRUCTION OF SEVICES HARBOUR AND CONTROL TOWER AT
23 ADNOC,CODE ABU DHABI
RUWAIS INDUSTRIAL AREA PROJECT NO 7012
24 MEYDAN BEACH HOTEL-MOCK UP AE7 CONSULTANCY SERVICES ABU DHABI
25 MEYDAN RESIDENCE-1 AE7 CONSULTANCY SERVICES ABU DHABI

26 AL FATTAN DOWN TOWN AE7 CONSULTANCY SERVICES DUBAI


27 MEYDAN RESIDENCE-1 AE7 CONSULTANCY SERVICES DUBAI
28 AL MARYAH CENTRAL AECOM ABU DHABI
29 AL SOFOUH ROAD DIC TOWER ON PLOT NO A-001-003 AT TECOM SITE AECOM DUBAI
30 AL DAR YAS MALL, YAS ISLAND AECOM, SIX CONSTRUCT ABU DHABI
31 RESDENTIAL DEVELOPMENT PLOT RS3 MEERA SHAMS PROJECT AECOM ABU DHABI
32 MEMORIAL PARK AL JABER L.E.G.T.ENGINEERING & CONTRACTING LLC ABU DHABI

33 DAMAC GOLF COMMUNITY DAMAC AKOYA DUBAI

34 BORA TOWERS AEDAS DUBAI


35 THE CLINIC,CITY WALK AEDAS DUBAI
36 LINCOLN ACADEMY AEDAS DUBAI
37 DUBAI FESTIVAL CITY AL FUTTAIM ENGINEERING DUBAI
38 AIN AL FAYDA EMIRATI HOUSING PROGRAM PHASE 1 ACE INTERNATIONAL- CONSULTING ENGINEERS AL AIN

39 FARMHOUSE AL ABBAR ALUMINIUM DUBAI

40 JEBEL ALI SEWERAGE TREATMENT PLANT AL AHMADIAH AKTOR AKTOR DUBAI


41 SHEIKH SULTAN BIN ZAYED THE FIRST MOSQUE AL ALIN CONSULTING ENGINEERS ABU DHABI
42 PROPOSED 12 RESIDENTIAL BUILDING AT DUBAI LAND AL AJMI ENGINEERING CONSULTANTS DUBAI

43 THE RESIDENCES AT MARINA GATE 1 AL BURJ ENGINEER DUBAI

44 KHALIDIYA TOWERS AL FARAA ABU DHABI


45 AL FATTAN CRYSTAL TOWERS PROJECT SOBHA ENGINEERING DUBAI
46 AL MARYAH ISLAND AL GHURAIR CONSTRU ABU DHABI

47 AL GHURAIR CITY EXPANSION AL HABTOOR ENG DUBAI

48 ADNEC PHASE 3 CAPITAL GATE AL HABTOOR ENG ABU DHABI

49 JAFZA CONVENTION CENTRE ARENCO,AL HABTOOR ENG DUBAI


50 DEVELOPMENT OF PLOT P-9 BAINONA CONSULTING ENGI ABU DHABI
51 IRIS BAY AL HABTOOR ENG DUBAI
52 SAADIYAT BEACH RESORT AL HABTOOR ENG ABU DHABI
53 TRUMP INTERNATIONAL HOTEL & TOWER AL HABTOOR ENG DUBAI
54 YAS ISLAND GOLF HOTELS H1 H2 AL HABTOOR ENG ABU DHABI
55 NEW DUBAI POLICE ACADEMY COMPLEX AL HABTOOR ENG DUBAI
56 DUBAI POLICE HEAD QUARTERS AL HASHEMI DUBAI
57 TIJARA TOWN, PHASE 1, DUBAI LAND AL HASHEMI DUBAI
58 ABU DHABI GAS DEVELOPMENT (OR) SHAH GAS DEVELOPMENT ASCON ABU DHABI
59 DESIGN & CONSTRUCTION OF PROJECT BRAVO AL NABOODAH ABU DHABI

60 JEBEL ALI AIRPORT CITY PHASE 1A AIRFIELD AND INFRASTRUCTURE DAR AL HANDASAH CONSULTANTS DUBAI
61 ATLANTIS PALM AL NABOODAH DUBAI

62 AL REEF 2 VILLA DEVELOPMENTIN SAMHA EAST DORSCH HOLDING GMBH ABU DHABI
63 DOWN TOWN DEVELOPMENT-BOULEVARD MODIFICATIONS PHASE 1 STAGE2 AECOM , TURNER DUBAI
64 RUWAISHOUSING COMPLEX EXPANSION PHASE 3 AL SABBAH ELECTOMECHANICAL SANITARY CONST ABU DHABI

65 PROPOSED PALM VILLA(G+2) AT PALM JUMEIRAH AL SARAYA DUBAI


66 COMMERCIAL BLDG FOR DR. AHMED ALI AL TORTH ENG. CON. ABU DHABI

67 FOUR STAR HOTEL AL AJMI ENG CON. DUBAI


68 DUBAI INTERNATIONAL AIRPORT EXPANSION ALEC DUBAI
69 DUBAI INTERNATIONAL AIRPORT DAR AL HANDASAH SHAIR & PARTNERS DUBAI

70 AUDI SERVICE CENTER ALI & SONS ABU DHABI


71 NEW AL AIN HOSPITAL IFO, ALLEN & SHARIFF AL AIN

72 BUSINESS BAY DISTRICT COOLING PLANT #2 ALLIED CONSULTANTS DUBAI


73 ATLANTIS THE PALM- AQUAVENTURE EXPANSION WSP DUBAI

74 HABTOOR POLO CLUB ATK ENGI CONSULT DUBAI


75 BLUEWATERS HOSPITALITY ATK ENGI CONSULT DUBAI
76 MARSA ALSEEF ATK ENGI CONSULT DUBAI

77 YAS ISLAND WATER PARK ATKINS DUBAI


78 SOWWAH ISLAND ROADS, BRIDGES INFRASTRUCTURE WORKS PACKAGE AL NABOODAH DUBAI
79 PACIFFIC DEVELOPMENT- AL MARJAN ISLAND ATKINS RAS AL KHAIMAH

80 ABU DHABI MARINA CITY DEVELOPMENT ATKINS ABU DHABI

81 BAYS EDGE TOWER ON PLOT NO BB-A03.044 AT BUSINESS BAY ATKINS DUBAI


82 AL FORSAN HOTEL ATKINS ABU DHABI

83 AFISR-STAFF ACCOMMODATION ATKINS ABU DHABI


84 D SEC OVAL TOWER ATKINS ABU DHABI

85 DUBAI OPERA HOUSE DOWNTOWN ATKINS DUBAI


86 ABU DHABI FUTURE SCHOOL PROGRAM ATKINS ABU DHABI
87 AL JAZIRA CLUB TOWERS ATKINS ABU DHABI
88 ATCC-BUILDING SITE ADPI ABU DHABI
89 RESIDENTIAL BUILDING FOR KHALID SEDEEQ ARKAN ARCHITECTS CONSULTANTS ABU DHABI

90 RUWAIS HOUSING COMPLEX EXPANSION PHASE 3 ASGC ABU DHABI

91 ASGC AL SHAFAR CONTRACTING OIL FIELD LLC ASGC ABU DHABI


92 ABU DHABI MARINABLOOM DEVELOPMENT KHATIB AND ALAMI ABU DHABI

93 BLUEWATER RESIDENTIAL ASGC ABU DHABI


94 INNOVATION CENTRE FOR BOROUGE IN ABU DHABI ASCON ABU DHABI

95 SHAH GAS DEVELOPMENT ASCON ABU DHABI

96 ASAS TOWER GULF INTERNATIONAL ENGINEERING SHARJAH


COMMERCIAL BUILDING FOR HEIRS OF ZAYED HAMAD MUBARAK MAHFOUZ AL
97 ARKAN ARCHITECT CONSULTANTS ABU DHABI
MANSOORI
98 WAFI HOTEL COMPLEX & MALL EXPANSION ARKITEKNIK INTERNATIONAL CONSULTING DUBAI

99 NILONA TOWER MARRIOTT HOTEL & MARRIOTT EXECUTIVE APARTMENTS ARIF & BINTOAK DUBAI
100 CONST 482 VILLAS INFRASTRUCTURE PACKAGE-2 ARIF & BINTOAK DUBAI
101 GREEN FIELD FACTORY ARIF & BINTOAK DUBAI
102 RESIDENTIAL DEVELOPMENT AT NADD AL SHIBA ARIF & BINTOAK DUBAI
103 MUDON PHASE -02 404 VILLAS PLOT NO 676 ARIF & BINTOAK DUBAI
104 FUJAIRAH COMMERCIAL COMPLEX ARCHITECTURAL CONSULTING GROUP FUJAIRAH
DEVELOPMENTOF FOOD COURT & MULTI STOREY CAR PARK AT DUBAI AIRPORT
105 LACASA DUBAI
FREEZONE
106 RESIDENTIAL TOWER AT CORNICHE ARCHITECTURAL ENGI NEERING CONSULTANT ABU DHABI
107 THE GRANDEUR RESIDENCES ON PLOT C06 AT CRESCENT PLAM JUMEIRAH ARCHGROUP DUBAI

108 POST OFFICE TOWER ARCHGROUP AL ALIN


109 PROPOSED HOTEL BUILDING ARCHGROUP DUBAI
110 MEDIA CITY HOTEL ARCHGROUP DUBAI
111 G + 2 PODIUM + 13 STOREY + ROOF ARCHGROUP DUBAI
COMMERCIAL BUILDING 4B +G + 2P + 8 OFFICE (7 + 1) + HEALTH CLUB + ROOF ON
112 ALI & SONS ABU DHABI
PLOT
113 CITY CENTRE MIRDIF- CAR PARK EXPANSION ARCADIS DUBAI

114 KHAZNA DATA CENTER ARCADIS DUBAI

115 MEYDAN RACING DISTRICT DEVELOPMENT TEO A KHING DESIGN CONSULTANTS DUBAI
ADNOC NEW CORPORATE HEAD QUARTERS CONSTRUCTION OF UNDERGROUND
116 SIX CONSTRUCT ABU DHABI
CAR PARK
117 MIDFEILD TERMINAL COMPLEX TCA JV DCG ABU DHABI
118 MNEW AL AIN HOSPITAL PROJECT IFO, ALLEN & SHARIFF AL ALIN
119 DUBAI INTERNATIONAL AIRPORT EXPANSION DUBAI AVIATION ENGINEERING PROJECTS DUBAI
120 AL AIN HOSPITAL MAIN WORKS PACKAGE IFO JV AL AIN

121 ONE AT PALM JUMEIRAH BROOKFIELD MULTIPLEX DUBAI


122 DUBAI PARKS AND RESORTS DYNAMIC ENGINEERING CONSULTANTS DUBAI
123 PARK VIEW TOWER AVA ARCHITECTS & ENGINEERING ABU DHABI
124 AL QURM VIEW RESIDENTIAL BUILDING AVA ARCHITECTS & ENGINEERING ABU DHABI
125 THE ADDRESS DOWNTOWN DUBAI AECOM DUBAI

126 HOTEL, RESIDENTIAL & COMMERCIAL COMPLEX BAINONA CONSULTING ENGI ABU DHABI
127 AL AMAL PSYVHIATRIC HOSPITAL HDP DUBAI

128 AL AIN STADIUM & MIXED USE DEVELOPMENT EC HARRIS AL AIN


129 2B+G RENTALS + OFFICES & CLINICS +13 HOTEL + MECH ON PLOT 3920482 BARAJEEL ENGINEERING CONSULTANTS DUBAI
130 SHEIKH KHALIFA BIN ZAYED AL NAHYAN MASJID AT AL AIN BAYATY ARCHITECTS AL ALIN

131 ABU DHABI ISLAMIC BANK , BANIYAS BAYATY ARCHITECTS ABU DHABI
132 KHALIDIYA PLAZA VIEW AL FARAA ENGINEERING ABU DHABI

133 RESIDENTIAL TOWER ON PLOT NO C38 DANAT AL FARDHAM TOWER BRAD ARCHITECTS & ENGINEERS ABU DHABI
134 G + 2 FLOORS PRIVATE SCHOOL @ AL WARQA BEL YOAHAH DUBAI
135 CITY OF ARABIA IMG THEAM PARK BRAYAN DUBAI

136 THE BEACH KHANSAHEB CIVIL ENGINEERING DUBAI


137 MASDAR NEIGHBOURHOOD ONE RESIDENCES BROOKFIELD MULTIPLEX DUBAI

138 ME AISEM CC BROOKFIELD MULTIPLEX DUBAI


DESIGN BUILD FOR THE PROPOSED MIXED DEVELOPMENT PROJECT FOR
139 CHINA STATE CONSTRUCTION ENGINEERING CORPORATIO ABU DHABI
PACKAGE
140 MTC LANDSIDE PRIMARY AND SECONDARY ROADS CONSTRUCTION CHINA STATE CONSTRUCTION ENGINEERING CORPORATIO ABU DHABI
141 CONSTRUCTION OF AL GARHOUD MAINTENANCE FACILITY PACKAGE HSS CONSULTANTS DUBAI

142 SCHOOL AT MUHAISNAH 1ST CITY SPACE ENG CONSULTANT DUBAI


MX-05 CAR PARKING BUILDING INCLUDING BRIDGE AT DOWN TOWN JABEL ALI
143 BELYOAHAH DUBAI
ZONE 1
144 PRESIDENTIAL PALACE MAIN BUILDING PACKAGE CONSOLIDATED CONTRACTING ENG & PROCUREMENT ABU DHABI
145 PLOT NO 1330 FUTURE TOWER - 2 CONSULTAIR ENG CONSULTANT DUBAI
146 2B+G+9+H.C COMMERCIAL RESIDENTIAL BUILDING AL JADAF CRC CONSTRUCTION & RECONSTRUCTION ENG. DUBAI

147 JEBEL ALI AIRPORT CITYPHASE 1A airfeild and infrastructure DAR AL HANDASAH CONSULTANTS DUBAI
148 DUBAI INTERNATIONAL AIRPORT DAR AL HANDASAH CONSULTANTS DUBAI

149 DUBAI INTERNATIONAL AIRPORT EXPANSION PHASE 3 DAR AL HANDASAH CONSULTANTS DUBAI
150 CONSTRUCTION OF NEW VVIP LOUNGE AT AL BATEEN EXECUTIVE AIRPORT ADAC ABU DHABI

151 JUMEIRAH PARK VILLAS PACKAGE 5 & 5A/2 DAR AL HANDASAH CONSULTANTS DUBAI

152 PALMA RESIDENCES DAR AL HANDASAH CONSULTANTS DUBAI


153 PEARL JUMEIRA PACKAGE 2-INFRASTRUCTURE WORKS DAR AL HANDASAH CONSULTANTS DUBAI

154 DRAGON MART 2 DAR AL HANDASAH CONSULTANTS DUBAI


155 NAS ARENA MULTI PURPOSE HALL DAR AL HANDASAH CONSULTANTS DUBAI

156 AL SHAYA FOLOD DAR AL HANDASAH CONSULTANTS DUBAI


157 1B + g + 5 comm.residential building @jvc10amra200 DATUM ENGINEERING DUBAI
158 AL BATHA TOWER AT BUSINESS BAY DUBAI CIVIL ENGINEERING DUBAI
159 WIDENING OF EMIRATES ROAD DE LEUW,CATHER OVERSEAS LTD DUBAI

160 DEERFIELDS TOWN SQUARE RMJM DUBAI


161 MASDAR INSTITUTE OF SCIENCE AND TECHNOLOGY - PHASE 1B FIBREX ABU DHABI
CONSTRUCTION PF SMALL PROJECTS AND MISCELLANEOUS WORKS FOR
162 DELMA ENGINEERING ABU DHABI
TRAFFIC ALLEVIATION PROJECTS IN ABU DHABI EMIRATE
AL MEENA RESIDENTIAL & COMMERCIAL TOWER ON PLOTS C56,C57,C58,SECTOR
163 DEWAN ABU DHABI
14
164 AMITY INTERNATIONAL SCHOOL DEWAN ARCHITECTS & ENGINEERS ABU DHABI

165 THE FIRST AVENUE MALL & HOTEL ON PLOT NO 6742010 PIVOT ENGINEERING & GENERAL CONTRACTING DUBAI
166 THE FIRST AVENUE MALL & HOTEL DEWAN ARCHITECTS & ENGINEERS DUBAI
167 LAPITA DUBAI PARKS HOTEL 1 DEWAN ARCHITECTS & ENGINEERS DUBAI

168 THE ADDRESS RESIDENCE FOUNTAIN VIEW DEVELOPMENT DEWAN ARCHITECTS & ENGINEERS DUBAI

169 GREEN COMMUNITY WEST EXTENSION PHASE-3 DEWAN ARCHITECTS & ENGINEERS DUBAI
170 RIVER PARK RD & E DEWAN ARCHITECTS & ENGINEERS DUBAI
171 REWAIS HOUSING COMPLEX EXPANSION- PHASE 4 DUBAI CONTRACTING LLC ABU DHABI
VICTORY HEIGHTS RESIDENTIAL DEVELOPMENT , MAIN RESIDENTIAL VILLAS
172 DIAR CONSULT DUBAI
CONTRACT IN DUBAI
CONSTRUCTION OF ADNOC HEALTH CLUB AT KHALIDIYA VILLAS COMPOUND IN
173 ADNOC ABU DHABI
ABU DHABI
174 HABSHAN SULPHUR GRANULATION PLANT DODSAL ABU DHABI
175 MANAZELAL REEF 2 VILLA DEVELOPMENT DORSCH GRUPPE DC ABU DHABI ABU DHABI

176 RUWAIS HOUSING COMPLEX EXPANSION DARK & SCULL ABU DHABI

177 NIKKI BEACH RESORT DSA DUBAI

178 AL MAKTOUM INTERNATIONAL AIRPORT DAR AL HAND DUBAI

179 SEWER NETWORK AND PRESSURE MAIN FOR DUBAI LAND RESIDENCE COMPLEX DUBAI MUNICIPALITY DUBAI

180 THE ROYAL ATLANTIS RESORT AND RESIDENCES DYNAMIC ENGINEERING CONSULTANTS DUBAI

181 BOLLYWOOD PARK DYNAMIC ENGINEERING CONSULTANTS DUBAI

182 LA MER WATER PARK AT JUMEIRAH BEACH DYNAMIC ENGINEERING CONSULTANTS DUBAI
183 2B+G RETAILS + 2 (OFFICES AND CLINICS) + 13HOTEL + MECH ON PLOT BARAJEEL ENGINEERING CONSULTANTS DUBAI

184 MULBERRY HEIGHTS ECC (ENGINEERING CONTRACTING CO. L.L.C) DUBAI


185 DANAT AL EMARAT HOSPITAL ECG(ENGINEERING & CONSULTANTS GROUP) DUBAI

186 NON-PROCESS BUILDINGS PACKAGE OF RUWAIS REFINERY EXPANSION PROJECT ECG(ENGINEERING & CONSULTANTS GROUP) ABU DHABI

187 DAMAC PAR TOWER AT DIFC ECG(ENGINEERING & CONSULTANTS GROUP) DUBAI
188 2B+G+6+GYM-BUILDING AT AL BARSHA FIRST GRAND COSMOPOLITAN HOTEL EDMAC ENGINEERING CONSULTANT DUBAI
189 KHALIFA UNIVERSITY EXTENSION DESIGN ENGINEERING CONSULTANCY DUBAI
190 UNIVERSITY HOSPITAL DUBAI HEALTHCARE CITY ELLERBE BECKET DUBAI

191 BLOOM GARDENS DEVELOPMENT PHASE 1A & 2A EMIRATES LINK MALTAURO LLC ABU DHABI
CONSTRUCTION OF RESIDENTIAL BUILDINGS- CONDOMINIUMS AND DUPLEX AT
192 EMSQUARE ENGINEERING CONSULTANTS DUBAI
RUWAYAH
NEW 132/11KV SUBSTATIONS AT E12, ZAYED SPORTS CITY, ADNEC CAPITAL
193 ENERGO CONSULT L.L.C ABU DHABI
CENTRE
194 REWAIS REFINERY EXPANSION PROJECT ENGINEERING CONSULTANTS GROUP ABU DHABI
195 MR. MOHAMED HAMAD MOHAMED MARZOUQ AL AMERI ENG. ADNAN SAFFARINI OFFICE ABU DHABI

196 G+4P+25TYP. FLOOR+H.C @ EMIRATES CITY ENG. ADNAN SAFFARINI AJMAN


197 EXECUTIVE BAY (3B + G +3P + 15 AND 17) EC DUBAI

198 THE RESIDENCES AT MARINA GATE 2 ENGINEERING CONSORTIUM CONSULTING ENGINEERS DUBAI
199 SHAH GAS DEVELOPMENT PROJECT ENI SAIPEM ABU DHABI

200 SEDDIQI & SONS HEADQUARTER ERGA PROGRESS ENGINEERING DUBAI


201 AL JOWHARA TOWER PROJECT ETAN CONSULT ABU DHABI
202 LEAF TOWER AL REEM ISLAND ETAN CONSULT ARCHITECTURE ABU DHABI
203 SARAYA PROJECT PLOT C-33, SECTOR E-12 ETAN CONSULT ARCHITECTURE & URBAN DESIGN ABU DHABI
204 PRESIDENTIAL PALACE ARMSTRONG ABU DHABI

205 RAWDHAT EWAN AERCHITECTURAL & ENGINEERING CONSULTANCY ABU DHABI


206 WARNER BROS THEME PARK FARAH LEISURE ABU DHABI
207 DEERFIELDS TOWN SQUARE DEERFIELDS FIBREX ABU DHABI

208 PROPOSED G+4P+17 R HOTEL APARTMENT ON PLOT# JVC18TCP017A AL AJMI ENGINEERING CONSULTANTS DUBAI
209 HABSHAN-5 PROCESS PLANT JGC ABU DHABI

210 RUWAIS SULFUR HANDLING TERINAL 2 GASCO ABU DHABI

211 2B+G+6 FLOOR +GYM ROOF BUILDING ON PLOTNO 373-0401, AL BARSHA FIRST. GCC CONTRACTING DUBAI

212 AKOYA OXYGEN, AMAZONIA PHASE 3 GEC DUBAI


213 AL RAYYAN COMPLEX, AL NAHDA . B+H ARCHITECTS MIDDLE EAST SHARJAH

214 INSTATEMENT OF AL KHAZAN PARK GENERAL PROJECTS DEPARTMENT DUBAI


215 ABU DHABI TRADE CENTRE EXTENSION PHASE 3 GHANTOOT TPT & GEN.CONT L.L.C ABU DHABI

216 AFRAA FARAJ HUMAID AL QUBAISI GOLDEN PLANNERS CONSULTANS ABU DHABI
2B +G +9 FLOORS COMERCIAL & RESIDENTIAL VUILDING FOR FALAKNAZ AL
217 GOLDEN SQUARE ENGINEERING CONSULTANTS DUBAI
QUSAIS 4
DUBAI POLICE FORCE BUILDING / AMINITIES / INFRASTRUCTURE WORKS AL QOUZ,
218 ARIF & BINTOAK DUBAI
4TH
219 AL AMAL PSYCHIATRIC HOSPITAL HEALTHCARE DESIGNERS AND PROJECTMANAGERS DUBAI

220 AL SILAA COMMUNITY HOSPITAL HDP ABU DHABI

221 BLOOM CENTRAL HEBERGER ENGINEERING CONSULTING ENGINEERING ABU DHABI

222 KHAIDEYAH BUILDING DEVELOPMENT AL KHALDEYAH, ZONE HEBERGER ENGINEERING CONSULTING ENGINEERING ABU DHABI

223 FAKEEH ACADEMIC MEDICAL CENTER HLG DUBAI


224 AL MAFRAQ HOSPITAL HLG ABU DHABI

225 AL HABTOOR CITY RESIDENTIAL DEVELOPMENT ATKINS DUBAI

226 BAY VIEWS HOTEL DIAR CONSULT DUBAI

227 AL HABTOOR CITY KHATIB & ALAMI DUBAI


228 AL HABTOOR ISLAND KHATIB & ALAMI DUBAI

229 "W" HOTEL & RESIDENCES PALM JUMEIRAH DUBAI HO FORDS DUBAI
230 BRIGHT START BEACH RESORT DUBAI
231 PENTOMINIUM PLOT 392-567 MARSA ACC DUBAI
232 BD PLOT 12 & 13 HYDER CONSULTING DUBAI
233 FUJAIRAH CITY CENTRE HYDER CONSULTING FUJAIRAH
234 ADISC RESIDENTIAL LEISURE & COMERCIAL COMPOUND ENGINEERING CONSULTANTS GROUP ABU DHABI
235 EMIRATES GARDEN (1) INCORPORATED CONSULTANTS SHARJAH
236 INTEGRATED GAS DEVELOPMENT (IGD) ADGAS ABU DHABI
237 CONTRACT THREE TOWERS EMIRATES INNOVATION EGINEERING CONSULTANTS DUBAI
238 WEST YAS -RESDENTIAL JLA INTERNATIONAL ENGINEERING ABU DHABI

239 P077/ PRIVATE VILLA - EMIRATES HILLS JRHP DUBAI


240 PROPOSED MEENA PLAZA MIXED DEVELOPMENT AT P-110,MEENA ZAYED. KDI ARCHITECTS DUBAI
241 DAMAC TOWERS BY PARAMOUNT, BUSINESS BAY. KEO DUBAI
242 PUMP STATION X1 AND ITS RISING MAIN KEO DUBAI
243 JAWHARA TOWER KHALIB & ALAMI DUBAI
244 SHAMS GATE DISTRICTTOWERS 3 TO 8 PROJECT KHALIB ALAMI ABU DHABI

245 AL RAHA BEACH RESIDENTIAL DEVELOPMENT KHALIB ALAMI ABU DHABI


246 IBIS HOTEL & OFFICES, AL RIGGA ATKINS DUBAI
247 SERENIA RESIDENCES THE PALM KHANSAHEB CIVIL ENGINEERING DUBAI
248 AL SOWWAH DISTRICT COOLING PLANT KHARAFI NATIONAL DUBAI
249 CENTRAL UTILITY COMPLEX ESSAM ABDULLAH DUBAI

250 FAIRMONT HOTEL AND SERVICES APARTMENT KHATIB & ALAMI DUBAI
251 AL FALAH COMMUNITY-SHEIKH KHALIFA MOSQUE KHATIB & ALAMI DUBAI
252 AL DHAID PROJECT PHASE-1B KHATIB & ALAMI DUBAI
253 ETISALAT UNIVERSITY KHATIB & ALAMI SHARJAH
254 OPERA GRAND TOWERS KHATIB & ALAMI DUBAI
255 INFINITY TOWER KHATIB & ALAMI DUBAI
256 HAKKASAN-MGM HOTEL KHATIB & ALAMI DUBAI
LEAD DEVELOPMENT AND PROJECT MANAGEMENT
257 HIDD AL SAADIYAT VILLAS DEVELOPMENT DUBAI
CONSULTANTS
258 KHALIFA AL NABOODA BLDG KHATIB & ALAMI DUBAI

259 JEWEL OF THE CREEK DEVELOPMENT PLOT NO 129-104 PORT SAEED KLING CONSULT DUBAI
260 RAJ MAHAL THEATRE AT BOLLYWOOD PARKS KLING CONSULT DUBAI

261 PROPOSED CONSTRUCTION OF WAREHOUSE STH ABU DHABI


262 JEBEL ALI SEWAGE TREATMENT PLANT PHASE 3 L&T DUBAI
263 KHALIFA PORT INDUSTRIAL ZONE L&T ABU DHABI

264 DUBAI HILLS ESTATECONSTRUCTION LACASA ARCHITECTS & ENG CONSULTANT DUBAI
265 PRIVE BY DAMAC LACASA ARCHITECTS & ENG CONSULTANT DUBAI
266 4B+G=17=ROOF COMMERCIAL & RESIDENTIAL TOWER AT DANET LACASA ARCHITECTS & ENG CONSULTANT ABU DHABI

267 SOUQ RESIDENCES FZCO GOLDEN MILE PALM JUMEIRAH LC CONSULTING DUBAI
268 HSBC OFFICE TOWER LEAD CONSULTING DUBAI

269 PRIVATE BEACH HOUSE MAISAM ARCHI ENG ABU DHABI


270 AL SHOHUB PRIVATE SCHOOL MAKAN CONSULTING ABU DHABI

271 TOYOTA 3S FACILITIES WAVE BUILDING MAKAN CONSULTING ABU DHABI


272 CITY LAND AL BARSHA SOUTH THIRD MBA ENGINEERING CONS DUBAI
273 EXCHANGE OFFICE TOWER BUILDING MBA ENGINEERING CONS DUBAI

274 BLUEWATERS - WHARF RETAIL ALEC DUBAI


275 GEMS ARABIC SCHOOL BOYS MEECON DUBAI
276 DUNES-B+G+8 RESIDENTIAL BUILDING MEECON DUBAI

277 RUWAIS HOUSING COMPLEX EXPANSION-PHASE 3 METITO ABU DHABI

278 DUBAI SUSTAINABLE CITY MODULR DESIGN ENGI CONSULTANTS DUBAI


279 AVENUE PHASE 2 EC HARRIS BUILT ASSET CONSULTANCY DUBAI

280 SIEMENS HQ MORGANTI ABU DHABI


281 STRATEGIC TUNEL ENHANCEMENT PROGRAMME TUNNEL PUMPING STATION MOTT MOCDONALD ABU DHABI

282 AL JALILA FOUNDATION HEAD QUARTERS TAMDEEN DUBAI


283 NEW YORK UNIVERSITY MUBADALA ABU DHABI
284 ABU DHABI FUTURE SCHOOL PROGRAM KEO ABU DHABI
285 NATIONAL REHIBILITATION CENTER HDP ABU DHABI
286 CENTRAL MARKET MUSHRIF ABU DHABI

287 EDUCATION & CULTURE SCHOOL YASILAND DARWISH ENGINEERING EMIRATES ABU DHABI

288 RUWAIS HOUSING COMPLEX EXPANSION PHASE 3 NATIONAL HOLDING AND MOUIL ABU DHABI
289 AL DUJA TOWER NATIONAL ENGINEERING BUREAU DUBAI

290 VOLKSWAGEN & PORSCHE, BODY & PAINT WORK SHOP ,SAIH SHUAIB NATIONAL ENGINEERING BUREAU DUBAI
291 AL BATEEN HOTL & RESIDENCE NATIONAL ENGINEERING BUREAU DUBAI

292 AL BATEEN JUMEIRAH TOWERS NATIONAL ENGINEERING BUREAU DUBAI

293 COMMERCIAL RESIDENTIAL AL JADAF NATIONAL ENGINEERING BUREAU DUBAI


294 MADA TOWER BURJ KHALIFA NATIONAL ENGINEERING BUREAU DUBAI

295 DUBAI SILICON OASIS RESIDENTIAL NATIONAL ENGINEERING BUREAU DUBAI


296 VEZUL TOWER NATIONAL ENGINEERING BUREAU DUBAI
297 FGB AL JADDAF NATIONAL ENGINEERING BUREAU DUBAI
298 AMESCO TOWER NATIONAL ENGINEERING BUREAU DUBAI
299 AL MAFRAQ HOSPITAL BURT , HILL ABU DHABI

300 KEMPINSKI HOTEL AT PALM JUMEIRAH NATIONAL ENGINEERING BUREAU DUBAI


301 REEM DEVELOPMENT PHASE- 2 NATIONAL ENGINEERING BUREAU DUBAI
302 RESIDENTIAL & COMMERCIAL BUILDING NEXT DUBAI
303 LOUVRE OGER ABU DHABI
GULF WORLDWIDE DISTRIBUTION FZE WAREHOUSE & HOUSE BUILDING ON PLOT
304 ORBIT DUBAI
MOO549 JAFZA
305 SEVENTHHEAVEN PROJECT PARSONS BRINCKERHOFF DUBAI
306 DUBAI WATER CANAL PARSONS DUBAI

307 DEVELOPMENT OF CYCLE AND JOGGING TRACK PARSONS DUBAI

308 AL RAHA BEACH DEVELOPMENT PELL FRISCHMANN ABU DHABI


309 AL HABTOOR POLO RANCH PIC DUBAI

310 RESIDENTIAL TOWER , RAHA PIONEER ENG CONSULTANCY ABU DHABI


311 RUWAIS REFINERY EXPANSION PROJECT PMC - ENGI CONSULTANTS GROUP ABU DHABI

312 AL ZORAH GOLF PRESTIGE CONST AJMAN


313 THE DISTINCTION PSE DUBAI
314 RESIDENTIAL TOWER,AL QASIMIA UNIVERSITY QHC ARCHITECTS ENGINEERS SHARJAH
315 SARAYA R01 & R02 RESIDENTIAL DEVLOPMENT RAMBOLL ABU DHABI

316 EXPANSION OF ABU DHABI INTERNATIONAL AIRPORT REALOG ABU DHABI


317 VANTAGE SERVICED APPARTMENTS GEC DUBAI
318 AL SOFOUH TRANSIT SYSTEM RTA DUBAI
319 SHAH GAS DEVELOPMENT SAMSUNG ENGINERING ABU DHABI

320 MULTI PURPOSE OUTDOOR STADIUM ,DUBAI SPORTS CITY SCHUSTER PECHTOLD DUBAI
321 ISTP 2 WASTE WATER TREATMENT AL WATHBA 2 SGS ABU DHABI
322 ETIHAD RAIL SHAH HABSHAN ABU DHABI
323 MNIA AL ARAB SHANKLAMD RAS AL KHAIMAH

324 MIRDIF HOUSING SHAPOORJI DUBAI


325 RESIDENTIAL PLOTS AL QUOZ SHAPOORJI DUBAI

326 CRICKET STADIUM SINCLAIR KNIGHT DUBAI


327 ADNOC NEW CORPORATE HEADQUARTERS PROJECT SIX CONSTRUCT ABU DHABI
328 SHIEKH KHALIFA MEDICAL CITY , DIALYSIS CENTRE DAR EMARA ABU DHABI

329 EMIRATES ALUM SMELTER COMPLEX SNC.LAVALIN INTERNATIONAL DUBAI


330 AL FATTAN CRYSTAL TOWER TABANLIOGLU ARCHITECTS DUBAI

331 MOHAMMED BIN RASHIDAL MUKTOUM CITY MEYDAN SOBHA DUBAI


332 AL MAFRAQ HOSIPITAL BURT HILL ABU DHABI
333 NMC SPECIALTY HOSPITAL KHALIFA CITY A STH DUBAI

334 RUWAIS HOUSING COMPLEX ECXPANSION P-3 SYSTEM CONSTRUCT ABU DHABI
335 DUBAI METRO SYSTRA DUBAI

336 TAKREER CARBON BLACK & DELAYED COKER SUAMSUNG ENGI ABU DHABI
337 ADNOC MEDICAL CENTER TARGET ENGI. CONS. ABU DHABI

338 RUWAIS LNG TERMINAL PROJECT TARGET ENGI. CONS. ABU DHABI
339 RUWAIS HOUSING COMPLEX ECXPANSION P-3 SK ENGINEERING & CONSTRUCTION ABU DHABI
340 RUWAIS HOUSING COMPLEX ECXPANSION P-4 SK ENGINEERING & CONSTRUCTION ABU DHABI

341 ABU DHABI TERMINAL 1 & 3, BUS GATE & T3 SCREENING EXPANSION TAYLOR WOODROW FIBREX ABU DHABI
342 MIDFIELD TERMINAL BUILDING TCA JV DUBAI
343 CRANLEIGH SCHOOL TCC ABU DHABI

344 STRATA COMPOSITE PLANT OBERMEYER ABU DHABI

345 SAHIL & SHAH FULL FIELDS TECNICAS REUNIDAS ABU DHABI
346 DAR AL SHIFAA HOSPITAL VAMED ENGI. ABU DHABI

347 DAMAC GOLF COMMUNITY PROJECT DUBAI TORJAN GENERAL CONTRACTING LLC ABU DHABI
348 THE DUBAI MALL EXPANSION TURNER DUBAI

349 HILTON GARDEN INN , AL BARSHA TED JACOB ENGINEERING DUBAI


350 UPPER CREST @ BURJ KHALIFA DUBAI
351 AJMAN WATER TREATMENT VEOLIA WATER AJMAN
352 SOUTH AIRFIELD DEVELOMENT & REHABILITION WADE ADAMS ABU DHABI
353 VILLAS COMPLEX AT STREET WORLD PLANNERS CONSULTANT ENGINEERS AL AIN

354 BVLGARI HOTEL & RESIDENCE PROJECT WSP MIDDLE EAST DUBAI

355 YMC DEFECTS ABU DHABI


356 TIARA BUNITED TOWER DUBAI

357 BURJSIDE TERRACE @ BURJ KHALIFA ZASPSE DUBAI


358 BURJ DAMAC 4 DARWISH DUBAI

359 BAYNUNAH ACADEMIC COMPLEX Z ABU DHABI


16. COO
Country of Origin

SR.NO Description Make Country Of Origin Area of Application

Water Supply &


1 Rubber Lined Split Clamps FRSR FISCHER CHINA
Drainage
2 U Bolt FISCHER UAE Riser

3 U Strap FISCHER UAE CHW Horizontal Pipes

4 Rubber Support Insert FRSI FISCHER India /UAE All CHW Pipes

P.O. Box No. 261738, R/A 07- BA 01- 04, Jebel Ali Free Zone, Dubai, U.A.E

TEL. : 00971 4 883 7477, FAX: 00971 4 883 7476, e-mail: enquiry@fischer.ae , Website: www.fischer.ae
Contact Information

Corporate Office MENA Office


fischer fixing LLC fischer FZE
PO Box No 261738
404 Pinnacle Building
PO Box No 261738
Al Barsha 1, Sheikh Zayed Road Jebel Ali Free Zone
Dubai, UAE Dubai, UAE
Ph: +971 4 395 7772 Ph: +971 4 883 7477
Fax: +971 4 395 7773 Fax: +971 4 883 7476
Email: technical@fischer.ae Email: technical@fischer.ae

Special Note:
Our aim is continuous development and innovations. Therefore the values given in submittals are subject to change without
notice. The specified data only apply when fischer products are used.

All products must be used, handled and applied strictly in accordance with all current instructions for use published by
fischerwerke (i.e. catalogues, technical instructions, manuals, setting instructions, installation manuals and others.

The information and recommendations given in this document are based on principles, equations and safety factors defined
in technical instructions of fischerwerke, operation manuals, installation instructions and other information that are believed
to be correct at the time of establishing. The user has the responsibility to check whether the present conditions on site and
the anchors, setting tools etc. intended to use comply with the conditions given. The ultimate responsibility for selecting
the product for the individual application is with the customer.