Professional Documents
Culture Documents
Test Rig Flier PDF
Test Rig Flier PDF
HYDROTECHNIK
UK LIMITED
1
We can test multi channels simultaneously and provide archiving From the initial conversation with the customer our technical engineers will get
We have extensive experience in the design, development, software and graphical reports. The software can be written to give a broad understanding of what you require. From the layout of your facility, your
manufacture and commissioning of fluid power test rigs for end of simple operator led control of the test procedures and simple green/ application and most importantly your testing requirements.
production sign off or component testing. Our test rigs are used red pass or fail warnings. The operator can add testing notes, serial
in demanding and ‘mission critical’ applications including defence, numbers etc, for accurate traceability.
manufacturing quality control, plant maintenance and research and
G
1
D
development. Users of Hydrotechnik test rigs rigorously test pumps, Our engineers take a full brief from the client and tailor make a test
B
2
A
REVISION
001
TEST STATION
A2
1
OF 1
SHEET 1
C
SCALE:1:50
3101-34-PTR-W
PRESSURE
3
DESIGN & FULL BRIEF
2
TITLE
DRAWING
PART NO.
hydraulic hoses, moulded coolant hoses, pipes, manifolds, tanks, rig and software that ensures the finished product is efficient to use
9/12/2015
9/12/2015
2
DATE
CONSTRUCTION
tion
GRAMS
FINISH
4
NAME
IL
CA
Quota
750211.42
BRUSHED
304 STST
1
DRAWN
MATERIAL:
CHK'D
and
3
FINISH:
MASS:
8
osal 6656
K
2
WWW.HYDROTECHNIK.CO.U
PARK, LENTON
Prop
H
: HT
900 3550
NOTTINGHAM.
nical ence 3
TEL: 0115
5
Tech Refer
ASK
IS IN µm
- IF IN DOUBT
Following on from the initial consultation we will gather key information
EDGES
4
tion
- 6H / 6g
SPECIFIED
TO BE COARSE1.6µm
IN
DIMESNIONS
ALL THREADS BE MACHINED
± 1°
accumulators, valves and many other components to ensure they are and enhances productivity. Whatever your application, Hydrotechnik
WHERE
± 0.4mm
- C���� m
Quota 4
SCALE DRAWING
TOLERANCE
ALL BURRS
TEXTURE
HOLE CENTRES
STATED
FEATUERS
TO
ANGULAR
SURFACE
SURFACE
REMOVE
UNLESS
MACHINED
- DO NOT
= ± 0.1mm
6
x ≤ 120mm = ± 0.2mm
> x ≤ 400mm = ± 0.3mm
= ± 0.5mm
0.8mm
1.2mm
= ± 2.0mm
EN 22768:1993
1000mm x ≤ 1000mm = ±
2000mm x ≤ 2000mm = ±
5
≤ 30mm
> x ≤ 4000mm
≤ 6mm
5
0mm > x
6mm > x
30mm >
>
>
WITH BS
120mm
G
400mm
- C���� �
= ± 1mm
2mm
- TO COMPLY
3mm
4mm
= ± 5mm
6
FEATUERS
1000mm x ≤ 1000mm = ±
2000mm x ≤ 2000mm = ±
3000mm x ≤ 3000mm = ±
≤ 500mm
> x ≤ 5000mm
FABRICATION
STATED
7
0mm > x
>
>
>
500mm
OTHERWISE
such as planning your required workspace using our in-house 3D
7
2500
FABRICATED
6
1.0mm
2.0mm
4.0mm
fit for purpose. will deliver the right testing and measurement solution for you.
TOLERANCES
1.0mm
4.0mm
UNLESS
0.2mm
MACHINED
0.2mm
0.2mm
TOLERANCES
0.4mm
0.2mm
0.4mm
3100
GEOMETRIC
8
> x ≤ 6000mm
> x ≤ 3000mm
≤ 1000mm
PERPENDICULARITY
≤ 1000mm
TOTAL RUNOUT
GENERAL
SYMMETRY
FLATNESS
8
0mm > x
1000mm
F
0mm > x
1000mm
9 2500
7
PROJECTION
THIRD ANGLE
10
9
CAD systems. A comprehensive brief will then be put together to ensure
600
11
8
980
E 1680
12
10
9
H
45°
clarity between both parties before installation takes place, including a full
11
PANEL
D
1500
10
45°
CONTROL
980
1680
2000
12
on 1.0
3100
Versi
2000
11
G
G
600 /16
3
22/01
F
5158
r:
25
E
mbe
Date
n
Nu C
risk assessment.
D
ratio
egist
C
any
R
Comp
12
1710
A
3867 Hydrotechnik
Ltd.
er:
5
1
Central
Pa
umb Tel:
+44
ion
N (0)115
90 rk,
Lento
strat 0
3550
n
Lane,
Not
F Regi Email:
sa tingham,
1500 VAT
les@hyd
Fax:
+44
(
NG7
2NR
NR
rotechni 0)115
98 VAT
Regi
k.co.uk
6
8875
stration
N
,
NG7
2
Web:
www
B umber:
5
gham .hydrote 3867171
ottin
chnik.co. 0
Company
ne,
N 875
uk
986
8
Registrat
on
La o.uk ion
Num
Lent )115 nik.c ber:
2551
l
Park,
ax:
+
44
(0 tech 583
Centra
F ww.h
ydro
hnik
Ltd.
1
eb:
w 7
of
12
otec 550
k
W
Hydr
900
3 .co.u
E EL )115 hnik
L PAN 44
(0 otec
TRO Tel:
+ hydr
CON il:
sa
les@
Ema
N
STATIO
A
T
G TITLE RE TES N
PRESSU
DRAWIN REVISIO
DATE 001
NAME
15 A2
IL
9/12/20 15 C 1 OF
1
9/12/20 TR-W SHEET 1
D DRAWN CA -34-P :50
CHK'D UCTION NO. 3101 SCALE:1
PART
AL: STST CONSTR
MATERI304
IN DOUBT
ASK
FINISH 2
G - IF BRUSHED
DRAWIN m FINISH:
LANE, 2 GRAMS
NOT
SCALE S - C���� LENTON 750211.4
- DO ED FEATUER ± 0.4mm± 1° PARK, 2NR.
993
22768:1 MACHIN CENTRES
TOLERAN
CE D 1.6µm / 6g
- 6H IS IN
µm 1 CENTRALHAM.
NG7
NOTTING 900 3550 NIK.CO.U
K
MASS:
3
BS EN
HOLE MACHINE RES
ANGULAR TO BE BE COARSESPECIFIED 0115
Y WITH = ± 0.1mm SURFACE
TO WHERE MILLIMET
NS IN EDGES
TEL: DROTECH
COMPL C���� � = ± 0.2mm
3
2000mm > x ≤
0.2mm
2.0mm
3000mm 5
RUNOUT
TOTAL RY 0.2mm 4.0mm
SYMMET 0.4mm
FLATNESS 1000mm 1.0mm
> x ≤ x ≤ 6000mm 4.0mm
0mm > Y
6
0.2mm
1000mm ICULARIT 0.4mm
PERPEND 1000mm
> x ≤ x ≤ 3000mm
0mm >
1000mm
ON
7
PROJECTI
ANGLE
THIRD
The test rig will be manufactured under ISO 9001 procedures to the highest
8
10
A
11
engineering standards. We will then install the test rig on site and carry out proof tests
12
to ensure that the test rig is fully functional to agreed specifications, full electrical test,
complete risk assesment and safety check.
STAFF TRAINING
4
After installation our technical team will spend a day training users on how
to operate the test equipment safely and take them through the full hardware
& software procedures as required.
SERVICE
5
Hydrotechnik UK supply specialist test rigs to: Hydrotechnik UK offer additional service programs to ensure the
system is kept running smoothly and is operating at its optimum level.
Brief Brief
Hydrotechnik started this project with detailed discussions with the After consultation with a manufacturer of formed hoses Hydrotechnik
client on the specific requirements of the testing system. The next custom made a dynamic water driven hydrostatic test rig capable of
stage of the process involved a specific brief sent through to our both R&D and batch testing of production hoses. The rig is operator
engineering team. They required a testing rig capable of measuring led via a touch screen control, each step is carefully controlled and all
pressure, temperature, flow rate, torque and RPM for finished data archived for future repeatability tests.
machine testing of the hydraulic operations.
Testing capabilities
Testing capabilities The hydrostatic test rig was able to test the following for R&D and
production purposes:
The testing rig displays the pressure, temperature, flow rate, torque
and RPM providing continual monitoring and data acquisition for Unified rate of rise in pressure
the production quality team. The testing system has multi-channel Proportional control of pressure
connectivity with up to 16 channels, any combination of data can be Endurance testing
recorded and archived through our HYDROcom6 software for further Burst test to capture all of the key information
analysis. With universal connections fitted to the test rig a whole range Dynamic destructive testing Key features
of data logging equipment and instrumentation can be connected Key features Unified rate of rise in pressure
providing the manufacturer with further data and added convenience. Proportionally control pressure testing
Bespoke fluid power test solutions
Data logging capabilities
Test rig and software design Customised software to proof test the pressure in hoses
Data logging capabilities The test rig is controlled via a PLC/HMI control unit mounted on the
Dynamic destructive testing
Measures multiple process parameters side of the test bay. Fully calibrated sensors logging flow, pressure,
Since installation the system has provided an all in one test and
Fully user programmable temperature and hose expansion all provide signals to a real time data Fully calibrated sensors logging flow, pressure & temperature
measurement solution, giving real time analysis to the production line
Powerful diagnostic capability logging module which in turn gives in-depth analysis of the results. Controlled via a PLC/HMI control unit mounted on the side
enabling a traceable and efficient quality management solution. One of
the unique features of the system is that the rig can be set to run but Expandable at a later date Development Engineers are given extra insight into to their product’s
doesn’t start writing data to the memory until certain key trigger points behaviour. The water tank has an integral automatic feed to main Example applications
have been met, eg. a rising pressure or flow rate. water supply. Hydraulics & Pneumatics
Example applications Industrial Machinery
The logger will capture the data leading up to this trigger point and Production acceptance
Design Plant Engineering
also record all the data after the trigger. This means the operator All Hydrotechnik test rigs are designed using a 3D CAD system, and Refrigeration & HVAC
End of line quality testing
only captures the key information required during a test and the data manufactured under ISO 9001 procedures to the highest engineering
Plant maintenance tests Automotive
is accurately recorded. This helps the operator of the rig get into standards.
position before starting the machine on test and cycling the hydraulics.
Advantages Advantages
Result
Easy to use User friendly operation
Design After successful installation the hose manufacturer has gained a greater
High quality data / reports Analyse data trends for proof component testing
All Hydrotechnik test rigs are designed using a 3D CAD system, and understanding and faster testing of the hoses they produce. This in
manufactured under ISO 9001 procedures to the highest engineering Reduced downtime, increased production flow turn has helped them win more business and rapidly proof test Display and processing of several channels or measurement series
standards. Rugged and reliable new product developments. Full traceability of tested parts
More channels can be added easily Fast acquisition of measurement values
Advantages
Advantages
Easy to use
User friendly operation
High quality data / reports
Analyse data trends for proof component testing
Low Cost
Display and processing of several channels or measurement series
Rugged and reliable
Cyclical testing for product proof testing
Fast acquisition of measurement values
Pressure Flow turbines Gear flow meters Load Infra red RPM Inductive RPM
TION
MENTA
& INSTRU
SORS
PRESSU
RE SEN
OT EC HNEDIK
HY DR UK LIMIT
Sensors
Pressurerumentation
GAS CH
AR GING TES
T KITS and Inst
NITRO
GEN
HNIK
OT EC
HY DR
ED
UK LIMIT
GAS
NITROGENG TEST KITS
sensors
accuracy
Rugged high ng applications
rangi
for wide
CHARGIN
n technology
rmance silico to 4000 bar
High perfo ar
s from 10mb
with range ns
mised desig
and custo resistance
Standard overload
shock and
vibration,
Excellent ined
eratu re and comb
High temp e sensors
emperatur
pressure/t ys,
accumulators s, panel displa
to fit most Digital gauge test kits
ing Test Kits rs and
Gas Charg ing & data logge
Nitrogen ess® charg
to use Minim
Safe & easy ctions m
testing conne lent syste
s offer excel
® test point
Minimess
s versa tility ction on to
acces hose conne
tightening
Simple hand s
valve
charging bleed
test, charge or
Safely
.uk
chnik.co
.hydrote
more at www
Discover
.uk
chnik.co
.hydrote
more at www
Discover
8Discover us now:at0115
Callmore 900 3550
www.hydrotechnik.co.uk