Ch:0+000 Ch:0+040 Ch:0+080

GL:1177.284 GL:1174.927 GL:1173.443


DL:1177.123 DL:1174.761 DL:1172.391

1:0
1:0

.5
.5

1:0
.5
+5.00%
+5.00% -5.00% +5.00% +5.00% -5.00% 1:10

1:0
.5
Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2
Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 4.426 m2 Cut - 3.513 m2 Cut - 10.244 m2
Datum 1170 m
Fill - 0.000 m2 Fill - 0.910 m2 Fill - 0.000 m2
DrainCut - 0.700 m2
Datum 1172 m DrainCut - 0.700 m2 DrainCut - 0.700 m2
Datum 1174 m StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

1:0
.5
Ch:0+010 Ch:0+050 Ch:0+090
GL:1175.818 GL:1175.097 GL:1173.254
DL:1176.538 DL:1174.168 DL:1171.799

1:0
.5
+0.77% +3.07% 1:10
+5.00% +5.00% +5.00% -5.00% 1:10
1:1
.5

H-2.00m
Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2
Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 0.000 m2 MasonryBreastWall - 1.280 m2 Cut - 14.118 m2
Datum 1174 m Fill - 4.240 m2 Cut - 15.889 m2 Fill - 0.000 m2
DrainCut - 0.261 m2 Fill - 0.000 m2 Datum 1169 m DrainCut - 0.700 m2
StructureCut - 0.000 m2 Datum 1171 m DrainCut - 0.700 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 StructureCut - 30.061 m2 BackFill - 0.000 m2
BackFill - 29.206 m2

1:0
.5
Ch:0+020 Ch:0+060 Ch:0+100
GL:1175.670 GL:1175.248 GL:1173.179
DL:1175.945 DL:1173.576 DL:1171.207

1:0
.5
+5.00% 1:10
+5.00% +5.00% -2.99% +5.00% -5.00% 1:10
1:1
.5

H-2.00m
Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2
Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 0.033 m2 MasonryBreastWall - 1.280 m2 Datum 1169 m Cut - 17.858 m2
Fill - 3.876 m2 Datum 1171 m Cut - 32.347 m2 Fill - 0.000 m2

Datum 1173 m DrainCut - 0.467 m2 Fill - 0.000 m2 DrainCut - 0.700 m2


StructureCut - 0.000 m2 DrainCut - 0.700 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 StructureCut - 23.172 m2 BackFill - 0.000 m2
BackFill - 22.317 m2

Ch:0+030 Ch:0+070 Ch:0+110


GL:1175.310 GL:1174.418 GL:1172.687
DL:1175.353 DL:1172.984 DL:1170.614

1:0
.5
1:0
1:0

.5
.5

+5.00%
+5.00% +5.00% -5.00% 1:10 +5.00% -5.00% 1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 2.249 m2 Cut - 12.955 m2 Cut - 23.725 m2
Datum 1173 m
Fill - 0.489 m2 Fill - 0.000 m2 Datum 1168 m Fill - 0.000 m2
DrainCut - 0.700 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
Datum 1170 m
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

CONSULTANT: DATE REVISION SIGNATURE DESIGNED BY : SCALE


DATE:
Cross-Section
DRAWN BY : 1: 200

1
SJVN Arun-3 Power Development Company Pvt. Ltd. 2m 0 4m
DRG NO :
(SAPDC) Tumlingtar, Nepal CHECKED BY :
0+000-0+110
APPROVED BY : SHEET NO : 1
1:0
.5
Ch:0+120 Ch:0+160 Ch:0+200
GL:1172.122 GL:1169.168 GL:1166.387
DL:1170.022 DL:1167.653 DL:1165.283

1:0
.5
1:0
.5
-3.00% -3.00% 1:10
+5.00% -5.00% 1:10 +5.00% -5.00%
1:10

H-3.00m
Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2
Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
MasonryBreastWall - 2.370 m2 Cut - 15.311 m2 Datum 1163 m Cut - 16.350 m2
Cut - 32.145 m2 Fill - 0.000 m2 Fill - 0.000 m2
Datum 1165 m
Fill - 0.000 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
Datum 1167 m
DrainCut - 0.700 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
StructureCut - 2.455 m2 BackFill - 0.000 m2 BackFill - 0.000 m2
BackFill - 0.760 m2

1:0
.5

Ch:0+130 Ch:0+170 Ch:0+210


GL:1171.577 GL:1168.091 GL:1165.443
DL:1169.430 DL:1167.060 DL:1164.691

1:0
.5

1:0
.5
+2.27% -3.00% -3.00%
+5.00% -5.00% 1:10 +5.00%
1:10

1:0
.5
H-3.00m
Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2
Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
PipeCulvert
MasonryBreastWall - 2.370 m2 Cut - 8.738 m2 Cut - 5.576 m2
Datum 1167 m Cut - 31.006 m2 Fill - 0.778 m2 Fill - 0.000 m2
Datum 1162 m
Fill - 0.000 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
Datum 1164 m
DrainCut - 0.700 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
StructureCut - 2.455 m2 BackFill - 0.000 m2 BackFill - 0.000 m2
BackFill - 0.760 m2

Ch:0+140 Ch:0+180 Ch:0+220


GL:1170.913 GL:1167.194 GL:1164.432
1:0

DL:1168.837 DL:1166.468 DL:1164.099


.5

1:0

1:0
.5

.5
+3.00% +3.00% -3.00% -3.00%
+5.00% -5.00% 1:10

1:1
.5

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 25.514 m2 Cut - 9.164 m2 Cut - 3.725 m2
Fill - 0.000 m2 Datum 1164 m Fill - 5.006 m2 Fill - 0.978 m2
Datum 1166 m DrainCut - 0.700 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2
Datum 1161 m StructureCut - 0.000 m2
1:1
BackFill - 0.000 m2 BackFill - 0.000 m2 .5 BackFill - 0.000 m2

Ch:0+150 Ch:0+190 Ch:0+230


GL:1169.988 GL:1167.197 GL:1163.363
DL:1168.245 DL:1165.876 DL:1163.506
1:0
.5

1:0
.5

1:0
.5
+3.00% +3.00% -0.41% -0.41%
+5.00% -5.00%
1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Datum 1166 m Cut - 18.454 m2 Cut - 13.450 m2 GabionRetainingWall - 4.500 m2
Fill - 0.000 m2 Fill - 0.000 m2 Datum 1161 m Cut - 0.651 m2
DrainCut - 0.700 m2 Datum 1163 m DrainCut - 0.700 m2 Fill - 1.843 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2 DrainCut - 0.700 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 StructureCut - 6.978 m2
BackFill - 4.375 m2
H-3.00m

CONSULTANT: DATE REVISION SIGNATURE DESIGNED BY : SCALE


DATE:
Cross-Section
DRAWN BY : 1: 200

1
SJVN Arun-3 Power Development Company Pvt. Ltd. 2m 0 4m
DRG NO :
(SAPDC) Tumlingtar, Nepal CHECKED BY :
0+120-0+230
APPROVED BY : SHEET NO : 2
1:0
.5
Ch:0+240 Ch:0+280 Ch:0+320
GL:1162.661 GL:1160.512 GL:1158.893
DL:1162.914 DL:1160.545 DL:1158.175

1:0

1:0
.5

.5
+3.00% +3.00% -3.00% -3.00% +3.00% +3.00% 1:10

1:1
.5

H-2.00m
Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2
Drain - 0.460 m2 1:1 Drain - 0.460 m2 Drain - 0.460 m2
.5
Cut - 3.849 m2 Cut - 1.826 m2 MasonryBreastWall - 1.280 m2
Fill - 1.740 m2 Datum 1158 m Fill - 1.199 m2 Cut - 29.159 m2

Datum 1160 m DrainCut - 0.700 m2 DrainCut - 0.700 m2 Fill - 0.000 m2


StructureCut - 0.000 m2 StructureCut - 0.000 m2 Datum 1155 m DrainCut - 0.700 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 StructureCut - 40.678 m2
BackFill - 39.823 m2

Ch:0+250 Ch:0+290 Ch:0+330


GL:1161.878 GL:1160.217 GL:1159.103
DL:1162.322 DL:1159.952 DL:1157.596

1:0
1:0

.5
.5

1:0
.5
+3.00% +3.00% -3.00% -3.00% +3.00% +3.00% 1:10

1:1
.5

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 16.189 m2 Cut - 4.642 m2 Cut - 17.622 m2
Datum 1160 m
Fill - 1.358 m2 Fill - 0.584 m2 Datum 1155 m Fill - 0.000 m2
DrainCut - 0.700 m2 Datum 1157 m DrainCut - 0.700 m2 DrainCut - 0.700 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

Ch:0+260 Ch:0+300 Ch:0+340


GL:1162.220 GL:1159.856 GL:1158.620
DL:1161.729 DL:1159.360 DL:1157.113

1:0
.5
1:0
.5
1:0
.5

+3.00% 1:10 -3.00% +3.00% 1:10


+3.00% -3.00% +3.00%

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 6.775 m2 Cut - 5.054 m2 Cut - 19.537 m2
Datum 1157 m
Fill - 0.000 m2 Fill - 0.010 m2 Fill - 0.000 m2
Datum 1159 m
DrainCut - 0.700 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2 Datum 1154 m StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2
1:0
.5

Ch:0+270 Ch:0+310 Ch:0+350

1:0
.5
GL:1161.654 GL:1159.571 GL:1158.140
DL:1161.137 DL:1158.768 DL:1156.727
1:0
.5

1:10
+0.40% +0.40% -0.48% -0.48% +4.76%
+4.76%
1:1
.5

1:1
.5 H-2.00m
Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2
Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 7.035 m2 MasonryBreastWall - 1.280 m2 Cut - 35.609 m2
Fill - 0.705 m2 Cut - 9.547 m2 Fill - 0.000 m2
Datum 1156 m Datum 1154 m
DrainCut - 0.700 m2 Fill - 0.114 m2 DrainCut - 0.700 m2
Datum 1158 m StructureCut - 0.000 m2 DrainCut - 0.700 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 StructureCut - 31.187 m2 BackFill - 0.000 m2
BackFill - 30.332 m2

CONSULTANT: DATE REVISION SIGNATURE DESIGNED BY : SCALE


DATE:
Cross-Section
DRAWN BY : 1: 200

1
SJVN Arun-3 Power Development Company Pvt. Ltd. 2m 0 4m
DRG NO :
(SAPDC) Tumlingtar, Nepal CHECKED BY :
0+240-0+350
APPROVED BY : SHEET NO : 3
1:0
.5
Ch:0+360 Ch:0+400 Ch:0+440
GL:1157.459 GL:1156.537 GL:1153.477

1:0
DL:1156.356 DL:1154.872 DL:1153.385

.5

1:0
.5
+5.00% -5.00% 1:10 +5.00% -5.00% 1:10 +5.00% -5.00%

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 25.783 m2 Cut - 22.888 m2 Cut - 3.631 m2
Datum 1154 m Datum 1151 m
Fill - 0.000 m2 Fill - 0.000 m2 Fill - 0.000 m2
DrainCut - 0.700 m2 Datum 1152 m DrainCut - 0.700 m2 DrainCut - 0.700 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

1:0
.5

Ch:0+370 Ch:0+410 Ch:0+450


GL:1158.452 GL:1155.462 GL:1153.542
DL:1155.985 DL:1154.501 DL:1152.812

1:0
.5
1:0
.5
+5.00% -5.00% 1:10 +5.00% -5.00% +5.00% -3.49%
1:10 1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 31.761 m2 Cut - 12.818 m2 Cut - 11.836 m2
Fill - 0.000 m2 Datum 1152 m Fill - 0.000 m2 Fill - 0.000 m2
DrainCut - 0.700 m2 DrainCut - 0.700 m2 Datum 1150 m DrainCut - 0.700 m2
Datum 1153 m
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

1:0
.5
Ch:0+380 Ch:0+420 Ch:0+460
GL:1157.054 GL:1154.685 GL:1153.452
1:0

DL:1155.614 DL:1154.130 DL:1151.926


.5

1:0
.5
+3.00% 1:10
+5.00% -5.00% 1:10 +5.00% -5.00% +3.00%

1:
1
H-3.00m
Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2
Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 20.100 m2 Cut - 4.307 m2 MasonryBreastWall - 2.370 m2

Datum 1153 m Fill - 0.000 m2 Fill - 0.961 m2 Cut - 30.096 m2


DrainCut - 0.700 m2 DrainCut - 0.700 m2 Datum 1149 m Fill - 0.000 m2
StructureCut - 0.000 m2 Datum 1151 m StructureCut - 0.000 m2 DrainCut - 0.700 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 StructureCut - 2.455 m2
BackFill - 0.760 m2

1:0
.5
Ch:0+390 Ch:0+430 Ch:0+470
GL:1156.394 GL:1153.979 GL:1152.981
DL:1155.243 DL:1153.759 DL:1150.923
1:0
.5

1:0
.5

1:10
+3.00% +3.00%
+5.00% -5.00% 1:10 +5.00% -5.00%

1:1
.5

H-3.00m
Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2
Drain - 0.460 m2 Drain - 0.460 m2 PipeCulvert
Drain - 0.460 m2
Datum 1153 m Cut - 19.268 m2 Cut - 4.279 m2 MasonryBreastWall - 2.370 m2
Fill - 0.000 m2 Fill - 0.223 m2 Cut - 45.803 m2
DrainCut - 0.700 m2
Datum 1151 m DrainCut - 0.700 m2 Datum 1148 m Fill - 0.000 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2 DrainCut - 0.700 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 StructureCut - 2.455 m2
BackFill - 0.760 m2

CONSULTANT: DATE REVISION SIGNATURE DESIGNED BY : SCALE


DATE:
Cross-Section
DRAWN BY : 1: 200

1
SJVN Arun-3 Power Development Company Pvt. Ltd. 2m 0 4m
DRG NO :
(SAPDC) Tumlingtar, Nepal CHECKED BY :
0+360-0+470
APPROVED BY : SHEET NO : 4
1:0
.5
Ch:0+480 Ch:0+520 Ch:0+560
GL:1151.268 GL:1145.663 GL:1144.343

1:0
.5
DL:1149.919 DL:1145.905 DL:1141.892

1:0
.5
1:10
+3.00% +3.00% -3.00% -3.00% +1.51% -5.00%

H-3.00m
Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2
Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 16.602 m2 GabionRetainingWall - 4.500 m2 MasonryBreastWall - 2.370 m2
Fill - 0.000 m2 Cut - 4.912 m2 Cut - 43.645 m2

Datum 1147 m DrainCut - 0.700 m2 Datum 1143 m Fill - 2.373 m2 Datum 1139 m Fill - 0.000 m2
StructureCut - 0.000 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
BackFill - 0.000 m2 StructureCut - 5.692 m2 StructureCut - 2.455 m2
BackFill - 3.832 m2 BackFill - 0.760 m2
H-3.00m

Ch:0+490 Ch:0+530 Ch:0+570


GL:1148.857 GL:1145.082 GL:1142.890

1:0

1:0
.5

.5
DL:1148.916 DL:1144.902 DL:1140.888
1:0
.5

+3.00% +3.00% +0.01% +2.01%


-5.00% -5.00%
1:10

1:
1

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 4.494 m2 GabionRetainingWall - 2.500 m2 Cut - 20.479 m2
Fill - 1.651 m2 Cut - 9.766 m2 Fill - 0.000 m2

Datum 1146 m DrainCut - 0.700 m2 Datum 1142 m Fill - 0.681 m2 Datum 1138 m DrainCut - 0.700 m2
StructureCut - 0.000 m2 DrainCut - 0.700 m2 H-2.00m StructureCut - 0.000 m2
BackFill - 0.000 m2 StructureCut - 3.156 m2 BackFill - 0.000 m2
BackFill - 0.006 m2
1:0

Ch:0+500 Ch:0+540 Ch:0+580

1:0
.5

.5
GL:1147.021 GL:1144.930 GL:1141.174
DL:1147.912 DL:1143.899 DL:1139.885

1:0
.5
+3.00% +3.00% +0.51% +2.51%
-5.00% -5.00%
1:10

1:1
Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2 .5
Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
GabionRetainingWall - 4.500 m2 Cut - 19.764 m2 Cut - 9.124 m2
Cut - 14.574 m2 Fill - 0.000 m2 Fill - 1.478 m2

Datum 1145 m Fill - 4.327 m2 Datum 1141 m DrainCut - 0.700 m2 Datum 1137 m DrainCut - 0.700 m2
DrainCut - 0.700 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
StructureCut - 3.327 m2 BackFill - 0.000 m2 BackFill - 0.000 m2
BackFill - 2.064 m2 H-3.00m
1:0
.5

Ch:0+510 Ch:0+550 Ch:0+590


1:0

GL:1146.377 GL:1144.961 GL:1139.747


.5

DL:1146.909 DL:1142.895 DL:1138.881

1:0
.5
-0.86% -0.86% +1.01% -5.00% 1:10 +3.01% -5.00%

H-3.00m
Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2
Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
GabionRetainingWall - 4.500 m2 MasonryBreastWall - 2.370 m2 Cut - 10.583 m2
Cut - 9.010 m2 Cut - 38.868 m2 Fill - 0.000 m2

Datum 1144 m Fill - 4.123 m2 Datum 1140 m Fill - 0.000 m2 Datum 1136 m DrainCut - 0.700 m2
DrainCut - 0.700 m2 DrainCut - 0.700 m2 StructureCut - 0.000 m2
StructureCut - 2.862 m2 StructureCut - 2.455 m2 BackFill - 0.000 m2
BackFill - 2.025 m2 BackFill - 0.760 m2
H-3.00m

CONSULTANT: DATE REVISION SIGNATURE DESIGNED BY : SCALE


DATE:
Cross-Section
DRAWN BY : 1: 200

1
SJVN Arun-3 Power Development Company Pvt. Ltd. 2m 0 4m
DRG NO :
(SAPDC) Tumlingtar, Nepal CHECKED BY :
0+480-0+590
APPROVED BY : SHEET NO : 5
Ch:0+600 Ch:0+640 Ch:0+680
GL:1138.434 GL:1133.598 GL:1130.393
DL:1137.878 DL:1133.864 DL:1129.850

1:0
.5

1:0

1:0
.5

.5
-4.81% -3.00%
+3.51% -5.00% -4.81% -3.00%
1:10
1:1
.5

1:
1
Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2
Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 14.821 m2 Cut - 4.016 m2 Cut - 5.278 m2
Fill - 0.000 m2 Fill - 0.822 m2 Fill - 0.207 m2
Datum 1135 m DrainCut - 0.700 m2 Datum 1131 m DrainCut - 0.700 m2 Datum 1127 m DrainCut - 0.700 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

Ch:0+610 Ch:0+650 Ch:0+690


GL:1137.025 GL:1132.341 GL:1129.938
DL:1136.875 DL:1132.861 DL:1128.847
1:0
.5

1:0
.5
1:0
.5
-3.00% -3.00% -3.00% -3.00%
+4.02% -5.00% 1:10 1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 11.765 m2 Cut - 1.715 m2 Cut - 12.186 m2
1:1
Fill - 0.000 m2 Fill - 6.389 m2 .5 Fill - 0.000 m2
Datum 1134 m DrainCut - 0.700 m2 Datum 1130 m DrainCut - 0.700 m2 Datum 1126 m DrainCut - 0.700 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

Ch:0+620 Ch:0+660 Ch:0+700


GL:1135.666 GL:1130.732 GL:1128.994
DL:1135.871 DL:1131.857 DL:1127.844

1:0
1:0

.5
.5

1:0
.5
-3.00% -3.00% -3.00% -3.00%
+4.52% -5.00%
1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 5.541 m2 GabionRetainingWall - 2.500 m2 Cut - 16.202 m2
Fill - 0.733 m2 Cut - 1.672 m2 Fill - 0.000 m2
Datum 1133 m DrainCut - 0.700 m2 Datum 1129 m Fill - 6.422 m2 Datum 1125 m DrainCut - 0.700 m2
StructureCut - 0.000 m2 DrainCut - 0.700 m2 H-2.00m StructureCut - 0.000 m2
BackFill - 0.000 m2 StructureCut - 1.119 m2 BackFill - 0.000 m2
BackFill - 0.643 m2

Ch:0+630 Ch:0+670 Ch:0+710


GL:1134.664 GL:1130.143 GL:1127.869
DL:1134.868 DL:1130.854 DL:1126.840

1:0
.5
1:0
.5

-3.00% -3.00% -3.00% -3.00%


+5.00% -5.00%

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
PipeCulvert
Cut - 6.022 m2 GabionRetainingWall - 4.500 m2 Cut - 12.984 m2
Fill - 0.513 m2 Cut - 0.000 m2 Fill - 0.000 m2
Datum 1132 m DrainCut - 0.700 m2 Datum 1128 m Fill - 7.151 m2 Datum 1124 m DrainCut - 0.700 m2
StructureCut - 0.000 m2 DrainCut - 0.402 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 StructureCut - 3.328 m2 BackFill - 0.000 m2
BackFill - 1.415 m2
H-3.00m

CONSULTANT: DATE REVISION SIGNATURE DESIGNED BY : SCALE


DATE:
Cross-Section
DRAWN BY : 1: 200

1
SJVN Arun-3 Power Development Company Pvt. Ltd. 2m 0 4m
DRG NO :
(SAPDC) Tumlingtar, Nepal CHECKED BY :
0+600-0+710
APPROVED BY : SHEET NO : 6
1:0
.5
Ch:0+720 Ch:0+760 Ch:0+800

1:0
.5
GL:1126.773 GL:1126.109 GL:1120.030

1:0
DL:1125.837 DL:1121.823 DL:1117.809

.5
-3.00% -3.00% 1:10
+5.00% -5.00% +5.00% -5.00%
1:10

H-3.00m
Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2
Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 12.156 m2 MasonryBreastWall - 2.370 m2 Cut - 29.569 m2
Fill - 0.000 m2 Cut - 48.867 m2 Fill - 0.000 m2
Datum 1123 m DrainCut - 0.700 m2 Datum 1119 m Fill - 0.000 m2 Datum 1115 m DrainCut - 0.700 m2
StructureCut - 0.000 m2 DrainCut - 0.700 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 StructureCut - 2.455 m2 BackFill - 0.000 m2
BackFill - 0.760 m2

1:0
.5
Ch:0+730 Ch:0+770 Ch:0+810
1:0
.5

GL:1126.805 GL:1124.413 GL:1118.610


DL:1124.833 DL:1120.819 DL:1116.806

1:0
.5
-3.00% -3.00% 1:10 +5.00% -5.00% 1:10 +5.00% -5.00% 1:10

H-3.00m
Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2
Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 25.391 m2 MasonryBreastWall - 2.370 m2 Cut - 23.268 m2
Fill - 0.000 m2 Cut - 35.677 m2 Fill - 0.000 m2
Datum 1122 m DrainCut - 0.700 m2 Datum 1118 m Fill - 0.000 m2 Datum 1114 m DrainCut - 0.700 m2
StructureCut - 0.000 m2 DrainCut - 0.700 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 StructureCut - 2.455 m2 BackFill - 0.000 m2
BackFill - 0.760 m2
1:0
.5

Ch:0+740 Ch:0+780 Ch:0+820

1:0
.5
GL:1126.973 GL:1122.640 GL:1117.248
DL:1123.830 DL:1119.816 DL:1115.802

1:0
.5
-3.00% -3.00% 1:10 +5.00% -5.00% 1:10 +5.00% -5.00%
1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 39.338 m2 Cut - 33.670 m2 Cut - 18.920 m2
Fill - 0.000 m2 Fill - 0.000 m2 Fill - 0.000 m2
Datum 1121 m DrainCut - 0.700 m2 Datum 1117 m DrainCut - 0.700 m2 Datum 1113 m DrainCut - 0.700 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2
1:0
.5

Ch:0+750 Ch:0+790 Ch:0+830


1:0
.5

GL:1126.950 GL:1121.315 GL:1115.887


DL:1122.826 DL:1118.813 DL:1114.799

1:0
.5
-3.21% -3.21% 1:10 +5.00% -5.00% +5.00% -5.00%
1:10

H-3.00m

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
MasonryBreastWall - 2.370 m2 Cut - 26.659 m2 Cut - 12.326 m2
Cut - 43.509 m2 Fill - 0.000 m2 Fill - 0.000 m2
Datum 1120 m Fill - 0.000 m2 Datum 1116 m DrainCut - 0.700 m2 Datum 1112 m DrainCut - 0.700 m2
DrainCut - 0.700 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
StructureCut - 2.455 m2 BackFill - 0.000 m2 BackFill - 0.000 m2
BackFill - 0.760 m2

CONSULTANT: DATE REVISION SIGNATURE DESIGNED BY : SCALE


DATE:
Cross-Section
DRAWN BY : 1: 200

1
SJVN Arun-3 Power Development Company Pvt. Ltd. 2m 0 4m
DRG NO :
(SAPDC) Tumlingtar, Nepal CHECKED BY :
0+720-0+830
APPROVED BY : SHEET NO : 7
1:10

Ch:0+840 Ch:0+880 Ch:0+920


GL:1114.530 GL:1109.954 GL:1110.216
DL:1113.795 DL:1111.178 DL:1109.024

1:0
.5
1:0
.5
1:0
.5
+3.00% +3.00%
+5.00% -5.00% +5.00% -5.00%
1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
PipeCulvert
Cut - 6.162 m2 GabionRetainingWall - 4.500 m2 Cut - 16.269 m2
Fill - 0.000 m2 Cut - 3.076 m2 Fill - 0.000 m2
Datum 1111 m DrainCut - 0.700 m2 Fill - 5.718 m2 DrainCut - 0.700 m2
Datum 1106 m
StructureCut - 0.000 m2 Datum 1108 m DrainCut - 0.700 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 StructureCut - 4.502 m2 BackFill - 0.000 m2
BackFill - 2.229 m2
H-3.00m

Ch:0+850 Ch:0+890 Ch:0+930


GL:1113.092 GL:1110.602 GL:1110.123
DL:1112.909 DL:1110.640 DL:1108.486

1:0
.5
1:0
.5
1:0

1:10
.5

+1.26% +2.45% +2.45%


+5.00% -5.00% -5.00%

1:0
.5

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 2.549 m2 GabionRetainingWall - 4.500 m2 Cut - 21.040 m2
Fill - 0.699 m2 Cut - 8.075 m2 Datum 1106 m Fill - 0.000 m2
Datum 1108 m
Datum 1110 m DrainCut - 0.700 m2 Fill - 1.385 m2 DrainCut - 0.700 m2
StructureCut - 0.000 m2 DrainCut - 0.700 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 StructureCut - 6.526 m2 BackFill - 0.000 m2
BackFill - 0.005 m2
H-3.00m

Ch:0+860 Ch:0+900 Ch:0+940


GL:1111.774 GL:1111.479 GL:1110.111

1:0
DL:1112.255 DL:1110.101 DL:1107.947

.5
1:0
.5
1:100
1:0

-3.00% -3.00% 1:10


.5

+5.00% -5.00% -3.00% -3.00%

1:1
.5

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2

Datum 1110 m GabionRetainingWall - 2.500 m2 Cut - 15.494 m2 Cut - 27.577 m2


Cut - 0.554 m2 Fill - 0.093 m2 Fill - 0.000 m2
Fill - 2.684 m2 DrainCut - 0.700 m2 Datum 1105 m DrainCut - 0.700 m2
DrainCut - 0.700 m2 H-2.00m Datum 1107 m StructureCut - 0.000 m2 StructureCut - 0.000 m2
StructureCut - 2.764 m2 BackFill - 0.000 m2 BackFill - 0.000 m2
BackFill - 1.431 m2

Ch:0+870 Ch:0+910 Ch:0+950


GL:1110.664 GL:1110.829 GL:1110.088
DL:1111.717 DL:1109.563 DL:1107.409

1:0
1:0

.5
.5

-0.15% -0.15% -3.00% -3.00% 1:10


+5.00% -5.00%

Pavement - 0.000 m2 Pavement - 0.000 m2 1:1 Pavement - 0.000 m2


.5
Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
GabionRetainingWall - 2.500 m2 Cut - 18.363 m2 Cut - 29.828 m2
Datum 1105 m
Cut - 0.010 m2 Datum 1107 m Fill - 1.267 m2 Fill - 0.000 m2
Datum 1109 m
Fill - 5.431 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
DrainCut - 0.581 m2 H-2.00m StructureCut - 0.000 m2 StructureCut - 0.000 m2
StructureCut - 2.046 m2 BackFill - 0.000 m2 BackFill - 0.000 m2
BackFill - 0.639 m2

CONSULTANT: DATE REVISION SIGNATURE DESIGNED BY : SCALE


DATE:
Cross-Section
DRAWN BY : 1: 200

1
SJVN Arun-3 Power Development Company Pvt. Ltd. 2m 0 4m
DRG NO :
(SAPDC) Tumlingtar, Nepal CHECKED BY :
0+840-0+950
APPROVED BY : SHEET NO : 8
Ch:0+960 Ch:1+000 Ch:1+040
GL:1110.688 GL:1106.028 GL:1103.717

1:0

1:0
DL:1106.870 DL:1104.716 DL:1101.814

.5

.5

1:0
.5
1:10 +3.00% 1:10
+5.00% -5.00% +3.00% +1.81% -5.00% 1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 31.519 m2 Cut - 27.208 m2 Cut - 21.128 m2
Fill - 0.000 m2 Fill - 0.000 m2 Fill - 0.000 m2
Datum 1102 m Datum 1099 m
Datum 1104 m DrainCut - 0.700 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

Ch:0+970 Ch:1+010 Ch:1+050


GL:1108.807 GL:1104.848 GL:1102.281
DL:1106.332 DL:1104.178 DL:1100.682

1:0
.5

1:0
1:0

.5
.5

1:10 -3.00%
+5.00% -5.00% -3.00% +3.03% -5.00% 1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 26.500 m2 Cut - 14.177 m2 Cut - 20.038 m2
Datum 1104 m
Fill - 0.000 m2 Fill - 0.000 m2 Fill - 0.000 m2
Datum 1098 m
DrainCut - 0.700 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
StructureCut - 0.000 m2 Datum 1101 m StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

Ch:0+980 Ch:1+020 Ch:1+060


GL:1108.021 GL:1106.077 GL:1101.216

1:0
DL:1105.793 DL:1103.629 DL:1099.549

.5
1:0
.5

1:0
.5
1:10 -3.00% -3.00%
+5.00% -3.83% 1:10 +4.25% -5.00%
1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 28.501 m2 Cut - 22.224 m2 Cut - 22.734 m2
Fill - 0.000 m2
Datum 1101 m Fill - 0.000 m2 Datum 1097 m Fill - 0.000 m2
Datum 1103 m DrainCut - 0.700 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

Ch:0+990 Ch:1+030 Ch:1+070

1:0
.5
GL:1107.207 GL:1105.141 GL:1101.987
1:0

DL:1105.255 DL:1102.865 DL:1098.416


.5

1:0
.5

+3.00% 1:10 -4.65%


+3.00% +0.59% -5.00% -5.00% 1:10
1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2

Datum 1103 m Cut - 31.274 m2 Cut - 22.828 m2 Cut - 43.611 m2


Fill - 0.000 m2 Fill - 0.000 m2
Datum 1096 m Fill - 0.000 m2
DrainCut - 0.700 m2 Datum 1100 m DrainCut - 0.700 m2 DrainCut - 0.700 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

CONSULTANT: DATE REVISION SIGNATURE DESIGNED BY : SCALE


DATE:
Cross-Section
DRAWN BY : 1: 200

1
SJVN Arun-3 Power Development Company Pvt. Ltd. 2m 0 4m
DRG NO :
(SAPDC) Tumlingtar, Nepal CHECKED BY :
0+960-1+070
APPROVED BY : SHEET NO : 9
.5
1:0
Ch:1+080 Ch:1+120 Ch:1+160

1:0
GL:1100.695 GL:1094.057 GL:1091.142

.5
DL:1097.284 DL:1092.753 DL:1088.223

.5
1:0
1:2

-3.00% -3.00% 1:10 +1.40% +1.40% +5.00% -5.00%

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


PipeCulvert
Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2

Datum 1095 m Cut - 40.927 m2 Cut - 17.651 m2 Datum 1086 m Cut - 40.567 m2
Fill - 0.000 m2 Fill - 0.000 m2 Fill - 0.000 m2
DrainCut - 0.700 m2
Datum 1090 m DrainCut - 0.700 m2 DrainCut - 0.700 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

.5
1:0
Ch:1+090 Ch:1+130 Ch:1+170
GL:1097.606 GL:1093.152 GL:1093.740
DL:1096.151 DL:1091.621 DL:1087.090

.5
1:0
1:0

.5
.5

1:0
-3.00% +3.00% 1:10 +3.00%
-3.00% +3.00% +3.00%
1:10

H-3.00m

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 13.439 m2 Cut - 11.935 m2 MasonryBreastWall - 2.370 m2
Fill - 0.000 m2 Datum 1089 m Fill - 0.000 m2 Cut - 74.745 m2
DrainCut - 0.700 m2 DrainCut - 0.700 m2 Fill - 0.000 m2
Datum 1093 m StructureCut - 0.000 m2 StructureCut - 0.000 m2
Datum 1084 m DrainCut - 0.700 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 StructureCut - 2.455 m2
BackFill - 0.760 m2

Ch:1+100 Ch:1+140 Ch:1+180


GL:1095.249 GL:1092.251 GL:1088.047
DL:1095.019 DL:1090.488 DL:1085.958

.5
1:0

.5
1:0
.5
1:0

-3.00% -3.00% +3.00% +3.00% +3.00% +3.00%


1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


GabionRetainingWall - 4.500 m2 Drain - 0.460 m2 Drain - 0.460 m2
Drain - 0.460 m2 Cut - 14.184 m2 Cut - 21.820 m2
Cut - 8.101 m2 Datum 1088 m Fill - 0.000 m2 Fill - 0.000 m2
Fill - 1.724 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
Datum 1092 m Datum 1083 m
DrainCut - 0.700 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
StructureCut - 6.771 m2 BackFill - 0.000 m2 BackFill - 0.000 m2
H-3.00m BackFill - 4.562 m2

Ch:1+110 Ch:1+150 Ch:1+190


GL:1095.692 GL:1091.812 GL:1086.616
DL:1093.886 DL:1089.356 DL:1084.826

.5
1:0
.5
1:0

1:0
.5
1:10 -1.12% -1.12% 1:10 +3.00% +3.00%
+5.00% -5.00%

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 14.047 m2 Cut - 23.145 m2 Cut - 15.756 m2
Datum 1087 m
Fill - 0.000 m2 Fill - 0.000 m2 Fill - 0.000 m2
Datum 1091 m DrainCut - 0.700 m2 DrainCut - 0.700 m2 Datum 1082 m DrainCut - 0.700 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

CONSULTANT: DATE REVISION SIGNATURE DESIGNED BY : SCALE


DATE:
Cross-Section
DRAWN BY : 1: 200

1
SJVN Arun-3 Power Development Company Pvt. Ltd. 2m 0 4m
DRG NO :
(SAPDC) Tumlingtar, Nepal CHECKED BY :
1+080-1+190
APPROVED BY : SHEET NO : 10
Ch:1+200 Ch:1+240 Ch:1+280
GL:1083.837 GL:1081.670 GL:1080.715
DL:1083.821 DL:1081.027 DL:1078.336

1:0
.5
1:0
.5
1:0
.5
+2.64% -5.00% +1.33%
+2.64% +5.00% -5.00% 1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
GabionRetainingWall - 4.500 m2 Cut - 5.913 m2 Cut - 28.230 m2
Datum 1076 m
Cut - 7.865 m2 Fill - 0.000 m2 Fill - 0.000 m2
Datum 1081 m Fill - 2.165 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
Datum 1078 m
DrainCut - 0.700 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
StructureCut - 6.113 m2 BackFill - 0.000 m2 BackFill - 0.000 m2
BackFill - 0.265 m2 H-3.00m
1:0

Ch:1+210 Ch:1+250 Ch:1+290


.5

GL:1083.553 GL:1081.343 GL:1080.086


DL:1083.045 DL:1080.354 DL:1077.663

1:0
.5
1:0
.5
-0.33% -0.33% -3.00% -3.00%
+4.28% -5.00% 1:10

1:1
Pavement - 0.000 m2 .5 Pavement - 0.000 m2 Pavement - 0.000 m2
Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
PipeCulvert
Cut - 18.651 m2 Cut - 7.469 m2 Cut - 22.989 m2
Datum 1078 m
Fill - 3.307 m2 Fill - 0.000 m2 Fill - 0.000 m2
Datum 1075 m
DrainCut - 0.700 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
Datum 1080 m
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

Ch:1+220 Ch:1+260 Ch:1+300


GL:1083.102 GL:1080.996 GL:1078.819
DL:1082.373 DL:1079.682 DL:1076.991
1:0
.5

1:0
.5

1:0
.5
-3.00% +3.00% 1:10
-3.00% +5.00% -5.00% +3.00%
1:100
1:1
.5

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 13.746 m2 Cut - 15.040 m2 Cut - 20.659 m2
Datum 1080 m
Fill - 0.023 m2 Fill - 0.000 m2 Fill - 0.000 m2
Datum 1077 m
DrainCut - 0.700 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
Datum 1074 m
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

Ch:1+230 Ch:1+270 Ch:1+310


GL:1082.160 GL:1080.844 GL:1077.450
DL:1081.700 DL:1079.009 DL:1076.318
1:0

1:0
.5

.5
1:0
.5

-3.00% 1:10 +4.73%


-3.00% +5.00% -5.00% +4.73%

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 10.018 m2 Cut - 22.693 m2 Cut - 14.429 m2
Datum 1074 m
Fill - 0.000 m2 Fill - 0.000 m2 Fill - 0.000 m2
Datum 1079 m
DrainCut - 0.700 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
Datum 1076 m
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

CONSULTANT: DATE REVISION SIGNATURE DESIGNED BY : SCALE


DATE:
Cross-Section
DRAWN BY : 1: 200

1
SJVN Arun-3 Power Development Company Pvt. Ltd. 2m 0 4m
DRG NO :
(SAPDC) Tumlingtar, Nepal CHECKED BY :
1+200-1+310
APPROVED BY : SHEET NO : 11
Ch:1+320 Ch:1+360 Ch:1+400
GL:1076.552 GL:1074.376 GL:1070.322
DL:1075.645 DL:1072.954 DL:1070.263

1:0

1:0
.5

.5
1:0
+3.99% -2.20%
+3.99%

.5
+5.00% -5.00% +5.00%

1:1
.5

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 6.082 m2 Cut - 17.564 m2 Datum 1068 m Cut - 7.512 m2
Fill - 0.000 m2 Fill - 0.000 m2 Fill - 1.812 m2
Datum 1073 m
DrainCut - 0.700 m2 Datum 1070 m DrainCut - 0.700 m2 DrainCut - 0.700 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

Ch:1+330 Ch:1+370 Ch:1+410


GL:1076.581 GL:1072.981 GL:1070.086

1:0
DL:1074.973 DL:1072.282 DL:1069.591

.5
1:0
.5
1:0
.5

-3.94% -0.40% -2.80%


-3.94% +5.00% +5.00%
1:10 1:10
1:1
.5

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 11.811 m2 Datum 1070 m Cut - 6.602 m2 Cut - 9.319 m2
Fill - 0.000 m2 Fill - 0.022 m2 Datum 1067 m Fill - 0.000 m2
DrainCut - 0.700 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
Datum 1072 m
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

Ch:1+340 Ch:1+380 Ch:1+420


GL:1076.301 GL:1071.722 GL:1069.303
1:0

1:0
.5

DL:1074.300 DL:1071.609 DL:1068.916

.5
1:0
.5
-3.00% -3.00% -1.00% -3.40%
+5.00% +5.00%

1:1
.5

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 21.728 m2 Cut - 5.547 m2 Cut - 7.095 m2
Datum 1072 m
Fill - 0.000 m2 Datum 1069 m Fill - 0.543 m2 Fill - 0.000 m2
DrainCut - 0.700 m2 DrainCut - 0.700 m2 Datum 1066 m DrainCut - 0.700 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

Ch:1+350 Ch:1+390 Ch:1+430


1:0

GL:1075.743 GL:1070.730 GL:1069.440


.5

DL:1073.627 DL:1070.936 DL:1068.097


1:0

1:0
.5

.5
+3.00% 1:10
+3.00% +5.00% -1.60% +5.00% -4.00%

1:1
.5

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 31.491 m2 Cut - 4.393 m2 1:1 Cut - 10.201 m2
.5
Datum 1071 m Fill - 0.000 m2 Fill - 5.903 m2 Fill - 0.110 m2
DrainCut - 0.700 m2 Datum 1068 m DrainCut - 0.700 m2 DrainCut - 0.700 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2
Datum 1065 m StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

CONSULTANT: DATE REVISION SIGNATURE DESIGNED BY : SCALE


DATE:
Cross-Section
DRAWN BY : 1: 200

1
SJVN Arun-3 Power Development Company Pvt. Ltd. 2m 0 4m
DRG NO :
(SAPDC) Tumlingtar, Nepal CHECKED BY :
1+320-1+430
APPROVED BY : SHEET NO : 12
Ch:1+440 Ch:1+480 Ch:1+520
GL:1068.864 GL:1064.573 GL:1058.867
DL:1067.042 DL:1062.454 DL:1057.866

1:0

1:0
.5

.5
1:0
.5
+4.97% 1:10
+5.00% -4.60% +5.00% +0.92% +0.92%
1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 12.649 m2 Cut - 23.657 m2 Cut - 9.947 m2
Fill - 0.000 m2 Datum 1060 m Fill - 0.000 m2 Fill - 0.000 m2
DrainCut - 0.700 m2 DrainCut - 0.700 m2 Datum 1055 m DrainCut - 0.700 m2
Datum 1064 m
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

Ch:1+450 Ch:1+490 Ch:1+530


GL:1067.351 GL:1063.391 GL:1057.251
DL:1065.895 DL:1061.307 DL:1056.719

1:0
1:0

.5
.5
1:0
.5

1:10
+7.00% -1.46%
+5.00% -5.00% +7.00% -1.46%
1:10

1:1
.5
Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2
Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 14.774 m2 Cut - 24.379 m2 Cut - 8.791 m2
Datum 1059 m
Fill - 0.000 m2 Fill - 0.000 m2 Fill - 0.602 m2
Datum 1054 m
Datum 1063 m DrainCut - 0.700 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

Ch:1+460 Ch:1+500 Ch:1+540


GL:1066.457 GL:1062.395 GL:1055.901
DL:1064.748 DL:1060.160 DL:1055.572

1:0
.5

1:0
.5
1:0
.5

1:10
+7.00% -3.00%
+5.00% -4.73% 1:10 +7.00% -3.00%

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 PipeCulvert
Drain - 0.460 m2 Drain - 0.460 m2
Cut - 18.221 m2 Cut - 40.594 m2 Cut - 7.711 m2
Fill - 0.000 m2 Fill - 0.000 m2 Datum 1053 m Fill - 0.000 m2
Datum 1062 m DrainCut - 0.700 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
StructureCut - 0.000 m2 Datum 1057 m StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

Ch:1+470 Ch:1+510 Ch:1+550


GL:1065.431 GL:1060.817 GL:1054.208
DL:1063.601 DL:1059.013 DL:1054.535
1:0
.5
1:0
.5

1:0
.5
1:5
+0.12% 1:10 +5.23% -3.00%
+5.00% +5.23% -3.00%

1:
1
Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2
Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 20.143 m2 Cut - 22.955 m2 Cut - 2.660 m2

Datum 1061 m Fill - 0.000 m2 Fill - 0.000 m2 Datum 1052 m Fill - 1.309 m2
DrainCut - 0.700 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
Datum 1056 m
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

CONSULTANT: DATE REVISION SIGNATURE DESIGNED BY : SCALE


DATE:
Cross-Section
DRAWN BY : 1: 200

1
SJVN Arun-3 Power Development Company Pvt. Ltd. 2m 0 4m
DRG NO :
(SAPDC) Tumlingtar, Nepal CHECKED BY :
1+440-1+550
APPROVED BY : SHEET NO : 13
Ch:1+560 Ch:1+600 Ch:1+640
GL:1053.611 GL:1056.088 GL:1053.708
DL:1053.906 DL:1052.702 DL:1051.516

1:0
.5

1:0
.5
1:10
-3.00% -3.00% +3.00% +3.00% +3.38% -5.00% 1:10

1:1
.5

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 0.066 m2 Cut - 48.889 m2 Cut - 21.783 m2
Fill - 2.554 m2 Fill - 0.000 m2 Datum 1049 m Fill - 0.000 m2
Datum 1050 m
Datum 1051 m DrainCut - 0.700 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

Ch:1+570 Ch:1+610 Ch:1+650


GL:1053.707 GL:1056.438 GL:1052.760

1:0
DL:1053.592 DL:1052.406 DL:1051.219

.5
1:0
.5

1:0
.5
1:10
-3.00% -3.00% +3.00% +3.00% -1.47% -5.00% 1:10

1:1
.5

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 3.316 m2 Cut - 61.236 m2 Datum 1049 m Cut - 13.428 m2
Datum 1050 m
Datum 1051 m Fill - 1.229 m2 Fill - 0.000 m2 Fill - 0.000 m2
DrainCut - 0.700 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

Ch:1+580 Ch:1+620 Ch:1+660


GL:1055.111 GL:1056.005 GL:1052.032
DL:1053.296 DL:1052.109 DL:1050.923

1:0
.5
1:0
.5

-3.00% +0.66% -6.32%


-3.00% 1:10 +5.00% 1:10 -6.32%
1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2

Datum 1051 m Cut - 15.509 m2 Cut - 33.556 m2 Cut - 9.571 m2


Fill - 0.000 m2 Fill - 0.000 m2 Fill - 0.000 m2
DrainCut - 0.700 m2 DrainCut - 0.700 m2 Datum 1048 m DrainCut - 0.700 m2
StructureCut - 0.000 m2 Datum 1049 m StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

Ch:1+590 Ch:1+630 Ch:1+670


GL:1055.616 GL:1055.062 GL:1050.814
DL:1052.999 DL:1051.812 DL:1050.626
1:0
.5

1:0
.5

1:5

+3.00% -7.00%
+3.00% +5.00% -5.00% 1:10 -7.00%

1:1
.5

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 32.794 m2 Cut - 25.202 m2 Cut - 1.549 m2
Fill - 0.000 m2 Fill - 0.000 m2 Datum 1048 m Fill - 1.340 m2
DrainCut - 0.700 m2 Datum 1049 m DrainCut - 0.700 m2 DrainCut - 0.118 m2
Datum 1050 m
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

CONSULTANT: DATE REVISION SIGNATURE DESIGNED BY : SCALE


DATE:
Cross-Section
DRAWN BY : 1: 200

1
SJVN Arun-3 Power Development Company Pvt. Ltd. 2m 0 4m
DRG NO :
(SAPDC) Tumlingtar, Nepal CHECKED BY :
1+560-1+670
APPROVED BY : SHEET NO : 14
Ch:1+680 Ch:1+720 Ch:1+760
GL:1050.436 GL:1047.969 GL:1047.491
DL:1050.329 DL:1049.143 DL:1047.956

1:0
.5

1:0
1:0

.5
.5
-7.00% -5.28% -3.27%
-7.00% -5.28% -3.27%

CauseWay
1:1 1:1
.5 .5

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 1.166 m2 GabionRetainingWall - 4.500 m2 Cut - 0.462 m2
Datum 1048 m
Fill - 2.898 m2 Cut - 3.230 m2 Fill - 3.089 m2
DrainCut - 0.700 m2 Fill - 6.759 m2 Datum 1045 m DrainCut - 0.677 m2
StructureCut - 0.000 m2 Datum 1046 m DrainCut - 0.700 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 StructureCut - 4.663 m2 BackFill - 0.000 m2
BackFill - 2.247 m2
H-3.00m

Ch:1+690 Ch:1+730 Ch:1+770


GL:1050.464 GL:1047.727 GL:1047.222
DL:1050.033 DL:1048.846 DL:1047.660
1:0
.5

-6.79% -4.78% -2.76%


-6.79% -4.78% -2.76%

1:1
Pavement - 0.000 m2 .5 Pavement - 0.000 m2 Pavement - 0.000 m2
Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 3.514 m2 GabionRetainingWall - 4.500 m2 GabionRetainingWall - 4.500 m2
Fill - 3.433 m2 Cut - 0.049 m2 Cut - 0.000 m2
Datum 1045 m
DrainCut - 0.700 m2 Datum 1046 m Fill - 6.659 m2 Fill - 2.689 m2
Datum 1047 m
StructureCut - 0.000 m2 DrainCut - 0.457 m2 DrainCut - 0.423 m2
BackFill - 0.000 m2 StructureCut - 4.675 m2 StructureCut - 6.690 m2
BackFill - 2.358 m2 BackFill - 4.055 m2
H-3.00m H-3.00m

Ch:1+700 Ch:1+740 Ch:1+780


GL:1049.716 GL:1048.002 GL:1047.034
DL:1049.736 DL:1048.549 DL:1047.363

1:0
1:0

.5
.5

-6.29% -4.27% -2.26%


-6.29% -4.27% -2.26%

1:1
Pavement - 0.000 m2 Pavement - 0.000 m2 .5 Pavement - 0.000 m2
Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
GabionRetainingWall - 4.500 m2 Cut - 2.312 m2 GabionRetainingWall - 4.500 m2
Datum 1045 m
Cut - 1.987 m2 Datum 1046 m Fill - 5.246 m2 Cut - 0.000 m2
Datum 1047 m
Fill - 0.500 m2 DrainCut - 0.700 m2 Fill - 2.999 m2
DrainCut - 0.700 m2 StructureCut - 0.000 m2 DrainCut - 0.526 m2
StructureCut - 10.079 m2 BackFill - 0.000 m2 StructureCut - 5.248 m2
BackFill - 0.818 m2 BackFill - 3.427 m2
H-3.00m
H-3.00m

Ch:1+710 Ch:1+750 Ch:1+790


GL:1048.687 GL:1048.329 GL:1046.457
DL:1049.439 DL:1048.253 DL:1047.066
1:0
.5

-5.78% -3.77% -2.05%


-5.78% -3.77% -2.05%
1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
GabionRetainingWall - 4.500 m2 Datum 1046 m Cut - 8.054 m2 GabionRetainingWall - 7.000 m2
Datum 1047 m Cut - 0.021 m2 Fill - 0.000 m2 Cut - 0.000 m2
Fill - 4.605 m2 DrainCut - 0.700 m2 Fill - 4.910 m2
Datum 1044 m
DrainCut - 0.480 m2 StructureCut - 0.000 m2 DrainCut - 0.533 m2
StructureCut - 5.432 m2 BackFill - 0.000 m2 StructureCut - 9.213 m2
BackFill - 3.155 m2 BackFill - 6.121 m2
H-3.00m

H-4.00m

CONSULTANT: DATE REVISION SIGNATURE DESIGNED BY : SCALE


DATE:
Cross-Section
DRAWN BY : 1: 200

1
SJVN Arun-3 Power Development Company Pvt. Ltd. 2m 0 4m
DRG NO :
(SAPDC) Tumlingtar, Nepal CHECKED BY :
1+680-1+790
APPROVED BY : SHEET NO : 15
Ch:1+800 Ch:1+840 Ch:1+880
GL:1045.781 GL:1045.218 GL:1044.891
DL:1046.770 DL:1044.879 DL:1041.398

1:0
.5
1:0
.5
-2.15% -2.15% -2.55% -2.55% -2.95% -2.95% 1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
GabionRetainingWall - 7.000 m2 GabionRetainingWall - 4.500 m2 Cut - 34.269 m2
Datum 1039 m
Cut - 0.000 m2 Cut - 3.118 m2 Fill - 0.000 m2
Datum 1044 m Fill - 6.088 m2 Datum 1042 m Fill - 0.241 m2 DrainCut - 0.700 m2
DrainCut - 0.335 m2 DrainCut - 0.700 m2 StructureCut - 0.000 m2
StructureCut - 8.920 m2 StructureCut - 9.558 m2 BackFill - 0.000 m2
BackFill - 5.325 m2 BackFill - 0.094 m2
H-3.00m

H-4.00m

Ch:1+810 Ch:1+850 Ch:1+890


GL:1045.630 GL:1045.538 GL:1043.361
DL:1046.473 DL:1044.009 DL:1040.527

1:0
1:0

.5
.5
-2.25% -2.25% -2.65% -2.65% -3.00% -3.00%
1:10 1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
GabionRetainingWall - 4.500 m2 Cut - 15.350 m2 Cut - 26.617 m2
Datum 1044 m Cut - 0.000 m2 Fill - 0.000 m2 Datum 1038 m Fill - 0.000 m2
Fill - 5.110 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
Datum 1041 m
DrainCut - 0.448 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
StructureCut - 3.276 m2 BackFill - 0.000 m2 BackFill - 0.000 m2
BackFill - 1.640 m2
H-3.00m

Ch:1+820 Ch:1+860 Ch:1+900


GL:1046.025 GL:1046.129 GL:1042.087
DL:1046.169 DL:1043.138 DL:1039.657

1:0
.5

1:0
.5
-2.35% -2.35% -2.75% -2.75% 1:10 -3.00% -3.00% 1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
GabionRetainingWall - 4.500 m2 Cut - 31.239 m2 Cut - 26.130 m2
Cut - 0.055 m2 Fill - 0.000 m2 Fill - 0.000 m2
Datum 1037 m
Fill - 1.928 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
Datum 1043 m DrainCut - 0.700 m2 Datum 1040 m StructureCut - 0.000 m2 StructureCut - 0.000 m2
StructureCut - 6.431 m2 BackFill - 0.000 m2 BackFill - 0.000 m2
BackFill - 4.135 m2
H-3.00m
1:0
.5

Ch:1+830 Ch:1+870 Ch:1+910


GL:1045.315 GL:1045.718 GL:1041.064
DL:1045.664 DL:1042.268 DL:1038.786

1:0
.5
1:0
.5

1:10
-2.45% -2.45% -2.85% -2.85% -1.05% -1.05%
1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
GabionRetainingWall - 4.500 m2 Datum 1040 m Cut - 37.745 m2 Cut - 29.661 m2
Cut - 0.539 m2 Fill - 0.000 m2 Fill - 0.000 m2
Datum 1043 m Datum 1036 m
Fill - 1.788 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
DrainCut - 0.541 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
StructureCut - 7.715 m2 BackFill - 0.000 m2 BackFill - 0.000 m2
BackFill - 0.136 m2
H-3.00m

CONSULTANT: DATE REVISION SIGNATURE DESIGNED BY : SCALE


DATE:
Cross-Section
DRAWN BY : 1: 200

1
SJVN Arun-3 Power Development Company Pvt. Ltd. 2m 0 4m
DRG NO :
(SAPDC) Tumlingtar, Nepal CHECKED BY :
1+800-1+910
APPROVED BY : SHEET NO : 16
Ch:1+920 Ch:1+960 Ch:2+000
GL:1040.365 GL:1034.478 GL:1030.333

1:0
DL:1037.916 DL:1034.435 DL:1030.953

.5

1:0
.5
1:10
+3.00% +3.00% -3.00% -3.00% -3.00% -3.00%

1:1
.5

1:
1
Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2
Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
PipeCulvert
Cut - 35.851 m2 Cut - 0.514 m2 Cut - 0.883 m2
Fill - 0.000 m2
Datum 1032 m Fill - 1.643 m2 Fill - 4.679 m2

Datum 1035 m DrainCut - 0.700 m2 DrainCut - 0.658 m2 Datum 1028 m DrainCut - 0.700 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

Ch:1+930 Ch:1+970 Ch:2+010


GL:1038.684 GL:1032.720 GL:1029.320
1:0

DL:1037.046 DL:1033.564 DL:1030.083


.5

+3.00% 1:10 -3.00% -3.00%


+3.00% -3.00% -3.00%

CauseWay

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 29.932 m2 Cut - 0.119 m2 GabionRetainingWall - 4.500 m2
Fill - 0.000 m2 Datum 1031 m Fill - 4.203 m2 Cut - 0.156 m2
DrainCut - 0.700 m2 DrainCut - 0.180 m2 Fill - 3.971 m2
Datum 1034 m Datum 1027 m
StructureCut - 0.000 m2 StructureCut - 0.000 m2 DrainCut - 0.685 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 StructureCut - 6.814 m2
BackFill - 3.889 m2
H-3.00m

Ch:1+940 Ch:1+980 Ch:2+020


GL:1037.413 GL:1032.514 GL:1028.769
DL:1036.175 DL:1032.694 DL:1029.212
1:0
.5

1:0
.5
+2.21% +2.21% 1:10 -3.00% -3.00% -3.00% -3.00%

CauseWay

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2

1:
Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2

1
Cut - 15.318 m2 Cut - 0.181 m2 Datum 1027 m Cut - 1.859 m2
Fill - 0.000 m2 Fill - 0.846 m2 Fill - 3.358 m2
Datum 1030 m
DrainCut - 0.700 m2 DrainCut - 0.655 m2 DrainCut - 0.700 m2
Datum 1033 m StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

Ch:1+950 Ch:1+990 Ch:2+030


GL:1036.008 GL:1031.493 GL:1028.061
DL:1035.305 DL:1031.823 DL:1028.342
1:0
.5

1:0
.5
-1.21% -1.21% -3.00% -3.00% -0.28% -0.28%
1:0
.5

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 8.976 m2 Cut - 0.562 m2 Cut - 2.512 m2
Datum 1033 m Datum 1026 m
Fill - 2.327 m2 Fill - 1.716 m2 Fill - 1.119 m2
DrainCut - 0.700 m2 Datum 1029 m DrainCut - 0.684 m2 DrainCut - 0.700 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

CONSULTANT: DATE REVISION SIGNATURE DESIGNED BY : SCALE


DATE:
Cross-Section
DRAWN BY : 1: 200

1
SJVN Arun-3 Power Development Company Pvt. Ltd. 2m 0 4m
DRG NO :
(SAPDC) Tumlingtar, Nepal CHECKED BY :
1+920-2+030
APPROVED BY : SHEET NO : 17
1:0
.5
Ch:2+040 Ch:2+080 Ch:2+120

1:0
GL:1027.350 GL:1025.637 GL:1021.906

.5
DL:1027.472 DL:1023.990 DL:1020.516

1:0
.5
1:10
+2.44% +2.44% +3.00% +3.00%
+5.00% -5.00% 1:10

1:
1
Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2
Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 10.378 m2 Cut - 32.141 m2 Cut - 21.720 m2
Datum 1025 m Fill - 0.732 m2 Fill - 0.000 m2 Datum 1018 m Fill - 0.000 m2
DrainCut - 0.700 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
Datum 1021 m
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

1:0
.5
1:0
1:0

.5
.5

Ch:2+050 Ch:2+090 Ch:2+130


GL:1027.137 GL:1025.140 GL:1021.190
DL:1026.601 DL:1023.120 DL:1019.882

1:10
+3.00% +3.00% +3.00% +3.00%
+5.00% -5.00%
1:10

H-2.00m
Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2
Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 23.999 m2 Cut - 34.546 m2 MasonryBreastWall - 1.280 m2

Datum 1024 m Fill - 0.000 m2 Fill - 0.000 m2 Cut - 25.944 m2


DrainCut - 0.700 m2 DrainCut - 0.700 m2 Datum 1017 m Fill - 0.000 m2
StructureCut - 0.000 m2 Datum 1020 m StructureCut - 0.000 m2 DrainCut - 0.700 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 StructureCut - 0.965 m2
BackFill - 0.110 m2

1:0
1:0

.5
.5
Ch:2+060 Ch:2+100 Ch:2+140
1:0

GL:1026.704 GL:1024.163 GL:1020.635


.5

DL:1025.731 DL:1022.249 DL:1019.579


.5
1:0

+3.00% +3.00%
+5.00% -5.00% +5.00% -5.00%
1:10 1:10

H-2.00m H-2.00m
Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2
Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 16.877 m2 Datum 1020 m MasonryBreastWall - 1.280 m2 MasonryBreastWall - 1.280 m2
Fill - 0.000 m2 Cut - 25.055 m2 Datum 1017 m Cut - 22.645 m2
Datum 1023 m
DrainCut - 0.700 m2 Fill - 0.000 m2 Fill - 0.000 m2
StructureCut - 0.000 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
BackFill - 0.000 m2 StructureCut - 28.694 m2 StructureCut - 0.965 m2
BackFill - 27.839 m2 BackFill - 0.110 m2

Ch:2+070 Ch:2+110 Ch:2+150

1:0
GL:1026.089 GL:1022.994 GL:1019.789

.5
1:0
.5

DL:1024.861 DL:1021.379 DL:1019.384


1:0
.5

+3.00% +3.00%
+5.00% -5.00% +5.00% -5.00%
1:10
1:0
.5

1:1
.5

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 12.977 m2 Cut - 24.511 m2 Cut - 8.323 m2
Datum 1019 m Datum 1017 m
Fill - 0.389 m2 Fill - 0.000 m2 Fill - 1.517 m2
Datum 1022 m DrainCut - 0.700 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

CONSULTANT: DATE REVISION SIGNATURE DESIGNED BY : SCALE


DATE:
Cross-Section
DRAWN BY : 1: 200

1
SJVN Arun-3 Power Development Company Pvt. Ltd. 2m 0 4m
DRG NO :
(SAPDC) Tumlingtar, Nepal CHECKED BY :
2+040-2+150
APPROVED BY : SHEET NO : 18
Ch:2+160 Ch:2+200 Ch:2+240
GL:1019.632 GL:1019.357 GL:1017.938

1:0
DL:1019.188 DL:1018.404 DL:1017.621

.5
1:0
.5

1:0
.5
-3.99% +3.00%
+5.00% -5.00% -3.99% +3.00%
1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 6.299 m2 Cut - 19.167 m2 Cut - 6.877 m2
Datum 1016 m
Fill - 0.091 m2 Fill - 0.000 m2 Datum 1015 m Fill - 0.000 m2
DrainCut - 0.700 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
Datum 1016 m StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

Ch:2+170 Ch:2+210 Ch:2+250


GL:1019.338 GL:1019.668 GL:1018.546
DL:1018.992 DL:1018.209 DL:1017.425

1:0
.5
1:0
.5

1:0
.5
1:10
+3.00% 1:10 -3.00% +2.09%
+3.00% -3.00% +5.00%

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
PipeCulvert
Cut - 11.792 m2 Datum 1016 m GabionRetainingWall - 4.500 m2 Cut - 14.650 m2
Fill - 0.000 m2 Cut - 10.763 m2
Datum 1015 m Fill - 0.000 m2
DrainCut - 0.700 m2 Fill - 0.548 m2 DrainCut - 0.700 m2
Datum 1016 m
StructureCut - 0.000 m2 DrainCut - 0.700 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 StructureCut - 12.235 m2 BackFill - 0.000 m2
BackFill - 0.531 m2
H-3.00m

Ch:2+180 Ch:2+220 Ch:2+260


GL:1018.740 GL:1019.276 GL:1018.576

1:0
.5
DL:1018.796 DL:1018.013 DL:1017.229

1:0
.5
1:0
.5

1:10
-0.77% -2.67% -2.67%
+5.00% +5.00% -5.00%

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


1:1 1:1
Drain - 0.460 m2 .5 Drain - 0.460 m2 .5 Drain - 0.460 m2
Cut - 9.704 m2 Cut - 18.701 m2 Datum 1015 m Cut - 24.579 m2
Fill - 1.073 m2 Fill - 2.073 m2 Fill - 0.000 m2
Datum 1016 m DrainCut - 0.700 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
Datum 1015 m
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

Ch:2+190 Ch:2+230 Ch:2+270


1:0

GL:1018.192 GL:1018.072 GL:1018.530


.5

DL:1018.600 DL:1017.817 DL:1017.034

1:0
.5
1:0
.5

1:10
+1.99% +1.99%
+5.00% -5.00% +5.00% -5.00%

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


1:

1:1
1

Drain - 0.460 m2 Drain - 0.460 m2 .5 Drain - 0.460 m2


Cut - 5.508 m2 Cut - 23.188 m2 Cut - 31.714 m2

Datum 1016 m Fill - 3.413 m2 Fill - 1.849 m2 Fill - 0.000 m2


DrainCut - 0.700 m2 Datum 1015 m DrainCut - 0.700 m2 DrainCut - 0.700 m2
Datum 1014 m
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

CONSULTANT: DATE REVISION SIGNATURE DESIGNED BY : SCALE


DATE:
Cross-Section
DRAWN BY : 1: 200

1
SJVN Arun-3 Power Development Company Pvt. Ltd. 2m 0 4m
DRG NO :
(SAPDC) Tumlingtar, Nepal CHECKED BY :
2+160-2+270
APPROVED BY : SHEET NO : 19
1:0
Ch:2+280 Ch:2+320 Ch:2+360

.5
GL:1018.189 GL:1017.303 GL:1016.994
DL:1016.838 DL:1016.055 DL:1015.271

1:0
.5

1:0
.5
1:10
+2.63%
+5.00% +5.00% -5.00% 1:10 +5.00% -5.00%
1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 28.043 m2 Cut - 27.043 m2 Datum 1013 m Cut - 12.282 m2
Fill - 0.000 m2 Fill - 0.000 m2 Fill - 0.000 m2
Datum 1014 m DrainCut - 0.700 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
Datum 1013 m
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

Ch:2+290 Ch:2+330 Ch:2+370

1:0
.5
GL:1018.399 GL:1016.032 GL:1017.359
1:0

1:0
DL:1016.642 DL:1015.859 DL:1015.075
.5

.5
1:10
+3.00% +3.00% 1:10
+5.00% -5.00% +5.00% -4.39%
1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 28.145 m2 Cut - 12.756 m2 Cut - 28.221 m2
Fill - 0.000 m2 Fill - 0.000 m2 Fill - 0.000 m2
Datum 1014 m
DrainCut - 0.700 m2 Datum 1013 m DrainCut - 0.700 m2 DrainCut - 0.700 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2
Datum 1012 m StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

1:0
.5

1:0
Ch:2+300 Ch:2+340 Ch:2+380

.5
GL:1018.337 GL:1015.788 GL:1017.794
DL:1016.446 DL:1015.663 DL:1014.880
1:0
.5

1:10 1:10
+3.00% +3.00% +3.00% +3.00%
+5.00% -5.00%
1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 26.555 m2 Cut - 16.818 m2 Cut - 42.307 m2
Datum 1014 m Fill - 0.000 m2 Fill - 0.000 m2 Fill - 0.000 m2
Datum 1013 m
DrainCut - 0.700 m2 DrainCut - 0.700 m2 Datum 1012 m DrainCut - 0.700 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

1:0
.5
Ch:2+310 Ch:2+350 Ch:2+390
GL:1018.069 GL:1016.307 GL:1017.828
1:0
.5

DL:1016.250 DL:1015.467 DL:1014.684


1:0
.5

1:10 +3.00% 1:10


+5.00% -5.00% +5.00% -5.00% +3.00%
1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2

Datum 1014 m Cut - 28.689 m2 Cut - 18.205 m2 Cut - 44.493 m2


Fill - 0.000 m2 Datum 1013 m Fill - 0.000 m2 Fill - 0.000 m2
Datum 1012 m
DrainCut - 0.700 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

CONSULTANT: DATE REVISION SIGNATURE DESIGNED BY : SCALE


DATE:
Cross-Section
DRAWN BY : 1: 200

1
SJVN Arun-3 Power Development Company Pvt. Ltd. 2m 0 4m
DRG NO :
(SAPDC) Tumlingtar, Nepal CHECKED BY :
2+280-2+390
APPROVED BY : SHEET NO : 20
1:0
.5
Ch:2+400 Ch:2+440 Ch:2+480

1:0
.5
GL:1017.702 GL:1013.525 GL:1010.550
DL:1014.488 DL:1013.705 DL:1012.921

-3.00% 1:10 +3.00% -4.00%


-3.00% +3.00% -4.00%

.5
1:1

H-3.00m

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 PipeCulvert
Drain - 0.460 m2
MasonryBreastWall - 2.370 m2 GabionRetainingWall - 4.500 m2 GabionRetainingWall - 10.000 m2
Datum 1012 m Cut - 45.663 m2 Cut - 10.799 m2 Cut - 0.000 m2
Datum 1011 m
Fill - 0.000 m2 Fill - 1.265 m2 Datum 1010 m Fill - 21.584 m2
DrainCut - 0.700 m2 DrainCut - 0.700 m2 DrainCut - 0.000 m2
StructureCut - 2.455 m2 StructureCut - 7.972 m2 StructureCut - 5.909 m2
BackFill - 0.760 m2 BackFill - 4.826 m2 H-3.00m BackFill - 3.629 m2

H-5.00m
1:0
.5

Ch:2+410 Ch:2+450 Ch:2+490


GL:1017.354 GL:1012.969 GL:1010.502
DL:1014.292 DL:1013.509 DL:1012.726

1:0
.5
-3.00% -3.00% 1:10 -3.55%
+5.00% -5.00% -3.55%

1:1
H-3.00m .5

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2

Datum 1012 m MasonryBreastWall - 2.370 m2 Cut - 0.012 m2 GabionRetainingWall - 10.000 m2


Cut - 53.837 m2 Datum 1011 m Fill - 5.145 m2 Cut - 1.066 m2
Datum 1010 m
Fill - 0.000 m2 DrainCut - 0.618 m2 Fill - 14.923 m2
DrainCut - 0.700 m2 StructureCut - 0.000 m2 DrainCut - 0.700 m2
StructureCut - 2.455 m2 BackFill - 0.000 m2 StructureCut - 6.974 m2
BackFill - 0.760 m2 BackFill - 4.683 m2

H-5.00m
1:0
.5

Ch:2+420 Ch:2+460 Ch:2+500


GL:1016.528 GL:1013.415 GL:1011.081
DL:1014.096 DL:1013.313 DL:1012.530

1:0
.5
1:0
.5
+3.00% 1:10
+3.00% +5.00% -5.00% +0.12% +0.12%
1:1
.5

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 40.855 m2 Cut - 4.466 m2 GabionRetainingWall - 4.500 m2
Datum 1011 m
Fill - 0.000 m2 Fill - 0.975 m2 Datum 1010 m Cut - 6.556 m2
DrainCut - 0.700 m2 DrainCut - 0.700 m2 Fill - 8.905 m2
Datum 1011 m StructureCut - 0.000 m2 StructureCut - 0.000 m2 DrainCut - 0.700 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 StructureCut - 2.780 m2
BackFill - 1.067 m2
H-3.00m
1:0

Ch:2+430 Ch:2+470 Ch:2+510


.5

GL:1014.608 GL:1011.962 GL:1011.622


DL:1013.900 DL:1013.117 DL:1012.334

1:0
.5
+3.00% +3.00% +0.49% +2.91% +2.91%
-5.00%

1:0
.5
Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2
Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 24.184 m2 GabionRetainingWall - 4.500 m2 Cut - 8.686 m2
Datum 1010 m
Fill - 0.000 m2 Cut - 0.002 m2 Fill - 3.692 m2
Datum 1011 m DrainCut - 0.700 m2 Fill - 5.886 m2 DrainCut - 0.700 m2
StructureCut - 0.000 m2 Datum 1010 m DrainCut - 0.517 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 StructureCut - 6.620 m2 BackFill - 0.000 m2
BackFill - 3.274 m2
H-3.00m

CONSULTANT: DATE REVISION SIGNATURE DESIGNED BY : SCALE


DATE:
Cross-Section
DRAWN BY : 1: 200

1
SJVN Arun-3 Power Development Company Pvt. Ltd. 2m 0 4m
DRG NO :
(SAPDC) Tumlingtar, Nepal CHECKED BY :
2+400-2+510
APPROVED BY : SHEET NO : 21
Ch:2+520 Ch:2+560 Ch:2+600

1:0
GL:1012.688 GL:1013.435 GL:1012.390

.5
DL:1012.138 DL:1011.355 DL:1010.571

1:0
.5
1:0
.5
1:10
+3.00% +3.00% 1:10 -3.53%
+5.00% -5.00% -3.53% 1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 12.126 m2 Cut - 28.910 m2 Cut - 25.038 m2
Datum 1009 m
Fill - 0.000 m2 Fill - 0.000 m2 Datum 1008 m Fill - 0.000 m2
DrainCut - 0.700 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
Datum 1009 m StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

Ch:2+530 Ch:2+570 Ch:2+610

1:0
GL:1012.960 GL:1012.993 GL:1012.278

.5
DL:1011.942 DL:1011.159 DL:1010.336

1:0
.5
1:0
.5

1:10 -3.00%
+5.00% -3.16% 1:10 +5.00% -5.00% -3.00% 1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 12.685 m2 Cut - 28.999 m2 Cut - 25.995 m2
Datum 1008 m
Fill - 0.000 m2 Fill - 0.000 m2 Fill - 0.000 m2

Datum 1009 m DrainCut - 0.700 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2


StructureCut - 0.000 m2 Datum 1008 m StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

Ch:2+540 Ch:2+580 Ch:2+620


GL:1013.321 GL:1012.628 GL:1010.985
DL:1011.746 DL:1010.963 DL:1009.880

1:0
.5
1:0
.5

1:0
.5
1:10 1:10 +3.00%
+5.00% -5.00% +5.00% -5.00% +3.00%

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 18.223 m2 Cut - 22.779 m2 Cut - 12.806 m2
Fill - 0.000 m2 Fill - 0.000 m2 Fill - 0.000 m2
Datum 1009 m DrainCut - 0.700 m2
Datum 1008 m DrainCut - 0.700 m2 Datum 1007 m DrainCut - 0.700 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

Ch:2+550 Ch:2+590 Ch:2+630


GL:1013.525 GL:1012.256 GL:1011.018
DL:1011.551 DL:1010.767 DL:1009.220

1:0
.5
1:0
.5

1:0

1:10
.5

1:10 1:10 +3.00% +3.00%


+5.00% -5.00% +5.00% -5.00%

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 25.209 m2 Cut - 15.340 m2 Datum 1007 m Cut - 42.205 m2
Datum 1009 m Fill - 0.000 m2 Fill - 0.000 m2 Fill - 0.000 m2
DrainCut - 0.700 m2
Datum 1008 m DrainCut - 0.700 m2 DrainCut - 0.700 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

CONSULTANT: DATE REVISION SIGNATURE DESIGNED BY : SCALE


DATE:
Cross-Section
DRAWN BY : 1: 200

1
SJVN Arun-3 Power Development Company Pvt. Ltd. 2m 0 4m
DRG NO :
(SAPDC) Tumlingtar, Nepal CHECKED BY :
2+520-2+630
APPROVED BY : SHEET NO : 22
1:10

Ch:2+640 Ch:2+680 Ch:2+720


GL:1010.455 GL:1006.168 GL:1003.437

1:0
.5
DL:1008.537 DL:1005.804 DL:1003.071

1:0
.5

1:0
.5
-3.23% -3.00% -3.00%
+5.00% +5.00% -5.00%

1:1
.5

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 PipeCulvert
Drain - 0.460 m2 Drain - 0.460 m2
Cut - 21.217 m2 Cut - 8.035 m2 Cut - 13.175 m2
Datum 1006 m Fill - 0.000 m2 Fill - 0.000 m2 Fill - 0.241 m2
DrainCut - 0.700 m2 Datum 1003 m DrainCut - 0.700 m2 DrainCut - 0.700 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2
Datum 1000 m StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

1:0

Ch:2+650 Ch:2+690 Ch:2+730


.5

1:0
.5
GL:1009.818 GL:1004.604 GL:1003.358
DL:1007.853 DL:1005.121 DL:1002.388

1:10 -4.42%
+5.00% -5.00% -4.42% +5.00% -5.00%
1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 43.445 m2 Cut - 0.000 m2 Cut - 22.019 m2
Datum 1000 m
Fill - 0.000 m2 Fill - 2.876 m2 Fill - 0.000 m2
Datum 1005 m DrainCut - 0.700 m2 DrainCut - 0.395 m2 DrainCut - 0.700 m2
StructureCut - 0.000 m2 Datum 1002 m StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2
1:0
.5

Ch:2+660 Ch:2+700 Ch:2+740

1:0
.5
GL:1009.033 GL:1003.650 GL:1002.553
DL:1007.170 DL:1004.438 DL:1001.705

1:0
.5
+1.86% -5.00% 1:10 +5.00% -5.00% +5.00% -5.00%
1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 32.994 m2 GabionRetainingWall - 4.500 m2 Cut - 19.845 m2
Fill - 0.000 m2
Datum 1002 m Cut - 2.539 m2 Fill - 0.000 m2
Datum 999 m
DrainCut - 0.700 m2 Fill - 4.764 m2 DrainCut - 0.700 m2
Datum 1004 m StructureCut - 0.000 m2 DrainCut - 0.700 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 StructureCut - 4.289 m2 BackFill - 0.000 m2
BackFill - 2.474 m2
H-3.00m

Ch:2+670 Ch:2+710 Ch:2+750


GL:1008.067 GL:1003.173 GL:1001.432
1:0

1:0
.5

.5
DL:1006.487 DL:1003.754 DL:1001.022
1:0
.5

-3.00% -3.00%
1:10 +5.00% -5.00% +5.00% -5.00%
1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 22.708 m2 GabionRetainingWall - 2.500 m2 Cut - 11.730 m2
Datum 1004 m Fill - 0.000 m2 Cut - 1.519 m2 Fill - 0.000 m2
DrainCut - 0.700 m2
Datum 1001 m Fill - 3.407 m2 DrainCut - 0.700 m2
H-2.00m Datum 998 m
StructureCut - 0.000 m2 DrainCut - 0.700 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 StructureCut - 1.303 m2 BackFill - 0.000 m2
BackFill - 0.691 m2

CONSULTANT: DATE REVISION SIGNATURE DESIGNED BY : SCALE


DATE:
Cross-Section
DRAWN BY : 1: 200

1
SJVN Arun-3 Power Development Company Pvt. Ltd. 2m 0 4m
DRG NO :
(SAPDC) Tumlingtar, Nepal CHECKED BY :
2+640-2+750
APPROVED BY : SHEET NO : 23
Ch:2+760 Ch:2+800 Ch:2+840

1:0
.5
GL:1000.606 GL:999.437 GL:1000.768
DL:1000.339 DL:997.608 DL:1000.182

1:0
.5
1:0
.5
-3.00% +3.00% 1:10 -2.07%
-3.00% +3.00% -2.07%
1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 6.468 m2 Cut - 30.548 m2 Cut - 14.635 m2
Datum 998 m
Fill - 0.003 m2 Datum 995 m Fill - 0.000 m2 Fill - 0.000 m2
DrainCut - 0.700 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2 Datum 997 m StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

Ch:2+770 Ch:2+810 Ch:2+850


GL:1000.245 GL:996.645 GL:1002.161
DL:999.655 DL:997.422 DL:1001.225

1:0

1:0
.5

.5
1:0
.5

+0.32% +0.32% 1:10 +2.41% -5.49%


+2.41% -5.49%

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
PipeCulvert
Cut - 6.991 m2 GabionRetainingWall - 4.500 m2 Datum 999 m Cut - 10.117 m2
Fill - 0.000 m2
Datum 995 m Cut - 8.323 m2 Fill - 0.000 m2
Datum 997 m
DrainCut - 0.700 m2 Fill - 5.669 m2 DrainCut - 0.700 m2
StructureCut - 0.000 m2 DrainCut - 0.700 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 StructureCut - 1.664 m2 BackFill - 0.000 m2
BackFill - 0.674 m2 H-3.00m

Ch:2+780 Ch:2+820 Ch:2+860


1:10
GL:1000.274 GL:999.081 GL:1003.471
DL:998.972 DL:998.095 DL:1002.268

1:0

1:0
1:0

.5

.5
.5

+3.00% -3.00% -7.00%


+3.00% -3.00% -7.00%
1:1 1:10
.5

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 14.723 m2 Cut - 7.849 m2 Datum 1000 m Cut - 9.275 m2
Fill - 0.000 m2 Fill - 0.482 m2 Fill - 0.000 m2
DrainCut - 0.700 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
Datum 996 m Datum 995 m
StructureCut - 0.000 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

Ch:2+790 Ch:2+830 Ch:2+870


GL:1000.592 GL:999.702 GL:1004.570
DL:998.289 DL:999.138 DL:1003.311
1:0
.5

1:0
.5
1:0
.5

1:10

+3.00% +3.00% -2.67% -2.67% -2.79%


-5.00% 1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2

Datum 996 m Cut - 39.908 m2 Cut - 8.102 m2 Cut - 15.248 m2


Datum 1001 m
Fill - 0.000 m2 Fill - 0.009 m2 Fill - 0.000 m2
DrainCut - 0.700 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
StructureCut - 0.000 m2 Datum 996 m StructureCut - 0.000 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

CONSULTANT: DATE REVISION SIGNATURE DESIGNED BY : SCALE


DATE:
Cross-Section
DRAWN BY : 1: 200

1
SJVN Arun-3 Power Development Company Pvt. Ltd. 2m 0 4m
DRG NO :
(SAPDC) Tumlingtar, Nepal CHECKED BY :
2+760-2+870
APPROVED BY : SHEET NO : 24
1:10

Ch:2+880 Ch:2+920 Ch:2+960


GL:1005.448 GL:1006.595 GL:1005.187
DL:1004.182 DL:1005.526 DL:1006.661

1:0
.5
1:0
.5

1:0
.5
+2.80% -5.00% +5.00% -5.00% +5.00% -5.00%

1:0
.5
Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2
Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 11.159 m2 Cut - 10.816 m2 GabionRetainingWall - 4.500 m2
Fill - 0.000 m2 Datum 1003 m Fill - 0.315 m2 Cut - 0.719 m2
Datum 1004 m
DrainCut - 0.700 m2 DrainCut - 0.700 m2 Fill - 7.112 m2
Datum 1001 m StructureCut - 0.000 m2 StructureCut - 0.000 m2 DrainCut - 0.655 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 StructureCut - 3.711 m2
BackFill - 1.724 m2
H-3.00m

Ch:2+890 Ch:2+930 Ch:2+970


GL:1005.310 GL:1006.763 GL:1005.504
DL:1004.674 DL:1005.809 DL:1006.945

1:0
1:0

.5
.5

+5.00% -5.00% 1:10 +5.00% -5.00% +5.00% -5.00%

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 8.671 m2 GabionRetainingWall - 4.500 m2 GabionRetainingWall - 4.500 m2
Fill - 0.000 m2 Cut - 6.603 m2 Cut - 0.000 m2
Datum 1002 m
DrainCut - 0.700 m2 Datum 1003 m Fill - 0.032 m2 Fill - 7.560 m2
Datum 1004 m
StructureCut - 0.000 m2 DrainCut - 0.700 m2 DrainCut - 0.229 m2
BackFill - 0.000 m2 StructureCut - 12.818 m2 StructureCut - 3.638 m2
BackFill - 7.529 m2 BackFill - 1.678 m2
H-3.00m H-3.00m

1:10

Ch:2+900 Ch:2+940 Ch:2+980


GL:1005.642 GL:1006.687 GL:1005.596
DL:1004.958 DL:1006.093 DL:1007.228

1:0
1:0

.5
.5

+5.00% -5.00% +5.00% -5.00% +5.00% -5.00%

1:1
.5

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 7.454 m2 Cut - 5.401 m2 Datum 1005 m GabionRetainingWall - 4.500 m2
Fill - 0.000 m2 Fill - 0.590 m2 Cut - 0.000 m2
DrainCut - 0.700 m2 DrainCut - 0.700 m2 Fill - 9.097 m2
Datum 1002 m
StructureCut - 0.000 m2
Datum 1003 m StructureCut - 0.000 m2 DrainCut - 0.003 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 StructureCut - 2.735 m2
BackFill - 1.020 m2
H-3.00m

Ch:2+910 Ch:2+950 Ch:2+990


GL:1006.135 GL:1005.826 GL:1005.617
DL:1005.242 DL:1006.377 DL:1007.512
1:0
.5
1:0
.5

1:0
.5
1:10 +3.00% +3.00%
+5.00% -5.00% +5.00% -5.00%

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Datum 1003 m Cut - 13.764 m2 Cut - 6.259 m2 GabionRetainingWall - 4.500 m2
Datum 1004 m
Fill - 0.000 m2 Fill - 1.988 m2 Datum 1005 m Cut - 1.172 m2
DrainCut - 0.700 m2 DrainCut - 0.700 m2 Fill - 10.381 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2 DrainCut - 0.700 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 StructureCut - 1.240 m2
BackFill - 0.404 m2 H-3.00m

CONSULTANT: DATE REVISION SIGNATURE DESIGNED BY : SCALE


DATE:
Cross-Section
DRAWN BY : 1: 200

1
SJVN Arun-3 Power Development Company Pvt. Ltd. 2m 0 4m
DRG NO :
(SAPDC) Tumlingtar, Nepal CHECKED BY :
2+880-2+990
APPROVED BY : SHEET NO : 25
Ch:3+000 Ch:3+040 Ch:3+080
GL:1008.490 GL:1009.999 GL:1011.862
DL:1007.796 DL:1008.931 DL:1010.067

1:0
.5
1:0
.5
1:0
.5
+3.42%
+3.42% +5.00% -5.00% +5.00% -5.00%
1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
GabionRetainingWall - 4.500 m2 GabionRetainingWall - 4.500 m2 Cut - 14.776 m2
Cut - 7.013 m2 Cut - 7.815 m2 Fill - 0.000 m2
Datum 1005 m Fill - 0.702 m2 Fill - 0.114 m2 DrainCut - 0.700 m2
Datum 1006 m
Datum 1007 m
DrainCut - 0.700 m2 DrainCut - 0.700 m2 StructureCut - 0.000 m2
StructureCut - 9.748 m2 StructureCut - 13.506 m2 BackFill - 0.000 m2
BackFill - 6.920 m2 H-3.00m BackFill - 7.885 m2
H-3.00m

Ch:3+010 Ch:3+050 Ch:3+090


GL:1008.170 GL:1010.910 GL:1012.541
DL:1008.080 DL:1009.215 DL:1010.350

1:0
.5
1:0
.5
1:0
.5

+5.00% -5.00% +5.00% -5.00% 1:10 +5.00% -5.00% 1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
GabionRetainingWall - 4.500 m2 Datum 1007 m Cut - 18.131 m2 Cut - 28.546 m2
Datum 1008 m
Cut - 2.372 m2 Fill - 0.000 m2 Fill - 0.000 m2
Fill - 0.547 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
Datum 1005 m DrainCut - 0.700 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
StructureCut - 9.223 m2 BackFill - 0.000 m2 BackFill - 0.000 m2
BackFill - 0.326 m2
H-3.00m

Ch:3+020 Ch:3+060 Ch:3+100


GL:1008.361 GL:1011.659 GL:1012.138
DL:1008.364 DL:1009.499 DL:1010.550

1:0
.5
1:0
1:0

.5
.5

+3.00% +3.00%
+5.00% -5.00% +5.00% -5.00% 1:10
1:0
.5

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
PipeCulvert
Cut - 2.322 m2 Cut - 15.223 m2 GabionRetainingWall - 4.500 m2
Datum 1006 m
Fill - 0.556 m2 Datum 1007 m Fill - 0.000 m2 Datum 1008 m Cut - 17.409 m2
DrainCut - 0.700 m2 DrainCut - 0.700 m2 Fill - 0.034 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2 DrainCut - 0.700 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 StructureCut - 15.955 m2
BackFill - 9.681 m2 H-3.00m

1:0
Ch:3+030 Ch:3+070 Ch:3+110

.5
GL:1009.076 GL:1012.139 GL:1011.522
DL:1008.647 DL:1009.783 DL:1010.131
1:0
.5
1:0
.5

1:10 -2.02% -2.02%


+5.00% -5.00% +5.00% -5.00% 1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
GabionRetainingWall - 4.500 m2 Cut - 24.341 m2 Cut - 24.366 m2
Cut - 3.666 m2 Fill - 0.000 m2 Fill - 0.000 m2
Datum 1006 m
Fill - 0.779 m2 Datum 1007 m DrainCut - 0.700 m2 DrainCut - 0.700 m2
DrainCut - 0.700 m2 StructureCut - 0.000 m2 Datum 1007 m StructureCut - 0.000 m2
StructureCut - 8.677 m2 BackFill - 0.000 m2 BackFill - 0.000 m2
BackFill - 5.771 m2
H-3.00m

CONSULTANT: DATE REVISION SIGNATURE DESIGNED BY : SCALE


DATE:
Cross-Section
DRAWN BY : 1: 200

1
SJVN Arun-3 Power Development Company Pvt. Ltd. 2m 0 4m
DRG NO :
(SAPDC) Tumlingtar, Nepal CHECKED BY :
3+000-3+110
APPROVED BY : SHEET NO : 26
Ch:3+120 Ch:3+160 Ch:3+200

1:0
.5
GL:1010.423 GL:1005.252 GL:1000.443
DL:1009.083 DL:1004.517 DL:999.950

1:0

1:0
.5

.5
-3.00% -3.00% +0.07% +0.07% +5.00% -5.00%
1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 16.545 m2 Cut - 11.353 m2 Cut - 9.831 m2
Fill - 0.000 m2 Datum 1002 m Fill - 11.103 m2 Fill - 0.000 m2
DrainCut - 0.700 m2 DrainCut - 0.700 m2 Datum 997 m DrainCut - 0.700 m2
Datum 1006 m 1:1
StructureCut - 0.000 m2 StructureCut - 0.000 m2 .5 StructureCut - 0.000 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 BackFill - 0.000 m2

Ch:3+130 Ch:3+170 Ch:3+210


GL:1009.007 GL:1004.057 GL:999.136

1:0
DL:1007.942 DL:1003.375 DL:998.808

.5
1:0

1:0
.5

.5
-0.81% -0.81% -3.00% -3.00% +5.00% -5.00%

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
GabionRetainingWall - 4.500 m2 GabionRetainingWall - 2.500 m2 Cut - 13.055 m2
Datum 1001 m
Cut - 18.214 m2 Cut - 7.804 m2 Fill - 0.290 m2
Fill - 0.985 m2 Fill - 0.628 m2 Datum 996 m DrainCut - 0.700 m2
Datum 1005 m
H-2.00m
DrainCut - 0.700 m2 DrainCut - 0.700 m2 StructureCut - 0.000 m2
StructureCut - 9.843 m2 StructureCut - 3.657 m2 BackFill - 0.000 m2
BackFill - 0.256 m2 BackFill - 0.007 m2
H-3.00m

1:1
.5

Ch:3+140 Ch:3+180 Ch:3+220


1:0

GL:1007.591 GL:1002.966 GL:997.841


.5

1:0

1:0
DL:1006.800 DL:1002.233 DL:997.667

.5

.5
+2.35% +2.35% 1:10 +1.23% +1.23% +5.00% -5.00%

1:1
.5

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 15.336 m2 Datum 1000 m Cut - 17.895 m2 GabionRetainingWall - 4.500 m2
Fill - 0.000 m2 Fill - 0.185 m2 Cut - 10.272 m2
Datum 995 m
Datum 1004 m DrainCut - 0.700 m2 DrainCut - 0.700 m2 Fill - 0.896 m2
StructureCut - 0.000 m2 StructureCut - 0.000 m2 DrainCut - 0.700 m2
BackFill - 0.000 m2 BackFill - 0.000 m2 StructureCut - 7.958 m2
BackFill - 0.017 m2
H-3.00m

Ch:3+150 Ch:3+190 Ch:3+230


1:0
.5

GL:1006.455 GL:1001.776 GL:996.570


DL:1005.659 DL:1001.092 DL:996.525
1:0
.5

1:0
.5
+3.00% +3.00% +3.00% +3.00% 1:10 -3.00% -3.00%

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
GabionRetainingWall - 2.500 m2 Cut - 20.942 m2 GabionRetainingWall - 2.500 m2
Cut - 11.623 m2 Fill - 0.000 m2 Datum 994 m Cut - 5.126 m2
Datum 1003 m
Fill - 0.270 m2 H-2.00m DrainCut - 0.700 m2 Fill - 1.966 m2
DrainCut - 0.700 m2
Datum 998 m StructureCut - 0.000 m2 DrainCut - 0.700 m2
H-2.00m

StructureCut - 4.538 m2 BackFill - 0.000 m2 StructureCut - 0.929 m2


BackFill - 0.028 m2 BackFill - 0.000 m2

CONSULTANT: DATE REVISION SIGNATURE DESIGNED BY : SCALE


DATE:
Cross-Section
DRAWN BY : 1: 200

1
SJVN Arun-3 Power Development Company Pvt. Ltd. 2m 0 4m
DRG NO :
(SAPDC) Tumlingtar, Nepal CHECKED BY :
3+120-3+230
APPROVED BY : SHEET NO : 27
Ch:3+240 Ch:3+280 Ch:3+320

1:0
.5
GL:995.401 GL:991.160 GL:993.050
DL:995.383 DL:991.704 DL:991.479

1:0

1:0
.5

.5
-2.64% -2.64% -0.93%
+5.00% +5.00% -5.00% 1:10

1:1
.5

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 PipeCulvert
Drain - 0.460 m2 Drain - 0.460 m2
Cut - 2.365 m2 GabionRetainingWall - 4.500 m2 Cut - 29.929 m2
Datum 993 m Datum 989 m
Fill - 2.806 m2 Cut - 1.665 m2 Fill - 0.000 m2
Datum 989 m
DrainCut - 0.700 m2 Fill - 4.044 m2 DrainCut - 0.700 m2
StructureCut - 0.000 m2 DrainCut - 0.700 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 StructureCut - 3.283 m2 BackFill - 0.000 m2
BackFill - 2.413 m2
H-3.00m

1:0
Ch:3+250 Ch:3+290 Ch:3+330

.5
GL:993.983 GL:991.150 GL:993.072
1:0
.5

DL:994.242 DL:991.640 DL:991.425

1:0
.5
+1.75% +1.75% +5.00% -2.07% +5.00% -5.00%
1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Datum 992 m GabionRetainingWall - 2.500 m2 GabionRetainingWall - 4.500 m2 Cut - 22.441 m2
Cut - 8.150 m2 Cut - 1.517 m2
Datum 989 m Fill - 0.000 m2
Datum 989 m
Fill - 2.227 m2 H-2.00m Fill - 3.125 m2 DrainCut - 0.700 m2
DrainCut - 0.700 m2 DrainCut - 0.700 m2 StructureCut - 0.000 m2
StructureCut - 1.321 m2 StructureCut - 5.435 m2 BackFill - 0.000 m2
BackFill - 0.713 m2 BackFill - 3.410 m2
H-3.00m

Ch:3+260 Ch:3+300 Ch:3+340


GL:992.638 GL:991.534 GL:992.684
1:0
.5

DL:993.100 DL:991.586 DL:991.372

1:0
.5
1:0
.5
+3.00% +3.00% -3.20%
+5.00% +5.00% -5.00%
1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
GabionRetainingWall - 4.500 m2 GabionRetainingWall - 2.500 m2 Cut - 10.881 m2
Datum 989 m
Cut - 15.963 m2 Datum 989 m Cut - 4.212 m2 Fill - 0.000 m2
Fill - 2.164 m2 Fill - 0.234 m2 DrainCut - 0.700 m2
Datum 990 m DrainCut - 0.700 m2 DrainCut - 0.700 m2
H-2.00m
StructureCut - 0.000 m2
StructureCut - 5.696 m2 StructureCut - 3.530 m2 BackFill - 0.000 m2
BackFill - 3.513 m2 H-3.00m BackFill - 0.004 m2

1:0
Ch:3+270 Ch:3+310 Ch:3+350

.5
1:0

GL:991.753 GL:992.909 GL:992.295


.5

DL:992.135 DL:991.533 DL:991.318


1:0
.5

+4.89%
+4.89% +5.00% -4.34% +5.00% -5.00%
1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
GabionRetainingWall - 4.500 m2 Cut - 20.107 m2 Cut - 13.361 m2
Datum 989 m
Cut - 7.607 m2 Datum 989 m Fill - 0.000 m2 Fill - 0.000 m2
Fill - 2.675 m2 DrainCut - 0.700 m2 DrainCut - 0.700 m2
Datum 989 m DrainCut - 0.700 m2 StructureCut - 0.000 m2 StructureCut - 0.000 m2
StructureCut - 4.478 m2 BackFill - 0.000 m2 BackFill - 0.000 m2
BackFill - 2.963 m2 H-3.00m

CONSULTANT: DATE REVISION SIGNATURE DESIGNED BY : SCALE


DATE:
Cross-Section
DRAWN BY : 1: 200

1
SJVN Arun-3 Power Development Company Pvt. Ltd. 2m 0 4m
DRG NO :
(SAPDC) Tumlingtar, Nepal CHECKED BY :
3+240-3+350
APPROVED BY : SHEET NO : 28
1:0
1:0

1:0
.5
.5

.5
Ch:3+360 Ch:3+400 Ch:3+440
GL:992.023 GL:989.337 GL:991.496
DL:991.264 DL:991.050 DL:990.835

+3.00% +3.00% -3.00% -3.00%


+5.00% -5.00%
1:10

H-3.00m
H-2.00m
Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2
Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2

Datum 989 m Cut - 20.557 m2 MasonryBreastWall - 1.280 m2 MasonryBreastWall - 2.370 m2


Fill - 0.000 m2 GabionRetainingWall - 4.500 m2 Cut - 9.450 m2
DrainCut - 0.700 m2 Cut - 8.522 m2 Datum 988 m Fill - 0.000 m2
Datum 988 m
StructureCut - 0.000 m2 Fill - 7.734 m2 DrainCut - 0.700 m2
BackFill - 0.000 m2 DrainCut - 0.700 m2 StructureCut - 2.455 m2
StructureCut - 4.844 m2 H-3.00m BackFill - 0.760 m2
BackFill - 1.580 m2

1:0
.5
Ch:3+370 Ch:3+410 Ch:3+450
1:0

GL:991.921 GL:989.784 GL:992.683


.5

DL:991.211 DL:990.996 DL:990.781

1:0
.5
-3.66% +3.04% -3.00% -3.00%
-3.66% +5.00% 1:10
1:10

Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2


Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Datum 989 m Cut - 14.961 m2 GabionRetainingWall - 4.500 m2 Cut - 17.834 m2
Fill - 0.000 m2 Cut - 7.346 m2 Fill - 0.000 m2
DrainCut - 0.700 m2 Fill - 5.883 m2 Datum 988 m DrainCut - 0.700 m2
Datum 988 m
StructureCut - 0.000 m2 DrainCut - 0.700 m2 StructureCut - 0.000 m2
BackFill - 0.000 m2 StructureCut - 2.444 m2 BackFill - 0.000 m2
BackFill - 1.453 m2 H-3.00m

1:0
.5
Ch:3+380 Ch:3+420 Ch:3+460
GL:991.398 GL:989.908 GL:992.314
DL:991.157 DL:990.942 DL:990.728

1:0
.5
1:0
.5

-3.00% -3.00% -3.00% -3.00%


+5.00% -5.00% 1:10

1:1
.5
H-3.00m
Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2
Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
Cut - 7.670 m2 MasonryBreastWall - 2.370 m2 Cut - 16.920 m2
Fill - 0.580 m2 GabionRetainingWall - 2.500 m2 Fill - 0.000 m2
Datum 988 m
DrainCut - 0.700 m2 Datum 988 m Cut - 5.566 m2 DrainCut - 0.700 m2
Datum 988 m StructureCut - 0.000 m2 Fill - 4.516 m2 H-2.00m StructureCut - 0.000 m2
BackFill - 0.000 m2 DrainCut - 0.700 m2 BackFill - 0.000 m2
StructureCut - 3.458 m2
BackFill - 1.311 m2
1:0
.5
1:0
.5

Ch:3+390 Ch:3+430 Ch:3+470


GL:990.139 GL:990.519 GL:992.002
DL:991.103 DL:990.889 DL:990.674

1:0
.5
+3.00% -4.05% -3.00%
+3.00% -4.05% -3.00%

H-3.00m 1:1
H-2.00m .5
Pavement - 0.000 m2 Pavement - 0.000 m2 Pavement - 0.000 m2
Drain - 0.460 m2 Drain - 0.460 m2 Drain - 0.460 m2
MasonryBreastWall - 1.280 m2 MasonryBreastWall - 2.370 m2 Cut - 12.255 m2
GabionRetainingWall - 4.500 m2 GabionRetainingWall - 2.500 m2 Fill - 0.926 m2
Datum 988 m
Cut - 5.576 m2 Datum 988 m Cut - 13.240 m2 DrainCut - 0.700 m2
Datum 988 m Fill - 5.557 m2 Fill - 2.070 m2 H-2.00m StructureCut - 0.000 m2
DrainCut - 0.700 m2 DrainCut - 0.700 m2 BackFill - 0.000 m2
StructureCut - 4.562 m2 H-3.00m StructureCut - 4.617 m2
BackFill - 2.057 m2 BackFill - 1.960 m2

CONSULTANT: DATE REVISION SIGNATURE DESIGNED BY : SCALE


DATE:
Cross-Section
DRAWN BY : 1: 200

1
SJVN Arun-3 Power Development Company Pvt. Ltd. 2m 0 4m
DRG NO :
(SAPDC) Tumlingtar, Nepal CHECKED BY :
3+360-3+470
APPROVED BY : SHEET NO : 29
Ch:3+480
GL:991.620
DL:990.620

1:0
.5
-3.00% -3.00%

1:1
.5

Pavement - 0.000 m2
Drain - 0.460 m2
PipeCulvert
Cut - 8.366 m2

Datum 988 m Fill - 0.193 m2


DrainCut - 0.700 m2
StructureCut - 0.000 m2
BackFill - 0.000 m2

Ch:3+490
GL:991.042
DL:990.567
1:0
.5

.5
1:0
+5.00% -5.00%

Pavement - 0.000 m2
Drain - 0.460 m2
Cut - 11.317 m2
Datum 988 m Fill - 0.000 m2
DrainCut - 0.700 m2
StructureCut - 0.000 m2
BackFill - 0.000 m2

Ch:3+492
GL:990.932
DL:990.556
1:0
.5

+5.00% -5.00%

Pavement - 0.000 m2
Drain - 0.460 m2
Cut - 2.854 m2
Datum 988 m Fill - 0.000 m2
DrainCut - 0.700 m2
StructureCut - 0.000 m2
BackFill - 0.000 m2

CONSULTANT: DATE REVISION SIGNATURE DESIGNED BY : SCALE


DATE:
Cross-Section
DRAWN BY : 1: 200

1
SJVN Arun-3 Power Development Company Pvt. Ltd. 2m 0 4m
DRG NO :
(SAPDC) Tumlingtar, Nepal CHECKED BY :
3+480-3+492
APPROVED BY : SHEET NO : 30

You might also like