You are on page 1of 2

DOCUMENT/DRAWING TRANSMITTAL

Our Ref. : VT4-T-DMPP-PMB-17-2447


Date : 15.09.2017

TO : Vinh Tan Thermal Power Project Management Board


– Branch of Power Generation Corporation 3
Hung Vuong Avenue – Quarter 5 – Phu Thuy Ward
Phan Thiet City – Binh Thuan Province, Vietnam
T: (+84 62) 2461 222; F: (+84 62) 3739 684

ATTENTION : Mr. Vo Minh Thang, Deputy Director of VTTPMB


CC : Mr. Tran Le Minh, Deputy General Director of PECC3
PROJECT : VINH TAN 4 THERMAL POWER PLANT PROJECT
SUBJECT : Documents/ Drawings submission – Oily and Waste Water
Drainage

Dear Sir,

With reference to VTTPMB’s Letter;


- Ref No. VT4-L-PMB-DMPP-16-7741 dated on 22nd Dec 2016

Please find enclosed herewith the documents submitted for your kind review and approval.
We would highly appreciate it if you could reply at your earliest convenience so that we can
promptly proceed with further works as necessary.

Yours faithfully,

On behalf of the DMPP Consortium,

Hankyu Yang
Project Engineering Senior Manager
Doosan Heavy Industries & Construction Co., Ltd.
(Tel : +84-91-392-9631, E-mail : hankyu.yang@doosan.com)

Attachment: Refer to attached Document/Drawing Transmittal Sheet

Page 1 / 2
DOCUMENT/DRAWING TRANSMITTAL SHEET
THE CONSORTIUM OF DOOSAN-MITSUBISHI-PACIFIC-PECC2
22 DoosanVolvo-ro,Seongsan-Gu, Changwon,Gyeongnam Korea
Tel: 82-55-278-6114 Fax: 82-55-264–5551~2
VINH TAN 4 THERMAL POWER PLANT PROJECT
TRANSMITTAL NO.: VT4-T-DMPP-PMB-17-2447
DATE : 15.09.2017
SUBJECT: Documents/ Drawings submission – Oily and Waste Water Drainage

No. Action
DOC./DWG. No. Rev DWG. TITLE / DOC. DESCRIPTION COPIES
Sheet Code

VT4-XB02-P0UZT-165201 1 G FA Oily and Waste Water Drainage Layout Note 2, 3

VT4-XB02-P0UZT-165202 10 G FA Oily and Waste Water Drainage Plan Note 2, 3

VT4-VK02-P0UZT-165211 6 G FA Oily Waste Water Transfer Sump Plan & Section Note 2, 3

VT4-VK02-P0UZT-165212 9 G FA Waste Water Transfer Sump Plan & Section Note 2, 3

VT4-VK02-P0UZT-165213 2 G FA Oily and Waste Water Drainage Structure Detail Note 2, 3


CaRs 2900(R6) DMPP-16-4656 Oily and Waste
CaRs 2900(R6) DMPP-16-4656 3 Note 2, 3
Water Drainage

SIGNATURE SIGNATURE*
OF SENDER/DATE : OF RECEIVER/DATE :

* NOTE
1. PLEASE SIGN AND RETURN TO SENDER
2. COPY OF SUMBMISSION
1) DOCUMENT
- PMB : 4 Copies
- PMC : 4 Copies
2) Drawing
- PMB : 5 Copies (Full Size) + 1 Copy (A3 Size)
- PMC : 2 Copies (Full Size) + 2 Copies (A3 Size)
3. All electronic file for the documents/drawings in this transmittal sheet will be RECORDED in A single CD. (ONE TO PMB, the
other TO PMC)

Page 2 / 2