You are on page 1of 4
Pagina ALCALDIA MUNICIPAL DE ENCISO, SANTANDER. ‘Mejoramionto de Redes y Estructuras del Sistoma de Acueduoto para la Vereda Plan del Llano, Municipio de Enciso, Santander PRESUPUESTO Y CANTIDADES DE OBRA APROXIMADOS FECHA: 254 9 a DESCRPCON [ve] con, [ORONO RPE 1.00 [PRELIMINARES TOT [Coeaizacony Reparice Tic [ayezia] saesa00 | saosena0 | "Toe [Devons y Descapate we sarz4o| scee00 | $26,070 425,34 [SUBTOTAL = *$47201.355 00) 200 [BOcATOMA [201 [Conte de Aguas y Beare UN [100 | $e07 50500 Sor 505 '202_|Excavacon on Material Common a Wand wa [228 | s2267200 $108,510 7208 |Excavacon en Roca a Cuslauer Pofunddad a [216 | $02,602.00 3 180690.1 72.04 |Gonereto para Sclados Fo=175 Kole = 2500PS1 (6-0 05m) 2 | 506_|_$67,19200 3.400 464.3) 7205 [Concieto de 4000 pslimeermeablzado Lose macza ma [214 | 8 1.101.860) $2,957,600. 7206 [Gonereto de 4000 palimpermeabitzado Muros Paral ma | 195 | $1,237,080.00 | 24%2.267.0 "207 |Sumintoe instalacon de Acero do refuerza FORO KG | 3286 | $5407.00 3,857,658 69 206 |Pafete mparmeablizedo 13 (e=003m) wa | 10.49 | $0588.00 5 506,160.79) oe [Senso talacon ce Rep Gavanaaes SOGRBDETTEVaMES Toy 499 | 528800 $551,280.00 270, |Sumiisvo« nsialadon de Npe Posamura en HG B= C=O 40m ON | oo |S Ten TR 3 155,570.09) 72:1 Sumingvoe stalacion de pe Posamura en HG G2", =0.40m UN | 100 [$49,520.00 $40,520.09] "2 | Surniiso e instalcion de Vavda de Compuera Elastica en FD @=z ne 2a [Sumit ie un | 100 | s764s4000 87645400 7a | Sumit erst de Tapa on Concrete O00 pa para Camara do a 2.19 [puma estlecon eT un | 100 | $10811300 $109,173, 2: Sumiictowtstalacion Gta PVC para Junta ConamicoonV-1Sem Ma | 700 | smaaTa00 ‘Soar 36.0) 2.18 |Suminisro y Apicacin RevestiniertoImpomeable Sika Top 1210Simiar | M2] 1064 | $.40,30500 $428 45.20) 218 | Suminisro e instalacon de Tuberia Santaria PVC O=#" USparaBrceses | me] 600 | $27,00500 $ 16731000) [SUBTOTAL = ‘SOB '3.00_|MEJORAMIENTO Y MANTENIMIENTO DESARENADOR EXISTENTE “aor | Saino e nstatacon para Cambio de Vala de Compuorta Elasica or ee un | 100 | s4t4sao00 $414,540.09] 30a [Safe otasan pra Canto we Tabata PresonPVC DEROE |u| ago | oseaoo aaa 3.03 |Suminstoe instalacon para Cambio de Tubera Santara pve D=s,US.| m| 1000 | $2245000 $224,500.09] 306 [Sumiistoe nstalacion para Cambio de Tubeia Santaia PVC O=e,US | m| 600 | s57.90000 $344,376.09] 305 | Suninsvoe Instalacion pare Cambio de Accesorios Preson Pvc O=2,US| un | 1400 | $30,200 $425,090. 306_ [Pate inpormeabizado 13 {e=0.m) wa | sa20 | S3058800 31.505 608 [SuBTOTAL. a "£00_[TANQUE ALMACENAMIENTO EN CONCRETO REFORZADO F'C=4000PS1 1401 _|Escavacion on Matera Comun'a Mano wa | 2751 | sanera00 3.308 806.72) 74.02 |Excavacon en Roce a Cun Profured wa _[te36 | 562.8620 1.519.600 09 1409 [Sanity Covermasen de elo con Masia Saeaonai> ST | ws | ran | sansea00 aeaael| “EH |Conerto pera Sclados Pani7s Kgtart= D50OPSL (oO 05m) wa [mam | _serse300 37 a0e | 74.05" [Gonereto 4000 pl impemmeabizedo Loss macze wwa_[ e668 [3 1.101,88000] $0,804 02.00 4.00 |Concreto de 4000 pal impermesbiizadoMiros Paral wma | rae $ 1257.060.00 | $14,201,448, 4.07 |Suminevee intalacon ds Acero de rooerzo PORO Ke | je2ase] $5401.00 | $10,309 576.39 Péine 2 ALCALDIA MUNICIPAL DE ENCISO, SANTANDER, 7 fo ejoramionio de Redes y Estrutuas del Sstoma de Acueduto para la Verda Pan dal } Llano, Municipio de Eis, Santander PRESUPUESTO ¥ CANTIDADES DE OBRA APRORINADOS FECHA: 2540b.19 Tm TESCPTT one P can | RONTARS Fates iparesBsnco 13 0am) wa | ome | Soosmeto 4.09" estocon Vala do Conpoata SF RW ow [san] saa1.e100 | onan 7410 |Sumiristoe ntlacion Vella de Bola G=9" RW tun] 100 | $.47401400 Sara0r400) 7.1 [Survie laden Vala Fda > ow | —1a0 | sasagra00 | sara 12 [Sunwto taonVua dol on Contra [a0 | i aet00_ [sa 415 [Survie erttacen TEE PVG Preson <7” ScHa0 ww | aan] s0ni800 50,789 7c [Sunwieo seisacon TEE PVE Peston 6-9” SCHAO [120] soso So.p3n0d 415 [Suninatosretison Gon PVG Pson S200" SCID on [200] ~sa282400 $45.80 4:16 [unio estdacon Code PVG reson 9-290" Sch40 oH | 100] -$s04a@00 $0,089 7.17 [Suni eeiocn Tes PUG reson 2" ROEZT US wm [970 | -$ rorenoo| ser 16 [Sune esilacon Tee PVG reson 7 ROE US we [ean —[sar-rioo | szzzesscr 410 [Sure eetsecon Cov HG reson 20 SoH oH [ #00] -sapesi.00_| 100.2009 420 [Sunde ehetsecon Nl Patorro on HG B=, L=040T tn [ s00_|-saoszno0_| 207s wai ow [100] -$7082000 $7o%2009 422 [Suni eetlocen Eno onVatl eo HO Bal =000 mc_[_s40_| seee700_| sazasraan 423 [Suro etdadon Ct PVG V-15 pret de Constisen | we | 00] #za7aoo_| 11042620 424 [RISES aes eso mpameaieon Sa Ton 27ST ya] ran | swomsco | 20003804 425 |Eaboren oj ae apo pra Vas (CODA OOO Tw [_200_| songaroo | $136.00 14.28 [Corton Fito on Pa O=7-7. andre m_[ 1000 [$4357.00 sa7ooncn czy [Sua cn Tap estan Aner rT Carmimmm Tux Tso0 | sanuzteov | ssinane [SUBTOTAL rr saz 500 NEA De CONDUCCION- RED DISTRIBUCION 501 |Esenrooun ental Caran Mane ia [ass] eRe STR 5.02 |Eserooun en Ross a Calis ronan wa | .ona42 | se7era0o | $0 7e0—70%¢ 502 [oortmaceny Conpacacon de Retro con Mata ela Bawecin | wo [2avaso] saazenoo | _sersnaove.y 5 | unseroy Gatorade Rana con ata de Preiano we [o7aa | sar aenoo_| seaman 5.05 |Sunietoestocen de Tubes Pron PVG Os? ROE AS UM | wt | 195900 | 1136100 | —sazerassaad 506 [Sune nstaacen de Tania reson VG O=IcIRDESt US| we] sea09 | sracaseo | $7600 507 [Sunineto einen de Tuba Presen PVC ORT ROE US we] Teoas | sesi7on | —saarsate 508 [euros wetioor de Tubs Peson pve oraeRoEZi us | we] asso | saaen00 | Sz f0n500 5.0 [Surin rstlcon de Tubes Peson PVE O=12-ROE-a5 US| we [aoa7an | $9050.00 | 3 tga7apaaad 5:10" | Sunol de ote PVG DHE 1225" 200 pe UM un] 100 | $27.5100 $27 654 5.11 [unio elon do Coin PVG Ona 1125" DOO UM un | —s00 [$0 76400318370 5:12 [Suni eniosdn de Code PVE O=T-IDaR SHAD US uN | 400 | 162000. sos. 18 [SUR incon vn Grp HO DAS TANS _T uw] goo] saeraeaoo | 1a 0. sa [Sunes nr 3 Va oC a Ba Ts Peas OF 5.14 | rz 200Ps1(valvla 6p Setonzscion) UN | 00 | $274794.00 Gisbis aa siaeonn vans oramamema TERS | | ame | srsumaree | sama amines nee eo pa ots Tes a erm oes 2st aus Sacco un | 200 | $98,181.00 $196,262 Se ioe a een Crome mBOS TEP Tin | soo | evaamz0o | snore Pagina? ALCALDIA MUNICIPAL DE ENCISO, SANTANDER Mejoramiento de Redes y Estructuras del Sistema de Acueduoto para la Vereda Plan del Llano, Municipio de Enciso, Santander PRESUPUESTO Y CANTIDADES DE OBRA APROXIMADOS FECHA: 25-eb19 Cee uno] CANT. [Scrincto e Wetalacon de Vala Versa de Camara Sencia ov TO] ani a un] a0o | sasamo0 | s05oa20r Suminstoe isalcion co Vella @ Conpusra HO DoF SOPSIWaNGS Tims | 400 semi saesreooo | sasa7e0cy semis Teaser avis & Campo ionn Too Pees OY up | 00 | sarssi7oo | satasirad Sao ease de Cold Denaaen PVE OPT asa | szazaa Teaza) Sunita de Cold Dragon PVE OP Ir ‘ww | “200 | “s reazsco 355009 Sura siscon do Teo PVC Proson O=-V ‘| s00[$raszeo0 770.064] Suse alc de Too PVC reson O-> ‘4008.68 00 S308 Sumner oinialcon de Tee PVC Proson =U ‘aw [ 300] $2mi00 Sar 58 Sumer eesacon do Teo Reduce BVO Presta D=T3I a] 400 raz 3545080 527 [Sure iniacin de Coa PVG Pein D+ a t00 | ra 00 3200209 3.28 [Sow reitsin de Code PVG Preson Oa ‘ow [300 | $8800 S874 3.20 [Sumit «rsann de Codo PVG Preson O00" ie [ 400] 83.8.0 Seer. 5.90" | unio enact de Cod PVG Pesin D=V3a ‘oi 0007 8459.00 $200009 5.1 [Sumineo een de Tes VC Preson DT [160 | $4086.00 46 52 | Suniel de Redocon PVG Pron DETTE [200 | 700 SzaaTA. 533, | Suna sinslad d Redon PVC Pron DPS [a8 rasr00 $3709 5.94 | Suninao sina de Redizoon PVC Pron D> 17H [500 | $0857 00 $7 860 535 [Sint ertalcn oe Reauccon PVG Preson D-H On| 200 | ~$857 00 ¥1907409 50 [Surin tact de Revzoen PVG Preson D> Uw [ “00 | “$87.00 3asa7 0 397 [Sumner ntalacn d Reoroen PVC reson O= [200 [ $7700 315.0740 58 [Sumas rtsicn de Reson PY Pesen =A GH [B00 | 260600 $16.00 so [imipeneor Can Puabetpe ent Oo in | asco | Souaroon | pose nc Sas tannins Ri CSTR EOP ATS] in| sean | saranae |e naeol 541 [cnt 500° npsneaat ee Tan acs] | WN | 160 [ s4ezaz0300| 4902000] aaa [Fonmteson Camas de Gusts 6 Preson W' (LeO1OTZOM | ow | 00 | sarenooamn | earencesod Fae [oorsiucson Canara de Gusts oo Preson NS (1EDXTEOTIOM, By a, | san | easmooom | aaseacaad Conesto de 4000 PSI mpermestizado (ve. Tapa Metaic) [SUBTOTAL nnennernenenenn $.35,808,375.09) 1500 _|SUMINISTRO E INSTALACION DE DOM {8.01 [Escavacion on Material Comune Mano "a0 | sa2672 $425,020.12) 10.02 |Sumisvoe stlacion de Acomebda Doria un | 2800 _| $8751 520.065 08.0 [SUBTOTAL nnn nnn nnn — $.20808.51700) "7.00 [SUMINISTRO Y CONSTRUCCION DE PTAP COMPACTA EN ESTRUCTURA METALICA PARA 3.01 UTS Suminsroeistalacion de un (1) reader, os (3) anques plastics para riacenar scenes, ds 2) os en arena, os (2) ito en ara, es} (2) stems de dosticacin, rs (3) mezcadores etates, un (1) foctade, un (1) secimertade, ura (1) patafrma, Kubwa, vavlasy secon Puesta en marcha inlye transporte a tie de mertae, neve Ineumes |ournicos para el aranque para res (3) meee. [SUBTOTAL, 701 un] 100 | stsassqoss | $ 133,263,088.00 Pagina 4 —______— ALCALDIA MUNICIPAL DE ENCISO, SANTANDER Mejoramiento de Redes y Estructuras del Sistema de Acueducto para la Vereda Plan del iano, Municipio de Enciso, Santander ‘PRESUPUESTO Y CANTIDADES DE OBRA APROXINADOS FECHA: 25feb.19 rea DESCRPCON [uno] came [RONTRO] vinpanca 'GOSTO TOTAL DIREGTO OBRA GV 559,667,085.00, [ADMINISTRACION. $ 101,301,715 IMPREVISTOS: v4 _$0,506611 \yTUDAD ‘sul $32,083,054.00 ‘VALOR TOTAL oBRa cnit| '$.880 52,465.00) ‘GOSTO TOTAL INTERVENTORIA TECNICA| Tal $62.357,973.00 VALOR TOTAL PROYECTO] Ing Cv.” Mat W'08202-224%88 STD

You might also like