No Uraian Real s/d Pengajuan Jumlah Satuan Harga Satuan Jumlah BLM
Kebutuhan
Tahap Lalu Sekarang Kumulatif
I SUMUR BOR
Pengadaan dan Pekerjaan Sumur Bor
Mobilisasi 2.00 Ls 1,000,000.00 2,000,000.00
Pengeboran Pilot Hole ( 00-50 m ) 50.00 M' 200,000.00 10,000,000.00
Pengeboran Pilot Hole ( 50-100 m ) 30.00 M' 250,000.00 7,500,000.00
Pembesaran Lobang Bor 00-30 m 50.00 M' 200,000.00 10,000,000.00
Pembesaran Lobang Bor 30-60 m 30.00 M' 240,000.00 7,200,000.00
Pumping Test 72.00 Jam 10,000.00 720,000.00
Pemasangan Apron Sumur 1.00 Ls 250,000.00 250,000.00
Pekerjaan Pasca Sumur Bor -
Logging Test (termasuk laporan) 1.00 Ls 2,500,000.00 2,500,000.00
Pengadaan dan Pemasangan Pompa dan Kelengkapannya -
Pompa Submersible kap. 4 m3/jam , 220 V 1 phase ,
h = 80 meter 1.00 Bh 9,500,000.00 9,500,000.00
Kabel NYYHY 6 x 2,5 mm 80.00 - 80.00 M' 18,000.00 1,440,000.00
Kabel NYYHY 3 x 1,5 mm 80.00 M' 9,000.00 720,000.00
Pipa PVC 1 1/2" 13.00 Btg 140,000.00 1,820,000.00
Pipa PVC Ø 6" SNI 12.5 13.00 Btg 1,300,000.00 16,900,000.00
Batu Pecah 1/2 0.26 M3 400,000.00 104,000.00
Semen PC 1.00 Bh 57,000.00 57,000.00
Pasir Beton 0.25 M3 176,000.00 44,000.00
Dop PVC Ø 6 1.00 Bh 55,000.00 55,000.00
Socked Drat PVC Ø 2" x 1,5 " 1.00 Bh 25,000.00 25,000.00
Socket PVC Ø 1,5" 8.00 Bh 16,000.00 128,000.00
Elbouw Ø 2" 1.00 Bh 25,000.00 25,000.00
Gate Valve Ø 2" drat 1.00 Bh 70,000.00 70,000.00
Check Valve Ø 2" 1.00 Bh 65,000.00 65,000.00
Panel Pompa 1.00 Unit 2,400,000.00 2,400,000.00
Rumah Panel 1.00 Unit 800,000.00 800,000.00
Elektroda Massa 5.00 Bh 30,000.00 150,000.00
Well Cover DN 4" x 2" 1.00 Set 30,000.00 30,000.00
Pemasangan Listrik -
Registrasi PLN 2200 W 1.00 Ls 2,170,000.00 2,170,000.00
Biaya Pemasangan Baru 1.00 Ls 1,330,000.00 1,330,000.00
Sub total I 78,003,000
II MENARA
BAHAN
Air Ltr 100.00 -
Ampelas 64.00 Lbr 9,000.00 576,000.00
Bata Merah 2,442.00 Bh 500.00 1,221,000.00
Batu Pecah 1/2 1.00 M3 410,000.00 410,000.00
Batu Pecah 2/3 19.00 M3 400,000.00 7,600,000.00
Benang 4.00 Rol 3,000.00 12,000.00
Besi Polos Dia 10 43.00 Btg 94,000.00 4,042,000.00
Besi Polos Dia 12 43.00 Btg 118,000.00 5,074,000.00
Besi Polos Dia 8 216.00 Btg 54,000.00 11,664,000.00
Cat Besi 1.00 Kg 55,000.00 55,000.00
Cat Dasar 17.00 Kg 30,000.00 510,000.00
Cat Tembok 46.00 Kg 30,000.00 1,380,000.00
Dolken D8 - 4 M 452.00 Btg 23,000.00 10,396,000.00
Dudukan Lampu 1.00 Bh 12,000.00 12,000.00
Ember 5 Lt 20.00 Bh 10,000.00 200,000.00
Engsel Jendela 2.00 Bh 35,000.00 70,000.00
Engsel Pintu 2.00 Bh 50,000.00 100,000.00
Flange GI 1 1/2" 1.00 Bh 172,000.00 172,000.00
Flange GI 2" 1.00 Bh 195,000.00 195,000.00
Flange PVC 1 1/2" 1.00 Bh 120,000.00 120,000.00
Flange PVC 2" 2.00 Bh 145,000.00 290,000.00
Handel dan Kunci 1.00 Bh 190,000.00 190,000.00
Jendela Nako 1.00 M2 105,000.00 105,000.00
Kabel 10.00 M' 6,000.00 60,000.00
Kaca (0.8 x 1M) t=3 mm 1.00 Bh 75,000.00 75,000.00
Kape 5.00 Bh 8,000.00 40,000.00
Kawat Beton 30.00 Kg 20,000.00 600,000.00
Kayu Kelas II (4x6cm x4m) 150.00 Btg 43,000.00 6,450,000.00
Kayu Kelas III (4x6cm x4m) 322.00 Btg 27,000.00 8,694,000.00
Kayu Papan (3x20cm x4m) 42.00 Btg 64,000.00 2,688,000.00
Keramik 40 x 40 25.00 M2 55,000.00 1,375,000.00
Knee GI 1 1/2" 6.00 Bh 18,000.00 108,000.00
Kuas 4" 5.00 Bh 20,000.00 100,000.00
Lampu Lilin 10 Watt 2.00 Bh 35,000.00 70,000.00
Manhole uk. 80 x 80 cm 1.00 Unit 650,000.00 650,000.00
Minyak Bekisting 21.00 Ltr 16,000.00 336,000.00
Paku 5-10 cm 44.00 Kg 15,000.00 660,000.00
Paku Campur 1.00 Kg 18,000.00 18,000.00
Pasir Beton 13.00 M3 176,000.00 2,288,000.00
Pasir Pasang 3.00 M3 165,000.00 495,000.00
Pasir Urug 2.00 M3 160,000.00 320,000.00
Volume
No Uraian Real s/d Pengajuan Jumlah Satuan Harga Satuan Jumlah BLM
Kebutuhan
Tahap Lalu Sekarang Kumulatif
Pintu Kayu Kelas II 1.00 M2 800,000.00 800,000.00
Pipa GI 1 1/2" 12.00 M' 200,000.00 2,400,000.00
Pipa GI 2" 18.00 M' 250,000.00 4,500,000.00
Plamur Tembok 17.00 Kg 35,000.00 595,000.00
Plywood t= 9 mm 36.00 Lbr 170,000.00 6,120,000.00
Rooster Kayu 14.00 Bh 35,000.00 490,000.00
Saklar Tunggal 2.00 Bh 25,000.00 50,000.00
Sealtape 4.00 Bh 5,000.00 20,000.00
Semen PC 229.00 Zak 57,000.00 13,053,000.00
Senai Pipa 8.00 Titik 14,000.00 112,000.00
Slot Jendela 1.00 Bh 15,000.00 15,000.00
Socket GI 1 1/2" 6.00 Bh 22,000.00 132,000.00
Stop Kontak 2.00 - Bh 30,000.00 60,000.00
Tangga Besi dan Pagar 22.00 - M 150,000.00 3,300,000.00
Water Meter 1.00 - Bh 2,500,000.00 2,500,000.00
Prasasti 30x40 cm 1.00 - Bh 500,000.00 500,000.00
Media/Logo & Lukis Tapis 1.00 - Bh 1,000,000.00 1,000,000.00
UPAH
Pekerja - - HOK 85,000.00 -
Tukang - - HOK 100,000.00 -
Sub total II 105,068,000
III PERPIPAAN
BAHAN
Ampelas 85.00 - Lbr 9,000.00 765,000.00
Bata Merah 1,786.00 - Bh 500.00 893,000.00
Volume
No Uraian Real s/d Pengajuan Jumlah Satuan Harga Satuan Jumlah BLM
Kebutuhan
Tahap Lalu Sekarang Kumulatif
Batu Pecah 1/2 3.00 - M3 410,000.00 1,230,000.00
Endcap Ø 1 1/2" 2.00 - Bh 35,000.00 70,000.00
Endcap Ø 1" 2.00 - Bh 18,000.00 36,000.00
Endcap Ø 3/4" 5.00 - Bh 11,000.00 55,000.00
Engsel 24.00 - Bh 15,000.00 360,000.00
Gate Valve PVC Ø 3/4" 15.00 - Bh 15,000.00 225,000.00
Gate Valve PVC Ø 1 .5" 2.00 - Bh 25,000.00 50,000.00
Gate Valve PVC Ø 1" 3.00 Bh 20,000.00 60,000.00
Gate Valve PVC Ø 2" 2.00 Bh 30,000.00 60,000.00
Kran Air 3/4" 10.00 Bh 48,000.00 480,000.00
Kran Air 1/2" 60.00 Bh 30,000.00 1,800,000.00
Knee "L" PVC Ø 1/2" 180.00 Bh 4,000.00 720,000.00
Knee PVC 1/2" - Bh 4,000.00 -
Water Meter 1/2" 60.00 Buah 145,000.00 8,700,000.00
Tutup Water Meter (Hard Plastic) - Buah 61,000.00 -
Kunci Gembok 12.00 Bh 40,000.00 480,000.00
Knee Ø 1" 1.00 Bh 25,000.00 25,000.00
Knee Ø 1,5" 1.00 Bh 37,000.00 37,000.00
Lem Pipa 46.00 Kg 50,000.00 2,300,000.00
Pasir Beton 2.00 M3 176,000.00 352,000.00
Pasir Pasang 2.00 M3 165,000.00 330,000.00
Pasir Urug 6.00 M3 160,000.00 960,000.00
Pelat Box Valve (50x50cm) 12.00 Bh 150,000.00 1,800,000.00
Pipa PVC 1 1/2" 6.00 Btg 140,000.00 840,000.00
Pipa PVC 1" 47.00 Btg 71,000.00 3,337,000.00
Pipa PVC 2" 45.00 Btg 213,000.00 9,585,000.00
Pipa PVC 3" - Btg 364,000.00 -
Pipa PVC 3/4" 120.00 Btg 64,000.00 7,680,000.00
Pipa PVC 1/2' 60.00 Btg 41,000.00 2,460,000.00
Pipa PVC 4" - Btg 200,000.00 -
Reducer Ø 3/4" x Ø 1,5" 60.00 Bh 6,000.00 360,000.00
Reducer Ø 1.5" x Ø 2" 6.00 Bh 21,000.00 126,000.00
Reducer Ø 1" x Ø 3/4" 8.00 Bh 6,500.00 52,000.00
Reducer Ø 2" x Ø 1" 3.00 Bh 25,000.00 75,000.00
Socket PVC 1/2" 120.00 Bh 4,000.00 480,000.00
Semen PC 29.00 Zak 57,000.00 1,653,000.00
Tee Ø 1" x Ø 1" x Ø 1" 3.00 Bh 12,000.00 36,000.00
Tee Ø 2" x Ø 2" x Ø 2" 2.00 Bh 70,000.00 140,000.00
Tee Ø 3/4" x Ø 3/4" x Ø 3/4" 60.00 Bh 7,000.00 420,000.00
Tee Ø 1.5" x Ø 1.5" x Ø 1.5" 2.00 Bh 25,000.00 50,000.00
Tee PVC 1/2" 120.00 - Bh 5,000.00 600,000.00
Bahan
Meterai 3000 buah 4,000.00
Meterai 6000 buah 7,000.00 -
-
Alat
Bantalan stempel buah 15,000.00
Isi Staples buah 5,000.00
Kalkulator buah 100,000.00
Kertas A4 rim 43,000.00 -
Lem besar buah 10,000.00 -
Map kertas buah 1,500.00 -
Map plastik Kecil buah 13,000.00 -
Odner buah 40,000.00 -
Pelobang kertas buah 30,000.00
Pena Box kotak 25,000.00
Penggaris plastik 30 cm buah 5,000.00
Staples buah 15,000.00
Binder Clip Kotak 13,000.00
Tinta Printer Botol 43,000.00
Tinta Stempel Botol 20,000.00
Galon (Cuci Tangan) Buah 75,000.00
Sabun Cuci Tangan Buah 35,000.00
Masker Buah 8,000.00
Sarung Tangan Buah 15,000.00
Termometer Buah 300,000.00
-
DOKUMEN DAN PELAPORAN
Biaya Cetak Photo /dokumentasi lembar 5,000.00
Biaya Copy Laporan Akhir Lembar 200.00
Biaya Jilid Laporan Akhir Lembar 8,000.00
Biaya Pembuatan Buku Bimbingan buku 20,000.00
Biaya Pembuatan Buku Tamu buku 20,000.00
Biaya Pembuatan Cap BP-SPAMS buah 50,000.00
Biaya Pembuatan Cap KKM buah 50,000.00
Biaya Pembuatan Papan Informasi unit 100,000.00
Biaya Pembuatan Papan Nama Proyek unit 100,000.00
Biaya Pembuatan Papan Sekretariat unit 100,000.00
Biaya Pembuatan Papan Struktur BP-SPAMS unit 100,000.00
Biaya Pembuatan Papan Struktur KKM unit 100,000.00
Biaya Pembuatan Peta Sosial Ls 150,000.00
Biaya Pencatatan Notaris KKM buku 300,000.00
Foto Copy & Jilid POB IMAS Buku 85,000.00 -
Foto Copy & Jilid PJM Buku 60,000.00 -
Foto Copy & Jilid RKM Buku 140,000.00 -
Foto Copy Berkas Hasil Pleno & Daftar Hadir lembar 200.00 -
Foto Copy Berkas LPD lembar 200.00 -
Foto Copy Berkas Pengadaan barjas lembar 200.00 -
Foto Copy Berkas Pengajuan Pencairan lembar 200.00 -
Foto Copy Berkas RPD lembar 200.00 -
Foto Copy Berkas pelaporan pelatihan lembar 200.00 -
Foto Copy laporan pengeboran lembar 200.00 -
Penjilidan Berkas & Dokumen KKM buku 8,000.00
Sub total IX -
JUMLAH PENGAJUAN 242,221,000
( Dua Ratus Empat Puluh Lima Juta Rupiah )
Sidomulyo, ………………2020
Disetujui : Dibuat :
Koordinator KKM Ketua Satlak
Diperiksa oleh :
Mengetahui :
PPK Air Minum Satker Pelaksanaan Prasarana Permukiman
Propinsi Lampung
RPD Global
Volume
No Uraian Real s/d Pengajuan Jumlah Satuan Harga Satuan Jumlah BLM
Kebutuhan
Tahap Lalu Sekarang Kumulatif
I SUMUR BOR
Pengadaan dan Pekerjaan Sumur Bor
Mobilisasi 2.00 Ls 1,000,000.00 2,000,000.00
Pengeboran Pilot Hole ( 00-50 m ) 50.00 M' 200,000.00 10,000,000.00
Pengeboran Pilot Hole ( 50-100 m ) 30.00 M' 250,000.00 7,500,000.00
Pembesaran Lobang Bor 00-30 m 50.00 M' 200,000.00 10,000,000.00
Pembesaran Lobang Bor 30-60 m 30.00 M' 240,000.00 7,200,000.00
Pumping Test 72.00 Jam 10,000.00 720,000.00
Pemasangan Apron Sumur 1.00 Ls 250,000.00 250,000.00
Pekerjaan Pasca Sumur Bor -
Logging Test (termasuk laporan) 1.00 Ls 2,500,000.00 2,500,000.00
Pengadaan dan Pemasangan Pompa dan Kelengkapannya -
Pompa Submersible kap. 4 m3/jam , 220 V 1 phase ,
h = 80 meter 1.00 Bh 10,000,000.00 10,000,000.00
Kabel NYYHY 6 x 2,5 mm 80.00 M' 18,000.00 1,440,000.00
Kabel NYYHY 3 x 1,5 mm 80.00 M' 9,000.00 720,000.00
Pipa PVC 1 1/2" 13.00 Btg 140,000.00 1,820,000.00
Pipa PVC Ø 6" SNI 12.5 13.00 Btg 1,300,000.00 16,900,000.00
Batu Pecah 1/2 0.26 M3 400,000.00 104,000.00
Semen PC 1.00 Bh 57,000.00 57,000.00
Pasir Beton 0.25 M3 176,000.00 44,000.00
Dop PVC Ø 6 1.00 Bh 55,000.00 55,000.00
Socked Drat PVC Ø 2" x 1,5 " 1.00 Bh 25,000.00 25,000.00
Socket PVC Ø 1,5" 8.00 Bh 16,000.00 128,000.00
Elbouw Ø 2" 1.00 Bh 25,000.00 25,000.00
Gate Valve Ø 2" drat 1.00 Bh 70,000.00 70,000.00
Check Valve Ø 2" 1.00 Bh 65,000.00 65,000.00
Panel Pompa 1.00 Unit 2,500,000.00 2,500,000.00
Rumah Panel 1.00 Unit 800,000.00 800,000.00
Elektroda Massa 5.00 Bh 30,000.00 150,000.00
Well Cover DN 4" x 2" 1.00 Set 30,000.00 30,000.00
Pemasangan Listrik -
Registrasi PLN 2200 W 1.00 Ls 2,170,000.00 2,170,000.00
Biaya Pemasangan Baru 1.00 Ls 1,330,000.00 1,330,000.00
Sub total I 78,603,000
II MENARA
BAHAN
Air Ltr 100.00 -
Ampelas 64.00 Lbr 9,000.00 576,000.00
Bata Merah 2,442.00 Bh 500.00 1,221,000.00
Batu Pecah 1/2 1.00 M3 410,000.00 410,000.00
Batu Pecah 2/3 19.00 M3 410,000.00 7,790,000.00
Benang 4.00 Rol 3,000.00 12,000.00
Besi Polos Dia 10 43.00 Btg 95,000.00 4,085,000.00
Besi Polos Dia 12 43.00 Btg 120,000.00 5,160,000.00
Besi Polos Dia 8 216.00 Btg 55,000.00 11,880,000.00
Cat Besi 1.00 Kg 55,000.00 55,000.00
Cat Dasar 17.00 Kg 30,000.00 510,000.00
Cat Tembok 46.00 Kg 30,000.00 1,380,000.00
Dolken D8 - 4 M 452.00 Btg 25,000.00 11,300,000.00
Dudukan Lampu 1.00 Bh 12,000.00 12,000.00
Ember 5 Lt 20.00 Bh 10,000.00 200,000.00
Engsel Jendela 2.00 Bh 35,000.00 70,000.00
Engsel Pintu 2.00 Bh 50,000.00 100,000.00
Flange GI 1 1/2" 1.00 Bh 172,000.00 172,000.00
Flange GI 2" 1.00 Bh 195,000.00 195,000.00
Flange PVC 1 1/2" 1.00 Bh 120,000.00 120,000.00
Flange PVC 2" 2.00 Bh 145,000.00 290,000.00
Handel dan Kunci 1.00 Bh 190,000.00 190,000.00
Jendela Nako 1.00 M2 105,000.00 105,000.00
Kabel 10.00 M' 6,000.00 60,000.00
Kaca (0.8 x 1M) t=3 mm 1.00 Bh 75,000.00 75,000.00
Kape 5.00 Bh 8,000.00 40,000.00
Kawat Beton 30.00 Kg 20,000.00 600,000.00
Kayu Kelas II (4x6cm x4m) 150.00 Btg 43,000.00 6,450,000.00
Kayu Kelas III (4x6cm x4m) 322.00 Btg 29,000.00 9,338,000.00
Kayu Papan (3x20cm x4m) 42.00 Btg 64,000.00 2,688,000.00
Keramik 40 x 40 25.00 M2 55,000.00 1,375,000.00
Knee GI 1 1/2" 6.00 Bh 18,000.00 108,000.00
Kuas 4" 5.00 Bh 20,000.00 100,000.00
Lampu Lilin 10 Watt 2.00 Bh 35,000.00 70,000.00
Manhole uk. 80 x 80 cm 1.00 Unit 650,000.00 650,000.00
Minyak Bekisting 21.00 Ltr 16,000.00 336,000.00
Paku 5-10 cm 44.00 Kg 15,000.00 660,000.00
Paku Campur 1.00 Kg 18,000.00 18,000.00
Pasir Beton 13.00 M3 176,000.00 2,288,000.00
Pasir Pasang 3.00 M3 165,000.00 495,000.00
Pasir Urug 2.00 M3 160,000.00 320,000.00
Volume
No Uraian Real s/d Pengajuan Jumlah Satuan Harga Satuan Jumlah BLM
Kebutuhan
Tahap Lalu Sekarang Kumulatif
Pintu Kayu Kelas II 1.00 M2 800,000.00 800,000.00
Pipa GI 1 1/2" 12.00 M' 200,000.00 2,400,000.00
Pipa GI 2" 18.00 M' 250,000.00 4,500,000.00
Plamur Tembok 17.00 Kg 35,000.00 595,000.00
Plywood t= 9 mm 36.00 Lbr 170,000.00 6,120,000.00
Rooster Kayu 14.00 Bh 35,000.00 490,000.00
Saklar Tunggal 2.00 Bh 25,000.00 50,000.00
Sealtape 4.00 Bh 5,000.00 20,000.00
Semen PC 229.00 Zak 57,000.00 13,053,000.00
Senai Pipa 8.00 Titik 14,000.00 112,000.00
Slot Jendela 1.00 Bh 15,000.00 15,000.00
Socket GI 1 1/2" 6.00 Bh 22,000.00 132,000.00
Stop Kontak 2.00 - Bh 30,000.00 60,000.00
Tangga Besi dan Pagar 22.00 - M 150,000.00 3,300,000.00
Water Meter 1.00 - Bh 2,500,000.00 2,500,000.00
Prasasti 30x40 cm 1.00 - Bh 500,000.00 500,000.00
Media/Logo & Lukis Tapis 1.00 - Bh 1,000,000.00 1,000,000.00
UPAH
Pekerja - - HOK 85,000.00 -
Tukang - - HOK 100,000.00 -
Sub total II 107,151,000
III PERPIPAAN
BAHAN
Ampelas 85.00 - Lbr 9,000.00 765,000.00
Bata Merah 1,786.00 - Bh 500.00 893,000.00
Volume
No Uraian Real s/d Pengajuan Jumlah Satuan Harga Satuan Jumlah BLM
Kebutuhan
Tahap Lalu Sekarang Kumulatif
Batu Pecah 1/2 3.00 - M3 410,000.00 1,230,000.00
Endcap Ø 1 1/2" 2.00 - Bh 35,000.00 70,000.00
Endcap Ø 1" 2.00 - Bh 18,000.00 36,000.00
Endcap Ø 3/4" 5.00 - Bh 11,000.00 55,000.00
Engsel 24.00 - Bh 15,000.00 360,000.00
Gate Valve PVC Ø 3/4" 15.00 - Bh 15,000.00 225,000.00
Gate Valve PVC Ø 1 .5" 2.00 - Bh 25,000.00 50,000.00
Gate Valve PVC Ø 1" 3.00 Bh 20,000.00 60,000.00
Gate Valve PVC Ø 2" 2.00 Bh 30,000.00 60,000.00
Kran Air 3/4" 10.00 Bh 48,000.00 480,000.00
Kran Air 1/2" 60.00 Bh 30,000.00 1,800,000.00
Knee "L" PVC Ø 1/2" 180.00 Bh 4,000.00 720,000.00
Knee PVC 1/2" - Bh 4,000.00 -
Water Meter 1/2" 60.00 Buah 145,000.00 8,700,000.00
Tutup Water Meter (Hard Plastic) - Buah 61,000.00 -
Kunci Gembok 12.00 Bh 40,000.00 480,000.00
Knee Ø 1" 1.00 Bh 25,000.00 25,000.00
Knee Ø 1,5" 1.00 Bh 37,000.00 37,000.00
Lem Pipa 46.00 Kg 50,000.00 2,300,000.00
Pasir Beton 2.00 M3 176,000.00 352,000.00
Pasir Pasang 2.00 M3 165,000.00 330,000.00
Pasir Urug 6.00 M3 160,000.00 960,000.00
Pelat Box Valve (50x50cm) 12.00 Bh 150,000.00 1,800,000.00
Pipa PVC 1 1/2" 6.00 Btg 140,000.00 840,000.00
Pipa PVC 1" 47.00 Btg 71,000.00 3,337,000.00
Pipa PVC 2" 45.00 Btg 215,000.00 9,675,000.00
Pipa PVC 3" - Btg 364,000.00 -
Pipa PVC 3/4" 120.00 Btg 64,000.00 7,680,000.00
Pipa PVC 1/2' 60.00 Btg 41,000.00 2,460,000.00
Pipa PVC 4" - Btg 200,000.00 -
Reducer Ø 3/4" x Ø 1,5" 60.00 Bh 6,000.00 360,000.00
Reducer Ø 1.5" x Ø 2" 6.00 Bh 21,000.00 126,000.00
Reducer Ø 1" x Ø 3/4" 8.00 Bh 6,500.00 52,000.00
Reducer Ø 2" x Ø 1" 3.00 Bh 25,000.00 75,000.00
Socket PVC 1/2" 120.00 Bh 4,000.00 480,000.00
Semen PC 29.00 Zak 57,000.00 1,653,000.00
Tee Ø 1" x Ø 1" x Ø 1" 3.00 Bh 12,000.00 36,000.00
Tee Ø 2" x Ø 2" x Ø 2" 2.00 Bh 70,000.00 140,000.00
Tee Ø 3/4" x Ø 3/4" x Ø 3/4" 60.00 Bh 7,000.00 420,000.00
Tee Ø 1.5" x Ø 1.5" x Ø 1.5" 2.00 Bh 25,000.00 50,000.00
Tee PVC 1/2" 120.00 - Bh 5,000.00 600,000.00
Bahan
Meterai 3000 buah 4,000.00
Meterai 6000 buah 7,000.00 -
-
Alat
Bantalan stempel buah 15,000.00
Isi Staples buah 5,000.00
Kalkulator buah 100,000.00
Kertas A4 rim 43,000.00 -
Lem besar buah 10,000.00 -
Map kertas buah 1,500.00 -
Map plastik Kecil buah 13,000.00 -
Odner buah 40,000.00 -
Pelobang kertas buah 30,000.00
Pena Box kotak 25,000.00
Penggaris plastik 30 cm buah 5,000.00
Staples buah 15,000.00
Binder Clip Kotak 13,000.00
Tinta Printer Botol 43,000.00
Tinta Stempel Botol 20,000.00
Galon (Cuci Tangan) Buah 75,000.00
Sabun Cuci Tangan Buah 35,000.00
Masker Buah 8,000.00
Sarung Tangan Buah 15,000.00
Termometer Buah 300,000.00
-
DOKUMEN DAN PELAPORAN
Biaya Cetak Photo /dokumentasi lembar 5,000.00
Biaya Copy Laporan Akhir Lembar 200.00
Biaya Jilid Laporan Akhir Lembar 8,000.00
Biaya Pembuatan Buku Bimbingan buku 20,000.00
Biaya Pembuatan Buku Tamu buku 20,000.00
Biaya Pembuatan Cap BP-SPAMS buah 50,000.00
Biaya Pembuatan Cap KKM buah 50,000.00
Biaya Pembuatan Papan Informasi unit 100,000.00
Biaya Pembuatan Papan Nama Proyek unit 100,000.00
Biaya Pembuatan Papan Sekretariat unit 100,000.00
Biaya Pembuatan Papan Struktur BP-SPAMS unit 100,000.00
Biaya Pembuatan Papan Struktur KKM unit 100,000.00
Biaya Pembuatan Peta Sosial Ls 150,000.00
Biaya Pencatatan Notaris KKM buku 300,000.00
Foto Copy & Jilid POB IMAS Buku 85,000.00 -
Foto Copy & Jilid PJM Buku 60,000.00 -
Foto Copy & Jilid RKM Buku 140,000.00 -
Foto Copy Berkas Hasil Pleno & Daftar Hadir lembar 200.00 -
Foto Copy Berkas LPD lembar 200.00 -
Foto Copy Berkas Pengadaan barjas lembar 200.00 -
Foto Copy Berkas Pengajuan Pencairan lembar 200.00 -
Foto Copy Berkas RPD lembar 200.00 -
Foto Copy Berkas pelaporan pelatihan lembar 200.00 -
Foto Copy laporan pengeboran lembar 200.00 -
Penjilidan Berkas & Dokumen KKM buku 8,000.00
Sub total IX -
JUMLAH PENGAJUAN 245,000,000
( Dua Ratus Empat Puluh Lima Juta Rupiah )
Sidomulyo, ………………2020
Disetujui : Dibuat :
Koordinator KKM Ketua Satlak
Diperiksa oleh :
Mengetahui :
PPK Air Minum Satker Pelaksanaan Prasarana Permukiman
Propinsi Lampung
RPD Global
Volume
No Uraian Real s/d Pengajuan Jumlah Satuan Harga Satuan Jumlah BLM
Kebutuhan
Tahap Lalu Sekarang Kumulatif
I SUMUR BOR
Pengadaan dan Pekerjaan Sumur Bor
Mobilisasi 2.00 Ls 1,000,000.00 2,000,000.00
Pengeboran Pilot Hole ( 00-50 m ) 50.00 M' 200,000.00 10,000,000.00
Pengeboran Pilot Hole ( 50-100 m ) 30.00 M' 250,000.00 7,500,000.00
Pembesaran Lobang Bor 00-30 m 50.00 M' 200,000.00 10,000,000.00
Pembesaran Lobang Bor 30-60 m 30.00 M' 240,000.00 7,200,000.00
Pumping Test 72.00 Jam 10,000.00 720,000.00
Pemasangan Apron Sumur 1.00 Ls 250,000.00 250,000.00
Pekerjaan Pasca Sumur Bor -
Logging Test (termasuk laporan) 1.00 Ls 2,500,000.00 2,500,000.00
Pengadaan dan Pemasangan Pompa dan Kelengkapannya -
Pompa Submersible kap. 4 m3/jam , 220 V 1 phase ,
h = 80 meter 1.00 Bh 9,500,000.00 9,500,000.00
Kabel NYYHY 6 x 2,5 mm 80.00 M' 18,000.00 1,440,000.00
Kabel NYYHY 3 x 1,5 mm 80.00 M' 9,000.00 720,000.00
Pipa PVC 1 1/2" 13.00 Btg 140,000.00 1,820,000.00
Pipa PVC Ø 6" SNI 12.5 13.00 Btg 1,300,000.00 16,900,000.00
Batu Pecah 1/2 0.26 M3 400,000.00 104,000.00
Semen PC 1.00 Bh 57,000.00 57,000.00
Pasir Beton 0.25 M3 176,000.00 44,000.00
Dop PVC Ø 6 1.00 Bh 55,000.00 55,000.00
Socked Drat PVC Ø 2" x 1,5 " 1.00 Bh 25,000.00 25,000.00
Socket PVC Ø 1,5" 8.00 Bh 16,000.00 128,000.00
Elbouw Ø 2" 1.00 Bh 25,000.00 25,000.00
Gate Valve Ø 2" drat 1.00 Bh 70,000.00 70,000.00
Check Valve Ø 2" 1.00 Bh 65,000.00 65,000.00
Panel Pompa 1.00 Unit 2,400,000.00 2,400,000.00
Rumah Panel 1.00 Unit 800,000.00 800,000.00
Elektroda Massa 5.00 Bh 30,000.00 150,000.00
Well Cover DN 4" x 2" 1.00 Set 30,000.00 30,000.00
Pemasangan Listrik -
Registrasi PLN 2200 W 1.00 Ls 2,170,000.00 2,170,000.00
Biaya Pemasangan Baru 1.00 Ls 1,330,000.00 1,330,000.00
Sub total I 78,003,000
II MENARA
BAHAN
Air Ltr 100.00 -
Ampelas 64.00 Lbr 9,000.00 576,000.00
Bata Merah 2,442.00 Bh 500.00 1,221,000.00
Batu Pecah 1/2 1.00 M3 410,000.00 410,000.00
Batu Pecah 2/3 19.00 M3 400,000.00 7,600,000.00
Benang 4.00 Rol 3,000.00 12,000.00
Besi Polos Dia 10 43.00 Btg 94,000.00 4,042,000.00
Besi Polos Dia 12 43.00 Btg 118,000.00 5,074,000.00
Besi Polos Dia 8 216.00 Btg 54,000.00 11,664,000.00
Cat Besi 1.00 Kg 55,000.00 55,000.00
Cat Dasar 17.00 Kg 30,000.00 510,000.00
Cat Tembok 46.00 Kg 30,000.00 1,380,000.00
Dolken D8 - 4 M 452.00 Btg 23,000.00 10,396,000.00
Dudukan Lampu 1.00 Bh 12,000.00 12,000.00
Ember 5 Lt 20.00 Bh 10,000.00 200,000.00
Engsel Jendela 2.00 Bh 35,000.00 70,000.00
Engsel Pintu 2.00 Bh 50,000.00 100,000.00
Flange GI 1 1/2" 1.00 Bh 172,000.00 172,000.00
Flange GI 2" 1.00 Bh 195,000.00 195,000.00
Flange PVC 1 1/2" 1.00 Bh 120,000.00 120,000.00
Flange PVC 2" 2.00 Bh 145,000.00 290,000.00
Handel dan Kunci 1.00 Bh 190,000.00 190,000.00
Jendela Nako 1.00 M2 105,000.00 105,000.00
Kabel 10.00 M' 6,000.00 60,000.00
Kaca (0.8 x 1M) t=3 mm 1.00 Bh 75,000.00 75,000.00
Kape 5.00 Bh 8,000.00 40,000.00
Kawat Beton 30.00 Kg 20,000.00 600,000.00
Kayu Kelas II (4x6cm x4m) 150.00 Btg 43,000.00 6,450,000.00
Kayu Kelas III (4x6cm x4m) 322.00 Btg 27,000.00 8,694,000.00
Kayu Papan (3x20cm x4m) 42.00 Btg 64,000.00 2,688,000.00
Keramik 40 x 40 25.00 M2 55,000.00 1,375,000.00
Knee GI 1 1/2" 6.00 Bh 18,000.00 108,000.00
Kuas 4" 5.00 Bh 20,000.00 100,000.00
Lampu Lilin 10 Watt 2.00 Bh 35,000.00 70,000.00
Manhole uk. 80 x 80 cm 1.00 Unit 650,000.00 650,000.00
Minyak Bekisting 21.00 Ltr 16,000.00 336,000.00
Paku 5-10 cm 44.00 Kg 15,000.00 660,000.00
Paku Campur 1.00 Kg 18,000.00 18,000.00
Pasir Beton 13.00 M3 176,000.00 2,288,000.00
Pasir Pasang 3.00 M3 165,000.00 495,000.00
Pasir Urug 2.00 M3 160,000.00 320,000.00
Volume
No Uraian Real s/d Pengajuan Jumlah Satuan Harga Satuan Jumlah BLM
Kebutuhan
Tahap Lalu Sekarang Kumulatif
Pintu Kayu Kelas II 1.00 M2 800,000.00 800,000.00
Pipa GI 1 1/2" 12.00 M' 200,000.00 2,400,000.00
Pipa GI 2" 18.00 M' 250,000.00 4,500,000.00
Plamur Tembok 17.00 Kg 35,000.00 595,000.00
Plywood t= 9 mm 36.00 Lbr 170,000.00 6,120,000.00
Rooster Kayu 14.00 Bh 35,000.00 490,000.00
Saklar Tunggal 2.00 Bh 25,000.00 50,000.00
Sealtape 4.00 Bh 5,000.00 20,000.00
Semen PC 229.00 Zak 57,000.00 13,053,000.00
Senai Pipa 8.00 Titik 14,000.00 112,000.00
Slot Jendela 1.00 Bh 15,000.00 15,000.00
Socket GI 1 1/2" 6.00 Bh 22,000.00 132,000.00
Stop Kontak 2.00 - Bh 30,000.00 60,000.00
Tangga Besi dan Pagar 22.00 - M 150,000.00 3,300,000.00
Water Meter 1.00 - Bh 2,500,000.00 2,500,000.00
Prasasti 30x40 cm 1.00 - Bh 500,000.00 500,000.00
Media/Logo & Lukis Tapis 1.00 - Bh 1,000,000.00 1,000,000.00
UPAH
Pekerja - - HOK 85,000.00 -
Tukang - - HOK 100,000.00 -
Sub total II 105,068,000
III PERPIPAAN
BAHAN
Ampelas 85.00 - Lbr 9,000.00 765,000.00
Bata Merah 1,786.00 - Bh 500.00 893,000.00
Volume
No Uraian Real s/d Pengajuan Jumlah Satuan Harga Satuan Jumlah BLM
Kebutuhan
Tahap Lalu Sekarang Kumulatif
Batu Pecah 1/2 3.00 - M3 410,000.00 1,230,000.00
Endcap Ø 1 1/2" 2.00 - Bh 35,000.00 70,000.00
Endcap Ø 1" 2.00 - Bh 18,000.00 36,000.00
Endcap Ø 3/4" 5.00 - Bh 11,000.00 55,000.00
Engsel 24.00 - Bh 15,000.00 360,000.00
Gate Valve PVC Ø 3/4" 15.00 - Bh 15,000.00 225,000.00
Gate Valve PVC Ø 1 .5" 2.00 - Bh 25,000.00 50,000.00
Gate Valve PVC Ø 1" 3.00 Bh 20,000.00 60,000.00
Gate Valve PVC Ø 2" 2.00 Bh 30,000.00 60,000.00
Kran Air 3/4" 10.00 Bh 48,000.00 480,000.00
Kran Air 1/2" 60.00 Bh 30,000.00 1,800,000.00
Knee "L" PVC Ø 1/2" 180.00 Bh 4,000.00 720,000.00
Knee PVC 1/2" - Bh 4,000.00 -
Water Meter 1/2" 60.00 Buah 145,000.00 8,700,000.00
Tutup Water Meter (Hard Plastic) - Buah 61,000.00 -
Kunci Gembok 12.00 Bh 40,000.00 480,000.00
Knee Ø 1" 1.00 Bh 25,000.00 25,000.00
Knee Ø 1,5" 1.00 Bh 37,000.00 37,000.00
Lem Pipa 46.00 Kg 50,000.00 2,300,000.00
Pasir Beton 2.00 M3 176,000.00 352,000.00
Pasir Pasang 2.00 M3 165,000.00 330,000.00
Pasir Urug 6.00 M3 160,000.00 960,000.00
Pelat Box Valve (50x50cm) 12.00 Bh 150,000.00 1,800,000.00
Pipa PVC 1 1/2" 6.00 Btg 140,000.00 840,000.00
Pipa PVC 1" 47.00 Btg 71,000.00 3,337,000.00
Pipa PVC 2" 45.00 Btg 213,000.00 9,585,000.00
Pipa PVC 3" - Btg 364,000.00 -
Pipa PVC 3/4" 120.00 Btg 64,000.00 7,680,000.00
Pipa PVC 1/2' 60.00 Btg 41,000.00 2,460,000.00
Pipa PVC 4" - Btg 200,000.00 -
Reducer Ø 3/4" x Ø 1,5" 60.00 Bh 6,000.00 360,000.00
Reducer Ø 1.5" x Ø 2" 6.00 Bh 21,000.00 126,000.00
Reducer Ø 1" x Ø 3/4" 8.00 Bh 6,500.00 52,000.00
Reducer Ø 2" x Ø 1" 3.00 Bh 25,000.00 75,000.00
Socket PVC 1/2" 120.00 Bh 4,000.00 480,000.00
Semen PC 29.00 Zak 57,000.00 1,653,000.00
Tee Ø 1" x Ø 1" x Ø 1" 3.00 Bh 12,000.00 36,000.00
Tee Ø 2" x Ø 2" x Ø 2" 2.00 Bh 70,000.00 140,000.00
Tee Ø 3/4" x Ø 3/4" x Ø 3/4" 60.00 Bh 7,000.00 420,000.00
Tee Ø 1.5" x Ø 1.5" x Ø 1.5" 2.00 Bh 25,000.00 50,000.00
Tee PVC 1/2" 120.00 - Bh 5,000.00 600,000.00
Bahan
Meterai 3000 buah 4,000.00
Meterai 6000 buah 7,000.00 -
-
Alat
Bantalan stempel buah 15,000.00
Isi Staples buah 5,000.00
Kalkulator buah 100,000.00
Kertas A4 rim 43,000.00 -
Lem besar buah 10,000.00 -
Map kertas buah 1,500.00 -
Map plastik Kecil buah 13,000.00 -
Odner buah 40,000.00 -
Pelobang kertas buah 30,000.00
Pena Box kotak 25,000.00
Penggaris plastik 30 cm buah 5,000.00
Staples buah 15,000.00
Binder Clip Kotak 13,000.00
Tinta Printer Botol 43,000.00
Tinta Stempel Botol 20,000.00
Galon (Cuci Tangan) Buah 75,000.00
Sabun Cuci Tangan Buah 35,000.00
Masker Buah 8,000.00
Sarung Tangan Buah 15,000.00
Termometer Buah 300,000.00
-
DOKUMEN DAN PELAPORAN
Biaya Cetak Photo /dokumentasi lembar 5,000.00
Biaya Copy Laporan Akhir Lembar 200.00
Biaya Jilid Laporan Akhir Lembar 8,000.00
Biaya Pembuatan Buku Bimbingan buku 20,000.00
Biaya Pembuatan Buku Tamu buku 20,000.00
Biaya Pembuatan Cap BP-SPAMS buah 50,000.00
Biaya Pembuatan Cap KKM buah 50,000.00
Biaya Pembuatan Papan Informasi unit 100,000.00
Biaya Pembuatan Papan Nama Proyek unit 100,000.00
Biaya Pembuatan Papan Sekretariat unit 100,000.00
Biaya Pembuatan Papan Struktur BP-SPAMS unit 100,000.00
Biaya Pembuatan Papan Struktur KKM unit 100,000.00
Biaya Pembuatan Peta Sosial Ls 150,000.00
Biaya Pencatatan Notaris KKM buku 300,000.00
Foto Copy & Jilid POB IMAS Buku 85,000.00 -
Foto Copy & Jilid PJM Buku 60,000.00 -
Foto Copy & Jilid RKM Buku 140,000.00 -
Foto Copy Berkas Hasil Pleno & Daftar Hadir lembar 200.00 -
Foto Copy Berkas LPD lembar 200.00 -
Foto Copy Berkas Pengadaan barjas lembar 200.00 -
Foto Copy Berkas Pengajuan Pencairan lembar 200.00 -
Foto Copy Berkas RPD lembar 200.00 -
Foto Copy Berkas pelaporan pelatihan lembar 200.00 -
Foto Copy laporan pengeboran lembar 200.00 -
Penjilidan Berkas & Dokumen KKM buku 8,000.00
Sub total IX -
JUMLAH PENGAJUAN 242,221,000
( Dua Ratus Empat Puluh Lima Juta Rupiah )
Sidomulyo, ………………2020
Disetujui : Dibuat :
Koordinator KKM Ketua Satlak
Diperiksa oleh :
Mengetahui :
PPK Air Minum Satker Pelaksanaan Prasarana Permukiman
Propinsi Lampung
RPDB 2 Penarikan 1
Volume
No Uraian Real s/d Pengajuan Jumlah Satuan Harga Satuan Jumlah BLM
Kebutuhan
Tahap Lalu Sekarang Kumulatif
I SUMUR BOR
Pengadaan dan Pekerjaan Sumur Bor
Mobilisasi 2.00 2.00 2.00 Ls 1,000,000.00 -
Pengeboran Pilot Hole ( 00-50 m ) 50.00 50.00 50.00 M' 200,000.00 -
Pengeboran Pilot Hole ( 50-100 m ) 30.00 30.00 30.00 M' 250,000.00 -
Pembesaran Lobang Bor 00-30 m 50.00 50.00 50.00 M' 200,000.00 -
Pembesaran Lobang Bor 30-60 m 30.00 30.00 30.00 M' 240,000.00 -
Pumping Test 72.00 72.00 72.00 Jam 10,000.00 -
Pemasangan Apron Sumur 1.00 1.00 1.00 Ls 250,000.00 -
Pekerjaan Pasca Sumur Bor - -
Logging Test (termasuk laporan) 1.00 1.00 1.00 Ls 2,500,000.00 -
Pengadaan dan Pemasangan Pompa dan Kelengkapannya - -
Pompa Submersible kap. 4 m3/jam , 220 V 1 phase ,
h = 80 meter 1.00 1.00 1.00 Bh 9,500,000.00 9,500,000.00
Kabel NYYHY 6 x 2,5 mm 80.00 - - - M' 18,000.00 -
Kabel NYYHY 3 x 1,5 mm 80.00 - - M' 9,000.00 -
Pipa PVC 1 1/2" 13.00 - - Btg 140,000.00 -
Pipa PVC Ø 6" SNI 12.5 13.00 13.00 13.00 Btg 1,300,000.00 -
Batu Pecah 1/2 0.26 0.26 0.26 M3 400,000.00 -
Semen PC 1.00 1.00 1.00 Bh 57,000.00 -
Pasir Beton 0.25 0.25 0.25 M3 176,000.00 -
Dop PVC Ø 6 1.00 1.00 1.00 Bh 55,000.00 -
Socked Drat PVC Ø 2" x 1,5 " 1.00 1.00 1.00 Bh 25,000.00 -
Socket PVC Ø 1,5" 8.00 8.00 8.00 Bh 16,000.00 -
Elbouw Ø 2" 1.00 1.00 1.00 Bh 25,000.00 -
Gate Valve Ø 2" drat 1.00 1.00 1.00 Bh 70,000.00 -
Check Valve Ø 2" 1.00 1.00 1.00 Bh 65,000.00 -
Panel Pompa 1.00 - - Unit 2,400,000.00 -
Rumah Panel 1.00 - - Unit 800,000.00 -
Elektroda Massa 5.00 5.00 5.00 Bh 30,000.00 -
Well Cover DN 4" x 2" 1.00 - - Set 30,000.00 -
Pemasangan Listrik - -
Registrasi PLN 2200 W 1.00 1.00 1.00 Ls 2,170,000.00 2,170,000.00
Biaya Pemasangan Baru 1.00 1.00 1.00 Ls 1,330,000.00 1,330,000.00
Sub total I 13,000,000
II MENARA
BAHAN
Air Ltr 100.00 -
Ampelas 64.00 10.00 54.00 64.00 Lbr 9,000.00 486,000.00
Bata Merah 2,442.00 2,442.00 2,442.00 Bh 500.00 -
Batu Pecah 1/2 1.00 1.00 1.00 M3 410,000.00 -
Batu Pecah 2/3 19.00 2.00 17.00 19.00 M3 400,000.00 6,800,000.00
Benang 4.00 3.00 1.00 4.00 Rol 3,000.00 3,000.00
Besi Polos Dia 10 43.00 20.00 23.00 43.00 Btg 94,000.00 2,162,000.00
Besi Polos Dia 12 43.00 20.00 23.00 43.00 Btg 118,000.00 2,714,000.00
Besi Polos Dia 8 216.00 80.00 136.00 216.00 Btg 54,000.00 7,344,000.00
Cat Besi 1.00 1.00 1.00 Kg 55,000.00 55,000.00
Cat Dasar 17.00 17.00 17.00 Kg 30,000.00 510,000.00
Cat Tembok 46.00 46.00 46.00 Kg 30,000.00 1,380,000.00
Dolken D8 - 4 M 452.00 - Btg 23,000.00 -
Dudukan Lampu 1.00 1.00 1.00 Bh 12,000.00 12,000.00
Ember 5 Lt 20.00 20.00 20.00 Bh 10,000.00 200,000.00
Engsel Jendela 2.00 1.00 1.00 Bh 35,000.00 35,000.00
Engsel Pintu 2.00 2.00 2.00 Bh 50,000.00 100,000.00
Flange GI 1 1/2" 1.00 1.00 1.00 Bh 172,000.00 172,000.00
Flange GI 2" 1.00 1.00 1.00 Bh 195,000.00 195,000.00
Flange PVC 1 1/2" 1.00 1.00 1.00 Bh 120,000.00 120,000.00
Flange PVC 2" 2.00 2.00 2.00 Bh 145,000.00 290,000.00
Handel dan Kunci 1.00 1.00 1.00 Bh 190,000.00 190,000.00
Jendela Nako 1.00 1.00 1.00 M2 105,000.00 -
Kabel 10.00 10.00 10.00 M' 6,000.00 60,000.00
Kaca (0.8 x 1M) t=3 mm 1.00 1.00 - 1.00 Bh 75,000.00 -
Kape 5.00 5.00 5.00 Bh 8,000.00 40,000.00
Kawat Beton 30.00 10.00 20.00 30.00 Kg 20,000.00 400,000.00
Kayu Kelas II (4x6cm x4m) 150.00 30.00 120.00 150.00 Btg 43,000.00 5,160,000.00
Kayu Kelas III (4x6cm x4m) 322.00 40.00 282.00 322.00 Btg 27,000.00 7,614,000.00
Kayu Papan (3x20cm x4m) 42.00 20.00 22.00 42.00 Btg 64,000.00 1,408,000.00
Volume
No Uraian Real s/d Pengajuan Jumlah Satuan Harga Satuan Jumlah BLM
Kebutuhan
Tahap Lalu Sekarang Kumulatif
Keramik 40 x 40 25.00 25.00 25.00 M2 55,000.00 1,375,000.00
Knee GI 1 1/2" 6.00 6.00 6.00 Bh 18,000.00 108,000.00
Kuas 4" 5.00 5.00 5.00 Bh 20,000.00 100,000.00
Lampu Lilin 10 Watt 2.00 - Bh 35,000.00 -
Manhole uk. 80 x 80 cm 1.00 - Unit 650,000.00 -
Minyak Bekisting 21.00 10.00 11.00 21.00 Ltr 16,000.00 176,000.00
Paku 5-10 cm 44.00 5.00 39.00 44.00 Kg 15,000.00 585,000.00
Paku Campur 1.00 1.00 1.00 2.00 Kg 18,000.00 18,000.00
Pasir Beton 13.00 3.00 10.00 13.00 M3 176,000.00 1,760,000.00
Pasir Pasang 3.00 1.00 2.00 3.00 M3 165,000.00 330,000.00
Pasir Urug 2.00 1.00 1.00 2.00 M3 160,000.00 160,000.00
Pintu Kayu Kelas II 1.00 - M2 800,000.00 -
Pipa GI 1 1/2" 12.00 12.00 12.00 M' 200,000.00 2,400,000.00
Pipa GI 2" 18.00 18.00 18.00 M' 250,000.00 4,500,000.00
Plamur Tembok 17.00 17.00 17.00 Kg 35,000.00 595,000.00
Plywood t= 9 mm 36.00 36.00 36.00 Lbr 170,000.00 6,120,000.00
Rooster Kayu 14.00 14.00 14.00 Bh 35,000.00 -
Saklar Tunggal 2.00 - Bh 25,000.00 -
Sealtape 4.00 - Bh 5,000.00 -
Semen PC 229.00 50.00 100.00 150.00 Zak 57,000.00 5,700,000.00
Senai Pipa 8.00 - Titik 14,000.00 -
Slot Jendela 1.00 - Bh 15,000.00 -
Socket GI 1 1/2" 6.00 - Bh 22,000.00 -
Stop Kontak 2.00 - Bh 30,000.00 -
Tangga Besi dan Pagar 22.00 - M 150,000.00 -
Water Meter 1.00 - Bh 2,500,000.00 -
Prasasti 30x40 cm 1.00 - Bh 500,000.00 -
Media/Logo & Lukis Tapis 1.00 - Bh 1,000,000.00 -
- -
UPAH - -
Pekerja - - HOK 85,000.00 -
Tukang - - HOK 100,000.00 -
Sub total II 61,377,000
III PERPIPAAN
BAHAN
Ampelas 85.00 - Lbr 9,000.00 -
Bata Merah 1,786.00 - Bh 500.00 -
Batu Pecah 1/2 3.00 - M3 410,000.00 -
Endcap Ø 1 1/2" 2.00 - Bh 35,000.00 -
Endcap Ø 1" 2.00 - Bh 18,000.00 -
Endcap Ø 3/4" 5.00 - Bh 11,000.00 -
Engsel 24.00 - Bh 15,000.00 -
Gate Valve PVC Ø 3/4" 15.00 - Bh 15,000.00 -
Gate Valve PVC Ø 1 .5" 2.00 - Bh 25,000.00 -
Gate Valve PVC Ø 1" 3.00 Bh 20,000.00 -
Gate Valve PVC Ø 2" 2.00 Bh 30,000.00 -
Kran Air 3/4" 10.00 Bh 48,000.00 -
Kran Air 1/2" 60.00 Bh 30,000.00 -
Knee "L" PVC Ø 1/2" 180.00 Bh 4,000.00 -
Knee PVC 1/2" - Bh 4,000.00 -
Water Meter 1/2" 60.00 Buah 145,000.00 -
Tutup Water Meter (Hard Plastic) - Buah 61,000.00 -
Kunci Gembok 12.00 Bh 40,000.00 -
Knee Ø 1" 1.00 Bh 25,000.00 -
Knee Ø 1,5" 1.00 Bh 37,000.00 -
Lem Pipa 46.00 Kg 50,000.00 -
Pasir Beton 2.00 M3 176,000.00 -
Pasir Pasang 2.00 M3 165,000.00 -
Pasir Urug 6.00 M3 160,000.00 -
Pelat Box Valve (50x50cm) 12.00 Bh 150,000.00 -
Pipa PVC 1 1/2" 6.00 Btg 140,000.00 -
Pipa PVC 1" 47.00 Btg 71,000.00 -
Pipa PVC 2" 45.00 Btg 213,000.00 -
Pipa PVC 3" - Btg 364,000.00 -
Pipa PVC 3/4" 120.00 Btg 64,000.00 -
Pipa PVC 1/2' 60.00 Btg 41,000.00 -
Pipa PVC 4" - Btg 200,000.00 -
Reducer Ø 3/4" x Ø 1,5" 60.00 Bh 6,000.00 -
Reducer Ø 1.5" x Ø 2" 6.00 Bh 21,000.00 -
Reducer Ø 1" x Ø 3/4" 8.00 Bh 6,500.00 -
Reducer Ø 2" x Ø 1" 3.00 Bh 25,000.00 -
Socket PVC 1/2" 120.00 Bh 4,000.00 -
Semen PC 29.00 Zak 57,000.00 -
Tee Ø 1" x Ø 1" x Ø 1" 3.00 Bh 12,000.00 -
Tee Ø 2" x Ø 2" x Ø 2" 2.00 Bh 70,000.00 -
Volume
No Uraian Real s/d Pengajuan Jumlah Satuan Harga Satuan Jumlah BLM
Kebutuhan
Tahap Lalu Sekarang Kumulatif
Tee Ø 3/4" x Ø 3/4" x Ø 3/4" 60.00 Bh 7,000.00 -
Tee Ø 1.5" x Ø 1.5" x Ø 1.5" 2.00 Bh 25,000.00 -
Tee PVC 1/2" 120.00 - Bh 5,000.00 -
Sub total VI -
PELATIHAN BP-SPAM
VI Pelatihan Administrasi dan Pembukuan
Spidol besar buah 10,000.00
Kertas plano - buah 2,000.00
Lakban kertas - buah 15,000.00
Alat
Map plastik buah 10,000.00
Penggaris buah 6,000.00
Pena - buah 6,000.00
Block note - buah 5,000.00
Volume
No Uraian Real s/d Pengajuan Jumlah Satuan Harga Satuan Jumlah BLM
Kebutuhan
Tahap Lalu Sekarang Kumulatif
Konsumsi - Orang 30,000.00
Masker Orang 8,000.00
Upah
Photocopy - lembar 200.00 -
Penjilidan - Buku 5,000.00 -
Spanduk pelatihan - buah 200,000.00 -
Sub total IX -
IX BIAYA OPERASIONAL KKM DAN SATLAK
TRANSPORTASI KKM DAN SATLAK
Transportasi Survey Harga - Kali 50,000.00
Transportasi ke Kabupaten 3 orang - - Kali 75,000.00 -
Transportasi ke Bank 3 orang Kali 50,000.00 -
Bahan
Meterai 3000 buah 4,000.00
Meterai 6000 buah 7,000.00 -
-
Alat
Bantalan stempel buah 15,000.00
Isi Staples buah 5,000.00
Kalkulator buah 100,000.00
Kertas A4 rim 43,000.00 -
Lem besar buah 10,000.00 -
Map kertas buah 1,500.00 -
Map plastik Kecil buah 13,000.00 -
Odner buah 40,000.00 -
Pelobang kertas buah 30,000.00
Pena Box kotak 25,000.00
Penggaris plastik 30 cm buah 5,000.00
Staples buah 15,000.00
Binder Clip Kotak 13,000.00
Tinta Printer Botol 43,000.00
Tinta Stempel Botol 20,000.00
Galon (Cuci Tangan) Buah 75,000.00
Sabun Cuci Tangan Buah 35,000.00
Volume
No Uraian Real s/d Pengajuan Jumlah Satuan Harga Satuan Jumlah BLM
Kebutuhan
Tahap Lalu Sekarang Kumulatif
Masker Buah 8,000.00
Sarung Tangan Buah 15,000.00
Termometer Buah 300,000.00
-
DOKUMEN DAN PELAPORAN
Biaya Cetak Photo /dokumentasi lembar 5,000.00
Biaya Copy Laporan Akhir Lembar 200.00
Biaya Jilid Laporan Akhir Lembar 8,000.00
Biaya Pembuatan Buku Bimbingan buku 20,000.00
Biaya Pembuatan Buku Tamu buku 20,000.00
Biaya Pembuatan Cap BP-SPAMS buah 50,000.00
Biaya Pembuatan Cap KKM buah 50,000.00
Biaya Pembuatan Papan Informasi unit 100,000.00
Biaya Pembuatan Papan Nama Proyek unit 100,000.00
Biaya Pembuatan Papan Sekretariat unit 100,000.00
Biaya Pembuatan Papan Struktur BP-SPAMS unit 100,000.00
Biaya Pembuatan Papan Struktur KKM unit 100,000.00
Biaya Pembuatan Peta Sosial Ls 150,000.00
Biaya Pencatatan Notaris KKM buku 300,000.00
Foto Copy & Jilid POB IMAS Buku 85,000.00 -
Foto Copy & Jilid PJM Buku 60,000.00 -
Foto Copy & Jilid RKM Buku 140,000.00 -
Foto Copy Berkas Hasil Pleno & Daftar Hadir lembar 200.00 -
Foto Copy Berkas LPD lembar 200.00 -
Foto Copy Berkas Pengadaan barjas lembar 200.00 -
Foto Copy Berkas Pengajuan Pencairan lembar 200.00 -
Foto Copy Berkas RPD lembar 200.00 -
Foto Copy Berkas pelaporan pelatihan lembar 200.00 -
Foto Copy laporan pengeboran lembar 200.00 -
Penjilidan Berkas & Dokumen KKM buku 8,000.00
Sub total IX -
JUMLAH PENGAJUAN 74,377,000
( Dua Ratus Empat Puluh Lima Juta Rupiah )
Sidomulyo, ………………2020
Disetujui : Dibuat :
Koordinator KKM Ketua Satlak
Diperiksa oleh :
No. Nama Selaku Tandatangan
1 Jihad Ansori, S.E. Fasilitator Masyarakat CD 1.
Mengetahui :
District Coordinator
Mardiana, S.KM.
RENCANA PENARIKAN DANA BANK (RPDB) TAHAP 2
Kampung/Kecamatan/Kabupaten : Sidomulyo/Sekampung/Lampung Timur
RPDB 2 Penarikan 1
Tranfer Material Bor
Volume
No Uraian Real s/d Pengajuan Jumlah Satuan Harga Satuan Jumlah BLM
Kebutuhan
Tahap Lalu Sekarang Kumulatif
I SUMUR BOR
Pengadaan dan Pekerjaan Sumur Bor
Mobilisasi 2.00 2.00 2.00 Ls 1,000,000.00 -
Pengeboran Pilot Hole ( 00-50 m ) 50.00 50.00 50.00 M' 200,000.00 -
Pengeboran Pilot Hole ( 50-100 m ) 30.00 30.00 30.00 M' 250,000.00 -
Pembesaran Lobang Bor 00-30 m 50.00 50.00 50.00 M' 200,000.00 -
Pembesaran Lobang Bor 30-60 m 30.00 30.00 30.00 M' 240,000.00 -
Pumping Test 72.00 72.00 72.00 Jam 10,000.00 -
Pemasangan Apron Sumur 1.00 1.00 1.00 Ls 250,000.00 -
Pekerjaan Pasca Sumur Bor - -
Logging Test (termasuk laporan) 1.00 1.00 1.00 Ls 2,500,000.00 -
Pengadaan dan Pemasangan Pompa dan Kelengkapannya - -
Pompa Submersible kap. 4 m3/jam , 220 V 1 phase ,
h = 80 meter 1.00 1.00 1.00 Bh 9,500,000.00 9,500,000.00
Kabel NYYHY 6 x 2,5 mm 80.00 - - - M' 18,000.00 -
Kabel NYYHY 3 x 1,5 mm 80.00 - - M' 9,000.00 -
Pipa PVC 1 1/2" 13.00 - - Btg 140,000.00 -
Pipa PVC Ø 6" SNI 12.5 13.00 13.00 13.00 Btg 1,300,000.00 -
Batu Pecah 1/2 0.26 0.26 0.26 M3 400,000.00 -
Semen PC 1.00 1.00 1.00 Bh 57,000.00 -
Pasir Beton 0.25 0.25 0.25 M3 176,000.00 -
Dop PVC Ø 6 1.00 1.00 1.00 Bh 55,000.00 -
Socked Drat PVC Ø 2" x 1,5 " 1.00 1.00 1.00 Bh 25,000.00 -
Socket PVC Ø 1,5" 8.00 8.00 8.00 Bh 16,000.00 -
Elbouw Ø 2" 1.00 1.00 1.00 Bh 25,000.00 -
Gate Valve Ø 2" drat 1.00 1.00 1.00 Bh 70,000.00 -
Check Valve Ø 2" 1.00 1.00 1.00 Bh 65,000.00 -
Panel Pompa 1.00 - - Unit 2,400,000.00 -
Rumah Panel 1.00 - - Unit 800,000.00 -
Elektroda Massa 5.00 5.00 5.00 Bh 30,000.00 -
Well Cover DN 4" x 2" 1.00 - - Set 30,000.00 -
Pemasangan Listrik - -
Registrasi PLN 2200 W 1.00 - Ls 2,170,000.00 -
Biaya Pemasangan Baru 1.00 - Ls 1,330,000.00 -
Sub total I 9,500,000
JUMLAH PENGAJUAN 9,500,000
( Dua Ratus Empat Puluh Lima Juta Rupiah )
Sidomulyo, ………………2020
Disetujui : Dibuat :
Koordinator KKM Ketua Satlak
Diperiksa oleh :
Mengetahui :
District Coordinator
Mardiana, S.KM.
RENCANA PENARIKAN DANA BANK (RPDB) TAHAP 2
Kampung/Kecamatan/Kabupaten : Sidomulyo/Sekampung/Lampung Timur
RPDB 2 Penarikan 1
Tranfer Material Toko
Volume
No Uraian Real s/d Pengajuan Jumlah Satuan Harga Satuan Jumlah BLM
Kebutuhan
Tahap Lalu Sekarang Kumulatif
1 MENARA
BAHAN
Air Ltr 100.00 -
Ampelas 64.00 10.00 54.00 64.00 Lbr 9,000.00 486,000.00
Bata Merah 2,442.00 2,442.00 2,442.00 Bh 500.00 -
Batu Pecah 1/2 1.00 1.00 1.00 M3 410,000.00 -
Batu Pecah 2/3 19.00 2.00 17.00 19.00 M3 400,000.00 6,800,000.00
Benang 4.00 3.00 1.00 4.00 Rol 3,000.00 3,000.00
Besi Polos Dia 10 43.00 20.00 23.00 43.00 Btg 94,000.00 2,162,000.00
Besi Polos Dia 12 43.00 20.00 23.00 43.00 Btg 118,000.00 2,714,000.00
Besi Polos Dia 8 216.00 80.00 136.00 216.00 Btg 54,000.00 7,344,000.00
Cat Besi 1.00 1.00 1.00 Kg 55,000.00 55,000.00
Cat Dasar 17.00 17.00 17.00 Kg 30,000.00 510,000.00
Cat Tembok 46.00 46.00 46.00 Kg 30,000.00 1,380,000.00
Dolken D8 - 4 M 452.00 - Btg 23,000.00 -
Dudukan Lampu 1.00 1.00 1.00 Bh 12,000.00 12,000.00
Ember 5 Lt 20.00 20.00 20.00 Bh 10,000.00 200,000.00
Engsel Jendela 2.00 1.00 1.00 Bh 35,000.00 35,000.00
Engsel Pintu 2.00 2.00 2.00 Bh 50,000.00 100,000.00
Flange GI 1 1/2" 1.00 1.00 1.00 Bh 172,000.00 172,000.00
Flange GI 2" 1.00 1.00 1.00 Bh 195,000.00 195,000.00
Flange PVC 1 1/2" 1.00 1.00 1.00 Bh 120,000.00 120,000.00
Flange PVC 2" 2.00 2.00 2.00 Bh 145,000.00 290,000.00
Handel dan Kunci 1.00 1.00 1.00 Bh 190,000.00 190,000.00
Jendela Nako 1.00 1.00 1.00 M2 105,000.00 -
Kabel 10.00 10.00 10.00 M' 6,000.00 60,000.00
Kaca (0.8 x 1M) t=3 mm 1.00 1.00 - 1.00 Bh 75,000.00 -
Kape 5.00 5.00 5.00 Bh 8,000.00 40,000.00
Kawat Beton 30.00 10.00 20.00 30.00 Kg 20,000.00 400,000.00
Kayu Kelas II (4x6cm x4m) 150.00 30.00 30.00 Btg 43,000.00 -
Kayu Kelas III (4x6cm x4m) 322.00 40.00 40.00 Btg 27,000.00 -
Kayu Papan (3x20cm x4m) 42.00 20.00 20.00 Btg 64,000.00 -
Keramik 40 x 40 25.00 25.00 25.00 M2 55,000.00 1,375,000.00
Knee GI 1 1/2" 6.00 6.00 6.00 Bh 18,000.00 108,000.00
Kuas 4" 5.00 5.00 5.00 Bh 20,000.00 100,000.00
Lampu Lilin 10 Watt 2.00 - Bh 35,000.00 -
Manhole uk. 80 x 80 cm 1.00 - Unit 650,000.00 -
Minyak Bekisting 21.00 10.00 11.00 21.00 Ltr 16,000.00 176,000.00
Paku 5-10 cm 44.00 5.00 39.00 44.00 Kg 15,000.00 585,000.00
Paku Campur 1.00 1.00 1.00 2.00 Kg 18,000.00 18,000.00
Pasir Beton 13.00 3.00 10.00 13.00 M3 176,000.00 1,760,000.00
Pasir Pasang 3.00 1.00 2.00 3.00 M3 165,000.00 330,000.00
Pasir Urug 2.00 1.00 1.00 2.00 M3 160,000.00 160,000.00
Pintu Kayu Kelas II 1.00 - M2 800,000.00 -
Pipa GI 1 1/2" 12.00 12.00 12.00 M' 200,000.00 2,400,000.00
Pipa GI 2" 18.00 18.00 18.00 M' 250,000.00 4,500,000.00
Plamur Tembok 17.00 17.00 17.00 Kg 35,000.00 595,000.00
Plywood t= 9 mm 36.00 36.00 36.00 Lbr 170,000.00 6,120,000.00
Rooster Kayu 14.00 14.00 14.00 Bh 35,000.00 -
Saklar Tunggal 2.00 - Bh 25,000.00 -
Sealtape 4.00 - Bh 5,000.00 -
Semen PC 229.00 50.00 100.00 150.00 Zak 57,000.00 5,700,000.00
Senai Pipa 8.00 - Titik 14,000.00 -
Slot Jendela 1.00 - Bh 15,000.00 -
Socket GI 1 1/2" 6.00 - Bh 22,000.00 -
Stop Kontak 2.00 - Bh 30,000.00 -
Tangga Besi dan Pagar 22.00 - M 150,000.00 -
Water Meter 1.00 - Bh 2,500,000.00 -
Prasasti 30x40 cm 1.00 - Bh 500,000.00 -
Volume
No Uraian Real s/d Pengajuan Jumlah Satuan Harga Satuan Jumlah BLM
Kebutuhan
Tahap Lalu Sekarang Kumulatif
Sidomulyo, ………………2020
Disetujui : Dibuat :
Koordinator KKM Ketua Satlak
Diperiksa oleh :
Mengetahui :
District Coordinator
Mardiana, S.KM.
RENCANA PENARIKAN DANA BANK (RPDB) TAHAP 2
Kampung/Kecamatan/Kabupaten : Sidomulyo/Sekampung/Lampung Timur
RPDB 2 Penarikan 1
Tarik Tunai
Volume
No Uraian Real s/d Pengajuan Jumlah Satuan Harga Satuan Jumlah BLM
Kebutuhan
Tahap Lalu Sekarang Kumulatif
I SUMUR BOR
Pengadaan dan Pekerjaan Sumur Bor
Mobilisasi 2.00 2.00 2.00 Ls 1,000,000.00 -
Pengeboran Pilot Hole ( 00-50 m ) 50.00 50.00 50.00 M' 200,000.00 -
Pengeboran Pilot Hole ( 50-100 m ) 30.00 30.00 30.00 M' 250,000.00 -
Pembesaran Lobang Bor 00-30 m 50.00 50.00 50.00 M' 200,000.00 -
Pembesaran Lobang Bor 30-60 m 30.00 30.00 30.00 M' 240,000.00 -
Pumping Test 72.00 72.00 72.00 Jam 10,000.00 -
Pemasangan Apron Sumur 1.00 1.00 1.00 Ls 250,000.00 -
Pekerjaan Pasca Sumur Bor - -
Logging Test (termasuk laporan) 1.00 1.00 1.00 Ls 2,500,000.00 -
Pengadaan dan Pemasangan Pompa dan Kelengkapannya - -
Pompa Submersible kap. 4 m3/jam , 220 V 1 phase ,
h = 80 meter 1.00 - Bh 9,500,000.00 -
Kabel NYYHY 6 x 2,5 mm 80.00 - - - M' 18,000.00 -
Kabel NYYHY 3 x 1,5 mm 80.00 - - M' 9,000.00 -
Pipa PVC 1 1/2" 13.00 - - Btg 140,000.00 -
Pipa PVC Ø 6" SNI 12.5 13.00 13.00 13.00 Btg 1,300,000.00 -
Batu Pecah 1/2 0.26 0.26 0.26 M3 400,000.00 -
Semen PC 1.00 1.00 1.00 Bh 57,000.00 -
Pasir Beton 0.25 0.25 0.25 M3 176,000.00 -
Dop PVC Ø 6 1.00 1.00 1.00 Bh 55,000.00 -
Socked Drat PVC Ø 2" x 1,5 " 1.00 1.00 1.00 Bh 25,000.00 -
Socket PVC Ø 1,5" 8.00 8.00 8.00 Bh 16,000.00 -
Elbouw Ø 2" 1.00 1.00 1.00 Bh 25,000.00 -
Gate Valve Ø 2" drat 1.00 1.00 1.00 Bh 70,000.00 -
Check Valve Ø 2" 1.00 1.00 1.00 Bh 65,000.00 -
Panel Pompa 1.00 - - Unit 2,400,000.00 -
Rumah Panel 1.00 - - Unit 800,000.00 -
Elektroda Massa 5.00 5.00 5.00 Bh 30,000.00 -
Well Cover DN 4" x 2" 1.00 - - Set 30,000.00 -
Pemasangan Listrik - -
Registrasi PLN 2200 W 1.00 1.00 1.00 Ls 2,170,000.00 2,170,000.00
Biaya Pemasangan Baru 1.00 1.00 1.00 Ls 1,330,000.00 1,330,000.00
Sub total I 3,500,000
II MENARA
BAHAN
Air Ltr 100.00 -
Ampelas 64.00 10.00 10.00 Lbr 9,000.00 -
Bata Merah 2,442.00 2,442.00 2,442.00 Bh 500.00 -
Batu Pecah 1/2 1.00 1.00 1.00 M3 410,000.00 -
Batu Pecah 2/3 19.00 2.00 2.00 M3 400,000.00 -
Benang 4.00 3.00 3.00 Rol 3,000.00 -
Besi Polos Dia 10 43.00 20.00 20.00 Btg 94,000.00 -
Besi Polos Dia 12 43.00 20.00 20.00 Btg 118,000.00 -
Besi Polos Dia 8 216.00 80.00 80.00 Btg 54,000.00 -
Cat Besi 1.00 - Kg 55,000.00 -
Cat Dasar 17.00 - Kg 30,000.00 -
Cat Tembok 46.00 - Kg 30,000.00 -
Dolken D8 - 4 M 452.00 - Btg 23,000.00 -
Dudukan Lampu 1.00 - Bh 12,000.00 -
Ember 5 Lt 20.00 - Bh 10,000.00 -
Engsel Jendela 2.00 - Bh 35,000.00 -
Engsel Pintu 2.00 - Bh 50,000.00 -
Flange GI 1 1/2" 1.00 - Bh 172,000.00 -
Flange GI 2" 1.00 - Bh 195,000.00 -
Flange PVC 1 1/2" 1.00 - Bh 120,000.00 -
Flange PVC 2" 2.00 - Bh 145,000.00 -
Handel dan Kunci 1.00 - Bh 190,000.00 -
Jendela Nako 1.00 1.00 1.00 M2 105,000.00 -
Kabel 10.00 - M' 6,000.00 -
Kaca (0.8 x 1M) t=3 mm 1.00 1.00 1.00 Bh 75,000.00 -
Kape 5.00 - Bh 8,000.00 -
Kawat Beton 30.00 10.00 10.00 Kg 20,000.00 -
Kayu Kelas II (4x6cm x4m) 150.00 30.00 120.00 150.00 Btg 43,000.00 5,160,000.00
Kayu Kelas III (4x6cm x4m) 322.00 40.00 282.00 322.00 Btg 27,000.00 7,614,000.00
Kayu Papan (3x20cm x4m) 42.00 20.00 22.00 42.00 Btg 64,000.00 1,408,000.00
Volume
No Uraian Real s/d Pengajuan Jumlah Satuan Harga Satuan Jumlah BLM
Kebutuhan
Tahap Lalu Sekarang Kumulatif
Keramik 40 x 40 25.00 - M2 55,000.00 -
Knee GI 1 1/2" 6.00 - Bh 18,000.00 -
Kuas 4" 5.00 Bh 20,000.00 -
Lampu Lilin 10 Watt 2.00 - Bh 35,000.00 -
Manhole uk. 80 x 80 cm 1.00 - Unit 650,000.00 -
Minyak Bekisting 21.00 10.00 10.00 Ltr 16,000.00 -
Paku 5-10 cm 44.00 5.00 5.00 Kg 15,000.00 -
Paku Campur 1.00 1.00 1.00 Kg 18,000.00 -
Pasir Beton 13.00 3.00 3.00 M3 176,000.00 -
Pasir Pasang 3.00 1.00 1.00 M3 165,000.00 -
Pasir Urug 2.00 1.00 1.00 M3 160,000.00 -
Pintu Kayu Kelas II 1.00 - M2 800,000.00 -
Pipa GI 1 1/2" 12.00 - M' 200,000.00 -
Pipa GI 2" 18.00 - M' 250,000.00 -
Plamur Tembok 17.00 - Kg 35,000.00 -
Plywood t= 9 mm 36.00 - Lbr 170,000.00 -
Rooster Kayu 14.00 14.00 14.00 Bh 35,000.00 -
Saklar Tunggal 2.00 - Bh 25,000.00 -
Sealtape 4.00 - Bh 5,000.00 -
Semen PC 229.00 50.00 50.00 Zak 57,000.00 -
Senai Pipa 8.00 - Titik 14,000.00 -
Slot Jendela 1.00 - Bh 15,000.00 -
Socket GI 1 1/2" 6.00 - Bh 22,000.00 -
Stop Kontak 2.00 - Bh 30,000.00 -
Tangga Besi dan Pagar 22.00 - M 150,000.00 -
Water Meter 1.00 - Bh 2,500,000.00 -
Prasasti 30x40 cm 1.00 - Bh 500,000.00 -
Media/Logo & Lukis Tapis 1.00 - Bh 1,000,000.00 -
- -
UPAH - -
Pekerja - - HOK 85,000.00 -
Tukang - - HOK 100,000.00 -
Sub total II 14,182,000
JUMLAH PENGAJUAN 17,682,000
( Dua Ratus Empat Puluh Lima Juta Rupiah )
Sidomulyo, ………………2020
Disetujui : Dibuat :
Koordinator KKM Ketua Satlak
Diperiksa oleh :
No. Nama Selaku Tandatangan
1 Jihad Ansori, S.E. Fasilitator Masyarakat CD 1.
Mengetahui :
District Coordinator
Mardiana, S.KM.