You are on page 1of 3

Assignment 8

LINGO

SETS:
PITS/1..2/:LOC;
BSITE/1..3/:NEEDED;
LINKS(PITS, BSITE):COST, X;
ENDSETS

[Tothall]MIN=@SUM(LINKS(I,J):COST(I,J)*X(I,J));
@FOR(PITS(I):
@SUM(BSITE(J):X(I,J))<= LOC(I));
@FOR(BSITE(J):
@SUM(PITS(I):X(I,J))= NEEDED(J));

DATA:
LOC = 18 14;
NEEDED = 10 5 10;
COST = 400 490 460
600 530 560;
ENDDATA
The above report verifies the allowable ranges for C12 and C21 in part e.
Question 3

You might also like