You are on page 1of 6
BRN,12/11/2019 Note technique Fast track ZOI: Flow assurance simulation of HBNP wells to CTH ROM. Distribution : - Directeurs BRN = DIRO ~ENPR = INFR - PROJ -DITE Préparée par Francesco Foi Vérifié par: ce POTTS ENPR.PROD —-pet o® PH) par int Noureddine Hafti* ges ant Samuele Brioschi ura" Approuvée par: Chef Département ENPI Abdelkrim TahRAO, ENPA Paolo Ceriéhef veaGI? GRO) 1. Introduct HBNP-1, HBNP-1bis, HBNP-6 are three wells (the first two already on production and the last ‘one is a new wells) in ZOI phase 1 and phase 2 project which will be processed on BRN CTH. Actually the Oil of HBNP-1 and HBNP-Lbis are processed on BBK CPF. In the new configuration the production of the three wells will be sent through a new 6” inch flowline to CTH ROM. There it will be mixed with the actual CTH ROM production and after a separation process will be sent through the existing flowlines to CTH BRN. The FA studies in this technical note were made for a fast track solution, to verify the feasibility of the proposed connections using the available materials. 2.1 Actul configuration and production data The actual configuration is show in the picture below where the production is processed on BBK CPF : (or ao » oven peiobintte BBK PLANT EPF 2.2 Future configuration and production data The input data used for the simulation are reported in the table below: HENP directly toCTHIROM 6! (12)7 km) WC% — [CTH ROM (1700 bbl) |P HBNP (1700 bbl) 0 3 25 10 3 27 20 3 30 ‘The future configuration is reported in the image below: ‘tual orodusan + 2°37 km. a2 17K { a2" aK BRN MAND wells ee Lad ms Train 182 (THROM Towels A possible route is drawn in white in the image below which highlights a length of the flowline of 12.7 km. 3. Flow Assurance simulation HBNP1 wells to CTH ROM: A flow assurance study was carried out, using Prosper Software, in order to understand the operating conditions of the new configuration. The study were made for a fast track solution using the available materials (6”inch flowline) and verifying the flow assurance on the flowline. In the table below is reported the simulation results with a sensitivity on WC (0-10-20%): we% _|CTH ROM (1700 bbl) | P HBNP (1700 bbi) 0 3 21 10 3 23 20 3 25 From the simulation we need a pressure between 21 and 25 barg at HBNP MFD to reach the ROM CTH (3 barg). The flow regime on the lines is shown in the graphs below: DP Friction: 16,9 bar DP Gravity: 0,8 bar | | DP Friction: 18,7 bar DP Gravity: 0,9 bar DP Friction: 20,7 bar DP Gravity: 1 bar The fluid dynamic regime will be frictional along all the flowline. Considering the low WHP of HBNP1 and HBNP1bis, itis recommended to install a MPP considering the high pressure required. Svetion: discharge: Conclusions : HBNP-1, HBNP-ibis, HBNP-6 are three wells (the first two already on production and the last one is a new wells) in ZOI phase 1 and phase 2 project which will be processed on BRN CTH. In the new configuration the production of the three wells will be sent through a new 6” inch flowline to CTH ROM. There it will be mixed with the actual CTH ROM production and after a separation process will be sent through the existing flowlines to CTH BRN. To be noted that the FA studies in this technical note were made for a fast track solution using the available materials (6”inch flowline). The simulation results indicated a high frictional losses due to the high flow rate in the li and a required pressure on HBNP manifold about 25 bar. With these pressures to ensure the production of the wells we recommend the installation a MPP with a suction pressure between 5 and 10 barg and a discharge pressure between 25 and 30 bare. Suction 0 bar

You might also like