Channels are C15 x33 Concrete Arca
Weis 76" Thick ;
Too 0} 7160 Tallby 7
(Channel Runners
For Switchgear Seotins
56° Long Each
Thostelehann! sal be piso
on op ofthe grating. This is 30
atthe channel an rating will
bth ad support the tt
whiligging In err do 50,
he gating must cut the
psc dimensions needed
All personnel shal be 100% ted
oF tal times once grating
ronoved
This route ete best option. It
ffs mre working sufics than
he alternative opening. It would
ne necessary to work over the
open "ole at the abe opening
Weean bie our fet ily
plated om he grating ding this
operation,
re Gring Opening
E | Otos Be cu)
** Giting nt showa Fr laity
Cannel Runners
For A-Frame Whose
13 Long Bach
Gear tobe ase trough the opening
ented inthe grating lieing 2 Ton
CCapciy Aluminum A-Feams Gant
(One (1)2 Toa Capacity Tilley tobe
taco the lei header bea,
One (1)2 Ton Capacity Chain Fall
‘bung from te tlle, lamin
sanzy to be placed inside the heavy
‘ug’ ste! channel runners or
‘Acre wheels
‘Once gear is hough the gaing it shal
‘bespun 90 doce The aluminum.
any ison wheel and sal rl
orwardso that the gear is suspended
cover the landing one
(Once over the lanting 20 ou (8)
doles wil be plaed isis the heavy
{age scl channel runners or
Schgsa sections. ‘The git wil be
lowered ano four 4) doles
Gear stall hen be ald onthe
Surface. Ctr hall then Be oe othe
‘estrical oor.
Proces to be repeated for ational
‘ew going in nd reverse proces 10 be
‘erformed fr addin od gear going