BULLETIN NO. R81-49.5 |
PARTS BOOK
and MAINTENANCE GUIDE
ROTARY
491”IDECO
For parts and service contact your
IDECO district sales office in your area
When ordering parts always furnish the following infor-
mation to assure prompt delivery:
1. Serial number of machine.
2. Part name, part number and quantity
required.
3. Whether to ship by freight, express, or
parcel post.
Claims for shortages or errors should be made imme-
diately upon receipt of material.
{DECO DIVISION, ORESSER INDUSTRIES, INC.
°.0. BOX 3280, BEAUMONT, TEXAS 77704TO THE OPERATOR
‘This manual has been prepared to belter acquaint you
with your IDECO Rotary. The text discusses a number of
Important subjects concerning proper maintenance and
operation of IDECO Rotaries.
Your IDECO Rotary Is built to render consistent efficient
service; however, the continued efficient performance of any
machine is dependent upon the way itis treated.
!DECO insures that your rotary provides top operating
efticieney by maintaining a force of competent field servicemen.
We hope you wil feel free to call onus for advice or assistanceat
‘wnan making repairs in the field, special care should be taken
to keep all parts clean and tree from dirt and dust when removed
‘rom the rotary. Clean all parts and the interior of the base
thoroughly before re-assembly. The condition of the gear teeth
‘should be noted and also the concition of the main table bearing
‘ace, balls and ball spacer.
WHEN ORDERING PARTS
‘Always furnish the serial number of the rotary. To obtain
‘prompt delivery of partis, give the number required, part number
land name of parts wanted. State whether pars ae tobe shipped
freight, express of parcel post, Claims for shortage of error
any time. should be made immediately upon receipt of material
LUBRICATION
CAUTION _Be sure the rotary is property lubricated before starting operation.
All working parts including gears, main
bearing, nold-down bearing and both pinion
shaft bearings are lubricated with a single
‘ilbath system, The reservoirs are filed and
‘gauged at the filer plug on top of the rotary
table (SEE THE ILLUSTRATION, AT POINT
1). All get and foreign matter is collected ina
sump (SEE ILLUSTRATION, AT POINT 2 &
53) from which itmay be removed periodically.
For a new rotary or one which has boon
toreughly rained, the filler plug is removed
fand oll ig added until the “ful” mark is
reached on the gauge stick. Therotaryis then
rotated fora few minutes during which time
the oll is circulated. Some oll will remain in
‘he main bearing and capsule. When the
‘olaty is stopped, the ol evel willshow below
‘the “full” mark on the gauge. An additional
[amount is then added to ring the ail level up
to the full mark
‘The oll should be checked daily. itis not
avromanc
wie. \
49.5 ROTARY
necessary to add ol a8 long a8 the level ae [AMBIENT TEMPERATURE
necessary 10 add ol as lng 8 the la SRS | woncanr| oreo SFO nor
Se hee EXXON | Gear Ol| GX 80 or | Gea Oil GX 90 or
‘Spartan EP 68 ‘Spartan EP 190
IMPORTANT: When gaging neo eva, GULF |Mui-Purpose aow-30 | "Multi-Purpose 20W-30
allow the machine to remain idle for LL ub. S100 |
minutes. This wil allow the olf return tothe 20 MOBIL |MoDiiube HO. sow-50 | —Mobilube HO. aow-0
Feservoir and be indicated on the gauge.
DO NOT fil over the"ull" mark on the guage
fas there is a possibilty that ths will cause
Freating of leaking of the oi,
or Mobiigear 628 ‘or Mobiigear 632
SHELL [Spirax HO. 6 Spirax HD. 00
Parma Parmalat
TEXAGO | Wihigear EP 8sW-05 | Multigoar EP e5¥7-00
‘or Meropa #220
jor Meropa #460
lin the rotary should be drained
periodically and replaced with fresh clean il
Note the location of the drain pluge in the
lastrationTABLE ASSEMBLY
REMOVING THE MAIN BEARING
To replace or inspect this bearing, it is necessary to remove the table from the rotary
base.
1
Lift the table guard by removing the bolts located at the edge of the rotary top
plate.
Remove the lower mud ring. (4 Bolts only. See Rotary Parts Drawing).
Remove the elastic stop nuts which fasten the hold-down ring to the base. These
nuts are located on the underside of the base.
Lift the table away from the rotary base. It is best to lock the master bushing in the
table and then placing the two bushing lifting handles in the bushing, asa means
for attachment to a block and tackle.
Place the table upside down on the floor. Remove the capscrews which hold the
bearing support ring to the table and remove the support ring. Note shims.
Remove lower race. Remove lower balls and ball spacer. Remove middle race.
Remove upper balls and ball spacer.
Remove hold down ring.
‘The upper race may be removed by driving wedges between the race and table in
about three (3) places. Gently warm the race if necessary.
REPLACING THE MAIN BEARING
Reverse the procedure given above by installing upper race, hold down ring,
upper ball and spacer, middle race, lower balls and spacer, lower race and
bearing support ring
Replace only about 4 capscrews in support ring. The main bearing assembly
should be .002” to .006” loose. This can be adjusted by the shims between the
table and the bearing support ring.
Replace the remaining support ring bolts except those which hold the lower mud
ring.
Turn the table right side up in the base with the flat of the hold down ring at the
pinion gear.CAPSULE ASSEMBLY
REMOVING THE ROTARY SPROCKET
1. Remove the capscrews (A) which hold the sprocket to the
hub. 2. Attach puller bolts othe sprocket hub (8). 3.Pullthe
hub trom the shaft with @2-Ton jack. 4. Drive out he sprocket
key.
REPLACING THE OIL SEAL
‘The oil seal is located just inside the sprocket and cover plate.
1. Take out the capscrews () holding the cover plate tothe capsule,
‘and remove the cover plate (D). 2. Drive the oll seal (E)outotthe
cover plate and drive in a new oll seal by tapping lightly around the
periphery. DO NOT distort the new seal or smash it by too severe
hammer blows. 3. When assembling the cover plate with now oil
seal back into position, take care not to damage the sealing lipof the
seal,
REMOVING THE CAPSULE
‘Any other repairs to the capsule assembly will necessitate removing
the capsule from the rotary base.
1. Remove the elastic stop nuts which hold the capsule to the
‘base. 2. The capsule can now be removed horizontally from the
bore in the base, Ifthe capsule fits fight, it can be started out by
‘serewing in on the two Allen Head Jack Screws provided for this
purpose on the flanged part of the capsule.
REPLACEMENT
OF THE CAPSULE BEARINGS.
IDECO Rotaries havea straight roller bearing in the sprocket end of
the capsule, A double tapered roller bearing is used on the pinion
end,
REMOVING
THE PINION END BEARINGS
1. Remove the six hex head cap scrows which hold the pinion end
cover plate to the capsule. 2, With the sprocket off the shaft,
remove the shatt with pinion, cover plate, pinion end bearing from
the capsule body. (The sprocket end bearing inner race which Is
shrunk onto the shaft wll come out with the shaft). Press the
pinion and pinion end bearing of the shat by fiting a piece of pipe
‘ver the shalt and against the inner race ofthe bearing, Then press.
the shaft through both members. A press of approximately 25-ton
‘capacity will be required
REPLACING
THE PINION END BEARINGS
‘A Double Tapered bearing is used inthe pinion end,
1. Heat the bearing components to a temperature of 250°F ino or
With steam in order to shrink them on the shalt. 2. Press the
bearing up to the shoulder ofthe shaft
REMOVING
THE SPROCKET END BEARING
‘To remove this bearing, hecapsule must be removed trom the rotary
base, and the pinion shaft must be removed from the capsule, as
‘mentioned earlier. The inner race of this bearing being shrunk on
will come out with the shat, Thisinner race may be ut witha torch
or driven oft
1. Remove the six hex head capscrews which hold the cover plate to
the capsule on the sprocket end. 2. Drive the bearing with ts
‘outer race trom the capsule body,
REPLACING
THE SPROCKET END BEARING
1. Heat the bearing inner race to 200" to 250° Fwith steam orin a pot
fotell. 2 Shrink the inner race on the pinion shat. tis tobe fitted
well up against the shoulder of the shaft. 3. The outer race and
bearing rollers can be driven into the capsule body with ight, even
taps around the outer edge. Useablock of wood andalight hammer,
Do not hammer directly on the outer race.
ASSEMBLING THE CAPSULE
Ater replacing the bearings, the shaft can be assembled,
1. Place the pinion end cover plate in position against the pinion
bearing. 2. Replace the pinion key and press the pinion onto the
shaft as faras possible. A press with approximately 25-ton capacity
is required, 3. Insort the shaft assembly into the capsule. 4
Position pinion end cover plate so thatthe ol pockets ae horizontal
and face up, in relation to the marked "TOP" ofthe capsule, Replace
capscrews, tightenandwire. 5. Replacesprocketend cover plate
to capsule body, replace capscrews, tignten and wire,
‘The capsule is now ready for assembly tothe rotary bese. Note the
y
DIMENSION OF ROTARY IN INCHES
84
~ 1398
43176
10%
65
31
seve 46
- 46
14%
c4aMepozEern
ROTARY
Size...
CATALOG NUMBER
RATED CAPACITY
Main Bearing-Dead Load-Ton
Rotating Load-Tons ‘i
Hold-Down Bearing-Dead Load-Tons .
Max. Dia, Table Opening for Bit or Pipe .
Type and Size Table Drive - API.
Center of Table to Center of Sprocket
Gear Ratio
Lr ——
Width Over Skid Base .....
Width At Top ...
| width At Top -
Length Overall
Height Overall .
Net Weight Including Master Bushin
ION
= |
113"
31”
24,900 |
MUNIN 15
+ 5.141-5.110
5T-
ie
eS
woven