You are on page 1of 1

08-Jun-16 11:49

WBS Code WBS Name Total At Completion Start Finish At 2016 2017
Activities Total Cost Completion
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct ov
Duration
SPH-1 SAN PABLO BUNGALOW HOUSE SCHEDULE 51 SAR0.00 06-Jun-16 09-Oct-17 421 09-O
SPH-1.1 GENERAL PRELIMINARIES 17 SAR0.00 06-Jun-16 22-May-1 301 22-May-17
SPH-1.1.1 MILESTONES 7 SAR0.00 06-Jun-16 06-Dec-16 158 06-Dec-16
SPH-1.1.2 CONTRACTS 4 SAR0.00 06-Jun-16 04-Jul-16 24 04-Jul-16
SPH-1.1.3 GROUND BREAKING (KICK-OFF) 6 SAR0.00 06-Jun-16 22-May-1 301 22-May-17
SPH-1.3 ENGINEERING 0 SAR0.00 0
SPH-1.3.2 STRUCTURAL 0 SAR0.00 0
SPH-1.3.1 CIVIL 0 SAR0.00 0
SPH-1.3.3 ARCHITECTURAL 0 SAR0.00 0
SPH-1.3.4 ELECTRICAL 0 SAR0.00 0
SPH-1.3.5 MECHANICAL 0 SAR0.00 0
SPH-1.6 PROCUREMENT 0 SAR0.00 0
SPH-1.6.1 PRIORITY ITEMS 0 SAR0.00 0
SPH-1.6.2 LONG LEAD ITEMS 0 SAR0.00 0
SPH-1.2 CONSTRUCTION 20 SAR0.00 14-May-17 21-Sep-17 112 14-May-17 21-Sep
SPH-1.2.1 EXTERNAL WORKS (SITE WORKS) 4 SAR0.00 20-May-17 24-Jun-17 29 20-May-17 24-Jun-17
SPH-1.2.2 MAIN BUILDING 16 SAR0.00 14-May-17 21-Sep-17 112 14-May-17 21-Sep
SPH-1.2.2.1 EARTHWORKS 5 SAR0.00 20-May-17 17-Jun-17 24 20-May-17 17-Jun-17
SPH-1.2.2.1.1 BASEMENT 2 SAR0.00 20-May-17 27-May-1 5 20-May-17 27-May-17
SPH-1.2.2.1.2 ISOLATED COLUMN FOOTING 3 SAR0.00 06-Jun-17 17-Jun-17 10 06-Jun-17 17-Jun-17
SPH-1.2.2.2 SUBSTRUCTURE 6 SAR0.00 14-May-17 17-Jul-17 56 14-May-17 17-Jul-17
SPH-1.2.2.2.1 BASEMENT FOUNDATION 2 SAR0.00 14-May-17 21-Jun-17 34 14-May-17 21-Jun-17
SPH-1.2.2.2.2 BASEMENT WALLS 2 SAR0.00 21-Jun-17 13-Jul-17 19 21-Jun-17 13-Jul-17
SPH-1.2.2.2.3 COLUMN FOOTING/FOUNDATION 2 SAR0.00 27-Jun-17 17-Jul-17 17 27-Jun-17 17-Jul-17
SPH-1.2.2.3 SUPERSTRUCTURE 3 SAR0.00 25-Jul-17 21-Sep-17 50 25-Jul-17 21-Sep
SPH-1.2.2.3.1 CAST IN PLACE CONCRETE 3 SAR0.00 25-Jul-17 21-Sep-17 50 25-Jul-17 21-Sep
SPH-1.2.2.3.1.1 BASEMENT SLAB ON GRADE 1 SAR0.00 25-Jul-17 09-Aug-17 13 25-Jul-17 09-Aug-17
SPH-1.2.2.3.1.2 COLUMNS 1 SAR0.00 17-Aug-17 24-Aug-17 7 17-Aug-17 24-Aug-17
SPH-1.2.2.3.1.3 BEAMS & SLAB 1 SAR0.00 01-Sep-17 21-Sep-17 17 01-Sep-17 21-Sep
SPH-1.2.2.3.1.4 STAIRWAYS 0 SAR0.00 0
SPH-1.2.2.3.2 PLANT-PRECAST ARCHIT ECTURAL CONCRE 0 SAR0.00 0
SPH-1.2.2.3.3 DECORATIVE GLASS FIBER REINFORCED C 0 SAR0.00 0
SPH-1.2.2.3.4 CEMENT-BASED SCREED 0 SAR0.00 0
SPH-1.2.2.4 MASONRY WORKS 0 SAR0.00 0
SPH-1.2.2.4.1 UNIT MASONRY ASSEMBLIES 0 SAR0.00 0
SPH-1.2.2.4.2 DIMENSION STONE CLADDING 0 SAR0.00 0
SPH-1.2.2.5 METAL FABRICATIONS 0 SAR0.00 0
SPH-1.2.2.5.1 Aluminum grills 0 SAR0.00 0
SPH-1.2.2.5.2 Metal gates 0 SAR0.00 0
SPH-1.2.2.5.3 PIPE AND TUBE RAILINGS, Balustrades 0 SAR0.00 0
SPH-1.2.2.5.4 Staircase; raking 0 SAR0.00 0
SPH-1.2.2.6 WOOD & PLASTICS 0 SAR0.00 0
SPH-1.2.2.6.1 Kitchen & pantry cabinets 0 SAR0.00 0
SPH-1.2.2.6.2 Countertops, Vanity, Ledge wall top, Kitchen cou 0 SAR0.00 0
SPH-1.2.2.6.3 PANELING 0 SAR0.00 0
SPH-1.2.2.7 THERMAL & MOISTURE PROTECTION 0 SAR0.00 0
SPH-1.2.2.7.1 WATERPROOFING 0 SAR0.00 0
SPH-1.2.2.7.1.1 BITUMINOUS DAMPROOFING 0 SAR0.00 0
SPH-1.2.2.7.1.2 COLD FLUID-APPLIED WATERPROOFING 0 SAR0.00 0
SPH-1.2.2.7.1.3 EPDM MEMBRANE ROOFING, 0 SAR0.00 0
SPH-1.2.2.7.2 ROOF ACCESSORIES 0 SAR0.00 0
SPH-1.2.2.8 DOORS & WINDOWS 1 SAR0.00 07-Aug-17 19-Aug-17 10 07-Aug-17 19-Aug-17
SPH-1.2.2.8.1 STEEL DOORS AND FRAMES 0 SAR0.00 0
SPH-1.2.2.8.2 FLUSH WOOD DOORS 0 SAR0.00 0
SPH-1.2.2.8.3 ALUMINUM WINDOWS 0 SAR0.00 0
SPH-1.2.2.8.4 DOOR HARDWARE 0 SAR0.00 0
SPH-1.2.2.8.5 DECORATIVE GLASS 0 SAR0.00 0
SPH-1.2.2.9 ARCHITECTURAL WORKS (FINISHINGS) 1 SAR0.00 07-Aug-17 07-Aug-17 0 07-Aug-17 07-Aug-17
SPH-1.2.2.9.1 PLASTERING WORKS 0 SAR0.00 0
SPH-1.2.2.9.2 TILEWORKS 0 SAR0.00 0
SPH-1.2.2.9.3 STONE WORKS 0 SAR0.00 0
SPH-1.2.2.9.4 MOULDINGS & WALL COVERINGS 0 SAR0.00 0
SPH-1.2.2.9.5 PAINTING WORKS 0 SAR0.00 0
SPH-1.2.2.9.6 CARPETING 0 SAR0.00 0
SPH-1.2.2.10 ROOFING WORKS 0 SAR0.00 0
SPH-1.2.2.10.1 ROOF GIRDERS 0 SAR0.00 0
SPH-1.2.2.10.2 ROOF INSULATION 0 SAR0.00 0
SPH-1.2.2.10.3 ROOFING SHEETS 0 SAR0.00 0
SPH-1.2.2.11 MECHANICAL WORKS 0 SAR0.00 0
SPH-1.2.2.11.1 ROUGH-INS SYSTEM 0 SAR0.00 0
SPH-1.2.2.11.2 WATERLINE SYSTEM 0 SAR0.00 0
SPH-1.2.2.11.3 SANITARY LINE SYSTEM 0 SAR0.00 0
SPH-1.2.2.11.4 PLUMBING FIXTURES 0 SAR0.00 0
SPH-1.2.2.11.5 HVAC SYSTEM 0 SAR0.00 0
SPH-1.2.2.12 ELECTRICAL WORKS 0 SAR0.00 0
SPH-1.2.2.12.1 GROUNDING AND BONDING 0 SAR0.00 0
SPH-1.2.2.12.2 CONDUCTORS AND CABLES 0 SAR0.00 0
SPH-1.2.2.12.3 CIRCUIT BREAKERS, SWITCHBOARDS 0 SAR0.00 0
SPH-1.2.2.12.4 WIRING DEVICES 0 SAR0.00 0
SPH-1.2.2.12.5 LIGTHING SYSTEM 0 SAR0.00 0
SPH-1.2.2.12.6 AUDIO VIDEO INTERCOM SYSTEM 0 SAR0.00 0
SPH-1.2.3 SPECIAL CONSTRUCTION 0 SAR0.00 0
SPH-1.4 CLOSE OUT 14 SAR0.00 19-Aug-17 09-Oct-17 44 19-Aug-17 09-O
SPH-1.4.1 TESTING & COMMISSIONING 1 SAR0.00 19-Aug-17 19-Aug-17 0 19-Aug-17 19-Aug-17
SPH-1.4.2 PUNCH LIST (SNAGGING) 10 SAR0.00 19-Aug-17 04-Oct-17 40 19-Aug-17 04-O
SPH-1.4.2.1 FINAL INSPECTIONS 10 SAR0.00 19-Aug-17 04-Oct-17 40 19-Aug-17 04-O
SPH-1.4.3 PROJECT HAND-OVER 3 SAR0.00 04-Oct-17 09-Oct-17 4 04-Oct-17 09-O

All Projects Summary Page 1 of 1 © Oracle Corporation


WBS Elements below Project

You might also like