CK 28
CK 28
EDISI 03 2020
KET.
DAFTAR UPAH PEKERJA
HARGA
NO. URAIAN PEKERJA SATUAN MINIMUM MAKSIMUM KET.
(Rp) (Rp)
1 Pekerja Hr 105,000 115,000 16,429 16,429
2 Mandor Hr 130,000 145,000 20,714 20,714
3 Tukang listrik Hr 135,000 145,000 20,714 20,714
4 Tukang kayu Hr 135,000 145,000 20,714 20,714
5 Kep. tk. kayu Hr 140,000 150,000 21,429 21,429
6 Tukang batu Hr 135,000 145,000 20,714 20,714
7 Kep. tk. batu Hr 140,000 150,000 21,429 21,429
8 Tukang besi Hr 125,000 135,000 19,286 19,286
9 Kep. tk. besi Hr 140,000 150,000 21,429 21,429
10 T u k a n g c a t Hr 135,000 145,000 20,714 20,714
11 K e p . t k . c a t Hr 140,000 150,000 21,429 21,429
12 T u k a n g p l i t u r Hr 135,000 145,000 20,714 20,714
13 T u k a n g j a l a n Hr 105,000 115,000 16,429 16,429
14 T u k a n g g a l i Hr 105,000 115,000 16,429 16,429
15 Tukang masak aspal Hr 105,000 115,000 16,429 16,429
16 T k . l e i d e n g Hr 135,000 145,000 20,714 20,714
17 M a s i n i s Hr 175,000 200,000 28,571 28,571
18 P e m b . M a s i n i s Hr 125,000 150,000 21,429 21,429
19 P e n j a g a a p i Hr 105,000 115,000 16,429 16,429
20 P e n j a g a m a l a m Hr 105,000 115,000 16,429 16,429
21 Sopir Hr 175,000 200,000 28,571 28,571
22 Pembantu Sopir Hr 125,000 150,000 21,429 21,429
92,000
HARGA
NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET
(Rp) (Rp)
I BAHAN DASAR
1 BATU KALI Bulat Utuh m3 220,000 250,000
Bulat Belah m3 260,000 320,000
Pecah 10/15 m3 270,000 340,000
Pecah 5/7 m3 270,000 350,000
Pecah 3/5 m3 300,000 360,000
2 KERIKIL Timbun m3 180,000 200,000
Sawur / Koral m3 170,000 200,000
Beton 0,5/1 m3 310,000 380,000
Beton 1/2 m3 310,000 390,000
Beton 2/3 m3 320,000 380,000
Biasa m3 210,000 260,000
Tras Giling m3 280,000 320,000
3 BATU BATA ex lokal bh 520 580
VII . B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC DN 20 ( ½" ) AW JIS btg 28,000 31,000 panjang 4 m
Pipa PVC DN 25 ( ¾" ) AW JIS btg 34,000 36,500 panjang 4 m
Pipa PVC DN 32 ( 1" ) AW JIS btg 49,000 55,000 panjang 4 m
Pipa PVC DN 40 ( 1½" ) btg 60,000 70,000 panjang 4 m
Pipa PVC DN 63 ( 2" ) btg 85,000 105,000 panjang 4 m
Pipa PVC DN 90 ( 3" ) btg 165,000 185,000 panjang 4 m
Pipa PVC DN 110 ( 4" ) btg 270,000 280,000 panjang 4 m
Pipa PVC DN 160 ( 6" ) btg 530,000 550,000 panjang 4 m
Pipa PVC DN 200 ( 8" ) btg 900,000 1,050,000 panjang 4 m
Pipa PVC DN 250 ( 10" ) btg - - panjang 4 m
Pipa PVC DN 315 ( 12" ) btg - - panjang 4 m
VIII . B A H A N L A N G I T - L A N G I T
1 AKUSTIK-uk : 30 X 30 lbr 5,800 6,500
30 X 60 lbr 13,200 14,500
60 X 120 lbr 42,000 46,000
List Kayu Profil m' 4,800 5,000
2 SOFT BOARD-uk: 4'X 8'
Gypsum tebal 9 mm lbr 60,000 65,000
3 HARD BOARD-uk: 4'X 8' lbr 51,000 55,000
GYPROC uk.120cmx240cmx9mm lbr 60,000 65,000
4 PLY WOOD
Teak wood
90 X 210 X 3 mm lbr 65,000 75,000
. 120 X 240 X 3 mm lbr 80,000 95,000
. 90 X 210 X 4 mm lbr 65,000 85,000
. 90 X 210 X 9 mm lbr 115,000 125,000
. 90 X 210 X 12 mm lbr 135,000 170,000
. 90 X 210 X 15 mm lbr 200,000 240,000
. 90 X 210 X 18 mm lbr 295,000 310,000
HARGA
NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET
(Rp) (Rp)
Tripleks
. 120 X 240 X 3 mm lbr 50,000 61,500
. 120 X 240 X 4 mm lbr 65,000 70,000
. 120 X 240 X 6 mm lbr 75,000 86,000
Multipleks
. 120 X 240 X 9 mm lbr 110,000 130,000
. 120 X 240 X 12 mm lbr 165,000 180,000
. 120 X 240 X 15 mm lbr 190,000 210,000
. 120 X 240 X 18 mm lbr 215,000 250,000
Formika ukuran pintu lbr 70,000 75,000
IX . B A H A N F I N I S H I N G
1 KAYU
Menie kg 30,000 32,000
Dempul plamur kg 25,000 30,000
Ambril/amplas lbr 4,100 5,000
Batu Apung kg 75,000 80,000
Cat dasar kg 40,000 42,500
. Emco kg 65,000 71,000
. Yunior 66 (nippon paint) kg 68,000 71,000
- Koas bh 17,500 20,000
. Deculux kg 67,000 75,000
. Siralax ons 20,000 21,000
. Spiritus ltr 15,000 18,000
. Plitur jadi ltr 65,000 71,000
2 TEMBOK
Kalkarium kg 4,500 5,000
Kapur sirih kg 4,250 4,750
Plamur kg 25,000 32,000
Cat Tembok kg 23,000 28,400
Sintex 5 kg 125,000 135,000
Danabride 5 kg 130,000 140,000
Catylac interior 5 kg 130,000 142,000
Mowilex 2,50 kg 285,000 350,000
3 BESI
Menie kg 25,000 36,000
Cat mengkilat kg 62,000 72,500
Cat kg 40,000 45,000
Thinner A ltr 16,000 20,000
Minyak cat ltr 20,000 22,000
Thinner Super ltr 17,500 35,000
Residu (teer/aspal) drum 60,000 67,500
Fibre glass (tanki air)
kapasitas 550 liter. bh 1,025,000 1,100,000
kapasitas 1100 liter. bh 1,625,000 1,700,000
Lem Aica Aibon kg 55,000 65,000
HARGA
NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET
(Rp) (Rp)
X.BAHAN KACA
1 POLOS 3 mm m2 88,000 95,000
5 mm m2 100,000 105,000
2 ES KABUR 3 mm m2 110,000 115,000
5 mm m2 130,000 135,000
3 RAY BAND 3 mm m2 95,000 100,000
5 mm m2 105,000 110,000
1 KABEL LISTRIK
NYA : . 1 X 1 1/2 mm2 m' 5,250 5,500
2 SKAKELAR
Out bauw . Seri bh 25,000 35,000
XV . POMPA AIR.
1 POMPA AIR TANGAN
Dragon buatan Indonesia bh 350,000 375,000
2 POMPA AIR LISTRIK
Sanyo 100 watt bh 975,000 1,100,000
Fuji 250 watt bh 1,450,000 1,650,000
Shimizu . 100 watt bh 470,000 550,000
. 90 watt bh 350,000 425,000
Dab . 125 watt bh 400,000 420,000
. 175 watt bh 425,000 475,000
X VI . PAVING BLOCK
1 SQUARE Abu-abu m2 85,000 95,000
Merah/hitam m2 90,000 105,000
2 HOLLAND Abu-abu m2 85,000 95,000
Merah/hitam m2 90,000 105,000
3 UNIDECOR Abu-abu m2 85,000 95,000
Merah/hitam m2 90,000 105,000
4 UNI Abu-abu m2 85,000 95,000
Merah/hitam m2 90,000 105,000
5 TRIHEX Abu-abu m2 85,000 95,000
Merah/hitam m2 90,000 105,000
6 OLYMPIA HEXA Abu-abu m2 85,000 95,000
7 HEXAGONAL Abu-abu m2 90,000 105,000
Merah/hitam m2 85,000 95,000
8 CASTLE Abu-abu m2 90,000 105,000
9 TRAPEZ Abu-abu m2 85,000 95,000
10 TRAPEZ GRASS BLOCK
Abu-abu m2 85,000 95,000
11 STANDARD GRASS BLOCK ABU-ABU BH 7,500 8,500
12 BATACO BH 4,100 5,500
13 KANSTEEN m' 27,000 32,500
HARGA
NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET
(Rp) (Rp)
XVII. L A I N - L A I N
1 KREI 25 MM m2 45,000 60,000
2 Sliding Pintu J4 bh 200,000 235,000
3 Naco per Daun bh 40,000 42,000
4 Rolling door Besi m2 325,000 335,000
Rolling door Almunium m2 275,000 290,000
5 Awning Almunium m2 225,000 250,000
6 Kusen Almunium 4" Putih m' 95,000 100,000
7 WIDE FLANGE BEAM
150 X 75 X 5 X 7 X 12 btg 1,425,000 1,545,600
8 ASPAL.
Aspal Ex Pertamina isi Net 160 kg drum 950,000 1,100,000
9 KACA
Cermin tebal 5 mm m2 275,000 325,000
6 A.3.2.1.6 Pemasangan Pondasi Batu Belah 1SP : 1KP : 2PP m3 872,740.00 1,016,262.50
Pemasangan Pondasi Batu Belah, 1 SP : 3 KP : 10
7 A.3.2.1.7 m3 956,747.00 1,113,403.50
PP
Pemasangan Pondasi Batu Belah, ¼ SP : 1KP : 4
8 A.3.2.1.8 m3 936,738.00 1,094,164.50
PP
9 A.3.2.1.9 Pemasang Batu Kosong/Anstamping m3 592,020.00 726,874.50
24 A.4.1.1.28 Membuat Ring Balok Beton Bertulang (11 x 11) cm m' 92,455.00 102,817.00
25 A.4.1.1.29 Membuat Ring Balok Beton Bertulang (10 x 15) cm m' 120,268.50 133,848.00
29 A.4.4.3.63 Pemasangan Plint Kayu Klas II Ukuran 2x10 cm m' 62,931.00 67,177.00
8 A.4.7.1.8 Pelaburan Bidang Kayu dg Cat Residu & Ter m2 13,563.00 14,906.38
7 A.5.1.1.8 Memasang Bak Mandi Batu Bata Vol. 0,30 m3 Unit 1,810,919.27 1,974,643.54
9 A.5.1.1.12 Pemasangan Bak Cuci Piring Stainless stell buah 357,280.00 399,987.50
6 A.3.2.1.6 Pemasangan Pondasi Batu Belah 1SP : 1KP : 2PP m3 872,740.00 1,016,262.50
Pemasangan Pondasi Batu Belah, 1 SP : 3 KP : 10
7 A.3.2.1.7 m3 956,747.00 1,113,403.50
PP
Pemasangan Pondasi Batu Belah, ¼ SP : 1KP : 4
8 A.3.2.1.8 m3 936,738.00 1,094,164.50
PP
9 A.3.2.1.9 Pemasang Batu Kosong/Anstamping m3 592,020.00 726,874.50
24 A.4.1.1.28 Membuat Ring Balok Beton Bertulang (11 x 11) cm m' 92,455.00 102,817.00
25 A.4.1.1.29 Membuat Ring Balok Beton Bertulang (10 x 15) cm m' 120,268.50 133,848.00
22 A.4.1.2.22 Upah Pekerjaan Gruot pada Joint Beton Pra Cetak ttk 71,186.50 76,648.00
8 A.4.7.1.8 Pelaburan Bidang Kayu dg Cat Residu & Ter m2 13,563.00 14,906.38
7 A.5.1.1.8 Memasang Bak Mandi Batu Bata Vol. 0,30 m3 Unit 1,810,919.27 1,974,643.54
9 A.5.1.1.12 Pemasangan Bak Cuci Piring Stainless stell buah 357,280.00 399,987.50
10 A.5.1.1.14 Pemasangan Floor Drain buah 56,760.00 66,412.50
C PERALATAN
D Jumlah A + B + C 172,050.00 198,925.00
E Overhead & Profit (contah 10%) 10% 17,205.00 19,892.50
F Harga Satuan Pekerjaan (D+E) 189,255.00 218,817.50
6 A.3.2.1.6 1 m3 Pemasangan Pondasi Batu Belah 1SP : 1KP : 2PP 872,740.00 1,016,262.50
A Tenaga 279,000.00 303,375.00
L.01 1.5 OH Pekerja 105,000.00 115,000.00 157,500.00 172,500.00
L.02 0.750 OH Tukang Batu 135,000.00 145,000.00 101,250.00 108,750.00
L.03 0.075 OH Kepala Tukang 140,000.00 150,000.00 10,500.00 11,250.00
L.04 0.075 OH Mandor 130,000.00 145,000.00 9,750.00 10,875.00
B Bahan 514,400.00 620,500.00
1.2 m3 Batu Belah 15/20 270,000.00 340,000.00 324,000.00 408,000.00
0.17 m3 Kapur Pasang (KP) 300,000.00 310,000.00 51,000.00 52,700.00
0.17 Kg Semen Merah (SM) 200,000.00 200,000.00 34,000.00 34,000.00
0.340 m3 Pasir Pasang 310,000.00 370,000.00 105,400.00 125,800.00
C PERALATAN
D Jumlah A + B + C 793,400.00 923,875.00
E Overhead & Profit (contoh 10%) 10% 79,340.00 92,387.50
F Harga Satuan Pekerjaan (D+E) 872,740.00 1,016,262.50
24 A.4.1.1.28 1 m' Membuat Ring Balok Beton Bertulang (11 x 11) cm 92,455.00 102,817.00
A Tenaga 28,810.00 31,405.00
L.01 0.180 OH Pekerja 105,000.00 115,000.00 18,900.00 20,700.00
L.02 0.020 OH Tukang batu 135,000.00 145,000.00 2,700.00 2,900.00
L.02 0.020 OH Tukang Kayu 135,000.00 145,000.00 2,700.00 2,900.00
L.02 0.020 OH Tukang Besi 125,000.00 135,000.00 2,500.00 2,700.00
L.03 0.006 OH Kepala Tukang 140,000.00 150,000.00 840.00 900.00
L.04 0.009 OH Mandor 130,000.00 145,000.00 1,170.00 1,305.00
B Bahan 55,240.00 62,065.00
0.002 m3 Kayu Klas III 3,290,000.00 3,300,000.00 6,580.00 6,600.00
0.01 Kg Paku Biasa 2" - 5" 17,000.00 17,500.00 170.00 175.00
3.0 Kg Besi Beton Polos 10,200.00 12,000.00 30,600.00 36,000.00
0.45 Kg Kawat Beton 19,000.00 20,000.00 8,550.00 9,000.00
4.0 Kg Portland Semen 1,150.00 1,200.00 4,600.00 4,800.00
0.006 m3 Pasir Beton 340,000.00 375,000.00 2,040.00 2,250.00
0.009 m3 Kerikil 300,000.00 360,000.00 2,700.00 3,240.00
C PERALATAN
D Jumlah A + B + C 84,050.00 93,470.00
E Overhead & Profit (contoh 10%) 10% 8,405.00 9,347.00
F Harga Satuan Pekerjaan (D+E) 92,455.00 102,817.00
25 A.4.1.1.29 1 m' Membuat Ring Balok Beton Bertulang (10 x 15) cm 120,268.50 133,848.00
A Tenaga 47,570.00 51,855.00
L.01 0.297 OH Pekerja 105,000.00 115,000.00 31,185.00 34,155.00
L.02 0.033 OH Tukang batu 135,000.00 145,000.00 4,455.00 4,785.00
L.02 0.033 OH Tukang Kayu 135,000.00 145,000.00 4,455.00 4,785.00
L.02 0.033 OH Tukang Besi 125,000.00 135,000.00 4,125.00 4,455.00
L.03 0.01 OH Kepala Tukang 140,000.00 150,000.00 1,400.00 1,500.00
L.04 0.015 OH Mandor 130,000.00 145,000.00 1,950.00 2,175.00
B Bahan 61,765.00 69,825.00
0.003 m3 Kayu Klas III 3,290,000.00 3,300,000.00 9,870.00 9,900.00
0.02 Kg Paku Biasa 2" - 5" 17,000.00 17,500.00 340.00 350.00
3.6 Kg Besi Beton Polos 10,200.00 12,000.00 36,720.00 43,200.00
0.05 Kg Kawat Beton 19,000.00 20,000.00 950.00 1,000.00
5.5 Kg Portland Semen 1,150.00 1,200.00 6,325.00 6,600.00
0.009 m3 Pasir Beton 340,000.00 375,000.00 3,060.00 3,375.00
0.015 m3 Kerikil 300,000.00 360,000.00 4,500.00 5,400.00
C PERALATAN
D Jumlah A + B + C 109,335.00 121,680.00
E Overhead & Profit (contoh 10%) 10% 10,933.50 12,168.00
F Harga Satuan Pekerjaan (D+E) 120,268.50 133,848.00
11 A.4.1.2.11 1 m3 Penuangan / Menebar Beton untuk Komponen Plat Pracetak 78,309.00 76,985.00
12 A.4.1.2.12 1 m3 Penuangan / Menebar Beton untuk Komponen Plat Pracetak 80,536.50 79,170.00
1 1.0000 13 1.114
2 1.0000 14 1.134
3 1.0000 15 1.155
4 1.0000 16 1.176
5 1.0000 17 1.197
6 1.0000 18 1.219
7 1.0000 19 1.241
8 1.0180 20 1.264
9 1.0370 21 1.287
10 1.0550 22 1.310
11 1.0750 23 1.334
12 1.0940 24 1.358
2 1.0000 14 1.080
3 1.0000 15 1.092
4 1.0000 16 1.104
5 1.0000 17 1.116
6 1.0000 18 1.129
7 1.0000 19 1.141
8 1.0110 20 1.154
9 1.0220 21 1.166
10 1.0340 22 1.179
11 1.0450 23 1.192
12 1.0570 24 1.206
1 1.0000 13 1.162
2 1.0000 14 1.191
3 1.0000 15 1.221
4 1.0000 16 1.252
5 1.0000 17 1.284
6 1.0000 18 1.318
7 1.0000 19 1.350
8 1.0250 20 1.384
9 1.0510 21 1.419
10 1.0780 22 1.455
11 1.1050 23 1.492
12 1.1330 24 1.530
22 A.4.1.2.22 1 ttk Upah Pekerjaan Gruot pada Joint Beton Pra Cetak 71,186.50 76,648.00
A Tenaga 64,715.00 69,680.00
L.02 0.367 OH Tukang Batu 135,000.000 145,000.000 49,545.000 53,215.000
L.03 0.074 OH Kepala Tukang 140,000.000 150,000.000 10,360.000 11,100.000
L.04 0.037 OH Mandor 130,000.000 145,000.000 4,810.000 5,365.000
B Bahan - -
C PERALATAN - -
D Jumlah A + B + C 64,715.00 69,680.00
E Overhead & Profit (contoh 10%) 10% 6,471.50 6,968.00
F Harga Satuan Pekerjaan (D+E) 71,186.50 76,648.00
C PERALATAN - -
D Jumlah A + B + C 57,200.00 61,985.00
E Overhead & Profit (contoh 10%) 10% 5,720.00 6,198.50
F Harga Satuan Pekerjaan (D+E) 62,920.00 68,183.50
16 A.4.4.1.16 1 m2 Pemasangan Dinding HB/CB 20, speci camp. 1SP : 3PP 412,328.40 471,997.90
A Tenaga 61,440.00 66,860.00
L.01 0.350 OH Pekerja 105,000.00 115,000.00 36,750.00 40,250.00
L.02 0.150 OH Tukang Batu 135,000.00 145,000.00 20,250.00 21,750.00
L.03 0.015 OH Kepala Tukang 140,000.00 150,000.00 2,100.00 2,250.00
L.04 0.018 OH Mandor 130,000.00 145,000.00 2,340.00 2,610.00
17 A.4.4.1.17 1 m2 Pemasangan Dinding HB/CB 20, speci camp. 1SP : 4PP 419,666.50 481,906.70
A Tenaga 61,440.00 66,860.00
L.01 0.350 OH Pekerja 105,000.00 115,000.00 36,750.00 40,250.00
L.02 0.150 OH Tukang Batu 135,000.00 145,000.00 20,250.00 21,750.00
L.03 0.015 OH Kepala Tukang 140,000.00 150,000.00 2,100.00 2,250.00
L.04 0.018 OH Mandor 130,000.00 145,000.00 2,340.00 2,610.00
18 A.4.4.1.18 1 m2 Pemasangan Dinding HB/CB 15, speci camp. 1SP : 3PP 326,498.70 372,589.80
A Tenaga 53,560.00 58,320.00
L.01 0.320 OH Pekerja 105,000.00 115,000.00 33,600.00 36,800.00
L.02 0.120 OH Tukang Batu 135,000.00 145,000.00 16,200.00 17,400.00
L.03 0.012 OH Kepala Tukang 140,000.00 150,000.00 1,680.00 1,800.00
L.04 0.016 OH Mandor 130,000.00 145,000.00 2,080.00 2,320.00
B Bahan 243,257.00 280,398.00
12.500 buah Batako 3,500.00 3,700.00 43,750.00 46,250.00
22.740 kg PC 1,150.00 1,200.00 26,151.00 27,288.00
0.550 m3 Pasir Pasang 310,000.00 370,000.00 170,500.00 203,500.00
0.280 kg Besi Angkur Ø 8 mm 10,200.00 12,000.00 2,856.00 3,360.00
C PERALATAN
D Jumlah A + B + C 296,817.00 338,718.00
E Overhead & Profit (contoh 10%) 10% 29,681.70 33,871.80
F Harga Satuan Pekerjaan (D+E) 326,498.70 372,589.80
19 A.4.4.1.19 1 m2 Pemasangan Dinding HB/CB 15, speci camp. 1SP : 4PP 331,667.60 379,621.00
A Tenaga 53,560.00 58,320.00
L.01 0.320 OH Pekerja 105,000.00 115,000.00 33,600.00 36,800.00
L.02 0.120 OH Tukang Batu 135,000.00 145,000.00 16,200.00 17,400.00
L.03 0.012 OH Kepala Tukang 140,000.00 150,000.00 1,680.00 1,800.00
L.04 0.016 OH Mandor 130,000.00 145,000.00 2,080.00 2,320.00
B Bahan 247,956.00 286,790.00
12.500 buah Batako 3,500.00 3,700.00 43,750.00 46,250.00
18.200 kg PC 1,150.00 1,200.00 20,930.00 21,840.00
0.582 m3 Pasir Pasang 310,000.00 370,000.00 180,420.00 215,340.00
0.280 kg Besi Angkur Ø 8 mm 10,200.00 12,000.00 2,856.00 3,360.00
C PERALATAN
D Jumlah A + B + C 301,516.00 345,110.00
E Overhead & Profit (contoh 10%) 10% 30,151.60 34,511.00
F Harga Satuan Pekerjaan (D+E) 331,667.60 379,621.00
20 A.4.4.1.20 1 m2 Pemasangan Dinding HB/CB 10, speci camp. 1SP : 3PP 256,003.00 305,422.70
A Tenaga 48,350.00 52,675.00
L.01 0.300 OH Pekerja 105,000.00 115,000.00 31,500.00 34,500.00
L.02 0.100 OH Tukang Batu 135,000.00 145,000.00 13,500.00 14,500.00
L.03 0.010 OH Kepala Tukang 140,000.00 150,000.00 1,400.00 1,500.00
L.04 0.015 OH Mandor 130,000.00 145,000.00 1,950.00 2,175.00
21 A.4.4.1.21 1 m2 Pemasangan Dinding HB/CB 10, speci camp. 1SP : 4PP 260,354.05 311,191.10
A Tenaga 48,350.00 52,675.00
L.01 0.300 OH Pekerja 105,000.00 115,000.00 31,500.00 34,500.00
L.02 0.100 OH Tukang Batu 135,000.00 145,000.00 13,500.00 14,500.00
L.03 0.010 OH Kepala Tukang 140,000.00 150,000.00 1,400.00 1,500.00
L.04 0.015 OH Mandor 130,000.00 145,000.00 1,950.00 2,175.00
C PERALATAN
D Jumlah A + B + C 318,211.40 341,170.05
E Overhead & Profit (contoh 10%) 10% 31,821.14 34,117.01
F Harga Satuan Pekerjaan (D+E) 350,032.54 375,287.06
C PERALATAN
D Jumlah A + B + C 317,578.40 338,726.55
E Overhead & Profit (contoh 10%) 10% 31,757.84 33,872.66
F Harga Satuan Pekerjaan (D+E) 349,336.24 372,599.21
22 A.4.4.2.22 1 m' Pemasangan Plesteran Traso 1Pc : 2Traso, lebar 10 mm 121,368.50 131,626.00
26 A.4.4.3.58 1 m2 Pemasangan Dinding Batu Paros / Batu Tempel Hitam 321,268.75 354,887.50
C PERALATAN
D Jumlah A + B + C 150,359.00 161,870.00
E Overhead & Profit (contoh 10%) 10% 15,035.90 16,187.00
F Harga Satuan Pekerjaan (D+E) 165,394.90 178,057.00
29 A.4.4.3.63 1 m' Pemasangan Plint Kayu Klas II Ukuran 2x10 cm 62,931.00 67,177.00
Tenaga 31,260.00 33,870.00
L.01 0.12 OH Pekerja 105,000.00 115,000.00 12,600.00 13,800.00
L.02 0.12 OH Tukang Batu 135,000.00 145,000.00 16,200.00 17,400.00
L.03 0.012 OH Kepala Tukang 140,000.00 150,000.00 1,680.00 1,800.00
L.04 0.006 OH Mandor 130,000.00 145,000.00 780.00 870.00
Bahan 25,950.00 27,200.00
0.003 m3 Papan Kayu Klas II 8,400,000.00 8,800,000.00 25,200.00 26,400.00
0.05 kg Paku Sekrup 5 cm 15,000.00 16,000.00 750.00 800.00
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
C PERALATAN
D Jumlah A + B + C 57,210.00 61,070.00
E Overhead & Profit (contoh 10%) 10% 5,721.00 6,107.00
F Harga Satuan Pekerjaan (D+E) 62,931.00 67,177.00
C PERALATAN
D Jumlah A + B + C 73,140.00 80,260.00
E Overhead & Profit (contoh 10%) 10% 7,314.00 8,026.00
F Harga Satuan Pekerjaan (D+E) 80,454.00 88,286.00
C PERALATAN
D Jumlah A + B + C 63,625.00 69,170.00
E Overhead & Profit (contoh 10%) 10% 6,362.50 6,917.00
F Harga Satuan Pekerjaan (D+E) 69,987.50 76,087.00
8 A.4.7.1.8 1 m2 Pelaburan Bidang Kayu dg Cat Residu & Ter 13,563.00 14,906.38
A Tenaga 11,280.00 12,370.00
L.01 0.1 OH Pekerja 105,000.00 115,000.00 10,500.00 11,500.00
L.04 0.006 OH Mandor 130,000.00 145,000.00 780.00 870.00
B Bahan 1,050.00 1,181.25
0.35 Ltr Residu atau Ter 3,000.00 3,375.00 1,050.00 1,181.25
C PERALATAN
D Jumlah A + B + C 12,330.00 13,551.25
E Overhead & Profit (contoh 10%) 10% 1,233.00 1,355.13
F Harga Satuan Pekerjaan (D+E) 13,563.00 14,906.38
C PERALATAN
D Jumlah A + B + C 85,225.00 95,662.50
E Overhead & Profit (contoh 10%) 10% 8,522.50 9,566.25
F Harga Satuan Pekerjaan (D+E) 93,747.50 105,228.75
7 A.5.1.1.8 1 Unit Memasang Bak Mandi Batu Bata Vol. 0,30 m3 1,810,919.27 1,974,643.54
A Tenaga 1,080,900.00 1,174,350.00
L.01 6.00 OH Pekerja 105,000.00 115,000.00 630,000.00 690,000.00
L.02 3.00 OH Tukang Batu 135,000.00 145,000.00 405,000.00 435,000.00
L.03 0.30 OH Kepala Tukang 140,000.00 150,000.00 42,000.00 45,000.00
L.04 0.03 OH Mandor 130,000.00 145,000.00 3,900.00 4,350.00
B Bahan 565,390.24 620,780.49
150.0 bh Batu Bata 520.00 580.00 78,000.00 87,000.00
120 Kg Portland Semen 0.11 1,150.00 1,200.00 138,000.00 144,000.00
0.3 m3 Pasir Pasang 0.0121 310,000.00 370,000.00 93,000.00 111,000.00
360 buah Porselen 11 x 11 cm 82.6446 512.20 524.39 184,390.24 188,780.49
6 Kg Semen Nat 12,000.00 15,000.00 72,000.00 90,000.00
C PERALATAN
D Jumlah A + B + C 1,646,290.24 1,795,130.49
E Overhead & Profit (contoh 10%) 10% 164,629.02 179,513.05
F Harga Satuan Pekerjaan (D+E) 1,810,919.27 1,974,643.54
9 A.5.1.1.12 1 buah Pemasangan Bak Cuci Piring Stainless stell 357,280.00 399,987.50
A Tenaga 49,800.00 53,625.00
L.01 0.030 OH Pekerja 105,000.00 115,000.00 3,150.00 3,450.00
L.02 0.300 OH Tukang Batu 135,000.00 145,000.00 40,500.00 43,500.00
L.03 0.030 OH Kepala Tukang 140,000.00 150,000.00 4,200.00 4,500.00
L.04 0.015 OH Mandor 130,000.00 145,000.00 1,950.00 2,175.00
B Bahan 275,000.00 310,000.00
1 unit Bak Cuci Piring 225,000.00 250,000.00 225,000.00 250,000.00
1 bh Water drain 50,000.00 60,000.00 50,000.00 60,000.00
C PERALATAN
D Jumlah A + B + C 324,800.00 363,625.00
E Overhead & Profit (contoh 10%) 10% 32,480.00 36,362.50
F Harga Satuan Pekerjaan (D+E) 357,280.00 399,987.50
C PERALATAN
D Jumlah A + B + C 51,600.00 60,375.00
E Overhead & Profit (contoh 10%) 10% 5,160.00 6,037.50
F Harga Satuan Pekerjaan (D+E) 56,760.00 66,412.50
28 A.5.1.1.33 1 m' Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 20 85,481.00 94,204.00
cm
A Tenaga 14,880.00 16,180.00
L.01 0.080 OH Pekerja 105,000.00 115,000.00 8,400.00 9,200.00
L.02 0.040 OH Tukang Batu 135,000.00 145,000.00 5,400.00 5,800.00
L.03 0.004 OH Kepala Tukang 140,000.00 150,000.00 560.00 600.00
L.04 0.004 OH Mandor 130,000.00 145,000.00 520.00 580.00
B Bahan 62,830.00 69,460.00
1.60 bh pipa tanah 10,000.00 12,000.00 16,000.00 19,200.00
35.00 kg Semen Portlan 1,150.00 1,200.00 40,250.00 42,000.00
0.014 m3 Pasir Pasang 310,000.00 370,000.00 4,340.00 5,180.00
0.014 m3 Pasir Urug 160,000.00 220,000.00 2,240.00 3,080.00
- -
C PERALATAN
D Jumlah A + B + C 374,800.00 392,280.00
E Overhead & Profit (contoh 10%) 10% 37,480.00 39,228.00
F Harga Satuan Pekerjaan (D+E) 412,280.00 431,508.00
Overhead & Profit (contoh 10%)
2 A.8.4.6.2 1 buah Pemasangan MCB 505,340.00 536,448.00
A Tenaga 229,700.00 243,840.00